The document outlines the steps involved in processing a water permit application at a provincial irrigation office. It involves 11 steps from submitting the application form and documents, to inspections of the site, endorsements to other agencies, posting a notice, paying fees, and waiting for the approved permit from the National Water Resources Board. The process is available Monday to Friday from 8:00 AM to 5:00 PM and requires an accomplished application form, certificate of incorporation if the applicant is an association or corporation, and a project description.
The document outlines 13 steps for processing a water permit application at provincial irrigation offices in the Philippines. It involves submitting an application, documents being reviewed for completeness, conducting an inspection of the site, accomplishing a technical report, endorsing the request to other agencies for clearance, posting a notice, advising the client once the posting period is over to pay fees, forwarding documents and payment to the National Water Resources Board, and waiting for the approved water permit. The process aims to provide frontline service for water permit applications and is available Monday to Friday from 8:00 AM to 5:00 PM.
This document provides a curriculum vitae for Sello Godfrey Matshweu, a Safety Officer. It includes personal details, education qualifications, computer skills, and work experience from November 2016 to March 2002 working on various mining and construction projects as a Safety Officer and Senior Safety Officer. Responsibilities in these roles included ensuring compliance with safety standards and legislation, conducting investigations and audits, coordinating training and meetings, and reporting on safety performance.
If you are interested in this job, please submit your candidacy through www.oagprofile.com
As per client's requests, only candidates who are signed up on platform will be considered.
B. Roberts is a British senior integrity consultant with over 40 years of experience in inspection engineering. He has worked extensively offshore and onshore, managing inspection teams and providing technical leadership. His areas of expertise include inspection of offshore and onshore facilities for oil and gas companies, implementing risk-based inspection programs, and developing integrity management strategies. He holds multiple engineering qualifications and inspector certifications.
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129James Zhang (Chi, Zhang)
This monthly report summarizes construction progress for the Valeo Engine Cooling (Foshan) Production Building Relocation and Refurbishment Project in November 2014. Key points include: construction is ongoing in parallel across areas with some structures and foundations completed; permitting challenges are being addressed; the schedule targets furnace testing by mid-December and overall completion by late January 2015; and risks around permitting and schedule are being mitigated. Photos document current site conditions and work progress.
This document contains personal and employment information for Sompol Kaewsanun. It lists his name, contact details, education history which includes a degree in electronics and computer engineering, and work experience including current roles as a maintenance and inspection planner for SPIE Oil & Gas Services and previous roles in inventory management, procurement, and field service for oil and gas companies. It provides descriptions of his responsibilities in each role.
Eod enterprise operation dept process flow PEZAPamelaCueco1
The document outlines the application processes for import permits, export declarations, and farm-in/farm-out transactions with the Philippine Economic Zone Authority (PEZA). For import permits, enterprises submit an application form along with required documents and pay a fee based on shipment value. For export declarations, enterprises submit a form and documents for approval within 20 minutes with no fee. The farm-in and farm-out processes both involve submitting an application form and documents for evaluation and approval, followed by inspection and releasing/receiving the shipment.
Pq doc ptop design-supervision consultants final 280414ali alajji
“CONSULTANCY SERVICES FOR WATER SUPPLY AND SANITATION PROJECTS
IN PROVINCIAL TOWNS (PTOP)
- PREPARATION OF CONCEPTUAL STUDIES, PRELIMINARY AND DETAILED
ENGINEERING DESIGNS,
TENDER DOCUMENTS AND CONSTRUCTION SUPERVISION-” APRIL 2014
The document outlines 13 steps for processing a water permit application at provincial irrigation offices in the Philippines. It involves submitting an application, documents being reviewed for completeness, conducting an inspection of the site, accomplishing a technical report, endorsing the request to other agencies for clearance, posting a notice, advising the client once the posting period is over to pay fees, forwarding documents and payment to the National Water Resources Board, and waiting for the approved water permit. The process aims to provide frontline service for water permit applications and is available Monday to Friday from 8:00 AM to 5:00 PM.
This document provides a curriculum vitae for Sello Godfrey Matshweu, a Safety Officer. It includes personal details, education qualifications, computer skills, and work experience from November 2016 to March 2002 working on various mining and construction projects as a Safety Officer and Senior Safety Officer. Responsibilities in these roles included ensuring compliance with safety standards and legislation, conducting investigations and audits, coordinating training and meetings, and reporting on safety performance.
If you are interested in this job, please submit your candidacy through www.oagprofile.com
As per client's requests, only candidates who are signed up on platform will be considered.
B. Roberts is a British senior integrity consultant with over 40 years of experience in inspection engineering. He has worked extensively offshore and onshore, managing inspection teams and providing technical leadership. His areas of expertise include inspection of offshore and onshore facilities for oil and gas companies, implementing risk-based inspection programs, and developing integrity management strategies. He holds multiple engineering qualifications and inspector certifications.
