A subcontractor works with the with the main contractor to supply or fix any materials or goods or execute work forming part of the main contract. Essentially this contractor is employed by the main contractor.
Breakdowns Happen: Factoring Downtime Into Your Simulationbussylee25
Wednesday March 5 2014, 11am (Eastern)
Due to the popularity of our recent whitepaper on factoring downtime in to your simulation, we're holding a FREE Webinar on how to factor downtime into your simulation.
Led by Brian Harrington, former Ford Motor Company employee and SIMUL8 expert, Brian is passionate about this subject and is keen to share his knowledge and discuss any questions you may have.
The Webinar will expand on the topics covered in the whitepaper including; questions to consider when working with downtime, capturing at station or line level, associated distributions and accounting for the lockout procedure. In addition, we'll look at simultaneous breakdowns, skill trades to handle your breakdown and more.
Learn the importance of defining performance metrics and how you can utilize them in eMaint X3. Gil Acosta discusses which metrics are key measures of success for any maintenance operation, and how to determine which metrics are important for your organization. He then discusses how these measures can be derived from the data within your CMMS, and what types of data will drive performance and results.
Improving Incident Response: Building a More Efficient IT InfrastructureEmulex Corporation
This webcast will focus on the results of a study Emulex commissioned from Forrester Consulting that evaluates the range of issues that enterprise IT staffs are facing while managing the performance of their business-critical application and business services. The results of the study, entitled “Improving Incident Response: Building a More Efficient IT Infrastructure,” indicate that a lack of network visibility negatively impacts the ability of IT staff to identify and resolve application performance issues, which leads to substantial business productivity loss.
A subcontractor works with the with the main contractor to supply or fix any materials or goods or execute work forming part of the main contract. Essentially this contractor is employed by the main contractor.
Breakdowns Happen: Factoring Downtime Into Your Simulationbussylee25
Wednesday March 5 2014, 11am (Eastern)
Due to the popularity of our recent whitepaper on factoring downtime in to your simulation, we're holding a FREE Webinar on how to factor downtime into your simulation.
Led by Brian Harrington, former Ford Motor Company employee and SIMUL8 expert, Brian is passionate about this subject and is keen to share his knowledge and discuss any questions you may have.
The Webinar will expand on the topics covered in the whitepaper including; questions to consider when working with downtime, capturing at station or line level, associated distributions and accounting for the lockout procedure. In addition, we'll look at simultaneous breakdowns, skill trades to handle your breakdown and more.
Learn the importance of defining performance metrics and how you can utilize them in eMaint X3. Gil Acosta discusses which metrics are key measures of success for any maintenance operation, and how to determine which metrics are important for your organization. He then discusses how these measures can be derived from the data within your CMMS, and what types of data will drive performance and results.
Improving Incident Response: Building a More Efficient IT InfrastructureEmulex Corporation
This webcast will focus on the results of a study Emulex commissioned from Forrester Consulting that evaluates the range of issues that enterprise IT staffs are facing while managing the performance of their business-critical application and business services. The results of the study, entitled “Improving Incident Response: Building a More Efficient IT Infrastructure,” indicate that a lack of network visibility negatively impacts the ability of IT staff to identify and resolve application performance issues, which leads to substantial business productivity loss.
How to Reduce your MTTI/MTTR with a Single ClickSumo Logic
Learn how Sumo Logic enables users to drastically reduce MTTI and MTTR with a single click. In this deck, we cover:
- The power of log analytics for faster troubleshooting and root-cause analysis
- How machine learning & pattern recognition enable faster MTTI and MTTR
- How Sumo Logic's LogReduce and LogCompare features are helping users gain better control of their applications
When working for Petrobras at PRSI (Pasadena Refining System Inc.) I had this opportunity to share my experience as a Maintenance Manager in Brazil with PRSI operators and maintenance crew.
Reducing MTTR and False Escalations: Event Correlation at LinkedInMichael Kehoe
LinkedIn’s production stack is made up of over 900 applications and over 2200 internal API’s. With any given application having many interconnected pieces, it is difficult to escalate to the right person in a timely manner.
In order to combat this, LinkedIn built an Event Correlation Engine that monitors service health and maps dependencies between services to correctly escalate to the SRE’s who own the unhealthy service.
We’ll discuss the approach we used in building a correlation engine and how it has been used at LinkedIn to reduce incident impact and provide better quality of life to LinkedIn’s oncall engineers.
