Title: Siruma 10-Year Ecological Solid Waste Management Plan
Municipality : Siruma Classification: 4th Class
Total Population:
( 2020 )
Number of Barangays
22 total Barangays
14-Coastal, 2-Island, & 6-Inland
SWM INFORMATION
Indicator Baseline ( 2021 ) 10-Year Plan ( 2021-2030 )
% of segregation at source 25% 100% of the Municipality
% of segregated collection 30% 100% of the Municipality
% of collection rate/service area 25% 100% of the Municipality
% of waste diversion rate 55% Waste Diversion Rate 90% Waste Diversion Rate
Number of Collection Vehicle Two (2) units of garbage truck w/ seven (7) units
garbage bins
4 Total of Collection Equipment (1 unit
Compactor, 1 Dump Truck, 2 garbage truck
with seven garbage bins)
With disposal facility
(cap = m3 /yr or kg/year, Density)
RCA and Central MRF in Brgy. Poblacion Category 1 Sanitary Landfill, RCA, and Central
MRF (Zero-Waste) in Brgy Poblacion, Siruma,
Camarines Sur
CITY ENRO/MENRO
1 MENRO Designate
1 SWM Officer (GSO)
5 Segregators
4 CMRF Staff
3 wastes collectors
1 Driver
1 MENRO (Permanent)
1-EMS 1 (Permanent)
GENERAL INFORMATION
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Waste Diversion
Biodegradable Waste
27.08 kg/day
Strategies:
• Encourage backyard composting to recover biodegradable waste;
• Installation of communal compost pit by zone or at least one for each
barangay;
• Establishment and operationalization of MRFs in all barangays;
• Provide technical assistance to every barangay on the proper way of making
compost from biodegradable waste;
• Develop an incentivized system to encourage full participation of all
stakeholders in the community; and
• Construction of Biodegradable waste and maintenance activities
composting facility and operationalization of composting equipment
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Waste Diversion
Recyclable Waste
35.53 kg/day
Strategies:
• Strict implementation of segregation at source through enforcement of
Municipal Ordinance No. 2021-02;
• Develop partnership with junkshops for collection and market of
recyclables;
• Establishment and operationalization of MRFs in all barangays;
• Develop an incentive system for the collection of recyclables in exchange of
school supplies for children; and
• Establish a waste bank program to complement the school’s MRF
operations
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Waste Collection Efficiency and Coverage
Strategies:
• Strict implementation of segregation at source through enforcement of
Municipal Ordinance No. 2021-02-”No Segregation, No Collection Policy”;
• Procurement of additional dump truck;
• Annual provision of PPEs and supplies;
• Conduct continuous training for SWM staffs and collection personnel on
proper handling, managing and processing of collected solid wastes;
• Facilitate the immediate repair of equipment and transport vehicles used in
the collection;
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Collection and Disposal of Residual and Special Waste
Strategies:
• Expansion of Residual Containment Facility;
• Construction and operation of Sanitary Landfill;
• Procurement of additional dump truck for hauling of residual and
hazardous wastes;
• Provision of septic vault for special and health care waste;
• Strict implementation of “No segregation, No Collection” Policy in all
sources of wastes; and
• Operationalization of Central MRF (Zero Waste).
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Policy Support
Strategies:
• Municipal Ordinance No. “;
• SWM Board Resolution No. 02 s. 2022 “A Resolution Banning the Use of
Single-Use Plastics and Styro Food Packaging Products for LGU-Initiated
Activities;
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
Program Support
Strategies:
• Incentives to barangays, schools, private entities, people’s organizations,
and non-government organizations for active participation and support to
the ecological solid waste management program
• Inclusion of garbage and environmental fees and fines in the ordinance;
• Strength IEC programs with special focus in schools;
• Creation of “Bantay Basura” as enforcers and monitoring crews for
violations and other offenses;
• Implementation of “Plastic mo, Bigas mo” Program wherein one kilo of rice
will be swapped with 5 kilos of plastics
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
Strategies to Achieve the Ten-Year
SWM Plan
MUNICIPAL LEVEL
a. Full operationalization of the municipal solid waste management board and
all barangay solid waste management committees;
b. Diversion of 50% of the solid waste by the LGU from waste disposal
facilities through reuse, recycling and composting activities;
c. Establishment of functional Clustered MRFs in all cluster barangays and
schools;
d. Develop of organic fertilizers in all barangays and increased its production
for local use and possible market;
e. Mandatory waste segregation and recycling at source;
f. Full implementation of environmental laws;
g. Incentives to barangays, schools, private entities, people’s organizations
and nongovernment organizations for active participation and support to
the ecological solid waste management program;
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
MUNICIPAL LEVEL
h. Inclusion of garbage and environmental fees and fines in the ordinance;
i. Strengthen IEC programs with special focus in schools;
j. Creation of BANTAY BASURA as enforcers and monitoring crews for
violations and other offenses; and
k. Implementation of “Plastic mo, Bigas mo” Program wherein one kilo or rice
will be swapped with 5 kilos of plastics.
Strategies to Achieve the Ten-Year
SWM Plan
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
BARANGAY/COMMUNITY LEVEL
a. Preparation of barangay solid waste management program that will
complement with the municipal solid waste management plan;
b. Strict implementation of segregation at source;
c. Encourage backyard composting in every household;
d. Coordinate with the municipal solid waste management office for the
proper transport of wastes from the barangays to the waste disposal facility
established by the LGU;
e. Establishment of barangay MRFs, in every zone if necessary;
f. Develop partnership with junkshops for collection and market of
recyclables; and
g. Strengthen IEC program.
Strategies to Achieve the Ten-Year
SWM Plan
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PRIVATE SECTOR
a. Orientation on waste segregation;
b. Issuance of policies for mandatory observance of segregation and impose
appropriation sanctions/penalties; and
c. Issuance of policies for mandatory observance of segregation and impose
appropriation sanctions/penalties.
SCHOOLS
a. Conduct re-orientation to all teachers, students and all school personnel on
the SWM program;
