Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-202
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh ...
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxalfredacavx97
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxmaxinesmith73660
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxmelvinjrobinson2199
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxbobbywlane695641
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxmelvinjrobinson2199
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxbobbywlane695641
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxalfredacavx97
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxmaxinesmith73660
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxmelvinjrobinson2199
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborg•.docxbobbywlane695641
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in wh.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxmelvinjrobinson2199
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborgò.docxbobbywlane695641
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. W.
ContemporaryProject ManagementTimothy J. Kloppenborg.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
Vittal Anantatmula
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 0.
ContemporaryProject ManagementTimothy J. Kloppenborg.docxmaxinesmith73660
Contemporary
Project Management
Timothy J. Kloppenborg
Vittal Anantatmula
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 0.
Bhopal Twenty Years Without Justice”httpswww.yout.docxtangyechloe
“Bhopal: Twenty Years Without Justice”
https://www.youtube.com/watch?time_continue=1&v=0csW97x8d24
Bhopal's on-going disaster
https://www.youtube.com/watch?time_continue=1&v=Jwh_wSJA9So
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves .
ORGANIZATIONAL STRUCTURE EXERCISEInstructions Copy and paste yo.docxhoney690131
ORGANIZATIONAL STRUCTURE EXERCISE
Instructions: Copy and paste your Business Case from Week 2 assignment. Analyze the selected project to determine which organizational structure/culture (Section 4-2a on page 110) would be the ideal or preferred organizational structure for this project. Discuss why you selected this structure and justify that choice. Then, discuss which structure is the least preferred and explain/justify why this would not be a preferred organizational structure for your selected project. Provide specific examples, elements or components from the project to explain your justification. Each of the justification sections should be a minimum of 300 words.
Business Case (copy and paste):
Preferred Org Structure:
Least Preferred Org Structure:
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule re.
ORGANIZATIONAL STRUCTURE EXERCISEInstructions Copy and paste yo.docxjacksnathalie
ORGANIZATIONAL STRUCTURE EXERCISE
Instructions: Copy and paste your Business Case from Week 2 assignment. Analyze the selected project to determine which organizational structure/culture (Section 4-2a on page 110) would be the ideal or preferred organizational structure for this project. Discuss why you selected this structure and justify that choice. Then, discuss which structure is the least preferred and explain/justify why this would not be a preferred organizational structure for your selected project. Provide specific examples, elements or components from the project to explain your justification. Each of the justification sections should be a minimum of 300 words.
Business Case (copy and paste):
Preferred Org Structure:
Least Preferred Org Structure:
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule re.
Develop a research paper on the project charter process. Follow th.docxhcheryl1
Develop a research paper on the project charter process. Follow this outline:
PART 1: INTRODUCTION
1) Open the essay with an introduction section describing a project charter.
2) Summarize why a project charter is critical to project management success.
PART 2: PROJECT CHARTER LITERATURE REVIEW
1.) Define Project Charter (per PMBOK 6th Edition and course text book).
2.) List the various elements of a project charter and why each is used (i.e. title, scope overview, business case, background, etc.).
3.) Explain in-depth the following key components of the project charter: project vision, objectives, scope, project risk planning, assumptions, constraints and organization and implementation plan.
PART 3: CONCLUSION:
1.) What critical take-aways in the development process of a project charter would you incorporate into the role of a Project Manager?
2.) Highlight specific components of the project charter that may be most critical to the overall success of the entire project plan.
3.) Discuss preferred methods for stakeholder engagement throughout the project charter process and into project planning.
ASSIGNMENT DETAILS:
Please attend to the following guidelines:
1) Prepare your report in APA format.
2) Literature Review should utilize outside sources substantially. A literature review is a comprehensive narrative on the most recent scholarly work on a certain subject. Therefore, seven (7) to ten (10) scholarly or professional journal articles should be utilized for this section. Other sources (websites, blogs, dictionaries, etc.) may be used in support but do not count toward this total. Also, the sources need to be current research which means contemporary sources (no more than ten years old).
3) Paper must be typed, double-spaced, 12-point font, 10-12 pages. (Page count does not include title page or reference pages)
4) Properly cite all sources referenced and include a reference section.
5) Proofread the document carefully before submission!
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonw.
Develop a research paper on the project charter process. Follow th.docxtenoelrx
Develop a research paper on the project charter process. Follow this outline:
PART 1: INTRODUCTION
1) Open the essay with an introduction section describing a project charter.
2) Summarize why a project charter is critical to project management success.
PART 2: PROJECT CHARTER LITERATURE REVIEW
1.) Define Project Charter (per PMBOK 6th Edition and course text book).
2.) List the various elements of a project charter and why each is used (i.e. title, scope overview, business case, background, etc.).
3.) Explain in-depth the following key components of the project charter: project vision, objectives, scope, project risk planning, assumptions, constraints and organization and implementation plan.
PART 3: CONCLUSION:
1.) What critical take-aways in the development process of a project charter would you incorporate into the role of a Project Manager?
2.) Highlight specific components of the project charter that may be most critical to the overall success of the entire project plan.
3.) Discuss preferred methods for stakeholder engagement throughout the project charter process and into project planning.
ASSIGNMENT DETAILS:
Please attend to the following guidelines:
1) Prepare your report in APA format.
2) Literature Review should utilize outside sources substantially. A literature review is a comprehensive narrative on the most recent scholarly work on a certain subject. Therefore, seven (7) to ten (10) scholarly or professional journal articles should be utilized for this section. Other sources (websites, blogs, dictionaries, etc.) may be used in support but do not count toward this total. Also, the sources need to be current research which means contemporary sources (no more than ten years old).
3) Paper must be typed, double-spaced, 12-point font, 10-12 pages. (Page count does not include title page or reference pages)
4) Properly cite all sources referenced and include a reference section.
5) Proofread the document carefully before submission!
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonw.
Paper deadline[10 pts] Due Saturday 0321 Turn in the followin.docxaman341480
Paper deadline
[10 pts] Due Saturday 03/21 Turn in the following document, submitted by email, keeping the format below, including:
Title
Author’s name
Abstract
Copy your proposal paragraph here. [You will add your main quantitative results to this paragraph in a later assignment]
I. Introduction
First paragraph: motivation and question:
· Present data or references showing why your question is important. 10 sentences.
Second paragraph: literature review (3 references at the very minimum):
· One connecting sentence to start the paragraph + 5 sentences by article +one sentence of conclusion regarding what we learn overall from the literature.
Description of what you are doing: theoretical model used, method, country, period:
· One connecting sentence + 4 sentences.
Quantitative results:[You will add your main quantitative results to this paragraph in a later assignment]
II. Methodology
a. [To be completed in a later assignment]
b. Calibration
i. Data description
Paragraph describing the data set. It must include important details, such as the provenance, the exact name of the data set, the frequency, and period covered.
ii. Parameters and model economy
Paragraph describing the table that you are filling below, which describes the ratios of the economy that you are studying (consumption/GDP, Investment/GDP, government expenditure/GDP, wage income/GDP). (Use program (7) Data treatment)
If you study two countries, make two tables.
Table 1: Actual versus model economy
Country
C/Y
I/Y
G/Y
wN/Y
Actual economy
Reference list
https://www.chicagomanualofstyle.org/tools_citationguide/citation-guide-1.html
Appendix
Your Mathematica code:
Data treatment, submitted as a separate file named: Your name_data1.nb
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, unde.
Nursing Discussion Rubric
Criteria Excellent Satisfactory Needs Improvement
Initial post
Content/Comprehension
Post demonstrates
depth of
understanding of
course content;
Addresses discussion
prompt completely;
offers clear point of
view and detail
(100%)
Post demonstrates
adequate depth of
understanding, but
does not address all
of discussion prompt;
point of view is
somewhat unclear
and detail is limited
(70%)
Post does not
demonstrate depth of
understanding of
course content;
Discussion prompt is
minimally addressed;
Point of view is
unclear and detail is
under-developed
(0%)
Initial Post
Timeliness
Submits initial post by
deadline
(100%)
Submits initial post one
to three days late.
(60%)
No initial post.
(0%)
Initial Post
Spelling/Grammar/Mechanics
Post has 0-1 spelling
or grammatical
errors; Properly cites
work in APA format
where required
(100%)
Post has 2-3 spelling
or grammatical
errors; Cites work in
APA format where
required with few
errors
(60%)
Posts have 3 or more
spelling or
grammatical errors;
Does not cite work
where required
(0%)
Peer Responses
Engagement/Classroom
Interaction
(One to two response posts,
please refer to the week’s
discussion for specific
requirements)
Submits required
number of response
posts; Responses
extend the discussion
by making
connections, relating
to others’ ideas and
adding supporting
detail
(100%)
Submits required
number of response
posts; Some
connections are made
with relevant
explanation and detail
(70%)
Responses are not
submitted; Responses
are generic, limited,
do not extend the
discussion or add
detail
(0%)
Peer Responses
Timeliness
Submits peer
response posts by
deadline
(100%)
Submits peer
response posts late
(0%)
Submits peer
response posts late
(0%)
Peer Responses
Spelling/Grammar/Mechanics
Posts have 0-1
spelling or
grammatical errors;
Properly cites work in
APA format where
required
(100%)
Posts have 2-3
spelling or
grammatical errors;
Cites work in APA
format where
required with few
errors
(60%)
Posts have 3 or more
spelling or
grammatical errors;
Does not cite work
where required
(0%)
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand th ...
