Rabbi’s CV
M FAZLE RABBI
7237 N Bonadelle Ave, Fresno, CA 93720
Tel: (559) 326-6177, E-mail: rabbifazle@yahoo.com
EDUCATION
Ph.D., Civil Engineering, Louisiana State University (LSU)
Supervisor: Late Professor Yalcin B. Acar
“Injection of Species Under Electrical Field to Enhance Bioremediation”
Major: Geoenvironmental Engineering
Minor: Microbiology
December, 1997
M.S., Civil Engineering, Louisiana State University (LSU)
Supervisor: Professor Donald D. Adrian
“Fate and Transport of Herbicides in the Presence of Adapted
Microorganisms in a Two Dimensional Soil Environment”
Major : Environmental Engineering
December, 1995
B.Sc., Civil Engineering, Bangladesh University of Engineering
and Technology (BUET)
Concentration: Water Resources and Structural Engineering
August,1988
REGISTRATION
Registered Professional Engineer (Civil), 2001
Engineer-in-training (EIT), 1992
GRANT
Rabbi, M. F., and Kerr J., “Electrochemical Acceleration of Bioremediation of
Contaminated Soil” LBNL Internal funds. In collaboration with the Center for
Environmental Biotechnology directed by Dr. Terry Hazen, Initiated October 1, 1997 for
Two years. $96K/yr, Total $192K
Kerr, J. B., Rabbi, M. F., and Stringfellow, W.“Electrocatalysis of Biological Process for
Remediation of Contaminated Soils,” DOE -Laboratory Directed Research Development
(LDRD), Lawrence Berkeley National Laboratory, Berkeley, CA, 11/98 to 12/99, $122K
Kerr, J. B., Rabbi, M. F., and Stringfellow, W, “Electrocatalysis of Biological Processes
for “Green” Manufacturing and Environmental Remediation,” DOE-Laboratory Directed
Research Development (LDRD), Lawrence Berkeley National Laboratory, Berkeley, CA
11/97 to 12/00, $88K
PROFESSIONAL EXPERIENCE
10/03/2000 to 06/08/2015:
Project Engineer, California Department of Transportation (CalTrans),
Highway Related Design, Report Writing and Review Reports for Functional Units like
Geotechnical, Environmental, Hydraulics, Survey, Structural Engineering, Electrical,
Traffic, and Project Management and I worked in Design and Project Development,
1
Rabbi’s CV
Construction, Planning and Project Management and Maintenance divisions as a project
engineer in CalTrans for last 15 years, Performs highly advanced and complex
transportation engineering work with different functional areas such as Project and
Planning Management, Project Development and Design, Environment, Hydraulics,
Geotechnical, Electrical, Traffic, Survey, Structural Engineering, construction, Manages
personnel engaged and is responsible for operations. Interprets, organizes, plans,
schedules, executes and coordinates major technical engineering assignments; manages
construction and maintenance activities, performs engineering design work, calculates
costs and conducts various studies for an area office. Manages professional, technical,
clerical employees and supervisors. Reports to the Branch Chief.
During the initiation of project to the completion of project, I was always closely involved
with the Project Manager to recommend him/she technical aspects of the project within the
scope, which should be buildable and economically feasible with reasonable time frame.
Help the Project Manager to estimate work resources, Capital and Support cost to
program the projects, Schedule and risk management documents and prepared presentation
of public meetings for critically environmental sensitive projects.
I finished projects from small scale (project cost from $20,000) like maintenance project to
replace some damaged concrete blocks of sidewalk. The biggest project construction cost
estimate was $850 million, which was a State Improvement Transportation Plan (STIP)
projec. I was involved more than twenty-six different types of large projects which I have
been done in CalTrans.
10/99 to 09/01:
Geo-environmental Engineer: BSK and Associates, Fresno, CA, Responsible for Geo-
Environmental Site Characterization by Field investigation and Laboratory Testing, Data
Analysis and Design, Proposals and Report Writing
11/97 to 12/99:
Fellow Research Engineer: Lawrence Berkeley Nation Laboratory, Berkeley, CA,
Innovative Development of a Safer, Efficient and Cost Effective Technological Aspects
for Bio-Electrochemical Soil Processing for Field Scale Implementation
1/91 to 5/97:
Assistant Consult Engineer: Electrokinetics Inc., Baton Rouge, LA, Performed standard
Geotechnical and environmental in-situ/ laboratory tests for contaminated site
Characterization and Electrokinetics Testing (with Late Dr. Yalcin B.
Acar) and data analysis and report writing
1/90 to 12/90: Foundation Engineer: Dhaka University, Dhaka, Bangladesh, Designed and inspection of
shallow and deep foundations for multi- storied frame structure buildings, Performed
slope stability analysis for landfill design
8/88 - 12/89: Field Engineer: Eastern Housing Society, Dhaka Bangladesh, Supervision of soil boring
and pile driving
RESEARCH EXPERIENCE
11/98 to 12/99: Lawrence Berkeley National Laboratory, “Electrocatalysis of Biological Process
for Remediation of Contaminated Soils,” DOE- Laboratory Directed Research
Development (LDRD), Lawrence Berkeley National Laboratory,
Berkeley, CA
2
Rabbi’s CV
11/97 to 12/99: Lawrence Berkeley National Laboratory, “Electrocatalysis of Biological Processes for
Green Manufacturing and Environmental Remediation,” Laboratory Directed
Research and Development Program, Lawrence Berkeley National Laboratory,
Berkeley, CA
7/96 to 9/97: Louisiana State University, “In-situ Bioremediation by Electrokinetic Injection,” Research
Project Sponsored by Board of Regents of Louisiana, Research and Development
Component of the Louisiana Education Quality Support Fund (LEQSF)
5/95 to 9/97: Louisiana State University and Electrokinetics Inc., “In-situ Bioremediation by
Electrokinetic Injection,” US Environmental Protection Agency (EPA), Cincinnati,
Ohio
8/93 to 12/95: Louisiana State University, “In-situ Bioremediation by Electrokinetic Injection,”
Research Project Sponsored By US Department of Energy (DOE), Germantown,
Maryland
1/91 to 6/93: Louisiana State University, “Accelerated Biodegradation of Herbicides Applied to the
Roadside Environment Using Adapted Soil Microorganisms,” Research Project
Sponsored by Louisiana Transportation Research Center (LTRC), Baton
Rouge, Louisiana
3/87 to 8/88: Bangladesh University of Engineering and Technology, “Studies on the Strength of Brick
Aggregate Concrete with Special Reference to Curing Conditions,” Research Project
Sponsored by Bangladesh University of Engineering and Technology
3/87 to 8/88: Bangladesh University of Engineering and Technology,“ A Study of Analysis and Design
of Building Frames,” Research Project Sponsored by Bangladesh University of
Engineering and Technology
TEACHING EXPERIENCE
11/96 to 12/99 Instructor, LBNL and UC Berkeley: Responsible for Student Interns.