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129James Zhang (Chi, Zhang)
This monthly report summarizes construction progress for the Valeo Engine Cooling (Foshan) Production Building Relocation and Refurbishment Project in November 2014. Key points include: construction is ongoing in parallel across areas with some structures and foundations completed; permitting challenges are being addressed; the schedule targets furnace testing by mid-December and overall completion by late January 2015; and risks around permitting and schedule are being mitigated. Photos document current site conditions and work progress.
This document contains personal and employment information for Sompol Kaewsanun. It lists his name, contact details, education history which includes a degree in electronics and computer engineering, and work experience including current roles as a maintenance and inspection planner for SPIE Oil & Gas Services and previous roles in inventory management, procurement, and field service for oil and gas companies. It provides descriptions of his responsibilities in each role.
Eod enterprise operation dept process flow PEZAPamelaCueco1
The document outlines the application processes for import permits, export declarations, and farm-in/farm-out transactions with the Philippine Economic Zone Authority (PEZA). For import permits, enterprises submit an application form along with required documents and pay a fee based on shipment value. For export declarations, enterprises submit a form and documents for approval within 20 minutes with no fee. The farm-in and farm-out processes both involve submitting an application form and documents for evaluation and approval, followed by inspection and releasing/receiving the shipment.
Pq doc ptop design-supervision consultants final 280414ali alajji
“CONSULTANCY SERVICES FOR WATER SUPPLY AND SANITATION PROJECTS
IN PROVINCIAL TOWNS (PTOP)
- PREPARATION OF CONCEPTUAL STUDIES, PRELIMINARY AND DETAILED
ENGINEERING DESIGNS,
TENDER DOCUMENTS AND CONSTRUCTION SUPERVISION-” APRIL 2014
This document outlines the online application process for layout and building plans in Tamil Nadu. It has 3 main stages: 1) online submission by the applicant, 2) processing by the local planning authority, and 3) processing by the Directorate of Town and Country Planning head office. It also provides details on specifying location details like survey number and local body in the application.
Permission & Clearance for Real Estate Projects in Haryana Pritam Santra
The document discusses the approval process required for real estate projects in Haryana, India. It outlines the various approvals like land conversion, building plan approval, environmental clearance, and occupation certificate that must be obtained from authorities like the Department of Town and Country Planning. The approval process can take 4-5 years to complete due to factors like lengthy environmental clearance procedures and delays in approvals from agencies like the Airports Authority of India. Streamlining processes like introducing single window clearances could help reduce approval timelines.
The audit report summarizes the results of a compliance audit of Kabasalan Agricultural Training and Assessment Center Inc.'s Heavy Equipment Operation program. The audit found that while most equipment, tools, facilities and documents were in order, the designated trainer had resigned shortly before the audit. Therefore, the program was found to be non-compliant overall due to the lack of a qualified trainer at the time of audit.
HAAD PART A ((notes)) VfFINAL 1101202023.pptxengmo1234
This document outlines the 5 steps for health facility approval and licensing in HAAD:
1. Registration - Involves submitting basic facility details for approval in principle.
2. Schematic submission - Architectural plans and compliance documents are reviewed.
3. Detailed submission - Full engineering drawings and specifications are submitted.
4. 90% inspection - Progress report on outstanding issues is reviewed before inspection.
5. 100% inspection - Final inspection verifies all issues are resolved before licensing.
Engineering plant facilities 12 mechanics building preventive maintenance and...Luis Cabrera
The document discusses facilities management and maintenance. It defines facilities management as maintaining commercial, institutional and manufacturing buildings. It outlines the benefits of outsourcing facilities management such as a healthy, safe and clean environment. It also describes various roles in facilities management including engineers, technicians and management. Standard procedures for work orders, preventative maintenance and inspections are also outlined.
WASA New Services Building Development processJeffrey James
The building development process for applicants of WASA includes several key steps:
1. Applicants first submit an application with required documents and pay a non-refundable fee. WASA then issues a reference number.
2. WASA conducts water and wastewater feasibility assessments and issues an Outline Approval or letter indicating reasons for denial.
3. Applicants submit design plans and pay a fee, receiving a Design Approval once designs meet requirements or a Defects Letter specifying issues.
4. Applicants install infrastructure per approved designs and submit to inspections, pressure testing, and meter inspection. Once passing, WASA records account information.
5. Applicants pay
Optimum Utilization and Managing The Supply of Bulk Nitrogen Contract - Revis...Sujeeshkraj
The document proposes implementing an eBEAMS workflow for managing bulk nitrogen requests at East Kuwait operations. Key aspects of the proposed workflow include:
- Creating service requests in eBEAMS that are automatically sent to contractors.
- Tracking requests from initiation to approval, completion, revision, extension or cancellation.
- Automatically generating service orders and invoices to avoid delays and optimize nitrogen contract utilization.
- Notifying relevant parties via email at different stages and providing reports for improved tracking of requests and expenses.
