1. Downtown South
Neighborhood Improvement District
Advisory Council
MEETING NOTICE
A meeting of the Downtown South Neighborhood Improvement District (NID) Advisory Council was
held at City Hall, Second Floor, Veterans Conference Room,
400 South Orange Avenue, Orlando, Florida.
MINUTES â December 13, 2017
Advisory Council Members Present:
Harlan Hanson (Chair)
Aaron Bottenhorn
Adam Freeman
Charlotte Manley
City/DSNID Staff Present:
Martin Hudson
Pauline Eaton
Members of the Public Present: (See Attached NID Board Meeting Sign-In Sheet)
1. Call Meeting to Order (9:00 AM)
2. Roll Call
3. Approval of Minutes
a. Minutes from November 8, 2017 - Motion to approve the minutes. â (Charlotte
Manley/Adam Freeman, Passed 4-0)
4. Public Comment - NONE
5. Business Items
a. Orange Avenue Discussion and Master Plan Update (GAI Consultants) â Peter Sechler
focused on pedestrian space, crosswalk/intersection design concepts and updated the
Board on the status of the designs for Orange Avenue. (See attachment for presentation.)
i. The Board gave their support for the main concept designs and selected items to
add to the FDOT Orange Avenue project.
6. Announcements and Other Business
a. Martin Hudson updated the Board on several items including: the new welcome to
Orlando sign on Orange Avenue, SODO NID/Main Street outreach efforts, NID booth at
Light Up SODO, entry landscaping, Gore Avenue resurfacing by the County and the
2. potential to bring Innovation Pavilion of Colorado to the Boardâs February meeting to
discuss the concept of a makerspace in the district.
7. Next meeting Date
a. January 10, 2017 â Board Legal Training and Bylaw Discussion
8. Adjourn
3.
4. Planning for Complete Streets in Downtown South
DSNID Advisory Committee Update
December 13, 2017
5. âQuick Updateâ â Plans Review w City + FDOT
FDOT and Orange Avenue â Preliminary Design Opportunities
Quick Overview Public Meeting â The Agenda & General Approach
Agenda for Today
6. Edits / Refinements with City
Bike Facilities
Detailed Street Sections
City Status
9. New Visualization: Gore Street
New visualization: Gore Street
Protected
Bike Lanes
Infill Loft Office /
Residential
Redevelopment
Branded Bus
Transit Stations
Road Diet on Gore
View Terminus /
Roundabout at Gore
/ Division
10. Additional Study Section for Gore St
City Status
Top Right: Original Section indicates a comprehensive
reconstruction of some or all of Gore Street to create a
feature bikeway / parkway
Bottom Right: New Section indicates that a cycle track or
dual protected bike lanes could fit within existing curb lines
(no heavy construction). Options for green bike lane paint
(special color) and special buffering features are avail.
Existing Section
12. OrangeAve:60%FDOTDwgs The FDOT â3Râ Program
ï§ Generally focused on âinside the curbsâ roadway surface / asphalt.
ï§ Includes roadway lane markings, signage and other MUTCD items.
ï§ Includes ADA Ramps and Minimal Approach Sidewalks.
ï§ Signalization and Intersection Lighting improvements.
ï§ Generally doesnât touch drainage or âundergroundâ improvements.
ï§ Generally doesnât include landscaping, but will âsleeveâ for future.
Planned FDOT work includes narrower lanes, increased sidewalks,
âbulb-outsâ around on-street parking, enhanced crosswalks, transit stops.
Not Included by FDOT: special trees, lighting, overhead
powerline burial, special pavements, art + sustainability
General Schedule:
60% Drawings: Oct 26, 2017
90% Drawings: March, 2018
Plans Complete: June, 2018
Production Date: Aug, 2018
Letting (Bid): Oct, 2018
Construction: Jan, 2019
1 year +/- Construction Period
13. OrangeAve:60%FDOTDwgs Key Topics if FDOT receives âpartneredâ funding
Special Pavement at Intersections â FDOT willing to do Stamped / Colored Asphalt.
Landscaping â Not in project. FDOT willing to create âsleeved and prepped areasâ for future planting.
Curb Extensions â FDOT only doing âfloating bulb-outsâ. Willing to consider aesthetic treatment options.