IBMS (Indian Bridge Management System) was initiated by the Ministry of Road, Transport and Highways (MORTH) in 2015 initially for a 3-year time frame.
Scenario OverviewAn airline company is looking for a PRP.docxanhlodge
Scenario Overview
An airline company is looking for a PRPC implementation to administer their Frequent Flyer Program called Sky-Kilometers.
Actors
1. Frequent Flyer Member – Can access and administer their account online, is able to use services such as request missing kilometers, file complaints, etc.
2. Customer Service Representative (CSR) – Acts on the requests from Frequent Flyer Members
3. Benefits Manager – Manages benefits and rules associated with the benefits. They can also run reports and handle all escalations by CSR’s
4. Customer Service Manager – Decides on disciplinary actions for complaints. They can also run reports
Process Overview
Frequent Flyer members should be able to:
View their flight history
Update their contact and personal information File a complaint request
Request missing kilometers
Detailed Requirements
Members of the Sky Kilometers program login to Sky Kilometers’ PRPC application where they can view their member ID, membership status, and total kilometers.
The system assigns the membership status: Silver, Gold or Platinum based on kilometers accumulated.
View recent account activity
The recent account activity view displays the flights flown by the member with the number of kilometers flown as well as the number of kilometers awarded for each flight.
1
Update contact information
The users can update their contact information such as their home and cell phone numbers and email. They can also update their payment information such as their credit card number, expiration date and CVV number.
Enter a missing kilometers request
Enter a request for missing kilometers consisting of origin and destination, and the date. Requests for missing kilometers are sent to a work basket. The Get Next Work functionality is used to retrieve work from the work basket. Requests are prioritized after member status and request date (oldest first).
The requests for missing kilometers are sent to a CSR who either approves or rejects it. The member is notified of the result by email.
Enter a Complaint
Enter a complaint consists of a category and a description. Complaints are categorized in: Crew behavior, cleanliness, flight delays, and other. A complaint is assigned to a CSR who can escalate it to the Benefits Manager, or reject it. The Benefits Manager can reward bonus kilometers for complaints. The Frequent Flyer Member receives an email response to his complaint, unless it was rejected. If the complaint is related to crew behavior an additional process is started in parallel allowing a Customer Service Manager to review the complaint and take disciplinary actions if necessary. The claim is closed when both processes are complete.
2
Complaints submitted are sent to the CSR with least amount of work in the work list for review. In addition, complaints for crew behavior are routed to the Customer Service Manager for.
In follow-up to the March 10, 2015 announcement of the Next Generation Accountable Care Organization (ACO) Model of payment and care delivery, the Center for Medicare and Medicaid Innovation (CMS Innovation Center) hosted the fifth in a series of open door forums on Tuesday, April 14, 2015. This open door forum focused on letter of intent (LOI) and application.
- - -
CMS Innovation Center
http://innovation.cms.gov
We accept comments in the spirit of our comment policy:
http://newmedia.hhs.gov/standards/comment_policy.html
CMS Privacy Policy
http://cms.gov/About-CMS/Agency-Information/Aboutwebsite/Privacy-Policy.html
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
RFP
1. Project Initiation Phase
The purpose of the RFP document is to define all procurement related activities for implementing Oracle for Tesla motors. This document will outline all the procurement management activities and resources that are required for implementing the software.
2. Procurement Statement
Below are the list of items that must be procured in order to successfully start the project.
Item/Service
Justification
Needed By
Cost
Rack server for the software implementation
This is an inventory item that needs to be procured for implementing the new software (Oracle R12) for the company
01/01/2018
$5000
Printer and scanner
Need printer/ scan to print out the documentation
01/5/2018
$2000
Table
Need computer tables for consultants to work on implementation
01/15/2018
$1000
Chair
Need desk chairs for consultants to implement the application
01/15/2018
$1000
Car
Need a car for consultant’s usage
01/15/2018
$10,000
Laptops
Laptops are needed for consultants to work on
01/15/2018
$5000
Office supplies
These are office supplies that are required by the implementation partner
01/15/2018
$2000
Consultants service
Consultant service is required to implement the Oracle software.
01/15/2018
$404,617.60
Vendor selection: The vendor selection process is very straight forward as most of the vendors are have had good relations with real tech. The entire consultant team are offered by Real Tech itself. The office supplies are procured by the vendor name Staples. Finally, the laptops are procured by tech systems. The vendors are carefully analyzed by the buyers and are listed on the buyer’s approved vendor list of vendors. The vendors are rated based on the price, delivery time and quality of the products.