The workflow aims to enhance process efficiency, timeliness and utilization through electronic request management between user teams and contractors.
This document outlines the details of the Cold Store Project Scheme, including its objectives, eligible project components, timeline for completion, documents required for the release of funds, statutory permissions needed, common deficiencies in grant requisition documents, and expectations of project promoters. The key objectives of the scheme are to provide integrated cold chain infrastructure from farm to consumer and establish value addition facilities for agriculture and dairy products.
This document outlines various frontline services provided by municipal, provincial, and regional MILG offices. The services include requests for certification, indorsement, legal opinions, processing of benefits, and more. For each service, the document lists the procedures, time required, responsible personnel, and requirements. Most services can be completed within 5-15 minutes and involve receiving documents, verification, preparation of certifications or indorsements, and issuance of output documents.
Wasa new services plumbing inspectorate processJeffrey James
The document outlines the plumbing inspectorate process for licensed sanitary constructors in Trinidad and Tobago. It involves several key steps: 1) Application submission with required documents; 2) Design review and approval or defect identification by inspectors; 3) Roughin and final inspections to check conformity with codes; 4) Testing of plumbing systems; 5) Obtaining a completion certificate once inspections are passed. Re-inspection fees apply if initial inspections or tests fail to meet code standards.
Order to Cash Project ( Time to Invoice), TTI for a leading oil and gas company based in Libya. Diagnostics, current state presentation, used to drive the workshop, to drive team toward
solution.
This document outlines the procedures for applying for admission tests and enrolling at a university. It details the steps a student must take which include obtaining an application form, submitting requirements, paying fees, taking admission tests, and undergoing an interview. It also provides information on the registration process, requirements for new and returning students, and procedures for obtaining transcripts and clearances. The various offices and personnel involved at each step are specified along with the typical duration of each transaction.
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA sunil seth kakkad
Conceptualization OF SRA SCHEME MUMBAI INDIA
Due Diliegence
Development Approval
Design Studio
Engineering and Development
Project Development
Project Funding
Project Marketing
Occupier support
SUNIL SETH KAKKAD
INDIA MAHARASHTRA MUMBAI
09820614117
sethkakkad@gmail.com
New York City Department of Buildings Filing rep course_103Safe Rise
This document provides an overview of the 2014 New York City Energy Conservation Code (NYCECC). It discusses the applicability of the code to new building and alteration applications as of January 1, 2015. It outlines the various compliance requirements including using tabular analysis, REScheck, COMcheck, or energy modeling. It distinguishes between residential and commercial buildings based on the code's definitions. It also mentions two rules and three bulletins that provide additional guidance on qualifications for energy code agencies and inspectors.
This document provides information about various options for responding to a final rejection from the USPTO, including the After Final Consideration Pilot Program (AFCP), Pre-Appeal Brief Review, and the new Post-Prosecution Pilot (P3). The AFCP allows filing a response with a non-broadening amendment without an RCE fee. Pre-Appeal Brief Review involves filing a notice of appeal and brief for panel review. P3 allows filing arguments and an optional amendment for panel consideration without an RCE. The document compares the options and provides guidance on which to select based on the examiner's position and whether an appeal is ready to be filed.
This document provides an overview and objectives of the DTCP Online Application Processing System. The system aims to provide online application processing for layout and building plans to streamline coordination between offices and increase productivity. Key benefits include applicants and offices being able to track application status online anytime. It outlines the administration roles and stages of online application processing, including online submission by applicants, processing by local authorities, and final processing by the DTCP Head Office.
TCC is working on emergency repair works at several locations for ANTARA including MARBELLA-114, MONACO-38, and CAPRI STREET-44. The upcoming Eid holiday may cause delays to the project timeline. TCC must prepare documentation like a method statement, materials list, and investigation schedule. They have completed works at some locations and are 50% complete at others, addressing issues like water leaks, duct sealing, and flooring repairs.
The document outlines the workflow processes for various employee requests at NORTHRAIL, including certificates of employment, leave without pay, service records, and leave monetization. The processes generally involve an employee submitting a request letter, the human resources unit reviewing records and validating the request over 1-2 days, and approvals by supervisors and the president before the request is granted and released to the employee. A separate section details the 8-step procedure for filing complaints against NORTHRAIL officers, employees, or services, which involves submitting a written complaint, reviews by supervisors, responses, and opportunities for reconsideration over a period of 30-90 days before a final order is issued and implemented.
The document provides a progress report on registering beneficiaries under the Artificial Limbs Manufacturing Corporation of India's (ALIMCO) aid scheme through Common Service Centres (CSCs). It summarizes that 1881 applications were received, 927 were accepted, 46 are pending verification, and 908 were rejected. Most rejections were due to invalid income certificates. It also outlines the multi-step registration and verification process, including capturing applicants' information at CSCs, reviewing documents, sending SMS updates, and next steps to conduct pre-assessment camps for accepted applicants. In conclusion, it addresses some operational issues encountered and the resolution of major problems, and plans to expand registration across India based on the pilot results.
