Sooraj Pancholi and Athiya Shetty starrer, Hero, has been the talk of the town for some time. The movie, produced and promoted by Salman Khan himself, released in the theaters today, shares Vaikundarajan
Este documento proporciona información sobre la presión arterial, incluyendo conceptos básicos, los riesgos de la presión arterial alta, y medidas para controlarla. Explica que la presión arterial es la fuerza de la sangre en las arterias, y que una medida normal es menor a 120/80 mmHg. También describe factores de riesgo para la presión arterial alta, como la edad, el sobrepeso, el tabaquismo y la diabetes. Además, recomienda medidas de estilo de vida saludables como una dieta baja en sal, ejerc
Sooraj Pancholi and Athiya Shetty starrer, Hero, has been the talk of the town for some time. The movie, produced and promoted by Salman Khan himself, released in the theaters today, shares Vaikundarajan
Este documento proporciona información sobre la presión arterial, incluyendo conceptos básicos, los riesgos de la presión arterial alta, y medidas para controlarla. Explica que la presión arterial es la fuerza de la sangre en las arterias, y que una medida normal es menor a 120/80 mmHg. También describe factores de riesgo para la presión arterial alta, como la edad, el sobrepeso, el tabaquismo y la diabetes. Además, recomienda medidas de estilo de vida saludables como una dieta baja en sal, ejerc
This document discusses HomeMedHelp's software ecosystem for better healthcare and their recent fundraising efforts. Key points include:
- HomeMedHelp conducted successful alpha testing of their doctor, patient, and clinic software with over 100 users in 2 weeks.
- They have received their first investment from Microsoft BizSpark and partnered with an international medical center for testing and promotion.
- HomeMedHelp is currently in beta testing with the medical center and offering free software through the end of 2015 to recruit more doctors and patients.
- They are developing additional software for clinics, labs, and pharmacies and plan to monetize through sales, rentals, and commissions from online services.
- HomeMed
The document discusses the pursuit of innovation, outlining the pre-launch, post-launch, and conclusion phases. It notes that innovation is the process of perceiving and implementing new ideas or practices. In the pre-launch phase, ideas are generated and refined through ideation, analysis, and convergence. Few ideas ultimately become successful products or innovations. The post-launch phase involves monitoring adoption using models like Rogers' diffusion of innovations and getting feedback to potentially reinvent the innovation. The conclusion emphasizes continuously iterating, getting experimental, celebrating small successes, and questioning everything to spur more innovation.
Sowmya D B is seeking an entry level position where she can enhance her knowledge and apply her academic learning. She has a BE in Electrical and Electronics from Jain Institute of Technology with 57% aggregate. She has technical skills in Java, SQL, manual testing, HTML, and MATLAB from hands-on training. Her BE project was on designing an efficient MOSFET-based three phase bridge inverter for induction heating applications using MATLAB SIMULINK. She has published a paper on this project. She has strong communication, teamwork, and problem-solving skills.
The document discusses an assignment completion strategy called PROJECT that helps students successfully complete assignments. The strategy involves preparing a plan, recording tasks and asking questions, organizing materials, starting work, engaging with the material, checking work, and turning in assignments. The document encourages paying attention and asks if there are any questions.
This document summarizes research on the benefits of infant massage for infants and parents or caregivers. It reviewed 31 peer-reviewed studies from 14 countries on the effects of parents and caregivers massaging infants. The research found benefits for both infants and parents, including for infants decreased crying, improved sleep and growth, and for parents decreased stress, anxiety and depression symptoms, increased interaction with their infants and satisfaction in their lives. Fathers in particular increased quality time with their infants after massage. The review found no reported negative outcomes of infant massage.
This document provides information about infant massage education programs at Children's of Alabama hospital. It defines infant massage as a positive interaction using manual manipulation techniques to stimulate growth, development, and attachment while reducing stress. Benefits include reducing colic, gas, constipation and improving development. The document outlines the history of massage, engagement and disengagement cues during sessions, adaptations for special needs, recommended session materials, and how to request an education session at the hospital.