3. Selection Process & Criteria
The hardware and office supplies are based on the planned purchase order contract with the vendor. The consultants are interviewed before hand before onboarding the resources into the team.
4. Project Procurement Team
All procurement activities must initially get approval from the immediate manager and then the approval of the project manager. The project manager must document justify the need in a form of a document and present it to the project sponsors.
5.Contract Type:
The procurement strategy used by Tesla is called Fixed- Price Contract. This type of contract is also called Lump- sum contract. The reason for choosing this contract is that there is no uncertainty in the scope of the project. The purchasing module in the Oracle ERP software will help improve the procure to pay cycle in the organization. The ERP implementation partner is bound to finish the implementation within one year at the cost of $350,000.
6.Contract Standards:
All procurement must follow the ISO 9001:2015 standards.
7.Vandor Management/ Perforance
This section describes the metrics to be used for procurement activities associated with the project. These metrics may include but not be limited to: methods to ensure the p ...
Breakout Session: Inside Scoop: How Crane Operator Certification and Evaluation is Really Going
Nearly a year after OSHA published its final rule on Operator Qualification, some companies still have questions about training and certification. How should employers evaluate their operators, and how often? What documentation is required? What implications, if any, are there to existing crane operator certifications? Hear from an industry expert on how his company implemented the requirements and learn the latest developments from NCCCO leadership.
Speakers: Bret Shields, Director of Safety, Buckner HeavyLift Cranes
Thom Sicklesteel, CEO, National Commission for the Certification of Crane Operators (NCCCO)
An overview of the ECMWF Copernicus Procurement Process
by Sylvia Baylis, ECMWF Head of Procurement provided at the ECMWF Copernicus Services Info Day, Brussels, 2 February 2015.
How to Reduce your MTTI/MTTR with a Single ClickSumo Logic
Learn how Sumo Logic enables users to drastically reduce MTTI and MTTR with a single click. In this deck, we cover:
- The power of log analytics for faster troubleshooting and root-cause analysis
- How machine learning & pattern recognition enable faster MTTI and MTTR
- How Sumo Logic's LogReduce and LogCompare features are helping users gain better control of their applications
When working for Petrobras at PRSI (Pasadena Refining System Inc.) I had this opportunity to share my experience as a Maintenance Manager in Brazil with PRSI operators and maintenance crew.
Reducing MTTR and False Escalations: Event Correlation at LinkedInMichael Kehoe
LinkedIn’s production stack is made up of over 900 applications and over 2200 internal API’s. With any given application having many interconnected pieces, it is difficult to escalate to the right person in a timely manner.
In order to combat this, LinkedIn built an Event Correlation Engine that monitors service health and maps dependencies between services to correctly escalate to the SRE’s who own the unhealthy service.
We’ll discuss the approach we used in building a correlation engine and how it has been used at LinkedIn to reduce incident impact and provide better quality of life to LinkedIn’s oncall engineers.
IBMS (Indian Bridge Management System) was initiated by the Ministry of Road, Transport and Highways (MORTH) in 2015 initially for a 3-year time frame.
Scenario OverviewAn airline company is looking for a PRP.docxanhlodge
Scenario Overview
An airline company is looking for a PRPC implementation to administer their Frequent Flyer Program called Sky-Kilometers.
Actors
1. Frequent Flyer Member – Can access and administer their account online, is able to use services such as request missing kilometers, file complaints, etc.
2. Customer Service Representative (CSR) – Acts on the requests from Frequent Flyer Members
3. Benefits Manager – Manages benefits and rules associated with the benefits. They can also run reports and handle all escalations by CSR’s
4. Customer Service Manager – Decides on disciplinary actions for complaints. They can also run reports
Process Overview
Frequent Flyer members should be able to:
View their flight history
Update their contact and personal information File a complaint request
Request missing kilometers
Detailed Requirements
Members of the Sky Kilometers program login to Sky Kilometers’ PRPC application where they can view their member ID, membership status, and total kilometers.
The system assigns the membership status: Silver, Gold or Platinum based on kilometers accumulated.
View recent account activity
The recent account activity view displays the flights flown by the member with the number of kilometers flown as well as the number of kilometers awarded for each flight.
