This document discusses contractor management for a learning course. It covers 5 sections: tender process, licenses and qualifications, permits to work, and workers compensation issues. Key points include developing clear tender documents, evaluating safety considerations in tenders, ensuring contractors have proper licenses and permits, and requiring regular consultation between principal contractors and subcontractors on safety matters.
It is Time to Switch Your Outsourcing Vendor jerianasmith
Are you thinking to switch your outsourcing vendor? Before you switch your outsourcing vendor, you should consider the risks and rewards of switching outsourcing vendors. While considering the risks you should properly plan a vendor switch, right from the transition phase to the execution. Here, we are making you aware of the risks involved in switching the outsourcing vendor, along with how to choose an outsourcing vendor and plan a successful vendor switch. Visit http://www.ishir.com to learn more.
Security methods are always changing, and Deft Security Consultants are always researching the latest innovative trends. Read a primer on designing a comprehensive program.
ISHIR White Paper - It is Time to Switch Your Offshore Outsourcing VendorISHIR
As more and more companies are sharing dissatisfaction with their existing software development outsourcing arrangements, companies are evaluating risks and rewards of switching outsourcing vendors. When switching outsourcing providers significant risks can be avoided or minimized if best practices are followed.
It is Time to Switch Your Outsourcing Vendor jerianasmith
Are you thinking to switch your outsourcing vendor? Before you switch your outsourcing vendor, you should consider the risks and rewards of switching outsourcing vendors. While considering the risks you should properly plan a vendor switch, right from the transition phase to the execution. Here, we are making you aware of the risks involved in switching the outsourcing vendor, along with how to choose an outsourcing vendor and plan a successful vendor switch. Visit http://www.ishir.com to learn more.
Security methods are always changing, and Deft Security Consultants are always researching the latest innovative trends. Read a primer on designing a comprehensive program.
ISHIR White Paper - It is Time to Switch Your Offshore Outsourcing VendorISHIR
As more and more companies are sharing dissatisfaction with their existing software development outsourcing arrangements, companies are evaluating risks and rewards of switching outsourcing vendors. When switching outsourcing providers significant risks can be avoided or minimized if best practices are followed.
White Paper : It Is Time To Switch Outsourcing VendorISHIR
It Is Time To Switch Outsourcing Vendor. - As more and more companies are sharing dissatisfaction with their existing software development outsourcing arrangements, companies are evaluating risks and rewards of switching outsourcing vendors. In this white paper, you will discover: Risks in switching an outsourcing provider How to choose a new outsourcing vendor Planning the vendor switch
Faculty of Business and LawAssignment BriefModule Title.docxRAJU852744
Faculty of Business and Law
Assignment Brief
Module Title:
Contemporary Issues in HR Service Deliver
Assignment Number
1
Module Code:
202HRM
Assignment Title
Allocation of HR Service Delivery in SME case study
Assignment Weighting
50%
Release Date:
23/01/17
Module Leader
Konstantinos Kakavelakis
Submission Date/Time:
16/03/17 :
23:55:00
Submission
Time and Place:
Submission through Turnitin ONLY
Assessment Information
This assignment is designed to assess learning outcomes:
1.
Understand the reasons behind organisations changing the structure and location of HR service provision.
2.
Understand the different HR service delivery models available to contemporary organisations.
3.
Understand the challenges involved in maintaining and managing HR services and how standards are established and monitored.
This assignment is an individual assignment.
This assignment requires you to:
Company Case Study: Softwire
Who We Are
Softwire is a UK-based software development company with offices in London and Bristol.
Our highly talented and dedicated staff deliver work of exceptional quality, and can help you no matter what stage you are at in developing your software. We are totally committed to customer satisfaction, and this drives everything we do.
Customer Satisfaction
Softwire is a complete software partner for our clients, from initial consultancy and design phases right through to deployment and ongoing support. We can provide a one-stop shop for your project through our partnerships with trusted third parties such as web designers and ISPs. Our proactive and capable project managers run project smoothly and efficiently, leaving you with an exceptional software solution for a highly competitive price.
We have experience of a vast range of markets and technologies and are continually broadening our horizons yet further. Our can-do attitude and deep technical experience allow us to deliver the most challenging projects with a minimum of fuss.
Website -
http://www.softwire.com/
Scenario
In building up the company, the founders of Softwire have always valued the contribution of its employees to its success.