Risk Breakdown Structure SUBURBAN HOMES CONSTRUCTION PRO.docxmalbert5
Risk Breakdown Structure
SUBURBAN HOMES CONSTRUCTION PROJECT
RISK BREAKDOWN STRUCTURE
OPERATIONAL STRATEGIC FINANCE EXTERNAL PROJECT
MANAGEMENT
Employee
Attitude
Delay in getting
accurate
information from
clients
Fluctuation of
Currency
Weather
Conditions
Unrealistic WBS
Office Culture Delay in getting
government
approvals
Loss of Financial
Partners
Natural Disasters Unrealistic
Resource
Allocation
Business
Processes
Indecisive Clients Drop in the
Market for
Investments
Site Conditions Ineffective
Communication
Availability of
Skills
Scope Creep Material Delay Inaccurate
Estimation
Unplanned Leaves Purchasing Error Labor Shortage Inaccurate
Planning Material Theft Site Accidents Installation Error
by Consultants System Failure
Running head: RISK BREAKDOWN STRUCTURE 1
RISK BREAKDOWN STRUCTURE3
Risk Breakdown Structure for Suburban Homes Project
Jagadish Thiruvayipati
University of the Cumberlands.
Risk Breakdown Structure for Suburban Homes Project
To ensure project success, risks must be effectively managed to keep the project on track. Below is a hierarchical structure of risk breakdown for the suburban homes construction project.
Level 0
Level 1
Level 2
Level 3
Project risk
Project Management
Customer and stakeholder
History and experience with home buyers and culture of local residents around new homes
Definition and stability of customer requirements
contractual
Corporate
The history, experience and culture of suburban homes project
Stability of the organization
Financials of suburban homes project
External
Regulators
Interest groups in the suburban project
Political factors and influence from the environment
Legal issues from the authorities e.g. labor laws and environmental laws
Local community
Opinion on the project
Benefits the community gains from the project
Contractors and subcontractors
Financial market
Labor market for the labor they hire
Labor conditions employees will engage in
Technology
Requirements
Complexity of the technology to be used
Conditions of using the new designs or technology
Scope uncertainty among contractors and project team
Performance
Technology limits
Technology maturity
Application
Organizational experience in using the specific technology for new homes
Physical resources to apply the technology
Personnel skill sets and experience needed to apply the technology
Organizational
Prioritization
Project priority
Decision making
Stability and timely
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Q.
Research Project Racial Equity in OregonYou can either write.docxaudeleypearl
Research Project
Racial Equity in Oregon
You can either write a paper which you then discuss, OR, create a presentation to share. Either way, please be prepared to share what you learned with your classmates.
“A” Project
· Discusses a topic, such as cultural appropriation, gentrification, the model minority myth, tone policing, white washing of history, or one of your choice; OR discusses a person of color who has been significant in Oregon history. Please discuss your topic with me to avoid repetition.
· Uses an accepted format for citations, with both in text citations and a works cited/bibliography page.
· Uses correct spelling, punctuation, grammar and sentence structure
· Is either a paper, Prezi, or Powerpoint. Papers should be a minimum of 3 pages, double spaced. Presentations must be 10 minutes in length. Be prepared to share either.
· Uses concrete examples from outside sources. You may also use course readings but not as the only source.
· Presents facts accurately.
“B” Paper
Paper quality fails to meet any oneor more of the above requirements
“C” Paper
Paper quality fails to meet any twoor more of the above requirements
“D” Paper
Paper quality fails to meet any threeor more of the above requirements
“F” Paper
Paper quality fails to meet any of the above requirements.
Additionally, evidence of plagiarism, even in an otherwise acceptable project, will result in a failed grade.
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing wi ...
HR517-B02 Managerial Accounting
Assignment #2
1
ASSIGNMENT #2: COST SUMMARY FOR TRAINING SESSION & ONGOING
EDUCATION
Miller Clinic is a privately owned Naturopathic Clinic in Winnipeg, Manitoba that specializes in
classic Traditional Chinese Medicine (TCM) treatment. As part of a five-year plan, Miller has
recently completed its expansion into four major areas of Winnipeg. It now offers treatment at
locations in Fort Gary, St. Boniface, Tuxedo and North End. In order to maintain consistency in
its services across all four of its locations and offer high-quality treatment, Dr. Miller has
decided to offer training and ongoing education for its team of 87 staff and practitioners.
Management is trying to decide between two methods of Knowledge-Based training and has
asked for your help.
Self-Directed Computer-
Based Distance Training
Classroom Training
Development time*
Initial: five months
Yearly updates: one week
Initial: one month
Yearly updates: one week
Internal developers
Three subject matter experts
(Dr. Miller, his wife and
assistant)
Three subject matter experts
(Dr. Miller, his wife and
assistant)
External developers
Web-based training developer
at $200,000
None
Training population
All primary participants
Maximum fifty participants
per session
Frequency
One time per participant
Presented quarterly;
participants attend as needed
Length
Administrative staff: one day
in total; at leisure
Practitioners: four days in
total; at leisure
Administrative staff: one day
Practitioners: four days
Location
In office or at other location
Rental space at $2,500 per
day all expenses included
* The development time estimated here is based on the fact that the owners have subject matter experts with
experience in developing training curricula and that basic modules will be used in each of the population-specific
training packages. If development time exceeds our estimate, training costs will increase.
If the company decides to offer the classroom training, the staff and practitioners will be paid to
attend the training and will be exempt from performing regular duties. The company estimates
that revenue for four days of normal business practices is approximately $40,000 among the four
locations. At each location, Miller employs two full-time administrative staff who make $200 a
HR517-B02 Managerial Accounting
Assignment #2
2
day and two part-time administrative staff that make approximately $80 a day and work 20 hours
per week (exactly half the hours of the full-time staff). The remainder of Miller’s employees are
practitioners. The practitioners’ average salary is $500 per day. The Millers will be providing
lunch if they decide to implement the classroom training which they budgeted $1000 per day.
Write a report to Dr. Miller explaining which training method you recommend he implement for
his employees ...
I need a effective research about Salt River in Arizona and how it i.docxkedsliemichal
I need a effective research about Salt River in Arizona and how it is important to the phoenix area. what kind of events happens there and how people enjoy Salt River in Summer and history, irrigation and former president roosevelt
I have done the intorduction and my teacher gave me full mark to it. so im gonna attach it here. I have some outline if you can do the stuff that i put there and If you can use some of the works consulted that would be wonderfull.
I need 5 pages.
.
I need a paper on1) Scenario Pursuant to the 2010 Health Care R.docxkedsliemichal
I need a paper on
1) Scenario: Pursuant to the 2010 Health Care Reform Bill, the United States will be challenged to bring into its health care population some 32 million more patients. Formerly, many of these patients were uninsured. Some of these patients were seen and treated in safety-net hospitals, but mostly in emergency rooms. Reliable, independent studies have shown that this population is low income and is disproportionately made up of ethnic and racial minorities; however, it is important to point out that due to the economic downturn at the turn of the decade surrounding 2010, this 32 million will include a significant number of non-minority unemployed individuals. Consider that health care institutions must move beyond simply taking in and treating the sick and injured who come through the door. In the near future, the health of the community will be measured in terms of low disease burden, high vaccination rates, controlled chronic disease rates, healthier life styles, and a better educated public. Clearly, the impacts to the health care system will have to be addressed.
2) Write a paper (1,250-1,500 words) that describes the roles and responsibilities of health care management in addressing this pressing dilemma. Apply the following questions to generate your conclusions about how you would proceed:
a) How do the considerations under the concept of governance apply?
b) What are the major financial issues being faced?
c) What are the major physical issues being faced?
d) What are the major demographic issues being faced?
.
More Related Content
Similar to ContemporaryProject ManagementTimothy J. Kloppenborg•
ContemporaryProject ManagementTimothy J. Kloppenborg.docxdickonsondorris
Contemporary
Project Management
Timothy J. Kloppenborg
Vittal Anantatmula
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 0.
ContemporaryProject ManagementTimothy J. Kloppenborg.docxmaxinesmith73660
Contemporary
Project Management
Timothy J. Kloppenborg
Vittal Anantatmula
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 0.
Bhopal Twenty Years Without Justice”httpswww.yout.docxtangyechloe
“Bhopal: Twenty Years Without Justice”
https://www.youtube.com/watch?time_continue=1&v=0csW97x8d24
Bhopal's on-going disaster
https://www.youtube.com/watch?time_continue=1&v=Jwh_wSJA9So
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves .
ORGANIZATIONAL STRUCTURE EXERCISEInstructions Copy and paste yo.docxhoney690131
ORGANIZATIONAL STRUCTURE EXERCISE
Instructions: Copy and paste your Business Case from Week 2 assignment. Analyze the selected project to determine which organizational structure/culture (Section 4-2a on page 110) would be the ideal or preferred organizational structure for this project. Discuss why you selected this structure and justify that choice. Then, discuss which structure is the least preferred and explain/justify why this would not be a preferred organizational structure for your selected project. Provide specific examples, elements or components from the project to explain your justification. Each of the justification sections should be a minimum of 300 words.
Business Case (copy and paste):
Preferred Org Structure:
Least Preferred Org Structure:
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule re.
ORGANIZATIONAL STRUCTURE EXERCISEInstructions Copy and paste yo.docxjacksnathalie
ORGANIZATIONAL STRUCTURE EXERCISE
Instructions: Copy and paste your Business Case from Week 2 assignment. Analyze the selected project to determine which organizational structure/culture (Section 4-2a on page 110) would be the ideal or preferred organizational structure for this project. Discuss why you selected this structure and justify that choice. Then, discuss which structure is the least preferred and explain/justify why this would not be a preferred organizational structure for your selected project. Provide specific examples, elements or components from the project to explain your justification. Each of the justification sections should be a minimum of 300 words.
Business Case (copy and paste):
Preferred Org Structure:
Least Preferred Org Structure:
Contemporary
Project Management
Timothy J. Kloppenborg
ò
Vittal Anantatmula
ò
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter duration-based performance data,
reschedule re.
Develop a research paper on the project charter process. Follow th.docxhcheryl1
Develop a research paper on the project charter process. Follow this outline:
PART 1: INTRODUCTION
1) Open the essay with an introduction section describing a project charter.
2) Summarize why a project charter is critical to project management success.
PART 2: PROJECT CHARTER LITERATURE REVIEW
1.) Define Project Charter (per PMBOK 6th Edition and course text book).
2.) List the various elements of a project charter and why each is used (i.e. title, scope overview, business case, background, etc.).
3.) Explain in-depth the following key components of the project charter: project vision, objectives, scope, project risk planning, assumptions, constraints and organization and implementation plan.
PART 3: CONCLUSION:
1.) What critical take-aways in the development process of a project charter would you incorporate into the role of a Project Manager?
2.) Highlight specific components of the project charter that may be most critical to the overall success of the entire project plan.
3.) Discuss preferred methods for stakeholder engagement throughout the project charter process and into project planning.
ASSIGNMENT DETAILS:
Please attend to the following guidelines:
1) Prepare your report in APA format.
2) Literature Review should utilize outside sources substantially. A literature review is a comprehensive narrative on the most recent scholarly work on a certain subject. Therefore, seven (7) to ten (10) scholarly or professional journal articles should be utilized for this section. Other sources (websites, blogs, dictionaries, etc.) may be used in support but do not count toward this total. Also, the sources need to be current research which means contemporary sources (no more than ten years old).
3) Paper must be typed, double-spaced, 12-point font, 10-12 pages. (Page count does not include title page or reference pages)
4) Properly cite all sources referenced and include a reference section.
5) Proofread the document carefully before submission!
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonw.
Develop a research paper on the project charter process. Follow th.docxtenoelrx
Develop a research paper on the project charter process. Follow this outline:
PART 1: INTRODUCTION
1) Open the essay with an introduction section describing a project charter.
2) Summarize why a project charter is critical to project management success.
PART 2: PROJECT CHARTER LITERATURE REVIEW
1.) Define Project Charter (per PMBOK 6th Edition and course text book).
2.) List the various elements of a project charter and why each is used (i.e. title, scope overview, business case, background, etc.).
3.) Explain in-depth the following key components of the project charter: project vision, objectives, scope, project risk planning, assumptions, constraints and organization and implementation plan.
PART 3: CONCLUSION:
1.) What critical take-aways in the development process of a project charter would you incorporate into the role of a Project Manager?
2.) Highlight specific components of the project charter that may be most critical to the overall success of the entire project plan.
3.) Discuss preferred methods for stakeholder engagement throughout the project charter process and into project planning.
ASSIGNMENT DETAILS:
Please attend to the following guidelines:
1) Prepare your report in APA format.
2) Literature Review should utilize outside sources substantially. A literature review is a comprehensive narrative on the most recent scholarly work on a certain subject. Therefore, seven (7) to ten (10) scholarly or professional journal articles should be utilized for this section. Other sources (websites, blogs, dictionaries, etc.) may be used in support but do not count toward this total. Also, the sources need to be current research which means contemporary sources (no more than ten years old).
3) Paper must be typed, double-spaced, 12-point font, 10-12 pages. (Page count does not include title page or reference pages)
4) Properly cite all sources referenced and include a reference section.
5) Proofread the document carefully before submission!
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonw.
Paper deadline[10 pts] Due Saturday 0321 Turn in the followin.docxaman341480
Paper deadline
[10 pts] Due Saturday 03/21 Turn in the following document, submitted by email, keeping the format below, including:
Title
Author’s name
Abstract
Copy your proposal paragraph here. [You will add your main quantitative results to this paragraph in a later assignment]
I. Introduction
First paragraph: motivation and question:
· Present data or references showing why your question is important. 10 sentences.
Second paragraph: literature review (3 references at the very minimum):
· One connecting sentence to start the paragraph + 5 sentences by article +one sentence of conclusion regarding what we learn overall from the literature.
Description of what you are doing: theoretical model used, method, country, period:
· One connecting sentence + 4 sentences.
Quantitative results:[You will add your main quantitative results to this paragraph in a later assignment]
II. Methodology
a. [To be completed in a later assignment]
b. Calibration
i. Data description
Paragraph describing the data set. It must include important details, such as the provenance, the exact name of the data set, the frequency, and period covered.
ii. Parameters and model economy
Paragraph describing the table that you are filling below, which describes the ratios of the economy that you are studying (consumption/GDP, Investment/GDP, government expenditure/GDP, wage income/GDP). (Use program (7) Data treatment)
If you study two countries, make two tables.
Table 1: Actual versus model economy
Country
C/Y
I/Y
G/Y
wN/Y
Actual economy
Reference list
https://www.chicagomanualofstyle.org/tools_citationguide/citation-guide-1.html
Appendix
Your Mathematica code:
Data treatment, submitted as a separate file named: Your name_data1.nb
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, unde.
Nursing Discussion Rubric
Criteria Excellent Satisfactory Needs Improvement
Initial post
Content/Comprehension
Post demonstrates
depth of
understanding of
course content;
Addresses discussion
prompt completely;
offers clear point of
view and detail
(100%)
Post demonstrates
adequate depth of
understanding, but
does not address all
of discussion prompt;
point of view is
somewhat unclear
and detail is limited
(70%)
Post does not
demonstrate depth of
understanding of
course content;
Discussion prompt is
minimally addressed;
Point of view is
unclear and detail is
under-developed
(0%)
Initial Post
Timeliness
Submits initial post by
deadline
(100%)
Submits initial post one
to three days late.
(60%)
No initial post.
(0%)
Initial Post
Spelling/Grammar/Mechanics
Post has 0-1 spelling
or grammatical
errors; Properly cites
work in APA format
where required
(100%)
Post has 2-3 spelling
or grammatical
errors; Cites work in
APA format where
required with few
errors
(60%)
Posts have 3 or more
spelling or
grammatical errors;
Does not cite work
where required
(0%)
Peer Responses
Engagement/Classroom
Interaction
(One to two response posts,
please refer to the week’s
discussion for specific
requirements)
Submits required
number of response
posts; Responses
extend the discussion
by making
connections, relating
to others’ ideas and
adding supporting
detail
(100%)
Submits required
number of response
posts; Some
connections are made
with relevant
explanation and detail
(70%)
Responses are not
submitted; Responses
are generic, limited,
do not extend the
discussion or add
detail
(0%)
Peer Responses
Timeliness
Submits peer
response posts by
deadline
(100%)
Submits peer
response posts late
(0%)
Submits peer
response posts late
(0%)
Peer Responses
Spelling/Grammar/Mechanics
Posts have 0-1
spelling or
grammatical errors;
Properly cites work in
APA format where
required
(100%)
Posts have 2-3
spelling or
grammatical errors;
Cites work in APA
format where
required with few
errors
(60%)
Posts have 3 or more
spelling or
grammatical errors;
Does not cite work
where required
(0%)
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand th ...
Risk Breakdown Structure SUBURBAN HOMES CONSTRUCTION PRO.docxmalbert5
Risk Breakdown Structure
SUBURBAN HOMES CONSTRUCTION PROJECT
RISK BREAKDOWN STRUCTURE
OPERATIONAL STRATEGIC FINANCE EXTERNAL PROJECT
MANAGEMENT
Employee
Attitude
Delay in getting
accurate
information from
clients
Fluctuation of
Currency
Weather
Conditions
Unrealistic WBS
Office Culture Delay in getting
government
approvals
Loss of Financial
Partners
Natural Disasters Unrealistic
Resource
Allocation
Business
Processes
Indecisive Clients Drop in the
Market for
Investments
Site Conditions Ineffective
Communication
Availability of
Skills
Scope Creep Material Delay Inaccurate
Estimation
Unplanned Leaves Purchasing Error Labor Shortage Inaccurate
Planning Material Theft Site Accidents Installation Error
by Consultants System Failure
Running head: RISK BREAKDOWN STRUCTURE 1
RISK BREAKDOWN STRUCTURE3
Risk Breakdown Structure for Suburban Homes Project
Jagadish Thiruvayipati
University of the Cumberlands.