1
Update contact information
The users can update their contact information such as their home and cell phone numbers and email. They can also update their payment information such as their credit card number, expiration date and CVV number.
Enter a missing kilometers request
Enter a request for missing kilometers consisting of origin and destination, and the date. Requests for missing kilometers are sent to a work basket. The Get Next Work functionality is used to retrieve work from the work basket. Requests are prioritized after member status and request date (oldest first).
The requests for missing kilometers are sent to a CSR who either approves or rejects it. The member is notified of the result by email.
Enter a Complaint
Enter a complaint consists of a category and a description. Complaints are categorized in: Crew behavior, cleanliness, flight delays, and other. A complaint is assigned to a CSR who can escalate it to the Benefits Manager, or reject it. The Benefits Manager can reward bonus kilometers for complaints. The Frequent Flyer Member receives an email response to his complaint, unless it was rejected. If the complaint is related to crew behavior an additional process is started in parallel allowing a Customer Service Manager to review the complaint and take disciplinary actions if necessary. The claim is closed when both processes are complete.
2
Complaints submitted are sent to the CSR with least amount of work in the work list for review. In addition, complaints for crew behavior are routed to the Customer Service Manager for.
In follow-up to the March 10, 2015 announcement of the Next Generation Accountable Care Organization (ACO) Model of payment and care delivery, the Center for Medicare and Medicaid Innovation (CMS Innovation Center) hosted the fifth in a series of open door forums on Tuesday, April 14, 2015. This open door forum focused on letter of intent (LOI) and application.
- - -
CMS Innovation Center
http://innovation.cms.gov
We accept comments in the spirit of our comment policy:
http://newmedia.hhs.gov/standards/comment_policy.html
CMS Privacy Policy
http://cms.gov/About-CMS/Agency-Information/Aboutwebsite/Privacy-Policy.html
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
RFP
1. Project Initiation Phase
The purpose of the RFP document is to define all procurement related activities for implementing Oracle for Tesla motors. This document will outline all the procurement management activities and resources that are required for implementing the software.
2. Procurement Statement
Below are the list of items that must be procured in order to successfully start the project.
Item/Service
Justification
Needed By
Cost
Rack server for the software implementation
This is an inventory item that needs to be procured for implementing the new software (Oracle R12) for the company
01/01/2018
$5000
Printer and scanner
Need printer/ scan to print out the documentation
01/5/2018
$2000
Table
Need computer tables for consultants to work on implementation
01/15/2018
$1000
Chair
Need desk chairs for consultants to implement the application
01/15/2018
$1000
Car
Need a car for consultant’s usage
01/15/2018
$10,000
Laptops
Laptops are needed for consultants to work on
01/15/2018
$5000
Office supplies
These are office supplies that are required by the implementation partner
01/15/2018
$2000
Consultants service
Consultant service is required to implement the Oracle software.
01/15/2018
$404,617.60
Vendor selection: The vendor selection process is very straight forward as most of the vendors are have had good relations with real tech. The entire consultant team are offered by Real Tech itself. The office supplies are procured by the vendor name Staples. Finally, the laptops are procured by tech systems. The vendors are carefully analyzed by the buyers and are listed on the buyer’s approved vendor list of vendors. The vendors are rated based on the price, delivery time and quality of the products.
3. Selection Process & Criteria
The hardware and office supplies are based on the planned purchase order contract with the vendor. The consultants are interviewed before hand before onboarding the resources into the team.
4. Project Procurement Team
All procurement activities must initially get approval from the immediate manager and then the approval of the project manager. The project manager must document justify the need in a form of a document and present it to the project sponsors.
5.Contract Type:
The procurement strategy used by Tesla is called Fixed- Price Contract. This type of contract is also called Lump- sum contract. The reason for choosing this contract is that there is no uncertainty in the scope of the project. The purchasing module in the Oracle ERP software will help improve the procure to pay cycle in the organization. The ERP implementation partner is bound to finish the implementation within one year at the cost of $350,000.
6.Contract Standards:
All procurement must follow the ISO 9001:2015 standards.
7.Vandor Management/ Perforance
This section describes the metrics to be used for procurement activities associated with the project. These metrics may include but not be limited to: methods to ensure the p ...
