Saving any amount of time when configuring or deploying servers can help IT admins as well as your organization. Enterprise-grade organizations might feel the pressure of a large-scale Dell PowerEdge server rollout and want to save time with pre-configured servers or on-site installation. Smaller organizations might not have IT staff available to configure or deploy PowerEdge servers in a new data center. Dell ProDeploy can save you time in these scenarios and more.
Regardless of whether you’re rolling out a hundred servers at once into an established IT infrastructure or needing on-site services installing new servers in a regional data center, using ProDeploy Infrastructure Suite can help your organization achieve critical business priorities and save time for your IT admins.
Faster, easier deployment of Dell PowerEdge servers helps it and your businessPrincipled Technologies
Saving IT deployment time has a number of benefits, including reducing setup hassle and complexities, freeing up time of administrators, and reducing costs. By choosing Dell PowerEdge servers with pre-installed OEM software, specifically Microsoft Windows Server 2012 R2 and Hyper-V, you’re saving time and effort compared to buying the server without the software. We found you could save over 3.5 hours by purchasing the server with pre-installed software. Deploying more servers can save time too, as our findings can scale up to meet IT resource needs of your business. What’s more, choosing the Dell server with pre-installed software can save you 24 percent of additional licensing costs per server.
Implementing and managing large and distributed enterprise solutions presents unique administrative challenges. Anything that can streamline the process to minimize error and save administrator time and effort can have a strong, positive effect on your company’s bottom line. We found that the Dell Chassis Management Controller made deploying Dell PowerEdge M620 blades in a Dell PowerEdge M1000e chassis much quicker and easier by allowing you to import existing server profiles in just a few clicks. In our test case to configure for a common mission critical application, Citrix XenDesktop, manually deploying a full 16-blade chassis required 800 steps; but only 59 steps with Dell Chassis Management Controller, transforming a multi-hour task to one that took just minutes. Certain demanding applications can require even greater hardware configuration — these would benefit even more from the “all settings” profile capture and replication features of the Dell Chassis Management Controller.
The ability to pre-provision empty slots and export profiles for redeployment on other chassis further increases the value of the Dell Chassis Management Controller in bigger environments by largely eliminating tedious, redundant tasks and decreasing the opportunities for human error, while freeing administrators to perform other mission-critical or innovative activities. Choosing a solution that automates much of the deployment process is an asset to managing your infrastructure and your business.
Systems management savings with Dell OpenManage on 13G Dell PowerEdge servers Principled Technologies
Administrators can spend their time doing routine tasks such as firmware updates, or they can spend their time on other initiatives to make your data center and your business more successful. Older servers keep admins focused on routine tasks instead of innovation because they just don’t have the capabilities to streamline management in a meaningful way to lessen the burden of routine management tasks.
In our hands-on tests, we found that Dell PowerEdge R730 servers with Dell OpenManage dramatically reduced the time it took to deploy, update, monitor, and maintain servers compared to completing the tasks manually on older systems. We estimate that you could save as much as 91.3 percent of administrator time—nearly 800 hours—over two years for a 200-server deployment.
Don’t let your older servers continue to be a time sink for administrators. By upgrading to new Dell PowerEdge R730 servers with new systems management features to handle routine tasks, you can potentially redirect those resources to innovation in other areas.
When considering whether to upgrade to the new Dell PowerEdge VRTX or repurpose older hardware, the advantages of new hardware are clear. Not only do you get newer hardware that is faster and is better-equipped to handle the increasing demands of today’s business applications and workloads, but you also benefit from advances that make deployment and management easier than ever.
In our labs, we compared the Dell PowerEdge VRTX with four server nodes and shared storage and networking to a similar infrastructure using four legacy tower servers, external network switches, and an external SAN. Our testing revealed the following:
· PowerEdge VRTX took 78.5 percent less time and 150 fewer steps to configure and deploy out of the box compared to the legacy solution.
· PowerEdge VRTX It took less than 1 hour to unbox and configure into a highly available VMware vSphere cluster compared to over 4 hours on the legacy solution.
· Deploying the Dell PowerEdge VRTX used just a single management tool, the integrated Chassis Management Controller, whereas the tower solution required six separate management tools.
Choosing such a complete solution during your next server refresh can simplify infrastructure setup and configuration, boost performance through built-in high availability features, and potentially save your organization space and operating costs over the life of the hardware.
Dell EMC ProDeploy Plus for Enterprise services deployed
and configured new storage resources and data protection
appliances faster than an in‑house administrator
Administrators can spend a great deal of time deploying and managing computing resources, especially when dealing with ROBO environments. The Dell PowerEdge VRTX, powered by the Intel Xeon processor E5-2400 v2 product family and running Microsoft Windows Server 2012 R2, gives administrators centralized management tools to help them provide time saving benefits and integrated toolsets.
In our hands-on testing, we found that the Dell PowerEdge VRTX greatly simplified deployment through an easy, wizard-based setup of Microsoft Windows Server Failover Clusters across server nodes with the Dell OpenManage Cluster Configurator. It also provided versatile hardware resource reassignment through a shared PCIe bus and efficient centralized management through CMC and scripting. Finally, we found that the Dell System Update Utility worked seamlessly with Microsoft Cluster-Aware Updating to update server nodes while keeping the failover cluster online and minimizing downtime. These advantages make the Dell PowerEdge VRTX an attractive choice for those who seek to reduce the management overhead of their ROBO environments.
Simplifying systems management with Dell OpenManage on 13G Dell PowerEdge ser...Principled Technologies
Automated systems management and additional connectivity solutions can reduce the number of administrators you need to run your datacenter or simply free up administrators to innovate rather than tying them up with routine management tasks. We found that the Dell OpenManage suite provides several new features for 13G Dell PowerEdge server solutions to streamline management tasks in both time and steps. Other new features let us easily connect to iDRAC right from the server. Updating firmware with Dell OpenManage features was also easier—eliminating 213 steps for updating a single server compared to updating manually.
The latest versions of the Dell OpenManage suite of system management tools and the power of iDRAC 8 contained within Dell 13G servers gives administrators increased flexibility and powerful new options for managing their data centers that translate to demonstrable savings in time and administrative effort. These automated enhancements and new technologies enable administrators to manage increasingly larger workloads while reducing the amount of hands-on work required for each system, bringing real value to systems management and datacenter operations.
Reduce hands-on deployment times to near zero* with iDRAC9 automationPrincipled Technologies
iDRAC9 v6.10 offers automated OS deployment alongside the Zero-Touch provisioning feature
Maximizing the value of administrator time and deploying new systems quickly is critical to business success.
iDRAC9 v6.10 provides administrators with Zero-Touch system provisioning features that include OS deployment,
allowing them to automate these routine tasks and reduce the time to deploy servers by 97.9 percent compared
to doing the same tasks manually. It also lets administrators avoid the hassle of scheduling, tracking, and
maintaining iDRAC9 SSL certificate renewals. Using iDRAC9 v6.10 to automate or even eliminate routine tasks
can give administrators time back to innovate and help your business grow. It can also help ensure a smoother
deployment by reducing the chance for errors that lead to lengthy troubleshooting.
Faster, easier deployment of Dell PowerEdge servers helps it and your businessPrincipled Technologies
Saving IT deployment time has a number of benefits, including reducing setup hassle and complexities, freeing up time of administrators, and reducing costs. By choosing Dell PowerEdge servers with pre-installed OEM software, specifically Microsoft Windows Server 2012 R2 and Hyper-V, you’re saving time and effort compared to buying the server without the software. We found you could save over 3.5 hours by purchasing the server with pre-installed software. Deploying more servers can save time too, as our findings can scale up to meet IT resource needs of your business. What’s more, choosing the Dell server with pre-installed software can save you 24 percent of additional licensing costs per server.
Implementing and managing large and distributed enterprise solutions presents unique administrative challenges. Anything that can streamline the process to minimize error and save administrator time and effort can have a strong, positive effect on your company’s bottom line. We found that the Dell Chassis Management Controller made deploying Dell PowerEdge M620 blades in a Dell PowerEdge M1000e chassis much quicker and easier by allowing you to import existing server profiles in just a few clicks. In our test case to configure for a common mission critical application, Citrix XenDesktop, manually deploying a full 16-blade chassis required 800 steps; but only 59 steps with Dell Chassis Management Controller, transforming a multi-hour task to one that took just minutes. Certain demanding applications can require even greater hardware configuration — these would benefit even more from the “all settings” profile capture and replication features of the Dell Chassis Management Controller.
The ability to pre-provision empty slots and export profiles for redeployment on other chassis further increases the value of the Dell Chassis Management Controller in bigger environments by largely eliminating tedious, redundant tasks and decreasing the opportunities for human error, while freeing administrators to perform other mission-critical or innovative activities. Choosing a solution that automates much of the deployment process is an asset to managing your infrastructure and your business.
Systems management savings with Dell OpenManage on 13G Dell PowerEdge servers Principled Technologies
Administrators can spend their time doing routine tasks such as firmware updates, or they can spend their time on other initiatives to make your data center and your business more successful. Older servers keep admins focused on routine tasks instead of innovation because they just don’t have the capabilities to streamline management in a meaningful way to lessen the burden of routine management tasks.