1993 1996: Teaching Assistant, CE 4300 (Foundation Design)
Louisiana State University
Fall, 1993/1994 : Teaching Assistant, MBIO 2051 (General Microbiology)
Louisiana State University
8/88 to 9/90 : Lecturer, Chemistry and Mathematics
Tejgaon College, Dhaka, Bangladesh
HONORS AND AWARDS
1980 : Bangladesh Government Scholarship for Higher Secondary Education, Placed in top 5%
in the Secondary School Certification (SSC) examination (1980-1982)
1982 : Bangladesh Government Scholarship for undergraduate study, Placed in top 5% in the
Higher Secondary Certificate (HSC) examination (1982 to 1988)
MEMBERSHIP
American Society of Civil Engineering (ASCE)
3
Rabbi’s CV
American Chemical Society (ACS)
American Society of Microbiology (ASM)
JOURNAL ASCE (Geoenvironment 2000)
REVIEWER Hazardous Waste Management (Special Edition)
Soil Contamination
PROFESSIONAL SERVICE
Secretary Bangladesh Student Association, LSU, Baton Rouge, LA
Member, Youth National Science Fair Organization, Dhaka, Bangladesh
COMMUNITY SERVICE
Ex Sea Scout of Bangladesh Navy
Member, Lions Club, Bangladesh
Member, Bangladesh Cultural Association, LA
Member, Bay Area Bangladesh Association, CA
COMPUTER SKILLS
Language : Fortran, Basic and C
Operating system : UNIX, VMS, MS-DOS, WINDOWS 95 and MAC
Software : Quattro, Lotus, WordPerfect, Latex, Framemaker, MacDraw, Auto-CAD,
MacPaint, SuperPaint, CricketGraph, MS Word, Excel, Access,
KaleidaGraph, DeltaGraph, SigmaPlot, Canvas, and Aldus Persuasion, MS
Office-2010
Technical Software : HEC-2, Migrate V-9, Geoslope and CXTFIT, CAiCE-
2000, MicroStation, Civil 3D, AutoCAD,
Data Acquisition : LABTECH NOTEBOOK
Analytical Instruments: HPLC, GC-MS, GC-FID, HP-EC, IC, ICP and various molecular level
Biological and chemical technique for microbial enumeration
LANGUAGES:
English, Bengali, Hindi, Urdu
TRAVEL
India, Thailand, Singapore, Pakistan, Canada, and Mexico
GRADUATE COURSES:
Louisiana State University
Major: Geoenvironmental Engineering Minor: Microbiology
Geotechnical Engineering (24 Credit Hours): GPA: 3.88/4.00
Environmental Geotechnics, Soil Behavior, Advanced Geotechnical Engineering I, Advanced Geotechnical
Engineering II, Soil Dynamics and Earthquake Engineering, Geotechnical Engineering II, Geotechnical
Engineering III, and Mathematical Methods in Engineering
4
Rabbi’s CV
Environment Engineering (27 Credit Hours): GPA: 3.78/4.00
Water Quality Analysis, Quantitative Water Management, Operations & Sanitary Engineering I,
Operations & Sanitary Engineering II, Operations & Sanitary Engineering III, Hydrology, Advanced
Subsurface Hydrology and Hydraulics, Free Surface Flow, and Solid & Hazardous Waste Management
Microbiology: (13 Credit Hours):
Microbial Ecology & Nutrient Cycling in Soil, Introductory Microbial Physiology, Microbial Genetics, and
General Biochemistry
UNDERGRADUATE COURSES (Partial Highlights):
Environmental Engineering I, Geotechnical Engineering I, Fluid Mechanics, Geology & Geomorphology,
Open Channel Flow and Hydraulic Machinery, Water Resources Engineering I, Water Resources
Engineering II, Water Resources Engineering III, and Computer Programming and Numerical Methods in
Civil Engineering, Statistics, Mathematics I, Mathematics II, Structural Engineering I, Structural
Engineering II, Structural Engineering II, Structural Engineering III, and Structural Engineering IV
REFEREED PUBLICATION
I had publication restrictions of my innovative research with Lawrence Berkeley National
Laboratory (LBNL), Berkeley, CA where I was Research Scientist from 1997-2000. It is my pleasure
after knowing that from April, 2015 and onward, I am opened to discussion and publish the out come
of my innovate research. If every things go well, I am thinking the outcomes of the research can result
in another 10-12 publications. I am working on the results of these researches to publish in Journals
and Present in Conferences in a reasonable time frame.
1. .M. F. Rabbi, B.Clark, R.J.Gale, E.Ozsu-Acar, J. Pardue and A.Jackson,” ISitu TCE
Bioremediation by Electrokinetic Cometabolite Injection”, Waste Management,
20(4) 279-86 (2000)
2.. M.F.Rabbi, R.J.Gale, E.Ozsu-Acar, G.Breintenbeck, J.H.Pardue, A.Jackson, R.K.Seals, and
D.D.Adrian,”Electrokinetic Injection of Nutrients in Layered Clay/Sand Media for Bioremediation
Applications”, D.W.Tedder and F.G. Pohland Eds. in Emerging Technologies in Hazardous Waste
Management 8, Kluwer Academic/Academic Publishers, NY, 2000, 29-38
3. John Kerr, Will Stringfellow, Fazle Rabbi, Richard Fish, H. Christine Lo & Olivier Buriez
“Electrochemical Acceleration of Bioprocesses for Remediation and Production”, LBNL Center for
Environmental Biotechnology Publication, 1998, pp. 39-72
4 Kerr, J. B.; Rabbi, F.; Stringfellow, W.; Clarke, R.; Lageman, R. "Electrokinetic Effects of
Bioremediation of Metal Ion and Organic Pollutants in Soil." Book of Abstracts, 216th ACS National
Meeting, Boston, MA. 1998, I&EC-059, pp 124-128.