b. Encourage integration in the school curriculum/lesson on SWM;
c. Promote the production of organic fertilizers for use in the school gardens;
d. Develop an incentive system for the collection of recyclables in exchange
of school supplies for children; and
e. Establish a waste bank program to complement the school’s MRF
operations.
Strategies to Achieve the Ten-Year
SWM Plan
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS
2022-31
PRO-
JECT
ACTIVITIES
COST TIMEFRAME
TOTAL
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Policy
Formulation
of the SWM
Plan of the
LGU
Drafting of the
ordinance; consultation
with the different
barangays;
organization of
BSWMC Reviews of
Policies and
Ordinance; Public
Hearing Publication
200,00
0.00
100,000.
00
100,00
0.00
1000,0
00.00
75,000.
00
75,000
.00
75,00
0.00
50,000
.00
50,000.
00
50,000.
00
875,000.00
Cluster MRFs
and
Composting
Facilities
Provision
Identification of the
possible sites of the 22
barangays; Public
consultation; General
Assembly Designs and
Planning; Provision of
Materials and
Equipment
3,500,0
00.00
3,500,00
0.00
3,500,0
00.00
3,500,0
00.00
3,500,0
00.00
1,000,
000.00
1,000,
000.0
0
500,00
0.00
500,00
0.00
500,000
.00
21,000,000.00
Solid Waste
Management
Program
Implementatio
n, Monitoring,
and
Evaluation
Monthly Meeting
MSWMB Regular
updates on SWM
Activities;
50,000.
00
50,000.0
0
50,000.
00
50,000.
00
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
500,000.00
Site Visit to Different
Barangay s and
Tourism Operating
Businesses s to
Monitor SWM
implementation
50,000.
00
50,000.0
0
50,000.
00
50,000.
00
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
500,000.00
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS
2022-31
PRO-
JECT
ACTIVITIES
COST TIMEFRAME
TOTAL
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SWM
Program
Community
Integration
Provision of Materials
Requirement,
Transportation, &
Maintenance
1,500,0
00.00
1,500,00
0.00
1,500,0
00.00
1,500,0
00.00
1,500,0
00.00
1,500,
000.00
1,500,
000.0
0
1,500,
000.00
1,500,0
00.00
1,500,0
00.00
10,000,000.00
IEC materials
development
production
Design, Preparation,
and Installation of
billboards and signages
for Poster Banners
Billboards and Flyers
100,00
0.00
100,000.
00
100,00
0.00
1000,0
00.00
100,00
0.00
100,00
0.00
100,0
00.00
100,00
0.00
1000,0
00.00
100,000
.00
1,000,000.00
Target
Audience
Identification
Conduct consultation
with different target
audience such as
household s, business
sectors , schools and
other stakeholders Tas
shall be properly
identified in order to
understand the
knowledge attitudes
and practices
300,00
0.00
300,000.
00
300,00
0.00
300,00
0.00
300,00
0.00
300,00
0.00
300,0
00.00
300,00
0.00
300,00
0.00
300,000
.00
3,000,000.00
Materials,
Structures and
Equipment s
Maintenance
and
Procurement
Purchase and provision
of SWM Materials ,
Structures and
Equipment: 3 Dump
Truck, 1 Motorboat,
Trash bins Supply for
waste management
enforce
500,00
0.00
500,000.
00
500,00
0.00
500,00
0.00
500,00
0.00
500,00
0.00
500,0
00.00
500,00
0.00
500,00
0.00
500,000
.00
5,000,000.00
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS
2022-31
PRO-
JECT
ACTIVITIES
COST TIMEFRAME
TOTAL
202
2
2023 2024
202
5
2026 2027 2028 2029 2030 2031
Rehabilitation
and
maintenance
of closed
dumpsite
Removal of structures,
levelling compaction, topsoil
(6mm) spreading and
backfilling, levelling and
compaction, construction of
access roads, construction of
open drain ditch, installation
of leaching pipes, excavation,
pipe laying, gravel bedding,
backfilling and compaction,
installation of leachate
collection station, installation
of concrete manhole
350,0
00.00
50,00
0.00
50,000
.00
50,0
00.0
0
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
800,000.00
Extension of
RCA and
maintenance
of RCA
Actual construction of RCA
extension facility and
purchase of sacks and
maintenance
1,500,
000.0
0
50,000
.00
50,0
00.0
0
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
1,900,000.00
Siruma
Sanitary
Landfill
Program
Conduct of consultation
meetings, planning workshop,
lakbay- aral for other LGUs
"Best Practices" ; and actual
construction of the proposed
sanitary landfill
250,0
00.00
250,0
00.00
250,00
0.00
250,
000.
00
1,000,0
00.00
1,000,
000.00
2,000,
000.0
0
2,000,
000.00
2,000,0
00.00
2,000,0
00.00
11,000,000.00
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS
2022-31
PRO-
JECT
ACTIVITIES
COST TIMEFRAME
TOTAL
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
SLF and
Central MRF
Office and
staff house
Pre-construction and
Construction of
Dumpsite Maintenance
Office/Shed
300,00
0.00
500,000.
00
200,00
0.00
50,000.
00
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
1,350,000.00
Fencing of the
SLF and
Central MRF
Construction of
perimeter fence and
maintenance activities
Electrical and
power
utilization and
maintenance
Maintenance and
improvement of power
house facility
100,00
0.00
50,000.0
0
100,00
0.00
50,000.
00
100,00
0.00
50,000
.00
100,0
00.00
50,000
.00
100,00
0.00
50,000.
00
750,000.00
Construction
of MENRO
Office
Construction of
MENRO Office and
maintenance activities
(Phase 1 to 3)
500,00
0.00
500,000.
00
500,00
0.00
100,00
0.00
100,00
0.00
100,00
0.00
100,0
00.00
100,00
0.00
100,00
0.00
100,000
.00
2,200,000.00
Safeguarding
of the SLF
and Central
MRF
Construction of Guard
house and maintenance
activities
300,00
0.00
50,000.0
0
50,000.
00
50,000.
00
50,000.
00
50,000
.00
50,00
0.00
50,000
.00
50,000.
00
50,000.
00
750,000.00
Biodegradable
waste
management
Construction of
biodegradable waste
and maintenance
activities composition
g facility
500,00
0.00
500,000.
00
200,00
0.00
100,00
0.00
100,00
0.00
100,00
0.00
100,0
00.00
100,00
0.00
100,00
0.00
100,000
.00
1,900,000.00
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS
2022-31
PRO-
JECT
ACTIVITIES
COST TIMEFRAME
TOTAL
2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Construction
of warehouse
of supplies
and
equipment
Construction of
warehouse of supplies
and equipment and
maintenance activities
500,00
0.00
100,000.
00
100,00
0.00
100,00
0.00
100,00
0.00
100,00
0.00
100,0
00.00
100,00
0.00
100,00
0.00
100,000
.00
1,400,000.00
Installation of
APCD
Consultation, actual
installation
10,000,
000.00
TOTAL
5,250,0
00.00
9,600,0
00.00
7,600,0
00.00
16,900,
000.00
7,675,0
00.00
4,125,
0
00.00
5,175,
0
00.00
4,600,
0
00.00
4,600,0
00.00
4,600,0
00.00
73,925,000.00
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED ANNUAL SWM COST
2022-2031
YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL
Personnel
Services/Wa
ges
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
28,800,000.00
MOOE 2,370,000.
00
5,220,000.
00
4,670,000.
00
3,970,000.
00
4,745,000.
00
1,195,000.
00
2,245,000.
00
1,670,000.
00
1,720,000.
00
1,670,000.
00
1,670,000.00
TOTAL 5,250,000 30,470,000.00
YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL
Income
Generated
50.000.00 100,000.00 150,000.0
0
175,000.00 200,000.0
0
230,000.0
0
230,000.00 250,000.0
0
260,000.0
0
300,000.0
0
1,945,000,000
.00
PROJECTED ANNUAL SWM REVENUES
2022-2031
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
PROJECTED ANNUAL SWM COST
2022-2031
YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL
Personnel
Services/Wa
ges
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
2,880,000.
00
28,800,000.00
MOOE 2,370,000.
00
5,220,000.
00
4,670,000.
00
3,970,000.
00
4,745,000.
00
1,195,000.
00
2,245,000.
00
1,670,000.
00
1,720,000.
00
1,670,000.
00
1,670,000.00
TOTAL
YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL
Income
Generated
50.000.00 100,000.00 150,000.0
0
175,000.00 200,000.0
0
230,000.0
0
230,000.00 250,000.0
0
260,000.0
0
300,000.0
0
1,945,000,000
.00
PROJECTED ANNUAL SWM REVENUES
2022-2031
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
IMPLEMENTATION SCHEDULE OF
SIRUMA 10-YEAR SWM PLAN
2022-2031
Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Policy Formulation of the SWM
Plan of the LGU
Drafting of the ordinance consultation with the
different barangays organization of BSWMC,
reviews of policies and ordinances, public
hearing publication
Cluster MRFs and composting
facilities provisions
Identification of the Possible sites of the 22
barangays Public consultation General
Assembly Designs and Planning Provission of
Materials and Equipments
Solid Waste Management
Program Implementation,
Monitoring, and Evaluation
Monthly Meeting MSWMB Regular
updates on SWM Activities ; Site Visit to
Different Barangays and Tourism
Operating Businesses to Monitor SWM
implementation
SWM Program Community
Integration
Provision of Materials Requirements,
Transportation, maintenance
IEC materials development
production
Design, Preparation, and Installation of
billboards and signages for Poster Banners
Billboards and Flyers
Target Audience
Identification
Conduct consultation with different target
audience such as households, business
sectors , schools and other stakeholders
Tas shall be properly identified in order to
understand the knowledge attitudes and
practices
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
IMPLEMENTATION SCHEDULE OF
SIRUMA 10-YEAR SWM PLAN
2022-2031
Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Materials, Structures and
Equipment's Maintenance and
Procurement
Purchase and provision of SWM Materials ,
Structures and Equipment: 3 Dump Truck, 1
Motorboat, Trash bins Supply for waste
management enforce
Rehabilitation and maintenance
of closed dumpsite
Conduct of consultation meetings, planning
workshop, lakbay aral for other LGUs "Best
Practices"; and actual construction of the
proposed Extension of RCA and actual
construction of SLF
Siruma Sanitary Landfill
Program
Monthly Meeting MSWMB Regular updates on
SWM Activities ; Site Visit to Different
Barangays and Tourism Operating Businesses
to Monitor SWM implementation
SLF and Central MRF Office
and staff house
Pre - construction and Construction of
Dumpsite Maintenance Office/Shed
Fencing of the SLF and Central
MRF
Construction of perimeter fence and
maintenance activities
Electrical and power utilization
and maintenance
Maintenance and improvement of power house
facility
Construction of MENRO Office Construction of MENRO Office and
maintenance activities (Phase 1 to 3)
Safeguarding of the SLF and
Central MRF
Construction of Guard house and
maintenance activities
10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031
IMPLEMENTATION SCHEDULE OF
SIRUMA 10-YEAR SWM PLAN
2022-2031
Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Biodegradable waste
management
Construction of biodegradable waste and
maintenance activities composting facility
Construction of warehouse of
supplies and equipment
Construction of warehouse of supplies and
equipment and maintenance activities
Construction Activities
Maintenance and preparatory phase
Biodegradable
Wastes
30.05%
27.08 kg/day
Recyclable Wastes
40.0%
35.5kg/day
Food estab. (0.44%)
0.12 kgs/day
Residential (97.4%)
26.4 kg/day
General Stores (0.28%)
0.08 kgs/day
Backyard Composting (97.4%)
26.4kg/day
Centralized Composting (2.6%)
kg/day
Institutions (1.77%)
0.48 kgs/day
Planned Waste Management System
Total Waste Generation
3,017 kgs/day
Soil conditioner
Harvested compost materials d will
be distributed commercially which shall
conform with the standards for organic
fertilizers set by the Fertilizer and
Pesticide Authority of the Department
of Agriculture.
Food estab. (0.77%)
0.28 kgs/day
Residential (88.8%)
31.57 kg/day
General Stores (7%)
2.49 kgs/day
Institutions (0.31%)
0.11 kgs/day
Service centers (0.11%)
0-kgs/day
Health Related Facilities
(0%) 0-kgs/day
Service centers (3.06%)
0-kgs/day
Health Related Facilities
(0%) 0-kgs/day
Recycled (0.5%)
0.17 kg/day
Sold to junkshop
(99.5%)
34.28 kg/day
Encourage recycling at
the household level and
establish recycling
facilities in all barangays
Recyclable Wastes
40.0%
35.5kg/day
Food estab. (0.66%)
0.12 kgs/day
Residential (89.9%)
16.25 kg/day
General Stores (4.11%)
0.74 kgs/day
Institutions (1.27%)
0.2kgs/day
Service centers (4.04%)
0.73 kgs/day
Health Related Facilities
(0%) 0-kgs/day
Residual with Potential
for Diversion. (0.6%)
0.11 kgs/day
Residual wastes for
disposal (99.4%)
17.93 kgs/day
Eco-bricks for
garden/construction
design
Disposal Facility ((SLF)
Category 1 / ZW-MRF
Residual Wastes
20.4%
18.7 kg/day
Special Wastes
9.1%
8.9 kg/day
Residential, Commercial,
Institution, Recreation
and other services
Properly stored in
Septic vault
For treatment and
disposal
LETTER OF UNDERTAKING
M.O. 101 An ordinance prescribing for issuance of citation ticket and providing for no
contest provision for violation of any existing municipal ordinances in the municipality
of Siruma, Cam. Sur
CLOSED DUMPSITE
Sitio Taligra, Poblacion, Siruma, Camarines Sur
RESIDUAL CONTAINMENT AREA
Sitio Taligra, Poblacion, Siruma, Camarines Sur
MINES AND GEOSCIENCES BUREAU
(Geological Assessment of Proposed Sanitary Landfill Site)
CENTRAL MATERIALS RECOVERY FACILITY
Sitio Taligra, Poblacion, Siruma, Camarines Sur
BARANGAY MATERIALS RECOVERY FACILITY
(BMRF)
Barangay Vito Barangay Nalayahan
BARANGAY MATERIALS RECOVERY FACILITY
(BMRF)
Barangay Homestead Barangay Malaconini
BARANGAY MATERIALS RECOVERY FACILITY
(BMRF)
Barangay Boboan
BARANGAY MATERIALS RECOVERY FACILITY
(BMRF)
Barangay Penitan
HEALTH CARE WASTE MANAGEMENT AREA
Barangay Poblacion
EMB FUNDED MRF 2019
EMB FUNDED MRF
EMB FUNDED MRF
EMB FUNDED MRF
PPEs MRF Operators
MRF bulletin
board
Son & San Bakery Joenor’s Beach and Resort
Kiudkad-The Last Resort
Coastal Cleanup Activity
IEC ON SOLID WASTE MANGEMENT
SUBMISSION OF BARANGAY’S
MONTHLY REPORT
THANK YOU!

