7:00am
___ Attend stand-up meeting
___Pull bank and get change if needed
___Check e-mail and respond/act accordingly
___Print Contingency Report if (Check to see if AYS
printed one first 1.6.8)
___Review house count & fill in information ( 1.6.1.N)
___Open GuestWare (Log all issues orGuest info
throughout shift. Make sure to use “Request”)
___Check for mobile guest arrivals & departures
___PA MARSHA 5 days out ( PA/DDMMM)
___Clear exceptions (1.1.4.2.A)
7:30am-8:30pm
___Print ZZ Departure Report and Check out all ZZ
accounts to the credit card on file (1.6.29.1.2.13.Y)
___Print Daily forecast summary to see the types of
. . . reservations arriving (1.1.7.1)
___Check all front office printers including boarding pass . . .
printer and stockappropriately
___Check for status C reservations and make sure all ZZ’s
are set up correctly
___Check for mobile guest arrivals & departures
___Clear OVVO Rooms (1.6.4.3. OVVO)
Credit Limit **Alert shift leader of major credit issues**
___Run Credit Limit Reports (1.10.1.Y.Y)
___Print Credit Card Review Report (1.10.17)
bbbIf decline and future reservation, go to reservation and
dddchange line 21 to CA/Collect MOP
___Print High Balance Report (1.6.29.1.2.5.Y) Check for any
accounts with a balance over $1000. Charge CC on file
for the balance.
___Run Supplemental Credit Report (1.10.10.1)
___Print Credit Card Review Report again (1.10.17)
8:30am-10:30am
___Print VIP report and pre-block and check-in room like a
Mobile check-in (1.6.11.V1)
___Check for mobile guest arrivals & departures
___View House count (1.6.1.N) C/I___ C/O___%___
___Check out OVVO rooms (1.4.3.OVVO)
___Get out from behind the deskand meet and greet people if
there is availability in people
___Check for Packages and place note in line 17 (1.6.29.1.2.8)
___ Run B6 report and ensure rooms control
has BF vouchers prepared for the days arrivals (1.6.11.B6)
___Ensure guest laundry has been picked up and delivered
___Print Elite Guest List and pre-block (1.6.11. X4 P6 X1 M1 Y1)
___Clear OVVO Rooms (1.6.4.3.OVVO)
10:30am-1:00pm
***Delta and MEPS Process***
___Print MEP and Delta reservations and
And pre-block all into respective rooms
___Make sure there are 16 MEP rooms on
Floor 6 and 4 MEP rooms on floor 5
___Check-in all MEP VR rooms and ensure
All 20 are completed by 2:00pm
___Pre-block all Delta crews on to the same
floor respectively.
___Check-in all Delta Rooms if possible,if
not, check-in until next shift
1:00pm-2:00pm
___Check for mobile C/I and C/O’s
___Clear OVVO Rooms (1.6.4.3.OVVO)
___Ensure all status ‘4’ reservations are blocked
and HK has been called to expedite rooms
(1.6.20.D)
___Note GuestWare and follow up as needed
___Note “Guest of the Day” from Elite Guest List
and prepare amenity, and personal letter.
(Preferably choose Plat, or top 50 for 1night)
2:00pm-3:00pm
___Restockand clean front desk
___Clear OVVO rooms (1.6.4.3.OVVO)
___Askthe shift leader if you can Bank Out and
close your shift (1.9.1.XX.XX).
___Place all accounting shiftwork in “Shift 1” box
and hand completed shiftwork to MOD/FOM
___Pass on all relevant info to next shift
*****Thank you for a hard day’s work!!!*****
Date: Team
Occupancy: Sell Strategy
Arrivals: GENR
Departures: DLUX
Stayovers: EXEC
Agent Signatures______________________
FOM Signatures______________________

More Related Content

Viewers also liked

Monthly smoke derector inspection report
Monthly smoke derector inspection reportMonthly smoke derector inspection report
Monthly smoke derector inspection report
Azmeel Contracting Company
 
Toilet cleaning check list
Toilet cleaning check listToilet cleaning check list
Toilet cleaning check list
Azmeel Contracting Company
 
Weekly generator check list
Weekly generator check listWeekly generator check list
Weekly generator check list
Azmeel Contracting Company
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
Ram Srivastava
 
Weekly air compressor check list
Weekly air compressor check listWeekly air compressor check list
Weekly air compressor check list
Azmeel Contracting Company
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
Choong KW
 
Checklist
ChecklistChecklist
Checklist
dygmasnah65
 
Hvac Pre-Service Checklist
Hvac Pre-Service ChecklistHvac Pre-Service Checklist
Hvac Pre-Service Checklist
JohnCFlood
 