Public health muncipal-engineering-department-graduate-engineer-apperntice-postsAniket Ghosh
The Government of Andhra Pradesh is inviting applications from eligible engineering graduates for 318 positions of Graduate Engineer Apprentice under the Apprentices Act of 1961. The last date to apply is April 20, 2015. Candidates with BE/BTech/AMIE degrees in civil, structural, transportation or environmental engineering from 2013 or later from government universities are eligible. Selection will be based on academic merit and as per reservation rules. The apprenticeship period will be 2 years or until regular recruitment by APPSC, whichever is earlier. Duties will include working as assistant engineers and maintaining project records.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
This document outlines the online application process for layout and building plans in Tamil Nadu. It has 3 main stages: 1) online submission by the applicant, 2) processing by the local planning authority, and 3) processing by the Directorate of Town and Country Planning head office. It also provides details on specifying location details like survey number and local body in the application.
Permission & Clearance for Real Estate Projects in Haryana Pritam Santra
The document discusses the approval process required for real estate projects in Haryana, India. It outlines the various approvals like land conversion, building plan approval, environmental clearance, and occupation certificate that must be obtained from authorities like the Department of Town and Country Planning. The approval process can take 4-5 years to complete due to factors like lengthy environmental clearance procedures and delays in approvals from agencies like the Airports Authority of India. Streamlining processes like introducing single window clearances could help reduce approval timelines.
The audit report summarizes the results of a compliance audit of Kabasalan Agricultural Training and Assessment Center Inc.'s Heavy Equipment Operation program. The audit found that while most equipment, tools, facilities and documents were in order, the designated trainer had resigned shortly before the audit. Therefore, the program was found to be non-compliant overall due to the lack of a qualified trainer at the time of audit.
HAAD PART A ((notes)) VfFINAL 1101202023.pptxengmo1234
This document outlines the 5 steps for health facility approval and licensing in HAAD:
1. Registration - Involves submitting basic facility details for approval in principle.
2. Schematic submission - Architectural plans and compliance documents are reviewed.
3. Detailed submission - Full engineering drawings and specifications are submitted.
4. 90% inspection - Progress report on outstanding issues is reviewed before inspection.
5. 100% inspection - Final inspection verifies all issues are resolved before licensing.
Engineering plant facilities 12 mechanics building preventive maintenance and...Luis Cabrera
The document discusses facilities management and maintenance. It defines facilities management as maintaining commercial, institutional and manufacturing buildings. It outlines the benefits of outsourcing facilities management such as a healthy, safe and clean environment. It also describes various roles in facilities management including engineers, technicians and management. Standard procedures for work orders, preventative maintenance and inspections are also outlined.
WASA New Services Building Development processJeffrey James
The building development process for applicants of WASA includes several key steps:
1. Applicants first submit an application with required documents and pay a non-refundable fee. WASA then issues a reference number.
2. WASA conducts water and wastewater feasibility assessments and issues an Outline Approval or letter indicating reasons for denial.
3. Applicants submit design plans and pay a fee, receiving a Design Approval once designs meet requirements or a Defects Letter specifying issues.
4. Applicants install infrastructure per approved designs and submit to inspections, pressure testing, and meter inspection. Once passing, WASA records account information.
5. Applicants pay
Optimum Utilization and Managing The Supply of Bulk Nitrogen Contract - Revis...Sujeeshkraj
The document proposes implementing an eBEAMS workflow for managing bulk nitrogen requests at East Kuwait operations. Key aspects of the proposed workflow include:
- Creating service requests in eBEAMS that are automatically sent to contractors.
- Tracking requests from initiation to approval, completion, revision, extension or cancellation.
- Automatically generating service orders and invoices to avoid delays and optimize nitrogen contract utilization.
- Notifying relevant parties via email at different stages and providing reports for improved tracking of requests and expenses.
The workflow aims to enhance process efficiency, timeliness and utilization through electronic request management between user teams and contractors.
This document outlines the details of the Cold Store Project Scheme, including its objectives, eligible project components, timeline for completion, documents required for the release of funds, statutory permissions needed, common deficiencies in grant requisition documents, and expectations of project promoters. The key objectives of the scheme are to provide integrated cold chain infrastructure from farm to consumer and establish value addition facilities for agriculture and dairy products.
This document outlines various frontline services provided by municipal, provincial, and regional MILG offices. The services include requests for certification, indorsement, legal opinions, processing of benefits, and more. For each service, the document lists the procedures, time required, responsible personnel, and requirements. Most services can be completed within 5-15 minutes and involve receiving documents, verification, preparation of certifications or indorsements, and issuance of output documents.