Risk Breakdown Structure for Suburban Homes Project
To ensure project success, risks must be effectively managed to keep the project on track. Below is a hierarchical structure of risk breakdown for the suburban homes construction project.
Level 0
Level 1
Level 2
Level 3
Project risk
Project Management
Customer and stakeholder
History and experience with home buyers and culture of local residents around new homes
Definition and stability of customer requirements
contractual
Corporate
The history, experience and culture of suburban homes project
Stability of the organization
Financials of suburban homes project
External
Regulators
Interest groups in the suburban project
Political factors and influence from the environment
Legal issues from the authorities e.g. labor laws and environmental laws
Local community
Opinion on the project
Benefits the community gains from the project
Contractors and subcontractors
Financial market
Labor market for the labor they hire
Labor conditions employees will engage in
Technology
Requirements
Complexity of the technology to be used
Conditions of using the new designs or technology
Scope uncertainty among contractors and project team
Performance
Technology limits
Technology maturity
Application
Organizational experience in using the specific technology for new homes
Physical resources to apply the technology
Personnel skill sets and experience needed to apply the technology
Organizational
Prioritization
Project priority
Decision making
Stability and timely
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Q.
Research Project Racial Equity in OregonYou can either write.docxaudeleypearl
Research Project
Racial Equity in Oregon
You can either write a paper which you then discuss, OR, create a presentation to share. Either way, please be prepared to share what you learned with your classmates.
“A” Project
· Discusses a topic, such as cultural appropriation, gentrification, the model minority myth, tone policing, white washing of history, or one of your choice; OR discusses a person of color who has been significant in Oregon history. Please discuss your topic with me to avoid repetition.
· Uses an accepted format for citations, with both in text citations and a works cited/bibliography page.
· Uses correct spelling, punctuation, grammar and sentence structure
· Is either a paper, Prezi, or Powerpoint. Papers should be a minimum of 3 pages, double spaced. Presentations must be 10 minutes in length. Be prepared to share either.
· Uses concrete examples from outside sources. You may also use course readings but not as the only source.
· Presents facts accurately.
“B” Paper
Paper quality fails to meet any oneor more of the above requirements
“C” Paper
Paper quality fails to meet any twoor more of the above requirements
“D” Paper
Paper quality fails to meet any threeor more of the above requirements
“F” Paper
Paper quality fails to meet any of the above requirements.
Additionally, evidence of plagiarism, even in an otherwise acceptable project, will result in a failed grade.
Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. WCN 02-200-203
MS Project 2016 Instructions in Contemporary Project Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider, Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and define task dependencies, assign task
duration estimates, identify the critical path, understand the network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing wi ...
HR517-B02 Managerial Accounting
Assignment #2
1
ASSIGNMENT #2: COST SUMMARY FOR TRAINING SESSION & ONGOING
EDUCATION
Miller Clinic is a privately owned Naturopathic Clinic in Winnipeg, Manitoba that specializes in
classic Traditional Chinese Medicine (TCM) treatment. As part of a five-year plan, Miller has
recently completed its expansion into four major areas of Winnipeg. It now offers treatment at
locations in Fort Gary, St. Boniface, Tuxedo and North End. In order to maintain consistency in
its services across all four of its locations and offer high-quality treatment, Dr. Miller has
decided to offer training and ongoing education for its team of 87 staff and practitioners.
Management is trying to decide between two methods of Knowledge-Based training and has
asked for your help.
Self-Directed Computer-
Based Distance Training
Classroom Training
Development time*
Initial: five months
Yearly updates: one week
Initial: one month
Yearly updates: one week
Internal developers
Three subject matter experts
(Dr. Miller, his wife and
assistant)
Three subject matter experts
(Dr. Miller, his wife and
assistant)
External developers
Web-based training developer
at $200,000
None
Training population
All primary participants
Maximum fifty participants
per session
Frequency
One time per participant
Presented quarterly;
participants attend as needed
Length
Administrative staff: one day
in total; at leisure
Practitioners: four days in
total; at leisure
Administrative staff: one day
Practitioners: four days
Location
In office or at other location
Rental space at $2,500 per
day all expenses included
* The development time estimated here is based on the fact that the owners have subject matter experts with
experience in developing training curricula and that basic modules will be used in each of the population-specific
training packages. If development time exceeds our estimate, training costs will increase.
If the company decides to offer the classroom training, the staff and practitioners will be paid to
attend the training and will be exempt from performing regular duties. The company estimates
that revenue for four days of normal business practices is approximately $40,000 among the four
locations. At each location, Miller employs two full-time administrative staff who make $200 a
HR517-B02 Managerial Accounting
Assignment #2
2
day and two part-time administrative staff that make approximately $80 a day and work 20 hours
per week (exactly half the hours of the full-time staff). The remainder of Miller’s employees are
practitioners. The practitioners’ average salary is $500 per day. The Millers will be providing
lunch if they decide to implement the classroom training which they budgeted $1000 per day.
Write a report to Dr. Miller explaining which training method you recommend he implement for
his employees ...
Similar to ContemporaryProject ManagementTimothy J. Kloppenborg• (20)
I need a effective research about Salt River in Arizona and how it i.docxkedsliemichal
I need a effective research about Salt River in Arizona and how it is important to the phoenix area. what kind of events happens there and how people enjoy Salt River in Summer and history, irrigation and former president roosevelt
I have done the intorduction and my teacher gave me full mark to it. so im gonna attach it here. I have some outline if you can do the stuff that i put there and If you can use some of the works consulted that would be wonderfull.
I need 5 pages.
.
I need a paper on1) Scenario Pursuant to the 2010 Health Care R.docxkedsliemichal
I need a paper on
1) Scenario: Pursuant to the 2010 Health Care Reform Bill, the United States will be challenged to bring into its health care population some 32 million more patients. Formerly, many of these patients were uninsured. Some of these patients were seen and treated in safety-net hospitals, but mostly in emergency rooms. Reliable, independent studies have shown that this population is low income and is disproportionately made up of ethnic and racial minorities; however, it is important to point out that due to the economic downturn at the turn of the decade surrounding 2010, this 32 million will include a significant number of non-minority unemployed individuals. Consider that health care institutions must move beyond simply taking in and treating the sick and injured who come through the door. In the near future, the health of the community will be measured in terms of low disease burden, high vaccination rates, controlled chronic disease rates, healthier life styles, and a better educated public. Clearly, the impacts to the health care system will have to be addressed.
2) Write a paper (1,250-1,500 words) that describes the roles and responsibilities of health care management in addressing this pressing dilemma. Apply the following questions to generate your conclusions about how you would proceed:
a) How do the considerations under the concept of governance apply?
b) What are the major financial issues being faced?
c) What are the major physical issues being faced?
d) What are the major demographic issues being faced?
.
I need a good reserch on Doilies (doily) history should incl.docxkedsliemichal
I need a good reserch on
Doilies (doily)
history
should include
- an intresting thing about the hirstory
where is it from?
and photographers used doilies in theire photos ?
I needd a difintion and your own interpretation (no website-no dictionary-no cite) just a simple difintion of these
7 words:
Ornemental
Delicate
unnecessary
Protecting
Round
Feminin
Fancy
.
I need a grammar, content and reference review of AMA style. I am al.docxkedsliemichal
I need a grammar, content and reference review of AMA style. I am also uploading syllabus , so you can see what the peofessor wants. alos run turintin for plagiarism. Ill check before submission. If not up to standart , i will dispute.
Here is the textbook reuired. you must use content from it. also , include more references.
This class calls Cultura Competence in Physical Therapy
B
la
c
k
L
a
tt
a
n
z
i
J
F
, Pu
r
n
e
ll
L
D.
D
eve
loping Cultural Comp
e
ten
c
ein Ph
y
si
c
al
T
h
e
rapy Pra
c
ti
ce
.
Phil
a
d
e
lphi
a
, PA 1910
3
,
F
A
Da
vis
C
o, 2005.
(
I
S
BN: 0
-
8036
-
1195
-
1)
Content
/ 50
Or
g
a
ni
z
a
tion
/25
S
t
y
l
e
/R
ea
d
a
bili
t
y
/25
E
x
ce
ll
e
nt
45
-
50
Subje
c
t is co
ve
r
e
d
thorou
g
h
l
y
, int
e
g
r
a
ting
a
ssi
g
n
e
dr
e
a
di
n
g
s
a
nd
a
dditional sour
c
e
s as
a
ppro
p
ri
a
te.
E
x
ce
ll
e
nt
23
-
25
I
d
ea
s
a
re
p
re
s
e
nted
c
le
a
r
l
y
a
nd lo
g
i
c
a
l
l
yin use
f
ul fo
r
mat.
