COMPANION PLANTING

Practiced by many in the past and a natural order in the forest, companion planting is once again becoming of interest.
Though controversy exists in its scientific implications, many of those who practice it believe it is very beneficial.
Basically, companion planting is the placing of certain plants in various combinations or “stands” due to the mutual
influences they have on one another. Due to the ever-increasing interest in organic gardening, the following list has
been compiled from various sources.

                                                 Vegetable Relationships

Asparagus ------------------- Tomato and asparagus directly benefit one another. Asparagus
        has been isolated as a substance, which controls some of the                                         soil pests
that frequent tomatoes.

Beans ------------------------- Corn and pole beans benefit one another. The beans can climb
                up the cornstalks. Beans thrive best with carrots and
        cauliflower inter-planted. Beans add nitrogen to the soil and                                        pole beans
are an excellent border to act as a windbreaker.

Beets -------------------------- Do well near dwarf beans, onions and kohlrabi but are
                adversely affected by pole beans. Lettuce and cabbage also
       benefit from beets.

Cabbage Family ------------ Positively influenced by dill, camomile, sage, wormwood,
      rosemary and mint. Tomatoes are said to repel the white                                         cabbage fly.

Carrots ----------------------- Raising flax or soybeans one year prior to planting carrots
        helps to loosen up the soil and make it flexible. Carrots grow                                       best with leaf
lettuce, chives, and red radishes, Onions and                                        leeks are said to repel the carrot fly.

Corn -------------------------- Early potatoes, beans and peas are good neighbors for         corn.
                Corn is also a good shade-making plant, which makes a good
       shelter for the cucurbit family.

Cucumbers ------------------ These are benefited by sunflowers, corn, alternate rows          of
              early potatoes and early cabbage. Radishes inter-planted are                                           said
to repel cucumber beetles.

Eggplant --------------------- A border of eggplant surrounding the potato field acts as a trap
      for potato beetles where they may be controlled.

Garlic ------------------------- Roses and garlic have mutual benefits. Garlic inhibits peas and
                beans.

Kohlrabi --------------------- This inhibits tomatoes and does not do well near pole beans.

Peas -------------------------- Peas grow well with radishes, carrots, cucumbers, sweet corn,
                beans and turnips.

Potatoes --------------------- Early potatoes, beans, sweet corn, cabbage and peas do well
               together. Rye followed by potatoes is beneficial to the
       potatoes. Potatoes and sunflowers are said to inhibit one                                      another.
Radishes -------------------- Radishes and peas are mutually beneficial. Leaf lettuce             is said
               to make radishes tender. Pole beans and radishes are not good                                combination.

Spinach ---------------------- Strawberries are a good intermingling crop for spinach.

Tomatoes -------------------     Asparagus, parsley and early cabbage all do well near
              tomatoes.

                                                     Herb Relationships

Most herbs are beneficial to plants. Their aroma is proclaimed to repel and prevent insect pests and diseases. Many
teas made from various herb combinations can be used as insect repellants.

Basil -------------------------- Basil is an aromatic herb which grows well with most plants
                with the exception of rue.

Borage ----------------------- Strawberries are aided by a sparse scattering of borage.
      Borage also attracts honey bees.

Camomile -------------------     In small ratios it is beneficial to peppermint, wheat, onions and
     cabbage.

Chervil ----------------------   Radishes growing near chervil have a hotter tang.

Chives ----------------------- Chives are hardly ever bothered by insects or diseases.            They
               benefit carrot uniformity and are proclaimed to prevent apple                                      scab
when planted near roots.

Corriander -----------------     In flowers it attracts bees and other beneficial insects.

Dill --------------------------- Sown in garden corners it attracts bees. It is also beneficial
                 near lettuce, onions and cucumbers.

Hyssop ---------------------- This herb increases grape yields, acts as a trap to cabbage
      butterfly and inhibits radishes.

Mint -------------------------   It repels ants, black flea beetles and cabbage butterfly.

Parsley ----------------------   It aids roses and tomatoes and also attracts honey bees.

Rosemary -------------------     It repels carrot worm butterfly and stimulates sage.

Summer Savory ------------       This is beneficial to onions and green beans.

Spurge -----------------------   This herb repels mole and mice.

Stinging Nettle ------------- It helps plants’ resistance to spoiling, increases essential oil
               content of herbs and promotes humus formation.

Thyme -----------------------    It repels cabbage worms.

Valerian ---------------------   It attracts earthworms and promotes phosphorus activity in
       root area.
Yarrow ----------------------    This increases aromatic quality of herbs and fiber content of
              grasses.

                                                    Flower Relationships

Bachelor’s Buttons --------      In small ratios is beneficial to small grains.

Foxgloves -------------------    A good companion to pines.

French Marigolds --------- I excretes a substance fatal to nematodes, repels             Mexican bean
       beetle, very beneficial to tomatoes and a recommended                                              “constant
companion” in all gardens.

Lupine -----------------------   Used to increase the friability of sandy soils.

Morning Glory -------------      I is said to increase the germination of melon seeds.

Nasturtium ----------------- Combats white fly in greenhouses, repels squash bugs              and is
              beneficial to radishes.

Roses ------------------------ Garlic and roses are good companions. Lupines and parsley
               are beneficial to roses. Boxwood and roses do not do well                                  together,

Sunflowers ----------------- They stunt potatoes, are a good wind border, and attract
       birds and bees for pollination. Cucumbers benefit from     the                                     protection of
sunflowers.

Tansy ------------------------ It repels flies, ants and moths. Warning: Stems and leaves
      are poisonous to man and livestock.

                                                                 Adapted from Companion Plants and How to grow Them.
                                                                                  Philbrick, Helen and Gregg, Prichard.



Remineralize your Soil ~ Healthy Soil,                            Healthy Plants, Healthy People
http://remineralize.org

Soil Regeneration with Volcanic Rock Dust
http://calameo.com/books/00062163120384c54b373
http://scribd.com/doc/30402511
Volcanic Rock Dust added to soil can double plant growth.

SoilSoup Compost Tea ~ Healthy Soil,                          Healthy Plants, Healthy People
http://soilsoup.com
SoilSoup Compost Tea is an excellent soil builder and organic fertilizer.
Soil Soup is very easy to handle and use.

Growing Solutions ~ Healthy Soil,                      Healthy Plants, Healthy People
http://www.growingsolutions.com
~

Companion Planting INCREASES Food Production by 250 Percent
One of the goals of research in South Africa is to look at ways to boost food production with the
practice of intercropping (companion planting, or growing crops together) a cereal grain crop, like
sorghum, with bean crops. We have been intercropping sorghum with legumes planted in row of zai
pits.


Why grow beans? Being legumes, bean crops can improve soils by converting nitrogen from the air
into forms that crops can use.

The crops we are working with are quite tolerant of dry conditions and produce vines that cover the
ground, protect6ing it from the intense tropical sun and creating an environments in which soil
microorganisms, can thrive.

Moreover, the legumes provide the farmer with a harvest of dried, edible beans.


What are zai holes? The zai system originated in West Africa as a way to cope with drought and hard
encrusted soil. Drought tolerant grain crops such as sorghum or millet are planted in pits about 12
inches, 6 inches deep.

With the excavated soil thrown to the downhill side, the pits act as tiny water catchment basins,
making maximum use of what little rainfall is received. Several handfuls of manure are traditionally
placed in each pit, concentrating nutrients near the crop roots.


Have we seen any benefits? The results we have so far are from year one of a sorghum-legumes
intercropping strategy within the zai system. Most of the legumes we have tried have grown very
well, but cowpea produced the most dried beans.


It increases total grain production by 1,000 kilograms (250%) from 400 kilograms per hectare
when grown sorghum alone to about 1,400 kilograms per hectare when grown together with
cowpeas.


It also increased soil nitrogen as well as nitrogen taken up by the sorghum plants.



All of this is very encouraging from the perspective of the smallholder farmer, because it means they
have a way to improve their soils while greatly increasing food production.
~
NATURAL SOLUTIONS in Africa by Using Companion Planting
Across East Africa, thousands of farmers are planting weeds in their maize fields (Companion
Planting). Bizarre as it sounds, their technique is actually raising yields by giving the insect pests
something else to chew on besides maize.

It is better than pesticides and a lot cheaper, said Ziadin Khan, whose idea it is.

And it has raised farm yields by 60-70      Percents.
In East Africa, maize fields face two major pests, and Khan has a solution to both. The first is an
insect called the stem borer. True to its name, it s larvae eat their way through a third of the regions'
maize most years.

But Khan discovered that the borer in even fonder of a local weed, napier grass. By planting napier
grass in their fields , farmers can lure the stem borers away from the maize and into a honey trap. For
the grass produces a sticky substance that traps and kills stem borer larvae.

The second major pest is Striga, a parasitic plant that wrecks 10 billion dollars worth damage on
maize crops every year, threating the livelihoods of one hundred million Africans.

Weeding Striga is one of the most time consuming activities for millions of African women farmers,
says Khan.

But he has an antidote: another weed, called Desmodium. It seems to release some sort of chemical
that Striga does not like. At any rate, where farmers plant Desmodium between rows of maize, Striga
will not grow.

Khan's cheap fixes for Striga and stem borer are spreading like wildfire through the fields of East
Africa.

Trials on more than 2,000 farms are finished. It is out of our hands now, says Khan's boss Hans
Herren , who is the director of the International Centre for Insect Physiology and Ecology in Nairobi.

The ideas are being taken up by framers in countries such as Ethiopia where we have never worked.

Khan's novel way of fighting pests is one of the host of Low-Tech Innovations boosting
production by 100 percent or more on millions of poor Thirds World farms in the past
decade.