Wasa new services plumbing inspectorate processJeffrey James
The document outlines the plumbing inspectorate process for licensed sanitary constructors in Trinidad and Tobago. It involves several key steps: 1) Application submission with required documents; 2) Design review and approval or defect identification by inspectors; 3) Roughin and final inspections to check conformity with codes; 4) Testing of plumbing systems; 5) Obtaining a completion certificate once inspections are passed. Re-inspection fees apply if initial inspections or tests fail to meet code standards.
Order to Cash Project ( Time to Invoice), TTI for a leading oil and gas company based in Libya. Diagnostics, current state presentation, used to drive the workshop, to drive team toward
solution.
This document outlines the procedures for applying for admission tests and enrolling at a university. It details the steps a student must take which include obtaining an application form, submitting requirements, paying fees, taking admission tests, and undergoing an interview. It also provides information on the registration process, requirements for new and returning students, and procedures for obtaining transcripts and clearances. The various offices and personnel involved at each step are specified along with the typical duration of each transaction.
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA sunil seth kakkad
Conceptualization OF SRA SCHEME MUMBAI INDIA
Due Diliegence
Development Approval
Design Studio
Engineering and Development
Project Development
Project Funding
Project Marketing
Occupier support
SUNIL SETH KAKKAD
INDIA MAHARASHTRA MUMBAI
09820614117
sethkakkad@gmail.com
New York City Department of Buildings Filing rep course_103Safe Rise
This document provides an overview of the 2014 New York City Energy Conservation Code (NYCECC). It discusses the applicability of the code to new building and alteration applications as of January 1, 2015. It outlines the various compliance requirements including using tabular analysis, REScheck, COMcheck, or energy modeling. It distinguishes between residential and commercial buildings based on the code's definitions. It also mentions two rules and three bulletins that provide additional guidance on qualifications for energy code agencies and inspectors.
This document provides information about various options for responding to a final rejection from the USPTO, including the After Final Consideration Pilot Program (AFCP), Pre-Appeal Brief Review, and the new Post-Prosecution Pilot (P3). The AFCP allows filing a response with a non-broadening amendment without an RCE fee. Pre-Appeal Brief Review involves filing a notice of appeal and brief for panel review. P3 allows filing arguments and an optional amendment for panel consideration without an RCE. The document compares the options and provides guidance on which to select based on the examiner's position and whether an appeal is ready to be filed.
This document provides an overview and objectives of the DTCP Online Application Processing System. The system aims to provide online application processing for layout and building plans to streamline coordination between offices and increase productivity. Key benefits include applicants and offices being able to track application status online anytime. It outlines the administration roles and stages of online application processing, including online submission by applicants, processing by local authorities, and final processing by the DTCP Head Office.
TCC is working on emergency repair works at several locations for ANTARA including MARBELLA-114, MONACO-38, and CAPRI STREET-44. The upcoming Eid holiday may cause delays to the project timeline. TCC must prepare documentation like a method statement, materials list, and investigation schedule. They have completed works at some locations and are 50% complete at others, addressing issues like water leaks, duct sealing, and flooring repairs.
The document outlines the workflow processes for various employee requests at NORTHRAIL, including certificates of employment, leave without pay, service records, and leave monetization. The processes generally involve an employee submitting a request letter, the human resources unit reviewing records and validating the request over 1-2 days, and approvals by supervisors and the president before the request is granted and released to the employee. A separate section details the 8-step procedure for filing complaints against NORTHRAIL officers, employees, or services, which involves submitting a written complaint, reviews by supervisors, responses, and opportunities for reconsideration over a period of 30-90 days before a final order is issued and implemented.
The document provides a progress report on registering beneficiaries under the Artificial Limbs Manufacturing Corporation of India's (ALIMCO) aid scheme through Common Service Centres (CSCs). It summarizes that 1881 applications were received, 927 were accepted, 46 are pending verification, and 908 were rejected. Most rejections were due to invalid income certificates. It also outlines the multi-step registration and verification process, including capturing applicants' information at CSCs, reviewing documents, sending SMS updates, and next steps to conduct pre-assessment camps for accepted applicants. In conclusion, it addresses some operational issues encountered and the resolution of major problems, and plans to expand registration across India based on the pilot results.
Public health muncipal-engineering-department-graduate-engineer-apperntice-postsAniket Ghosh
The Government of Andhra Pradesh is inviting applications from eligible engineering graduates for 318 positions of Graduate Engineer Apprentice under the Apprentices Act of 1961. The last date to apply is April 20, 2015. Candidates with BE/BTech/AMIE degrees in civil, structural, transportation or environmental engineering from 2013 or later from government universities are eligible. Selection will be based on academic merit and as per reservation rules. The apprenticeship period will be 2 years or until regular recruitment by APPSC, whichever is earlier. Duties will include working as assistant engineers and maintaining project records.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Working with data is a challenge for many organizations. Nonprofits in particular may need to collect and analyze sensitive, incomplete, and/or biased historical data about people. In this talk, Dr. Cori Faklaris of UNC Charlotte provides an overview of current AI capabilities and weaknesses to consider when integrating current AI technologies into the data workflow. The talk is organized around three takeaways: (1) For better or sometimes worse, AI provides you with “infinite interns.” (2) Give people permission & guardrails to learn what works with these “interns” and what doesn’t. (3) Create a roadmap for adding in more AI to assist nonprofit work, along with strategies for bias mitigation.