In our hands-on tests, we found that Dell PowerEdge R730 servers with Dell OpenManage dramatically reduced the time it took to deploy, update, monitor, and maintain servers compared to completing the tasks manually on older systems. We estimate that you could save as much as 91.3 percent of administrator time—nearly 800 hours—over two years for a 200-server deployment.
Don’t let your older servers continue to be a time sink for administrators. By upgrading to new Dell PowerEdge R730 servers with new systems management features to handle routine tasks, you can potentially redirect those resources to innovation in other areas.
When considering whether to upgrade to the new Dell PowerEdge VRTX or repurpose older hardware, the advantages of new hardware are clear. Not only do you get newer hardware that is faster and is better-equipped to handle the increasing demands of today’s business applications and workloads, but you also benefit from advances that make deployment and management easier than ever.
In our labs, we compared the Dell PowerEdge VRTX with four server nodes and shared storage and networking to a similar infrastructure using four legacy tower servers, external network switches, and an external SAN. Our testing revealed the following:
· PowerEdge VRTX took 78.5 percent less time and 150 fewer steps to configure and deploy out of the box compared to the legacy solution.
· PowerEdge VRTX It took less than 1 hour to unbox and configure into a highly available VMware vSphere cluster compared to over 4 hours on the legacy solution.
· Deploying the Dell PowerEdge VRTX used just a single management tool, the integrated Chassis Management Controller, whereas the tower solution required six separate management tools.
Choosing such a complete solution during your next server refresh can simplify infrastructure setup and configuration, boost performance through built-in high availability features, and potentially save your organization space and operating costs over the life of the hardware.
Dell EMC ProDeploy Plus for Enterprise services deployed
and configured new storage resources and data protection
appliances faster than an in‑house administrator
Administrators can spend a great deal of time deploying and managing computing resources, especially when dealing with ROBO environments. The Dell PowerEdge VRTX, powered by the Intel Xeon processor E5-2400 v2 product family and running Microsoft Windows Server 2012 R2, gives administrators centralized management tools to help them provide time saving benefits and integrated toolsets.
In our hands-on testing, we found that the Dell PowerEdge VRTX greatly simplified deployment through an easy, wizard-based setup of Microsoft Windows Server Failover Clusters across server nodes with the Dell OpenManage Cluster Configurator. It also provided versatile hardware resource reassignment through a shared PCIe bus and efficient centralized management through CMC and scripting. Finally, we found that the Dell System Update Utility worked seamlessly with Microsoft Cluster-Aware Updating to update server nodes while keeping the failover cluster online and minimizing downtime. These advantages make the Dell PowerEdge VRTX an attractive choice for those who seek to reduce the management overhead of their ROBO environments.
Simplifying systems management with Dell OpenManage on 13G Dell PowerEdge ser...Principled Technologies
Automated systems management and additional connectivity solutions can reduce the number of administrators you need to run your datacenter or simply free up administrators to innovate rather than tying them up with routine management tasks. We found that the Dell OpenManage suite provides several new features for 13G Dell PowerEdge server solutions to streamline management tasks in both time and steps. Other new features let us easily connect to iDRAC right from the server. Updating firmware with Dell OpenManage features was also easier—eliminating 213 steps for updating a single server compared to updating manually.
The latest versions of the Dell OpenManage suite of system management tools and the power of iDRAC 8 contained within Dell 13G servers gives administrators increased flexibility and powerful new options for managing their data centers that translate to demonstrable savings in time and administrative effort. These automated enhancements and new technologies enable administrators to manage increasingly larger workloads while reducing the amount of hands-on work required for each system, bringing real value to systems management and datacenter operations.
Reduce hands-on deployment times to near zero* with iDRAC9 automationPrincipled Technologies
iDRAC9 v6.10 offers automated OS deployment alongside the Zero-Touch provisioning feature
Maximizing the value of administrator time and deploying new systems quickly is critical to business success.
iDRAC9 v6.10 provides administrators with Zero-Touch system provisioning features that include OS deployment,
allowing them to automate these routine tasks and reduce the time to deploy servers by 97.9 percent compared
to doing the same tasks manually. It also lets administrators avoid the hassle of scheduling, tracking, and
maintaining iDRAC9 SSL certificate renewals. Using iDRAC9 v6.10 to automate or even eliminate routine tasks
can give administrators time back to innovate and help your business grow. It can also help ensure a smoother
deployment by reducing the chance for errors that lead to lengthy troubleshooting.
Using Dell ProDeploy Plus for Infrastructure can improve deployment times for...Principled Technologies
Save valuable in-house admin time by using a Dell Technologies-certified engineer for installation and configuration of a Dell solution
New data center resources can be great for your critical workloads and applications, but deploying those resources can burden IT staff. Organizations adding Dell Technologies solutions to their data center can use the deployment service Dell ProDeploy Plus for Infrastructure to simplify deployment and save time.
We found that Dell ProDeploy Plus:
• Planned the deployment with minimal input from our in-house staff, which freed them up to focus on
organizational demands and other strategic initiatives during deployment
• Reduced deployment planning by 67 percent—down to just three hours and 34 minutes—saving significant pre-deployment time for our admin as well as in totality
• Deployed our Dell Technologies solution in just one business day, needing just four
hours and 17 minutes
• Reduced installation time by nearly 16 hours, or two days, compared to our admin—or in other words, deployed the solution three times as fast
With ProDeploy Plus for Infrastructure, your organization can realize a faster, more efficient deployment of Dell technology with minimal impact on your in-house IT staff.
Microsoft System Center virtual environment comparison: Dell PowerEdge server...Principled Technologies
When repetitive and admin-intensive management tasks are quicker and easier to complete, that’s a win for your datacenter and IT administrators. We found that using Dell Lifecycle Controller Integration for SCVMM took 74.6 percent less time to complete four key server management use cases on a single server, compared to performing the same use cases with HP OneView for System Center. When managing many servers, data extrapolated to 100 servers from testing on a second server shows the Dell solution would take 95.8 percent fewer steps and 96.5 percent less time than the HP solution. Dell Lifecycle Controller Integration for Microsoft System Center Virtual Machine Manager also enabled IT admins to perform all of the server management operations through a single console—and staged firmware updates without necessitating a server power-down. Easier to use and less time-intensive, the results of our testing showed that the DLCI for SCVMM and Microsoft System Center Virtual Machine Manager can be a more efficient and effective combination for your virtualized datacenter.
As our tests show, investing in the powerful new Dell PowerEdge R920 running Oracle VM Server 3.2.8 with Oracle Database 12c VMs achieves cost savings without compromising performance. In our testing, a single Dell PowerEdge R920 could perform five times the work of a single HP ProLiant DL385 G6 server; the costs to power and cool the Dell PowerEdge would be 43 percent less than the five servers it could replace. The three-year software licensing costs of the Dell PowerEdge R920 server would be 22 percent lower than the licensing costs for the five-server solution. These dramatic savings—which come out to $212,091 for our single test environment — could grow to millions of dollars in a larger consolidation effort.
Dell 3-2-1 Reference Configurations: High available and scalable performance ...Principled Technologies
Dell 3-2-1 Reference Configurations consisting of Dell PowerEdge R720 servers, Dell Force10 S4810P switches, and Dell EqualLogic PS6110XV storage provide a range of configuration options so that you can select the one that is right for your business needs. Additionally, each configuration is easily scalable to accommodate for business growth.
The 3-2-1 base configuration provides a robust solution for any business needing to support up to 500 users on multiple business applications. Our tests demonstrate this solution supporting 500 users per VM for four VMs including two database VMs, one email VM, and one collaboration application VM.
If the number of users you need to support exceeds the user count the base configuration provides, adding another Dell PowerEdge R720 server to make a 4-2-1 configuration can support up to 1,000 users on multiple business applications while maintaining high availability. Our tests demonstrate this solution supporting 1,000 users per VM in the same four VMs as the 3-2-1 solution. Additionally, these configurations are so easy to scale upward that you can complete the process of adding a server in a matter of two hours or less from start to finish.
If you require support for an even higher number of users, adding a server and storage array to the base configuration, to make a 4-2-2 configuration allows for up to 1,500 users on multiple business applications. Our tests demonstrated this when we ran 1,500 users against each of the four VMs. Better yet, adding a Dell EqualLogic PS6110XV storage array to an existing 4-2-1 configuration is a cinch, taking under 30 minutes start to finish.
All of these Dell Reference Configurations give your business the reliability of highly available hardware configurations, greatly reducing downtime resulting from any hardware malfunctions.
By choosing proven Dell architecture, you avoid the hassles of putting your infrastructure together piece by piece, reducing the potential for error and providing you with a sturdy solution that is easily scalable to fit your present and future needs.
Dell PowerEdge R920 and Microsoft SQL Server 2014 Migration and Benefits GuidePrincipled Technologies
The latest Dell PowerEdge R920 server is designed to provide highly scalable performance for large enterprises, with greater memory capacity, improved and expanded attached storage options, and processor architectures designed for high availability. Microsoft SQL Server 2014 is the perfect companion software to take advantage of the Dell PowerEdge R920’s impressive specifications. Upgrading has never looked more attractive, and with hardware/software upgrades must come data migration.
Migrating legacy database applications to the latest database technologies on newer Dell server platforms is a common task for businesses upgrading their hardware/software stack. As this guide shows, the process is straightforward and the cost benefits can be enormous. We calculated the savings attainable from multiple consolidation ratios, as well as how long it would take to pay off the replacement server. We found that a consolidation ratio of 13 to 1 could yield $531,725 in software savings, many times the cost of the replacement hardware itself. So not only will the business benefit from the massively-scalable current-generation Dell server technology paired with Microsoft Windows Server 2012 R2 running SQL Server 2014, but you can save money in the process.