More Related Content

Similar to FORM 4 SIRUMA Sample 10yr SWM Plan.pptx

Bayombong swm initiatives
Bayombong swm initiativesBayombong swm initiatives
Bayombong swm initiativesmark juan
 
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINES
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINESSUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINES
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINESMarie911714
 
IEPA and Legislators Presentation 11 19 2009
IEPA and Legislators Presentation 11 19 2009IEPA and Legislators Presentation 11 19 2009
IEPA and Legislators Presentation 11 19 2009Frank Miles
 
Municipal Solid Waste: Is it Garbage or Gold?
Municipal Solid Waste: Is it Garbage or Gold?Municipal Solid Waste: Is it Garbage or Gold?
Municipal Solid Waste: Is it Garbage or Gold?ESD UNU-IAS
 
Haik Petrosian
Haik PetrosianHaik Petrosian
Haik PetrosianCCCASTAFF
 
3. RA 9003 - Ecological Solid Waste Management Act.pdf
3. RA 9003 - Ecological Solid Waste Management Act.pdf3. RA 9003 - Ecological Solid Waste Management Act.pdf
3. RA 9003 - Ecological Solid Waste Management Act.pdfMichaelFagela1
 
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...NAP Events
 
A policy framework_for_key_environmental_issues____review_of_the_national_env...
A policy framework_for_key_environmental_issues____review_of_the_national_env...A policy framework_for_key_environmental_issues____review_of_the_national_env...
A policy framework_for_key_environmental_issues____review_of_the_national_env...Malik Khalid Mehmood
 
Enhancing farmer engagement in climate policy and COP27
Enhancing farmer engagement in climate policy and COP27Enhancing farmer engagement in climate policy and COP27
Enhancing farmer engagement in climate policy and COP27ILRI
 
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...Brussels Briefings (brusselsbriefings.net)
 
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...Can Household-Scale Biogas Support Rural Development? Insight from the Study ...
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...Purnama Alamsyah
 
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.Dr. Joshua Zake
 
Nairobi city council policy and regulatory framework for waste reuse in kenya
Nairobi city council policy and regulatory framework for waste reuse in kenyaNairobi city council policy and regulatory framework for waste reuse in kenya
Nairobi city council policy and regulatory framework for waste reuse in kenyaWater, Land and Ecosystems (WLE)
 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfOECD Environment
 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfOECD Environment
 

Similar to FORM 4 SIRUMA Sample 10yr SWM Plan.pptx (20)

Bayombong swm initiatives
Bayombong swm initiativesBayombong swm initiatives
Bayombong swm initiatives
 
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINES
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINESSUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINES
SUSTAINABLE SOLID WASTE MANAGEMENT IN THE PHILIPPINES
 
IEPA and Legislators Presentation 11 19 2009
IEPA and Legislators Presentation 11 19 2009IEPA and Legislators Presentation 11 19 2009
IEPA and Legislators Presentation 11 19 2009
 
Municipal Solid Waste: Is it Garbage or Gold?
Municipal Solid Waste: Is it Garbage or Gold?Municipal Solid Waste: Is it Garbage or Gold?
Municipal Solid Waste: Is it Garbage or Gold?
 