Currently, all HR services are performed by the foundering members.
They have decided recently that it is now time to invest in a small team of employees to enable the company to extent its existing HRM services.
The founders wish to retain some HRM services internally but also to consider outsourcing other HRM services.
One of the founders, has agreed to produce a report outlining the company’s plans on this issue.
Task
Imagine then that you are the member of the team with the task of producing this report.
The report will illustrate:
·
a brief outline and justification of your view of HR service delivery (i.e. generalist/specialist. centralised/decentralised).
·
identification and justification of what HR services would be retained and what HR services would be outsourced.
Your discussion should d ...
The Ultimate Guide to The Digital Procurement ManagementDanitKellmer1
The ultimate guide to the digital procurement process – Learn how to use technology to
manage your construction procurement, find some great software features, and tips on
what to pay attention to when buying your software.
More info: https://tinyurl.com/mwafxuhz
Safety Audit may be a Risk Management tool for any organization and it's being an improvement too wherever is it's mandatory for hazardous Industries (as per IS 14489). The auditors expertise and data is significant to have a spotlight towards lack of management, however not solely viewing the issue's relevance to non- compliance.
Do you ever feel confused, worried or overwhelmed about where to begin when looking at improving your compliance program? Do you wish that you had a resource to help you organize and create better processes to address your most pressing needs? If so, you need this guide. Compliance issues can surface any minute and change the company’s course in a matter of seconds, don’t wait to get started.
Mitigate Hidden Business Risk: Improving Safety by Pre-screening and Qualifyi...browzcompliance
When considering the biggest drivers of organizational safety and compliance, it’s not often that contractors enter the discussion. As a result, organizations may be overlooking an area of significant risk and opportunity.
Pat Cunningham, Director of Safety & Auditing Services at BROWZ, addresses the following questions:
-Why are businesses relying on contractors more than ever before?
-What does OSHA expect when it comes to contractors?
-What types of data should you be collecting about your contractors?
-What are elements of a good screening program?
-Who else from your organization needs to be involved?
-What are the different ways you can approach prequalification?
Watch a video recording of the webinar here: https://vimeo.com/74964788
If you’re looking for a comprehensive step-by-step process to guide you to an effective and less time-consuming vendor onboarding, you’re in the right place. Process Street has long been managing vendor onboarding processes and developing ways to make them effortless and less stressful. That’s why we know all the challenges firsthand and want to share our knowledge, solutions, best practices, and tips to help you execute efficient vendor onboarding the very first time. And thanks to our free vendor onboarding workflow template below, you’ll soon be on your way to designing the best onboarding experience for your vendors.
LSCTIG 2015 Session Materials - Shop Smart: How a Formal Procurement Process ...Legal Services Corporation
LSCTIG 2015 Session Materials - Shop Smart: How a Formal Procurement Process can Safeguard Your Investment
Buying a major system, such as phones or CMS, or hiring a consultant to help deploy technology can be a hit or miss experience. We all want to avoid the fiascos. In this session, we’ll discuss the best ways to identify and evaluate vendors and discuss some key strategies for ensuring that major system implementations return the results that you’re looking for. Topics will include Requests for Information and Proposals; what to look for in a demo or interview; negotiating contracts and engaging your co-workers in the project.
Outsourcing and Procurement: The Hot Points and PitfallsJon Hansen
eWorld Purchasing & Supply Conference
Day 1 - September 28th, 2010
10:20 to 10:50 AM Outsourcing and Procurement: The Hot Points and Pitfalls
Overview:
On paper, outsourcing holds significant potential for delivering much-needed efficiency gains and cost savings. But it can also present a legal minefield for procurement departments and getting the contract right from the outset is one of the most significant factors for realising these benefits. This information-packed briefing explains the key considerations for a successful outsourcing contract, including: defining project scope, employment issues & TUPE, intellectual property rights, agreeing service levels, benchmarking, reporting & audit rights, liability, data protection, confidentiality & Freedom of Information, dispute resolution, duration, termination and exit management.