Breakout Session: Inside Scoop: How Crane Operator Certification and Evaluation is Really Going
Nearly a year after OSHA published its final rule on Operator Qualification, some companies still have questions about training and certification. How should employers evaluate their operators, and how often? What documentation is required? What implications, if any, are there to existing crane operator certifications? Hear from an industry expert on how his company implemented the requirements and learn the latest developments from NCCCO leadership.
Speakers: Bret Shields, Director of Safety, Buckner HeavyLift Cranes
Thom Sicklesteel, CEO, National Commission for the Certification of Crane Operators (NCCCO)
An overview of the ECMWF Copernicus Procurement Process
by Sylvia Baylis, ECMWF Head of Procurement provided at the ECMWF Copernicus Services Info Day, Brussels, 2 February 2015.
Once entities allocate the transaction price, they can then move to the fifth and final step of the new revenue recognition standard: recognizing revenue.
Step 5 requires entities to recognize the consideration given for an asset when or as the performance obligation has been satisfied. This point occurs when the customer receives control of the good or service.
Similar to ELEVATOR MAINTENANCE CONTROL PROGRAM IN WASHINGTON STATE (20)
LOVE TO HATE THEM - Destination Dispatching Elevator SystemsLee Chain
Elevator Destination Dispatching Control Systems - A quick and painless slide show on how and why they were developed, what they're supposed to accomplish, advantages and disadvantages. A quick overview of the latest elevator control and dispatching technology.
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...Joseph Lewis Aguirre
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus on Public Safety as Job #1, Engagement, Wealth of HOA, Branding, Communication, Culture, Civic Responsibility
Sense Levent Kagithane Catalog - Listing TurkeyListing Turkey
Sense Levent offers a luxurious living experience in the heart of Istanbul’s vibrant Levent district.
This cutting-edge development seamlessly integrates modern design with natural elements, featuring live evergreen plants maintained by an advanced irrigation system, ensuring lush greenery year-round.
The building’s elegant ceramic balconies are both stylish and durable, enhancing the overall aesthetic and functionality. Residents can enjoy the 700m Sky Lounge, which provides breathtaking views of Istanbul and a perfect space to relax and unwind.
Sense Levent promotes a healthy and active lifestyle with a full gym, swimming pool, sauna, and steam room, all available in the building. The interiors are crafted with high-quality materials, ensuring a luxurious and inviting living space.
Designed with young professionals in mind, Sense Levent features 1+1 and 2+1 units with smart floor plans and balconies. The project promises high investment returns, with an expected annual return of 6.5-7%, significantly above Istanbul’s average ROI.
Located in the rapidly growing and highly desirable Levent area, the development benefits from ongoing urban regeneration projects. Its prime location offers proximity to shopping malls, municipal buildings, universities, and public transportation, adding immense value to your investment.
Early investors can take advantage of discounted units during the construction phase, with an expected capital appreciation of +45% USD upon completion. Property Turkey provides comprehensive rental management services, ensuring a seamless and profitable investment experience.
Additionally, robust legal support and significant tax advantages are available through Property Turkey’s licensed Real Estate Investment Fund. Levent is a dynamic urban hub, ideal for young professionals with its numerous corporate headquarters and shopping malls.
Sense Levent is more than just a residence; it’s a place where dreams and opportunities come to life. Contact us today to secure your place in this exclusive development and experience the best of Istanbul living. Sense Levent: Sense the Opportunity. Live the Dream.
https://listingturkey.com/property/sense-levent/
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfListing Turkey
Tersane Suites Residences is a luxurious real estate project located in the heart of Istanbul, next to the beautiful Golden Horn. This unique development offers hotel concept residences with Rixos management, making it the perfect choice for both homeowners and investors.
The Tersane Suites Residences offers a wide range of options, from studio apartments to spacious four-bedroom units, all designed to the highest standard. The suites are finished with high-quality materials and feature modern, open-plan living spaces, fully-equipped kitchens, and large balconies with stunning views of the city and sea.
One of the standout features of Tersane Suites Residences is the Rixos management, which provides a truly exclusive and upscale living experience. Residents will have access to a range of luxury amenities, including a fitness center, spa, and indoor and outdoor swimming pools. Plus, the on-site restaurants and cafes provide a taste of the local and international cuisine.
The Tersane Suites Residences also offers a great opportunity for investors, as it provides a rental guarantee program. This means that investors can enjoy a steady income stream, with the peace of mind that their property is being managed by a reputable and experienced team.