Elavarasi Thirumagal has 2 years of experience in banking operations and SAP HR. She has handled processing payments, customer queries, payroll processing, and SAP tasks like creating employee records and processing personnel actions. At Royal Bank of Scotland from 2007 to 2010, she managed the Greece payment processing desk, ensured tasks were completed on time, and maintained SAP HR including personnel administration. She has skills in SWIFT, financial reports, and relationship management.
This document profiles Luis Rodríguez, an architect and mobile photographer based in Spain. It provides details about his career as an architect and professor, and focuses on his work as a professional mobile photographer. It lists numerous awards and honors he has received for his mobile photography, including being named a finalist or winner in multiple photography competitions between 2012-2017. It also provides links to several publications and interviews about his mobile photography work.
Cơ sở lý luận về quản lí chất lượng công trình xây dựng. Công trình xây dựng là sản phẩm được tạo ra do sức lao động của con người, vật liệu xây dựng, thiết bị lắp đặt vào công trình, được liên kết định vị với đất, có thể bao gồm phần dưới mặt đất, phần trên mặt đất, phần dưới mặt nước và phần trên mặt nước, được xây dựng theo thiết kế. Công trình xây dựng bao gồm công trình dân dụng, công trình công nghiệp, giao thông, nông nghiệp và phát triển nông thôn, công trình hạ tầng kỹ thuật và công trình khác
This document discusses HomeMedHelp's software ecosystem for better healthcare and their recent fundraising efforts. Key points include:
- HomeMedHelp conducted successful alpha testing of their doctor, patient, and clinic software with over 100 users in 2 weeks.
- They have received their first investment from Microsoft BizSpark and partnered with an international medical center for testing and promotion.
- HomeMedHelp is currently in beta testing with the medical center and offering free software through the end of 2015 to recruit more doctors and patients.
- They are developing additional software for clinics, labs, and pharmacies and plan to monetize through sales, rentals, and commissions from online services.
- HomeMed
The document discusses the pursuit of innovation, outlining the pre-launch, post-launch, and conclusion phases. It notes that innovation is the process of perceiving and implementing new ideas or practices. In the pre-launch phase, ideas are generated and refined through ideation, analysis, and convergence. Few ideas ultimately become successful products or innovations. The post-launch phase involves monitoring adoption using models like Rogers' diffusion of innovations and getting feedback to potentially reinvent the innovation. The conclusion emphasizes continuously iterating, getting experimental, celebrating small successes, and questioning everything to spur more innovation.
Sowmya D B is seeking an entry level position where she can enhance her knowledge and apply her academic learning. She has a BE in Electrical and Electronics from Jain Institute of Technology with 57% aggregate. She has technical skills in Java, SQL, manual testing, HTML, and MATLAB from hands-on training. Her BE project was on designing an efficient MOSFET-based three phase bridge inverter for induction heating applications using MATLAB SIMULINK. She has published a paper on this project. She has strong communication, teamwork, and problem-solving skills.
The document discusses an assignment completion strategy called PROJECT that helps students successfully complete assignments. The strategy involves preparing a plan, recording tasks and asking questions, organizing materials, starting work, engaging with the material, checking work, and turning in assignments. The document encourages paying attention and asks if there are any questions.
This document summarizes research on the benefits of infant massage for infants and parents or caregivers. It reviewed 31 peer-reviewed studies from 14 countries on the effects of parents and caregivers massaging infants. The research found benefits for both infants and parents, including for infants decreased crying, improved sleep and growth, and for parents decreased stress, anxiety and depression symptoms, increased interaction with their infants and satisfaction in their lives. Fathers in particular increased quality time with their infants after massage. The review found no reported negative outcomes of infant massage.
This document provides information about infant massage education programs at Children's of Alabama hospital. It defines infant massage as a positive interaction using manual manipulation techniques to stimulate growth, development, and attachment while reducing stress. Benefits include reducing colic, gas, constipation and improving development. The document outlines the history of massage, engagement and disengagement cues during sessions, adaptations for special needs, recommended session materials, and how to request an education session at the hospital.
Elavarasi Thirumagal has 2 years of experience in banking operations and SAP HR. She has handled processing payments, customer queries, payroll processing, and SAP tasks like creating employee records and processing personnel actions. At Royal Bank of Scotland from 2007 to 2010, she managed the Greece payment processing desk, ensured tasks were completed on time, and maintained SAP HR including personnel administration. She has skills in SWIFT, financial reports, and relationship management.