Spend less time, effort, and money by choosing a Dell EMC server with pre-ins...Principled Technologies
Deploying a Dell EMC PowerEdge R740 with pre-installed Microsoft Windows Server 2016 Standard took less time and fewer steps than deploying the same server without it
Compared to aging desktops, new Dell OptiPlex desktops can allow employees to be more productive with faster and more reliable hardware while providing significantly lower power costs. Improved management technology with the new desktops can support the efforts of your IT staff and can reduce costly deskside visits. Upgrading your aging desktops with the Dell OptiPlex 9030 All-in-One or the Dell OptiPlex 9020 Micro desktops brings important improvements to your business through both hardware and software.
Meet database performance needs while reducing TCO with the Dell PowerEdge VR...Principled Technologies
Cloud WAN services can seem convenient for small businesses and remote offices, but they remove local control and can be more expensive over time. In our tests, the all-in-one Dell PowerEdge VRTX provided the necessary transactional database performance while saving up to 63.9 percent in costs over five years. When you’re looking for a reliable solution to run workloads in remote offices, the Dell PowerEdge VRTX has the potential to cost less than running databases from the cloud.
Upgrade to Dell EMC PowerEdge R6515 servers and gain better OLTP and VDI perf...Principled Technologies
Additionally, PowerEdge R6515 servers with 3rd Gen AMD EPYC processors could lower licensing costs and also empower your business to explore Kubernetes with VMware Tanzu
Deduplication without performance hits: Intel Xeon processor E5-2697v2-powere...Principled Technologies
Backing up business data with deduplication has the potential to clog network resources and slow down performance for your customers. Servers with powerful processors are crucial to running an efficient and secure infrastructure. We found that a Dell PowerEdge R720xd server powered by the Intel Xeon processor E5-2600 v2 Series successfully overcame this hurdle in our tests. When we used NetVault Backup to dedupe and back up data while running database workloads, performance did not slow down. The Dell solution using source-based deduplication reduced backup storage space used by 39 times and reduced application server network traffic by 70.5 percent when compared with a traditional backup method. Strong processor and server combinations, such as the one we tested, can keep your business moving swiftly and save resources as you back up your data to keep it safe.
The evolution of Dell EMC PowerEdge server systems management - InfographicPrincipled Technologies
Technology that anticipates your infrastructure needs before you realize them may be closer than you think. Over 13 years of hands-on testing, we’ve found that the tools in the Dell EMC™ OpenManage™ Suite have steadily improved the speed and quality of systems management.
A Dell PowerEdge MX environment using OpenManage Enterprise and OpenManage En...Principled Technologies
Compared to a Cisco UCS-X environment using Intersight, the Dell environment streamlined making changes to VLANs and helped avoid interventions during scheduled firmware updates
Conclusion
We executed two management scenarios in a Dell PowerEdge MX environment with Dell OpenManage Enterprise and OpenManage Enterprise Modular and a Cisco UCS X-Series chassis environment with Cisco Intersight. We learned that the Dell solution’s single-part profile modification for performing VLAN updates was quicker and simpler than the Cisco solution’s two-part profile deployment, requiring 40 percent less time and two-thirds as many steps. We also compared the firmware updating process on the solutions. Being able to schedule these updates to occur automatically from the online Dell repository offered an advantage over having to manually execute the same tasks from the Cisco Intersight repositories. Namely, administrators do not need to take action during maintenance windows but can instead schedule them ahead of time. Saving time on routine tasks frees administrators to pursue innovation, and being able to avoid middle-of-the-night duties helps companies provide a better work experience for admins. Together, these advantages help make Dell PowerEdge MX servers a good candidate for companies considering upgrading the older Cisco UCS servers in their data centers.
By upgrading from the legacy solution we tested to the new Intel processor-based Dell and VMware solution, you could do 18 times the work in the same amount of space. Imagine what that performance could mean to your business: Consolidate workloads from across your company, lower your power and cooling bills, and limit datacenter expansion in the future, all while maintaining a consistent user experience—the list of potential benefits is huge.
Try running DPACK, which can help you identify bottlenecks in your environment and inform you about your current performance needs. Then consider how the consolidation ratio we proved could be helpful for your company. The Intel processor-powered Dell PowerEdge R730 solution with VMware vSphere and Dell Storage SC4020, also powered by Intel, could be the right destination for your upgrade journey.
Speed up system deployment with Dell Connected Configuration servicesPrincipled Technologies
The days of administrators going through lengthy system provisioning procedures to update and patch client images on new employee systems are gone. With Dell Connected Configuration service, your organization can get any number of systems delivered to your door with the latest company image loaded and customized for your employees’ needs. Dell Connected Configuration Service lets customers using management software such as SCCM integrate existing software and processes securely into the Dell manufacturing process at the factory using a secure VPN with your own network/firewall standards, so you can change configurations from your location in real time, on your time. From your headquarters, you can complete a number of tasks on new systems, including imaging, updating BIOS settings, partitioning and encrypting hard drives, and installing user-specific software.
As we found, using Dell Connected Configuration Service could save significant time for a laptop deployment, allowing your administrative staff to focus on other ways to improve your business IT. Additionally, your employees can receive their new systems more quickly, potentially avoiding days of waiting for a system to be ready. These time saving advantages of Dell Connected Configuration services can mean a more efficient process for deploying new systems, and can boost productivity by putting the up-to-date tools employees need to do their jobs into their hands more quickly.
Converged architecture advantages: Dell PowerEdge FX2s and FC830 servers vs. ...Principled Technologies
Based on our testing with heavy SQL Server 2014 database workloads, the converged architecture solution of a Dell PowerEdge FX2s chassis and FC830 servers delivered 3.8 times the performance of our legacy HP solution. We also found the Dell PowerEdge FX2s and FC830 solution offered 72 lower cost per new order compared to the legacy HP ProLiant DL580 G7 solution. In addition, the PowerEdge FX2s and FC830 solution does not sacrifice traditional hardware redundancy while providing the same highly available database solution in a smaller rack space. If your business runs Microsoft SQL Server 2014, the converged architecture approach with Dell PowerEdge FX2s chassis and FC830 servers powered by Intel could bring a harmonious balance of performance, reliability, and cost efficiency to your data center.
Save space, increase efficiency, and boost performance in your remote office ...Principled Technologies
Two realities drive many remote and branch office server decisions: the need for a versatile platform that delivers excellent performance, and the need for simplification by using fewer servers and cables. By consolidating your older servers to the powerful, space-efficient Dell PowerEdge VRTX server, you can increase database performance while saving valuable space. In our tests, the base-configuration Dell PowerEdge VRTX could consolidate four legacy servers while providing 5.4 times the overall performance. With the Micron P420m PCIe SSD added to the configuration, the VRTX consolidated eight legacy servers and delivered 10.7 times the overall performance.
Investing in the Dell PowerEdge VRTX—in either configuration—can elevate your IT infrastructure by answering database performance and space-saving challenges that face your remote and branch offices.
In addition to providing excellent performance in a space-efficient manner, the VRTX simplifies the office environment, brings efficiency to IT staff through its management advantages, and offers businesses the versatility of deploying performance anywhere.
Simplify administrator tasks and improve security and health monitoring with ...Principled Technologies
Management tools that reduce hands-on time and effort for recurring tasks provide real benefits to administrators with demanding responsibilities. In our comparison of the management portfolios from Dell and HPE, we found that the Dell tools we tested offered better ease-of use than their HPE counterparts, with many additional features and views that can streamline administrator tasks. Plus, the Dell management portfolio offered features that increase data security and allow admins to make changes without infrastructure downtime. By reducing time and effort for tasks like monitoring system health or updating firmware, your admins can focus their time on supporting key business initiatives.
Dell OpenManage Essentials: Improve efficiency with fewer tools, more benefits Principled Technologies
Using a systems management solution that streamlines and automates common data center operations is vital to the efficient operation of your data center and the continuous availability of your infrastructure. The right servers and systems management solution can actually provide your IT organization with dramatic savings and enable greater efficiency and productivity.
We carried out three typical data center use cases using a Dell PowerEdge R630 managed with Dell OpenManage Essentials and an HP ProLiant DL380 Gen9 managed with HP OneView. We found that the Dell solution reduced IT administrator time by as much as 40 percent and provided incremental systems management benefits and features. It achieved this with the additional advantage that the cost of the Dell OpenManage Essentials systems management solution is 93 percent lower than the cost of the HP OneView systems management solution.
Our conclusion: Dell OpenManage Essentials and PowerEdge servers can be excellent investments for your data center if you are interested in ease of use, cost and time savings, accuracy, and infrastructure availability.
Investing in GenAI: Cost‑benefit analysis of Dell on‑premises deployments vs....Principled Technologies
Conclusion
Diving into the world of GenAI has the potential to yield a great many benefits for your organization, but it first requires consideration for how best to implement those GenAI workloads. Whether your AI goals are to create a chatbot for online visitors, generate marketing materials, aid troubleshooting, or something else, implementing an AI solution requires careful planning and decision-making. A major decision is whether to host GenAI in the cloud or keep your data on premises. Traditional on-premises solutions can provide superior security and control, a substantial concern when dealing with large amounts of potentially sensitive data. But will supporting a GenAI solution on site be a drain on an organization’s IT budget?