The location of Tersane Suites Residences is also unbeatable, with easy access to the city’s main transportation links and within close proximity to the historic center, making it the perfect base for exploring all that Istanbul has to offer.
The KA Housing - Catalogue - Listing TurkeyListing Turkey
Welcome to KA Housing, a distinguished real estate development nestled in the heart of Eyüpsultan, one of Istanbul’s most promising districts.
Just 10 minutes from the bustling city center, Eyüpsultan offers a serene escape with the convenience of urban living. The direct metro line ensures seamless connectivity to all parts of Istanbul, making it an ideal location for residents who seek both tranquility and vibrancy.
KA Housing boasts unparalleled accessibility, with proximity to Istanbul Airport only 30 minutes away, facilitating easy international travel. Effortless city access is guaranteed by direct metro and transportation links to Istanbul’s cultural and commercial hubs. Quick access to key metro lines connects you to every corner of the city within minutes, making commuting and exploring the city hassle-free.
The development offers luxurious living spaces with a range of unit layouts from 1+1 to 4+1, designed with meticulous attention to detail. Each unit features balconies or terraces, providing stunning vistas of Istanbul and enhancing the living experience. High-quality materials and superior craftsmanship ensure durability and elegance, while sound-proof insulation and high ceilings (2.95 m) offer comfort and sophistication.
Residents of KA Housing enjoy exclusive on-site amenities, including a state-of-the-art gym, outdoor swimming pool, yoga area, and walking paths. Entertainment options abound with a private cinema, children’s playground, and a variety of dining options including a café and restaurant. Security and convenience are paramount with 24/7 security, a dedicated carpark garage, and an IP intercom system.
KA Housing represents a prime investment opportunity with limited availability in a high-demand area, ensuring enduring value and potential for lucrative returns. Homes in this development provide exceptional value without compromising on quality, offering affordable luxury for discerning buyers. The construction is of the highest quality, built to the latest seismic and disaster resistance standards, ensuring safety and resilience.
The community and surroundings of KA Housing are enriched by close proximity to prestigious universities such as Haliç University, Bilgi University, and Istanbul Ticaret University, making it an ideal location for students and academics. The development is adjacent to the Alibeyköy stream leading into the Halic waters, offering serene natural escapes amidst lush greenery. Residents can enjoy the cultural richness of the area, surrounded by historical and cultural landmarks that blend leisure, nature, and culture seamlessly.
https://listingturkey.com/property/the-ka-housing/
Keep Your Home Naturally Cool and Warm Out Change in Seasons
Vinra Construction is a private limited company registered under the ROC. The management has an experience of over 15 years of understanding the needs and delivering apt solutions to the end users We are providing turnkey solutions in construction fields. like Construction, Interior Designing Facility Management, Plantation Management, etc..
Vinra Construction Tech Enabled Company for Eco-Friendly Home Construction
Contact With Vinra for a Greener Future >>> Call us @ 888 4898 765
Simpolo Tiles & Bathware
Tile ho,
toh Simpolo.
Since the first steps were taken in 1977, Simpolo Ceramics has carved its niche as a consistently growing organisation with unparalleled innovation and passion rooted in simplicity.
We endure gratification for every experience we offer, created to share something meaningful. It may not resonate with the majority, but that makes us a class apart. If only a handful were to understand the purpose of our existence, we would be proud to have found our believers. Rather, people with whom we can share our beliefs.
VISUALIZER
Design your space in your style with our very own Visualizer. Now, you can choose the tiles of your liking from our wide selection and see how they would look in a space. Select the tile from the multiple options and the visualiser will replace the surfaces in the image with the selected tiles. This way, instead of just your imagination, you can choose the tiles for your place by getting an actual picture of how they would look in a space. So, design your space the way you desire digitally and implement it in real life to get the best results!
You can also share this visualiser with others to help them design their space.
Committed to delighting customers with world-class ceramic products and services. Make Simpolo synonymous with the best quality and set new benchmarks of excellence for all stakeholders. Pursue best business practices with utmost integrity to make Simpolo an exciting organisation to work with, for vendors, channel partners, investors and employees alike.
Gain worldwide recognition in the field of ceramic building products through Research and Innovation and bring an enhanced lifestyle within reach for every household.
Rams Garden Bahcelievler - Istanbul - ListingTurkeyListing Turkey
Implemented by Rams Global in Bahcelievler, the Rams Garden Bahcelievler Apartments includes 796 residences of different types from 2+1 to 5+1.