This document profiles Luis Rodríguez, an architect and mobile photographer based in Spain. It provides details about his career as an architect and professor, and focuses on his work as a professional mobile photographer. It lists numerous awards and honors he has received for his mobile photography, including being named a finalist or winner in multiple photography competitions between 2012-2017. It also provides links to several publications and interviews about his mobile photography work.
Cơ sở lý luận về quản lí chất lượng công trình xây dựng. Công trình xây dựng là sản phẩm được tạo ra do sức lao động của con người, vật liệu xây dựng, thiết bị lắp đặt vào công trình, được liên kết định vị với đất, có thể bao gồm phần dưới mặt đất, phần trên mặt đất, phần dưới mặt nước và phần trên mặt nước, được xây dựng theo thiết kế. Công trình xây dựng bao gồm công trình dân dụng, công trình công nghiệp, giao thông, nông nghiệp và phát triển nông thôn, công trình hạ tầng kỹ thuật và công trình khác
Tra cứu online định mức dự toán lắp đặt hệ thống kỹ thuật của công trình trên https://qlda.gxd.vn. Sử dụng điện thoại mobi phone tra cũng được. Mọi lúc mọi nơi.
1. royalhaskoningdhv.com
Curriculum Vitae
Truong Dang Dung
Industry, Energy & Mining
M&E Engineer
T:
M: +84 977 202 966
As a M&E site engineer I am responsible for the
overall time schedule, quality and health and safety
of a project. The projects I have managed range
from small monodisciplinary assigments to major
international multi-disciplinary industrial facilities.
I had been w orked for some mechanical and thermal
local company, now I’m w orking for Atelier
Management & Design Consultancy (VN) co., Ltd.
Mechanical engineer specializing in Air Con system,
Fire fighting, Water chiller system, Ventilation system, I
participated in many projects (Diana – Unicharm,
Indochina Plaza, Hoang Thanh Tow er & Damen
Shipyard…). With nearly 10 years I have
accumulated much experience in system
design, technical draw ing; cost estimates of materials
and experience in construction planning, technical
supervision, Operation and management of M&E
systems & implementation of safety.
Nationality
Vietnamese
Years of experience
Nearly 10 years
Years within Royal HaskoningDHV
2. Truong Dang Dung
Professional experience
HaskoningDHV Vietnam Co. Ltd.
> From 03/2015 to present:
Scope: Mechanical & Electrical Position at site.
Position: Mechanical & Electrical site Engineering at Diana
Unicharm – Bac Ninh.
Jobs description:
- Reading Specs, reading tender draw ing & reading
contracts.
- Checking & signed shop draw ing & equipment, material
input.
- Setting up and management about M&E system w ork at
construction site.
- Coordination meeting betw een M&E w ork & Cilvil at
construction site.
- Propose technical solutions for Client & contractor about
design & changer design at construction site.
- Propose method statement for contractor installation on
site.
- Hosted combine M&E betw een contractors.
- Reporting, assessing the quality, schedule & checking
about M&E system
- Controlling quality, maters schedule & w orks of
contractors
- Meeting quality coordination, project schedule &
technical discussion betw een Client & contractor.
- Checking & inspections of w ork items.
- Receiving request information from contractor and
processing this inform.
- Receiving information from Client and processing this
inform.
- Profile Project Management.
- Testing & commissioning Mechanical system.
- To report direct w ith M&E Team leader.
Atelier Management & Design Consultancy (VN) co., Ltd
> From 08/2014 to 02/2015:
Scope: Mechanical system.
Position: Mechanical management & consultancy at Somerset
project of Capital Land Group
Jobs description:
- Reading Specs, reading tender draw ing & reading
contracts.
- Checking shop draw ing & equipment, material input.
- Setting up and management about Mechanical system
w ork at construction site.
- Reporting, assessing the quality, schedule & checking
about Mechanical system
- Controlling quality, maters schedule & w orks of
contractors
- Meeting quality coordination, project schedule &
technical discussion
- Checking & inspections of w ork items.