5. Pardue, J. H., W. A. Jackson, R. Gale, M. Fazle Rabbi, B. Clark and E. Ozsu-Acar, “ Electrokinetics as
a supporting technology for in situ TCE Biodegradation”, in Physical, Chemical and Thermal
Technologies, Remediation of chlorinated and recalcitrant compounds, G.B. Wickramanayake and R.E.
Hinchee (eds.), Batelle Press, Columbus, Ohio, (1998) pp. 461-465.
6. Acar, Y. B., Rabbi, M. F. and Ozsu, E. E. “ Electrokinetic Injection of Ammonium and Sulfate Ions into
Sand and Kaolinite Beds,” Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 123,
No. 3, March 1997, pp. 239-249.
5
Rabbi’s CV
7. Acar, Y. B., Rabbi, M. F., Ozsu, E. E., Gale, R. J., and Alshawabkeh, A. N. “ Enhance Soil
Bioremediation with Electrical Fields,” Chemtech, American Chemical Society, Vol. 26, No. 4, April 1996,
pp. 40-44
8. Alshawabkeh, A. N., Acar, Y., B. Rabbi, F. and Ozsu, E. “Electrokinetic Injection of Ions into Soil for
Bioremediation.” Emerging Technologies in Hazardous Waste Management VIII, Industrial and
Chemistry Division of the American Chemical Society (ACS), Alabama, Birmingham,September/1996,
pp. 96-117
9. Acar, Y. B.,and Rabbi Fazle, M. F. “Enhance soil bioremediation with electric fields” Journal of
Hazardous Waste Management, 20-35
Journals (Submitted))
10. Rabbi Rabbi, M. F., and Gale R. J. “Technological Aspects of Bio-Electro-Chemical Soil Processing,”
11. Rabbi, M. F., and Gale R. J. “Optimization of Ion Injection under Electrical Fields”
12. Rabbi, M., F., Gale, R. J. and Kerr, J. B., “Enhanced Injection/Extraction of Species under Electrical
Field,”
13. Kerr, J. B., and Rabbi, M. F. “Electrokinetic Effects on Metal Ion and Organic Pollutants in Soils
14. Rabbi, M. F., Acar, Gale, R. J., Ozsu-Acar, E.“ Electrokinetic Injection in Heterogeneous Media for
In-situ Bioremediation,” Journal of Hazardous Materials,
15. Rabbi, M. F., Gale, R. J., and Pardue, J. H. “Fundamental of Electrokinetic Injection into a Layered
Soil Bed” Environmental Science and Technology,
16. Rabbi, M. F., and D.D. Adrian “Fate and Transport of 2-4 D under Two-Dimensional Soil
Environmental,” Soil Science ,
17. Rabbi, M. F., and D.D. Adrian “Laboratory Scale -Simulation of Contamination Transport in Two
Dimensional Soil Environment” Water Research,
Refereed Conference Publications
18. Rabbi, M. F., Kerr, J. H. and Stringfellow, W., Enhanced Bioremediation in Subsurface Environments
By Heating,” The 25th Annual Conference of the Federation of Analytical Chemistry and Spectroscopy
Societies, American Chemical Society, Austin, Texas, October 11-15, 1998
19. Pardue, J.H., Jackson, W.A., Gale, R.J., Rabbi, M.F., Green, B., Ozsu-Acar, E.,“Electrokinetics as a
Supporting Technology for In-situ TCE Biodegradation” The First International Conference on
Remediation of Chlorinated and Recalcitrant Compounds, Monterey, California, May 18-21, 1998
20. Kerr, J. B., Rabbi, M. F., Stringfellow, W., Clarke, R., and Lageman R., “Electrokinetic Effects on
Metal Ion and Organic Pollutants in Soil” American Chemical Society, 216th National Meeting, Boston,
Massachusetts, August 22-26, 1998
21. Rabbi, M. F., Acar, Y. B., Adrian, D. D., Gale, R. J., Breitenbeck, G., Pardue, J. H., Seals, R. K.,
Acar, E. O. and Jackson, W. A. “Electrokinetic Injection in Heterogeneous Media for In-Situ
Bioremediation” PREPRINT OF EXTENDED ABSTRACT, WILL BE PRESENTED AT THE I & EC
6
Rabbi’s CV
SYMPOSIUM, AMERICAN CHEMICAL SOCIETY, Pittsburgh, PA, September 15-17, 1997, Vol. I,
pp. 119
22. Pardue, J. H., Rabbi, M. F., Gale, R. J., Jackson, W. A., Seals, R. K. And Acar, E. O. “ In-Situ
Bioremediation Using Electrokinetic Injection - A Bench Scale Trial” PREPRINT OF EXTENDED
ABSTRACT, WILL BE PRESENTED AT THE I & EC SYMPOSIUM, AMERICAN CHEMICAL
SOCIETY, Pittsburgh, PA, September 15-17, 1997, Vol. I, pp. 120
23. Acar, Y. B., Rabbi, M. F., Gale, R. J., and Peters R. “Electrokinetic Injection of Ammonium and
Sulfate Ions into Soils for in-situ Bioremediation,” PREPRINT OF EXTENDED ABSTRACT,
PRESENTED AT THE I & EC SYMPOSIUM, AMERICAN CHEMICAL SOCIETY, Atlanta, GA,
October 10, 1995, Vol. II, pp. xxx-xxx
24. Rabbi, M. F., and Yalcin, B. A., “Enhance Soil Bioremediation with Electric Fields” ASCE,
Geotechnical Special Publication No. 71, pp. 421-429.
25. Zappi, M., Rabbi, M. F., Ghent, D., Acar, Y. B., and Gale, R. J. “Bioremediation Enhanced by
Electrokinetics,” PREPRINT OF EXTENDED ABSTRACT, PRESENTED AT THE I & EC
SYMPOSIUM, THE AMERICAN CHEMICAL SOCIETY, Atlanta, GA, September 21, 1994, Vol. II,
pp. xxx xxx
26. Rabbi, M. F., Kerr, J. H. and Stringfellow, W., Enhanced Bioremediation in Subsurface Environments
By Heating,” The 25th Annual Conference of the Federation of Analytical Chemistry and Spectroscopy
Societies, American Chemical Society, Austin, Texas, October 11-15, 1998
27. Pardue, J.H., Jackson, W.A., Gale, R.J., Rabbi, M.F., Green, B., Ozsu-Acar, E.,“Electrokinetics as a
Supporting Technology for In-situ TCE Biodegradation” The First International Conference on
Remediation of Chlorinated and Recalcitrant Compounds, Monterey, California, May 18-21, 1998
Publication (not listed on the Conference Publications)
28. Invited “Electrochemical and Biogeochemical Interactions Associated with Electrokinetic Soil
Remediation,” Hydrology Section, American Geophysical Union, Fall Meeting, December 6‐10,
1998, San Francisco, CA.