Speaker:
Debbie Venn, Associate at asb law LLP
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
More Related Content
Similar to Contractor management section 3 unit 4&5
White Paper : It Is Time To Switch Outsourcing VendorISHIR
It Is Time To Switch Outsourcing Vendor. - As more and more companies are sharing dissatisfaction with their existing software development outsourcing arrangements, companies are evaluating risks and rewards of switching outsourcing vendors. In this white paper, you will discover: Risks in switching an outsourcing provider How to choose a new outsourcing vendor Planning the vendor switch
Faculty of Business and LawAssignment BriefModule Title.docxRAJU852744
Faculty of Business and Law
Assignment Brief
Module Title:
Contemporary Issues in HR Service Deliver
Assignment Number
1
Module Code:
202HRM
Assignment Title
Allocation of HR Service Delivery in SME case study
Assignment Weighting
50%
Release Date:
23/01/17
Module Leader
Konstantinos Kakavelakis
Submission Date/Time:
16/03/17 :
23:55:00
Submission
Time and Place:
Submission through Turnitin ONLY
Assessment Information
This assignment is designed to assess learning outcomes:
1.
Understand the reasons behind organisations changing the structure and location of HR service provision.
2.
Understand the different HR service delivery models available to contemporary organisations.
3.
Understand the challenges involved in maintaining and managing HR services and how standards are established and monitored.
This assignment is an individual assignment.
This assignment requires you to:
Company Case Study: Softwire
Who We Are
Softwire is a UK-based software development company with offices in London and Bristol.
Our highly talented and dedicated staff deliver work of exceptional quality, and can help you no matter what stage you are at in developing your software. We are totally committed to customer satisfaction, and this drives everything we do.
Customer Satisfaction
Softwire is a complete software partner for our clients, from initial consultancy and design phases right through to deployment and ongoing support. We can provide a one-stop shop for your project through our partnerships with trusted third parties such as web designers and ISPs. Our proactive and capable project managers run project smoothly and efficiently, leaving you with an exceptional software solution for a highly competitive price.
We have experience of a vast range of markets and technologies and are continually broadening our horizons yet further. Our can-do attitude and deep technical experience allow us to deliver the most challenging projects with a minimum of fuss.
Website -
http://www.softwire.com/
Scenario
In building up the company, the founders of Softwire have always valued the contribution of its employees to its success.
Currently, all HR services are performed by the foundering members.
They have decided recently that it is now time to invest in a small team of employees to enable the company to extent its existing HRM services.
The founders wish to retain some HRM services internally but also to consider outsourcing other HRM services.
One of the founders, has agreed to produce a report outlining the company’s plans on this issue.
Task
Imagine then that you are the member of the team with the task of producing this report.
The report will illustrate:
·
a brief outline and justification of your view of HR service delivery (i.e. generalist/specialist. centralised/decentralised).
·
identification and justification of what HR services would be retained and what HR services would be outsourced.
Your discussion should d ...
The Ultimate Guide to The Digital Procurement ManagementDanitKellmer1
The ultimate guide to the digital procurement process – Learn how to use technology to
manage your construction procurement, find some great software features, and tips on
what to pay attention to when buying your software.
More info: https://tinyurl.com/mwafxuhz
Safety Audit may be a Risk Management tool for any organization and it's being an improvement too wherever is it's mandatory for hazardous Industries (as per IS 14489). The auditors expertise and data is significant to have a spotlight towards lack of management, however not solely viewing the issue's relevance to non- compliance.
Do you ever feel confused, worried or overwhelmed about where to begin when looking at improving your compliance program? Do you wish that you had a resource to help you organize and create better processes to address your most pressing needs? If so, you need this guide. Compliance issues can surface any minute and change the company’s course in a matter of seconds, don’t wait to get started.
Mitigate Hidden Business Risk: Improving Safety by Pre-screening and Qualifyi...browzcompliance
When considering the biggest drivers of organizational safety and compliance, it’s not often that contractors enter the discussion. As a result, organizations may be overlooking an area of significant risk and opportunity.
Pat Cunningham, Director of Safety & Auditing Services at BROWZ, addresses the following questions:
-Why are businesses relying on contractors more than ever before?
-What does OSHA expect when it comes to contractors?
-What types of data should you be collecting about your contractors?
-What are elements of a good screening program?
-Who else from your organization needs to be involved?
-What are the different ways you can approach prequalification?
Watch a video recording of the webinar here: https://vimeo.com/74964788
If you’re looking for a comprehensive step-by-step process to guide you to an effective and less time-consuming vendor onboarding, you’re in the right place. Process Street has long been managing vendor onboarding processes and developing ways to make them effortless and less stressful. That’s why we know all the challenges firsthand and want to share our knowledge, solutions, best practices, and tips to help you execute efficient vendor onboarding the very first time. And thanks to our free vendor onboarding workflow template below, you’ll soon be on your way to designing the best onboarding experience for your vendors.
