1. PROJEKTI___________________
Linja _____kV _______________
Ditari Kantierit
Faqe 1 nga 2
Nenshkrimi:
Kontraktori: Inxhinieri Klientit : Probleme te hasura/Incidente etj:
Projekti: Nr.Kontrates: Site (Location/ Section): Kontraktor: Data:
Twr.: T1, T34
Sec.: T4-T13; T23-T28
___/___/______
Fillimi I punes: Mbarimi I punes: Dite/Nate: Inxhinier Supervizori: Nr.kontakti Supervizor:
___:00 ___:00 _______ _______________ _____________________
Raporti kushteve atmosferike:
Koha Temperatura (°C): Diell (Po/Jo) Rreshje Shiu (Dendura,
Lehta,Vranesira):
Era (Fuqishme/Mesatare/Lehta):
_____ _____
_____ _____
Akriviteti Terrenit:
Nr. Pershkrimi
Detyres:
Lokaci. /
Seksi.:
Fillimi
/
Mbarrimi
Kohes:
People on
SiteTrades
&
Numbers:
e.g. Civil Eng.
(4)
Plant & Equipment Status:
(%
Mbaruar)
Volumi
kryer
ditor %:
Description & Qty
e.g. Forklift (3)
Oret e
punes
Punime
percjellesi
Seks .
64-65
08:00/
18:00
Inxhinier
Elektrik. (1)
Pergjegjes (2)
Shofer (2)
Manovrator (1)
Montator (23)
Pickup (4)
Pickup Van (1)
Kamion Vinc (2)
Kamion ngarkimi (0)
Arganello/Frenues (3)
Vinc Hidraulik (0)
Kompresor Hidraulik (2)
10
10
10
0
7
0
3
0% 0%
Mbeturina/Mateiriale:
Mbeturina pergjithshme: Controlled Waste: Mbeturina te kontaminuara:
Pershkrimi: Sasia: Pershkrimi: Sasia: Pershkrimi: Sasia:
Testimi (Kontrolli Kualitetit) (KK):
Pershkrimi: Laboratori I perdorur: Rezultati: Kalon/Ngel/Ne proces: Shenime:
Sonde/Kampion Gjeologjik Ne process Terratest 5000 Blu
Testim Kubikesh Euroteorema Kodovjat
SSH&M(Siguria Shendeti & Mjedisi) & Vizitor Terreni:
Induksion & Trajnime: Inspektime terreni : Vizitoret ne terren:
2. PROJEKTI___________________
Linja _____kV _______________
Ditari Kantierit
Faqe 2 nga 2
Nenshkrimi:
Kontraktori: Inxhinieri Klientit : Probleme te hasura/Incidente etj:
Emri Inspektoreve: Departamenti: Emri: Departamenti:
JO JO
JO JO
Problematika te llojit:
Konstruksion: JO
Kontoroll I Kualitetit JO
Fotografi:
Punime percjellesi Seksioni T12-T23