University BDT College of Engineering
Davanagere
Presentation on Intra/intern
Institutional training report
Construction of Road Pavement
Activity -2
-KOTRESH.N
Under the Mentorship of
Dr.H Eramma
Department of Civil Engineering
2024/2/26 1
CONTENTS
Construction of Residential Building
1 Construction of Road Pavement
2
Water Treatment Plant
3 F i r e F i g h t i n g
4
Components of MS Word
5
2024/2/26 2
02
Construction of Road
Pavement
Road pavement, also known simply as pavement or
road surface, refers to the top layer or surface of a
road that is designed and constructed to provide a
durable and smooth driving surface for vehicles.
2024/2/26 3
1.Asphalt (Bituminous):Asphalt pavement, also known as blacktop
or macadam, is a common type of road surface. It consists of a
mixture of asphalt binder (a petroleum-based product) and
aggregate (such as crushed stone or gravel). Asphalt pavements
are flexible and can adapt to slight ground movements.
2.Concrete:Concrete pavement is made of cement, water, and
aggregates (sand, gravel, or crushed stone). It is rigid and
typically used for high Traffic. roads and highways.
3.Composite Materials:Some pavements use composite materials,
which may combine asphalt and concrete or other innovative
materials to optimize performance and durability.
Pavements can be made from various materials,
including:
2024/2/26 4
TYPES OF ROAD
PAVEMENT:
 Flexible Pavement:Asphalt Concrete (AC) Pavement: This is the most
common type of road pavement. It consists of multiple layers, with the top
layer being a smooth, black asphalt surface.
 Rigid Pavement :Concrete Pavement: Rigid pavements are made of
concrete slabs. They are very durable and capable of withstanding heavy
loads. Concrete pavements are commonly used for highways and high-
traffic areas but can be more expensive to construct initially.
 Composite Pavement: This type of pavement combines both flexible and
rigid elements. It often consists of a concrete base layer and an asphalt
surface layer.
 Permeable Asphalt/Concrete: These pavements are designed to allow
water to penetrate through them, reducing surface runoff and aiding in
groundwater recharge. They are environmentally friendly and help
manage stormwater.
2024/2/26 5
CONSTRUCTION OF FLEXIBLE PAVEMENT :
• Subgrade Preparation:The subgrade should be properly compacted to achieve the desired
density and stability.
• Subbase Installation :In some cases, a subbase layer is added above the subgrade to improve
load-bearing capacity and drainage. Common subbase materials include crushed stone, gravel,
or recycled materials.
• Base Course Installation :A base course, typically made of aggregate materials, is placed on
top of the subbase to provide additional support and distribute loads. Proper compaction is
essential to ensure a stable base.
• Asphalt Binder Course :The next layer is the asphalt binder course, which consists of a mix of
asphalt binder and coarse aggregates. This layer provides strength and durability to the
pavement.
• Asphalt Surface Course :The final layer of the flexible pavement is the asphalt surface course.
This layer consists of a mix of asphalt binder and finer aggregates, creating a smooth and wear -
resistant driving surface.
2024/2/26 6
1.Subgrade Preparation:The first step is to prepare
the subgrade, which is the native soil or existing
roadbed upon which the pavement will be built.
2.Subbase Installation:In some cases, a subbase
layer is added above the subgrade to improve
load-bearing capacity and drainage. Common
subbase materials include crushed stone, gravel,
or recycled materials.
3.Base Course Installation:A base course, typically
made of aggregate materials, is placed on top of the
subbase to provide additional support and distribute
loads
2024/2/26 7
CONSTRUCTION OF RIGID PAVEMENT :
2024/2/26 8
4.Surface Or Wearing Course:
The concrete should be placed over the entire width of bay in successive batches as a
continuous operation and topmost layer is laid about 10 mm higher than the actual profile
for further The top layer should also be laid to the required camber and gradient, while
placing the concrete it is rolled with suitable tool to eliminate voids tamping.
5.Curing Process of Cement Concrete Road:
Curing consist of checking the loss of water from the concrete slab, and keeping the fresh
concrete slab moist during hardening period. Initial curing is done for 24 hrs. By this time,
the concrete becomes hard enough to walk upon and then wet mats are removed and final
curing done for 2 to 3 weeks.
6.Fillings of Joints and Edging:After curing, the surface is cleaned and washed.The
joints are then properly filled-in attains with a suitable sealing compound.
CONCLUSION:
2024/2/26 9
Road pavement is the foundation of our transportation
infrastructure, and its quality directly impacts the safety,
efficiency,low cost and higher productivity From our road
networks. It is essential to invest in well-designed,
durable, and sustainable pavement solutions to ensure
the continued smooth flow of goods and people.

More Related Content

Similar to Construction of Road pavement Civil Engineering

FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
DolanGhosh4
 

Similar to Construction of Road pavement Civil Engineering (20)

Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WECROADS/PAVEMENT  &  TYPES OF ROAD BY ENGR SAAD ULLAH WEC
ROADS/PAVEMENT & TYPES OF ROAD BY ENGR SAAD ULLAH WEC
 
Design of highway pavements
Design of highway pavementsDesign of highway pavements
Design of highway pavements
 
journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...journal publishing, how to publish research paper, Call For research paper, i...
journal publishing, how to publish research paper, Call For research paper, i...
 
Construction of rigid pavement
Construction of rigid pavement Construction of rigid pavement
Construction of rigid pavement
 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
 
pavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptxpavement engineering 17-10-20 (2) (2).pptx
pavement engineering 17-10-20 (2) (2).pptx
 
FOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptxFOUNDATION ENGINEERING.pptx
FOUNDATION ENGINEERING.pptx
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptxCONSTRUCTION_OF_RIGID_PAVEMENT.pptx
CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
2.4 HIGHWAY TRANSPORTATION : DESIGN AND CONSTRUCTION OF PAVEMENT (TRE) 315061...
 