This Sustainable Agriculture just happens to be the biggest movement in Third World Farming
today, dwarfing the tentative forays in genetic manipulation. It seems peasant farmers have a long
way to go before they exhaust the possibilities of traditional agriculture
~

COMPANION PLANTING BOOKS
(Intercropping Gardening, Mixed Vegetables Gardening, Polycultures Gardening):


Carrots Love Tomatoes and Roses Love Garlic: Secrets of Companion Planting for Successful
Gardening; by Louise Riotte
http://www.librarything.com/work/141405
http://books.google.com/books?id=MtFvQnYDy_sC
http://www.worldcat.org/oclc/37688263     bookfinder.com     addall.com      booksprice.com


A-Z of Companion Planting; by Pamela Allardice
http://www.librarything.com/work/10584295
http://books.google.com/books?id=OD4iHQAACAAJ
http://www.worldcat.org/oclc/29456594       bookfinder.com       addall.com     booksprice.com


A Crash Course on Companion Planting; by Ralph Cummings
~ Nook book allbookstores.com     bing.com      bookfinder.com         yahoo.com


Bob's Basics Companion Planting; by Bob Flowerdew
http://www.librarything.com/work/12593858
http://books.google.com/books?id=LyWr_nVIKNYC
http://www.worldcat.org/oclc/755704762      bookfinder.com        addall.com      booksprice.com


Biological Pest Control, including: Bird, Bacillus Thuringiensis, Predation, Companion Planting,
Disease Resistance In Fruit And Vegetables, Biocide, Parasitoid, Pyrethrum, Beetle Bank, Scoliidae,
Pyrethrin, Fire Ant, Integrated Pest Management, Tansy; by Hephaestus Books
http://books.google.com/books?id=OGmQSQAACAAJ


Companion Gardening in New Zealand: Working with Mother Nature; by Judith Collins
http://books.google.com/books?id=gvJIHQAACAAJ


Companion Planting; by Jeannine Davidoff - South African Organic Gardener
http://www.blurb.com       http://www.yahoo.com        http://www.google.com
~
Companion Planting; by Margaret Roberts
http://books.google.com/books?id=U4FZAAAACAAJ
http://www.worldcat.org/oclc/139975988


Companion Planting; by Richard Bird
http://www.librarything.com/work/729518
http://books.google.com/books?id=5xsGAAAACAAJ
http://www.worldcat.org/oclc/23667555   bookfinder.com          addall.com   booksprice.com


Companion Planting and Intensive Cultivation; by Nancy Lee Maffia
http://www.librarything.com/work/4993593
http://books.google.com/books?id=cQfatgAACAAJ
http://www.worldcat.org/oclc/43414392      bookfinder.com       addall.com   booksprice.com


Companion Planting Boost Your Garden's Health, Secure It From Pests And Grow More Vegetables;
by Ephraim Acre http://www.amazon.co.uk          http://www.dealzilla.co.uk
http://www.yahoo.com        http://www.google.com      http://www.bing.com
~ Kindle book    allbookstores.com    bing.com       bookfinder.com     yahoo.com


Companion Planting for Australian Gardens; by Kelly Morris
http://books.google.com/books?id=OXicOO4HMFUC


Companion Planting For Beginners; by Wendi Eaton
~ Kindle book   allbookstores.com      bing.com        bookfinder.com    yahoo.com


Companion Planting for Successful Gardening; by Louise Riotte
http://www.librarything.com/work/4821536


Companion Planting for Veggies; by Annette Welsford
http://www.companionplantingguide.com          http://www.librarything.com/work/8981096
http://www.yahoo.com http://www.google.com             http://www.bing.com


Companion Planting Guide; by Julie Villani
http://www.yahoo.com      http://www.google.com        http://www.bing.com
~
Companion Planting In Australia; by Brenda Little
http://www.librarything.com/work/424991
http://books.google.com/books?id=WcV0PQAACAAJ
http://www.worldcat.org/oclc/154645816        bookfinder.com     addall.com     booksprice.com


Companion Planting in New Zealand; by Brenda Little
http://www.librarything.com/work/4174999
http://books.google.com/books?id=y0EtOAAACAAJ
http://www.worldcat.org/oclc/154585972      bookfinder.com       addall.com     booksprice.com


Companion Planting Made Easy; by Editors of Organic Gardening Magazine
http://www.librarything.com/work/3406736
google.com     bing.com    bookfinder.com      addall.com     booksprice.com

Companion Planting: Successful Gardening the Organic Way; by Gertrud Franck
http://www.librarything.com/work/4820831
http://books.google.com/books?id=C7M4AQAACAAJ
http://www.worldcat.org/oclc/11197884      bookfinder.com     addall.com    booksprice.com


Companion Plants and How to Use Them: A Guide to Planting the Right Plants to Ward off Plant
Diseases; by Helen Louise Porter Philbrick
http://www.librarything.com/work/940350
http://books.google.com/books?id=GqyMAAAACAAJ
http://www.worldcat.org/oclc/2323470       bookfinder.com   addall.com      booksprice.com


Complete Guide to Companion Planting: Everything You Need to Know to Make Your Garden
Successful; by Dale Mayer
http://www.librarything.com/work/10080769
http://books.google.com/books?id=32xpkvpXyvIC
http://www.worldcat.org/oclc/316834155     bookfinder.com     addall.com   booksprice.com


Garden Companion to Native Plants. Selecting, Planting and Caring for over 400 Australian Native
Plants; by Allan Seale
http://www.librarything.com/work/4264765
http://books.google.com/books?id=mW_gPAAACAAJ
http://www.worldcat.org/oclc/38406971      bookfinder.com       addall.com     booksprice.com
~
Good Companions: A Guide to Gardening with Plants that Help Each Other; by Bob Flowerdew
http://www.librarything.com/work/1177805
http://books.google.com/books?id=AnF5qClHJqsC
http://www.worldcat.org/oclc/24246840    bookfinder.com      addall.com      booksprice.com


Good Neighbors: Companion Planting for Gardeners; by Anna Carr
http://www.librarything.com/work/819899
http://books.google.com/books?id=2yNIAAAAYAAJ
http://www.worldcat.org/oclc/11397323    bookfinder.com        addall.com     booksprice.com


Great Garden Companions: A Companion-Planting System for a Beautiful, Chemical-Free Vegetable
Garden; by Sally Jean Cunningham
http://www.librarything.com/work/392320
http://books.google.com/books?id=bYOPlJt6SfAC
http://www.worldcat.org/oclc/37792416    bookfinder.com     addall.com     booksprice.com


Growing Together: the A to Z of Companion Planting; by Susan Tomnay
http://www.librarything.com/work/10090519
http://books.google.com/books?id=zJafPQAACAAJ
http://www.worldcat.org/oclc/219996984     bookfinder.com       addall.com     booksprice.com


How to Grow World Record Tomatoes: a Guinness World Record Holder, Reveals His
All-Organic Secrets. His organic methods work with other crops; by Charles Wilber
http://librarything.com/work/1752882
http://books.google.com/books?id=hQdIAAAAYAAJ
http://worldcat.org/oclc/40948283    bookfinder.com      addall.com       booksprice.com




Intercropping: A Step Towards Sustainability; by Haseeb ur Rehman
http://books.google.com/books?id=0a8RTwEACAAJ


Jackie French's Guide to Companion Planting in Australia and New Zealand; by Jackie French
http://www.librarything.com/work/2209675
http://books.google.com/books?id=aAvWAAAACAAJ
http://www.worldcat.org/oclc/25753761      bookfinder.com      addall.com       booksprice.com
~
List of Companion Plants; by Frederic P Miller
http://www.alibris.com
http://books.google.com/books?id=y1EzygAACAAJ


My Garden Companion: A Complete Guide for the Beginner, With a Special Emphasis on Useful
Plants and Intensive Planting in the Wayside, Dooryard, Patio, Rooftop, and Vacant Lot; by Jamie
Jobb
http://www.librarything.com/work/1129726
http://books.google.com/books?id=MbhFAAAAYAAJ
http://www.worldcat.org/oclc/2681054        bookfinder.com      addall.com     booksprice.com



Organic Gardening Books, Eco Farming Books, DVD's, Newsletter and Much More
http://www.acresusa.com


Planting The Future: Saving Our Medicinal Herbs; by Rosemary Gladstar
http://www.librarything.com/work/4402479
http://books.google.com/books?id=ndk42wxMBzUC
http://www.worldcat.org/oclc/43894470      bookfinder.com      addall.com       booksprice.com


Primer of Companion Planting: Herbs and Their Part in Good Gardening; by Richard B. Gregg
http://www.librarything.com/work/10966145
http://books.google.com/books?id=ZtXIMAEACAAJ
http://www.worldcat.org/oclc/153273738     bookfinder.com      addall.com       booksprice.com


Principles and Practice of Plant Conservation; by David R. Given
http://www.librarything.com/work/8843936
http://books.google.com/books?id=tHvwAAAAMAAJ
http://www.worldcat.org/oclc/28338097         bookfinder.com       addall.com   booksprice.com


Rodale's Successful Organic Gardening: Companion Planting; by Susan McClure
http://www.librarything.com/work/204704
http://books.google.com/books?id=nRdVNgAACAAJ
http://www.worldcat.org/oclc/29388690     bookfinder.com        addall.com  booksprice.com
~
Sharing the Harvest: A Citizen's Guide to Community Supported Agriculture; by Elizabeth Henderson
librarything.com/4557502   books.google.com/13sDbCIz0ooC      worldcat.org/oclc/144328213
http://localharvest.org


Secrets of Companion Planting: Plants That Help, Plants That Hurt; by Brenda Little
http://www.librarything.com/work/2596731
http://books.google.com/books?id=byjoAAAACAAJ
http://www.worldcat.org/oclc/148670035       bookfinder.com        addall.com       booksprice.com


Soil Mates: Companion Plants for Your Vegetable Garden; by Sara Alway
http://www.librarything.com/work/10746015
http://books.google.com/books?id=TV_wRQAACAAJ
http://www.worldcat.org/oclc/690917742      bookfinder.com       addall.com       booksprice.com


South African Planting and Companion Planting Guide; by Jeannine Davidoff
http://www.yahoo.com        http://www.google.com       http://www.bing.com