- Checking & confirm interim payment certificate.
- Receiving request information from contractor and
processing this inform.
- Receiving information from Client and processing this
inform.
- Profile Project Management.
- Check recurring billing records of Contractor
- Controlling the quantity contract, the contractor VO.
- Evaluating and controlling the quantity increase or
decrease arising from contractors.
- Testing & commissioning Mechanical system.
- To report direct w ith Project manager.
Sigma Engineering
> From 02/2011 to 06/2014:
Scope: HVAC System, Pumping & Fire Fighting system.
Position: Air condition, Ventilation, Air Compressor System,
LPG System, Fire Fighting system & Boiler System
Jobs description:
- Checking of design draw ings and make shop draw ing
HVAC sys, Fire protection sys.
- Computational design of air conditioning systems & Fire
Fighting system.
- Mass dissection, to estimate and make bids ...air
conditioning, ventilation, Fire Fighting in project.
- Submission material & equipment.
- Estimate Material & order material, equipment.
- Installation HVAC sys, Fire Fighting system.
- Order ducting & fitting.
- Setup & Control w orking Schedule, Supervision
Technical & Safety
- Testing & commissioning system.
- Check & verify all technical reports (maintenance,
services, troubleshooting)
- Making Handover document.
3. Truong Dang Dung
- Organize w arranty & maintenance equipment factory &
office.
Execute at project:
- Installation HVAC system at Indochina Plazza – Cau
Giay District – Ha Noi
- Execute the w ork of Fire Fighting, HVAC system at
Hoang Thanh Tow er – 114 Mai Hac De street – Hai Ba
Trung District - Ha Noi
- Execute the w ork of Fire Fighting, HVAC system at
Damen Shipyards - Thuy Nguyen District – Hai Phong.
- Execute the w ork of Fire Fighting, HVAC system at
Somerset project – Hai Phong.
Minh Quang – Bitexco Group
> From 08/2009 to 02/2011:
Scope: HVAC System & Fire protection system.
Position: HVAC & Fire Fighting Engineer (Design & Site
Engineer)
Jobs description:
- Make shop draw ing HVAC sys.
- Estimate Material
- Installation HVAC sys.
- Make as built draw ing.
- Order ducting & fitting
- Setup & Control w orking Schedule, Supervision
Technical & Safety
- Testing & commissioning system.
- Check & verify all technical reports (maintenance,
services, troubleshooting)
- Making Handover document.
Execute at project:
- Installation apart of Fire Fighting system at The Garden
– Me Tri Street – Cau Giay – Ha Noi
- Execute the w ork of HVAC system at the Garden – Me
Tri Street – Cau Giay – Ha Noi
- Execute the w ork of HVAC system at the Manor II at
Nguyen Huu Canh – Binh Thanh - Ho Chi Minh
- Execute the apart of w ork of HVAC system at Bitexco
Financial Tow er at I District – Ho Chi Minh
Reeco LTD
> From 11/2007 to 07/2009:
Scope: HVAC System
Position: Design & Site engineer.
Jobs description:
- Make shop draw ing HVAC sys.
- Estimate Material
- Installation HVAC sys.
- Order ducting & fitting
- Make as built draw ing.
- Setup & Control w orking Schedule, Supervision
Technical & Safety
- Testing & commissioning system.
- Check & verify all technical reports (maintenance,
services, troubleshooting)
- Making Handover document.
Execute at project:
- Installation apart of HVAC at Kim Long stock market
project – Ha Noi
- Execute the w ork of HVAC system at Suncity tow er
project – 13 Hai Ba Trung Street – Hoan Kiem district –
Ha Noi
- Execute the w ork of HVAC system & Fire Fighting at
Seebank project 245 Tay Son Street, Dong Da District –
Ha Noi
- Execute the apart of w ork of HVAC system at Modory
factory at Khai Quang Industry – Vinh Phuc provice.
Boiler joint stock company
> From 6/2005 to 10/2007:
Scope: Boiler & LPG System.
Position: Design & Site engineer
Jobs discription:
- To design boiler at center design in Boiler Joint stock
company.
- Make shop draw ing.
- Installation a boiler.