52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist
imaduddin91
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
imaduddin91
 

Viewers also liked (10)

Monthly smoke derector inspection report
Monthly smoke derector inspection reportMonthly smoke derector inspection report
Monthly smoke derector inspection report
 
Toilet cleaning check list
Toilet cleaning check listToilet cleaning check list
Toilet cleaning check list
 
Weekly generator check list
Weekly generator check listWeekly generator check list
Weekly generator check list
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
Weekly air compressor check list
Weekly air compressor check listWeekly air compressor check list
Weekly air compressor check list
 
Hvac Presentation
Hvac PresentationHvac Presentation
Hvac Presentation
 
Checklist
ChecklistChecklist
Checklist
 
Hvac Pre-Service Checklist
Hvac Pre-Service ChecklistHvac Pre-Service Checklist
Hvac Pre-Service Checklist
 
52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist52573830 electrical inspectionchecklist
52573830 electrical inspectionchecklist
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 

FD AM Checklist 070415

  • 1. Front Desk Checklist AM Shift Initial each item as completed 7:00am ___ Attend stand-up meeting ___Pull bank and get change if needed ___Check e-mail and respond/act accordingly ___Print Contingency Report if (Check to see if AYS printed one first 1.6.8) ___Review house count & fill in information ( 1.6.1.N) ___Open GuestWare (Log all issues orGuest info throughout shift. Make sure to use “Request”) ___Check for mobile guest arrivals & departures ___PA MARSHA 5 days out ( PA/DDMMM) ___Clear exceptions (1.1.4.2.A) 7:30am-8:30pm ___Print ZZ Departure Report and Check out all ZZ accounts to the credit card on file (1.6.29.1.2.13.Y) ___Print Daily forecast summary to see the types of . . . reservations arriving (1.1.7.1) ___Check all front office printers including boarding pass . . . printer and stockappropriately ___Check for status C reservations and make sure all ZZ’s are set up correctly ___Check for mobile guest arrivals & departures ___Clear OVVO Rooms (1.6.4.3. OVVO) Credit Limit **Alert shift leader of major credit issues** ___Run Credit Limit Reports (1.10.1.Y.Y) ___Print Credit Card Review Report (1.10.17) bbbIf decline and future reservation, go to reservation and dddchange line 21 to CA/Collect MOP ___Print High Balance Report (1.6.29.1.2.5.Y) Check for any accounts with a balance over $1000. Charge CC on file for the balance. ___Run Supplemental Credit Report (1.10.10.1) ___Print Credit Card Review Report again (1.10.17) 8:30am-10:30am ___Print VIP report and pre-block and check-in room like a Mobile check-in (1.6.11.V1) ___Check for mobile guest arrivals & departures ___View House count (1.6.1.N) C/I___ C/O___%___ ___Check out OVVO rooms (1.4.3.OVVO) ___Get out from behind the deskand meet and greet people if there is availability in people ___Check for Packages and place note in line 17 (1.6.29.1.2.8) ___ Run B6 report and ensure rooms control has BF vouchers prepared for the days arrivals (1.6.11.B6) ___Ensure guest laundry has been picked up and delivered ___Print Elite Guest List and pre-block (1.6.11. X4 P6 X1 M1 Y1) ___Clear OVVO Rooms (1.6.4.3.OVVO) 10:30am-1:00pm ***Delta and MEPS Process*** ___Print MEP and Delta reservations and And pre-block all into respective rooms ___Make sure there are 16 MEP rooms on Floor 6 and 4 MEP rooms on floor 5 ___Check-in all MEP VR rooms and ensure All 20 are completed by 2:00pm ___Pre-block all Delta crews on to the same floor respectively. ___Check-in all Delta Rooms if possible,if not, check-in until next shift 1:00pm-2:00pm ___Check for mobile C/I and C/O’s ___Clear OVVO Rooms (1.6.4.3.OVVO) ___Ensure all status ‘4’ reservations are blocked and HK has been called to expedite rooms (1.6.20.D) ___Note GuestWare and follow up as needed ___Note “Guest of the Day” from Elite Guest List and prepare amenity, and personal letter. (Preferably choose Plat, or top 50 for 1night) 2:00pm-3:00pm ___Restockand clean front desk ___Clear OVVO rooms (1.6.4.3.OVVO) ___Askthe shift leader if you can Bank Out and close your shift (1.9.1.XX.XX). ___Place all accounting shiftwork in “Shift 1” box and hand completed shiftwork to MOD/FOM ___Pass on all relevant info to next shift *****Thank you for a hard day’s work!!!***** Date: Team Occupancy: Sell Strategy Arrivals: GENR Departures: DLUX Stayovers: EXEC Agent Signatures______________________ FOM Signatures______________________