LSCTIG 2015 Session Materials - Shop Smart: How a Formal Procurement Process ...Legal Services Corporation
LSCTIG 2015 Session Materials - Shop Smart: How a Formal Procurement Process can Safeguard Your Investment
Buying a major system, such as phones or CMS, or hiring a consultant to help deploy technology can be a hit or miss experience. We all want to avoid the fiascos. In this session, we’ll discuss the best ways to identify and evaluate vendors and discuss some key strategies for ensuring that major system implementations return the results that you’re looking for. Topics will include Requests for Information and Proposals; what to look for in a demo or interview; negotiating contracts and engaging your co-workers in the project.
Outsourcing and Procurement: The Hot Points and PitfallsJon Hansen
eWorld Purchasing & Supply Conference
Day 1 - September 28th, 2010
10:20 to 10:50 AM Outsourcing and Procurement: The Hot Points and Pitfalls
Overview:
On paper, outsourcing holds significant potential for delivering much-needed efficiency gains and cost savings. But it can also present a legal minefield for procurement departments and getting the contract right from the outset is one of the most significant factors for realising these benefits. This information-packed briefing explains the key considerations for a successful outsourcing contract, including: defining project scope, employment issues & TUPE, intellectual property rights, agreeing service levels, benchmarking, reporting & audit rights, liability, data protection, confidentiality & Freedom of Information, dispute resolution, duration, termination and exit management.
Speaker:
Debbie Venn, Associate at asb law LLP
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Cracking the Workplace Discipline Code Main.pptxWorkforce Group
Cultivating and maintaining discipline within teams is a critical differentiator for successful organisations.
Forward-thinking leaders and business managers understand the impact that discipline has on organisational success. A disciplined workforce operates with clarity, focus, and a shared understanding of expectations, ultimately driving better results, optimising productivity, and facilitating seamless collaboration.
Although discipline is not a one-size-fits-all approach, it can help create a work environment that encourages personal growth and accountability rather than solely relying on punitive measures.
In this deck, you will learn the significance of workplace discipline for organisational success. You’ll also learn
• Four (4) workplace discipline methods you should consider
• The best and most practical approach to implementing workplace discipline.
• Three (3) key tips to maintain a disciplined workplace.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Implicitly or explicitly all competing businesses employ a strategy to select a mix
of marketing resources. Formulating such competitive strategies fundamentally
involves recognizing relationships between elements of the marketing mix (e.g.,
price and product quality), as well as assessing competitive and market conditions
(i.e., industry structure in the language of economics).
[Note: This is a partial preview. To download this presentation, visit:
https://www.oeconsulting.com.sg/training-presentations]
Sustainability has become an increasingly critical topic as the world recognizes the need to protect our planet and its resources for future generations. Sustainability means meeting our current needs without compromising the ability of future generations to meet theirs. It involves long-term planning and consideration of the consequences of our actions. The goal is to create strategies that ensure the long-term viability of People, Planet, and Profit.
Leading companies such as Nike, Toyota, and Siemens are prioritizing sustainable innovation in their business models, setting an example for others to follow. In this Sustainability training presentation, you will learn key concepts, principles, and practices of sustainability applicable across industries. This training aims to create awareness and educate employees, senior executives, consultants, and other key stakeholders, including investors, policymakers, and supply chain partners, on the importance and implementation of sustainability.
LEARNING OBJECTIVES
1. Develop a comprehensive understanding of the fundamental principles and concepts that form the foundation of sustainability within corporate environments.
2. Explore the sustainability implementation model, focusing on effective measures and reporting strategies to track and communicate sustainability efforts.
3. Identify and define best practices and critical success factors essential for achieving sustainability goals within organizations.
CONTENTS
1. Introduction and Key Concepts of Sustainability
2. Principles and Practices of Sustainability
3. Measures and Reporting in Sustainability
4. Sustainability Implementation & Best Practices
To download the complete presentation, visit: https://www.oeconsulting.com.sg/training-presentations
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
2. Welcome to this HR Learning Course on
Contractor Management
The course has 5 sections.
Each Section has slides.