In our research, we found that the value proposition is just the opposite: Hosting GenAI workloads on premises, either in a traditional Dell solution or using a managed Dell APEX pay-per-use solution, could significantly lower your GenAI costs over 3 years compared to hosting these workloads in the cloud. In fact, we found that a comparable AWS SageMaker solution would cost up to 3.8 times as much and an Azure ML solution would cost up to 3.6 times as much as GenAI on a Dell APEX pay-per-use solution. These results show that organizations looking to implement GenAI and reap the business benefits to come can find many advantages in an on-premises Dell solution, whether they opt to purchase and manage it themselves or choose a subscription-based Dell APEX pay-per-use solution. Choosing an on-premises Dell solution could save your organization significantly over hosting GenAI in the cloud, while giving you control over the security and privacy of your data as well as any updates and changes to the environment, and while ensuring your environment is managed consistently.
Workstations powered by Intel can play a vital role in CPU-intensive AI devel...Principled Technologies
In three AI development workflows, Intel processor-powered workstations delivered strong performance, without using their GPUs, making them a good choice for this part of the AI process
Conclusion
We executed three AI development workflows on tower workstations and mobile workstations from three vendors, with each workflow utilizing only the Intel CPU cores, and found that these platforms were suitable for carrying out various AI tasks. For two of the workflows, we learned that completing the tasks on the tower workstations took roughly half as much time as on the mobile workstations. This supports the idea that the tower workstations would be appropriate for a development environment for more complex models with a greater volume of data and that the mobile workstations would be well-suited for data scientists fine-tuning simpler models. In the third workflow, we explored tower workstation performance with different precision levels and learned that using 16-bit floating point precision allowed the workstations to execute the workflow in less time and also reduced memory usage dramatically. For all three AI workflows we executed, we consider the time the workstations needed to complete the tasks to be acceptable, and believe that these workstations can be appropriate, cost-effective choices for these kinds of activities.
More Related Content
Similar to Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure
Using Dell ProDeploy Plus for Infrastructure can improve deployment times for...Principled Technologies
Save valuable in-house admin time by using a Dell Technologies-certified engineer for installation and configuration of a Dell solution
New data center resources can be great for your critical workloads and applications, but deploying those resources can burden IT staff. Organizations adding Dell Technologies solutions to their data center can use the deployment service Dell ProDeploy Plus for Infrastructure to simplify deployment and save time.
We found that Dell ProDeploy Plus:
• Planned the deployment with minimal input from our in-house staff, which freed them up to focus on
organizational demands and other strategic initiatives during deployment
• Reduced deployment planning by 67 percent—down to just three hours and 34 minutes—saving significant pre-deployment time for our admin as well as in totality
• Deployed our Dell Technologies solution in just one business day, needing just four
hours and 17 minutes
• Reduced installation time by nearly 16 hours, or two days, compared to our admin—or in other words, deployed the solution three times as fast
With ProDeploy Plus for Infrastructure, your organization can realize a faster, more efficient deployment of Dell technology with minimal impact on your in-house IT staff.
Microsoft System Center virtual environment comparison: Dell PowerEdge server...Principled Technologies
When repetitive and admin-intensive management tasks are quicker and easier to complete, that’s a win for your datacenter and IT administrators. We found that using Dell Lifecycle Controller Integration for SCVMM took 74.6 percent less time to complete four key server management use cases on a single server, compared to performing the same use cases with HP OneView for System Center. When managing many servers, data extrapolated to 100 servers from testing on a second server shows the Dell solution would take 95.8 percent fewer steps and 96.5 percent less time than the HP solution. Dell Lifecycle Controller Integration for Microsoft System Center Virtual Machine Manager also enabled IT admins to perform all of the server management operations through a single console—and staged firmware updates without necessitating a server power-down. Easier to use and less time-intensive, the results of our testing showed that the DLCI for SCVMM and Microsoft System Center Virtual Machine Manager can be a more efficient and effective combination for your virtualized datacenter.
As our tests show, investing in the powerful new Dell PowerEdge R920 running Oracle VM Server 3.2.8 with Oracle Database 12c VMs achieves cost savings without compromising performance. In our testing, a single Dell PowerEdge R920 could perform five times the work of a single HP ProLiant DL385 G6 server; the costs to power and cool the Dell PowerEdge would be 43 percent less than the five servers it could replace. The three-year software licensing costs of the Dell PowerEdge R920 server would be 22 percent lower than the licensing costs for the five-server solution. These dramatic savings—which come out to $212,091 for our single test environment — could grow to millions of dollars in a larger consolidation effort.
Dell 3-2-1 Reference Configurations: High available and scalable performance ...Principled Technologies
Dell 3-2-1 Reference Configurations consisting of Dell PowerEdge R720 servers, Dell Force10 S4810P switches, and Dell EqualLogic PS6110XV storage provide a range of configuration options so that you can select the one that is right for your business needs. Additionally, each configuration is easily scalable to accommodate for business growth.
The 3-2-1 base configuration provides a robust solution for any business needing to support up to 500 users on multiple business applications. Our tests demonstrate this solution supporting 500 users per VM for four VMs including two database VMs, one email VM, and one collaboration application VM.
If the number of users you need to support exceeds the user count the base configuration provides, adding another Dell PowerEdge R720 server to make a 4-2-1 configuration can support up to 1,000 users on multiple business applications while maintaining high availability. Our tests demonstrate this solution supporting 1,000 users per VM in the same four VMs as the 3-2-1 solution. Additionally, these configurations are so easy to scale upward that you can complete the process of adding a server in a matter of two hours or less from start to finish.
If you require support for an even higher number of users, adding a server and storage array to the base configuration, to make a 4-2-2 configuration allows for up to 1,500 users on multiple business applications. Our tests demonstrated this when we ran 1,500 users against each of the four VMs. Better yet, adding a Dell EqualLogic PS6110XV storage array to an existing 4-2-1 configuration is a cinch, taking under 30 minutes start to finish.
All of these Dell Reference Configurations give your business the reliability of highly available hardware configurations, greatly reducing downtime resulting from any hardware malfunctions.
By choosing proven Dell architecture, you avoid the hassles of putting your infrastructure together piece by piece, reducing the potential for error and providing you with a sturdy solution that is easily scalable to fit your present and future needs.
Dell PowerEdge R920 and Microsoft SQL Server 2014 Migration and Benefits GuidePrincipled Technologies
The latest Dell PowerEdge R920 server is designed to provide highly scalable performance for large enterprises, with greater memory capacity, improved and expanded attached storage options, and processor architectures designed for high availability. Microsoft SQL Server 2014 is the perfect companion software to take advantage of the Dell PowerEdge R920’s impressive specifications. Upgrading has never looked more attractive, and with hardware/software upgrades must come data migration.
Migrating legacy database applications to the latest database technologies on newer Dell server platforms is a common task for businesses upgrading their hardware/software stack. As this guide shows, the process is straightforward and the cost benefits can be enormous. We calculated the savings attainable from multiple consolidation ratios, as well as how long it would take to pay off the replacement server. We found that a consolidation ratio of 13 to 1 could yield $531,725 in software savings, many times the cost of the replacement hardware itself. So not only will the business benefit from the massively-scalable current-generation Dell server technology paired with Microsoft Windows Server 2012 R2 running SQL Server 2014, but you can save money in the process.
Spend less time, effort, and money by choosing a Dell EMC server with pre-ins...Principled Technologies
Deploying a Dell EMC PowerEdge R740 with pre-installed Microsoft Windows Server 2016 Standard took less time and fewer steps than deploying the same server without it
Compared to aging desktops, new Dell OptiPlex desktops can allow employees to be more productive with faster and more reliable hardware while providing significantly lower power costs. Improved management technology with the new desktops can support the efforts of your IT staff and can reduce costly deskside visits. Upgrading your aging desktops with the Dell OptiPlex 9030 All-in-One or the Dell OptiPlex 9020 Micro desktops brings important improvements to your business through both hardware and software.
Meet database performance needs while reducing TCO with the Dell PowerEdge VR...Principled Technologies
Cloud WAN services can seem convenient for small businesses and remote offices, but they remove local control and can be more expensive over time. In our tests, the all-in-one Dell PowerEdge VRTX provided the necessary transactional database performance while saving up to 63.9 percent in costs over five years. When you’re looking for a reliable solution to run workloads in remote offices, the Dell PowerEdge VRTX has the potential to cost less than running databases from the cloud.
Upgrade to Dell EMC PowerEdge R6515 servers and gain better OLTP and VDI perf...Principled Technologies
Additionally, PowerEdge R6515 servers with 3rd Gen AMD EPYC processors could lower licensing costs and also empower your business to explore Kubernetes with VMware Tanzu
Deduplication without performance hits: Intel Xeon processor E5-2697v2-powere...Principled Technologies
Backing up business data with deduplication has the potential to clog network resources and slow down performance for your customers. Servers with powerful processors are crucial to running an efficient and secure infrastructure. We found that a Dell PowerEdge R720xd server powered by the Intel Xeon processor E5-2600 v2 Series successfully overcame this hurdle in our tests. When we used NetVault Backup to dedupe and back up data while running database workloads, performance did not slow down. The Dell solution using source-based deduplication reduced backup storage space used by 39 times and reduced application server network traffic by 70.5 percent when compared with a traditional backup method. Strong processor and server combinations, such as the one we tested, can keep your business moving swiftly and save resources as you back up your data to keep it safe.