Sidewalks - FDOT only working at intersections. (Some areas of existing walks are outside R.O.W.)
Special Milling â FDOT willing to look at reductions in centerline âhigh pointâ.
Lighting â FDOT only replacing lighting at signalized intersections.
Project Boundaries â FDOT willing to consider extending 50â-100â past Grant St ROW line to âfinishâ intersection
Corner Clips â FDOT is NOT including any corner clips in this project
14. OrangeAve:60%FDOTDwgs
Line Art Patterns, highly graphic, not trying to be ârealâ materials. Meant to be âGraphicâ.
Items for DSNID Consideration / Input: Pavement + Graphic Treatments
15. OrangeAve:60%FDOTDwgs Looking at the Special Pavement Markings
$15-$20/SF $14-$18/SF $14-$18/SF â Std
$25-$35 / SF â Custom*
$14-$18/SF $35/SF
Order of Magnitude Pricing provided by Ennis-Flint product representative as ârule of thumbâ installed prices
17. OrangeAve:60%FDOTDwgs Custom Patterns digitally printed as 2 x 2 squares & heat bonded to asphalt
Special Patterns can be
printed and installed as
2âx2â squares ($35/sf); or
existing patterns can be
arranged in new ways at
$14-$20 / SF)
30. Costs and Priority
Order of Magnitude Budget Opinion Numbers for Reference Only, no Detailed Design + Engineering
Special Pavement Markings
Orange Avenue Intersection Pavement Markings
INTERSECTION INTERIOR FIELD CROSSWALKS
Street Intersection Interior (sf) Interior SF $/sf TOTAL Crosswalks (lf) Crosswalks SF $/sf TOTAL
Grant 50 70 3,500 14 $49,000 10 220 2,200 14 $30,800
Michigan 105 120 12,600 14 $176,400 10 315 3,150 14 $44,100
Pineloch 100 75 7,500 14 $105,000 10 250 2,500 14 $35,000
$330,400 $109,900
Contingency (20%) $66,080 $21,980
Design/Engineering (10%) $33,040 $10,990
Side Street Crosswalks
Illiana 35 8 280 14 $3,920
Jersey 40 8 320 14 $4,480
W. Crystal Lake 40 8 320 14 $4,480
E. Crystal Lake 40 8 320 14 $4,480
Page Street 35 8 280 14 $3,920
$21,280
Contingency (20%) $4,256
Design/Engineering (10%) $2,128
GRAND TOTAL of all Design Opportunities
All Intersection Interior Field $429,520
All Crosswalks $142,870
All Side Streets $27,664
$600,054
OrangeAve:60%FDOTDwgs
31. Costs and Priority
Planting & Landscape
Medians & Bulb-Outs
Measurements Total sf $/sf TOTAL
Pineloch area 320 8 2,560 2.5 $6,400
Illiana Street 210 8 1,680 2.5 $4,200
Crystal Lake 300 6 1,800 2.5 $4,500
Page Street 100 6 600 2.5 $1,500
Trees
Crape Myrtle 20 300 $6,000
Sylvester Dale Palm 2 3500 $7,000
TOTAL $29,600
Contingency (20%) $5,920
Design /
Engineering (10%)
$2,960
GRAND TOTAL $38,480
Grant Street Intersection Expansion
Grant Street lf $/lf Total
Pedestrian/Pavement 4000 10 40,000
New Curb/Gutter 250 20 5,000
18" Storm Pipe 200 60 12,000
Storm Inlets/Manholes 4 4000 16,000
TOTAL 73,000
Contingency (20%) 14,600
Design / Engineering (10%) 7,300
GRAND TOTAL 94,900
Order of Magnitude Budget Opinion Numbers for Reference Only, no Detailed Design + Engineering
OrangeAve:60%FDOTDwgs
33. Planning Process â Steps and Sequence
Strategic Vision Elements â Orlandoâs Urban Lab
District Visualizations â Preliminary Design Opportunities
Complete Streets System â Proposed Bike Classifications
Orange Avenue Example â the âBuildâ pages from Report
Orange Avenue and the FDOT Project â Immediate Opportunity
Public Meeting Tonight