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".Christina Parmionova
The program will expand our perspectives and appreciation for our blue planet, build new foundations for our relationship to the ocean, and ignite a wave of action toward necessary change.
UN WOD 2024 will take us on a journey of discovery through the ocean's vastness, tapping into the wisdom and expertise of global policy-makers, scientists, managers, thought leaders, and artists to awaken new depths of understanding, compassion, collaboration and commitment for the ocean and all it sustains. The program will expand our perspectives and appreciation for our blue planet, build new foundations for our relationship to the ocean, and ignite a wave of action toward necessary change.
Combined Illegal, Unregulated and Unreported (IUU) Vessel List.Christina Parmionova
The best available, up-to-date information on all fishing and related vessels that appear on the illegal, unregulated, and unreported (IUU) fishing vessel lists published by Regional Fisheries Management Organisations (RFMOs) and related organisations. The aim of the site is to improve the effectiveness of the original IUU lists as a tool for a wide variety of stakeholders to better understand and combat illegal fishing and broader fisheries crime.
To date, the following regional organisations maintain or share lists of vessels that have been found to carry out or support IUU fishing within their own or adjacent convention areas and/or species of competence:
Commission for the Conservation of Antarctic Marine Living Resources (CCAMLR)
Commission for the Conservation of Southern Bluefin Tuna (CCSBT)
General Fisheries Commission for the Mediterranean (GFCM)
Inter-American Tropical Tuna Commission (IATTC)
International Commission for the Conservation of Atlantic Tunas (ICCAT)
Indian Ocean Tuna Commission (IOTC)
Northwest Atlantic Fisheries Organisation (NAFO)
North East Atlantic Fisheries Commission (NEAFC)
North Pacific Fisheries Commission (NPFC)
South East Atlantic Fisheries Organisation (SEAFO)
South Pacific Regional Fisheries Management Organisation (SPRFMO)
Southern Indian Ocean Fisheries Agreement (SIOFA)
Western and Central Pacific Fisheries Commission (WCPFC)
The Combined IUU Fishing Vessel List merges all these sources into one list that provides a single reference point to identify whether a vessel is currently IUU listed. Vessels that have been IUU listed in the past and subsequently delisted (for example because of a change in ownership, or because the vessel is no longer in service) are also retained on the site, so that the site contains a full historic record of IUU listed fishing vessels.
Unlike the IUU lists published on individual RFMO websites, which may update vessel details infrequently or not at all, the Combined IUU Fishing Vessel List is kept up to date with the best available information regarding changes to vessel identity, flag state, ownership, location, and operations.
RFP for Reno's Community Assistance CenterThis Is Reno
Property appraisals completed in May for downtown Reno’s Community Assistance and Triage Centers (CAC) reveal that repairing the buildings to bring them back into service would cost an estimated $10.1 million—nearly four times the amount previously reported by city staff.
Jennifer Schaus and Associates hosts a complimentary webinar series on The FAR in 2024. Join the webinars on Wednesdays and Fridays at noon, eastern.
Recordings are on YouTube and the company website.
https://www.youtube.com/@jenniferschaus/videos
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOChristina Parmionova
The 2024 World Health Statistics edition reviews more than 50 health-related indicators from the Sustainable Development Goals and WHO’s Thirteenth General Programme of Work. It also highlights the findings from the Global health estimates 2021, notably the impact of the COVID-19 pandemic on life expectancy and healthy life expectancy.
1. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1
Submit duly accomplished Application Form together with
required documents
NONE
2 Receive letter-request and forward to Technical Personnel 5 minutes Office Clerk NONE
3
(Advised to call/come back after four (4) office hours for the
schedule of inspection)
Pre-assess/evaluate the completeness of submitted documents
and prepare schedule date of inspection.
(Only complete documents shall be processed)
4 hours Technical Personnel NONE
4 Provide guide/assistance during inspection Conduct inspection of site
8 hours
(depending on the location of the
site)
Technical/Survey
Personnel
NONE
5
(Advise to call after 8 office hours)
Accomplish technical data in the Water Permit Application &
Inspection Report
8 hours
Technical Personnel
NONE
6
Endorse the request to other agencies for clearance (DPWH,
LWUA, etc)
30 minutes
7
Follow-up clearance with other office/agencies and submit
same for endorsement to NWRB
NONE
8 Endorse Application together with the clearances to NWRB 30 minutes
Provincial Irrigation
Officer
NONE
9
(Wait for the completion of the 30-day post period and advise
form NIA re: Result of Publication)
Post Notice of Water Permit in the NIA Bulletin Board Technical Personnel NONE
10
Advise client of expiration of the 30-day post period
(If there is no adverse claims, client may pay the required fees)
15 minutes
Provincial Irrigation
Officer
NONE
11 Pay Water Permit Fees in Postal Money Order Form
(Please refer to the schedule
of fees and charges pursuant
to EO No.159 and NWRB Res.