29. “Reactive Transport in Soils under Electric Fields” Hydrology Section, American Geophysical
Union, Spring Meeting, May 26‐29, 1998, Boston, MA.
30. “Effect of Solubility on Enhanced Electrokinetic Extraction of Metals,” ASCE 1997 Convention,
“In Situ Remediation of the Geoenvironment ‐ In Situ Remediation ‘97, Minneapolis, MN,
October 5‐7, 1997.
31. “Remediation of soils Contaminated with Tetraethyl Lead by Electric Fields,” presented in TRB
1998 meeting, Session Title “ Assessment, Characterization and Remediation of Contaminated
Transportation Facilities”, sponsored by Committee A2L03, January 11‐15, 1998,Washington, D.C.
32. “Use of Acetic Acid for Enhanced Electrokinetic Extraction of Lead from Contaminated Army
Firing Range”, 12 Annual Conference on Contaminated Soils, Univ. of Mass., Amherst, Oct. 20‐
23, 1997.
OTHER PUBLICATIONS
Poster Paper
33. Rabbi, M. F. “Electrokinetic Injection to Enhance Bioremediation,” Geotechnical Seminar Series, *-
+Sponsored By Louisiana State University and Louisiana Transportation Research Center, Baton Rouge,
LA, December 3-4, 1996
7
Rabbi’s CV
34. Rabbi, M. F., and Acar, Y. B. “Electrokinetic Bioremediation,” Geoenvironment 2000, ASCE Special
Conference on Characterization, Containment, Remediation and Performance in the Geoenvironment, New
Orleans, LA, February 24-26, 1995
Technical Reports
35. “Electrocatalysis of Biological Process for Remediation of Contaminated Soils,” Final Report, DOE-
LDRD, December, 1999
36. “Electrocatalysis of Biological Processes for Green Manufacturing and Environmental Remediation,”
Interim Report, DOE-LDRD July1997
37.“In-situ Bioremediation by Electrokinetic Injection,” Final Report for LEQSF in Preparation
38. “In-situ Bioremediation By Electrokinetic Injection,” Final Report Submitted to EPA for Review,
August, 1998
39. “In-situ Bioremediation By Electrokinetic Injection,” Quality Assurance Project Plan, Prepared for
USEPA Office of Research and Development, Risk Reduction Engineering Laboratory, Cincinnati, Ohio,
Report No: CR824116-01-0, August 1996
40. “In-situ Bioremediation by Electrokinetic Injection,” STTR-Phase I Report to the Department of
Energy, Report No: EK-95-1201, 1995
41. “Accelerated Biodegradation of a Herbicide Applied to the Roadside Environment Using Adapted Soil
Microorganisms,” Report Prepared for Louisiana Transportation research Center, Baton Rouge, LA,
Report No: 284, 1994
42. “Studies on the Strength of Brick Aggregate Concrete with Special Reference to Curing Conditions,”
Report Prepared for Bangladesh University of Engineering and Technology
43. “A Study of Analysis and Design of Building Frames,” Report Prepared for Bangladesh University of
Engineering and Technology
Guest Lectures
44. “Fundamental of Electrochemical Bioremediation,” Center for Environmental Biotechnology,
University of California at Berkeley, Berkeley, CA, February 17, 1998
45. “Electrokinetic Injection to Enhance Bioremediation,” Geokinetics and Flour Daniel Remediation
Forum, Berkeley, CA, April 23, 1997
46. “Injection of Species Under Electrical Field to Enhance Bioremediation,” Institute for Recycling
Materials, Baton Rouge, LA, July 05, 1997
47. “In-situ Bioremediation by Electrokinetic Injection,” Electrokinetics Inc., Baton Rouge, LA, November
10, 1995
REFERENCE
1. Tarek F. Haider, P.E.
President,
Geo-explorers
813 Gravel Pike, Second Floor
Collegeville, PA 19426
Tel: (610) 8310-1193
8
Rabbi’s CV
Fax: 610.831.1194
thaider@geo-explorers.com
2. Scott Shaver, P.E.
Supervising Engineer
California Department of Transportation (CalTrans)
2015 E Shield Ave, Suite #100
Fresno, CA 19426
Tel: (559) 230-3118
Fax: (559) 243-3835
Scott_sahaver@dot.ca.gov
3. Dr. Akram N. Alshawabkeh
George A. Snell Professor of Engineering, Civil and Environmental Engineering
Associate Dean for Research
Director, PROTECT Superfund Research Center
Affiliated Faculty, Bioengineering
Northeastern University
501 Stearns
360 Huntington Avenue
Boston, MA 02115
617.373.3994
Email: aalsha@neu.edu
4. Dr. Donald Dean Adrian
Professor Civil and Environmental Engineering Department
Louisiana State University
3513A CEBA
Louisiana State University
Baton Rouge, LA 70803-6413
Phone: (225) 578-8636
Fax: (225) 578-8652
Email: dadrian@lsu.edu
5. Dr. Mohd Raihan Taha
Professor
Dept. Civil & Structural Engineering
University Kebangsaan Malaysia
43600 UKM Bangi Selangor Malaysia
Tel:+603 8921 6212
Fax:+603 8921 6147
E-mail: drmrt@eng.ukm.my
6. Dr. Roger K. Seals
Professor Civil and Environmental Engineering Department
Louisiana State University
Baton Rouge, LA 70803-6413
Phone: (225) 578-6503
Fax: (225) 578-8652
Email: ceseal@lsu.edu
7. Dr. John H. Pardue
9
Rabbi’s CV
Professor, Civil and Environmental Engineering Department
State University
Baton Rouge, LA 70803-6413
Phone: (225) 578-8661
Fax: (225) 578-8652
Email: jpardue@unix1.sncc.lsu.edu
PS: I wish that I would include Dr. Yalcin B. Acar in the reference lists, who died in a car accident on May
9, 1996. I had been actively involved in Geoenvironmental research with last four years of his life. I had an
opportunity to meet with him as an advisor/supervisor, mentor and above all as a friend. He was one of the
leading researchers in Geoenvironment, especially in Electrokinetics soil remediation. He is a continuous
source of my professional inspiration. Some of my works are dedicated to his name
10

CV_Rabbi_10-07-2015

  • 1.
