SlideShare a Scribd company logo
1 of 2
Raza Ahmed
A MechanicalEngineer
Email:engrraza_khan@yahoo.com
Contact No:0334-3428711,0341-2250450
D.O.B:November23,1989
CNIC:42201-4703424-9
__________________________________________PROFESSIONAL EXPERIENCE________________________________________
AdamjeeEngineering(Pvt.)Ltd
Workingas“AssistantManagerProduction”,June2014 – Present
Responsibilities/Projects:
 Plan the production in order to meet the targets
 Responsible fortimely delivery of the products arrived in Heat Treatment and Electroplating Section
 Deals withVendors to improve the Results of product
AdamjeeEngineering(Pvt.)Ltd
Workingas“Works Engineer”, June 2013 – June2014
Responsibilities/Projects:
 Involvedin maintenance and Running of furnace (Continuous and Salt Bath)
 Have Added Value in Annealing Process
 Have workedin a Team lead By Team of Engineers from Taiwan “HouTrong”
 Involvedin Development of High Tensile Bolts
 Improved Methods of Testing Hardness (Brinell and Rockwell)
 Have introduced Specimen making machine
 Cut downthe Cost of Heat Treatment upto 50%
 Increased Rate of production 5 times
 Have done enhancement in Galvanizing and Nickel Plating
 Improve Quality of Product
AREAS OF STRENGTHS AND SKILLS
 Through Hardening
 Management Skills
 ProjectCoordination
 Maintenance
 Carburizing
 Annealing
 Process Flow Diagram
 Bill of Quantity
 JIS and ASTM Standards
 AutoCAD 2007
 Pro-E Wildfire5.0
 Zinc, Nickeland Chrome Plating
 Process & Instrumentation Diagram
Why Raza?
 Performance-drivenMechanical Engineer in Heat Treatment and Electroplating,Maintenance, Cold
Forging, Thread Rolling, ProjectCoordination and Management
 A logical thinker and methodical professional having a great eye for the 'detail' and taking products
from conceptthrough production
 Abreast of noveltechnical concepts and markets with high level of basic quality, health safety and
environmental knowledge
 A creative analytical problem solver with excellent team building skills that combines patience,
determination and persistence to troubleshoot client issues and ensure 100% satisfaction
 An excellent communicator adept in PowerPointpresentation of reports and high level computer
proficiency in AutoCAD 2D/3D, Pro-E Wildfire 5.0, ANSYS and MS Office
CONTINENTAL ENGINEERING Ltd.
Workedas “Intern(MaintenanceDepartment)”,June2011 – July 2011
Responsibilities:
 Worked as an Internee in CONTINENTALENGINEERINGwheregot experience of Machining operations
like milling , grinding ,welding and drawing etc.
Orient EnergySystemsPakistan
Workedas “Intern(Services Department)”,December2011 – January 2012
Responsibilities:
 Worked in a Workshop where Diesel and Gas Engines were overhauled
___________________________________________________ACADEMICS____________________________________________________
NED UniversityofEngineeringandTechnology – Karachi,Pakistan,
(2009 – 2012)
BE (MechanicalEngineering)
NED UniversityofEngineeringandTechnology – Karachi,Pakistan,(2011)
Auto CAD 2-D, ProEngineer 5.0, Ansys
FINAL YEARPROJECTS
 Design of a Wave Energy Convertor ( point Absorber ) to produce electricity by using a linear
generator .Design includes the Calculations of buoyancy, calculations of forces on WEC ,
stresses induced on WEC and linear generator designing
 Have participated in NERC Robotic Competition-2011 Received3rd Prize.
ACTIVITIES
 Technical news and latest mechanical equipments and techniques
 Latest Trends and Advancement in Heat Treatment Area
 Social Networking – personal & professional, Social Media
ACHIEVEMENTS
 Have Successfully Commissioned the most advance “Continuous Mesh Belt Type Furnace” CAPEX
Project,whichcosts around 50 Million PKR rupees. Team Members mainly includes Engineers from
TAIWAN
 Have made Several improvements in Electroplating Department in terms of chrome Plating, Zinc Plating
and NickelPlating
 Have Improved and Introduced Hardness Testing Methods and replace old Conventional Methods by
latest Technology followedworldwide
 Have introduced new machinery for specimen making
 Have successfully improved the Annealing Methods that result in better product and low consumption
of Tooling Dies.
House no 68, Street 13, area 35/B, Korangi No 4, Karachi

More Related Content

What's hot (20)

