STEP BY STEP CONSTRUC-             BURO CITE PROJECTS
TION OF A NEW STRUC-
TURE WITH BURO CITE

1. Schedule of requirements
                                   Cycle bridge Zuidereinde (Netherlands)
In this phase together with the
                                   Construction of a cycle bridge over the
client we define the require-
                                   Hilversums Kanaal, which put an end to a
ments regarding functionality,
                                   dangerous traffic situation. Commissioned
safety, design, sustainability,
                                   by the local authority of Wijdemeren, Buro
manageability, and financial
                                   CITE coordinated engineering and contract
feasibility.
                                   supervision, according to the UAV 2012
                                   system.
2. Sketching
Our next step is to explore
possible solutions by sketch-                                                             Bridge over the Saramacca river near Pikin
ing, taking into account the                                                              Saron (Surinam)
schedule of requirements.                                                                 Part of the program to upgrade the existing
                                                                                          second east-west connection bridges to
3. Design                                                                                 “class 60” bridges.
We optimize the chosen                                                                    Buro CITE provided engineering and contract
alternative and perform the                                                               supervision commissioned by the Ministry of
necessary strength and                                                                    Public Works.
stability calculations.

4. Technical drawings
                                   Oil Jetty (Surinam)
Using the results of the
                                   Modification of an existing oil jetty to allow
calculations we develop the
                                   larger oil tankers to dock and unload.
chosen alternative into a
                                   Buro CITE provided the design and project-
technical design, 3D if
                                   mangement during construction commis-
required.
                                   sioned by the Port Authorities of Surinam.
5. Contract specifications
Based on the technical design,
(RAW) contract specifications
are drawn up.                                                                             Bridge over the Saramacca Canal (Surinam)
                                                                                          Creation of an alternative north-south link to
6. Procurement and                                                                        relieve the pressure on the congested
construction                                                                              existing routes. Buro CITE provided
We organize the tender                                                                    engineering and contract supervision
process up to the contract                                                                commissioned by the Ministry of Public
award. When the necessary                                                                 Works.
permits are granted construc-
tion can begin, during which
we can supervise the work in
progress.
                                   River Dikes at Commewijne and Albina
                                   (Surinam)
7. Application, management
                                   The raising of existing river dikes with an
and maintenance
                                   average of 55 cm, to withstand sea level rise
To ensure functionality and
                                   over the next 15 years. Buro CITE was
structural integrity during it’s
                                   responsible for the design and supervision
intended life-cycle regular
                                   on behalf of the Ministry of Public Works.
maintenance is essential.
Identifying defects or deterio-
ration in an early stage can
prevent excessive mainte-
nance costs. Buro CITE
advises you on managing
construction maintenance and
sets up maintenance plans.




                                                                                                                      Buro CITE coöperates with the leading
                                                                                                                      construction engineers of Rustwijk &
                                                                                                                      Rustwijk in Surinam


                                                                            www.burocite.nl
                                   Buro CITE BV The Netherlands              Buro CITE NV Surinam
                                   Postbus 150        T: +31 70 307 69 80    PO Box 2944        T: +597 47 45 63
                                   2280 AD Rijswijk   F: +31 70 399 24 83    Paramaribo         F: +597 47 40 64
                                   Visseringlaan 18   E: info@burocite.nl    Mahonylaan 46      E: info@burocite.nl
                                   2288 ER Rijswijk                          Paramaribo                                         Buro CITE supports Kika

More Related Content

Viewers also liked (9)

Tiết 18 19
Tiết 18   19Tiết 18   19
Tiết 18 19
 
Ethics pwp
Ethics pwpEthics pwp
Ethics pwp
 
Introducción clase 1
Introducción clase 1Introducción clase 1
Introducción clase 1
 
Personal Time
Personal TimePersonal Time
Personal Time
 
Strata2015
Strata2015Strata2015
Strata2015
 
Application Note: Advanced Applications Enabled by OmniGIS® Gas Injection
Application Note: Advanced Applications Enabled by OmniGIS® Gas InjectionApplication Note: Advanced Applications Enabled by OmniGIS® Gas Injection
Application Note: Advanced Applications Enabled by OmniGIS® Gas Injection
 
Larry Scheinfeld: What Your Start-up Needs to Gain VC & Investor Attention
Larry Scheinfeld: What Your Start-up Needs to Gain VC & Investor AttentionLarry Scheinfeld: What Your Start-up Needs to Gain VC & Investor Attention
Larry Scheinfeld: What Your Start-up Needs to Gain VC & Investor Attention
 
Barangolások franciaországban dijon
Barangolások  franciaországban dijonBarangolások  franciaországban dijon
Barangolások franciaországban dijon
 