No. 03-0697 dated 9 June
1997)
12 Forward documents and payment to NWRB 30 minutes
Technical
Personnel/Provincial
Irrigation Officer
NONE
13 Wait for the approved Water Permit from NWRB
END OF TRANSACTION
PROCESSING OF WATER PERMIT APPLICATION
(Frontline Service in the Provincial Irrigation Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : 1. Private Individuals
2. Juridical Persons-Associations, Corporations
WHAT ARE THE REQUIREMENTS : 1. Accomplished Water Permit Application Form
2. Certificate of Incorporation, If applicant is an Association or Corporation
3. Brief description of the project
4. List of proposed project beneficiaries
WHERE TO FILE : NIA Provincial Irrigation Offices
2. STEP APPLICANT/CLIENT SERVICE PROVIDER
DURATION OF
ACTIVITY
PERSON IN CHARGE FEES FORM
1 Request (written or verbal) for water delivery NONE
2
Receive/record the request and forward the same to
the head of office
2 minutes Receiving Clerk NONE
3
(Advise to wait in the lobby for the
approval/disapproval of the request)
Evaluate/assess request for approval or disapproval 20 minutes Irrigation Superintendent NONE
4
Receive notice of approval/disapproval and go back
to the field to receive water delivery
If approved, instruct gatekeepers to open gates;
If disapproved, inform client of the reason for the
approval
15 minutes
Irrigation Superintendent
/Water Resources Facilities
Technician
NONE
5 Acknowledge service NONE
6 Record area served 5 minutes
Water Resources Facilities
Technician
NONE Form B – 2
7
Issue certification if irrigation user refuse to
acknowledge service
5 minutes
Water Resources Facilities
Technician
NONE Form A – 1
END OF TRANSACTION
REQUEST FOR WATER DELIVERY
(Frontline Service in the Provincial Irrigation Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : Farmer – Member of an Irrigators Association
WHAT ARE THE REQUIREMENTS : Water Request
WHERE TO FILE : NIA Provincial Irrigation Office concerned
3. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1 Submit request/IA Resolution NONE
2
Receive/record the request and forward the same to the
head of office for appropriate action
5 minutes Receiving Clerk NONE
3 Guide/assist in the conduct of inspection Conduct walk – through/inspection 2 hours
Water Resources Facilities
Technician
NONE
4
(At home waiting for approval of program of work and
release of funds)
Prepare Program of Work (POW) and submit to the
Regional Office for approval and funding
3 days
Project Personnel/Irrigation
Superintendent
NONE
5 Attend NIA – IA meeting
Conduct NIA – IA meeting to discuss repair/rehab
schedule
2 hours
Irrigation Superintendent
/Water Resources Facilities
Technician
NONE
6
Provide assistance/counterpart as per agreement during
the NIA – IA meeting
Implement repair/rehab activities
(depends upon the volume
of repair/rehab to be
undertaken)
Project Personnel/Irrigation
Superintendent
NONE
END OF TRANSACTION
REQUEST FOR REPAIR OF IRRIGATION FACILITIES
(Frontline Service in the Provincial Irrigation Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : Farmer – Member of an Irrigators Association
WHAT ARE THE REQUIREMENTS : Water Request/IA Resolution
WHERE TO FILE : NIA Provincial Irrigation Office concerned
4. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1
Submit letter – request together with required
documents
NONE
2
Receive letter – request and forward to Technical
Personnel
2 minutes Office Clerk NONE
3 (In the waiting area)
Review/evaluate the completeness of submitted
documents and prepare schedule of field inspection
(Only complete documents shall be processed)
30 minutes Technical Personnel/ SWRFT/ IDO NONE
4
Provide guide/ assistance to NIA personnel during
inspection
Conduct inspection of subject landholding and advise
client of the schedule of release of certification
2 hours Technical Personnel/ SWRFT/ IDO NONE
5
(At home waiting for the scheduled release of
certification)
Prepare Investigation Report, Clearance and Certification
of Irrigation Coverage and issue charge slip
3 hours
Technical Personnel/ SWRFT/ IDO/
Data Encoder
NONE
6 Pay the required fee NONE
7 Receive payment and issue Official Receipt 10 minutes Cashier P 500.00
8 Present Receipt NONE
9 Sign the certification 10 minutes Chief of Office NONE
10 Release the Certification of Irrigation Coverage 2 minutes Office Clerk NONE
11 Receive the certification NONE
END OF TRANSACTION
ISSUANCE OF CERTIFICATE OF IRRIGATION COVERAGE
(For Service in the Provincial Irrigation Offices and Nation al Irrigation System Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : All Landowners’
WHAT ARE THE REQUIREMENTS : 1. Landowners’ letter requesting for certification
2. Transfer Certificate of Title or Real Property field Appraisal and Assessment Sheet (Tax Declaration)
3. Vicinity Map
4. Certification of Full Payment of ISF from Irrigators Association (If subject landholding is irrigated)
WHERE TO FILE : NIA Provincial Irrigation Office (PIO) or National Irrigation System Office (NISO)
5. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1 Submit request for payment of IA share/incentive NONE
2
Receive/record the request and forward same to the
Senior Water Resources Facilities Technician
2 minutes Receiving Clerk NONE
3
Advised to call/comeback after 2 days for the result of
the review/evaluation of documents
Review/evaluate request as to completeness of
documents.