- Make As built draw ing.
- Testing & commissioning system.
Education
1997 – 1999: Lien Ha high school – Dong Anh district, Ha Noi
1999 – 2005: Bach Khoa Ha Noi University
4. Truong Dang Dung
a. Review and
approve shop
drawings, materials
and samples
submissions to
ensure compliance
with specifications,
contract drawings,
codes compliance
and local authorities
requirements and
to eliminate
"interference"
problems.
Kiểm tra và phê
duyệt các bản vẽ
triển khai thi công
đệ trình bởi nhà
thầu, các mẫu vật
liệu nhằm đảm bảo
sự phù hợp với các
thuyết minh, thông
số kỹ thuật, bản vẽ,
các luật liên quan
và các yêu cầu của
cơ quan chức năng
và giảm thiểu các
vấn đề phát sinh
không đáng có.
b. Carry out
quantities
verification, CO-CQ
check for materials
and finished
products delivered
to site to comply
with the obligations
of a Local
Supervision
Consultant. Prepare
Quality Assurance
and Quality Control
(QAQC) checklist
forms.
Xác minh và đảm
bảo số lượng vật tư
và thiết bị chế tạo
sẵn được chuyển
đến công trường và
kiểm tra hồ sơ CO-
CQ. Chuẩn bị các
danh sách kiểm tra
QAQC
c. Plan, direct and
coordinate all on-
site activities to
comply with
applicable
specifications,
requirements and
codes of designer,
government and
relevant parties.
Lập kế hoạch, chỉ
đạo và điều phối
các công tác thi
công nhằm đáp ứng
các tiêu chuẩn của
5. Truong Dang Dung
đơn vị thiết kế, của
nhà nước và các
bên liên quan.
d. Inspect
materials, products,
and work in
progress for
conformance to
specifications,
drawings and other
requirements.
Tiến hành nghiệm
thu vật tư đầu vào,
các sản phẩm chế
tạo sẵn, và nghiệm
thu công việc xây
dựng/lắp đặt dựa
trên các thuyết
minh, thông số kỹ
thuật, bản vẽ và
các yêu cầu khác.
e. Use instruments
properly for
inspection/testing.
Confer with
contractors
regarding
inspection results,
recommends
corrective
procedures in case
of inspection/
testing failure, and
compiles reports of
results,
recommendations,
and needed repairs.
Sử dụng các thiết
bị, công cụ chuyên
dụng đúng cách để
nghiệm thu và thử
nghiệm các thiết bị,
hệ thống. Làm việc
với các nhà thầu về
các kết quả nghiệm
thu, hướng dẫn các
biện pháp khắc
phục nếu chưa đạt,
báo cáo và sao lưu
các thông tin liên
quan đến công việc
sửa lỗi của nhà
thầu.
f. Plan, update and
achieve schedule
and target
objectives by
attending internal
meetings,
contractor meeting
and other
necessary meeting,
getting updated
data and reviewing,
etc.
Lập kế hoạch, cập
nhật tiến độ và các
mục tiêu dự án
6. Truong Dang Dung
thông qua các buổi
họp nội bộ, họp nhà
thầu, họp với các
đơn vị liên quan
khác, thu thập các
thông tin cập nhật,
…
g. Get work
organized and
provide timely
reaction/responses.
Sắp xếp công việc
hợp lý và phản ứng/
phản hồi kịp thời
trong việc xử lý các
vấn đề
h. Prepare daily
construction reports
and issues during
the implementation
of construction
management plan,
project progress to
M&E Section Leader
Chuẩn bị Báo cáo
ngày, báo cáo các
vấn đề thi công,
tiến độ dự án cho
Trưởng bộ phận Cơ
điện
i. Assist the Project
Team in
establishing and
maintaining good
safety and security
practices for the
entire project in
accordance with
project safety
program, applying
safety standards
including labour
safety code and
OHSAS internally
and supervising
contractors’
implementation.
Remind and stop
the
constructions of
contractors in case
of any infringement
of regulation,
procedures,
specifications,
safety
requirements,
approved drawings,
etc.
