1. PROJECT AREAS Phase 1 Phase 2 Phases 3
Town School for Boys Key Areas/ Improvements
FACT SHEET
Strengthen columns &
December 2011 Seismic & Safety foundations, replace glazing at
Includes foundation work
at west stair
at west stair
courtyard
Flattened slab & openings to
Theater Cafeteria for more flexible
PROJECT AREAS Existing Phase 1 Phases 2 & 3 programming
Barrier removal for
Cafeteria
Area Totals accessibility & new flooring
Renovate 2nd Floor east wing
Complete STEM Center
p
Site Area 35,113 sqft No change No Change
STEM to collaborative center for
ll b f
with 2nd Lab
Science, Math & Technology
Renovate 3rd Floor for
Building Area: Gross 54,540 sqft 54,540 sqft 72,600 sqft Art combined Lower & Upper
School Art classroom
Co‐locate Upper School classes
Building Area: Net 48,500 sqft 48,900 sqft 69,200 sqft Upper School
& lockers in East Wing
Building Area:
g
Renovate 2nd floor west wing
Useable teaching 31,300 sqft 28,900 sqft 45,300 sqft Lower School
areas for 3rd & 4th grade classrooms
Shell construction for 8,000 Buildout of gym & stage
Proposed Expansion Multipurpose Gym /
sqft flexible gym/assembly finishes including seating for
Theater
room 450.
Building Area: Gross -- 0 sqft 17,200 sqft 2nd Floor Music & Drama
Music & Drama
classrooms above the stage
20,300 ft (includes
20 300 sqft (i l d
Building Area: Net -- 0 sqft New P.E. Studio, renovated
Roof Learning Lab) Existing Gym support
Locker Room & P.E. Office.
Building Area:
11,700 sqft (includes
Useable Teaching -- 0 sqft New double‐height Project
Areas
Roof Learning Lab) Classrooms
Room & Roof Learning Lab.
Double‐height Project Room,
Proposed Improved
Meeting Rooms renovated Faculty Lounge &
3rd Floor Meeting Room.
g
Building Area: Gross 17,400 sqft 17,400 sqft Create collaborative Expand STEM team room,
Teacher Teaming & STEM, Humanities & create Reading/ English team
Support Areas Language teacher team room & 3rd floor staff support
Building Area: Net -- 14,200 sqft 15,100 sqft
rooms space
Building Area: Centrally locate 2‐floor Literary
Useable teaching -- 12,500 sqft 4,400 sqft Arts Center with stacks, flex
Literary Arts
areas teaching spaces & Literary
team room.
team room
Schedule
Educational support Co‐locate Reading/ English
Option to co‐locate 3
(Reading, Learning Team Room with Librarians &
Reading Rooms
Project Schedules 6/2012 – 8/2012 6/2013 – 8/2014 resources, etc) Learning Services.
Sprinkler system throughout,
Sprinklers at Existing
Upgrade heating system
Other Theater, Upgrade heating
throughout. Stair, Elevator &
system
Restrooms renovations