Sustainable Gardening, including: Raised Bed Gardening, Energy-efficient Landscaping,
Permaculture, Masanobu Fukuoka, Companion Planting, Biological Pest Control, Leaf Mold, Spent
Mushroom Compost, Green Roof, Agroecology, Wildlife Garden, Mulch; by Hephaestus Books
http://books.google.com/books?id=qhaLtgAACAAJ


Tending The Wild: Native American Knowledge and the Management of California's Natural
Resources; by M. Kat Anderson
http://www.librarything.com/work/1300650
http://books.google.com/books?id=WM--vVFtnvkC
http://www.worldcat.org/oclc/56103978    bookfinder.com   addall.com      booksprice.com


The A-Z of Companion Planting; by Jayne Neville
http://www.librarything.com/work/10584295
http://books.google.com/books?id=f80bQwAACAAJ
http://www.worldcat.org/oclc/495273643       bookfinder.com       addall.com      booksprice.com
~
The Best Gardening Ideas I Know: Foolproof way to start any seed, Compost piles that work,
Practical companion planting, More vegetables in less space, Succession planting chart, Natural
weed controls, Mulching with weeds, Midsummer feeding; by Robert Rodale
http://www.librarything.com/work/767913
http://books.google.com/books?id=H3esPwAACAAJ
http://www.worldcat.org/oclc/6449670      bookfinder.com        addall.com      booksprice.com


Climate Change, Intercropping, Pest Control and Beneficial Microorganisms; by Eric Lichtfouse
http://books.google.com/books?id=RNsyKTwTfgY
http://www.worldcat.org/oclc/489218897


Intercropping And The Scientific Basis Of Traditional Agriculture; by Donald Quayle Innis
http://books.google.com/books?id=pPk4AQAAIAAJ
http://www.worldcat.org/oclc/37454497


The Complete Book of Herbs: A Practical Guide to Cultivating, Drying, and Cooking With More
Than 50 Herbs; by Emma Callery
http://www.librarything.com/work/1420424
http://books.google.com/books?id=GehUsea2PqcC
http://www.worldcat.org/oclc/30264455     bookfinder.com       addall.com     booksprice.com


The Complete Guide to Companion Planting: Everything You Need to Know to Make Your Garden
Successful; by Dale Mayer
http://www.librarything.com/work/10080769
http://books.google.com/books?id=32xpkvpXyvIC
http://www.worldcat.org/oclc/316834155     bookfinder.com    addall.com    booksprice.com


The Cook and the Gardener: A Year of Recipes and Writings for the French Countryside; by Amanda
Hesser
http://www.librarything.com/work/150161
http://books.google.com/books?id=7mYoAAAACAAJ
http://www.worldcat.org/oclc/40354856     bookfinder.com       addall.com    booksprice.com
~




The Ecology of Intercropping; by John H. Vandermeer
http://www.librarything.com/work/12183339
http://books.google.com/books?id=CvyyTVq_o70C
http://www.worldcat.org/oclc/17202869        bookfinder.com   addall.com    booksprice.com




The Huge Book of Organic Gardening and Companion Planting; by Billie Rex
http://books.google.com/books?id=ZuKIZwEACAAJ




The Natural Garden: A New Zealander's Guide to Companion Gardening, Natural Pest Control and
Soil Health; by Michael Crooks
http://books.google.com/books?id=0oS6AQAACAAJ
http://www.worldcat.org/oclc/154277336




Your Backyard Herb Garden: A Gardener's Guide to Growing Over 50 Herbs Plus How to Use Them
in Cooking, Crafts, Companion Planting and More; by Miranda Smith
http://www.librarything.com/work/217099
http://books.google.com/books?id=Zxxm0awYC3QC
http://www.worldcat.or/oclc/34722846      bookfinder.com      addall.com  booksprice.com




SWAP your Books with Other People
http://www.scribd.com/doc/81071919
http://www.calameo.com/books/00115999712e89ac6bda5
~
ORGANIC GARDENING TECHNOLOGIES
INCREASING Plant Yields by over         400
                                       PERCENT
http://www.scribd.com/doc/75160339
http://www.calameo.com/books/0010511867e619fa5b018


Remineralize your Soil ~ Healthy Soil,               Healthy Plants, Healthy People
http://remineralize.org

Soil Regeneration with Volcanic Rock Dust
http://calameo.com/books/00062163120384c54b373
http://scribd.com/doc/30402511
Volcanic Rock Dust added to soil can double plant or lawn growth.

Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by
Marc Remillard
librarything.com/11197572    books.google.com/PZHObwAACAAJ        worldcat.org/oclc/744677817


A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra
Truax
~ Kindle book    allbookstores.com bing.com    bookfinder.com       yahoo.com
http://vermico.com

SoilSoup Compost Tea ~ Healthy Soil,             Healthy Plants, Healthy People
http://soilsoup.com
SoilSoup Compost Tea is an excellent soil builder and organic fertilizer.
Soil Soup is very easy to handle and use.

Growing Solutions ~ Healthy Soil,          Healthy Plants, Healthy People
http://www.growingsolutions.com


Zing Bokashi: Recycling Organic Waste with Effective Microorganisms (EM)
http://www.zingbokashi.co.nz

An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural,
Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism
http://www.librarything.com/work/5162954
http://books.google.com/books?id=drOMQQAACAAJ
http://www.worldcat.org/oclc/54830842     bookfinder.com   addall.com     booksprice.com
~

ORGANIC GARDENING and Eco Gardening
~ Healthy    Soil, Healthy Plants, Healthy People

Advanced Aeroponics; by Chad Peterson
~ Kindle book allbookstores.com     bing.com           bookfinder.com      yahoo.com


20 Best Small Gardens: Innovative Designs for every Site and Situation ; by Tim Newbury
http://www.librarything.com/work/2326033
http://books.google.com/books?id=2i2qQgAACAAJ
http://www.worldcat.org/oclc/41925845     bookfinder.com       addall.com        booksprice.com


101 Ideas for Veg from Small Spaces: Delicious Crops from Tiny Plots; by Jane Moore
http://www.librarything.com/work/8553786
http://books.google.com/books?id=VcYUOgAACAAJ
http://www.worldcat.org/oclc/288986247     bookfinder.com      addall.com      booksprice.com


101 Organic Gardening Tips; by Sheri Ann Richerson
http://www.librarything.com/work/13168242
http://books.google.com/books?id=UDI-YgEACAAJ
~ Kindle book     allbookstores.com     bing.com       bookfinder.com      yahoo.com


300 of the Most Asked Questions About Organic Gardening; by Charles Gerras; Rodale Organic
Gardening Magazine
http://www.librarything.com/work/2720602
http://books.google.com/books?id=94VFAQAAIAAJ
http://www.worldcat.org/oclc/532445   bookfinder.com      addall.com      booksprice.com


365 Down-To-Earth Gardening Hints and Tips; by Susan McClure
http://books.google.com/books?id=EvJL7JsrCq8C
http://www.worldcat.org/oclc/40443946


1,001 Old-Time Garden Tips: Timeless Bits of Wisdom on How to Grow Everything Organically,
from the Good Old Days When Everyone Did; by Roger Yepsen
http://www.librarything.com/work/368884
http://books.google.com/books?id=UzQHAAAACAAJ
http://www.worldcat.org/oclc/53912298    bookfinder.com   addall.com     booksprice.com
~
A Beginners Guide to Organic Vegetable Gardening: Introduction to Composting, Worm Farming,
No Dig Raised and Wicking Gardens Plus More; by Mel Jeffreys
http://www.librarything.com/work/13508623
~ Kindle book     allbookstores.com    bing.com      bookfinder.com    yahoo.com


A Brief Guide to Organic Gardening; by Irish Seed Savers Association
http://www.irishseedsavers.ie
http://www.google.com      http://www.bing.com


A Child's Organic Garden: Grow Your Own Delicious Nutritious Foods, Australia; by Lee Fryer
http://www.librarything.com/work/3612052
http://books.google.com/books?id=QFPfAQAACAAJ
http://www.worldcat.org/oclc/20295655    bookfinder.com     addall.com     booksprice.com


A Guide to Organic Gardening in Australia; by Michael J. Roads
http://books.google.com/books?id=ZNGaAQAACAAJ
http://www.worldcat.org/oclc/27616780


A Patch of Eden: America's Inner-City Gardeners; by H. Patricia Hynes
http://www.librarything.com/work/173800
http://books.google.com/books?id=QqBHAAAAMAAJ
http://www.worldcat.org/oclc/34410093     bookfinder.com         addall.com   booksprice.com


A Treatise on the Management of Peach and Nectarine Trees: Either in Forcing-Houses, or on Hot
and Common Walls. Containing an Effectual and Easy Process for Preventing Them from Being
Infected with Any Species of Insects; by Thomas Kyle
http://books.google.com/books?id=kTREAAAAYAAJ
http://www.worldcat.org/oclc/642622210
http://www.echobooks.org


A Year on the Garden Path: A 52-Week Organic Gardening Guide; by Carolyn Herriot
http://www.librarything.com/work/5305327
http://books.google.com/books?id=5y9VYgEACAAJ
http://www.worldcat.org/oclc/60318976
~
Adobe and Rammed Earth Buildings: Design and Construction; by Paul G. McHenry
http://www.librarything.com/work/984947
http://books.google.com/books?id=q4GU71IMn3kC
http://www.worldcat.org/oclc/9645321    bookfinder.com    addall.com     booksprice.com


Advanced Organic Gardening (Rodale's Grow-It Guides); by Anna Carr
http://www.librarything.com/work/2314163
http://books.google.com/books?id=nhrSAAAACAAJ
http://www.worldcat.org/oclc/7925730   bookfinder.com      addall.com        booksprice.com


Advancing Biological Farming: Practicing Mineralized, Balanced Agriculture to Improve Soils and
Crops; by Gary F. Zimmer
http://www.librarything.com/work/11126192
http://books.google.com/books?id=nifUZwEACAAJ
http://www.worldcat.org/oclc/710981889