    Rabbi’s CV M FAZLERABBI 7237 N Bonadelle Ave, Fresno, CA 93720 Tel: (559) 326-6177, E-mail: rabbifazle@yahoo.com EDUCATION Ph.D., Civil Engineering, Louisiana State University (LSU) Supervisor: Late Professor Yalcin B. Acar “Injection of Species Under Electrical Field to Enhance Bioremediation” Major: Geoenvironmental Engineering Minor: Microbiology December, 1997 M.S., Civil Engineering, Louisiana State University (LSU) Supervisor: Professor Donald D. Adrian “Fate and Transport of Herbicides in the Presence of Adapted Microorganisms in a Two Dimensional Soil Environment” Major : Environmental Engineering December, 1995 B.Sc., Civil Engineering, Bangladesh University of Engineering and Technology (BUET) Concentration: Water Resources and Structural Engineering August,1988 REGISTRATION Registered Professional Engineer (Civil), 2001 Engineer-in-training (EIT), 1992 GRANT Rabbi, M. F., and Kerr J., “Electrochemical Acceleration of Bioremediation of Contaminated Soil” LBNL Internal funds. In collaboration with the Center for Environmental Biotechnology directed by Dr. Terry Hazen, Initiated October 1, 1997 for Two years. $96K/yr, Total $192K Kerr, J. B., Rabbi, M. F., and Stringfellow, W.“Electrocatalysis of Biological Process for Remediation of Contaminated Soils,” DOE -Laboratory Directed Research Development (LDRD), Lawrence Berkeley National Laboratory, Berkeley, CA, 11/98 to 12/99, $122K Kerr, J. B., Rabbi, M. F., and Stringfellow, W, “Electrocatalysis of Biological Processes for “Green” Manufacturing and Environmental Remediation,” DOE-Laboratory Directed Research Development (LDRD), Lawrence Berkeley National Laboratory, Berkeley, CA 11/97 to 12/00, $88K PROFESSIONAL EXPERIENCE 10/03/2000 to 06/08/2015: Project Engineer, California Department of Transportation (CalTrans), Highway Related Design, Report Writing and Review Reports for Functional Units like Geotechnical, Environmental, Hydraulics, Survey, Structural Engineering, Electrical, Traffic, and Project Management and I worked in Design and Project Development, 1
  • 2.
    Rabbi’s CV Construction, Planningand Project Management and Maintenance divisions as a project engineer in CalTrans for last 15 years, Performs highly advanced and complex transportation engineering work with different functional areas such as Project and Planning Management, Project Development and Design, Environment, Hydraulics, Geotechnical, Electrical, Traffic, Survey, Structural Engineering, construction, Manages personnel engaged and is responsible for operations. Interprets, organizes, plans, schedules, executes and coordinates major technical engineering assignments; manages construction and maintenance activities, performs engineering design work, calculates costs and conducts various studies for an area office. Manages professional, technical, clerical employees and supervisors. Reports to the Branch Chief. During the initiation of project to the completion of project, I was always closely involved with the Project Manager to recommend him/she technical aspects of the project within the scope, which should be buildable and economically feasible with reasonable time frame. Help the Project Manager to estimate work resources, Capital and Support cost to program the projects, Schedule and risk management documents and prepared presentation of public meetings for critically environmental sensitive projects. I finished projects from small scale (project cost from $20,000) like maintenance project to replace some damaged concrete blocks of sidewalk. The biggest project construction cost estimate was $850 million, which was a State Improvement Transportation Plan (STIP) projec. I was involved more than twenty-six different types of large projects which I have been done in CalTrans. 10/99 to 09/01: Geo-environmental Engineer: BSK and Associates, Fresno, CA, Responsible for Geo- Environmental Site Characterization by Field investigation and Laboratory Testing, Data Analysis and Design, Proposals and Report Writing 11/97 to 12/99: Fellow Research Engineer: Lawrence Berkeley Nation Laboratory, Berkeley, CA, Innovative Development of a Safer, Efficient and Cost Effective Technological Aspects for Bio-Electrochemical Soil Processing for Field Scale Implementation 1/91 to 5/97: Assistant Consult Engineer: Electrokinetics Inc., Baton Rouge, LA, Performed standard Geotechnical and environmental in-situ/ laboratory tests for contaminated site Characterization and Electrokinetics Testing (with Late Dr. Yalcin B. Acar) and data analysis and report writing 1/90 to 12/90: Foundation Engineer: Dhaka University, Dhaka, Bangladesh, Designed and inspection of shallow and deep foundations for multi- storied frame structure buildings, Performed slope stability analysis for landfill design 8/88 - 12/89: Field Engineer: Eastern Housing Society, Dhaka Bangladesh, Supervision of soil boring and pile driving RESEARCH EXPERIENCE 11/98 to 12/99: Lawrence Berkeley National Laboratory, “Electrocatalysis of Biological Process for Remediation of Contaminated Soils,” DOE- Laboratory Directed Research Development (LDRD), Lawrence Berkeley National Laboratory, Berkeley, CA 2
  • 3.