Next to the project, which will have 33 thousand square meters of green area, there will be 42 thousand 300 square meters of woodland. There will also be a 210-meter-long pond in the landscape of the project. There are 94.5 square meters of green space per flat.
Rams Garden Bahcelievler Apartments, which has 8 times more green space than the average of Istanbul with its 33 thousand square meters of green area located within a total of 75 thousand square meters, offers various housing options from 2+1 to 5+1.RAMS Garden has brought a lifeline to the construction industry.
Rams Global, which has signed projects in many places from Dubai to Phuket and delivered more than 20 thousand residences, is now starting new projects in Istanbul.
Rams Garden Bahcelievler is located 9 minutes from Metroport AVM, 5 minutes from Marmara Forum AVM, 12 minutes from Kazlıçeşme beach, 9 minutes from Yıldız Technical University, 7 minutes from Istinye University, 9 minutes from Ramada Hotel and Medicana Hospital.
https://listingturkey.com/property/rams-garden-bahcelievler-apartments/
Discover Yeni Eyup Evleri 2, nestled among the rising values of Eyupsultan, offering the epitome of modern living in Istanbul.
With its spacious living areas, contemporary architecture, and meticulous details, Yeni Eyup Evleri 2 is poised to be the star of your happiest moments. Situated in the new favorite district of Eyupsultan, claim your spot and unlock the doors to a peaceful life alongside your loved ones. Nestled next to the historical and natural beauties of Eyupsultan, embrace the comfort of modern living and rediscover life.
Social Amenities:
Yeni Eyup 2 offers a life filled with joy with its green landscaping areas, gym, sauna, children’s play areas, café, outdoor pool, and basketball court. Reserve your place for unforgettable moments!
Reliable Structure:
With 1+1, 2+1, and 3+1 apartment options, Yeni Eyup Evleri 2 is designed with first-class materials and craftsmanship. The doors to a safe and comfortable life are here! Choose the option that suits you best and step into your dream home.
Project:
Yeni Eyup 2 is conveniently located, with Istanbul Airport just 26 minutes away, the Mecidiyeköy Metro Line 4 minutes away, and the Tram Stop 5 minutes away, making your life easier with its central location.
Location:
Your home is positioned in a privileged location, providing easy access to the city center, shopping malls, restaurants, schools, and other important places.
Yeni Eyup 2 offers 1+1, 2+1, and 3+1 apartment options designed to meet different needs. Find an option suitable for every lifestyle and open the doors to a comfortable life in your dream home.
https://listingturkey.com/property/yeni-eyup-evleri-2/
Serviced Apartment Ho Chi Minh For RentalGVRenting
GVRenting is the leading rental real estate company in Vietnam. We help you to find a serviced apartment for rent in Ho Chi Minh & Saigon. Discover our broad range of rental properties in Vietnam.
For more details https://gvrenting.com/
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaFarmland Bazaar
Embarking on the journey to acquire a farmhouse for sale is just the beginning; the real investment lies in crafting an environment that contributes to our mental and physical well-being while satisfying the soul. At Farmlandbazaar.com, India’s leading online marketplace dedicated to farm land, farmhouses, and agricultural lands, we understand the importance of transforming a humble farmland into a warm and inviting sanctuary. Let's explore the fundamental aspects that can elevate your farmhouse into a tranquil haven.
2. An Elevator Maintenance Control Program,
or Elevator MCP, is a program or plan to
ensure that an elevator or escalator is
maintained correctly throughout its life.
It is mandatory in any jurisdiction that has
adopted the ASME 17.1 2000 Elevator Code.
3. The State of Washington and the City of
Seattle are two of those jurisdictions as of
January 1, 2014.
4. How the State of Washington administers
the MCP is different from any other state.
Just
here
5. The Elevator Service Providers doing
business in the State of Washington and the
City of Seattle, have had to submit their
MCP programs to the AHJ (Authority Having
Jurisdiction) for acceptance.
No other state requires the Elevator Service
Providers to do that at this time.
6. For a Maintenance Control Program to be
code-compliant, (and accepted by the AHJ), it
must be specific to the type of equipment and
address the following things:
7. 1. Examinations at scheduled intervals.
2. Periodic inspections at intervals
established by the Authority Having
Jurisdiction.
3. Cleaning, lubricating and adjusting at
regular intervals.
