‫اد‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬ ‫ادم‬ ‫…ﻋﺒﺪاﻟﻠﻪ‬
Electro Mechanical Project Engineer
at Smart Safety
Location: Saudi Arabia
Education: Bachelor's degree, Mechanical…
Experience: 5 Years, 9 Months
Contact
Name: ‫ادم‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬ ‫ادم‬ ‫ﻋﺒﺪاﻟﻠﻪ‬
Mobile Phone: +966.565230284
Address: Jeddah
AL- HAMDANIAH
Country: Saudi Arabia
Email Address: abdallahadam5@gmail.com
Fax: +966.565230284 (Ext. 0)
P. O. Box: 00000
Evening-time Phone: +966.565230284 (Ext. 0)
Day-time Phone: +966.565230284 (Ext. 0)
Website: http://abdaladam5@gmail.comlah
Last Activity: 2016-07-28 Ref.: CV14961899
Target Job
Target Job Title: Mechanical engineer
Career Level: Mid Career
Career Objective: I have a willing to gain a challenging and rewarding job as a mechanical engineer
makes me utilize my knowledge .skills, techniques, abilities and creativities to improve my experiences
where my potential power could be provided.
Employment Type: Employee
Employment Status: Full time
Notice Period: Immediately
1/7
Personal Information
Birth Date: 18 September 1986 (Age: 29)
Gender: Male
Nationality: Sudan
Residence Country: Saudi Arabia
Visa Status: Residency Visa (Transferable)
Name in Arabic: ‫ادم‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬ ‫ادم‬ ‫ﻋﺒﺪاﻟﻠﻪ‬
Marital Status: Single
Number of Dependents: 4
Driving License Issued From: Sudan
Experience (5 Years, 9 Months)
February 2016 - Present
Electro Mechanical Project Engineer
at Smart Safety
Location: Jeddah , Saudi Arabia
Company Industry: Construction/Civil Engineering
Job Role: Engineering
• Design calculation and Shop Drawing for Fire Fighting, Fire Alarm, Plumbing, HVAC and Lifts.
• Pricing all electro mechanical systems.
• Supervision, monitoring and controlling, making any Required Modifications during.
• Testing, Commissioning, and Handing Over For electro mechanical systems.
November 2015 - February 2016
Project Engineer and Designer
at (Al - Hadaf Services Co.Ltd ( HASCO
Location: Khartoum, Sudan
Company Industry: Engineering
Job Role: Engineering
• Design calculation and Shop Drawing for Fire Fighting, Fire Alarm.
• Supervision, monitoring and controlling, making any Required Modifications during.
• Testing and commissioning Firefighting and Fire Alarm Systems.
January 2015 - October 2015
Electro Mechanical Engineer
at FREELANCE CONTRATOR
Company Industry: Engineering
Job Role: Engineering
Electricity, Air Conditioning, Firefighting, Fire Alarm and plumbing Designing, installation & Maintenance.
October 2013 - December 2014
Project Engineer and Mechanical Designer
at .Fire Follow System Co. ltd
2/7
Location: Khartoum, Sudan
Company Industry: Engineering
Job Role: Engineering
• Design calculation and Shop Drawing for Fire Fighting, Fire Alarm, CCTV and MATV.
• Supervision, monitoring and controlling, making any Required Modifications during.
• Maintenance Team Manager.
July 2013 - October 2013
Maintenance Engineer and storekeeper
at Elfarouk Workshop
Location: Khartoum, Sudan
Company Industry: Mechanical
Job Role: Engineering
Receiving Customers and checking cars to determine the faults.
• Filling in the job card and then send the car to the technician for maintenance. Then follow the maintenance process with
the technician and supply him with required spare parts from the store.
• After finishing the maintenance I call the customer to receive the car and get from him/her maintenance fee.
June 2012 - June 2013
Electro Mechanical Site Engineer.
at Fire Follow System Co. ltd.
Location: Khartoum, Sudan
Company Industry: Engineering
Job Role: Engineering
• Supervision, monitoring and controlling and making any Required Modifications during in sites.
• Maintenance Team Manager.
December 2011 - June 2012
Emergency and Service Employee.
at Sudanese Electricity Distribution Company Ltd
Location: Khartoum, Sudan
Company Industry: Government Sector
Job Role: Engineering
• Receive customers' communications regarding Power outages through a window or through program services subscribers
on the computer.