Some have resources and videos. Make sure that you use all the
resources.
There is an Assessment Workbook for you to complete. This will help you
to understand the most important information. It will also help you
engage with hypotheticals to UP your skills and knowledge.
If you see a key symbol It indicates this is important for your assessment.
If you see a book symbol it indicates there is a resource that is
downloadable accompanying these slides.
Upload your assessment when complete, and It will be assessed by one
of our HR Learning experts. You will also be awarded a certificate of
completion.
3. INSTRUCTIONS FOR
LEARNERS
• Make sure to download the Assessment
Workbook after looking at the two units in this
Section.
• Have a look at the resources.
• Ask yourself- Can I remember what this material is
about? What are the main learning points? Do I
understand the material? How would I teach
someone else this material?
• If you get really stuck. Send your question to
michael@hrlearning.com.au.
• (You must be enrolled in the HR Learning Course
at hrlearning.com.au to get academic support)
4. The Tender Process
• By the end of this section you will be able
to:
• Contribute to developing the tender
document
• Argue for WHS benchmarking during
tender evaluation
• Select contractors for small projects
that have no tender
• Participate in the tender evaluation
process
5. Reasonably
Practicable
• Where the PCBU relies on a specialist or technical
expertise, the PCBU is required to:
verify the expert has the necessary
expertise for the work
verify the expert has their own systems
in place for carrying out work safely
verify the expert is carrying out that
work safely as per their own stated
procedures (and not putting others at
risk)
continue to consult co-ordinate and co-
operate with the expert
provide appropriate instruction to the
contractor.
6. Developing the
tender document
• Should you be required by your company to provide
advice for the tender document keep the following in
mind:
1. If it’s not in the tender document then the
successful contractor will not be bound by it.
Don’t make the mistake of thinking that an
item is implied. If it’s not in the tender the
service or item will not be provided.
2. Clarity of language is crucial. So, for
example, rather than talking about a ‘safety
system’ talk about a safety system that has
current WHS policy, consultation policy, safe
work procedures, notification methods, take
5’s. I think you understand. You have to spell
everything out to the exact degree.
3. Ensure that the tenderer’s answers are
evidence based. E.g. if they say they have a
WHSMS, make sure that you see it.
7. Imagine that
you are the
tenderer
1. You want to win the job. It will bring
employment and food on the table.
2. You have to provide the most
competitive quote because you
know that cost will be a significant
evaluation component.
3. How can you keep your costs as low
as possible but still make the
exercise profitable. You can use
cheap materials; use cheap labour;
under quote and then add variances
during works; reduce profit margins;
take on other projects and split time
between to or more projects.
8. Can you see
the possible
safety issues?
• Obviously if the tenderer uses cheap materials this can
quickly become a safety problem. Poor quality
components can increase the risk factors dramatically
by not providing the risk control parameters that have
been calculated. Think about electrical wiring-fire;
weight bearing components-collapse; scaffolding-
collapse (happened recently in Sydney where the
contractor economised on securing bolts on a high rise
scaffold). Cheap labour means people on your site who
may not have the skills and knowledge to do the job
properly.
• Can you see why the language that we use in a tender
has to be airtight? We cannot leave wriggle room for
tenderers to underquote and provide poor materials
and work.
9. WHS Considerations
When will Section 46 Consultation
occur? Who will carry out that
consultation? What time period?
Once? Weekly? Monthly? How will
the consultation be documented?
How will the successful tenderer
inform on notifiables? [S35-39
WHS Act]
Sign on/sign off process
Audits/Inspections by PCBU of
Contractor
Tenderer and PCBU to provide
dedicated “go-to” staff without
notice
Communication formats
10. Consultation
• If you write the requirement for regular
consultation into the tender document,
this makes it a formality which can’t be
waived off during the process.
• Ongoing consultation is important to
ensure that each duty holder is meeting
their obligation, that risks are not arising
and that all processes are being met by
all parties.
11. Notifiables
• It would be hard to accept a Contractor not informing about a death on your site but it’s very
common that some contractors won’t inform on injuries, electrocutions and dangerous
occurrences.
• A worker gets a minor electric shock. He reports it to security, who suggest that he goes home. This
really happened. What are some of the repercussions in that scenario? Are you thinking worker
has a heart attack driving home? Kills some bystanders. Your organisation sued and prosecuted?
No? A WHS expert has to think of worst case scenarios.