4. Repairing or replacing damaged or
broken parts affecting safe operation.
8. 1. Design and inherent quality of the
equipment.
2. Environmental conditions.
3. Usage.
4. Improved technology.
The code also states the following criteria
be considered when determining the
intervals between these tasks:
9. MCP Documentation
Includes:
A Procedure Manual (for
mechanics only), which is:
1. Not left on job site.
2. Specific to type and manufacture of
equipment.
3. Tells mechanic how to correctly fulfill
each task.
4. Proprietary to the Elevator Service
Provider.
10. This manual will not be found in the
elevator machine room. It is kept by the
Elevator Service Provider.
The Owner can ask to see it, but cannot
keep it.
11. 1. A record of maintenance tasks with
interval.
2. A record of examinations with
interval.
3. A record of safety tests and interval.
4. A record of callback and repair.
5. A record of fire service and
initiation device with interval.
6. A record of oil use (for hydraulic
elevators).
7. A sample signature page.
The MCP also includes these logs which
should be found in the elevator machine room:
12. Here’s an example of what a page from
one of these logs might look like.
Notice the dates and initials denoting when
task was completed and by whom.
How do you know whose initials these
are?
13. The MCP should include a sample signature
page within the MCP documentation in the
elevator machine room.
Elevator mechanics can be held personally
responsible for the validity of the MCP
documentation.
Jesse
Reno
JRJesse Reno
14. Additionally, in the State of
Washington, the Elevator Service
Provider must also cover the section of
the Code pertaining to Periodic
Inspection and Witnessing of Tests
(Section 8.11). Previously the testing
required by this section was
completed by the State Elevator
Inspector.
In the City of Seattle, City Elevator
Inspectors will still cover this part of
the code, for now.
15. 1. Belong to the owner of the
conveyance.
2. Are the Owner’s responsibility to
maintain.
3. Belong in the machine room or other
location within the building
designated by a sticker on the
controller.
4. Have a retention cycle of six years.
The MCP
logs:
16. So why is administration of the MCP unique in
Washington?
Over the years, several things can be said to
have contributed to where we are now.
17. Changes in technology have made many
elevator components less time consuming to
maintain. Elevator companies have used
this factor to try to drive down direct labor
costs.
1. Changes in
technology
18. 2. Labor Costs
In the last 25 years, the hourly wage for a
trained and qualified elevator mechanic has
increased about 2 ½
times. However, the monthly price charged
for elevator services has not increased
proportionately.
19. Strong competition and aggressive bidding
within the elevator industry itself have
exerted downward pressure over the years
on monthly service pricing.
3. Competition
20. Some believe that over the years, the
culmination of these things have had a
negative effect on the elevator industry
which needed to be addressed for the
good of the public at large.
The Maintenance Control Program,
administered in this particular way, was
seen as a means to do that.
21. Building Owners are responsible for
having an MCP for each elevator or
escalator in the facility.
The Elevator Service Provider is responsible
for providing and following the MCP.
22. 2014 was a grace
year...
Both the City of Seattle and the State
of Washington wanted to ease all
parties into the new procedures in
2014.
However, starting in 2015, things will be different.
23. Elevators that are overdue for Category 5
tests (for example a full-load safety test)
will be sealed out of service in the City of
Seattle.
24. Previously, there was a 90 days grace
period, i.e. , if an elevator was 60 days
past due for a 5 year full load test, the
City would give an additional 30 days,
after which it was sealed out of service if
the test was not done.
Starting in 2015, once the test is 30 days
past due, the elevator may be sealed out of
service.
25. In the State of Washington, the AHJ will
assess the owner a civil penalty of $500 per
month, per conveyance, after being one year
overdue, beginning in month 13.
26. Compliance with the MCP
is ultimately the responsibility of the
Owner.
Because of the extra labor required to
comply with the MCP, testing is sometimes
written out of Elevator Service Contracts.
Having your Elevator Service Contract
reviewed, or even re-written, by an
Elevator Consultant, could save your
building money in the long run.
28. CALIFORNIA
23211 South Pointe Drive
Laguna Hills, CA
949-348-9711
john@hkaconsulting.com
NEVADA
3765 E. Sunset Rd., Ste. B-5
Las Vegas, NV
702-319-9711
jim@hkaconsulting.com
WASHINGTON
15811 32nd Ave. NE
Lake Forest Park, WA
206-954-1821
lchain@hkaconsulting.com