The evolution of Dell EMC PowerEdge server systems management - InfographicPrincipled Technologies
Technology that anticipates your infrastructure needs before you realize them may be closer than you think. Over 13 years of hands-on testing, we’ve found that the tools in the Dell EMC™ OpenManage™ Suite have steadily improved the speed and quality of systems management.
A Dell PowerEdge MX environment using OpenManage Enterprise and OpenManage En...Principled Technologies
Compared to a Cisco UCS-X environment using Intersight, the Dell environment streamlined making changes to VLANs and helped avoid interventions during scheduled firmware updates
Conclusion
We executed two management scenarios in a Dell PowerEdge MX environment with Dell OpenManage Enterprise and OpenManage Enterprise Modular and a Cisco UCS X-Series chassis environment with Cisco Intersight. We learned that the Dell solution’s single-part profile modification for performing VLAN updates was quicker and simpler than the Cisco solution’s two-part profile deployment, requiring 40 percent less time and two-thirds as many steps. We also compared the firmware updating process on the solutions. Being able to schedule these updates to occur automatically from the online Dell repository offered an advantage over having to manually execute the same tasks from the Cisco Intersight repositories. Namely, administrators do not need to take action during maintenance windows but can instead schedule them ahead of time. Saving time on routine tasks frees administrators to pursue innovation, and being able to avoid middle-of-the-night duties helps companies provide a better work experience for admins. Together, these advantages help make Dell PowerEdge MX servers a good candidate for companies considering upgrading the older Cisco UCS servers in their data centers.
By upgrading from the legacy solution we tested to the new Intel processor-based Dell and VMware solution, you could do 18 times the work in the same amount of space. Imagine what that performance could mean to your business: Consolidate workloads from across your company, lower your power and cooling bills, and limit datacenter expansion in the future, all while maintaining a consistent user experience—the list of potential benefits is huge.
Try running DPACK, which can help you identify bottlenecks in your environment and inform you about your current performance needs. Then consider how the consolidation ratio we proved could be helpful for your company. The Intel processor-powered Dell PowerEdge R730 solution with VMware vSphere and Dell Storage SC4020, also powered by Intel, could be the right destination for your upgrade journey.
Speed up system deployment with Dell Connected Configuration servicesPrincipled Technologies
The days of administrators going through lengthy system provisioning procedures to update and patch client images on new employee systems are gone. With Dell Connected Configuration service, your organization can get any number of systems delivered to your door with the latest company image loaded and customized for your employees’ needs. Dell Connected Configuration Service lets customers using management software such as SCCM integrate existing software and processes securely into the Dell manufacturing process at the factory using a secure VPN with your own network/firewall standards, so you can change configurations from your location in real time, on your time. From your headquarters, you can complete a number of tasks on new systems, including imaging, updating BIOS settings, partitioning and encrypting hard drives, and installing user-specific software.
As we found, using Dell Connected Configuration Service could save significant time for a laptop deployment, allowing your administrative staff to focus on other ways to improve your business IT. Additionally, your employees can receive their new systems more quickly, potentially avoiding days of waiting for a system to be ready. These time saving advantages of Dell Connected Configuration services can mean a more efficient process for deploying new systems, and can boost productivity by putting the up-to-date tools employees need to do their jobs into their hands more quickly.
Converged architecture advantages: Dell PowerEdge FX2s and FC830 servers vs. ...Principled Technologies
Based on our testing with heavy SQL Server 2014 database workloads, the converged architecture solution of a Dell PowerEdge FX2s chassis and FC830 servers delivered 3.8 times the performance of our legacy HP solution. We also found the Dell PowerEdge FX2s and FC830 solution offered 72 lower cost per new order compared to the legacy HP ProLiant DL580 G7 solution. In addition, the PowerEdge FX2s and FC830 solution does not sacrifice traditional hardware redundancy while providing the same highly available database solution in a smaller rack space. If your business runs Microsoft SQL Server 2014, the converged architecture approach with Dell PowerEdge FX2s chassis and FC830 servers powered by Intel could bring a harmonious balance of performance, reliability, and cost efficiency to your data center.
Save space, increase efficiency, and boost performance in your remote office ...Principled Technologies
Two realities drive many remote and branch office server decisions: the need for a versatile platform that delivers excellent performance, and the need for simplification by using fewer servers and cables. By consolidating your older servers to the powerful, space-efficient Dell PowerEdge VRTX server, you can increase database performance while saving valuable space. In our tests, the base-configuration Dell PowerEdge VRTX could consolidate four legacy servers while providing 5.4 times the overall performance. With the Micron P420m PCIe SSD added to the configuration, the VRTX consolidated eight legacy servers and delivered 10.7 times the overall performance.
Investing in the Dell PowerEdge VRTX—in either configuration—can elevate your IT infrastructure by answering database performance and space-saving challenges that face your remote and branch offices.
In addition to providing excellent performance in a space-efficient manner, the VRTX simplifies the office environment, brings efficiency to IT staff through its management advantages, and offers businesses the versatility of deploying performance anywhere.
Simplify administrator tasks and improve security and health monitoring with ...Principled Technologies
Management tools that reduce hands-on time and effort for recurring tasks provide real benefits to administrators with demanding responsibilities. In our comparison of the management portfolios from Dell and HPE, we found that the Dell tools we tested offered better ease-of use than their HPE counterparts, with many additional features and views that can streamline administrator tasks. Plus, the Dell management portfolio offered features that increase data security and allow admins to make changes without infrastructure downtime. By reducing time and effort for tasks like monitoring system health or updating firmware, your admins can focus their time on supporting key business initiatives.
Dell OpenManage Essentials: Improve efficiency with fewer tools, more benefits Principled Technologies
Using a systems management solution that streamlines and automates common data center operations is vital to the efficient operation of your data center and the continuous availability of your infrastructure. The right servers and systems management solution can actually provide your IT organization with dramatic savings and enable greater efficiency and productivity.
We carried out three typical data center use cases using a Dell PowerEdge R630 managed with Dell OpenManage Essentials and an HP ProLiant DL380 Gen9 managed with HP OneView. We found that the Dell solution reduced IT administrator time by as much as 40 percent and provided incremental systems management benefits and features. It achieved this with the additional advantage that the cost of the Dell OpenManage Essentials systems management solution is 93 percent lower than the cost of the HP OneView systems management solution.
Our conclusion: Dell OpenManage Essentials and PowerEdge servers can be excellent investments for your data center if you are interested in ease of use, cost and time savings, accuracy, and infrastructure availability.
Similar to Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure (20)
Investing in GenAI: Cost‑benefit analysis of Dell on‑premises deployments vs....Principled Technologies
Conclusion
Diving into the world of GenAI has the potential to yield a great many benefits for your organization, but it first requires consideration for how best to implement those GenAI workloads. Whether your AI goals are to create a chatbot for online visitors, generate marketing materials, aid troubleshooting, or something else, implementing an AI solution requires careful planning and decision-making. A major decision is whether to host GenAI in the cloud or keep your data on premises. Traditional on-premises solutions can provide superior security and control, a substantial concern when dealing with large amounts of potentially sensitive data. But will supporting a GenAI solution on site be a drain on an organization’s IT budget?
In our research, we found that the value proposition is just the opposite: Hosting GenAI workloads on premises, either in a traditional Dell solution or using a managed Dell APEX pay-per-use solution, could significantly lower your GenAI costs over 3 years compared to hosting these workloads in the cloud. In fact, we found that a comparable AWS SageMaker solution would cost up to 3.8 times as much and an Azure ML solution would cost up to 3.6 times as much as GenAI on a Dell APEX pay-per-use solution. These results show that organizations looking to implement GenAI and reap the business benefits to come can find many advantages in an on-premises Dell solution, whether they opt to purchase and manage it themselves or choose a subscription-based Dell APEX pay-per-use solution. Choosing an on-premises Dell solution could save your organization significantly over hosting GenAI in the cloud, while giving you control over the security and privacy of your data as well as any updates and changes to the environment, and while ensuring your environment is managed consistently.
Workstations powered by Intel can play a vital role in CPU-intensive AI devel...Principled Technologies
In three AI development workflows, Intel processor-powered workstations delivered strong performance, without using their GPUs, making them a good choice for this part of the AI process
Conclusion
We executed three AI development workflows on tower workstations and mobile workstations from three vendors, with each workflow utilizing only the Intel CPU cores, and found that these platforms were suitable for carrying out various AI tasks. For two of the workflows, we learned that completing the tasks on the tower workstations took roughly half as much time as on the mobile workstations. This supports the idea that the tower workstations would be appropriate for a development environment for more complex models with a greater volume of data and that the mobile workstations would be well-suited for data scientists fine-tuning simpler models. In the third workflow, we explored tower workstation performance with different precision levels and learned that using 16-bit floating point precision allowed the workstations to execute the workflow in less time and also reduced memory usage dramatically. For all three AI workflows we executed, we consider the time the workstations needed to complete the tasks to be acceptable, and believe that these workstations can be appropriate, cost-effective choices for these kinds of activities.
