1. PROGRAM PELAKSANAAN PENANGANAN BANJIR DKI JAKARTA
REDUKSI
JADWAL PELAKSANAAN
DAERAH
NO PROGRAM STATUS
GENANGAN
2012 2013 2014 2015 2016 2017 2018
(TITIK)
A PENANGANAN STRUKTURAL DI BAGIAN HILIR
A.1 PENINGKATAN KAPASITAS BANJIR KANAL BARAT SUDAH SELESAI 6
A.2 PENINGKATAN KAPASITAS BANJIR KANAL TIMUR SUDAH SELESAI 16
A.3 NORMALISASI KALI PESANGGRAHAN, ANGKE, DAN SUNTER DALAM PELAKSANAAN 10
A.4 JUFMP/JEDI (CENGKARENG DRAIN, SUNTER HILIR, MUARA BKB) PROSES LELANG 20
A.5 NORMALISASI KALI CILIWUNG
1. PINTU AIR MANGGARAI DAN PINTU AIR KARET DALAM PELAKSANAAN
2. NORMALISASI KALI CILIWUNG LAMA DALAM PELAKSANAAN 2
3. NORMALISASI KALI CILIWUNG (PA. MANGGARAI - JEMB. TB. SIMATUPANG) RENCANA 1
A.6 NORMALISASI KALI KRUKUT RENCANA 2
A.7 NORMALISASI KALI CIPINANG (HULU) RENCANA 6
A.8 SUDETAN CILIWUNG - BKT RENCANA 4
A.9 WADUK CIAWI RENCANA
A.10 POMPA PLUIT DALAM PELAKSANAAN
B PENANGANAN STRUKTURAL DI BAGIAN HULU
B.1 REVITALISASI SITU-SITU DAN DAM PARIT DALAM PELAKSANAAN
B.2 PEMBANGUNAN CHECK-DAM DAN SUMUR RESAPAN RENCANA
C PENANGANAN SECARA NON-STRUKTURAL
C.1 SISTEM PERINGATAN DINI
Catatan : Sisa 11 (sebelas) rawan genangan di dataran rendah (perlu sistem polder /pompa dan lokal drainase )
2. IMPLEMENTATION SCHEDULE FLOOD-
PRONE
NO PROGRAM STATUS
AREAS
2012 2013 2014 2015 2016 2017 2018
(POINT)
A Structural Management in Downstream
A1 Increase the capacity of West Flood Canal DONE 6
A2 Increase the capacity of East Flood Canal DONE 16
A3 Normalization of Pesanggrahan, Angke and Sunter River IN PROGRESS 10
Jakarta Emergency Dredging Initiative (JUFMP) / Jakarta
BIDDING
A4 Urgent Flood Mitigation Project (JEDI) (Cengkareng drain, 20
PROCESS
Sunter Downstream, West Flood Canal Estuary)
A5 Normalization of Ciliwung River
1. Manggarai Water Gate and Karet Water Gate IN PROGRESS
2. Normalization of Old Ciliwung River IN PROGRESS 2
3. Normalization of Ciliwung River (Manggarai Water 1
IN PLAN
Gate – Simatupang Bridge)
A6 Normalization of Krukut River IN PLAN 2
A7 Normalization of Cipinang River (Upstream) IN PLAN 6
A8 Ciliwung-East Flood Canal Channel 4
A9 Ciawi Reservoir
A1 Pluit Pump
0
B Structural Management in Upstream
B1 Revitalization of lake and trench dam
B2 Development of Check Dam and Infiltration Wells
C Non-Structural Management