• Contact emergency technicians and follow up the process of problem and then identify it through the program.
July 2008 - July 2008
Trainee
at Sudan Railways Corporation
Location: Sudan
Company Industry: Transportation
Job Role: Engineering
As a Trainee In Railways Workshops.
Extra years of experience not listed above: 1 Years, 0 Months
3/7
Education
Bachelor's degree , Mechanical Engineering Department of (Power)
at Sudan University of Science and Technology
Location: Khartoum, Sudan
September 2011
Grade: 2.69
GPA 2.69 equivalent of 67.25%, second-class division two a good appreciation
Diploma , Mechanical Engineering Department Of (Auto Mobile)
at Sudan University of Science and Technology
Location: Khartoum, Sudan
October 2008
Grade: 3.00
GPA 3.00 equivalent to 75%, an excellent first-class appreciation
High school or equivalent , Charter scientific
at Muglad Secondary School for Boys
Location: Muglad Sudan
May 2005
Grade: 70 out of 100
Specialties
Plumbing Questions: 0 Answers: 0
HVAC Questions: 0 Answers: 0
fire alarm & fire fighting Questions: 0 Answers: 0
AUTODESK REVIT MEP Questions: 0 Answers: 0
AUTOCAD 2D & MEP Questions: 0 Answers: 0
Skills
Computer Applications
Level: Expert | Last Used: 1 month or less
internet
Level: Expert | Last Used: 1 month or less
4/7
Printing
Level: Expert | Last Used: 1 month or less
autocad 2D
Level: Expert | Last Used: 1 month or less
PowerPoint
Level: Expert | Last Used: 1 month or less
Excel
Level: Expert | Last Used: 1 month or less
AutoCAD
Level: Expert
Revit
Level: Intermediate
Projects Management
Level: Expert
Languages
English
Level: Expert
Arabic
Level: Expert | Experience: More than 10 years
References
Dr. Mohyedin Ahmed Abdelghadir
Job Title: assistant professor
Company Name: Sudan University of Science & Technology
Phone Number: +249.912299077
Email Address: abmoohy87@yahoo.com
Farouk Mahmoud
Job Title: General Manager
Company Name: Elfarouk Spare Parts & Maintenance
Phone Number: +249.912307241
Email Address: fradah@yahoo.com
Mahamed Shareef Mahamed Abeden
Job Title: Executive Director and Project Manager
Company Name: Fire Follow System Co. Ltd.
Phone Number: +249.910124442
Email Address: aborahaf1972@hotmail.com
5/7
Memberships
Saudi Council Of Engineers
Membership/Role: Engineer
Member since: April 2016
Federation of Sudanese Engineers
Membership/Role: graduate engineer
Member since: March 2012
Training and Certifications
Primavera P6 (Training)
Training Institute: Soft Star Training Center
Date Attended: November 2015 (20 hours)
Risk Assessment Course , Online Course (Training)
Training Institute: Safety Academy
Date Attended: January 2015 (5 hours)
Plumbing Design System (Training)
Training Institute: Gazeera for training and human resources development
Date Attended: January 2015 (24 hours)
OSHA Construction Health and Safety Course, Online Course
(Training)
Training Institute: Aldarayn Academy
Date Attended: January 2015 (14 hours)
OSHA for general Industries Course, Online Course. (Training)
Training Institute: Safety Academy
Date Attended: January 2015 (10 hours)
central air conditioning system (Training)
Training Institute: Gazeera for training and human resources development
Date Attended: November 2014 (20 hours)
6/7
Cooling Load and Duct Design (Training)
Training Institute: Gazeera Training and Human Resource Development
Date Attended: August 2014 (16 hours)
AutoCAD 2D (Training)
Training Institute: Gazeera Training and Human Resource Development
Date Attended: May 2014 (14 hours)
Advanced Training Course in Refrigeration and Air
Conditioning (Training)
Training Institute: Training Center Sudan University of Science and Technology
Date Attended: February 2014 (60 hours)
Diploma in Computer Application (Training)
Training Institute: M.E.C For Computer Science
Date Attended: August 2012 (70 hours)
Hobbies and Interests
Reading, soccer, volleyball and the Internet
First-class score in Diploma in Mechanical Engineering from the Sudan University of Science and Technology in 2008
7/7

cv14961899_عبدالله_ادم_ابراهيم_اسحق-ادم_mechanical-engineer

  • 1.