• We put the requirement to notify ALL incidents as a part of the tender process. The tender is not a
contract document-however, it does give the tenderer an opportunity to explain how they will
meet our safety requirements.
12. Sign on and Sign off
• You might think that it’s premature to talk about
signing onto site and signing off. However, right from
the get go you are making it clear to the tenderer
that a successful tender does not give them free rein
at your site. Signing on and off is far more than the
contractors signing a book.
• Contractors need to be controlled on your site. They
need to have permission to be at various places. They
also need to wear clear identification that they are an
approved contractor. If your company can afford it
give them a programmable swipe card that only
allows them entry into pre-programmed spaces, that
tracks them and gives the PCBU control over their
movements. No card, no entry. Depending on the
size of your company this kind of system has many
benefits.
13. Audits
• Have a short paragraph in the WHS section of the Tender on
audits. Although you would expect the winning tenderer to
have exemplary WHS your PCBU has the right to ensure that
work is being carried out safely and as agreed.
• Audits provide an evidence based affirmation of the safety
agreements and assurances made by each party.
• The audit will allow you access to relevant safety paperwork
of the contractor. From there you can determine if safety is
being carried out methodically and to the agreed upon
standards.
14. Dedicated “go to” staff
• As the safety representative of the PCBU
it’s important to have a direct channel to a
dedicated person on the contractor’s
team. This means that a relationship can
be formed that allows for clear channels of
communication and rapid response to
safety issues when needed.
• By formalising this relationship the
contractor cannot make excuses for failure
to notify and for not communicating
issues.
15. Communication formats
• When you communicate on safety with
the Contractor will it be written
communication.
• It is suggested that all safety
communication is recorded in written
form. Make this clear to the contractor
in the tender document.
• How do you deal with phone calls?
Make a log of the discussion including
the time, date and content of
discussion. Assume that every
communication that you make about
WHS will need to be represented in
front of a court.
16. Area of
expertise
• The tender document is a place where we will ask the
tenderer to describe their safety systems especially with
regard to their area of expertise. We want to be assured
that we have met our ‘due diligence’ obligations. We
want to ensure that the tenderer will not bring our PCBU
into vulnerability of litigation or endanger our staff.
• Many contractor managers lay down the law on how
they feel the contractor should carry out WHS. They
insist on SWMS’s and other bureaucratic documentation.
The danger is that documentation becomes an entry
permit rather than a real safe work method.
• The contractor should have their own safety system.
They should implement that. Our job is to ensure that
they are meeting their S46 duties and not bringing our
PCBU into breach at any time. It’s a fine line.
17. Competence
• The competence of the contractor and their team should
include knowledge and skills needed to appropriately
identify hazards and deal with WHS risks associated with
the project.
• The tenderer should satisfy you that the team has:
• Education, training, qualifications and experience
necessary to undertake works
• Duties and responsibilities associated with their role
that are appropriate to their experience
• Individual capabilities, including experience, language
& literacy skills
• Correct licenses, insurances and authorities.
18. The finalised tender
You will have written your component part of the
tender and given it to the Project Manager or to the
Company solicitor to look over.
This is an important necessity to ensure that there are
no loopholes. However, remember that you are the
safety expert.
Read through your part of the tender document
thoroughly.
What is your outcome for the tender document? Has
the way that you have written it gotten you your
outcome.
19. Where there is no
tender
• When the required task is small there may not be a
tender document. In this case it can be very
difficult to control small business contractors who
may be coming onto site every now and then to
carry out repairs or installations.
• One form of control is the induction process. No
contractor should ever be allowed on site without
completing an induction. We will talk about this in
more detail in section 6 of this course.
• Also all contractors must sign in and out. Make it
clear that they will be penalised if they don’t sign
in and sign out. E.g. immediate termination of
contract.
• A lot of the safety issues that we have discussed in
this unit can be included in a Contractor Contract.
20. Preferred Contractors
If your organisation is large, having dozens of different contractors doing the
same kind of work can lead to very inconsistent outcomes. Contractors often
have preferred brands of equipment, plant and infrastructure. At one
organisation this meant that the fire alarm systems for different buildings were
all different makes and models. It meant that they couldn’t talk to each other.
Eventually that organisation chose three preferred contractors and specified
which make and model of fire equipment had to be used. It cost a lot of money
to get a modern fire alarm system that could communicate back to a central
point but because of that we were able to prevent hundreds of thousands of
dollars of false alarms each year.