Haik Petrosian
Haik PetrosianHaik Petrosian
Haik Petrosian
 
3. RA 9003 - Ecological Solid Waste Management Act.pdf
3. RA 9003 - Ecological Solid Waste Management Act.pdf3. RA 9003 - Ecological Solid Waste Management Act.pdf
3. RA 9003 - Ecological Solid Waste Management Act.pdf
 
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...
A Sahelian Lands Development Strategy; A Front for the Adaptation and Resilie...
 
A policy framework_for_key_environmental_issues____review_of_the_national_env...
A policy framework_for_key_environmental_issues____review_of_the_national_env...A policy framework_for_key_environmental_issues____review_of_the_national_env...
A policy framework_for_key_environmental_issues____review_of_the_national_env...
 
Enhancing farmer engagement in climate policy and COP27
Enhancing farmer engagement in climate policy and COP27Enhancing farmer engagement in climate policy and COP27
Enhancing farmer engagement in climate policy and COP27
 
India Report
India ReportIndia Report
India Report
 
Napcc
NapccNapcc
Napcc
 
003 NCWRM 2011 Fakih_Lebanon
003 NCWRM 2011 Fakih_Lebanon003 NCWRM 2011 Fakih_Lebanon
003 NCWRM 2011 Fakih_Lebanon
 
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...
Brussels Briefing 50: Coumbaly Diaw "The experience of micro-gardening in Wes...
 
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...Can Household-Scale Biogas Support Rural Development? Insight from the Study ...
Can Household-Scale Biogas Support Rural Development? Insight from the Study ...
 
4 eremie presentation
4 eremie presentation4 eremie presentation
4 eremie presentation
 
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.
ENR-CSOs annual performance Report, 2019/20, Septemeber 2020.
 
Planning for adaptation to climate variability and change with a gender focus
Planning for adaptation to climate variability and change with a gender focusPlanning for adaptation to climate variability and change with a gender focus
Planning for adaptation to climate variability and change with a gender focus
 
Nairobi city council policy and regulatory framework for waste reuse in kenya
Nairobi city council policy and regulatory framework for waste reuse in kenyaNairobi city council policy and regulatory framework for waste reuse in kenya
Nairobi city council policy and regulatory framework for waste reuse in kenya
 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdf
 
Session 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdfSession 6 - ADB_Blue SEA Finance Hub.pdf
Session 6 - ADB_Blue SEA Finance Hub.pdf
 

Recently uploaded

Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available9953056974 ,Low Rate Call Girls In Adarsh Nagar  Delhi 24hrs Available
9953056974 ,Low Rate Call Girls In Adarsh Nagar Delhi 24hrs Available
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCREscort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
Escort Service Call Girls In Shakti Nagar, 99530°56974 Delhi NCR
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 