Agriculture in the City: A Key to Sustainability in Havana, Cuba; by Maria Caridad Cruz
http://www.librarything.com/work/2562094
http://books.google.com/books?id=qySx0yq9Jd4C
http://www.worldcat.org/oclc/53356977       bookfinder.com      addall.com       booksprice.com


Agricultural Options of the Poor: A Handbook for Those Who Serve Them; by Timothy N. Motts
http://www.echobooks.org       http://www.google.com    http://www.bing.com


All-Time Best Gardening Secrets; by the Editors of Organic Gardening Magazine
http://www.librarything.com/work/1608013
http://books.google.com/books?id=jpFHYAAACAAJ
http://www.worldcat.org/oclc/23728857       bookfinder.com      addall.com    booksprice.com


Allergy-Free Gardening: The Revolutionary Guide to Healthy Landscaping; by Thomas Leo Ogren
http://www.librarything.com/work/881332
http://books.google.com/books?id=UnAlAQAAMAAJ
http://www.worldcat.org/oclc/43919603    bookfinder.com      addall.com      booksprice.com
~
Allotment Gardening: An Organic Guide For Beginners; by Susan Berger, the Organic Centre, Ireland
http://www.librarything.com/work/1387210
http://books.google.com/books?id=gtlYoks42I4C
http://www.worldcat.org/oclc/58456384
~ Kindle book     allbookstores.com    bing.com      bookfinder.com       yahoo.com


Alternatives to Peat; by Pauline Pears
http://books.google.com/books?id=O6KaXwAACAAJ
http://www.worldcat.org/oclc/316533298
http://www.worldcat.org/oclc/223261303


Amaranth to Zai Holes: Ideas for Growing Food Under Difficult Conditions; by Laura S. Meitzner
http://www.librarything.com/work/4512527
http://books.google.com/books?id=__RHAAAAYAAJ
http://www.worldcat.org/oclc/36561933     bookfinder.com      addall.com      booksprice.com



An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural,
Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism
http://www.librarything.com/work/5162954
http://books.google.com/books?id=drOMQQAACAAJ
http://www.worldcat.org/oclc/54830842     bookfinder.com   addall.com     booksprice.com


Any Size, Anywhere Edible Gardening: The No Yard, No Time, No Problem Way to Grow Your
Own Food; by William Moss
http://books.google.com/books?id=G2D8TmIR_agC
http://www.worldcat.org/oclc/738347398
~ Kindle book     ~ Nook book    allbookstores.com  bing.com    bookfinder.com


Anything Grows: Ingenious Ways To Grow More Food In Front Yards, Backyards, Side Yards, In
The Suburbs, In The City, On Rooftops, Even Parking Lots; by Sheryl London
http://www.librarything.com/work/1112076
http://books.google.com/books?id=je44AQAAIAAJ
http://www.worldcat.org/oclc/10208434      bookfinder.com        addall.com booksprice.com
~
Apartment Gardening: Plants, Projects, and Recipes for Growing Food in Your Urban Home; by
Amy Pennington
librarything.com/11367320 books.google.com/UNa9bwAACAAJ worldcat.org/oclc/759838812
~ Kindle book     ~ Nook book      allbookstores.com     bing.com     bookfinder.com


Aquaponic Gardening: A Step-By-Step Guide to Raising Vegetables; by Sylvia Bernstein
http://www.librarything.com/work/11672554
http://books.google.com/books?isbn=1550924893
http://www.worldcat.org/oclc/709681564
~ Kindle book     ~ Nook book    allbookstores.com bing.com      bookfinder.com


Asphalt to Ecosystems: Design Ideas for Schoolyard Transformation; by Sharon Gamson Danks
http://www.librarything.com/work/9587254
http://books.google.com/books?id=GzhxmxBsn5oC
http://www.worldcat.org/oclc/216936727     bookfinder.com      addall.com      booksprice.com


Attracting Native Pollinators: The Xerces Society Guide Protecting North America's Bees and
Butterflies
http://www.librarything.com/work/10501685
http://books.google.com/books?id=iTwPEDL3nvMC
http://www.worldcat.org/oclc/535495615
~ Kindle book     ~ Nook book      allbookstores.com    bing.com     bookfinder.com


Australia and New Zealand Guide to Compost Gardening: A Guide to Gardening Without Digging:
by David Hornblow
http://www.librarything.com/work/8412440
http://books.google.com/books?id=QyanAQAACAAJ
http://www.worldcat.org/oclc/6910861   bookfinder.com    addall.com      booksprice.com


Backyard Farming: Growing Your Own Fresh Vegetables, Fruits, and Herbs in a Small Space; by Lee
Foster
http://www.librarything.com/work/8602055
http://books.google.com/books?id=ZINjAAAACAAJ
http://www.worldcat.org/oclc/7307268   bookfinder.com    addall.com      booksprice.com

Back to Eden; by Jethro Kloss - he was curing cancer in the 1930's
librarything.com/86035     books.google.com/blIQgUVUy_8C        worldcat.org/28157353
~ Kindle book     ~ Nook book      allbookstores.com     bing.com     bookfinder.com
~
Backyard Organic Gardening in Australia; by Brenda Little
http://www.librarything.com/work/1004810
http://books.google.com/books?id=KpGlYgEACAAJ
http://www.worldcat.org/oclc/221117836      bookfinder.com      addall.com     booksprice.com


Backyard Bounty: The Complete Guide to Year-Round Organic Gardening in the Pacific Northwest;
by Linda A Gilkeson
http://www.librarything.com/work/11026821
http://books.google.com/books?id=xSOTCeV_m4gC
http://www.worldcat.org/oclc/669755016
~ Kindle book      ~ Nook book    bookfinder.com   addall.com    booksprice.com


Balcony Gardening : Growing Herbs and Vegetables in a Small Urban Space; by Jeff Haase
http://books.google.com/books?id=DrJ-lwEACAAJ
~ Kindle book     allbookstores.com    bing.com      bookfinder.com    yahoo.com


Basic Book of Cloche and Frame Gardening; by W E Shewell-Cooper
http://books.google.com/books?id=YYmbAAAACAAJ
http://www.worldcat.org/oclc/4578165


Basic Book of Natural Gardening; by Wilfred Edward Shewell-Cooper
http://www.librarything.com/work/13211130
http://books.google.com/books?id=oqTpRwAACAAJ
http://www.worldcat.org/oclc/6358555      bookfinder.com    addall.com       booksprice.com


Basic Vegetable Gardening: Small-Scale Vegetable Production in Tropical Climates; by E.D. Adams
http://www.google.com
http://www.bing.com


Best Ideas for Organic Vegetable Growing; by Glenn F. Johns
http://www.librarything.com/work/368890
http://books.google.com/books?id=p_V-ntrP768C
http://www.worldcat.org/oclc/54881    bookfinder.com        addall.com   booksprice.com
~
Best Methods for Growing Fruits and Berries; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/1608026
http://books.google.com/books?id=SFwrlAEACAAJ
http://www.worldcat.org/oclc/6403713    bookfinder.com        addall.com   booksprice.com


Better Vegetable Gardens the Chinese Way: Peter Chan's Raised-Bed System; by Peter Chan
http://www.librarything.com/work/1361317
http://books.google.com/books?id=TVsjAQAAMAAJ


Bible Plants for American Gardens; by Eleanor Anthony King
http://www.librarything.com/work/482448
http://books.google.com/books?id=M1FfDLxT_DoC
http://www.worldcat.org/oclc/1186027        bookfinder.com        addall.com     booksprice.com


Big Ideas for Northwest Small Gardens; by Marty Wingate
http://www.librarything.com/work/907983
http://books.google.com/books?id=66yNsFIpGNoC
http://www.worldcat.org/oclc/50252055      bookfinder.com         addall.com     booksprice.com


Biodynamics for the Home Garden, New Zealand; by Peter Proctor
http://www.librarything.com/work/9783978
http://books.google.com/books?id=NQtlLwEACAAJ
http://www.worldcat.org/oclc/819421004   bookfinder.com        addall.com         booksprice.com


Biofertilizers for Sustainable Agriculture; by Arun K. Sharma
http://books.google.com/books?id=d7WOAAAACAAJ
http://www.worldcat.org/oclc/50390257


Biological Transmutations; by C. Louis Kervran
http://www.librarything.com/work/3248374
http://books.google.com/books?id=FFoGAAAACAAJ
http://www.worldcat.org/oclc/560595      bookfinder.com         addall.com     booksprice.com


Bioshelter Market Garden: A Permaculture Farm; by Darrell Frey
librarything.com/10703491 books.google.com/Vx8enVBW5jwC worldcat.org/oclc/601130383
~ Kindle book     ~ Nook book      allbookstores.com      bing.com      bookfinder.com
~
Botanica's Organic Gardening: The Healthy Way to Live and Grow; by Judyth McLeond.
http://www.librarything.com/work/157977
http://books.google.com/books?id=5N1yjCNM8fIC
http://www.worldcat.org/oclc/50730815    bookfinder.com     addall.com      booksprice.com


Breaking Through Concrete: Building an Urban Farm Revival; by David Hanson
http://www.librarything.com/work/12241103
http://books.google.com/books?id=pW1r0u95OLEC
http://www.worldcat.org/oclc/712114151
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com


Building and Using Cold Frames; by Charles Siegchrist
http://www.librarything.com/work/44477
http://books.google.com/books?id=_YZgFQ4fwSUC
http://www.worldcat.org/oclc/6993581
~ Kindle book    ~ Nook book      allbookstores.com     bing.com      bookfinder.com


Building Soils Naturally: Innovative Methods for Organic Gardeners; by Phil Nauta
http://books.google.com/books?id=aJdtMAEACAAJ
http://www.worldcat.org/oclc/807332486


Building With Cob: A Step-by-step Guide; by Adam Weismann
http://www.librarything.com/work/1103587
http://books.google.com/books?id=ri45AQAAIAAJ
http://www.worldcat.org/oclc/66901843
~ Kindle book    allbookstores.com   bing.com     bookfinder.com