Preferred contractors is one way of managing who does
work at your sites. Issues to watch out for are conflict of
interests; cronyism or other types of corruption. Make
the appointment of a preferred contractor based on
criteria and have at least yearly evaluation of
performance against those criteria.
21. Arguing the safety
message
• Who usually arranges the hiring of contractors at
your organisation?
• You will need to convince that person or that team
that safety should be a key factor in which
contractor to choose.
• Don’t be surprised if that hiring team is
passionately attached to hiring the cheapest
contractor every time. They are just doing their job
the best way that they know.
• Your job is to convince them that cheapest can
often be false economics when the work is shoddy,
poor quality and will fail when it’s put to the test.
22. Evaluating the tender
• Generally tenders will be evaluated
using a points system. Cost will be 40%
Quality will be 25% Past performance
10% Environmental 15% . Add them up.
It leaves 10% for WHS considerations.
Ideally WHS should get a 30% loading.
• The more evolved our company’s
safety systems, the more percentage
points will be given over to safety.
• If you are fortunate enough to be on
the evaluation committee find a pivotal
decision maker and try to get the WHS
percentage up. Good luck.
23. Evaluating the tender
• If you haven’t evaluated tenders before,
you may be shocked by some of the poor
quality tenders that are received.
• For the safety component consider detail.
How have they addressed your
specifications for safety from the tender
document. What is their past history.
Prosecutions? You can look up the
contractor on Google and also on the
Australian Legal Database (AUSTLII).
• Take your time and involve the other panel
members in your consideration so that
they understand why you are making the
evaluation that you are.
24. Evaluating the tender
• The tender process deserves consideration and deliberation. The
wrong contractor can destroy a project.
• When you see a tender that you suspect will act against the interest
of the PCBU and bring the company into breach of the legislation
exercise your veto. Of course, you probably don’t have a veto but
careful use of this imagined veto can be very effective in
deliberations.
• Being involved in tenders can be extremely interesting and
challenging for the WHS professional. Do your research and enjoy the
process.
26. Licenses
• Consider the nature of project being undertaken.
• It is not up to you to do the Contractors safety for them. They
are a PCBU and have responsibilities under the Act.
• So when it comes to jobs that involve working with asbestos,
excavation work, demolition work, high risk construction, crane
operation, forklift use and so on, this is squarely the
responsibility of the Contractor PCBU.
• However, there are a few things to take into account.
• Your tender’s safety section should itemise activities that
are part of the project that require licensing. Make the
tenderer/contractor sign off that their workforce has the
necessary up-to-date licenses.
• Make your organisation checking currency of licences a part
of your agreed audit process.
• Section 46 Consultation must take place around the
planning for these activities. Insist that it does before work
commences.
27. Reasonably
Practicable
• Where the PCBU relies on a specialist or technical
expertise, the PCBU is required to:
verify the expert has the necessary
expertise for the work
verify the expert has their own systems
in place for carrying out work safely
verify the expert is carrying out that
work safely as per their own stated
procedures (and not putting others at
risk)
continue to consult co-ordinate and co-
operate with the expert
provide appropriate instruction to the
contractor.
28. Confined Spaces
• The law around confined spaces has changed over the
last few years.
• If your project requires workers to enter into confined
spaces on your site, whose duty of care is it?
• For areas that are part of your organisations premises,
the Primary duty rests with your organisations PCBU
and the Officers.
• It is essential that Contractors follow your
organisation’s Confined Space procedures. Entry to the
confined space will be granted by a qualified member
of your staff. Required paperwork will be filled in for
your organisation as a part of your WHSMS. This will
include formal notification that all workers are out of
the confined space and the space is locked.
29. Confined spaces continued
• When there is more than one PCBU…”, each duty holder should exchange
information to find out who is doing what and work together in a cooperative and
coordinated way so risks are eliminated or minimised so far as is reasonably
practicable. For example, a person who owns the plant or structure that contains
the confined space will have management or control of the confined space. A
contractor engaged to carry out work in the same space will also have
management or control of the confined space at the time that work is being
carried out. In these situations, effective communication, cooperation and
coordination of activities between duty holders is essential to ensure that risks
associated with the confined space are eliminated or minimised as far as is
reasonably practicable.” From Code of Practice for Confined Spaces NSW
30. Section 46 Consultation
• The law requires joint duty holders to hold meaningful
consultation on all safety matters. This is a clear obligation
and key to managing contractors. Sometimes contractors will
attempt to laugh this off, or ignore this obligation entirely and
just carry on with work. This is not acceptable.