Pressekonferenz
PressekonferenzPressekonferenz
Pressekonferenz
 

Similar to Factsheet burocite opmaak achterr-constructies

Factsheet burocite opmaak achter-engineering
Factsheet burocite opmaak achter-engineeringFactsheet burocite opmaak achter-engineering
Factsheet burocite opmaak achter-engineering
Buro CITE
 
Factsheet burocite opmaak achter-projectsupport
Factsheet burocite opmaak achter-projectsupportFactsheet burocite opmaak achter-projectsupport
Factsheet burocite opmaak achter-projectsupport
Buro CITE
 
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdfPre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
ashishm52
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.
Kartikey Joshi
 

Similar to Factsheet burocite opmaak achterr-constructies (20)

Factsheet burocite opmaak achter-engineering
Factsheet burocite opmaak achter-engineeringFactsheet burocite opmaak achter-engineering
Factsheet burocite opmaak achter-engineering
 
Report-on-the-heritage-city-project
Report-on-the-heritage-city-projectReport-on-the-heritage-city-project
Report-on-the-heritage-city-project
 
Factsheet burocite opmaak achter-projectsupport
Factsheet burocite opmaak achter-projectsupportFactsheet burocite opmaak achter-projectsupport
Factsheet burocite opmaak achter-projectsupport
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Rosshire engineering
Rosshire engineeringRosshire engineering
Rosshire engineering
 
Atkins Bim Capability (3)
Atkins Bim Capability (3)Atkins Bim Capability (3)
Atkins Bim Capability (3)
 
Atkins Bim Capability
Atkins Bim CapabilityAtkins Bim Capability
Atkins Bim Capability
 
Atkins BIM Capability
Atkins BIM CapabilityAtkins BIM Capability
Atkins BIM Capability
 
Atkins Bim Capability
Atkins Bim CapabilityAtkins Bim Capability
Atkins Bim Capability
 
Atkins Bim Capability (3)
Atkins Bim Capability (3)Atkins Bim Capability (3)
Atkins Bim Capability (3)
 
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdfPre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
Pre_Cast Concrete - AE & IE Perspective by Shri Shailesh Rastogi .pdf
 
2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
Article-Revolutionizing Marine Engineering with BIM
Article-Revolutionizing Marine Engineering with BIMArticle-Revolutionizing Marine Engineering with BIM
Article-Revolutionizing Marine Engineering with BIM
 
Hassan Elaref CV 3
Hassan Elaref CV 3Hassan Elaref CV 3
Hassan Elaref CV 3
 
Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...Government recognized new advance material for sustainable construction of ro...
Government recognized new advance material for sustainable construction of ro...
 
c.v(abozamel)
c.v(abozamel)c.v(abozamel)
c.v(abozamel)
 
Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.Advanced Session on Statutory procedure and required documentations.
Advanced Session on Statutory procedure and required documentations.
 
TMR and BIM
TMR and BIMTMR and BIM
TMR and BIM
 
CSU Recruitment
CSU RecruitmentCSU Recruitment
CSU Recruitment
 

More from Buro CITE

Factsheet burocite opmaak voor-projectsupport
Factsheet burocite opmaak voor-projectsupportFactsheet burocite opmaak voor-projectsupport
Factsheet burocite opmaak voor-projectsupport
Buro CITE
 
Factsheet burocite opmaak voor-engineering
Factsheet burocite opmaak voor-engineeringFactsheet burocite opmaak voor-engineering
Factsheet burocite opmaak voor-engineering
Buro CITE
 
Factsheet burocite opmaak voor-constructies
Factsheet burocite opmaak voor-constructiesFactsheet burocite opmaak voor-constructies
Factsheet burocite opmaak voor-constructies
Buro CITE
 
Factsheet burocite opmaak achter-buitenruimtemanagement
Factsheet burocite opmaak achter-buitenruimtemanagementFactsheet burocite opmaak achter-buitenruimtemanagement
Factsheet burocite opmaak achter-buitenruimtemanagement
Buro CITE
 
Factsheet burocite opmaak voor-lior
Factsheet burocite opmaak voor-liorFactsheet burocite opmaak voor-lior
Factsheet burocite opmaak voor-lior
Buro CITE
 
Factsheet burocite opmaak achter-lior
Factsheet burocite opmaak achter-liorFactsheet burocite opmaak achter-lior
Factsheet burocite opmaak achter-lior
Buro CITE
 
Factsheet burocite opmaak achter-dali
Factsheet burocite opmaak achter-daliFactsheet burocite opmaak achter-dali
Factsheet burocite opmaak achter-dali
Buro CITE
 
Factsheet burocite opmaak achter-brochure
Factsheet burocite opmaak achter-brochureFactsheet burocite opmaak achter-brochure
Factsheet burocite opmaak achter-brochure
Buro CITE
 