FORM 4 SIRUMA Sample 10yr SWM Plan.pptx

  • 1.
  • 2. Title: Siruma 10-Year Ecological Solid Waste Management Plan Municipality : Siruma Classification: 4th Class Total Population: ( 2020 ) Number of Barangays 22 total Barangays 14-Coastal, 2-Island, & 6-Inland SWM INFORMATION Indicator Baseline ( 2021 ) 10-Year Plan ( 2021-2030 ) % of segregation at source 25% 100% of the Municipality % of segregated collection 30% 100% of the Municipality % of collection rate/service area 25% 100% of the Municipality % of waste diversion rate 55% Waste Diversion Rate 90% Waste Diversion Rate Number of Collection Vehicle Two (2) units of garbage truck w/ seven (7) units garbage bins 4 Total of Collection Equipment (1 unit Compactor, 1 Dump Truck, 2 garbage truck with seven garbage bins) With disposal facility (cap = m3 /yr or kg/year, Density) RCA and Central MRF in Brgy. Poblacion Category 1 Sanitary Landfill, RCA, and Central MRF (Zero-Waste) in Brgy Poblacion, Siruma, Camarines Sur CITY ENRO/MENRO 1 MENRO Designate 1 SWM Officer (GSO) 5 Segregators 4 CMRF Staff 3 wastes collectors 1 Driver 1 MENRO (Permanent) 1-EMS 1 (Permanent) GENERAL INFORMATION
  • 3. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Waste Diversion Biodegradable Waste 27.08 kg/day Strategies: • Encourage backyard composting to recover biodegradable waste; • Installation of communal compost pit by zone or at least one for each barangay; • Establishment and operationalization of MRFs in all barangays; • Provide technical assistance to every barangay on the proper way of making compost from biodegradable waste; • Develop an incentivized system to encourage full participation of all stakeholders in the community; and • Construction of Biodegradable waste and maintenance activities composting facility and operationalization of composting equipment
  • 4. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Waste Diversion Recyclable Waste 35.53 kg/day Strategies: • Strict implementation of segregation at source through enforcement of Municipal Ordinance No. 2021-02; • Develop partnership with junkshops for collection and market of recyclables; • Establishment and operationalization of MRFs in all barangays; • Develop an incentive system for the collection of recyclables in exchange of school supplies for children; and • Establish a waste bank program to complement the school’s MRF operations
  • 5. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Waste Collection Efficiency and Coverage Strategies: • Strict implementation of segregation at source through enforcement of Municipal Ordinance No. 2021-02-”No Segregation, No Collection Policy”; • Procurement of additional dump truck; • Annual provision of PPEs and supplies; • Conduct continuous training for SWM staffs and collection personnel on proper handling, managing and processing of collected solid wastes; • Facilitate the immediate repair of equipment and transport vehicles used in the collection;
  • 6. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Collection and Disposal of Residual and Special Waste Strategies: • Expansion of Residual Containment Facility; • Construction and operation of Sanitary Landfill; • Procurement of additional dump truck for hauling of residual and hazardous wastes; • Provision of septic vault for special and health care waste; • Strict implementation of “No segregation, No Collection” Policy in all sources of wastes; and • Operationalization of Central MRF (Zero Waste).
  • 7. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Policy Support Strategies: • Municipal Ordinance No. “; • SWM Board Resolution No. 02 s. 2022 “A Resolution Banning the Use of Single-Use Plastics and Styro Food Packaging Products for LGU-Initiated Activities;
  • 8. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan Program Support Strategies: • Incentives to barangays, schools, private entities, people’s organizations, and non-government organizations for active participation and support to the ecological solid waste management program • Inclusion of garbage and environmental fees and fines in the ordinance; • Strength IEC programs with special focus in schools; • Creation of “Bantay Basura” as enforcers and monitoring crews for violations and other offenses; • Implementation of “Plastic mo, Bigas mo” Program wherein one kilo of rice will be swapped with 5 kilos of plastics
  • 9. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 Strategies to Achieve the Ten-Year SWM Plan MUNICIPAL LEVEL a. Full operationalization of the municipal solid waste management board and all barangay solid waste management committees; b. Diversion of 50% of the solid waste by the LGU from waste disposal facilities through reuse, recycling and composting activities; c. Establishment of functional Clustered MRFs in all cluster barangays and schools; d. Develop of organic fertilizers in all barangays and increased its production for local use and possible market; e. Mandatory waste segregation and recycling at source; f. Full implementation of environmental laws; g. Incentives to barangays, schools, private entities, people’s organizations and nongovernment organizations for active participation and support to the ecological solid waste management program;
  • 10. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 MUNICIPAL LEVEL h. Inclusion of garbage and environmental fees and fines in the ordinance; i. Strengthen IEC programs with special focus in schools; j. Creation of BANTAY BASURA as enforcers and monitoring crews for violations and other offenses; and k. Implementation of “Plastic mo, Bigas mo” Program wherein one kilo or rice will be swapped with 5 kilos of plastics. Strategies to Achieve the Ten-Year SWM Plan
  • 11. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 BARANGAY/COMMUNITY LEVEL a. Preparation of barangay solid waste management program that will complement with the municipal solid waste management plan; b. Strict implementation of segregation at source; c. Encourage backyard composting in every household; d. Coordinate with the municipal solid waste management office for the proper transport of wastes from the barangays to the waste disposal facility established by the LGU; e. Establishment of barangay MRFs, in every zone if necessary; f. Develop partnership with junkshops for collection and market of recyclables; and g. Strengthen IEC program. Strategies to Achieve the Ten-Year SWM Plan
  • 12. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PRIVATE SECTOR a. Orientation on waste segregation; b. Issuance of policies for mandatory observance of segregation and impose appropriation sanctions/penalties; and c. Issuance of policies for mandatory observance of segregation and impose appropriation sanctions/penalties. SCHOOLS a. Conduct re-orientation to all teachers, students and all school personnel on the SWM program; b. Encourage integration in the school curriculum/lesson on SWM; c. Promote the production of organic fertilizers for use in the school gardens; d. Develop an incentive system for the collection of recyclables in exchange of school supplies for children; and e. Establish a waste bank program to complement the school’s MRF operations. Strategies to Achieve the Ten-Year SWM Plan
