Presented by:
Mahira Nisar
Zoya Farooq
SiemensPakistan
EngineeringCompanyLimited
Introduction
Siemens Pakistan Engineering Company Limited has been established since pre-
partition days.
It started in Pakistan with first cable laying project in Karachi.
The firm was incorporated as public listed company in 1963, when it established a
factory for motors and transformers in addition to the switchboards.
 In 1976, the firm introduced diesel generating sets.
The firm made another breakthrough when it was able to setup 412MW combined
cycle Rousche Power Plant, and became the first value added seller of SAP.
Introduction
In 2000s, Siemens Pakistan completed the first load dispatch center for K-Electric
and later continued grid stations for K-Electric, Wapda and DEWA Dubai.
The firm has been successful is commissioning of Sawan and Kandhkot gas
compression trains, equipping of Al Razi Medical Diagnostic Centre with imaging
equipment, and getting a new project for airfield lighting for Benazir Bhutto
International Airport.
In 2012, the firm armed Karachi's largest mall - Dolmen Mall - with safety, security
& building management technology.
Introduction
Major shareholders
 Siemens AG Germany 74.65%
 National Investment Trust 12.64%
 General Public 4.36%
Business Segments
 Energy Segment
 Healthcare Segment
 Industry Division
 Infrastructure & cities
Business Segments
Energy segment Healthcare segment
• Power generation
• Wind power
• Power transmission
• Energy services
• Imaging and therapy systems
• Clinical products
• Diagnostics and customer solutions
Business Segments
Industry division Infrastructure & cities
• Industry automation
• Technologies
• Customer service
• Building technologies
• Rail systems
• Mobility and logistics
• Smart grids
Past Performance
2009-2013
• Net turnover and annual orders have halved
• Causes contributing to the company’s dwindling performance:
 The termination of contract worth of Rs 1.992 billion by the Civil Aviation Authority
(CAA) relating to power supply and telecommunication network at New Benazir Bhutto
International Airport, Islamabad
 Delays in different projects of various business segments
 Restructuring, rightsizing and portfolio adjustment activities which have also affected
profitability
Past Performance
2014
• Improvement in gross margins, as some signs of recovery were witnessed; the firm got the
contract for the work at New Benazir Bhutto International Airport, Islamabad by the CAA
again
• However, the firm continued to bear losses for the year as both orders received and sales
revenues were less by 25 percent year-on-year in 2014
Past performance
2015 2016
• A contract with K-Electric worth
approximately Rs 10.7 billion for
execution of transmission package
• The firm's new orders and sales saw a
negative growth of 4.8 percent and 5.3
percent year-on-year, respectively
• Causes: Increase in continuation costs in
Islamabad International Airport
Projects, cost overruns in other projects
and under absorption of fixed costs due
to reduced sales
• Turnaround year , became profitable
again
• Efforts of management and increased
level of employee’s commitment and
dedication.
• The improvement in new orders and
revenues has been significant in 2016
• Gain from the sale of some key fixed
assets
Sales and Profitability
2011, 13.34 2012, 13.82
2013, 12.35
2014, 9.26 2015, 8.81
2016, 22.84
0
5
10
15
20
25
2010 2011 2012 2013 2014 2015 2016 2017
Neworders(bn)
Year
New Orders
New orders
Sales and Profitability
2011, 11.13%
2012, 6.62%
2013, 2.51%
2014, 7.20%
2015, 5.33%
2016, 9.19%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
2010 2011 2012 2013 2014 2015 2016 2017
GrossProfit(Ratio)
Year
Gross Profit (Ratio)
Gross Profit(ratio)
Sales and Profitability
2011, 0.45% 2012, -0.04%
2013, -7.48%
2014, -5.36% 2015, -5.70%
2016, 20.68%
2010 2011 2012 2013 2014 2015 2016 2017
Netprofit(Ratio)
Year
Net Profit (Ratio)
Net Profit(Ratio)
Sales and Profitability
2011, 38.0%
2012, 4.09% 2013, 5.01% 2014, 4.12% 2015, 3.98%
2016, 40.22%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
2010 2011 2012 2013 2014 2015 2016 2017
Percent
Year
ROE
ROE
Liquidity
2011, 1.19 2012, 1.23
2013, 1.09 2014, 1.09
2015, 1.22
2016, 1.38
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
2010 2011 2012 2013 2014 2015 2016 2017
CurrentRatio
Year
Current Ratio
Current Ratio
Liquidity
2011, 0.96 2012, 0.98
2013, 0.92
2014, 0.87
2015, 0.74
2016, 1.17
0
0.2
0.4
0.6
0.8
1
1.2
1.4
2010 2011 2012 2013 2014 2015 2016 2017
QuickRatio
Year
Quick Ratio
Quick Ratio
Market
2011, 0.01
2012, 0.15
2013, 0.02
2014, 0.01
2015, 0.01
2016, 0.13
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
2010 2011 2012 2013 2014 2015 2016 2017
Dividendyield
Year
Dividend Yield
Dividend Yield
Market
2011, 3.16 2012, 0.07 2013, -3.08 2014, 0.06 2015, -1.28
2016, 109.2
-20
0
20
40
60
80
100
120
2010 2011 2012 2013 2014 2015 2016 2017
Interestcover
Year
Interest Cover
Interest Cover
Efficiency
2011, 9.12 2012, 8.71 2013, 8.91 2014, 10.05
2015, 26.43
2016, 53.67
0
10
20
30
40
50
60
2010 2011 2012 2013 2014 2015 2016 2017
Fixedassetsturnover
Year
Fixed Assets Turnover
Fixed Assets Turnover
Efficiency
2011, 0.66
2012, 0.69
2013, 0.74
2014, 0.65
2015, 0.7
2016, 0.75
0.64
0.66
0.68
0.7
0.72
0.74
0.76
2010 2011 2012 2013 2014 2015 2016 2017
Year
Total Asset Turnover
Total Asset Turnover
Efficiency
2011, 1.74
2012, 1.9
2013, 2.06
2014, 1.55
2015, 1.82
2016, 2.52
0
0.5
1
1.5
2
2.5
3
2010 2011 2012 2013 2014 2015 2016 2017
InventoryTurnover
Year
Inventory Turnover
Inventory Turnover