    Rabbi’s CV 11/97 to12/99: Lawrence Berkeley National Laboratory, “Electrocatalysis of Biological Processes for Green Manufacturing and Environmental Remediation,” Laboratory Directed Research and Development Program, Lawrence Berkeley National Laboratory, Berkeley, CA 7/96 to 9/97: Louisiana State University, “In-situ Bioremediation by Electrokinetic Injection,” Research Project Sponsored by Board of Regents of Louisiana, Research and Development Component of the Louisiana Education Quality Support Fund (LEQSF) 5/95 to 9/97: Louisiana State University and Electrokinetics Inc., “In-situ Bioremediation by Electrokinetic Injection,” US Environmental Protection Agency (EPA), Cincinnati, Ohio 8/93 to 12/95: Louisiana State University, “In-situ Bioremediation by Electrokinetic Injection,” Research Project Sponsored By US Department of Energy (DOE), Germantown, Maryland 1/91 to 6/93: Louisiana State University, “Accelerated Biodegradation of Herbicides Applied to the Roadside Environment Using Adapted Soil Microorganisms,” Research Project Sponsored by Louisiana Transportation Research Center (LTRC), Baton Rouge, Louisiana 3/87 to 8/88: Bangladesh University of Engineering and Technology, “Studies on the Strength of Brick Aggregate Concrete with Special Reference to Curing Conditions,” Research Project Sponsored by Bangladesh University of Engineering and Technology 3/87 to 8/88: Bangladesh University of Engineering and Technology,“ A Study of Analysis and Design of Building Frames,” Research Project Sponsored by Bangladesh University of Engineering and Technology TEACHING EXPERIENCE 11/96 to 12/99 Instructor, LBNL and UC Berkeley: Responsible for Student Interns. 1993 1996: Teaching Assistant, CE 4300 (Foundation Design) Louisiana State University Fall, 1993/1994 : Teaching Assistant, MBIO 2051 (General Microbiology) Louisiana State University 8/88 to 9/90 : Lecturer, Chemistry and Mathematics Tejgaon College, Dhaka, Bangladesh HONORS AND AWARDS 1980 : Bangladesh Government Scholarship for Higher Secondary Education, Placed in top 5% in the Secondary School Certification (SSC) examination (1980-1982) 1982 : Bangladesh Government Scholarship for undergraduate study, Placed in top 5% in the Higher Secondary Certificate (HSC) examination (1982 to 1988) MEMBERSHIP American Society of Civil Engineering (ASCE) 3
  • 4.
    Rabbi’s CV American ChemicalSociety (ACS) American Society of Microbiology (ASM) JOURNAL ASCE (Geoenvironment 2000) REVIEWER Hazardous Waste Management (Special Edition) Soil Contamination PROFESSIONAL SERVICE Secretary Bangladesh Student Association, LSU, Baton Rouge, LA Member, Youth National Science Fair Organization, Dhaka, Bangladesh COMMUNITY SERVICE Ex Sea Scout of Bangladesh Navy Member, Lions Club, Bangladesh Member, Bangladesh Cultural Association, LA Member, Bay Area Bangladesh Association, CA COMPUTER SKILLS Language : Fortran, Basic and C Operating system : UNIX, VMS, MS-DOS, WINDOWS 95 and MAC Software : Quattro, Lotus, WordPerfect, Latex, Framemaker, MacDraw, Auto-CAD, MacPaint, SuperPaint, CricketGraph, MS Word, Excel, Access, KaleidaGraph, DeltaGraph, SigmaPlot, Canvas, and Aldus Persuasion, MS Office-2010 Technical Software : HEC-2, Migrate V-9, Geoslope and CXTFIT, CAiCE- 2000, MicroStation, Civil 3D, AutoCAD, Data Acquisition : LABTECH NOTEBOOK Analytical Instruments: HPLC, GC-MS, GC-FID, HP-EC, IC, ICP and various molecular level Biological and chemical technique for microbial enumeration LANGUAGES: English, Bengali, Hindi, Urdu TRAVEL India, Thailand, Singapore, Pakistan, Canada, and Mexico GRADUATE COURSES: Louisiana State University Major: Geoenvironmental Engineering Minor: Microbiology Geotechnical Engineering (24 Credit Hours): GPA: 3.88/4.00 Environmental Geotechnics, Soil Behavior, Advanced Geotechnical Engineering I, Advanced Geotechnical Engineering II, Soil Dynamics and Earthquake Engineering, Geotechnical Engineering II, Geotechnical Engineering III, and Mathematical Methods in Engineering 4
  • 5.
    Rabbi’s CV Environment Engineering(27 Credit Hours): GPA: 3.78/4.00 Water Quality Analysis, Quantitative Water Management, Operations & Sanitary Engineering I, Operations & Sanitary Engineering II, Operations & Sanitary Engineering III, Hydrology, Advanced Subsurface Hydrology and Hydraulics, Free Surface Flow, and Solid & Hazardous Waste Management Microbiology: (13 Credit Hours): Microbial Ecology & Nutrient Cycling in Soil, Introductory Microbial Physiology, Microbial Genetics, and General Biochemistry UNDERGRADUATE COURSES (Partial Highlights): Environmental Engineering I, Geotechnical Engineering I, Fluid Mechanics, Geology & Geomorphology, Open Channel Flow and Hydraulic Machinery, Water Resources Engineering I, Water Resources Engineering II, Water Resources Engineering III, and Computer Programming and Numerical Methods in Civil Engineering, Statistics, Mathematics I, Mathematics II, Structural Engineering I, Structural Engineering II, Structural Engineering II, Structural Engineering III, and Structural Engineering IV REFEREED PUBLICATION I had publication restrictions of my innovative research with Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA where I was Research Scientist from 1997-2000. It is my pleasure after knowing that from April, 2015 and onward, I am opened to discussion and publish the out come of my innovate research. If every things go well, I am thinking the outcomes of the research can result in another 10-12 publications. I am working on the results of these researches to publish in Journals and Present in Conferences in a reasonable time frame. 1. .M. F. Rabbi, B.Clark, R.J.Gale, E.Ozsu-Acar, J. Pardue and A.Jackson,” ISitu TCE Bioremediation by Electrokinetic Cometabolite Injection”, Waste Management, 20(4) 279-86 (2000) 2.. M.F.Rabbi, R.J.Gale, E.Ozsu-Acar, G.Breintenbeck, J.H.Pardue, A.Jackson, R.K.Seals, and D.D.Adrian,”Electrokinetic Injection of Nutrients in Layered Clay/Sand Media for Bioremediation Applications”, D.W.Tedder and F.G. Pohland Eds. in Emerging Technologies in Hazardous Waste Management 8, Kluwer Academic/Academic Publishers, NY, 2000, 29-38 3. John Kerr, Will Stringfellow, Fazle Rabbi, Richard Fish, H. Christine Lo & Olivier Buriez “Electrochemical Acceleration of Bioprocesses for Remediation and Production”, LBNL Center for Environmental Biotechnology Publication, 1998, pp. 39-72 4 Kerr, J. B.; Rabbi, F.; Stringfellow, W.; Clarke, R.; Lageman, R. "Electrokinetic Effects of Bioremediation of Metal Ion and Organic Pollutants in Soil." Book of Abstracts, 216th ACS National Meeting, Boston, MA. 1998, I&EC-059, pp 124-128. 5. Pardue, J. H., W. A. Jackson, R. Gale, M. Fazle Rabbi, B. Clark and E. Ozsu-Acar, “ Electrokinetics as a supporting technology for in situ TCE Biodegradation”, in Physical, Chemical and Thermal Technologies, Remediation of chlorinated and recalcitrant compounds, G.B. Wickramanayake and R.E. Hinchee (eds.), Batelle Press, Columbus, Ohio, (1998) pp. 461-465. 6. Acar, Y. B., Rabbi, M. F. and Ozsu, E. E. “ Electrokinetic Injection of Ammonium and Sulfate Ions into Sand and Kaolinite Beds,” Journal of Geotechnical and Geoenvironmental Engineering, ASCE, Vol. 123, No. 3, March 1997, pp. 239-249. 5
  • 6.