• Who should be at S46 consultation meetings? Your
organisation project manager or their second, the contractor
or their principal, key sub-contractors, contractors works
specialists, you as the organisation’s safety adviser/manager.
• The meetings should be formal. As they are safety meetings,
you should chair that meeting.
31. Consultation
• As Chair you should prepare an agenda. All
participants/stakeholders should get that agenda with
enough time to 1. Research 2. Add items
• Formal minutes should be taken but NOT by the Chair. Your
organisation may need to allocate a resource to do this.
• Discussions and decisions should be minuted.
• You should attend regular Project meetings as well as these
safety consultation meetings. Arrange with the Project
Manager to have a standing Safety Agenda item where you
report on your consultation.
32. Chemicals
• The same as with confined spaces, any chemicals which your
organisation has stored are your PCBU’s duty of care.
• Section 46 Consultation required before contractors gain
access to those chemicals.
• One real episode involved a construction contractor who
needed to have chemical expertise because they were going
to be putting a vent into a chemical store that contained
chemicals that could kill on accidental inhalation. Chemical
expertise was essential. Contractors turned up to site,
supposed “chemical experts” and had no idea what a deluge
shower was for. Suffice to say work did not continue and that
contractor was replaced. Why? The risk of one of those guys
getting killed was too much for the PCBU.
• Remember, what is your company’s risk appetite?
33. Lock out, tag out
• Your PCBU should have lock out, tag out procedures
established for your site. It’s important to understand, not
only the risk parameters, but also the knock on effect of the
close downs.
• These procedures must be followed by your Contractors.
• At your regular safety consultation meeting, lock out/tag
outs required for a large project can be planned out and
documented.
• This allows you to analyse the lock out/tag out schedule
and determine how to minimise productivity losses in
consultation with your production management team.
34. Hot work
Consult with the contractor. If your company stores flammable goods, gases
or ignitable substances it’s crucial that everyone has adequate information.
Where the risk of explosion or ignition is present; then welding and other
hot processes should only be carried out under your PCBU’s permit system.
A thorough risk assessment should be carried out before work commences.
Control measures and mitigations using the hierarchy of control should be
implemented as required by the WHS regulations cl-36-38
35. Remote work
• Like many of the risks that we have talked about, the duty
of care for remote work at your site is with the PCBU [cl48
WHS Regs2017]
• There is an obligation for your PCBU to provide
communication with remote workers so that assistance can
be provided if required.
• You will need to consult with the contractor and your
security team about establishing this communication.
36. Summary
• You can see that, when managing
contractors on your site, you would expect
them to have sound safety credentials and
safety processes in place. As the PCBU’s
safety representative, you don’t want to
become the safety Nazi.
• Nevertheless, there is a lot of duty that falls
onto the PCBU not just the contractor.
• You will need to be an expert communicator
who is well prepared with an understanding
of the legislation, WHS processes and a
thorough knowledge of your organisation’s
WHSMS.
37. Hypotheticals
• A worker and an apprentice were waterproofing a small room
at our site, when it appears vapours from an adhesive and
solvent ignited. The small room they were working in was
engulfed in a fire ball, resulting in burns to 55% of one
worker’s body, and 45% of the other’s body. Both workers
were transported to Royal North Shore Hospital.
From SafeworkNSW Website
• Who has the Primary duty of care in this instance?
• Consider the ignition source? SWMS? Risk Assessment? How
could have the ignition source have been controlled?
• How would you prevent an incident like this occurring during
your project?
Have a think about this and answer Question 6 in Section 3
Assessment Work Book.
38. Hypothetical
• A worker has fallen approximately 8m into a lift
shaft while working on the refurbishment of a
building in Sydney. The worker was removing
timber rafters from a roof frame when he fell and
sustained serious injuries.
From SafeworkNSW
• What are some ways that this tragedy could have
been prevented?
• How could you address this scenario in the tender
process and in the section 46 consultation
process?
• Have a think about this and answer Question 7
in Section 3 Assessment Work Book.
39. This ends this section
of the course
Proceed to section 6