Bush-Fruits: A Horticultural Monograph of Raspberries, Blackberries, Dewberries, Currants,
Gooseberries, and Other Shrub-Like Fruits; by Fred W. Card
http://books.google.com/books?id=NHP3f3W2hH0C
http://www.worldcat.org/oclc/3547720
~ Nook book allbookstores.com      bing.com        bookfinder.com     yahoo.com


Charles Dowding's Vegetable Course; by Charles Dowding
http://www.librarything.com/work/12309906
http://books.google.com/books?id=IPeNZwEACAAJ
http://www.worldcat.org/oclc/762989736     bookfinder.com       addall.com      booksprice.com
~
Chico's Organic Gardening and Natural Living; by Frank Bucaro
http://www.librarything.com/work/9228498
http://books.google.com/books?id=G9axOAAACAAJ
http://www.worldcat.org/oclc/235155    bookfinder.com       addall.com       booksprice.com


City Bountiful: A Century of Community Gardening in America; by Laura J. Lawson
http://www.librarything.com/work/1327706
http://books.google.com/books?id=lgopAQAAMAAJ
http://www.worldcat.org/oclc/58728578    bookfinder.com     addall.com      booksprice.com


City People's Book of Raising Food; by Helga Olkowski
http://www.librarything.com/work/3501360
http://books.google.com/books?id=t04WPwAACAAJ
http://www.worldcat.org/oclc/1177811      bookfinder.com     addall.com       booksprice.com


City Permaculture, Volume 1: Sustainable Living in Small Spaces; by Earth Garden Publication
http://www.google.com
http://www.bing.com


City Permaculture, Volume 2; by Earth Garden Publication
http://www.google.com
http://www.bing.com


Clay Soil Gardening - Australasian Edition; by Michael Carr
~ Kindle book    allbookstores.com       bing.com       bookfinder.com     yahoo.com


Cold-Climate Gardening; by Lewis Hill
http://www.librarything.com/work/800344
http://books.google.com/books?id=YYac91iUGr8C
http://www.worldcat.org/oclc/14413823    bookfinder.com         addall.com      booksprice.com


Comfrey: Fodder, Food and Remedy, United Kingdom; by Lawrence Donegan Hills
http://www.librarything.com/work/6954118
http://books.google.com/books?id=VfQ4AQAAIAAJ
http://www.worldcat.org/oclc/2212835   bookfinder.com    addall.com    booksprice.com
~
Comfrey Report: The Story of the World's Fastest Protein Builder and Herbal Healer; by Lawrence D.
Hills
http://www.librarything.com/work/2404463
http://books.google.com/books?id=BGc4RAAACAAJ
http://www.worldcat.org/oclc/2507087     bookfinder.com       addall.com     booksprice.com


Commonsense Gardening in Australia: Organic Growing for All Gardeners ; by Panorama Books
http://www.librarything.com/work/4948078
http://books.google.com/books?id=MtkAuAAACAAJ
http://www.worldcat.org/oclc/27624021    bookfinder.com     addall.com       booksprice.com


Common Sense Organic Gardening; by Warner Fremont Bower
http://www.librarything.com/work/232881
http://www.worldcat.org/oclc/796985


Community Gardening, New Zealand; by Stephen Trinder
http://books.google.com/books?id=WYrpLQAACAAJ
http://www.worldcat.org/oclc/156371596


Complete Organic Gardening: A Comprehensive Guide to Better Gardening and Increased Self
Sufficiency; by Jonathan Sturm
http://www.librarything.com/work/6278906
http://books.google.com/books?id=pFsAAQAACAAJ
http://www.worldcat.org/oclc/28473558    bookfinder.com    addall.com    booksprice.com


Compost and Mulch Gardening; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/9660918
http://books.google.com/books?id=0lrWAAAAMAAJ
http://www.worldcat.org/oclc/17358150    bookfinder.com    addall.com         booksprice.com


Compost Gardening: A New Time-Saving System for More Flavorful Vegetables, Bountiful Blooms,
and the Richest Soil You've Ever Seen; by by Wilfred Edward Shewell-Cooper
http://www.librarything.com/work/1410958
http://books.google.com/books?id=oHJlNQAACAAJ
http://www.worldcat.org/oclc/1046147       bookfinder.com     addall.com   booksprice.com
~
Compost, Vermicompost, and Compost Tea; by Grace Gershuny
http://www.librarything.com/work/9379681
http://books.google.com/books?id=Xub8aChfFsIC
http://www.worldcat.org/oclc/676727212
~ Kindle book    ~ Nook book    allbookstores.com   bing.com       bookfinder.com


Composting: The Ultimate Organic Guide to Recycling Your Garden, Australia; by Tim Marshall
http://www.librarything.com/work/7930606
http://books.google.com/books?id=lGpz4mFf6-QC
http://www.worldcat.org/oclc/252764840    bookfinder.com    addall.com        booksprice.com


Composting for Manure Management; by The Staff of BioCycle
http://books.google.com/books?id=U44dAQAAMAAJ
http://www.worldcat.org/oclc/41095726


Composting Inside And Out: The Comprehensive Guide To Reusing Trash, Saving Money And
Enjoying The Benefits Of Organic Gardening; by Stephanie Davies
http://www.librarything.com/work/10782998
http://books.google.com/books?id=ITTfPbwXyNkC
http://www.worldcat.org/oclc/661181266
~ Kindle book     ~ Nook book    allbookstores.com     bing.com bookfinder.com


Country Wisdom and Know-How: Everything You Need To Know to Live Off the Land; by Storey
Publishing
http://www.librarything.com/work/635434
http://books.google.com/books?id=x1wezh3aP34C
http://www.worldcat.org/oclc/56513771
~ Kindle book    ~ Nook book    allbookstores.com bing.com   bookfinder.com


Contour Farming with Living Barriers; by World Neighbors
http://books.google.com/books?id=5sXdlAEACAAJ
http://www.worldcat.org/oclc/43935008
http://www.echobooks.org


Converting to Organic Farming; by Nicolas Lampkin
http://books.google.com/books?id=CPZHAAAAYAAJ
http://www.worldcat.org/oclc/23362983
~
Converting to Organic Farming; by David Younie
http://books.google.com/books?id=1844MwEACAAJ
http://www.worldcat.org/oclc/80681198


Converting to Organic Farming; by Hartmut Vogtmann
http://www.worldcat.org/oclc/23362983


Creative Sustainable Gardening for the Twenty-First Century, New Zealand; by Diana Anthony
http://www.worldcat.org/oclc/154751351


Creative Vegetable Gardening; by Joy Larkcom
http://www.librarything.com/work/748050
http://books.google.com/books?id=lrk9PgAACAAJ
http://www.worldcat.org/oclc/180478256     bookfinder.com      addall.com     booksprice.com


Crop Rotation and Cover Cropping: Soil Resiliency and Health on the Organic Farm; by Seth Kroeck
http://www.librarything.com/work/11138600
http://books.google.com/books?id=vp5xYRVkIzAC
http://www.worldcat.org/oclc/676727214
~ Kindle book     ~ Nook book    allbookstores.com     bing.com     bookfinder.com


Cultivating Community: Principles and Practices for Community Gardening as a Community-
Building Tool; by Karen Payne
http://www.librarything.com/work/10004068
http://books.google.com/books?id=1ELkGwAACAAJ
http://www.worldcat.org/oclc/49777298     bookfinder.com     addall.com     booksprice.com


Desert Gardening for Beginners: How to Grow Vegetables, Flowers and Herbs in an Arid Climate; by
Cathy Cromell
http://www.librarything.com/work/613055
http://books.google.com/books?id=zrINAAAACAAJ
http://www.worldcat.org/oclc/42697618     bookfinder.com     addall.com      booksprice.com
~
Desert Gardening: Fruits and Vegetables; by George Brookbank
http://www.librarything.com/work/1093624
http://books.google.com/books?id=Fmzr1uGU4jkC
http://www.worldcat.org/oclc/23047472        bookfinder.com     addall.com     booksprice.com


Desert Harvest: A Guide to Vegetable Gardening in Arid Lands; by Jane Nyhuis
http://www.librarything.com/work/1961242
http://books.google.com/books?id=AVdYpwAACAAJ
http://www.worldcat.org/oclc/9026622      bookfinder.com       addall.com    booksprice.com


Digging Deeper: Integrating Youth Gardens into Schools and Communities, A Comprehensive
Guide; by Joseph Kiefer
http://www.librarything.com/work/4964212
http://books.google.com/books?id=Hu_ZAAAACAAJ
http://www.worldcat.org/oclc/41174314    bookfinder.com      addall.com    booksprice.com


Don't Throw It, Grow It: 68 Windowsill Plants From Kitchen Scraps; by Millicent Selsam
http://www.librarything.com/work/5003825
http://books.google.com/books?id=71kCTjFilNMC
http://www.worldcat.org/oclc/192050048
~ Kindle book     ~ Nook book     bookfinder.com      addall.com      booksprice.com


Down to Earth: The Absolute Beginner's Guide to Growing Organic Vegetables, New Zealand ; by
David Prosser
http://www.librarything.com/work/12135436
http://books.google.com/books?id=g9K1PQAACAAJ
http://www.worldcat.org/oclc/154667091    bookfinder.com     addall.com     booksprice.com


Dr. Shewell-Cooper's Basic Book of Fruit Growing, United Kingdom; by Wilfred Edward Shewell-
Cooper
http://books.google.com/books?id=3G2ZPAAACAAJ
http://www.worldcat.org/oclc/6377385
~
Drip Irrigation for Every Landscape and All Climates: Helping Your Garden Flourish, While
Conserving Water; by Robert Kourik
http://www.librarything.com/work/2069850
http://books.google.com/books?id=pj5_AAAACAAJ
http://www.worldcat.org/oclc/26704282        bookfinder.com     addall.com    booksprice.com