    Rabbi’s CV 7. Acar,Y. B., Rabbi, M. F., Ozsu, E. E., Gale, R. J., and Alshawabkeh, A. N. “ Enhance Soil Bioremediation with Electrical Fields,” Chemtech, American Chemical Society, Vol. 26, No. 4, April 1996, pp. 40-44 8. Alshawabkeh, A. N., Acar, Y., B. Rabbi, F. and Ozsu, E. “Electrokinetic Injection of Ions into Soil for Bioremediation.” Emerging Technologies in Hazardous Waste Management VIII, Industrial and Chemistry Division of the American Chemical Society (ACS), Alabama, Birmingham,September/1996, pp. 96-117 9. Acar, Y. B.,and Rabbi Fazle, M. F. “Enhance soil bioremediation with electric fields” Journal of Hazardous Waste Management, 20-35 Journals (Submitted)) 10. Rabbi Rabbi, M. F., and Gale R. J. “Technological Aspects of Bio-Electro-Chemical Soil Processing,” 11. Rabbi, M. F., and Gale R. J. “Optimization of Ion Injection under Electrical Fields” 12. Rabbi, M., F., Gale, R. J. and Kerr, J. B., “Enhanced Injection/Extraction of Species under Electrical Field,” 13. Kerr, J. B., and Rabbi, M. F. “Electrokinetic Effects on Metal Ion and Organic Pollutants in Soils 14. Rabbi, M. F., Acar, Gale, R. J., Ozsu-Acar, E.“ Electrokinetic Injection in Heterogeneous Media for In-situ Bioremediation,” Journal of Hazardous Materials, 15. Rabbi, M. F., Gale, R. J., and Pardue, J. H. “Fundamental of Electrokinetic Injection into a Layered Soil Bed” Environmental Science and Technology, 16. Rabbi, M. F., and D.D. Adrian “Fate and Transport of 2-4 D under Two-Dimensional Soil Environmental,” Soil Science , 17. Rabbi, M. F., and D.D. Adrian “Laboratory Scale -Simulation of Contamination Transport in Two Dimensional Soil Environment” Water Research, Refereed Conference Publications 18. Rabbi, M. F., Kerr, J. H. and Stringfellow, W., Enhanced Bioremediation in Subsurface Environments By Heating,” The 25th Annual Conference of the Federation of Analytical Chemistry and Spectroscopy Societies, American Chemical Society, Austin, Texas, October 11-15, 1998 19. Pardue, J.H., Jackson, W.A., Gale, R.J., Rabbi, M.F., Green, B., Ozsu-Acar, E.,“Electrokinetics as a Supporting Technology for In-situ TCE Biodegradation” The First International Conference on Remediation of Chlorinated and Recalcitrant Compounds, Monterey, California, May 18-21, 1998 20. Kerr, J. B., Rabbi, M. F., Stringfellow, W., Clarke, R., and Lageman R., “Electrokinetic Effects on Metal Ion and Organic Pollutants in Soil” American Chemical Society, 216th National Meeting, Boston, Massachusetts, August 22-26, 1998 21. Rabbi, M. F., Acar, Y. B., Adrian, D. D., Gale, R. J., Breitenbeck, G., Pardue, J. H., Seals, R. K., Acar, E. O. and Jackson, W. A. “Electrokinetic Injection in Heterogeneous Media for In-Situ Bioremediation” PREPRINT OF EXTENDED ABSTRACT, WILL BE PRESENTED AT THE I & EC 6
  • 7.
    Rabbi’s CV SYMPOSIUM, AMERICANCHEMICAL SOCIETY, Pittsburgh, PA, September 15-17, 1997, Vol. I, pp. 119 22. Pardue, J. H., Rabbi, M. F., Gale, R. J., Jackson, W. A., Seals, R. K. And Acar, E. O. “ In-Situ Bioremediation Using Electrokinetic Injection - A Bench Scale Trial” PREPRINT OF EXTENDED ABSTRACT, WILL BE PRESENTED AT THE I & EC SYMPOSIUM, AMERICAN CHEMICAL SOCIETY, Pittsburgh, PA, September 15-17, 1997, Vol. I, pp. 120 23. Acar, Y. B., Rabbi, M. F., Gale, R. J., and Peters R. “Electrokinetic Injection of Ammonium and Sulfate Ions into Soils for in-situ Bioremediation,” PREPRINT OF EXTENDED ABSTRACT, PRESENTED AT THE I & EC SYMPOSIUM, AMERICAN CHEMICAL SOCIETY, Atlanta, GA, October 10, 1995, Vol. II, pp. xxx-xxx 24. Rabbi, M. F., and Yalcin, B. A., “Enhance Soil Bioremediation with Electric Fields” ASCE, Geotechnical Special Publication No. 71, pp. 421-429. 25. Zappi, M., Rabbi, M. F., Ghent, D., Acar, Y. B., and Gale, R. J. “Bioremediation Enhanced by Electrokinetics,” PREPRINT OF EXTENDED ABSTRACT, PRESENTED AT THE I & EC SYMPOSIUM, THE AMERICAN CHEMICAL SOCIETY, Atlanta, GA, September 21, 1994, Vol. II, pp. xxx xxx 26. Rabbi, M. F., Kerr, J. H. and Stringfellow, W., Enhanced Bioremediation in Subsurface Environments By Heating,” The 25th Annual Conference of the Federation of Analytical Chemistry and Spectroscopy Societies, American Chemical Society, Austin, Texas, October 11-15, 1998 27. Pardue, J.H., Jackson, W.A., Gale, R.J., Rabbi, M.F., Green, B., Ozsu-Acar, E.,“Electrokinetics as a Supporting Technology for In-situ TCE Biodegradation” The First International Conference on Remediation of Chlorinated and Recalcitrant Compounds, Monterey, California, May 18-21, 1998 Publication (not listed on the Conference Publications) 28. Invited “Electrochemical and Biogeochemical Interactions Associated with Electrokinetic Soil Remediation,” Hydrology Section, American Geophysical Union, Fall Meeting, December 6‐10, 1998, San Francisco, CA. 29. “Reactive Transport in Soils under Electric Fields” Hydrology Section, American Geophysical Union, Spring Meeting, May 26‐29, 1998, Boston, MA. 30. “Effect of Solubility on Enhanced Electrokinetic Extraction of Metals,” ASCE 1997 Convention, “In Situ Remediation of the Geoenvironment ‐ In Situ Remediation ‘97, Minneapolis, MN, October 5‐7, 1997. 31. “Remediation of soils Contaminated with Tetraethyl Lead by Electric Fields,” presented in TRB 1998 meeting, Session Title “ Assessment, Characterization and Remediation of Contaminated Transportation Facilities”, sponsored by Committee A2L03, January 11‐15, 1998,Washington, D.C. 32. “Use of Acetic Acid for Enhanced Electrokinetic Extraction of Lead from Contaminated Army Firing Range”, 12 Annual Conference on Contaminated Soils, Univ. of Mass., Amherst, Oct. 20‐ 23, 1997. OTHER PUBLICATIONS Poster Paper 33. Rabbi, M. F. “Electrokinetic Injection to Enhance Bioremediation,” Geotechnical Seminar Series, *- +Sponsored By Louisiana State University and Louisiana Transportation Research Center, Baton Rouge, LA, December 3-4, 1996 7
  • 8.
