Goosian Sallie has over 30 years of experience in piping, structural, and mechanical roles. He currently works as a Site Superintendent for SPXDB Thermal on the Sasol1 Workpack 3 project. Previously he has held positions as a Senior Piping Supervisor, Structural and Piping Supervisor, and Mechanical QC Inspector for numerous companies working on projects throughout South Africa and Mozambique. He resides in Klerksdorp, South Africa and has worked extensively with Sasol and other major energy and engineering firms.
An algorithm for solving integer linear programming problemseSAT Journals
Abstract Management of municipal solid waste (MSW) is a major concerned for Allahabad city as the city is growing with population and the increase is 20.74 percent for the last 10 years. In this regard, MSW samples were collected from twenty wards and three dumpsites to estimate composting, energy and gas generation potential for MSW Management. It was observed that the MSW is not suitable for composting because C/N ratio was found to be less than 30:1. Existing gas generation model is modified and found a bioreactor landfill with leachate recirculation would be the best method for the MSW management. Keywords: Municipal solid waste, Energy, Composting, Gas generation, Calorific Value, landfill
An algorithm for solving integer linear programming problemseSAT Journals
Abstract Management of municipal solid waste (MSW) is a major concerned for Allahabad city as the city is growing with population and the increase is 20.74 percent for the last 10 years. In this regard, MSW samples were collected from twenty wards and three dumpsites to estimate composting, energy and gas generation potential for MSW Management. It was observed that the MSW is not suitable for composting because C/N ratio was found to be less than 30:1. Existing gas generation model is modified and found a bioreactor landfill with leachate recirculation would be the best method for the MSW management. Keywords: Municipal solid waste, Energy, Composting, Gas generation, Calorific Value, landfill
1. CurriculumVitae
Of
Goosian Sallie
PERSONALINFORMATION:
SURNAME Sallie
NAME Goosian
ID NUMBER 6812255089080
DATE OF BIRTH 25 December 1968
GENDER Male
MARITALSTATUS Married
PASSPORTNUMBER 444332569
RELIGION Muslim
DEPENDENTS 3
LANGUAGE Afrikaans&English
HEALTH CONDITION Excellent
ADDRESS 3222 Jacob Street
Alabama Ext3
Klerksdorp
2577
CELL NUMBER 072 851 0891 or 076 375 5255
CAREER HISTORY:
YEAR 1987 – 1988
COMPANYNAME C/W Engineering
Botswana Vaccine
POSITION Boilermaker/PipeFitter
REFERENCE Chris (079 419 9732)
2. YEAR 1989 – 1990
COMPANYNAME Babcock
Sasol1
POSITION Big and Small Bore Pipefitter
REFERENCE Bruce (073 892 3774)
YEAR 1990 – 1991
COMPANYNAME ENGSA
Sasol1
Paraffin Plant
Sasolburg
POSITION Pipe Fabrication Supervisor
YEAR 1991 – 1992
COMPANYNAME E.C.S Mosselbay Ical
Mossgas
POSITION Pipe Fitter/Welding Foreman
YEAR 1992 – 1993
COMPANYNAME Babcock
Rustenburg
POSITION SeniorPiping Supervisor
REFERENCE Brain (074 816 1516)
YEAR 1994 shutdown
COMPANYNAME Edwardo Construction
Stein Muller
Sasol1 & 2 Secunda
POSITION SeniorPiping Supervisor
REFERENCE Jeff (073 305 4239)
YEAR 1995 – 1996 April to January
COMPANYNAME Hydra Arc
Sasol2 & 3
POSITION SeniorPiping Supervisor
REFERENCE Chris (079 419 9732)
YEAR 1996 – 1997 January to January
COMPANYNAME Griniker LTA
AAA
Sasolburg
POSITION SeniorPiping Supervisor
REFERENCE Johan (076 741 8429)
3. YEAR 1997 – 1997 January to June
COMPANYNAME Stein Muller
Sasol2 & 3
Sasreactors
POSITION SeniorPiping Supervisor
REFERENCE Ismail (083 461 6912)
YEAR 1997 – 1998 July to November
COMPANYNAME SPXDB Thermal
Natref
Sasolburg
POSITION SeniorPiping Supervisor
REFERENCE Ismail (083 461 6912)
YEAR 1998 – 1999 Decemberto September
COMPANYNAME DEC Construction
Lonmin Project
Marikana
Rustenburg
POSITION Structural$ MechanicalSupervisor
REFERENCE Jeff (073 305 4239)
YEAR 1999 – 2004 Novemberto September
COMPANYNAME Hydra Arc
Sasol1 & 2
POSITION Structural& Piping Supervisor
REFERENCE Chris (079 419 9732)
YEAR 2004 – 2005 Novemberto September
COMPANYNAME Griniker LTA
Poly Propelien Extention
POSITION QC Inspector
REFERENCE Jeff (073 305 4239)
YEAR 2005 – 2006 February to November
COMPANYNAME Goss & Balfe
Uranium1
Klerksdorp
POSITION Piping $Mechanical QCInspector
REFERENCE Krishen (082 552 3092)
YEAR 2006 – 2007 Decemberto October
COMPANYNAME Goss & Balfe
Sapref
Durban
POSITION Structural& Piping QCInspector
4. YEAR 2007 – 2009
COMPANYNAME Union Carriage
Nigel
POSITION LocomotiveFabrication & JigsQC Inspector
REFERENCE Shogren Mestry (082 924 0875)
YEAR 2009 – 2011
COMPANYNAME Griniker LTA
SasolGas PlantTemane
Mosambique
POSITION Structural,Piping and MechanicalQC Inspector
REFERENCE Malcolm(082 927 5838)
YEAR 2011 – 2012
COMPANYNAME Griniker LTA
SasolSecunda Can Project
POSITION Piping $Mechanical Qc Inspector
REFERENCE Colin (083 951 4307)
YEAR 2012 – 2013
COMPANYNAME SPXDB Thermal
Sasol1 Wax Project
POSITION MechanicalQC Supervisor
REFERENCE Ismail (083 461 6912)
YEAR 2013 - 2014
COMPANYNAME StefanuttiStocksOil & Gas
WRG
POSITION MechanicalQC Inspector
REFERENCE Anderson (084 737 6509)
COMPANYNAME
YEAR 2014-current
COMPANYNAME SPXDB Thermal
Sasol1 Workpack 3
POSITION Site Superintendent
REFERENCE Riki Armstrong(071-6820796)