Factsheet burocite opmaak voor-brochure
Factsheet burocite opmaak voor-brochureFactsheet burocite opmaak voor-brochure
Factsheet burocite opmaak voor-brochure
Buro CITE
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
Buro CITE
 

More from Buro CITE (10)

Factsheet burocite opmaak voor-projectsupport
Factsheet burocite opmaak voor-projectsupportFactsheet burocite opmaak voor-projectsupport
Factsheet burocite opmaak voor-projectsupport
 
Factsheet burocite opmaak voor-engineering
Factsheet burocite opmaak voor-engineeringFactsheet burocite opmaak voor-engineering
Factsheet burocite opmaak voor-engineering
 
Factsheet burocite opmaak voor-constructies
Factsheet burocite opmaak voor-constructiesFactsheet burocite opmaak voor-constructies
Factsheet burocite opmaak voor-constructies
 
Factsheet burocite opmaak achter-buitenruimtemanagement
Factsheet burocite opmaak achter-buitenruimtemanagementFactsheet burocite opmaak achter-buitenruimtemanagement
Factsheet burocite opmaak achter-buitenruimtemanagement
 
Factsheet burocite opmaak voor-lior
Factsheet burocite opmaak voor-liorFactsheet burocite opmaak voor-lior
Factsheet burocite opmaak voor-lior
 
Factsheet burocite opmaak achter-lior
Factsheet burocite opmaak achter-liorFactsheet burocite opmaak achter-lior
Factsheet burocite opmaak achter-lior
 
Factsheet burocite opmaak achter-dali
Factsheet burocite opmaak achter-daliFactsheet burocite opmaak achter-dali
Factsheet burocite opmaak achter-dali
 
Factsheet burocite opmaak achter-brochure
Factsheet burocite opmaak achter-brochureFactsheet burocite opmaak achter-brochure
Factsheet burocite opmaak achter-brochure
 
Factsheet burocite opmaak voor-brochure
Factsheet burocite opmaak voor-brochureFactsheet burocite opmaak voor-brochure
Factsheet burocite opmaak voor-brochure
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
 

Factsheet burocite opmaak achterr-constructies

  • 1. STEP BY STEP CONSTRUC- BURO CITE PROJECTS TION OF A NEW STRUC- TURE WITH BURO CITE 1. Schedule of requirements Cycle bridge Zuidereinde (Netherlands) In this phase together with the Construction of a cycle bridge over the client we define the require- Hilversums Kanaal, which put an end to a ments regarding functionality, dangerous traffic situation. Commissioned safety, design, sustainability, by the local authority of Wijdemeren, Buro manageability, and financial CITE coordinated engineering and contract feasibility. supervision, according to the UAV 2012 system. 2. Sketching Our next step is to explore possible solutions by sketch- Bridge over the Saramacca river near Pikin ing, taking into account the Saron (Surinam) schedule of requirements. Part of the program to upgrade the existing second east-west connection bridges to 3. Design “class 60” bridges. We optimize the chosen Buro CITE provided engineering and contract alternative and perform the supervision commissioned by the Ministry of necessary strength and Public Works. stability calculations. 4. Technical drawings Oil Jetty (Surinam) Using the results of the Modification of an existing oil jetty to allow calculations we develop the larger oil tankers to dock and unload. chosen alternative into a Buro CITE provided the design and project- technical design, 3D if mangement during construction commis- required. sioned by the Port Authorities of Surinam. 5. Contract specifications Based on the technical design, (RAW) contract specifications are drawn up. Bridge over the Saramacca Canal (Surinam) Creation of an alternative north-south link to 6. Procurement and relieve the pressure on the congested construction existing routes. Buro CITE provided We organize the tender engineering and contract supervision process up to the contract commissioned by the Ministry of Public award. When the necessary Works. permits are granted construc- tion can begin, during which we can supervise the work in progress. River Dikes at Commewijne and Albina (Surinam) 7. Application, management The raising of existing river dikes with an and maintenance average of 55 cm, to withstand sea level rise To ensure functionality and over the next 15 years. Buro CITE was structural integrity during it’s responsible for the design and supervision intended life-cycle regular on behalf of the Ministry of Public Works. maintenance is essential. Identifying defects or deterio- ration in an early stage can prevent excessive mainte- nance costs. Buro CITE advises you on managing construction maintenance and sets up maintenance plans. Buro CITE coöperates with the leading construction engineers of Rustwijk & Rustwijk in Surinam www.burocite.nl Buro CITE BV The Netherlands Buro CITE NV Surinam Postbus 150 T: +31 70 307 69 80 PO Box 2944 T: +597 47 45 63 2280 AD Rijswijk F: +31 70 399 24 83 Paramaribo F: +597 47 40 64 Visseringlaan 18 E: info@burocite.nl Mahonylaan 46 E: info@burocite.nl 2288 ER Rijswijk Paramaribo Buro CITE supports Kika