More Related Content

Similar to Financial Statement Analysis - Siemens Pakistan

Calidda investor's presentation Q2 2014
Calidda  investor's presentation Q2 2014Calidda  investor's presentation Q2 2014
Calidda investor's presentation Q2 2014
Empresa de Energía de Bogotá
 
Cálidda earnings 4Q 13
Cálidda earnings   4Q 13Cálidda earnings   4Q 13
Cálidda earnings 4Q 13
Empresa de Energía de Bogotá
 
Calidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vfCalidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vf
Empresa de Energía de Bogotá
 
Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014
Empresa de Energía de Bogotá
 
ELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - CopyELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - Copy
Muneer Agha
 
WorlCall Telecommunication Limited
WorlCall Telecommunication LimitedWorlCall Telecommunication Limited
WorlCall Telecommunication Limited
harry3114
 
Firstcall shilpi cable_technologies_ltd_8_july15
Firstcall shilpi cable_technologies_ltd_8_july15Firstcall shilpi cable_technologies_ltd_8_july15
Firstcall shilpi cable_technologies_ltd_8_july15
IndiaNotes.com
 
Calidda conference call 3T 13
Calidda conference call 3T 13Calidda conference call 3T 13
Calidda conference call 3T 13
Empresa de Energía de Bogotá
 
ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
Ali Othman
 
Siqens GmbH
Siqens GmbHSiqens GmbH
Siqens GmbH
CleantechInnovate
 
System Integrator
System IntegratorSystem Integrator
System Integrator
Echelon Edge Pvt Ltd
 
Cardtronics Future Ready with Oracle EPM Cloud
Cardtronics Future Ready with Oracle EPM CloudCardtronics Future Ready with Oracle EPM Cloud
Cardtronics Future Ready with Oracle EPM Cloud
Perficient, Inc.
 