    ‫اد‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬‫ادم‬ ‫…ﻋﺒﺪاﻟﻠﻪ‬ Electro Mechanical Project Engineer at Smart Safety Location: Saudi Arabia Education: Bachelor's degree, Mechanical… Experience: 5 Years, 9 Months Contact Name: ‫ادم‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬ ‫ادم‬ ‫ﻋﺒﺪاﻟﻠﻪ‬ Mobile Phone: +966.565230284 Address: Jeddah AL- HAMDANIAH Country: Saudi Arabia Email Address: abdallahadam5@gmail.com Fax: +966.565230284 (Ext. 0) P. O. Box: 00000 Evening-time Phone: +966.565230284 (Ext. 0) Day-time Phone: +966.565230284 (Ext. 0) Website: http://abdaladam5@gmail.comlah Last Activity: 2016-07-28 Ref.: CV14961899 Target Job Target Job Title: Mechanical engineer Career Level: Mid Career Career Objective: I have a willing to gain a challenging and rewarding job as a mechanical engineer makes me utilize my knowledge .skills, techniques, abilities and creativities to improve my experiences where my potential power could be provided. Employment Type: Employee Employment Status: Full time Notice Period: Immediately 1/7
  • 2.
    Personal Information Birth Date:18 September 1986 (Age: 29) Gender: Male Nationality: Sudan Residence Country: Saudi Arabia Visa Status: Residency Visa (Transferable) Name in Arabic: ‫ادم‬ ‫اﺳﺤﻖ‬ ‫اﺑﺮاﻫﻴﻢ‬ ‫ادم‬ ‫ﻋﺒﺪاﻟﻠﻪ‬ Marital Status: Single Number of Dependents: 4 Driving License Issued From: Sudan Experience (5 Years, 9 Months) February 2016 - Present Electro Mechanical Project Engineer at Smart Safety Location: Jeddah , Saudi Arabia Company Industry: Construction/Civil Engineering Job Role: Engineering • Design calculation and Shop Drawing for Fire Fighting, Fire Alarm, Plumbing, HVAC and Lifts. • Pricing all electro mechanical systems. • Supervision, monitoring and controlling, making any Required Modifications during. • Testing, Commissioning, and Handing Over For electro mechanical systems. November 2015 - February 2016 Project Engineer and Designer at (Al - Hadaf Services Co.Ltd ( HASCO Location: Khartoum, Sudan Company Industry: Engineering Job Role: Engineering • Design calculation and Shop Drawing for Fire Fighting, Fire Alarm. • Supervision, monitoring and controlling, making any Required Modifications during. • Testing and commissioning Firefighting and Fire Alarm Systems. January 2015 - October 2015 Electro Mechanical Engineer at FREELANCE CONTRATOR Company Industry: Engineering Job Role: Engineering Electricity, Air Conditioning, Firefighting, Fire Alarm and plumbing Designing, installation & Maintenance. October 2013 - December 2014 Project Engineer and Mechanical Designer at .Fire Follow System Co. ltd 2/7
  • 3.
    Location: Khartoum, Sudan CompanyIndustry: Engineering Job Role: Engineering • Design calculation and Shop Drawing for Fire Fighting, Fire Alarm, CCTV and MATV. • Supervision, monitoring and controlling, making any Required Modifications during. • Maintenance Team Manager. July 2013 - October 2013 Maintenance Engineer and storekeeper at Elfarouk Workshop Location: Khartoum, Sudan Company Industry: Mechanical Job Role: Engineering Receiving Customers and checking cars to determine the faults. • Filling in the job card and then send the car to the technician for maintenance. Then follow the maintenance process with the technician and supply him with required spare parts from the store. • After finishing the maintenance I call the customer to receive the car and get from him/her maintenance fee. June 2012 - June 2013 Electro Mechanical Site Engineer. at Fire Follow System Co. ltd. Location: Khartoum, Sudan Company Industry: Engineering Job Role: Engineering • Supervision, monitoring and controlling and making any Required Modifications during in sites. • Maintenance Team Manager. December 2011 - June 2012 Emergency and Service Employee. at Sudanese Electricity Distribution Company Ltd Location: Khartoum, Sudan Company Industry: Government Sector Job Role: Engineering • Receive customers' communications regarding Power outages through a window or through program services subscribers on the computer. • Contact emergency technicians and follow up the process of problem and then identify it through the program. July 2008 - July 2008 Trainee at Sudan Railways Corporation Location: Sudan Company Industry: Transportation Job Role: Engineering As a Trainee In Railways Workshops. Extra years of experience not listed above: 1 Years, 0 Months 3/7
  • 4.