  • 13. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS 2022-31 PRO- JECT ACTIVITIES COST TIMEFRAME TOTAL 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Policy Formulation of the SWM Plan of the LGU Drafting of the ordinance; consultation with the different barangays; organization of BSWMC Reviews of Policies and Ordinance; Public Hearing Publication 200,00 0.00 100,000. 00 100,00 0.00 1000,0 00.00 75,000. 00 75,000 .00 75,00 0.00 50,000 .00 50,000. 00 50,000. 00 875,000.00 Cluster MRFs and Composting Facilities Provision Identification of the possible sites of the 22 barangays; Public consultation; General Assembly Designs and Planning; Provision of Materials and Equipment 3,500,0 00.00 3,500,00 0.00 3,500,0 00.00 3,500,0 00.00 3,500,0 00.00 1,000, 000.00 1,000, 000.0 0 500,00 0.00 500,00 0.00 500,000 .00 21,000,000.00 Solid Waste Management Program Implementatio n, Monitoring, and Evaluation Monthly Meeting MSWMB Regular updates on SWM Activities; 50,000. 00 50,000.0 0 50,000. 00 50,000. 00 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 500,000.00 Site Visit to Different Barangay s and Tourism Operating Businesses s to Monitor SWM implementation 50,000. 00 50,000.0 0 50,000. 00 50,000. 00 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 500,000.00
  • 14. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS 2022-31 PRO- JECT ACTIVITIES COST TIMEFRAME TOTAL 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 SWM Program Community Integration Provision of Materials Requirement, Transportation, & Maintenance 1,500,0 00.00 1,500,00 0.00 1,500,0 00.00 1,500,0 00.00 1,500,0 00.00 1,500, 000.00 1,500, 000.0 0 1,500, 000.00 1,500,0 00.00 1,500,0 00.00 10,000,000.00 IEC materials development production Design, Preparation, and Installation of billboards and signages for Poster Banners Billboards and Flyers 100,00 0.00 100,000. 00 100,00 0.00 1000,0 00.00 100,00 0.00 100,00 0.00 100,0 00.00 100,00 0.00 1000,0 00.00 100,000 .00 1,000,000.00 Target Audience Identification Conduct consultation with different target audience such as household s, business sectors , schools and other stakeholders Tas shall be properly identified in order to understand the knowledge attitudes and practices 300,00 0.00 300,000. 00 300,00 0.00 300,00 0.00 300,00 0.00 300,00 0.00 300,0 00.00 300,00 0.00 300,00 0.00 300,000 .00 3,000,000.00 Materials, Structures and Equipment s Maintenance and Procurement Purchase and provision of SWM Materials , Structures and Equipment: 3 Dump Truck, 1 Motorboat, Trash bins Supply for waste management enforce 500,00 0.00 500,000. 00 500,00 0.00 500,00 0.00 500,00 0.00 500,00 0.00 500,0 00.00 500,00 0.00 500,00 0.00 500,000 .00 5,000,000.00
  • 15. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS 2022-31 PRO- JECT ACTIVITIES COST TIMEFRAME TOTAL 202 2 2023 2024 202 5 2026 2027 2028 2029 2030 2031 Rehabilitation and maintenance of closed dumpsite Removal of structures, levelling compaction, topsoil (6mm) spreading and backfilling, levelling and compaction, construction of access roads, construction of open drain ditch, installation of leaching pipes, excavation, pipe laying, gravel bedding, backfilling and compaction, installation of leachate collection station, installation of concrete manhole 350,0 00.00 50,00 0.00 50,000 .00 50,0 00.0 0 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 800,000.00 Extension of RCA and maintenance of RCA Actual construction of RCA extension facility and purchase of sacks and maintenance 1,500, 000.0 0 50,000 .00 50,0 00.0 0 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 1,900,000.00 Siruma Sanitary Landfill Program Conduct of consultation meetings, planning workshop, lakbay- aral for other LGUs "Best Practices" ; and actual construction of the proposed sanitary landfill 250,0 00.00 250,0 00.00 250,00 0.00 250, 000. 00 1,000,0 00.00 1,000, 000.00 2,000, 000.0 0 2,000, 000.00 2,000,0 00.00 2,000,0 00.00 11,000,000.00
  • 16. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS 2022-31 PRO- JECT ACTIVITIES COST TIMEFRAME TOTAL 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 SLF and Central MRF Office and staff house Pre-construction and Construction of Dumpsite Maintenance Office/Shed 300,00 0.00 500,000. 00 200,00 0.00 50,000. 00 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 1,350,000.00 Fencing of the SLF and Central MRF Construction of perimeter fence and maintenance activities Electrical and power utilization and maintenance Maintenance and improvement of power house facility 100,00 0.00 50,000.0 0 100,00 0.00 50,000. 00 100,00 0.00 50,000 .00 100,0 00.00 50,000 .00 100,00 0.00 50,000. 00 750,000.00 Construction of MENRO Office Construction of MENRO Office and maintenance activities (Phase 1 to 3) 500,00 0.00 500,000. 00 500,00 0.00 100,00 0.00 100,00 0.00 100,00 0.00 100,0 00.00 100,00 0.00 100,00 0.00 100,000 .00 2,200,000.00 Safeguarding of the SLF and Central MRF Construction of Guard house and maintenance activities 300,00 0.00 50,000.0 0 50,000. 00 50,000. 00 50,000. 00 50,000 .00 50,00 0.00 50,000 .00 50,000. 00 50,000. 00 750,000.00 Biodegradable waste management Construction of biodegradable waste and maintenance activities composition g facility 500,00 0.00 500,000. 00 200,00 0.00 100,00 0.00 100,00 0.00 100,00 0.00 100,0 00.00 100,00 0.00 100,00 0.00 100,000 .00 1,900,000.00
  • 17. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED INVESTMENT COST PER YEAR FOR 10-YEARS 2022-31 PRO- JECT ACTIVITIES COST TIMEFRAME TOTAL 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Construction of warehouse of supplies and equipment Construction of warehouse of supplies and equipment and maintenance activities 500,00 0.00 100,000. 00 100,00 0.00 100,00 0.00 100,00 0.00 100,00 0.00 100,0 00.00 100,00 0.00 100,00 0.00 100,000 .00 1,400,000.00 Installation of APCD Consultation, actual installation 10,000, 000.00 TOTAL 5,250,0 00.00 9,600,0 00.00 7,600,0 00.00 16,900, 000.00 7,675,0 00.00 4,125, 0 00.00 5,175, 0 00.00 4,600, 0 00.00 4,600,0 00.00 4,600,0 00.00 73,925,000.00
  • 18. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED ANNUAL SWM COST 2022-2031 YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL Personnel Services/Wa ges 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 28,800,000.00 MOOE 2,370,000. 00 5,220,000. 00 4,670,000. 00 3,970,000. 00 4,745,000. 00 1,195,000. 00 2,245,000. 00 1,670,000. 00 1,720,000. 00 1,670,000. 00 1,670,000.00 TOTAL 5,250,000 30,470,000.00 YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL Income Generated 50.000.00 100,000.00 150,000.0 0 175,000.00 200,000.0 0 230,000.0 0 230,000.00 250,000.0 0 260,000.0 0 300,000.0 0 1,945,000,000 .00 PROJECTED ANNUAL SWM REVENUES 2022-2031