SIPL_Company_Profile.pptx
SIPL_Company_Profile.pptxSIPL_Company_Profile.pptx
SIPL_Company_Profile.pptx
NaveenRavindran6
 
Q414 investor call slides final
Q414 investor call slides finalQ414 investor call slides final
Q414 investor call slides final
broadwind
 
DAYANG – Fundamental Analysis FY15
DAYANG – Fundamental Analysis FY15DAYANG – Fundamental Analysis FY15
DAYANG – Fundamental Analysis FY15
lcchong76
 
205410 primavera and sap
205410 primavera and sap205410 primavera and sap
205410 primavera and sap
p6academy
 
Walton quickly presentation by rabbi
Walton quickly presentation by rabbiWalton quickly presentation by rabbi
Walton quickly presentation by rabbi
Md. Fazle Rabbi
 
Cv neeraj mittal-nit-iim-operations-business development-international
Cv neeraj mittal-nit-iim-operations-business development-internationalCv neeraj mittal-nit-iim-operations-business development-international
Cv neeraj mittal-nit-iim-operations-business development-international
Neeraj Mittal
 
Aveva marine pipeline
Aveva marine pipelineAveva marine pipeline
Aveva marine pipeline
budhiazis
 
Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019
KeppelCorporation
 

Similar to Financial Statement Analysis - Siemens Pakistan (20)

Calidda investor's presentation Q2 2014
Calidda  investor's presentation Q2 2014Calidda  investor's presentation Q2 2014
Calidda investor's presentation Q2 2014
 
Cálidda earnings 4Q 13
Cálidda earnings   4Q 13Cálidda earnings   4Q 13
Cálidda earnings 4Q 13
 
Calidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vfCalidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vf
 
Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014
 
ELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - CopyELBAYRAK Catalog_EN_R0 - Copy
ELBAYRAK Catalog_EN_R0 - Copy
 
WorlCall Telecommunication Limited
WorlCall Telecommunication LimitedWorlCall Telecommunication Limited
WorlCall Telecommunication Limited
 
Firstcall shilpi cable_technologies_ltd_8_july15
Firstcall shilpi cable_technologies_ltd_8_july15Firstcall shilpi cable_technologies_ltd_8_july15
Firstcall shilpi cable_technologies_ltd_8_july15
 
Calidda conference call 3T 13
Calidda conference call 3T 13Calidda conference call 3T 13
Calidda conference call 3T 13
 
ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
 
Siqens GmbH
Siqens GmbHSiqens GmbH
Siqens GmbH
 
System Integrator
System IntegratorSystem Integrator
System Integrator
 
Cardtronics Future Ready with Oracle EPM Cloud
Cardtronics Future Ready with Oracle EPM CloudCardtronics Future Ready with Oracle EPM Cloud
Cardtronics Future Ready with Oracle EPM Cloud
 
SIPL_Company_Profile.pptx
SIPL_Company_Profile.pptxSIPL_Company_Profile.pptx
SIPL_Company_Profile.pptx
 
Q414 investor call slides final
Q414 investor call slides finalQ414 investor call slides final
Q414 investor call slides final
 
DAYANG – Fundamental Analysis FY15
DAYANG – Fundamental Analysis FY15DAYANG – Fundamental Analysis FY15
DAYANG – Fundamental Analysis FY15
 
205410 primavera and sap
205410 primavera and sap205410 primavera and sap
205410 primavera and sap
 
Walton quickly presentation by rabbi
Walton quickly presentation by rabbiWalton quickly presentation by rabbi
Walton quickly presentation by rabbi
 
Cv neeraj mittal-nit-iim-operations-business development-international
Cv neeraj mittal-nit-iim-operations-business development-internationalCv neeraj mittal-nit-iim-operations-business development-international
Cv neeraj mittal-nit-iim-operations-business development-international
 