If found complete, advise client to comeback after 2 days;
If found incomplete, return documents for client’s
completion
4 hours
Senior Water Resources Facilities
Technician
NONE
4
Review documents as to correctness of claim and return
same if found incomplete/incorrect
1 day Billing Clerk NONE
5 Complete/correct documents
(If documents are found complete and correct, proceed
to step 6)
NONE
6
Advised to come back after 11 to 12 days to collect
payment
Conduct audit of documents 1 day Senior Accounting Processor B NONE
7 Approve request for processing of payment 30 minutes Chief of Office NONE
8 Prepare disbursement vouchers 30 minutes Data Encoder NONE
9 Obligate disbursement vouchers 5 minutes Senior Accounting Processor B NONE
10 Approve voucher for payment 5 minutes Chief of Office NONE
11 Prepare check for approval and release 15 minutes Cashier/Chief of Office NONE
12 Receive check and issue Official Receipt NONE
END OF TRANSACTION
PAYMENT OF IRRIGATORS ASSOCIATIONS’ SHARE/INCENTIVE
(Frontline Service in the Provincial Irrigation Offices and National Irrigation System Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : Irrigators Associations (IA) under different turnover stages
WHAT ARE THE REQUIREMENTS : 1. IA Request
2. IA Remittance List
3. IA Collection Report
WHERE TO FILE : NIA office concerned
6. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1 Request for Certificate of Good Standing NONE
2 Review/verify Irrigators Associations (IA) 1 hour Technical Personnel/ SWRFT/ IDO NONE
3 (Advised to stay in the lobby or waiting area)
Prepare/ Encode Certificate of Good Standing and issue
charge slip
30 minutes
Technical Personnel/ SWRFT/ IDO/
Data Encoder
NONE
4 Pay the required fee P 250.00
5 Receive payment and issue Official Receipt (OR) 10 minutes Cashier NONE
6 Present Official Receipt (OR) NONE
7 Sigh certification 5 minutes Chief of Office NONE
8 Release the Certificate of Good Standing 2 minutes Office Clerk NONE
9 Receive the certification NONE
END OF TRANSACTION
ISSUANCE OF CERTIFICATE OF GOOD STANDING TO NIA ASSISTED IAs
(Frontline Service in the Provincial Irrigation Offices and National Irrigation System Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : Irrigators Associations (IA)
WHAT ARE THE REQUIREMENTS : Master List of IA Members
WHERE TO FILE : NIA Provincial Irrigation Office (PIO) or National Irrigation Systems Office (NISO)
7. STEP APPLICANT/CLIENT SERVICE PROVIDER DURATION OF ACTIVITY PERSON IN CHARGE FEES
1
Submit letter – request for exemption from ISF
indicating reason for request
NONE
2
Receive/record the request and forward same to the
chief of office
2 minutes Receiving Clerk NONE
3 Guide or assist in the conduct of inspection Conduct inspection/sampling 2 hours
Water Resources Facilities
Technician
NONE
4
Secure certification from the Department of Agriculture
(DA)
Re: Extent of Damage due to crop infestation
NONE
5
(At home waiting for the approval or disapproval of the
request)
Verify/check with the Department of Agriculture (DA) in
the locality if damage is due to crop infestation
30 minutes
Water Resources Facilities
Technician
NONE
6
If approved, record exemption to the Irrigation Fee
Register and send notice of approval or disapproval to
applicant
5 minutes
Billing Clerk/ Data Encoder/
Irrigation Superintendent
NONE
7 Receive notice approval/disapproval NONE
END OF TRANSACTION
REQUEST FOR EXEMPTION FROM PAYMENT OF IRRIGATION FEE
(Frontline Service in the Provincial Irrigation Offices and National Irrigation System Offices)
HOW TO AVAIL OF THE SERVICE
SCHEDULE OF AVAILABILITY OF SERVICE : Monday – Friday
8:00 AM – 5:00 PM
WHO MAY AVAIL OF THE SERVICE : Irrigators Associations (IA)
WHAT ARE THE REQUIREMENTS : Master List of IA Members
WHERE TO FILE : NIA Provincial Irrigation Office (PIO) or National Irrigation Systems Office (NISO)