Hỗ trợ Nhóm dự án
xây dựng và duy trì
các biện pháp an
toàn cho dự án
bằng cách triển
khai chương trình
an toàn, áp dụng
các tiêu chuẩn an
toàn bao gồm các
7. Truong Dang Dung
luật về an toàn lao
động và OHSAS
trong nội bộ công ty
cũng như trong quá
trình giám sát nhà
thầu thi công. Nhắc
nhở và dừng công
việc thi công khi
phát hiện có sai
phạm về an toàn
lao động và các yêu
cầu luật định khác,
có
sự sai khác so với
quy trình thực hiện
công việc, với thông
số kỹ thuật, bản vẽ
đã duyệt, v.v
j. Perform other
duties as assigned.
Thực hiện các công
việc khác theo chỉ
đạo của quản lý
3. Client
relationship/ Quan
hệ khách hàng
- Support customer
relations with a
respect to proper
explaining their
designs in the
manner showing
that their interests
are much
considered.
Hỗ trợ chăm sóc
khách hàng qua
việc thuyết trình
thiết kế theo hướng
giúp khách hàng
hiểu rằng quyền lợi
của họ rất được chú
trọng.
4. Others/ các
nghĩa vụ khác
- Fulfill other
assignments as
required by
superior.
Thực hiện các hoạt
động công việc bổ
sung theo hướng
dẫn của quản lý
trực tiếp.
Yêu Cầu Công Việc
1.Education/
Training:
Học vấn/ Đào tạo
- Relevant degree
on HVAC/HVMC/
Heating &
Refrigeration
Bằng cấp chuyên
ngành Điều hòa
thông gió/ Nhiệt
lạnh
-
Design/Construction
8. Truong Dang Dung
Supervision
certificate in
Electrical
Engineering
Chứng chỉ hành
nghề thiết kế /
Giám sát thi công
Kỹ thuật Điện
- Safety license/
chứng chỉ an toàn
lao động
2.Skills, knowledge
and competences:
Các kĩ năng, kiến
thức và năng lực:
a. Technical/ Về
chuyên môn
- Familiarity of
design software/
skill sets for the
HVAC services;
- Biết các phần
mềm /các kỹ năng
thiết kế đối với hệ
thống Điều hòa
thông gió;
- Ability to read and
analyze blueprints,
manuals, readings,
various standards,
etc;
- Có khả năng đọc
hiểu và phân tích
các tài liệu kỹ
thuật, sách hướng
dẫn, các tiêu chuẩn
kỹ thuật khác nhau,
v.v;
- Proficiency with
standard testing
instruments;
sử dụng thành thạo
các dụng cụ, công
cụ tiêu chuẩn dành
để thử nghiệm các
thiết bị, hệ thống;
- Familiarity of
relevant
construction and
safety standards;
- Biết các tiêu
chuẩn xây dựng và
an toàn liên quan;
- Computer literacy.
- Thành thạo kỹ
năng sử dụng máy
tính.
b. Character/ Về
tính cách
- Organized and
logical thinking;
-Có tổ chức và tư
duy logic;
- Self-motivation
and calmness under
9. Truong Dang Dung
high pressure;
- Có tinh thần cầu
tiến và chịu được áp
lực lớn trong công
việc;
- Attention to
detail.
- Cẩn thận, tỉ mỉ.
3.Experience/ Kinh
nghiệm:
- At least 8 years of
experience in
development and
implementation of
Electrical &
Mechanical systems
for development
projects/civil
construction field.
Deep knowledge of
HVAC system
- Có ít nhất 8 năm
kinh nghiệm trong
việc thiết kế và thi
công, giám sát các
hạng mục Cơ điện
cho các dự án/ công
trình dân dụng.
Hiểu biết sâu về hệ
thống điều hoà-
thông gió.
4 .Additional
Preferred
Qualifications/ Các
yếu tố khác được
ưu tiên:
- Experience in
International
standard projects
preferred;
- Ưu tiên các ứng
viên có kinh nghiệm
thực hiện các dự án
theo tiêu chuẩn
quốc tế;
5. Language/ Ngôn
ngữ sử dụng:
English (Good) and
Vietnamese (Mother
tongue)
- Tiếng Anh (tốt) và
tiếng Việt (tiếng mẹ
đẻ