    Education Bachelor's degree ,Mechanical Engineering Department of (Power) at Sudan University of Science and Technology Location: Khartoum, Sudan September 2011 Grade: 2.69 GPA 2.69 equivalent of 67.25%, second-class division two a good appreciation Diploma , Mechanical Engineering Department Of (Auto Mobile) at Sudan University of Science and Technology Location: Khartoum, Sudan October 2008 Grade: 3.00 GPA 3.00 equivalent to 75%, an excellent first-class appreciation High school or equivalent , Charter scientific at Muglad Secondary School for Boys Location: Muglad Sudan May 2005 Grade: 70 out of 100 Specialties Plumbing Questions: 0 Answers: 0 HVAC Questions: 0 Answers: 0 fire alarm & fire fighting Questions: 0 Answers: 0 AUTODESK REVIT MEP Questions: 0 Answers: 0 AUTOCAD 2D & MEP Questions: 0 Answers: 0 Skills Computer Applications Level: Expert | Last Used: 1 month or less internet Level: Expert | Last Used: 1 month or less 4/7
  • 5.
    Printing Level: Expert |Last Used: 1 month or less autocad 2D Level: Expert | Last Used: 1 month or less PowerPoint Level: Expert | Last Used: 1 month or less Excel Level: Expert | Last Used: 1 month or less AutoCAD Level: Expert Revit Level: Intermediate Projects Management Level: Expert Languages English Level: Expert Arabic Level: Expert | Experience: More than 10 years References Dr. Mohyedin Ahmed Abdelghadir Job Title: assistant professor Company Name: Sudan University of Science & Technology Phone Number: +249.912299077 Email Address: abmoohy87@yahoo.com Farouk Mahmoud Job Title: General Manager Company Name: Elfarouk Spare Parts & Maintenance Phone Number: +249.912307241 Email Address: fradah@yahoo.com Mahamed Shareef Mahamed Abeden Job Title: Executive Director and Project Manager Company Name: Fire Follow System Co. Ltd. Phone Number: +249.910124442 Email Address: aborahaf1972@hotmail.com 5/7
  • 6.
    Memberships Saudi Council OfEngineers Membership/Role: Engineer Member since: April 2016 Federation of Sudanese Engineers Membership/Role: graduate engineer Member since: March 2012 Training and Certifications Primavera P6 (Training) Training Institute: Soft Star Training Center Date Attended: November 2015 (20 hours) Risk Assessment Course , Online Course (Training) Training Institute: Safety Academy Date Attended: January 2015 (5 hours) Plumbing Design System (Training) Training Institute: Gazeera for training and human resources development Date Attended: January 2015 (24 hours) OSHA Construction Health and Safety Course, Online Course (Training) Training Institute: Aldarayn Academy Date Attended: January 2015 (14 hours) OSHA for general Industries Course, Online Course. (Training) Training Institute: Safety Academy Date Attended: January 2015 (10 hours) central air conditioning system (Training) Training Institute: Gazeera for training and human resources development Date Attended: November 2014 (20 hours) 6/7
  • 7.
    Cooling Load andDuct Design (Training) Training Institute: Gazeera Training and Human Resource Development Date Attended: August 2014 (16 hours) AutoCAD 2D (Training) Training Institute: Gazeera Training and Human Resource Development Date Attended: May 2014 (14 hours) Advanced Training Course in Refrigeration and Air Conditioning (Training) Training Institute: Training Center Sudan University of Science and Technology Date Attended: February 2014 (60 hours) Diploma in Computer Application (Training) Training Institute: M.E.C For Computer Science Date Attended: August 2012 (70 hours) Hobbies and Interests Reading, soccer, volleyball and the Internet First-class score in Diploma in Mechanical Engineering from the Sudan University of Science and Technology in 2008 7/7