Earthbag Building: The Tools, Tricks and Techniques; by Kaki Hunter
http://www.librarything.com/work/1677450
http://books.google.com/books?id=5TLCbGmcGLUC
http://www.worldcat.org/oclc/56752089
~ Kindle book    ~ Nook book      allbookstores.com     bing.com    bookfinder.com


Easy Garden Projects to Make, Build, and Grow: 200 Do-It-Yourself Ideas to Help You Grow Your
Best Garden Ever, by Barbara Pleasant
http://www.librarything.com/work/3830618
http://books.google.com/books?id=y9GpDTUwG4kC
http://www.worldcat.org/oclc/62782168     bookfinder.com    addall.com       booksprice.com


Easy Organic Gardening and Moon Planting; Lyn Bagnall
http://www.librarything.com/work/1467113
http://books.google.com/books?id=ZTgmRxGxb-0C
http://www.worldcat.org/oclc/224492192
~ Kindle book     ~ Nook book    allbookstores.com  bing.com         bookfinder.com


Eat More Dirt: Diverting and Instructive Tips for Growing and Tending an Organic Garden; by Ellen
Sandbeck
http://www.librarything.com/work/785915
http://books.google.com/books?id=9L-bI_M_WskC
http://www.worldcat.org/oclc/50339883       bookfinder.com     addall.com    booksprice.com


Eat the Weeds; by Ben Charles Harris
http://www.librarything.com/work/307825
http://books.google.com/books?id=tB1FAAAAYAAJ
http://www.worldcat.org/oclc/4426    bookfinder.com        addall.com      booksprice.com
~
Eat Your Garden: Organic Gardening for Home and Schools; Leonie Shanahan
http://books.google.com/books?id=VwGJSQAACAAJ
http://www.worldcat.org/oclc/643584711


ECHO Appropriate Technologies Book; by ECHO
http://www.echobooks.org


Eco-Farm, An Acres U.S.A. Primer: The definitive guide to managing farm and ranch soil fertility,
crops, fertilizers, weeds and insects while avoiding dangerous chemicals; by Jr. Charles Walters
librarything.com/326739 books.google.com/hKodAQAAMAAJ worldcat.org/oclc/35908160


Ecological Gardening: Your Path to a Healthy Garden; by Marjorie Harris
http://www.librarything.com/work/1320836
http://books.google.com/books?id=T0jLCKrsV8AC
http://www.worldcat.org/oclc/22510551
~ Kindle book     ~ Nook book     allbookstores.com     bing.com      bookfinder.com


Edible Flower Garden; by Rosalind Creasy
http://www.librarything.com/work/326878
http://books.google.com/books?id=AwGJVW948mwC
http://www.worldcat.org/oclc/39713714
~ Kindle book    ~ Nook book      allbookstores.com     bing.com       bookfinder.com

Edible Flowers Hydroponic Kit; by Institue of Simplified Hydroponics
carbon.org     google.com       bing.com       yahoo.com


Edible Forest Gardens; by Dave Jacke
http://www.librarything.com/work/10192426
http://books.google.com/books?id=s_vwAAAAMAAJ
http://www.worldcat.org/oclc/57344039
~ Nook book allbookstores.com        bing.com bookfinder.com           yahoo.com


Edible Landscaping in the Desert Southwest: Wheelbarrow to Plate; by Catherine Crowley
http://books.google.com/books?id=uDio8-sC2wMC
http://www.worldcat.org/oclc/63205838
~ Nook book allbookstores.com       bing.com    bookfinder.com        yahoo.com
~
Encyclopedia of Organic Gardening; by Pauline Pears, UK Garden Organic, Henry Doubleday
Research Assoc.
http://www.librarything.com/work/3203058
http://books.google.com/books?id=WywrPQAACAAJ
http://www.worldcat.org/oclc/47062668      bookfinder.com     addall.com    booksprice.com


Enhanced Composting for Cold-Climate Biodegradation of Organic Contaminated in Soil; by James
D. Berg
http://books.google.com/books?id=9H9sHAAACAAJ
http://www.worldcat.org/oclc/26528976   bookfinder.com     addall.com    booksprice.com


Essiac: A Native Herbal Cancer Remedy; by Cynthia B. Olsen
http://www.librarything.com/work/1378787
http://books.google.com/books?id=XdaoKpyNqjwC
http://www.worldcat.org/oclc/39508255
~ Kindle book      bookfinder.com    addall.com      booksprice.com


Extreme Gardening: How To Grow Organic In The Hostile Deserts; by David Owens
http://www.librarything.com/work/1734788
http://books.google.com/books?id=G2ANAAAACAAJ
http://www.worldcat.org/oclc/45401379
~ Kindle book     bookfinder.com   addall.com   booksprice.com


Fall and Winter Gardening: 25 Organic Vegetables to Plant and Grow for Late Season Food; by R.J.
Ruppenthal
http://www.librarything.com/work/12863754
http://books.google.com/books?id=cBO7MQEACAAJ
~ Kindle book     allbookstores.com    bing.com        bookfinder.com    yahoo.com


Fall and Winter Vegetable Gardening in the Pacific Northwest; by Oregon State University
http://books.google.com/books?id=plp1NwAACAAJ
http://www.worldcat.org/oclc/49659478


Farm City: The Education of an Urban Farmer; by Novella Carpenter
librarything.com/11480723   books.google.com/KqUVJLLDJbQC      worldcat.org/oclc/276819186
~ Kindle book     ~ Nook book     allbookstores.com     bing.com      bookfinder.com
~
Farmers of Forty Centuries: Organic Farming in China, Korea, and Japan; by F. H. King
http://www.librarything.com/work/307828
http://books.google.com/books?id=5IFxU_UP1l0C
http://www.worldcat.org/oclc/2204645
~ Kindle book     ~ Nook book     allbookstores.com    bing.com      bookfinder.com


Farming God's Way, Trainer's Reference Guide; by Grant W. Dryden
http://www.echobooks.org
http://www.google.com
http://www.bing.com


Feed Me Right: Nutritional Know-How and Body Science; by Dee Pigneguy
http://www.librarything.com/work/9863792
http://books.google.com/books?id=KLCjPQAACAAJ
http://www.worldcat.org/oclc/156664877   bookfinder.com      addall.com        booksprice.com


Feed Me Right Teacher's Resource: Nutritional Know-How and Body Science; by Dee Pigneguy
http://www.worldcat.org/oclc/212408333
http://www.google.com
http://www.bing.com


Fertility without Fertilizers: A Basic Approach to Organic Garden; by Lawrence D. Hills
http://www.librarything.com/work/8806700
http://books.google.com/books?id=4_4JAQAAMAAJ
http://www.worldcat.org/oclc/3183370        bookfinder.com     addall.com      booksprice.com


Fletcher Sims' Compost; by Charles Walters
http://www.librarything.com/work/8170309
http://books.google.com/books?id=wo0UAQAAMAAJ
http://www.worldcat.org/oclc/31294906      bookfinder.com        addall.com     booksprice.com


Food, Not Lawns: How to Turn Your Yard into a Garden And Your Neighborhood into a
Community; by Heather Coburn Flores
http://librarything.com/work/1658215
http://books.google.com/books?id=M_DtwznYASwC
http://www.worldcat.org/oclc/68693667
~ Kindle book      ~ Nook book   allbookstores.com   bing.com   bookfinder.com
~
Food From Dryland Gardens: An Ecological, Nutritional, and Social Approach to Small-Scale
Household Food Production; by David Arthur Cleveland
http://www.librarything.com/work/2225653
http://books.google.com/books?id=1a8QAQAAMAAJ
http://www.worldcat.org/oclc/23950386     bookfinder.com     addall.com     booksprice.com


Food Growing without Poisons; by Meta Strandberg
http://www.librarything.com/work/6298211
http://books.google.com/books?id=kMqCAAAACAAJ
http://www.worldcat.org/oclc/5188246     bookfinder.com       addall.com        booksprice.com


Foods Jesus Ate and How to Grow Them; by Allan A. Swenson
http://www.librarything.com/work/7847224
http://books.google.com/books?id=Nx1GPwGTqz0C
http://www.worldcat.org/oclc/180851958
~ Kindle book     ~ Nook book   allbookstores.com    bing.com        bookfinder.com


Four-Season Harvest: Organic Vegetables from Your Home Garden All Year Long; by Eliot Coleman
http://books.google.com/books?id=QMHdDgkRjDkC
http://www.worldcat.org/oclc/40856843
http://www.librarything.com/work/11571806
~ Kindle book     ~ Nook book    allbookstores.com  bing.com    bookfinder.com


Fresh Food from Small Gardens, United Kingdom; by Brian George Furner
http://books.google.com/books?id=fq3aAAAACAAJ
http://www.worldcat.org/oclc/99789


Fresh Food from Small Spaces; by R.J. Ruppenthal
librarything.com/6347778 books.google.com/OPQXAfANf08 worldcat.org/oclc/225871288
~ Kindle book     ~ Nook book     allbookstores.com     bing.com     bookfinder.com

Fresh Start Kit for Simple Hydroponics; by Institue of Simplified Hydroponics
carbon.org       google.com      bing.com      yahoo.com

Fruit and Vegetables for Scotland: What to Grow and How to Grow It; by Kenneth Cox
http://www.librarything.com/work/12646142
http://books.google.com/books?id=iyWUtgAACAAJ
http://www.worldcat.org/oclc/806457656      bookfinder.com    addall.com       booksprice.com
~
Fruits and Vegetables Under Glass; Apples, Apricots, Cherries, Figs, Grapes, Melons, Peaches and
Nectarines, Pears, Pineapples, Plums, Strawberries; by William Turner
http://www.librarything.com/work/10024680
http://books.google.com/books?id=E8_UygAACAAJ
http://www.worldcat.org/oclc/811981519
http://www.echobooks.org
~ Kindle book      ~ Nook book     allbookstores.com      bing.com    bookfinder.com