Enable security features with no impact to OLTP performance with Dell PowerEd...Principled Technologies
Get comparable online transaction processing (OLTP) performance with or without enabling AMD Secure Memory Encryption and AMD Secure Encrypted Virtualization - Encrypted State
Conclusion
You’ve likely already implemented many security measures for your servers, which may include physical security for the data center, hardware-level security, and software-level security. With the cost of data breaches high and still growing, however, wise IT teams will consider what additional security measures they may be able to implement.
AMD SME and SEV-ES are technologies that are already available within your AMD processor-powered 16th Generation Dell PowerEdge servers—and in our testing, we saw that they can offer extra layers of security without affecting performance. We compared the online transaction processing performance of a Dell PowerEdge R7625 server, powered by AMD EPYC 9274F processors, with and without these two security features enabled. We found that enabling AMD Secure Memory Encryption and Secure Encrypted Virtualization-Encrypted State did not impact performance at all.
If your team is assessing areas where you might be able to enhance security—without paying a large performance cost—consider enabling AME SME and AMD SEV-ES in your Dell PowerEdge servers.
Improving energy efficiency in the data center: Endure higher temperatures wi...Principled Technologies
In high-temperature test scenarios, a Dell PowerEdge HS5620 server continued running an intensive workload without component warnings or failures, while a Supermicro SYS‑621C-TN12R server failed
Conclusion: Remain resilient in high temperatures with the Dell PowerEdge HS5620 to help increase efficiency
Increasing your data center’s temperature can help your organization make strides in energy efficiency and cooling cost savings. With servers that can hold up to these higher everyday temperatures—as well as high temperatures due to unforeseen circumstances—your business can continue to deliver the performance your apps and clients require.
When we ran an intensive floating-point workload on a Dell PowerEdge HS5620 and a Supermicro SYS-621CTN12R in three scenario types simulating typical operations at 25°C, a fan failure, and an HVAC malfunction, the Dell server experienced no component warnings or failures. In contrast, the Supermicro server experienced warnings in all three scenario types and experienced component failures in the latter two tests, rendering the system unusable. When we inspected and analyzed each system, we found that the Dell PowerEdge HS5620 server’s motherboard layout, fans, and chassis offered cooling design advantages.
For businesses aiming to meet sustainability goals by running hotter data centers, as well as those concerned with server cooling design, the Dell PowerEdge HS5620 is a strong contender to take on higher temperatures during day-to-day operations and unexpected malfunctions.
Dell APEX Cloud Platform for Red Hat OpenShift: An easily deployable and powe...Principled Technologies
The 4th Generation Intel Xeon Scalable processor‑powered solution deployed in less than two hours and ran a Kubernetes container-based generative AI workload effectively
Dell APEX Cloud Platform for Red Hat OpenShift: An easily deployable and powe...Principled Technologies
The 4th Generation Intel Xeon Scalable processor‑powered solution deployed in less than two hours and ran a generative AI workload effectively
Conclusion
The appeal of incorporating GenAI into your organization’s operations is likely great. Getting started with an efficient solution for your next LLM workload or application can seem daunting because of the changing hardware and software landscape, but Dell APEX Cloud Platform for Red Hat OpenShift powered by 4th Gen Intel Xeon Scalable processors could provide the solution you need. We started with a Dell Validated Design as a reference, and then went on to modify the deployment as necessary for our Llama 2 workload. The Dell APEX Cloud Platform for Red Hat OpenShift solution worked well for our LLM, and by using this deployment guide in conjunction with numerous Dell documents and some flexibility, you could be well on your way to innovating your next GenAI breakthrough.
Upgrade your cloud infrastructure with Dell PowerEdge R760 servers and VMware...Principled Technologies
Compared to a cluster of PowerEdge R750 servers running VMware Cloud Foundation (VCF)
For organizations running clusters of moderately configured, older Dell PowerEdge servers with a previous version of VCF, upgrading to better-configured modern servers can provide a significant performance boost and more.
Upgrade your cloud infrastructure with Dell PowerEdge R760 servers and VMware...Principled Technologies
Compared to a cluster of PowerEdge R750 servers running VMware Cloud Foundation 4.5
If your company is struggling with underperforming infrastructure, upgrading to 16th Generation Dell PowerEdge servers running VCF 5.1 could be just what you need to handle more database throughput and reduce vSAN latencies. As an additional benefit to IT admins, we also found that the embedded VMware Aria Operation adapter provided useful infrastructure insights.
Realize 2.1X the performance with 20% less power with AMD EPYC processor-back...Principled Technologies
Three AMD EPYC processor-based two-processor solutions outshined comparable Intel Xeon Scalable processor-based solutions by handling more Redis workload transactions and requests while consuming less power
Conclusion
Performance and energy efficiency are significant factors in processor selection for servers running data-intensive workloads, such as Redis. We compared the Redis performance and energy consumption of a server cluster in three AMD EPYC two-processor configurations against that of a server cluster in two Intel Xeon Scalable two-processor configurations. In each of our three test scenarios, the server cluster backed by AMD EPYC processors outperformed the server cluster backed by Intel Xeon Scalable processors. In addition, one of the AMD EPYC processor-based clusters consumed 20 percent less power than its Intel Xeon Scalable processor-based counterpart. Combining these measurements gave us power efficiency metrics that demonstrate how valuable AMD EPYC processor-based servers could be—you could see better performance per watt with these AMD EPYC processor-based server clusters and potentially get more from your Redis or other data intensive applications and workloads while reducing data center power costs.
Improve performance and gain room to grow by easily migrating to a modern Ope...Principled Technologies
We deployed this modern environment, then migrated database VMs from legacy servers and saw performance improvements that support consolidation
Conclusion
If your organization’s transactional databases are running on gear that is several years old, you have much to gain by upgrading to modern servers with new processors and networking components and an OpenShift environment. In our testing, a modern OpenShift environment with a cluster of three Dell PowerEdge R7615 servers with 4th Generation AMD EPYC processors and high-speed 100Gb Broadcom NICs outperformed a legacy environment with MySQL VMs running on a cluster of three Dell PowerEdge R7515 servers with 3rd Generation AMD EPYC processors and 25Gb Broadcom NICs. We also easily migrated a VM from the legacy environment to the modern environment, with only a few steps required to set up and less than ten minutes of hands-on time. The performance advantage of the modern servers would allow a company to reduce the number of servers necessary to perform a given amount of database work, thus lowering operational expenditures such as power and cooling and IT staff time for maintenance. The high-speed 100Gb Broadcom NICs in this solution also give companies better network performance and networking capacity to grow as they embrace emerging technologies such as AI that put great demands on networks.
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
With more memory available, system performance of three Dell devices increased, which can translate to a better user experience
Conclusion
When your system has plenty of RAM to meet your needs, you can efficiently access the applications and data you need to finish projects and to-do lists without sacrificing time and focus. Our test results show that with more memory available, three Dell PCs delivered better performance and took less time to complete the Procyon Office Productivity benchmark. These advantages translate to users being able to complete workflows more quickly and multitask more easily. Whether you need the mobility of the Latitude 5440, the creative capabilities of the Precision 3470, or the high performance of the OptiPlex Tower Plus 7010, configuring your system with more RAM can help keep processes running smoothly, enabling you to do more without compromising performance.
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
A Principled Technologies deployment guide
Conclusion
Deploying VMware Cloud Foundation 5.1 on next gen Dell PowerEdge servers brings together critical virtualization capabilities and high-performing hardware infrastructure. Relying on our hands-on experience, this deployment guide offers a comprehensive roadmap that can guide your organization through the seamless integration of advanced VMware cloud solutions with the performance and reliability of Dell PowerEdge servers. In addition to the deployment efficiency, the Cloud Foundation 5.1 and PowerEdge solution delivered strong performance while running a MySQL database workload. By leveraging VMware Cloud Foundation 5.1 and PowerEdge servers, you could help your organization embrace cloud computing with confidence, potentially unlocking a new level of agility, scalability, and efficiency in your data center operations.
Upgrade your cloud infrastructure with Dell PowerEdge R760 servers and VMware...Principled Technologies
Compared to a cluster of PowerEdge R750 servers running VMware Cloud Foundation 4.5
Conclusion
If your company is struggling with underperforming infrastructure, upgrading to 16th Generation Dell PowerEdge servers running VCF 5.1 could be just what you need to handle more database throughput and reduce vSAN latencies. We found that a Dell PowerEdge R760 server cluster running VCF 5.1 processed over 78 percent more TPM and 79 percent more NOPM than a Dell PowerEdge R750 server cluster running VCF 4.5. It’s also worth noting that the PowerEdge R750 cluster bottlenecked on vSAN storage, with max write latency at 8.9ms. For reference, the PowerEdge R760 cluster clocked in at 3.8ms max write latency. This higher latency is due in part to the single disk group per host on the moderately configured PowerEdge R750 cluster, while the better-configured PowerEdge R760 cluster supported four disk groups per host. As an additional benefit to IT admins, we also found that the embedded VMware Aria Operation adapter provided useful infrastructure insights.
Based on our research using publicly available materials, it appears that Dell supports nine of the ten PC security features we investigated, HP supports six of them, and Lenovo supports three features.
Increase security, sustainability, and efficiency with robust Dell server man...Principled Technologies
Compared to the Supermicro management portfolio
Conclusion
Choosing a vendor for server purchases is about more than just the hardware platform. Decision-makers must also consider more long-term concerns, including system/data security, energy efficiency, and ease of management. These concerns make the systems management tools a vendor offers as important as the hardware.