Rules of
g
r
a
mm
a
r,
spellin
g
, pun
c
tuation, usage
a
r
e
f
ollow
e
d throu
g
hout. Consistent
l
y
f
ollows AMA
g
ui
d
e
lin
e
s for r
e
fer
e
n
c
e
s.
Good
40
-
44
Subje
c
t is co
ve
r
e
d
a
d
e
qu
a
te
l
y
, usi
n
gsome
a
ssi
g
n
e
dr
e
a
di
n
g
s
o
r
a
dditional sour
c
e
s as
a
ppro
p
ri
a
te.
Good
20
-
22
I
d
ea
s
a
reusu
a
l
l
y
c
le
a
r
a
nd
a
r
r
a
n
g
e
d in a
c
ce
p
t
a
ble fo
r
mat.
Most
l
y
c
onsistent,
e
r
r
o
rs
do not inte
r
f
e
re with und
e
rst
a
ndi
n
g
.
Minor
de
viations or inconsist
e
nt use ofAMA r
e
fer
e
n
c
e
g
uidelines.
COURSE GRADING:
Assignments
:
(Wh
a
t
y
ou will submit
f
or
r
e
view
a
ndg
r
a
din
g
)
·
A
f
ive to ten pa
g
e
p
a
p
e
r
s
y
nthesi
z
ing the
r
ea
di
n
g
s
a
ndw
e
b
-
b
a
s
e
d t
r
a
iningon the topic of
c
ultur
a
l comp
e
te
n
c
ein
h
ea
lth
ca
r
e
.
·
I
n
c
lude a
r
e
f
l
ec
tionon
y
o
u
r pre and post
r
e
sults f
r
o
mthe Cultural Competence Reflection Checklist posted on the online platform. You should complete the checklist prior to accessing course material and then again after completing the course material.
·
Yo
u
r p
a
p
e
r should
f
o
c
usonwh
a
t
y
o
u
h
a
ve le
a
rn
e
df
r
om this cou
r
se, using the course objectives as a guide,
a
nd how
y
ou will
i
mpl
e
ment that le
a
rni
n
ginto
y
our
c
u
r
r
e
nt or futu
r
epra
c
ti
ce
. Additio
n
a
l r
e
f
e
r
e
n
ce
s
a
re
e
x
p
ec
t
e
d.
Sub
m
it assign
m
e
nt
to the
online platform
NOTE: Assignments with grammatical, spelling, or typographical errors are unacceptable. Composition and organization of written assignments are expected to reflect graduate level skill. Having someone proofread
.
I need a paragraph for each question with details,1) How can u.docxkedsliemichal
I need a paragraph for each question with details,
1)
How can universities and colleges improve their understanding of what leads an offender to target random individuals during a violent crime?
2)
What pre-incident behaviors were directed toward the targets?
3)
What factors motivated or triggered the attacks? How did target selection compare with the actual victims?
4)
In your opinion, what are some of the things that college and university administrators can do to improve campus safety and prevent or reduce violence? What can you (as a student or group of students) do to prevent a repeat of these senseless killings at our higher institutions?
5)
Have you been affected by a school or work-related violence of any kind? Briefly discuss the nature of the violence and how you survived or dealt with it.
NOTES:
- Use you own words (No references)
- Use simple words
- 2 or 2 and half pages
- See the attachment for more information
- Due on Thursday by 12:00pm
.
I need a essay that sounds very personal but yet professional.It.docxkedsliemichal
I need a essay that sounds very personal but yet professional.
It must include my ambitions of having a bachelor degree in Computer Studies at the local college, The name of the local college is The Turks and Caicos Community College,
It must include that I have had a trilling and amazing experience at The TCICC when I was in pursuit of my Associates Degree in Computer Studies.
Mus include: My hobbies are reading and music. I play the saxophone and I am apart of the Church of God of Prophecy Band.
.
I need a Juke Box Created in Visual Studios 2010.The code should b.docxkedsliemichal
I need a Juke Box Created in Visual Studios 2010.
The code should be done in Visual Basic.
This is a simple jukebox that must meet the following criteria.
- The jukebox will be capable of playing virtually any .WAV file in any order that you please.
- A database is required for this.
- the database will store information about the songs, including the directory of the song. Not the song file itself. (I have attached the songs in this email)
The interface must be pleasing to look at.
There must be a separate file that will contain information about each soundtrack in your system. That information will be:
Title;
Artist;
Note area;
Type; and
Anything else that you wish to include on each record.
There must be a way to add data to this file.
There must be a way to delete data from this file.
There must be at least one report using data from the file.
There must be a queue to allow you to play selected music tracks in sequence (like two in a row) without manual intervention.
There must be a way to show the data in at least two different sequences (by title, by artist, etc.).
There must be documentation explaining how your Jukebox works (how you add songs, play songs, etc.).
.
I need a Child Development timeline power point referencing physical.docxkedsliemichal
I need a Child Development timeline power point referencing physical and mental changes along with major issues and problems/influential theorists and theories/ physical and learning events that change development in 15-20 slides...stages of learning that illustrate he progression of child development...can you assist?
.
i need a 600-word (minimum) essay on Federalist Paper #10. Must prov.docxkedsliemichal
i need a 600-word (minimum) essay on Federalist Paper #10. Must provide a brief overview of the paper's message and the author's intent in writing it. also, if you were living during that time, what would your response be to the paper's message? What is the correlation between the paper's message and current events? Be sure to use APA standards, proper citation in text, double speed and work cited reference page.
.
I need a 5 page essay for Let The Great World Spin, double spaced. T.docxkedsliemichal
I need a 5 page essay for Let The Great World Spin, double spaced. This is the prompt:
One of the themes discussed is storytelling. The importance of of sharing stories is that it often gives a voice to the unheard and beauty to the mundane. How does the author embody this idea in his work?
Consider the author's use of composition as an art form. How does syntax function in illustrating and highlighting story development? In other words, consider the author's use of sense structure, language, grammar, and word order as "characters" with direct influence on how details unravel throughout the text. Also consider how all of the above help to create a mood or theme throughout the novel. For example, certain words or the arrangement of language represent a color, mood , idea, etc.
It may be helpful to select a specific passage, idea, theme, etc. in the text and develop your idea from a perspective that is focused on a centralized idea. However, your approach is completely up tp you. It should be organized and focused on an idea that you found interesting, significant and/or unusual.
That is the prompt. I need a very well-written essay.
.
I need a 4 page paper....defining a WORD......which meets below .docxkedsliemichal
I need a 4 page paper....defining a WORD......which meets below requirements...asap
Definition Essay Rubric
Total:
/100
Exceeds Expectations:
(Meets
all
objectives, or accomplishes objective thoroughly)
Proficient:
(Meets
most
objectives, or accomplishes objective generally)
Basic Understanding:
(Meets
some
objectives, or accomplishes objective somewhat)
Below Basic Understanding:
(Meets
Few or No
Objectives, or barely accomplishes objective, if at all)
Objectives
Exceeds Expectations
Proficient
Basic Understanding
Below Basic Understanding
Assignment Goals
/60
1.
) Lays out the ‘dialogue’— the differing perspectives regarding the interpretation of the topic
2.)
Author briefly clarifies what he or she considers the typical, but incorrect, interpretation of the topic.
3.)
Thesis statement is specific, organized, and lays out the author’s interpretation of the topic’s definition.
4.)
Definition remains consistent throughout essay
5.)
Topic is explored through the use of differing methods; describing what the topic is, pointing out what the topic is not, and illustrating those concepts for the reader
6.)
Conclusion discusses the significance of recognizing his or her interpretation of the topic as the correct interpretation.
Essay Structure
/30
1.)
Each paragraph is focused and organized, with a clear tie-in to the thesis.
2.)
The introduction effectively clarifies your main purpose and point for the reader. It features an effective thesis statement.
3.)
In the essay’s body, main ideas are well organized and the argument is thoroughly analyzed from numerous perspectives and supported with factual information.
Grammar, Mechanics, & Formatting
/10
1.
) Grammar and mechanics errors are nonexistent or rare, and are never distracting.
2.)
Paper is typed in 12-point font, double-spaced, Times New Roman font.
.
I need a 2 pages report with atleast 1 workcited. QUESTION Gen.docxkedsliemichal
I need a 2 pages report with atleast 1 workcited.
QUESTION: General Background about the jet fighter F-117 NIGHTHAWCK.
Name and picture of the plane ( jet)
Companies involved in the design
Country or Countries that own the plane
The history often plane
The plane design
The objective and the role of the plane in interest
The cost
.
I need a 5 page paper apa with references. The details are below..docxkedsliemichal
I need a 5 page paper apa with references. The details are below.
Assignment 1: Stories of Change
Due Week 3 and worth 135 points
Read the “Stories of Change” section in Chapter 1 of the textbook that describes how companies such as Hewlett Packard, IBM, Kodak, and McDonald’s have addressed significant changes within their organizations.
Write a four to six (4-6) page paper in which you:
Using Kotter’s model, identify the three (3) most significant errors made out of all of the change stories presented and describe the ramifications of those mistakes.
Make at least one (1) recommendation for each change story that would have improved the effectiveness of the change process and explain why that recommendation would have altered the outcome of the change process.