Karthikeyan Resume
Karthikeyan ResumeKarthikeyan Resume
Karthikeyan Resume
 
Souren C.V.-1
Souren C.V.-1Souren C.V.-1
Souren C.V.-1
 
AGHIL-RESUME
AGHIL-RESUMEAGHIL-RESUME
AGHIL-RESUME
 
RAJAGOPAL
RAJAGOPALRAJAGOPAL
RAJAGOPAL
 
RAVI
RAVIRAVI
RAVI
 
RESUME SP
RESUME SPRESUME SP
RESUME SP
 
cv
cvcv
cv
 
RITESH cv
RITESH cvRITESH cv
RITESH cv
 
Resume_HVAC Engineer
Resume_HVAC EngineerResume_HVAC Engineer
Resume_HVAC Engineer
 
Utkarsh CV
Utkarsh  CVUtkarsh  CV
Utkarsh CV
 
karthi
karthikarthi
karthi
 
CV_HVAC_ENGINEER
CV_HVAC_ENGINEERCV_HVAC_ENGINEER
CV_HVAC_ENGINEER
 
Vasil-CV
Vasil-CVVasil-CV
Vasil-CV
 
resume
resumeresume
resume
 
Harsimar CV
Harsimar CVHarsimar CV
Harsimar CV
 
CV FLEMIN modcon 2017
CV FLEMIN modcon 2017CV FLEMIN modcon 2017
CV FLEMIN modcon 2017
 
cocube resume latest 2014
cocube resume latest 2014cocube resume latest 2014
cocube resume latest 2014
 
Resume
ResumeResume
Resume
 
Ritesh_s_CV.doc.PDF
Ritesh_s_CV.doc.PDFRitesh_s_CV.doc.PDF
Ritesh_s_CV.doc.PDF
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 

Similar to CV of Raza Ahmed

Curriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s ExperienceCurriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s ExperienceSUDHAN R
 
resume Designer instrumentation
resume Designer instrumentationresume Designer instrumentation
resume Designer instrumentationsandeep nirmal
 
Resume mradul 2020
Resume mradul 2020Resume mradul 2020
Resume mradul 2020Mradul Jha
 
Resume Aghilan 12+ exp
Resume Aghilan 12+ expResume Aghilan 12+ exp
Resume Aghilan 12+ expAghilan Gmail
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)Aravind Sadasivan
 
CV-Krushna Ch. Parida_Design engineer (Electrical)
CV-Krushna Ch. Parida_Design engineer (Electrical)CV-Krushna Ch. Parida_Design engineer (Electrical)
CV-Krushna Ch. Parida_Design engineer (Electrical)Krushna Parida
 
dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016Dhananjay Gijare
 
Aswath-Kumar Resume
Aswath-Kumar ResumeAswath-Kumar Resume
Aswath-Kumar ResumeAsh Kumar
 

Similar to CV of Raza Ahmed (20)

Sudheer_CV
Sudheer_CVSudheer_CV
Sudheer_CV
 
Adam's resume
Adam's resumeAdam's resume
Adam's resume
 
Curriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s ExperienceCurriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s Experience
 
georgy resume
georgy resumegeorgy resume
georgy resume
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
ELECTRICAL ENGINEER
ELECTRICAL ENGINEERELECTRICAL ENGINEER
ELECTRICAL ENGINEER
 
Elavarasu_CV
Elavarasu_CVElavarasu_CV
Elavarasu_CV
 
Ankit Ward CV 2021.pdf
Ankit Ward CV 2021.pdfAnkit Ward CV 2021.pdf
Ankit Ward CV 2021.pdf
 
Vivek resume
Vivek resumeVivek resume
Vivek resume
 
resume Designer instrumentation
resume Designer instrumentationresume Designer instrumentation
resume Designer instrumentation
 
Resume mradul 2020
Resume mradul 2020Resume mradul 2020
Resume mradul 2020
 
Resume Aghilan 12+ exp
Resume Aghilan 12+ expResume Aghilan 12+ exp
Resume Aghilan 12+ exp
 
BhavyaRaj CV
BhavyaRaj CVBhavyaRaj CV
BhavyaRaj CV
 
Tony resume
Tony resumeTony resume
Tony resume
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
CV-Krushna Ch. Parida_Design engineer (Electrical)
CV-Krushna Ch. Parida_Design engineer (Electrical)CV-Krushna Ch. Parida_Design engineer (Electrical)
CV-Krushna Ch. Parida_Design engineer (Electrical)
 