    Rabbi’s CV 34. Rabbi,M. F., and Acar, Y. B. “Electrokinetic Bioremediation,” Geoenvironment 2000, ASCE Special Conference on Characterization, Containment, Remediation and Performance in the Geoenvironment, New Orleans, LA, February 24-26, 1995 Technical Reports 35. “Electrocatalysis of Biological Process for Remediation of Contaminated Soils,” Final Report, DOE- LDRD, December, 1999 36. “Electrocatalysis of Biological Processes for Green Manufacturing and Environmental Remediation,” Interim Report, DOE-LDRD July1997 37.“In-situ Bioremediation by Electrokinetic Injection,” Final Report for LEQSF in Preparation 38. “In-situ Bioremediation By Electrokinetic Injection,” Final Report Submitted to EPA for Review, August, 1998 39. “In-situ Bioremediation By Electrokinetic Injection,” Quality Assurance Project Plan, Prepared for USEPA Office of Research and Development, Risk Reduction Engineering Laboratory, Cincinnati, Ohio, Report No: CR824116-01-0, August 1996 40. “In-situ Bioremediation by Electrokinetic Injection,” STTR-Phase I Report to the Department of Energy, Report No: EK-95-1201, 1995 41. “Accelerated Biodegradation of a Herbicide Applied to the Roadside Environment Using Adapted Soil Microorganisms,” Report Prepared for Louisiana Transportation research Center, Baton Rouge, LA, Report No: 284, 1994 42. “Studies on the Strength of Brick Aggregate Concrete with Special Reference to Curing Conditions,” Report Prepared for Bangladesh University of Engineering and Technology 43. “A Study of Analysis and Design of Building Frames,” Report Prepared for Bangladesh University of Engineering and Technology Guest Lectures 44. “Fundamental of Electrochemical Bioremediation,” Center for Environmental Biotechnology, University of California at Berkeley, Berkeley, CA, February 17, 1998 45. “Electrokinetic Injection to Enhance Bioremediation,” Geokinetics and Flour Daniel Remediation Forum, Berkeley, CA, April 23, 1997 46. “Injection of Species Under Electrical Field to Enhance Bioremediation,” Institute for Recycling Materials, Baton Rouge, LA, July 05, 1997 47. “In-situ Bioremediation by Electrokinetic Injection,” Electrokinetics Inc., Baton Rouge, LA, November 10, 1995 REFERENCE 1. Tarek F. Haider, P.E. President, Geo-explorers 813 Gravel Pike, Second Floor Collegeville, PA 19426 Tel: (610) 8310-1193 8
  • 9.
    Rabbi’s CV Fax: 610.831.1194 thaider@geo-explorers.com 2.Scott Shaver, P.E. Supervising Engineer California Department of Transportation (CalTrans) 2015 E Shield Ave, Suite #100 Fresno, CA 19426 Tel: (559) 230-3118 Fax: (559) 243-3835 Scott_sahaver@dot.ca.gov 3. Dr. Akram N. Alshawabkeh George A. Snell Professor of Engineering, Civil and Environmental Engineering Associate Dean for Research Director, PROTECT Superfund Research Center Affiliated Faculty, Bioengineering Northeastern University 501 Stearns 360 Huntington Avenue Boston, MA 02115 617.373.3994 Email: aalsha@neu.edu 4. Dr. Donald Dean Adrian Professor Civil and Environmental Engineering Department Louisiana State University 3513A CEBA Louisiana State University Baton Rouge, LA 70803-6413 Phone: (225) 578-8636 Fax: (225) 578-8652 Email: dadrian@lsu.edu 5. Dr. Mohd Raihan Taha Professor Dept. Civil & Structural Engineering University Kebangsaan Malaysia 43600 UKM Bangi Selangor Malaysia Tel:+603 8921 6212 Fax:+603 8921 6147 E-mail: drmrt@eng.ukm.my 6. Dr. Roger K. Seals Professor Civil and Environmental Engineering Department Louisiana State University Baton Rouge, LA 70803-6413 Phone: (225) 578-6503 Fax: (225) 578-8652 Email: ceseal@lsu.edu 7. Dr. John H. Pardue 9
  • 10.
    Rabbi’s CV Professor, Civiland Environmental Engineering Department State University Baton Rouge, LA 70803-6413 Phone: (225) 578-8661 Fax: (225) 578-8652 Email: jpardue@unix1.sncc.lsu.edu PS: I wish that I would include Dr. Yalcin B. Acar in the reference lists, who died in a car accident on May 9, 1996. I had been actively involved in Geoenvironmental research with last four years of his life. I had an opportunity to meet with him as an advisor/supervisor, mentor and above all as a friend. He was one of the leading researchers in Geoenvironment, especially in Electrokinetics soil remediation. He is a continuous source of my professional inspiration. Some of my works are dedicated to his name 10