Attribute a change image to the leading managers or directors in each change story and provide an explanation as to why that change image label is appropriate.
Recommend a different strategy for managing change in each of the one change stories presented and provide a justification for your recommended strategy.
Use at least three (3) quality academic resources in this assignment.
Note:
Wikipedia and other Websites do not qualify as academic resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Compare theories of change management and select an appropriate theory for an organization change.
Evaluate the reactions to change including identifying signs of resistance and approaches to managing it.
Use technology and information resources to research issues in managing organizational change.
Write clearly and concisely about managing organizational change using proper writing mechanics.
Click
here
to view the grading rubric.
Chapter
1
Introduction: Stories of Change
Learning objectives
On completion of this chapter you should be able to:
• Understand why change is both a creative and a rational process.
• Identify why there are limits on what the manager of change can achieve.
• Recognize how stories of change can illuminate key issues in managing change.
• Appreciate the “roadmap” for this book and the multiple “images” approach that underlies it.
Changing organizations is as messy as it is exhilarating, as frustrating as it is satisfying, as muddling-through and creative a process as it is a rational one. This book recognizes these tensions for those involved in managing organizational change. Rather than pretend that they do not ex.
I need 6 pages for the project and the 7th page is the reference.docxkedsliemichal
I need 6 pages for the project and the 7th page is the reference
Project Concept
The final project allows students to apply different frameworks of discourse analysis and stylistics on an authentic text of their choice.
Text
Analyzed text
should be
authentic
, i.e., not a figment of one’s imagination, but a record of an existent interaction
. It could be
spoken or written, literary or non-literary, in Arabic or English.
Spoken text is to be transcribed, and the audio/video file containing the text is to be submitted along with the project for instructor review
. If the text is in Arabic, examples may be cited in Arabic, but all discussion of text is to be in English.
Discourse Analysis and Stylistics Perspectives
Discourse and stylistics perspectives are to be applied in a comprehensive and sophisticated manner. That is, indices are to be clearly highlighted, explanations of their relation to frameworks are to be explained, and connections with other aspects of discourse are to be made. Perspectives discussed in class include:
1.
Intertextuality in discourse
2.
Differences between spoken and written discourse (grammatical intricacy, lexical density, nominalization, explicitness, contextualization, spontaneity, repetition, hesitation, redundancy)
3.
Speech acts (illocutionary acts, directness/indirectness in relation to syntactic structures)
4.
The cooperative principle (maxims, meta-discourse, flouting, violating, opting-out, implicatures)
5.
Politeness (positive face, negative face, face-threatening acts, mitigating devices, politeness strategies)
6.
Identity construction through language
7.
Indexing gender in discourse
8.
Critical discourse analysis
9.
Stylistics
Individual Contributions
Students are to work individuallyor in pairs; each student/pair is to decide on whether to:
-
Explore
different perspectives
in
one text
, or
-
Explore
one perspective
in
multiple texts
.
Report Structure
The project is to be
submitted as a Word document. Follow APA format
in indicating student name, university ID number, and course number.
The body of the document is to be double-spaced and structured as follows:
I.
Introduction
a.
State the source of the text (type of data, title of work, and year – if applicable.)
b.
Provide a characterization of text context (who, what, why, where, when, and how.)
c.
Indicate your main discourse analysis perspective.
d.
Specify the framework followed, citing scientific research.
II.
Text
a.
Transcribe pre-approved text according to discourse analysis conventions
b.
Number each line to the left of text.
c.
Capitalize the names of each speaker and the beginning of their utterances.
III.
Analysis
a.
Analyze text holistically, avoiding line-by-line analysis.
b.
Have a clear topic sentence for each paragraph.
c.
Identify discourse phenomena using appropriate technical terminology.
d.
Support statements with illustrative examples.
e.
Examples are to be single-spaced, followed .
I need a 3 page, single spaced, MLA style paper that focus on the .docxkedsliemichal
I need a 3 page, single spaced, MLA style paper that focus on the leadership styles and traits of the key leader(s) within the MacDonald’s organization.
Please focus on the former leadership style and traits of the CEO of Macdonald's Don Thompson.
You can also add the leadership styles and traits that most managers use to run the MacDonald’s franchise.
.
I need a 5 page paper APA format with References on the following to.docxkedsliemichal
I need a 5 page paper APA format with References on the following topic. I will list the requirements and the chapter.
Assignment 1: Stories of Change
Due Week 3 and worth 135 points
Read the “Stories of Change” section in Chapter 1 of the textbook that describes how companies such as Hewlett Packard, IBM, Kodak, and McDonald’s have addressed significant changes within their organizations.
Write a four to six (4-6) page paper in which you:
Using Kotter’s model, identify the three (3) most significant errors made out of all of the change stories presented and describe the ramifications of those mistakes.
Make at least one (1) recommendation for each change story that would have improved the effectiveness of the change process and explain why that recommendation would have altered the outcome of the change process.
Attribute a change image to the leading managers or directors in each change story and provide an explanation as to why that change image label is appropriate.
Recommend a different strategy for managing change in each of the one change stories presented and provide a justification for your recommended strategy.
Use at least three (3) quality academic resources in this assignment.
Note:
Wikipedia and other Websites do not qualify as academic resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Compare theories of change management and select an appropriate theory for an organization change.
Evaluate the reactions to change including identifying signs of resistance and approaches to managing it.
Use technology and information resources to research issues in managing organizational change.
Write clearly and concisely about managing organizational change using proper writing mechanics.
Chapter
1
Introduction: Stories of Change
Learning objectives
On completion of this chapter you should be able to:
• Understand why change is both a creative and a rational process.
• Identify why there are limits on what the manager of change can achieve.
• Recognize how stories of change can illuminate key issues in managing change.
• Appreciate the “roadmap” for this book and the multiple “images” approach that underlies it.
Changing organizations is as messy as it is exhilarating, as frustrating as it is satisfying, as muddling-through and creative a process as it is a rational one. This book recognizes these tensions for those involved in managing organizational change. Rather than pretend that the.
I need a 3 page philosophy essay on Socrates, with a focus on his .docxkedsliemichal
I need a 3 page philosophy
essay on Socrates, with a focus on his trial and death
please use three to four sources and proper citations within the essay, also in addition to the three page essay a works cited page with the sources used in the essay. (I need it done no later then 6am tomorrow)
.
I need a 2 papers geology hypothesis its a class project for GE.docxkedsliemichal
I need a 2 paper's geology hypothesis
its a class project for GEOL 101 i want any kind of paper that shows a geology hypothesis the class takes about minerals, different kinds of rocks, how the rocks forms and the natural disasters ,so i want a 2 paper's double spaced ama format that gives a geology hypothesis and the title would br the hypothesis
thank you.
.
I need 3 sources about the Arctic wolves.The first source about ho.docxkedsliemichal
I need 3 sources about the Arctic wolves.
The first source about how global warming affecting the Arctic wolves?
Second source, what are the things that are connected with this problem? ( like how other kinds of animals or places)
The third one, Discribe how oil industry ( drilling oil ) are affecting the Arctic wolves and melting the ice?
It has to be specifec
Each source has to have a 250 word explaining the source with all information, and a work cited for each source.
.
I need 5 PowerPoint slides about Masculinity and Homophobia.Most.docxkedsliemichal
I need 5 PowerPoint slides about Masculinity and Homophobia.
Mostly I’ll need an introduction to the problem and few ideas then an introduction to how it’s presented in media.
Each slide MUST have 5 full lines. Don’t copy and past from the web, I need ideas.
I’m paying $20 and I need it in 17 hours. Please don’t contact me if you are not able to it within the time frame for that price.
Thank you
.
How to Create Map Views in the Odoo 17 ERPCeline George
The map views are useful for providing a geographical representation of data. They allow users to visualize and analyze the data in a more intuitive manner.
This is a presentation by Dada Robert in a Your Skill Boost masterclass organised by the Excellence Foundation for South Sudan (EFSS) on Saturday, the 25th and Sunday, the 26th of May 2024.
He discussed the concept of quality improvement, emphasizing its applicability to various aspects of life, including personal, project, and program improvements. He defined quality as doing the right thing at the right time in the right way to achieve the best possible results and discussed the concept of the "gap" between what we know and what we do, and how this gap represents the areas we need to improve. He explained the scientific approach to quality improvement, which involves systematic performance analysis, testing and learning, and implementing change ideas. He also highlighted the importance of client focus and a team approach to quality improvement.
Operation “Blue Star” is the only event in the history of Independent India where the state went into war with its own people. Even after about 40 years it is not clear if it was culmination of states anger over people of the region, a political game of power or start of dictatorial chapter in the democratic setup.
The people of Punjab felt alienated from main stream due to denial of their just demands during a long democratic struggle since independence. As it happen all over the word, it led to militant struggle with great loss of lives of military, police and civilian personnel. Killing of Indira Gandhi and massacre of innocent Sikhs in Delhi and other India cities was also associated with this movement.