Aveva marine pipeline
Aveva marine pipelineAveva marine pipeline
Aveva marine pipeline
 
Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019
 

Recently uploaded

ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
TestOrg1
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
MandalayResources
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
SOFTTECHHUB
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
f3wjr2q2
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
Methanex Corporation
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
Probe Gold
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
Cleades Robinson
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
LHelferty
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
cosmo-soil
 

Recently uploaded (14)

ppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.pptppt-namibia-worldeconomy-standardbank.ppt
ppt-namibia-worldeconomy-standardbank.ppt
 
Mandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPTMandalay Resouces June 2024 Investor Relations PPT
Mandalay Resouces June 2024 Investor Relations PPT
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024Collective Mining | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdfZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
ZKsync airdrop of 3.6 billion ZK tokens is scheduled by ZKsync for next week.pdf
 
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
快速办理(CUBoulder毕业证书)科罗拉多大学博尔德分校毕业证录取通知书一模一样
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024Methanex Investor Presentation - April 2024
Methanex Investor Presentation - April 2024
 
AGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdfAGM Presentation Probe June 11 Final.pdf
AGM Presentation Probe June 11 Final.pdf
 
Cleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is BlueCleades robinson:The Diplomat is Blue
Cleades robinson:The Diplomat is Blue
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
 
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptxUnderstanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
Understanding-the-E-Way-Bill-A-Digital-Transformation-in-Logistics.pptx
 