Fruit for Australian Gardens: A Practical Guide to Growing Fruit at Home, Organic Methods
Included; by Paul Baxter
http://www.librarything.com/work/3635276
http://books.google.com/books?id=Ls4bAAAACAAJ
http://www.worldcat.org/oclc/220877251       bookfinder.com      addall.com    booksprice.com


Fruits of Warm Climates; by Julia Frances Morton
http://www.librarything.com/work/2012189
http://books.google.com/books?id=pCgmAQAAMAAJ
http://www.worldcat.org/oclc/16947184        bookfinder.com     addall.com     booksprice.com


Fruit Trees in Small Spaces: Abundant Harvests from Your Own Backyard ; by Colby Eierman
http://www.librarything.com/work/12084193
http://books.google.com/books?id=GbPHdcCktHYC
http://www.worldcat.org/oclc/712124012
~ Kindle book     ~ Nook book     allbookstores.com   bing.com    bookfinder.com


Gaia's Garden: A Guide To Home-Scale Permaculture; by Toby Hemenway
http://www.librarything.com/work/7674490
http://books.google.com/books?id=gxW0MGXha6cC
http://www.worldcat.org/oclc/262883159
~ Kindle book    ~ Nook book    allbookstores.com     bing.com   bookfinder.com


Garden Anywhere: How to Grow Gorgeous Container Gardens, Herb Gardens, Kitchen Gardens ; by
Alys Fowler
http://www.librarything.com/work/8196682
http://books.google.com/books?id=JYD9OQAACAAJ
http://www.worldcat.org/oclc/262430097   bookfinder.com   addall.com    booksprice.com
~
Garden My Heart: Organic Strategies for Backyard Sustainability; by Cecil Bothwell
http://www.librarything.com/work/8479871
http://books.google.com/books?id=alAtXrP8EAcC
http://www.worldcat.org/oclc/252079992
~ Kindle book     allbookstores.com     bing.com      bookfinder.com        yahoo.com


Garden Wisdom and Know-How: Everything You Need to Know to Plant, Grow, and Harvest; by
Editors of Rodale Books
http://www.librarything.com/work/9524818
http://books.google.com/books?id=0vDd6X4pnY0C
http://www.worldcat.org/oclc/495597866   bookfinder.com   addall.com     booksprice.com


Gardening Answers (Storey Country Wisdom Bulletin, Vol. A-49); by Storey Publishing
http://www.librarything.com/work/3253617
http://books.google.com/books?id=reAlzkJrLvwC
http://www.worldcat.org/oclc/42693801
~ Kindle book     ~ Nook book    allbookstores.com  bing.com        bookfinder.com


Gardening by the Foot: Mini Grow-Boxes for Maxi Yields; by Jacob R. Mittleider
http://www.librarything.com/work/2882555
http://books.google.com/books?id=GNFNewAACAAJ
http://www.worldcat.org/oclc/7774519   bookfinder.com        addall.com     booksprice.com


Gardening Down-Under: A Guide to Healthier Soils and Plants; by Kevin Handreck
http://www.librarything.com/work/2105270
http://books.google.com/books?id=NFdY04HS9oEC
http://www.worldcat.org/oclc/695998454   bookfinder.com         addall.com   booksprice.com


Gardening for Health and Nutrition; by John Philbrick
http://www.librarything.com/work/3533219
http://books.google.com/books?id=86Y6qCo8-tAC
http://www.worldcat.org/oclc/157328
~ Kindle book    ~ Nook book      allbookstores.com     bing.com    bookfinder.com


Gardening for Planet Earth, New Zealand; by Dee Pigneguy
http://www.librarything.com/work/9783950
http://books.google.com/books?id=I-zjQgAACAAJ
http://www.worldcat.org/oclc/457182888       bookfinder.com    addall.com     booksprice.com
~
Gardening for the Faint of Heart; by Robin Wheeler, Canadian Organic Growers
http://www.librarything.com/work/94245
http://books.google.com/books?id=M5zEPQAACAAJ
http://www.worldcat.org/oclc/45265081       bookfinder.com     addall.com    booksprice.com


Gardening in Clay Soil; by Sara Pitzer
http://www.librarything.com/work/1479640
http://books.google.com/books?id=HbODYMQNELIC
http://www.worldcat.org/oclc/32665494
~ Kindle book    ~ Nook book        allbookstores.com   bing.com    bookfinder.com


Gardening Naturally: Getting The Most from Your Organic Garden, Australia ; by Ann Reilly
http://www.librarything.com/work/11827602
http://books.google.com/books?id=U2PsiASpd7IC
http://www.worldcat.org/oclc/154700776    bookfinder.com     addall.com        booksprice.com


Gardening the Organic Way: A Central Minnesota Truck Gardener Offers Ideas and Observations ; by
David J. Schonberg
http://www.google.com
http://www.bing.com


Gardening Under Cover: A Northwest Guide to Solar Greenhouses, Cold Frames, and Cloches ; by
William Head
http://www.librarything.com/work/326757
http://books.google.com/books?id=CQhleOXhivgC
http://www.worldcat.org/oclc/20171991   bookfinder.com     addall.com    booksprice.com


Gardening When It Counts: Growing Food in Hard Times; by Steve Solomon
http://www.librarything.com/work/1114565
http://books.google.com/books?id=lbohaJCxFnAC
http://www.worldcat.org/oclc/62535644
~ Kindle book    ~ Nook book    allbookstores.com   bing.com       bookfinder.com


Gardening with Cloches, United Kingdom; by Louis N Flawn
http://books.google.com/books?id=aFtCAAAAYAAJ
http://www.worldcat.org/oclc/3012403
~
Gardening with Earthworms: A Manual for New Zealanders; by John Stemmer
http://books.google.com/books?id=xbHtXwAACAAJ
http://www.worldcat.org/oclc/156005711


Gardening with Green Manures; by Pauline M. Pears
http://books.google.com/books?id=vtYfMgAACAAJ
http://www.worldcat.org/oclc/152375742


Gardening With SPROUTS: A How-to Guide to Understanding Organic Gardening and Design; by
Daniel A Atlas
http://books.google.com/books?id=jgRMWNzvU3gC
http://www.worldcat.org/oclc/388032342


Gardening without Peat: The Friends of the Earth Guide to Peat Alternatives ; by Graham Howell
http://books.google.com/books?id=ID8cAAAACAAJ
http://www.worldcat.org/oclc/24751168


Gardening Without Chemicals: Grow Untreated Natural Vegetables And Fresh Garden Produce All
Year Round In Your Own Organic Garden Using These Homemade Recipes For Organic Fertilizer
And Natural Pesticides; by Henry Q. Wilson
~ Nook book allbookstores.com        bing.com bookfinder.com      yahoo.com


Gardener to Gardener: 1,001 Greatest Gardening Tips Ever, the Best Hints and Techniques from the
Pages of Organic Magazine
http://www.librarything.com/work/326755
http://books.google.com/books?id=kpoicRF6CrAC
http://www.worldcat.org/oclc/50292740     bookfinder.com      addall.com      booksprice.com


Gaviotas: A Village to Reinvent the World; by Alan Weisman
http://www.librarything.com/work/353643
http://books.google.com/books?id=vWR_LQys4hsC
http://www.worldcat.org/oclc/37955739
~ Kindle book     ~ Nook book     allbookstores.com    bing.com       bookfinder.com
~
Getting the Most from Your Garden: Using Advanced Intensive Gardening Techniques; by Dan
Wallace, Rodale Organic Gardening Magazine
http://www.librarything.com/work/837826
http://books.google.com/books?id=rsP2AAAACAAJ
http://www.worldcat.org/oclc/6085860    bookfinder.com     addall.com    booksprice.com


Getting Started in Permaculture: 50 Practical Projects to Build and Design Productive Gardens ; by
Ross Mars
http://www.librarything.com/work/1479240
http://books.google.com/books?id=0WUUHVpMSoEC
http://www.worldcat.org/oclc/191856838
~ Kindle book      ~ Nook book     allbookstores.com       bing.com     bookfinder.com


Golden Gate Gardening: The Complete Guide to Year-Round Food Gardening in the San Francisco
Bay Area and Coastal California; by Pam Peirce
http://www.librarything.com/work/305892
http://books.google.com/books?id=TFv2PwAACAAJ
http://www.worldcat.org/oclc/38168316
~ Kindle book     ~ Nook book       allbookstores.com bing.com  bookfinder.com


Great Garden Gadgets: Make-It-Yourself Gizmos and Projects; by Fern Marshall Bradley
http://www.librarything.com/work/639109
http://books.google.com/books?id=0875969984
http://www.worldcat.org/oclc/45890319    bookfinder.com       addall.com     booksprice.com


Green Harvest: A History of Organic Farming and Gardening in Australia; by Rebecca Jones
http://books.google.com/books?id=fXlumxpqbeUC
http://www.worldcat.org/oclc/714770262


Greenhouses, Cloches and Frames; by Peter McHoy
http://books.google.com/books?id=aV0lAQAAMAAJ
http://www.worldcat.org/oclc/10608452


Greenhouse Gardener's Companion; by Shane Smith
http://www.librarything.com/work/308369
http://books.google.com/books?id=Onv60-c6iEIC
http://www.worldcat.org/oclc/42592887
~ Kindle book     ~ Nook book    allbookstores.com        bing.com      bookfinder.com
~
Greening of the Revolution: Cuba's Experiment with Organic Agriculture; by Peter Rossett
http://www.librarything.com/work/1156025
http://books.google.ca/books?id=JP9gAAAAMAAJ
http://www.worldcat.org/oclc/31388107     bookfinder.com     addall.com        booksprice.com


Grow Anything Anywhere with the Garden Doctor; by Jacob R. Mittleider
http://www.librarything.com/work/11463866
http://books.google.com/books?id=5w9HAAAAYAAJ
http://www.worldcat.org/oclc/22310155   bookfinder.com      addall.com        booksprice.com