The Indian economy is classified into different sectors to simplify the analysis and understanding of economic activities. For Class 10, it's essential to grasp the sectors of the Indian economy, understand their characteristics, and recognize their importance. This guide will provide detailed notes on the Sectors of the Indian Economy Class 10, using specific long-tail keywords to enhance comprehension.
For more information, visit-www.vavaclasses.com
Read| The latest issue of The Challenger is here! We are thrilled to announce that our school paper has qualified for the NATIONAL SCHOOLS PRESS CONFERENCE (NSPC) 2024. Thank you for your unwavering support and trust. Dive into the stories that made us stand out!
How to Split Bills in the Odoo 17 POS ModuleCeline George
Bills have a main role in point of sale procedure. It will help to track sales, handling payments and giving receipts to customers. Bill splitting also has an important role in POS. For example, If some friends come together for dinner and if they want to divide the bill then it is possible by POS bill splitting. This slide will show how to split bills in odoo 17 POS.
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdfTechSoup
In this webinar you will learn how your organization can access TechSoup's wide variety of product discount and donation programs. From hardware to software, we'll give you a tour of the tools available to help your nonprofit with productivity, collaboration, financial management, donor tracking, security, and more.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
ContemporaryProject ManagementTimothy J. Kloppenborg•
1. Contemporary
Project Management
Timothy J. Kloppenborg
•
Vittal Anantatmula
•
Kathryn N. Wells
F O U R T H E D I T I O N
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
MS Project 2016 Instructions in Contemporary Project
Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider,
Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
2. Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks
detail
8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s
working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and
define task dependencies, assign task
duration estimates, identify the critical path, understand the
network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
3. Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current
and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter
duration-based performance data,
reschedule remaining work, revise future estimates
4. 15 Close Project
Creating project progress reports, sharing reports, export a
report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
PMBOK® Guide 6e Coverage in Contemporary Project
Management 4e
The numbers refer to the text page where the process is defined.
Project management (PM) processes and knowledge areas 10–11
Project life cycle 7–10, 62–64
Projects and strategic planning 33–37 Organizational influences
102–110
Portfolio and program management 37–42
PMBOK® Guide, 6th ed. Coverage
Knowledge
Areas
Initiating
5. Process
Group Planning Process Group
Executing Process
Group
Monitoring &
Controlling
Process Group
Closing
Process
Group
Project
Integration
Management
Develop
Project
Charter
60–79
Develop Project Management Plan
409–410
Direct and Manage
Project Work 459–460
Manage Project
Knowledge 192–193,
504–508
Monitor and Control
Project Work 460–462
Perform Integrated
Change Control
6. 229–232, 462–463
Close
Project
or Phase
503,
508–511
Project Scope
Management
Plan Scope Management 211–212
Collect Requirements 212–216
Define Scope 216–220
Create WBS 220–229
Validate Scope
500–501
Control Scope
475–476
Project
Schedule
Management
Plan Schedule Management 246
Define Activities 249–253
Sequence Activities 253–255
Estimate Activity Durations 255–258
Develop Schedule 259–267
Control Schedule
476–480
Project Cost
Management
7. Plan Cost Management 329–330
Estimate Costs 330–341
Determine Budget 342–344
Control Costs 345,
476–480
Project Quality
Management
Plan Quality Management 401–404 Manage Quality
404–406, 469–474
Control Quality
406–409, 469–474
Project
Resources
Management
Plan Resource Management 290–295
Estimate Activity Resources 290
Aquire Resources
138–141
Develop Team 141–157
Manage Team 157–161
Control Resources 476
Project Com-
munications
Management
Plan Communications Management
9. 434–438
Control Procurments
441
Project Stake-
holder
Management
Identify
Stakehold-
ers 75–77,
178–184
Plan Stakeholder Engagement 184–186 Manage Stakeholder
Engagement 187–188
Monitor Stakeholder
Engagement 188
Source: Adapted from A Guide to the Project Management Body
of Knowledge (PMBOK® Guide), 6th ed. (Newtown Square,
PA: Project Management
Institute, Inc., 2017): 31.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
10. WCN 02-200-202
Contemporary Project
Management
ORGANIZE LEAD PLAN PERFORM
FOURTH EDITION
TIMOTHY J. KLOPPENBORG
Xavier University
VITTAL ANANTATMULA
Western Carolina University
KATHRYN N. WELLS
Keller Williams Real Estate
Australia • Brazil • Mexico • Singapore • United Kingdom •
United States
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
11. This is an electronic version of the print textbook. Due to
electronic rights restrictions,
some third party content may be suppressed. Editorial review
has deemed that any suppressed
content does not materially affect the overall learning
experience. The publisher reserves the right
to remove content from this title at any time if subsequent
rights restrictions require it. For
valuable information on pricing, previous editions, changes to
current editions, and alternate
formats, please visit www.cengage.com/highered to search by
ISBN#, author, title, or keyword for
materials in your areas of interest.
Important Notice: Media content referenced within the product
description or the product
text may not be available in the eBook version.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
Contemporary Project Management,
Fourth Edition
12. Timothy J. Kloppenborg
2019 2015
Cengage Learning Customer & Sales Support, 1-800-354-9706
www.cengage.com/permissions
[email protected]
2017947974
978 1 337 40645 1
Cengage Learning
20
02210
40
125
www.cengage.com.
www.cengage.com
www.cengagebrain.com
Printed in the United States of America
Print Number: 01 Print Year: 2017
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
13. not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
MS Project 2016 Instructions in Contemporary Project
Management 4e
Chapter MS Project
3 MS Project 2016 Introduction
Ribbon, Quick Access Toolbar, view panes, Zoom Slider,
Shortcuts, Scheduling Mode Selector
Setting Up Your First Project
Auto schedule, start date, identifying information, summary row
Create Milestone Schedule
Key milestones, zero duration, must finish on, information
7 Set Up a Work Breakdown Structure (WBS)
Understand the WBS definitions and displays
Enter WBS Elements (tasks), Create the outline,
Insert WBS Code Identifier column, Hide or show subtasks
detail
14. 8 Using MS Project for Critical Path Schedules
Set Up the Project Schedule
Set or update the project start date, Define organization’s
working and nonworking time
Build the Network Diagram and Identify the Critical Path
Enter tasks and milestones, edit the timescale, understand and
define task dependencies, assign task
duration estimates, identify the critical path, understand the
network diagram view
Display and Print Schedules
9 Define Resources
Resource views, max units, resource calendars
Assigning Resources
Basic assignment, modify an assignment
Identify Overallocated Resources
Resource usage and Detailed Gantt views together
Overallocated Resources
Finding overallocated resources, dealing with overallocations
Crashing a Critical Path Activity
10 Develop Bottom-up Project Budget
15. Assignment costs, task costs, various cost perspectives
Develop Summary Project Budget
12 Baseline the Project Plan
First time baseline, subsequent baselines, viewing variances
14 Using MS Project to Monitor and Control Projects
What Makes a Schedule Useful?
How MS Project recalculates based on reported actuals, current
and future impacts of variances, define
the performance update process (who, what, when)
Steps to Update the Project Schedule
Acquire performance data, set and display status date, Enter
duration-based performance data,
reschedule remaining work, revise future estimates
15 Close Project
Creating project progress reports, sharing reports, export a
report to MS Excel, archive project work,
capture and publish lessons learned
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
16. time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
PMBOK® Guide 6e Coverage in Contemporary Project
Management 4e
The numbers refer to the text page where the process is defined.