Financial Statement Analysis - Siemens Pakistan

  • 1. Presented by: Mahira Nisar Zoya Farooq SiemensPakistan EngineeringCompanyLimited
  • 2. Introduction Siemens Pakistan Engineering Company Limited has been established since pre- partition days. It started in Pakistan with first cable laying project in Karachi. The firm was incorporated as public listed company in 1963, when it established a factory for motors and transformers in addition to the switchboards.  In 1976, the firm introduced diesel generating sets. The firm made another breakthrough when it was able to setup 412MW combined cycle Rousche Power Plant, and became the first value added seller of SAP.
  • 3. Introduction In 2000s, Siemens Pakistan completed the first load dispatch center for K-Electric and later continued grid stations for K-Electric, Wapda and DEWA Dubai. The firm has been successful is commissioning of Sawan and Kandhkot gas compression trains, equipping of Al Razi Medical Diagnostic Centre with imaging equipment, and getting a new project for airfield lighting for Benazir Bhutto International Airport. In 2012, the firm armed Karachi's largest mall - Dolmen Mall - with safety, security & building management technology.
  • 4. Introduction Major shareholders  Siemens AG Germany 74.65%  National Investment Trust 12.64%  General Public 4.36% Business Segments  Energy Segment  Healthcare Segment  Industry Division  Infrastructure & cities
  • 5. Business Segments Energy segment Healthcare segment • Power generation • Wind power • Power transmission • Energy services • Imaging and therapy systems • Clinical products • Diagnostics and customer solutions
  • 6. Business Segments Industry division Infrastructure & cities • Industry automation • Technologies • Customer service • Building technologies • Rail systems • Mobility and logistics • Smart grids
  • 7. Past Performance 2009-2013 • Net turnover and annual orders have halved • Causes contributing to the company’s dwindling performance:  The termination of contract worth of Rs 1.992 billion by the Civil Aviation Authority (CAA) relating to power supply and telecommunication network at New Benazir Bhutto International Airport, Islamabad  Delays in different projects of various business segments  Restructuring, rightsizing and portfolio adjustment activities which have also affected profitability
  • 8. Past Performance 2014 • Improvement in gross margins, as some signs of recovery were witnessed; the firm got the contract for the work at New Benazir Bhutto International Airport, Islamabad by the CAA again • However, the firm continued to bear losses for the year as both orders received and sales revenues were less by 25 percent year-on-year in 2014
  • 9. Past performance 2015 2016 • A contract with K-Electric worth approximately Rs 10.7 billion for execution of transmission package • The firm's new orders and sales saw a negative growth of 4.8 percent and 5.3 percent year-on-year, respectively • Causes: Increase in continuation costs in Islamabad International Airport Projects, cost overruns in other projects and under absorption of fixed costs due to reduced sales • Turnaround year , became profitable again • Efforts of management and increased level of employee’s commitment and dedication. • The improvement in new orders and revenues has been significant in 2016 • Gain from the sale of some key fixed assets
  • 10. Sales and Profitability 2011, 13.34 2012, 13.82 2013, 12.35 2014, 9.26 2015, 8.81 2016, 22.84 0 5 10 15 20 25 2010 2011 2012 2013 2014 2015 2016 2017 Neworders(bn) Year New Orders New orders
  • 11. Sales and Profitability 2011, 11.13% 2012, 6.62% 2013, 2.51% 2014, 7.20% 2015, 5.33% 2016, 9.19% 0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 2010 2011 2012 2013 2014 2015 2016 2017 GrossProfit(Ratio) Year Gross Profit (Ratio) Gross Profit(ratio)
  • 12. Sales and Profitability 2011, 0.45% 2012, -0.04% 2013, -7.48% 2014, -5.36% 2015, -5.70% 2016, 20.68% 2010 2011 2012 2013 2014 2015 2016 2017 Netprofit(Ratio) Year Net Profit (Ratio) Net Profit(Ratio)
  • 13. Sales and Profitability 2011, 38.0% 2012, 4.09% 2013, 5.01% 2014, 4.12% 2015, 3.98% 2016, 40.22% 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 45.0% 2010 2011 2012 2013 2014 2015 2016 2017 Percent Year ROE ROE
  • 14. Liquidity 2011, 1.19 2012, 1.23 2013, 1.09 2014, 1.09 2015, 1.22 2016, 1.38 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 2010 2011 2012 2013 2014 2015 2016 2017 CurrentRatio Year Current Ratio Current Ratio
  • 15. Liquidity 2011, 0.96 2012, 0.98 2013, 0.92 2014, 0.87 2015, 0.74 2016, 1.17 0 0.2 0.4 0.6 0.8 1 1.2 1.4 2010 2011 2012 2013 2014 2015 2016 2017 QuickRatio Year Quick Ratio Quick Ratio
  • 16. Market 2011, 0.01 2012, 0.15 2013, 0.02 2014, 0.01 2015, 0.01 2016, 0.13 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 2010 2011 2012 2013 2014 2015 2016 2017 Dividendyield Year Dividend Yield Dividend Yield
  • 17. Market 2011, 3.16 2012, 0.07 2013, -3.08 2014, 0.06 2015, -1.28 2016, 109.2 -20 0 20 40 60 80 100 120 2010 2011 2012 2013 2014 2015 2016 2017 Interestcover Year Interest Cover Interest Cover
  • 18. Efficiency 2011, 9.12 2012, 8.71 2013, 8.91 2014, 10.05 2015, 26.43 2016, 53.67 0 10 20 30 40 50 60 2010 2011 2012 2013 2014 2015 2016 2017 Fixedassetsturnover Year Fixed Assets Turnover Fixed Assets Turnover
  • 19. Efficiency 2011, 0.66 2012, 0.69 2013, 0.74 2014, 0.65 2015, 0.7 2016, 0.75 0.64 0.66 0.68 0.7 0.72 0.74 0.76 2010 2011 2012 2013 2014 2015 2016 2017 Year Total Asset Turnover Total Asset Turnover
  • 20. Efficiency 2011, 1.74 2012, 1.9 2013, 2.06 2014, 1.55 2015, 1.82 2016, 2.52 0 0.5 1 1.5 2 2.5 3 2010 2011 2012 2013 2014 2015 2016 2017 InventoryTurnover Year Inventory Turnover Inventory Turnover