Unit 6..pptx
Unit 6..pptxUnit 6..pptx
Unit 6..pptx
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Seminar report-3rd sem.pdf
Seminar report-3rd sem.pdfSeminar report-3rd sem.pdf
Seminar report-3rd sem.pdf
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Airfield pavements
Airfield pavementsAirfield pavements
Airfield pavements
 
6. Pavement Engineering.pdf
6. Pavement Engineering.pdf6. Pavement Engineering.pdf
6. Pavement Engineering.pdf
 
Construction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic WastesConstruction of Flexible Pavements Using Plastic Wastes
Construction of Flexible Pavements Using Plastic Wastes
 
Types of Flexible Pavements
Types of Flexible PavementsTypes of Flexible Pavements
Types of Flexible Pavements
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 

Construction of Road pavement Civil Engineering

  • 1. University BDT College of Engineering Davanagere Presentation on Intra/intern Institutional training report Construction of Road Pavement Activity -2 -KOTRESH.N Under the Mentorship of Dr.H Eramma Department of Civil Engineering 2024/2/26 1
  • 2. CONTENTS Construction of Residential Building 1 Construction of Road Pavement 2 Water Treatment Plant 3 F i r e F i g h t i n g 4 Components of MS Word 5 2024/2/26 2
  • 3. 02 Construction of Road Pavement Road pavement, also known simply as pavement or road surface, refers to the top layer or surface of a road that is designed and constructed to provide a durable and smooth driving surface for vehicles. 2024/2/26 3
  • 4. 1.Asphalt (Bituminous):Asphalt pavement, also known as blacktop or macadam, is a common type of road surface. It consists of a mixture of asphalt binder (a petroleum-based product) and aggregate (such as crushed stone or gravel). Asphalt pavements are flexible and can adapt to slight ground movements. 2.Concrete:Concrete pavement is made of cement, water, and aggregates (sand, gravel, or crushed stone). It is rigid and typically used for high Traffic. roads and highways. 3.Composite Materials:Some pavements use composite materials, which may combine asphalt and concrete or other innovative materials to optimize performance and durability. Pavements can be made from various materials, including: 2024/2/26 4
  • 5. TYPES OF ROAD PAVEMENT:  Flexible Pavement:Asphalt Concrete (AC) Pavement: This is the most common type of road pavement. It consists of multiple layers, with the top layer being a smooth, black asphalt surface.  Rigid Pavement :Concrete Pavement: Rigid pavements are made of concrete slabs. They are very durable and capable of withstanding heavy loads. Concrete pavements are commonly used for highways and high- traffic areas but can be more expensive to construct initially.  Composite Pavement: This type of pavement combines both flexible and rigid elements. It often consists of a concrete base layer and an asphalt surface layer.  Permeable Asphalt/Concrete: These pavements are designed to allow water to penetrate through them, reducing surface runoff and aiding in groundwater recharge. They are environmentally friendly and help manage stormwater. 2024/2/26 5
  • 6. CONSTRUCTION OF FLEXIBLE PAVEMENT : • Subgrade Preparation:The subgrade should be properly compacted to achieve the desired density and stability. • Subbase Installation :In some cases, a subbase layer is added above the subgrade to improve load-bearing capacity and drainage. Common subbase materials include crushed stone, gravel, or recycled materials. • Base Course Installation :A base course, typically made of aggregate materials, is placed on top of the subbase to provide additional support and distribute loads. Proper compaction is essential to ensure a stable base. • Asphalt Binder Course :The next layer is the asphalt binder course, which consists of a mix of asphalt binder and coarse aggregates. This layer provides strength and durability to the pavement. • Asphalt Surface Course :The final layer of the flexible pavement is the asphalt surface course. This layer consists of a mix of asphalt binder and finer aggregates, creating a smooth and wear - resistant driving surface. 2024/2/26 6
  • 7. 1.Subgrade Preparation:The first step is to prepare the subgrade, which is the native soil or existing roadbed upon which the pavement will be built. 2.Subbase Installation:In some cases, a subbase layer is added above the subgrade to improve load-bearing capacity and drainage. Common subbase materials include crushed stone, gravel, or recycled materials. 3.Base Course Installation:A base course, typically made of aggregate materials, is placed on top of the subbase to provide additional support and distribute loads 2024/2/26 7 CONSTRUCTION OF RIGID PAVEMENT :
  • 8. 2024/2/26 8 4.Surface Or Wearing Course: The concrete should be placed over the entire width of bay in successive batches as a continuous operation and topmost layer is laid about 10 mm higher than the actual profile for further The top layer should also be laid to the required camber and gradient, while placing the concrete it is rolled with suitable tool to eliminate voids tamping. 5.Curing Process of Cement Concrete Road: Curing consist of checking the loss of water from the concrete slab, and keeping the fresh concrete slab moist during hardening period. Initial curing is done for 24 hrs. By this time, the concrete becomes hard enough to walk upon and then wet mats are removed and final curing done for 2 to 3 weeks. 6.Fillings of Joints and Edging:After curing, the surface is cleaned and washed.The joints are then properly filled-in attains with a suitable sealing compound.
  • 9. CONCLUSION: 2024/2/26 9 Road pavement is the foundation of our transportation infrastructure, and its quality directly impacts the safety, efficiency,low cost and higher productivity From our road networks. It is essential to invest in well-designed, durable, and sustainable pavement solutions to ensure the continued smooth flow of goods and people.