Project management (PM) processes and knowledge areas 10–11
Project life cycle 7–10, 62–64
Projects and strategic planning 33–37 Organizational influences
102–110
Portfolio and program management 37–42
PMBOK® Guide, 6th ed. Coverage
Knowledge
Areas
Initiating
Process
Group Planning Process Group
Executing Process
Group
Monitoring &
Controlling
Process Group
Closing
Process
Group
17. Project
Integration
Management
Develop
Project
Charter
60–79
Develop Project Management Plan
409–410
Direct and Manage
Project Work 459–460
Manage Project
Knowledge 192–193,
504–508
Monitor and Control
Project Work 460–462
Perform Integrated
Change Control
229–232, 462–463
Close
Project
or Phase
503,
508–511
Project Scope
Management
Plan Scope Management 211–212
Collect Requirements 212–216
21. Plan Stakeholder Engagement 184–186 Manage Stakeholder
Engagement 187–188
Monitor Stakeholder
Engagement 188
Source: Adapted from A Guide to the Project Management Body
of Knowledge (PMBOK® Guide), 6th ed. (Newtown Square,
PA: Project Management
Institute, Inc., 2017): 31.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
Brief Contents
Preface xx
About the Authors xxix
PART 1 Organizing Projects
1 Introduction to Project Management 2
2 Project Selection and Prioritization 32
22. 3 Chartering Projects 60
PART 2 Leading Projects
4 Organizational Capability: Structure, Culture, and Roles 100
5 Leading and Managing Project Teams 136
6 Stakeholder Analysis and Communication Planning 176
PART 3 Planning Projects
7 Scope Planning 210
8 Scheduling Projects 244
9 Resourcing Projects 286
10 Budgeting Projects 328
11 Project Risk Planning 358
12 Project Quality Planning and Project Kickoff 386
PART 4 Performing Projects
13 Project Supply Chain Management 426
14 Determining Project Progress and Results 456
15 Finishing the Project and Realizing the Benefits 498
Appendix A PMP and CAPM Exam Prep Suggestions 522
Appendix B Agile Differences Covered 527
Appendix C Answers to Selected Exercises 532
Appendix D Project Deliverables 537
Appendix E Strengths Themes As Used in Project Management
[Available Online]
23. Index 539
v
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
Requirements
Documents
13.1 Identify
Stakeholders
Stakeholder
Register
Stakeholder
Engagement
Assessment Matrix
Integration
28. 6.4 Estimate
activity
Durations
7.3 Determine
Budget
7.2 Estimate
Costs
6.3 Sequence
Activities
1.2 Foundational Elements
2.4 Organizational Systems
3.4 Project Manager Competencies
Selecting Projects
Project Customer Tradeoff Matrix
Life Cycle and Development Approach
Elevator Pitch
Leader Roles and Responsibilities
Project Selection and Prioritization Matrix
Project Resource Assignment Matrix
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
29. Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
11.6 Implement
Risk Responses
13.3 Manage
Stakeholder
Engagement
13.4 Monitor
Stakeholder
Engagement
4.3 Direct and Manage
Project Work
4.4 Manage Project
Knowledge
Scope
Baseline with WBS
Resource Histogram
Project Crashing
Retrospectives
Closure
Documents
33. Control
Project Work
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . xx
About the Authors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . xxix
PART 1 Organizing Projects
CHAPTER 1
Introduction to Project Management . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . 2
1.1 What Is a Project? 3
1.2 History of Project Management 5
1.3 How Can Project Work Be Described? 6
34. 1.3a Projects versus Operations 6 / 1.3b Soft Skills and Hard
Skills 7 / 1.3c Authority
and Responsibility 7 / 1.3d Project Life Cycle 7
1.4 Understanding Projects 10
1.4a Project Management Institute 10 / 1.4b Project
Management Body of Knowledge
(PMBOK®) 10 / 1.4c The PMI Talent Triangle 11 / 1.4d
Selecting and Prioritizing
Projects 14 / 1.4e Project Goals and Constraints 14 / 1.4f
Defining Project Success
and Failure 15 / 1.4g Using Microsoft Project to Help Plan and
Measure
Projects 16 / 1.4h Types of Projects 16 / 1.4i Scalability of
Project Tools 17
1.5 Project Roles 17
1.5a Project Executive-Level Roles 18 / 1.5b Project
Management-Level Roles 19 /
1.5c Project Associate-Level Roles 20
1.6 Overview of the Book 20
1.6a Part 1: Organizing and Initiating Projects 20 / 1.6b Part 2:
Leading Projects 21 /
1.6c Part 3: Planning Projects 21 / 1.6d Part 4: Performing
Projects 23
PMP/CAPM Study Ideas 23
Summary 24
Key Terms Consistent with PMI Standards and Guides 24
35. Chapter Review Questions 25
Discussion Questions 25
PMBOK® Guide Questions 26
Integrated Example Projects 27
Suburban Homes Construction Project 27
Casa DE PAZ Development Project 28
Semester Project Instructions 28
Project Management in Action 29
References 30
Endnotes 31
viii
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
36. CHAPTER 2
Project Selection and Prioritization . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . 32
2.1 Strategic Planning Process 33
2.1a Strategic Analysis 33 / 2.1b Guiding Principles 34 / 2.1c
Strategic
Objectives 36 / 2.1d Flow-Down Objectives 37
2.2 Portfolio Management 37
2.2a Portfolios 38 / 2.2b Programs 39 / 2.2c Projects and
Subprojects 39 /
2.2d Assessing an Organization’s Ability to Perform Projects 42
/ 2.2e Identifying
Potential Projects 42 / 2.2f Using a Cost-Benefit Analysis
Model to Select
Projects 43 / 2.2g Using a Scoring Model to Select Projects 45 /
2.2h Prioritizing
Projects 48 / 2.2i Resourcing Projects 48
2.3 Securing Projects 49
2.3a Identify Potential Project Opportunities 50 / 2.3b
Determine Which Opportunities to
Pursue 50 / 2.3c Prepare and Submit a Project Proposal 51 /
2.3d Negotiate to
Secure the Project 51
PMP/CAPM Study Ideas 52
Summary 52
Key Terms Consistent with PMI Standards and Guides 52
37. Chapter Review Questions 53
Discussion Questions 53
PMBOK® Guide Questions 53
Exercises 54
Integrated Example Projects 55
Casa DE PAZ Development Project 56
Semester Project Instructions 56
Project Management in Action 57
References 58
Endnotes 59
CHAPTER 3
Chartering Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . 60
3.1 What Is a Project Charter? 62
3.2 Why Is a Project Charter Used? 63
3.3 When Is a Charter Needed? 64
3.4 Typical Elements in a Project Charter 65
3.4a Title 65 / 3.4b Scope Overview 65 / 3.4c Business Case 66
/
3.4d Background 66 / 3.4e Milestone Schedule with Acceptance
Criteria 66 /
3.4f Risks, Assumptions, and Constraints 67 / 3.4g Resource
Estimates 69 /
38. 3.4h Stakeholder List 69 / 3.4i Team Operating Principles 69 /
3.4j Lessons
Learned 70 / 3.4k Signatures and Commitment 70
3.5 Constructing a Project Charter 70
3.5a Scope Overview and Business Case Instructions 70 / 3.5b
Background
Instructions 71 / 3.5c Milestone Schedule with Acceptance
Criteria
Instructions 72 / 3.5d Risks, Assumptions, and Constraints
Instructions 75 /
3.5e Resources Needed Instructions 75 / 3.5f Stakeholder List
Instructions 75 /
Contents ix
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
3.5g Team Operating Principles Instructions 77 / 3.5h Lessons
Learned
Instructions 77 / 3.5i Signatures and Commitment Instructions
78
39. 3.6 Ratifying the Project Charter 79
3.7 Starting a Project Using Microsoft Project 79
3.7a MS Project 2016 Introduction 80 / 3.7b Setting up Your
First Project 81 /
3.7c Define Your Project 82 / 3.7d Create a Milestone Schedule
83
PMP/CAPM Study Ideas 88
Summary 88
Key Terms Consistent with PMI Standards and Guides 88
Chapter Review Questions 89
Discussion Questions 89
PMBOK® Guide Questions 89
Exercises 90
Integrated Example Projects 91
Casa DE PAZ Development Project 93
Semester Project Instructions 93
Project Management in Action 93
References 96
Endnotes 97
PART 2 Leading Projects
40. CHAPTER 4
Organizational Capability: Structure, Culture, and Roles . . . . . .
. . . . . . . . . . . . . . . 100
4.1 Types of Organizational Structures 103
4.1a Functional 103 / 4.1b Projectized 104 / 4.1c Matrix 105
4.2 Organizational Culture and Its Impact on Projects 109
4.2a Culture of the Parent Organization 110 / 4.2b Project
Cultural Norms 111
4.3 Project Life Cycles 111
4.3a Define-Measure-Analyze-Improve-Control (DMAIC)
Model 112 / 4.3b Research and
Development (R&D) Project Life Cycle Model 113 / 4.3c
Construction Project Life
Cycle Model 113 / 4.3d Agile Project Life Cycle Model 113
4.4 Agile Project Management 114
4.4a What Is Agile? 114 / 4.4b Why Use Agile? 114 / 4.4c What
Is an Agile
Mindset? 114 / 4.4d What Are the Key Roles in Agile Projects?
115 / 4.4e How Do
You Start an Agile Project? 115 / 4.4f How Do You Continue an
Agile Project?
115 / 4.4g What Is Needed for Agile to Be Successful? 116
4.5 Traditional Project Executive Roles 116
4.5a Steering Team 116 / 4.5b Sponsor 117 / 4.5c Customer 119
/ 4.5d Chief
Projects Officer/Project Management Office 121
41. 4.6 Traditional Project Management Roles 121
4.6a Functional Manager 121 / 4.6b Project Manager 122 / 4.6c
Facilitator 124
4.7 Traditional Project Team Roles 126
4.7a Core Team Members 126 / 4.7b Subject Matter Experts 126
x Contents
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part. Due
to electronic rights, some third party content may be suppressed
from the eBook and/or eChapter(s).
Editorial review has deemed that any suppressed content does
not materially affect the overall learning experience. Cengage
Learning reserves the right to remove additional content at any
time if subsequent rights restrictions require it.
Copyright 2019 Cengage Learning. All Rights Reserved. May
not be copied, scanned, or duplicated, in whole or in part.
WCN 02-200-202
4.8 Role Differences on Agile Projects 126
PMP/CAPM Study Ideas 128
Summary 128
Key Terms Consistent with PMI Standards and Guides 128
Chapter Review Questions 129
Discussion Questions 129
42. PMBOK® Guide Questions 129
Exercises 130
Integrated Example Projects 130
Casa DE PAZ Development Project 131
Semester Project Instructions 131
Project Management in …