We investigated the features and capabilities of server management tools from Dell and Supermicro, comparing Dell iDRAC9 against Supermicro IPMI for embedded server management and Dell OpenManage Enterprise and CloudIQ against Supermicro Server Manager for one-to-many device and console management and monitoring. We found that the Dell management tools provided more comprehensive security, sustainability, and management/monitoring features and capabilities than Supermicro servers did. In addition, Dell tools automated more tasks to ease server management, resulting in significant time savings for administrators versus having to do the same tasks manually with Supermicro tools.
When making a server purchase, a vendor’s associated management products are critical to protect data, support a more sustainable environment, and to ease the maintenance of systems. Our tests and research showed that the Dell management portfolio for PowerEdge servers offered more features to help organizations meet these goals than the comparable Supermicro management products.
Increase security, sustainability, and efficiency with robust Dell server man...Principled Technologies
Compared to the Supermicro management portfolio
Conclusion
Choosing a vendor for server purchases is about more than just the hardware platform. Decision-makers must also consider more long-term concerns, including system/data security, energy efficiency, and ease of management. These concerns make the systems management tools a vendor offers as important as the hardware.
We investigated the features and capabilities of server management tools from Dell and Supermicro, comparing Dell iDRAC9 against Supermicro IPMI for embedded server management and Dell OpenManage Enterprise and CloudIQ against Supermicro Server Manager for one-to-many device and console management and monitoring. We found that the Dell management tools provided more comprehensive security, sustainability, and management/monitoring features and capabilities than Supermicro servers did. In addition, Dell tools automated more tasks to ease server management, resulting in significant time savings for administrators versus having to do the same tasks manually with Supermicro tools.
When making a server purchase, a vendor’s associated management products are critical to protect data, support a more sustainable environment, and to ease the maintenance of systems. Our tests and research showed that the Dell management portfolio for PowerEdge servers offered more features to help organizations meet these goals than the comparable Supermicro management products.
Scale up your storage with higher-performing Dell APEX Block Storage for AWS ...Principled Technologies
In our tests, Dell APEX Block Storage for AWS outperformed similarly configured solutions from Vendor A, achieving more IOPS, better throughput, and more consistent performance on both NVMe-supported configurations and configurations backed by Elastic Block Store (EBS) alone.
Dell APEX Block Storage for AWS supports a full NVMe backed configuration, but Vendor A doesn’t—its solution uses EBS for storage capacity and NVMe as an extended read cache—which means APEX Block Storage for AWS can deliver faster storage performance.
Scale up your storage with higher-performing Dell APEX Block Storage for AWSPrincipled Technologies
Dell APEX Block Storage for AWS offered stronger and more consistent storage performance for better business agility than a Vendor A solution
Conclusion
Enterprises desiring the flexibility and convenience of the cloud for their block storage workloads can find fast-performing solutions with the enterprise storage features they’re used to in on-premises infrastructure by selecting Dell APEX Block Storage for AWS.
Our hands-on tests showed that compared to the Vendor A solution, Dell APEX Block Storage for AWS offered stronger, more consistent storage performance in both NVMe-supported and EBS-backed configurations. Using NVMe-supported configurations, Dell APEX Block Storage for AWS achieved 4.7x the random read IOPS and 5.1x the throughput on sequential read operations per node vs. Vendor A. In our EBS-backed comparison, Dell APEX Block Storage for AWS offered 2.2x the throughput per node on sequential read operations vs. Vendor A.
Plus, the ability to scale beyond three nodes—up to 512 storage nodes with capacity of up to 8 PBs—enables Dell APEX Block Storage for AWS to help ensure performance and capacity as your team plans for the future.
Get in and stay in the productivity zone with the HP Z2 G9 Tower WorkstationPrincipled Technologies
We compared CPU performance and noise output of an HP Z2 G9 Tower Workstation in High Performance Mode to Dell Precision 3660 and 5860 tower workstations in optimized performance modes
Conclusion
HP Z2 G9 Tower Workstation users can change the BIOS settings to dial in the performance mode that best suits their needs: High Performance Mode, Performance Mode, or Quiet Mode. In good
news for both creative and technical professionals, we found that an Intel Core i9-13900 processor-powered HP Z2 G9 Tower Workstation set to High Performance mode received higher CPU-based benchmark scores than both a similarly configured Dell Precision 3660 and a Dell Precision 5860 equipped with an Intel Xeon w5-2455x processor. Plus, the HP Z2 G9 Tower Workstation was quieter while running CPU-intensive Cinebench 2024 and SPECapc for Solidworks 2022 workloads than both Dell Precision tower workstations. This means HP Z2 G9 Tower Workstation users who prize performance over everything else can do so without sacrificing a quiet workspace.
Open up new possibilities with higher transactional database performance from...Principled Technologies
In our PostgreSQL tests, R7i instances boosted performance over R6i instances with previous-gen processors
If you use the open-source PostgreSQL database to run your critical business operations, you have many cloud options from which to choose. While many of these instances can do the job, some can deliver stronger performance, which can mean getting a greater return on your cloud investment.
We conducted hands-on testing with the HammerDB TPROC-C benchmark to see how the PostgreSQL performance of Amazon EC2 R7i instances, enabled by 4th Gen Intel Xeon Scalable processors, stacked up to that of R6i instances with previous-generation processors. We learned that small, medium-sized, and large R7i instances with the newer processors delivered better OLTP performance, with improvements as high as 13.8 percent. By choosing the R7i instances, your organization has the potential to support more users, deliver a better experience to those users, and even lower your cloud operating expenditures by requiring fewer instances to get the job done.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
I have heard many times that architecture is not important for the front-end. Also, many times I have seen how developers implement features on the front-end just following the standard rules for a framework and think that this is enough to successfully launch the project, and then the project fails. How to prevent this and what approach to choose? I have launched dozens of complex projects and during the talk we will analyze which approaches have worked for me and which have not.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
Slack (or Teams) Automation for Bonterra Impact Management (fka Social Soluti...Jeffrey Haguewood
Sidekick Solutions uses Bonterra Impact Management (fka Social Solutions Apricot) and automation solutions to integrate data for business workflows.
We believe integration and automation are essential to user experience and the promise of efficient work through technology. Automation is the critical ingredient to realizing that full vision. We develop integration products and services for Bonterra Case Management software to support the deployment of automations for a variety of use cases.
This video focuses on the notifications, alerts, and approval requests using Slack for Bonterra Impact Management. The solutions covered in this webinar can also be deployed for Microsoft Teams.
Interested in deploying notification automations for Bonterra Impact Management? Contact us at sales@sidekicksolutionsllc.com to discuss next steps.
From Daily Decisions to Bottom Line: Connecting Product Work to Revenue by VP...
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure
1. Faster and easier server installation with
Dell ProDeploy Factory Configuration or
ProDeploy for Infrastructure
IT installation services have a variety of requirements to meet. Some organizations
want large-scale data center expansions or server refreshes while others want smaller
installations that require hands-on, on-premises deployments of just a few servers.
Dell Technologies™
can meet those requirements and anything in between for
Dell™
PowerEdge™
servers via Dell ProDeploy Infrastructure Suite. For large server
installations within organizations that have IT staff available to rack and stack servers,
Dell ProDeploy Factory Configuration configures servers at the factory and ships them
to customers just how they want them. For organizations without a robust IT staff, Dell
ProDeploy for Infrastructure sends a Dell Technologies-certified engineer to deploy
hardware and software on site.
To understand how much IT admin time the two ProDeploy services can save, we
tasked one of our admins with configuring and deploying a Dell PowerEdge R750
server in two different scenarios. Each of the following two sections provides an
overview of one of these scenarios.
Save
69m
configuring one
PowerEdge server
or over
115h
configuring 100
PowerEdge servers
Using ProDeploy
Factory Configuration
vs. an in-house admin
Save over
133m
deploying one
PowerEdge server
or over
223h
deploying 100
PowerEdge servers
Using ProDeploy
for Infrastructure
vs. an in-house admin
Scenario 1: Server configuration – ProDeploy Factory Configuration
We ordered a PowerEdge R750 server with specific settings via Dell
ProDeploy Factory Configuration. We then had our admin configure the
same server and manually prepare it for deployment, which took 1 hour
and 9 minutes—time that an organization could save per server if they used
ProDeploy. By extrapolating the data to a 100-server installation, we found
that an organization could bank over 115 IT admin hours.
Scenario 2: Server deployment – ProDeploy for Infrastructure
We tasked our admin with installing hardware in our data center. For one
PowerEdge R750, our admin needed over two hours and 13 minutes to
complete the deployment. Using Dell ProDeploy for Infrastructure for your
on-site deployment frees up that admin time per server for other business-
critical initiatives. It also can save your organization the additional overhead
of planning and allocating resources for new data center deployments.
By extrapolating the data to a 100-server installation, we found that an
organization could save over 223 IT admin hours.
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023
A Principled Technologies report: Hands-on testing. Real-world results.
2. How we tested
Scenario 1: Server configuration –
ProDeploy Factory Configuration
vs. in-house admin
Configuring servers can be tedious and time-consuming
for IT staff, especially for larger server orders.