720815_Jignesh
720815_Jignesh720815_Jignesh
720815_Jignesh
 
dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016dhananjay_gijare_resume_08.10.2016
dhananjay_gijare_resume_08.10.2016
 
Aswath-Kumar Resume
Aswath-Kumar ResumeAswath-Kumar Resume
Aswath-Kumar Resume
 

CV of Raza Ahmed

  • 1. Raza Ahmed A MechanicalEngineer Email:engrraza_khan@yahoo.com Contact No:0334-3428711,0341-2250450 D.O.B:November23,1989 CNIC:42201-4703424-9 __________________________________________PROFESSIONAL EXPERIENCE________________________________________ AdamjeeEngineering(Pvt.)Ltd Workingas“AssistantManagerProduction”,June2014 – Present Responsibilities/Projects:  Plan the production in order to meet the targets  Responsible fortimely delivery of the products arrived in Heat Treatment and Electroplating Section  Deals withVendors to improve the Results of product AdamjeeEngineering(Pvt.)Ltd Workingas“Works Engineer”, June 2013 – June2014 Responsibilities/Projects:  Involvedin maintenance and Running of furnace (Continuous and Salt Bath)  Have Added Value in Annealing Process  Have workedin a Team lead By Team of Engineers from Taiwan “HouTrong”  Involvedin Development of High Tensile Bolts  Improved Methods of Testing Hardness (Brinell and Rockwell)  Have introduced Specimen making machine  Cut downthe Cost of Heat Treatment upto 50%  Increased Rate of production 5 times  Have done enhancement in Galvanizing and Nickel Plating  Improve Quality of Product AREAS OF STRENGTHS AND SKILLS  Through Hardening  Management Skills  ProjectCoordination  Maintenance  Carburizing  Annealing  Process Flow Diagram  Bill of Quantity  JIS and ASTM Standards  AutoCAD 2007  Pro-E Wildfire5.0  Zinc, Nickeland Chrome Plating  Process & Instrumentation Diagram Why Raza?  Performance-drivenMechanical Engineer in Heat Treatment and Electroplating,Maintenance, Cold Forging, Thread Rolling, ProjectCoordination and Management  A logical thinker and methodical professional having a great eye for the 'detail' and taking products from conceptthrough production  Abreast of noveltechnical concepts and markets with high level of basic quality, health safety and environmental knowledge  A creative analytical problem solver with excellent team building skills that combines patience, determination and persistence to troubleshoot client issues and ensure 100% satisfaction  An excellent communicator adept in PowerPointpresentation of reports and high level computer proficiency in AutoCAD 2D/3D, Pro-E Wildfire 5.0, ANSYS and MS Office
  • 2. CONTINENTAL ENGINEERING Ltd. Workedas “Intern(MaintenanceDepartment)”,June2011 – July 2011 Responsibilities:  Worked as an Internee in CONTINENTALENGINEERINGwheregot experience of Machining operations like milling , grinding ,welding and drawing etc. Orient EnergySystemsPakistan Workedas “Intern(Services Department)”,December2011 – January 2012 Responsibilities:  Worked in a Workshop where Diesel and Gas Engines were overhauled ___________________________________________________ACADEMICS____________________________________________________ NED UniversityofEngineeringandTechnology – Karachi,Pakistan, (2009 – 2012) BE (MechanicalEngineering) NED UniversityofEngineeringandTechnology – Karachi,Pakistan,(2011) Auto CAD 2-D, ProEngineer 5.0, Ansys FINAL YEARPROJECTS  Design of a Wave Energy Convertor ( point Absorber ) to produce electricity by using a linear generator .Design includes the Calculations of buoyancy, calculations of forces on WEC , stresses induced on WEC and linear generator designing  Have participated in NERC Robotic Competition-2011 Received3rd Prize. ACTIVITIES  Technical news and latest mechanical equipments and techniques  Latest Trends and Advancement in Heat Treatment Area  Social Networking – personal & professional, Social Media ACHIEVEMENTS  Have Successfully Commissioned the most advance “Continuous Mesh Belt Type Furnace” CAPEX Project,whichcosts around 50 Million PKR rupees. Team Members mainly includes Engineers from TAIWAN  Have made Several improvements in Electroplating Department in terms of chrome Plating, Zinc Plating and NickelPlating  Have Improved and Introduced Hardness Testing Methods and replace old Conventional Methods by latest Technology followedworldwide  Have introduced new machinery for specimen making  Have successfully improved the Annealing Methods that result in better product and low consumption of Tooling Dies. House no 68, Street 13, area 35/B, Korangi No 4, Karachi