  • 19. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 PROJECTED ANNUAL SWM COST 2022-2031 YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL Personnel Services/Wa ges 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 2,880,000. 00 28,800,000.00 MOOE 2,370,000. 00 5,220,000. 00 4,670,000. 00 3,970,000. 00 4,745,000. 00 1,195,000. 00 2,245,000. 00 1,670,000. 00 1,720,000. 00 1,670,000. 00 1,670,000.00 TOTAL YEAR 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL Income Generated 50.000.00 100,000.00 150,000.0 0 175,000.00 200,000.0 0 230,000.0 0 230,000.00 250,000.0 0 260,000.0 0 300,000.0 0 1,945,000,000 .00 PROJECTED ANNUAL SWM REVENUES 2022-2031
  • 20. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 IMPLEMENTATION SCHEDULE OF SIRUMA 10-YEAR SWM PLAN 2022-2031 Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Policy Formulation of the SWM Plan of the LGU Drafting of the ordinance consultation with the different barangays organization of BSWMC, reviews of policies and ordinances, public hearing publication Cluster MRFs and composting facilities provisions Identification of the Possible sites of the 22 barangays Public consultation General Assembly Designs and Planning Provission of Materials and Equipments Solid Waste Management Program Implementation, Monitoring, and Evaluation Monthly Meeting MSWMB Regular updates on SWM Activities ; Site Visit to Different Barangays and Tourism Operating Businesses to Monitor SWM implementation SWM Program Community Integration Provision of Materials Requirements, Transportation, maintenance IEC materials development production Design, Preparation, and Installation of billboards and signages for Poster Banners Billboards and Flyers Target Audience Identification Conduct consultation with different target audience such as households, business sectors , schools and other stakeholders Tas shall be properly identified in order to understand the knowledge attitudes and practices
  • 21. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 IMPLEMENTATION SCHEDULE OF SIRUMA 10-YEAR SWM PLAN 2022-2031 Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Materials, Structures and Equipment's Maintenance and Procurement Purchase and provision of SWM Materials , Structures and Equipment: 3 Dump Truck, 1 Motorboat, Trash bins Supply for waste management enforce Rehabilitation and maintenance of closed dumpsite Conduct of consultation meetings, planning workshop, lakbay aral for other LGUs "Best Practices"; and actual construction of the proposed Extension of RCA and actual construction of SLF Siruma Sanitary Landfill Program Monthly Meeting MSWMB Regular updates on SWM Activities ; Site Visit to Different Barangays and Tourism Operating Businesses to Monitor SWM implementation SLF and Central MRF Office and staff house Pre - construction and Construction of Dumpsite Maintenance Office/Shed Fencing of the SLF and Central MRF Construction of perimeter fence and maintenance activities Electrical and power utilization and maintenance Maintenance and improvement of power house facility Construction of MENRO Office Construction of MENRO Office and maintenance activities (Phase 1 to 3) Safeguarding of the SLF and Central MRF Construction of Guard house and maintenance activities
  • 22. 10-YEAR SOLID WASTE MANAGEMENT PLAN 2022-2031 IMPLEMENTATION SCHEDULE OF SIRUMA 10-YEAR SWM PLAN 2022-2031 Project Activities 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Biodegradable waste management Construction of biodegradable waste and maintenance activities composting facility Construction of warehouse of supplies and equipment Construction of warehouse of supplies and equipment and maintenance activities Construction Activities Maintenance and preparatory phase
  • 23. Biodegradable Wastes 30.05% 27.08 kg/day Recyclable Wastes 40.0% 35.5kg/day Food estab. (0.44%) 0.12 kgs/day Residential (97.4%) 26.4 kg/day General Stores (0.28%) 0.08 kgs/day Backyard Composting (97.4%) 26.4kg/day Centralized Composting (2.6%) kg/day Institutions (1.77%) 0.48 kgs/day Planned Waste Management System Total Waste Generation 3,017 kgs/day Soil conditioner Harvested compost materials d will be distributed commercially which shall conform with the standards for organic fertilizers set by the Fertilizer and Pesticide Authority of the Department of Agriculture. Food estab. (0.77%) 0.28 kgs/day Residential (88.8%) 31.57 kg/day General Stores (7%) 2.49 kgs/day Institutions (0.31%) 0.11 kgs/day Service centers (0.11%) 0-kgs/day Health Related Facilities (0%) 0-kgs/day Service centers (3.06%) 0-kgs/day Health Related Facilities (0%) 0-kgs/day Recycled (0.5%) 0.17 kg/day Sold to junkshop (99.5%) 34.28 kg/day Encourage recycling at the household level and establish recycling facilities in all barangays Recyclable Wastes 40.0% 35.5kg/day Food estab. (0.66%) 0.12 kgs/day Residential (89.9%) 16.25 kg/day General Stores (4.11%) 0.74 kgs/day Institutions (1.27%) 0.2kgs/day Service centers (4.04%) 0.73 kgs/day Health Related Facilities (0%) 0-kgs/day Residual with Potential for Diversion. (0.6%) 0.11 kgs/day Residual wastes for disposal (99.4%) 17.93 kgs/day Eco-bricks for garden/construction design Disposal Facility ((SLF) Category 1 / ZW-MRF Residual Wastes 20.4% 18.7 kg/day Special Wastes 9.1% 8.9 kg/day Residential, Commercial, Institution, Recreation and other services Properly stored in Septic vault For treatment and disposal
  • 24.
  • 25.
  • 27. M.O. 101 An ordinance prescribing for issuance of citation ticket and providing for no contest provision for violation of any existing municipal ordinances in the municipality of Siruma, Cam. Sur
  • 28. CLOSED DUMPSITE Sitio Taligra, Poblacion, Siruma, Camarines Sur
  • 29.
  • 30.
  • 31. RESIDUAL CONTAINMENT AREA Sitio Taligra, Poblacion, Siruma, Camarines Sur
  • 32.
  • 33. MINES AND GEOSCIENCES BUREAU (Geological Assessment of Proposed Sanitary Landfill Site)
  • 34. CENTRAL MATERIALS RECOVERY FACILITY Sitio Taligra, Poblacion, Siruma, Camarines Sur
  • 35. BARANGAY MATERIALS RECOVERY FACILITY (BMRF) Barangay Vito Barangay Nalayahan
  • 36. BARANGAY MATERIALS RECOVERY FACILITY (BMRF) Barangay Homestead Barangay Malaconini
  • 37. BARANGAY MATERIALS RECOVERY FACILITY (BMRF) Barangay Boboan
  • 38. BARANGAY MATERIALS RECOVERY FACILITY (BMRF) Barangay Penitan
  • 39. HEALTH CARE WASTE MANAGEMENT AREA Barangay Poblacion
  • 40.
  • 44. EMB FUNDED MRF PPEs MRF Operators MRF bulletin board
  • 45. Son & San Bakery Joenor’s Beach and Resort Kiudkad-The Last Resort
  • 47. IEC ON SOLID WASTE MANGEMENT