ProDeploy Factory Configuration allows you to acquire
pre-configured servers that are ready to deploy
in your environment out of the box. Without the
service, IT staff must configure settings themselves after
receiving the servers.
We ordered one Dell PowerEdge R750 server with Intel®
Xeon®
Silver 4309Y processors, 16 GB of memory, PERC-
enabled SSD storage, and an additional 25GbE network
adapter through ProDeploy Factory Configuration.
When we placed our PowerEdge R750 server order, we
provided the following:
• A list of desired hardware, including a PERC RAID
controller and additional network adapter to allow
for custom RAID, boot, and firmware settings
• An asset tag number and list of desired
Asset Report fields
• A description of BIOS, iDRAC, firmware, and RAID
settings that we wanted
• A custom disk image that we uploaded through the
Dell online portal
Once we received the PowerEdge R750 and ensured
that it met our specifications, we reset all settings. To
see how much time the service can save for an IT admin
configuring a single server, we completed and timed the
tasks that Factory Configuration performed.
ProDeploy Factory Configuration
key takeaways
Time savings: ProDeploy Factory
Configuration saved 69 minutes of IT
admin time by delivering a pre-configured
server. The service could save nearly 115
hours (or approximately three working
weeks) by pre-configuring 100 servers.
Simplified future orders: ProDeploy
Factory Configuration keeps
necessary information from orders,
e.g., server settings, to help expedite
subsequent orders.
Consistent configuration: ProDeploy
Factory Configuration ensures all servers in
a large order have the correct settings at
scale upon delivery. Without the service,
an admin configuring each server could
make errors or apply the wrong settings
(e.g., RAID 6 for a server running write-
intensive workloads).
About Dell ProDeploy Factory Configuration
Dell ProDeploy Factory Configuration delivers ready-to-install, preconfigured servers to where
customers need them, whether that’s an enterprise data center, remote office, or somewhere in
between. Factory Configuration provides asset tagging and reporting; RAID, BIOS, and iDRAC
configuration; and OS and hypervisor installation and configuration.
For more information on Factory Configuration, visit https://www.dell.com/en-us/dt/services/
deployment-services/prodeploy-infrastructure-suite.htm.
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023 | 2
3. Scenario 2: Server deployment –
ProDeploy for Infrastructure
vs. in‑house admin
Organizations without available IT staff can
see serious delays when they need to deploy
servers. ProDeploy for Infrastructure tasks an
experienced and knowledgeable Dell-certified
engineer to deploy servers, including single
server orders, on site for you.
In another PT study,1
we compared deployment
time of a server, storage, and networking
solution for ProDeploy for Infrastructure and
one of our in-house admins. While deploying
the solutions, we captured the time our admin
needed to deploy a single Dell PowerEdge R750
server. We include that time in this report to
show the time savings benefits for organizations
considering on-site services for PowerEdge
servers and to demonstrate that ProDeploy can
save time for organizations performing server
deployments at scale.
About ProDeploy for Infrastructure
Dell Technologies offers ProDeploy for Infrastructure for end-to-end, 24/7 service that provides skill
and scale in a single point of contact for data center project management, site readiness review,
onsite hardware installation, program management, and knowledge transfer. Customers can also
get deployment verification.
To learn more about ProDeploy for Infrastructure, visit https://www.dell.com/en-us/dt/services/
deployment-services/prodeploy-infrastructure-suite.htm.
ProDeploy for Infrastructure
key takeaways
Time savings: Deployment with Dell ProDeploy
for Infrastructure can save over 133 minutes per
server. The service could save over 223 hours
when deploying 100 servers.
Flexibility to meet customized customer
requirements: Whether it’s meeting industry-
specific compliance standards or dealing with
limited rack space, the portfolio of ProDeploy
services meets customers where they are.
Dell team expertise: ProDeploy for Infrastructure
relies on engineers, architects, project managers,
and others who have years of experience with
Dell solutions and technology. Their expertise
comes through in time savings while following
best practices.
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023 | 3
4. What we found
Scenario 1: Server configuration – ProDeploy Factory Configuration vs. in-house admin
Get servers with the settings you need while saving time for admins
ProDeploy Factory Configuration completely configured the Dell PowerEdge R750 server before shipping it to
us. The server was ready for deployment once we received it; we spent no additional time on configuration.
Figure 1 shows the total time and steps to complete the configuration tasks after resetting the PowerEdge
server. To see the full list of tasks, see the science behind this report. Please note, using deployment tools when
configuring servers on site could cause the time savings to vary.
Scale time savings for larger server installations
Enterprise-grade organizations often replace large quantities of servers, and sometimes need to deliver
many consistently configured servers to multiple locations. Our first test scenario reflects these use cases and
demonstrates perhaps a greater value of using ProDeploy Factory Configuration. To show how much time
an organization could save using ProDeploy Factory Configuration on a large-scale server installation, we
extrapolated the timings we captured from the single PowerEdge R750 server configuration to 100 servers. As
Figure 2 shows, allowing the service to complete all configuration tasks for 100 servers (rather than having an
admin complete them manually) could save approximately 115 hours while ensuring configuration remained
consistent for each server throughout the installation.
Figure 1: In-house admin time, in minutes, and steps to configure a single PowerEdge server. Lower is better.
Source: Principled Technologies.
Save hands-on admin time and effort with a
pre-configured Dell PowerEdge server
Dell ProDeploy Factory Configuration
0 time 0 steps
Our admin
69m
Save 69m
and 115 steps
115 steps
Figure 2: Extrapolated in-house admin time, in hours and minutes, and steps to configure 100 PowerEdge servers. Lower is better.
Source: Principled Technologies.
Scale time savings when ordering 100
Dell PowerEdge servers
Save 115h 45m
and 11,500 steps
Dell ProDeploy Factory Configuration
0 time 0 steps
Our admin (projected)
115h 45m 11,500 steps
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023 | 4
5. Save over
133 minutes
Our admin
with ProDeploy
for Infrastructure
133m
Scenario 2: Server deployment – ProDeploy
for Infrastructure vs. in-house admin
Remove IT admin time from server deployment
Organizations with remote or regional data centers
might not have the IT staff to deploy solutions on site
when necessary. To address these kinds of situations,
ProDeploy for Infrastructure can send a Dell-certified
technician to leverage extensive Dell solutions expertise
and deploy hardware on site, saving admin time (or in
some instances, non-IT staff time). As Figure 3 shows,
our admin needed over two hours and 13 minutes to
deploy a single Dell PowerEdge R750—admin time
that an organization could save with ProDeploy for
Infrastructure. Installation requirements vary, but by
using ProDeploy for Infrastructure, your organization
could see additional savings by eliminating project
planning, travel to the deployment site, and other
time-based hurdles.
Roll out a large server installation while saving
admin time.
ProDeploy can also help with a large or multi-phase
server rollout by deploying the servers for you. To
show how much time an organization could save using
ProDeploy for Infrastructure on a large-scale server
installation, we extrapolated the captured timings from
the single Dell PowerEdge R750 server deployment to
100 servers. As Figure 4 shows, allowing a Dell-certified
engineer to deploy 100 PowerEdge servers for you
could save over 223 hours compared to having an in-
house admin deploy them.
Figure 3: Time, in minutes, and steps to deploy a
single PowerEdge server. Lower is better. Source:
Principled Technologies.
Figure 4: Extrapolated time, in hours and minutes, and
steps to deploy 100 PowerEdge servers. Lower is better.
Source: Principled Technologies.
Save over
223 hours
Our admin (projected)
223h 16m
with ProDeploy
for Infrastructure
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023 | 5
6. Conclusion
Saving any amount of time when configuring or deploying servers can help IT admins as well as your
organization. Enterprise-grade organizations might feel the pressure of a large-scale Dell PowerEdge server
rollout and want to save time with pre-configured servers or on-site installation. Smaller organizations might not
have IT staff available to configure or deploy PowerEdge servers in a new data center. Dell ProDeploy can save
you time in these scenarios and more.
By tasking one of our admins with configuration and deployment of a Dell PowerEdge R750 server, we found
Dell ProDeploy Factory Configuration and ProDeploy for Infrastructure services can offer the following:
Regardless of whether you’re rolling out a hundred servers at once into an established IT infrastructure or
needing on-site services installing new servers in a regional data center, using ProDeploy Infrastructure Suite can
help your organization achieve critical business priorities and save time for your IT admins.
1. See “Using Dell ProDeploy Plus
for Infrastructure can improve deployment
times for Dell technology” at https://facts.
pt/5gOqYFB for more information.
ProDeploy Factory Configuration
• Eliminated hands-on IT admin involvement in server configuration, saving 1 hour and 9
minutes of admin time per server
• Could save over 115 hours based on our extrapolated data for 100 servers
ProDeploy for Infrastructure
• Could save over 2 hours and 13 minutes of admin time per server
• Could save over 223 hours based on our extrapolated data for 100 servers
• Depending on installation requirements, could save additional time by eliminating planning,
travel, and other admin tasks
Principled Technologies is a registered trademark of Principled Technologies, Inc.
All other product names are the trademarks of their respective owners.
For additional information, review the science behind this report.
Principled
Technologies®
Facts matter.®
Principled
Technologies®
Facts matter.®
This project was commissioned by Dell Technologies.
Read the science behind this report at https://facts.pt/VM30HOj
Faster and easier server installation with Dell ProDeploy Factory Configuration or ProDeploy for Infrastructure June 2023 | 6