Grow Fruit Naturally: A Hands-On Guide to Luscious, Homegrown Fruit; by Lee Reich
http://www.librarything.com/work/12549835
http://books.google.com/books?id=sQCIb5cMAHgC
http://www.worldcat.org/oclc/742508603    bookfinder.com    addall.com       booksprice.com


Grow Great Grub: Organic Food from Small Spaces; by Gayla Trail
http://www.librarything.com/work/9007003
http://books.google.com/books?id=qXpkPgAACAAJ
http://www.worldcat.org/oclc/419799997    bookfinder.com        addall.com       booksprice.com


Grow It, Eat it: Simple Gardening Projects and Delicious Recipes; by Royal Horticultural Society
http://www.librarything.com/work/8471989
http://books.google.com/books?id=kWQZfEXECj4C
http://www.worldcat.org/oclc/190777430       bookfinder.com      addall.com      booksprice.com


Grow Organic: Fruit and Vegetables Fresh from Your Garden; by Nick Hamilton
http://www.librarything.com/work/9259684
http://books.google.com/books?id=q7PhFBPagggC
http://www.worldcat.org/oclc/244652353     bookfinder.com      addall.com   booksprice.com


Grow Organic: A Simple Guide to Nova Scotia Vegetable Gardening; by Elizabeth Peirce
http://www.librarything.com/work/10050034
http://books.google.com/books?id=p7QZQwAACAAJ
http://www.worldcat.org/oclc/489949713    bookfinder.com    addall.com       booksprice.com
~
Grow Organic, Cook Organic: Natural Food From Garden to Table, with Over 1700 Photographs; by
Ysanne Spevack
http://www.librarything.com/work/5252443
http://books.google.com/books?id=HONoAAAACAAJ
http://www.worldcat.org/oclc/731265846   bookfinder.com     addall.com     booksprice.com


Grow Organic, Eat Organic: A Practical Activity Book for Beginners; by Lone Morton
http://www.librarything.com/work/6981315
http://books.google.com/books?id=6GzTAAAACAAJ
http://www.worldcat.org/oclc/50747132     bookfinder.com      addall.com     booksprice.com


Grow Organic, Eat Organic: Creative Activities; by Susan Martineau
http://www.google.com
http://www.bing.com    bookfinder.com       addall.com      booksprice.com


Grow Your Food for Free (well almost); by Dave Hamilton
http://www.librarything.com/work/11138599
http://books.google.com/books?id=6j23cQAACAAJ
http://www.worldcat.org/oclc/701113495
~ Kindle book     allbookstores.com      bing.com     bookfinder.com      yahoo.com


Grow Your Own: Be an Organic Farmer, Grow Vegetables in Your Back Garden, United Kingdom;
Thompson Yardley
http://books.google.com/books?id=4k9CAQAACAAJ
http://www.worldcat.org/oclc/819661088


Grow Your Own Pizza: Gardening Plans and Recipes for Kids; by Constance Hardesty
http://www.librarything.com/work/2336285
http://books.google.com/books?id=FrreSip51z8C
http://www.worldcat.org/oclc/42619631    bookfinder.com      addall.com    booksprice.com


Grow Your Own Vegetables; by Joy Larkcom
http://www.librarything.com/work/748047
http://books.google.com/books?id=Z1YzE5QU7gEC
http://www.worldcat.org/oclc/51914602   bookfinder.com       addall.com      booksprice.com
~
Growing a Garden City: How Farmers, First Graders, Counselors, Troubled Teens, Foodies, a
Homeless Shelter Chef, Single Mothers, and More Are Transforming Themselves and Their
Neighborhoods Through the Intersection of Local Agriculture and Community - and How You Can,
Too; by Jeremy N. Smith
http://www.librarything.com/work/10163107
http://books.google.com/books?id=6qleEZuwdCAC
http://www.worldcat.org/oclc/593629391
~ Kindle book      ~ Nook book   allbookstores.com    bing.com     bookfinder.com


Growing Communities: How to Build Community Through Community Gardening ; by Jeanette Abi-
Nader
http://www.librarything.com/work/9435547
http://books.google.com/books?id=wLolAAAACAAJ
http://www.worldcat.org/oclc/51738829    bookfinder.com addall.com  booksprice.com


Growing Community: Starting and Nurturing Community Gardens ; by Claire Nettle
http://www.librarything.com/work/11937751
http://books.google.com/books?id=4o69Qp3y1f0C
http://www.worldcat.org/oclc/556524850    bookfinder.com  addall.com         booksprice.com


Growing Food in Solar Greenhouses: A Month-By-Month Guide to Raising Vegetables, Fruit, and
Herbs Under Glass; by Delores Wolfe
http://www.librarything.com/work/4898291
http://books.google.com/books?id=mE54MwEACAAJ
http://www.worldcat.org/oclc/7554710   bookfinder.com   addall.com     booksprice.com


Growing Food in the High Desert Country; by Julie Behrend Weinberg
http://www.librarything.com/work/2023815
http://books.google.com/books?id=hbFVCgkPR4kC
http://www.worldcat.org/oclc/11624150
~ Kindle book    ~ Nook book     allbookstores.com      bing.com   bookfinder.com


Growing Food in the Southwest Mountains: A Permaculture Approach to Home Gardening Above
6,500 Feet in Arizona, New Mexico, Southern Colorado and Southern Utah; by Lisa Rayner
http://www.librarything.com/work/3451496
http://books.google.com/books?id=4G33NlnnC24C
http://www.worldcat.org/oclc/51049019      bookfinder.com     addall.com      booksprice.com
~
Growing Food Organically: The Key to Healthy Soil for Pest-Free Gardening and Farming; by John B.
Harris
http://www.librarything.com/work/2072626
http://books.google.com/books?id=nV3vAAAACAAJ
http://www.worldcat.org/oclc/28497526    bookfinder.com       addall.com    booksprice.com


Growing Fruit and Herbs Organically: Step by Step to Growing Success (Australian Self-Sufficiency
Guides) by Liz Sinnamon
http://www.librarything.com/work/1307648
http://books.google.com/books?id=tJ3VPAAACAAJ
http://www.worldcat.org/oclc/32008702     bookfinder.com     addall.com     booksprice.com


Growing Fruit and Vegetables on a Bed System the Organic Way; by Pauline Pears
http://www.librarything.com/work/3794249
http://www.worldcat.org/oclc/53961948


Growing Fruits and Vegetables Organically: The Complete Guide to a Great-Tasting, More
Bountiful, Problem-Free Harvest; by Jean M. A. Nick
http://www.librarything.com/work/554644
http://books.google.com/books?id=CANIAAAAYAAJ
http://www.worldcat.org/oclc/28962115       bookfinder.com  addall.com      booksprice.com


Growing Gardeners: The Fun and Science of Organic Gardening, New Zealand ; by Dee Pigneguy
http://www.librarything.com/work/11633552
http://books.google.com/books?id=KFqOOwAACAAJ
http://www.worldcat.org/oclc/244797522    bookfinder.com     addall.com      booksprice.com

Growing Greenhouse Crops on Straw Bales; by A Loughton
http://books.google.com/books?id=_EnHSgAACAAJ
http://www.worldcat.orgoclc/67679459


Growing Gourmet and Medicinal Mushrooms; by Paul Stamets
http://www.librarything.com/work/494919
http://books.google.com/books?id=M9Mz99pAdXMC
http://www.worldcat.org/oclc/30657098
~ Kindle book     ~ Nook book    allbookstores.com  bing.com        bookfinder.com
~
Growing Great Garlic: The Definitive Guide for Organic Gardeners and Small Farmers ; by Ron L.
Engeland
http://www.librarything.com/work/176627
http://books.google.com/books?id=hh6qNCngPyQC
http://www.worldcat.org/oclc/26064602
~ Nook book allbookstores.com       bing.com     bookfinder.com      yahoo.com


Growing Green: Animal-Free Organic Techniques; by Jenny Hall
http://www.librarything.com/work/3807896
http://books.google.com/books?id=vi4aRQAACAAJ
http://www.worldcat.org/oclc/86105554    bookfinder.com      addall.com      booksprice.com


Growing Organic: Green Tips for the New Zealand Gardener; by Philippa Jamieson
http://www.worldcat.org/oclc/229447967


Growing Rich, Tasty Veggies in Harmony with Nature; by Jeff Van Hautte
http://www.librarything.com/work/8722855


Growing Together: School Garden Tips and Healthy Recipes; by the Organic Centre, Ireland
http://www.google.com
http://www.theorganiccentre.ie
http://www.bing.com


Growing Under Glass: Without Using Chemicals; by Sue Stickland
http://www.librarything.com/work/13250800
http://books.google.com/books?id=JzsCAAAACAAJ
http://www.worldcat.org/oclc/52993042   bookfinder.com         addall.com      booksprice.com


Growing Under Glass: Your Guide to Greenhouse Gardening Success; by Hilery Hixon
http://www.librarything.com/work/8665091
http://books.google.com/books?id=DF_OWunf4HcC
http://www.worldcat.org/oclc/430234632
~ Kindle book     ~ Nook book    allbookstores.com  bing.com      bookfinder.com
~
Growing Under Glass (Royal Horticultural Society Encyclopedia of Practical Gardening) ; by Kenneth
A. Beckett
http://www.librarything.com/work/1653322
http://books.google.com/books?id=kcMqGwAACAAJ
http://www.worldcat.org/oclc/26549983    bookfinder.com      addall.com      booksprice.com


Growing Unusual Vegetables: Weird And Wonderful Vegetables And How to Grow Them; by Simon
Hickmott
http://www.librarything.com/work/857014
http://books.google.com/books?id=USssAAAACAAJ


Growing Vegetables in South Africa - electronic book; by Darlene Roelofsen
http://www.gardeninginsouthafrica.co.za
https://www.google.com
http://www.yahoo.com


Growing Vegetables Indoors: How to Supply Your Own Organic Food Year Round ; by Steve
Meyerowitz
~ Kindle book   allbookstores.com     bing.com     bookfinder.com    yahoo.com


Growing Vegetables West of the Cascades: The Complete Guide to Organic Gardening ; by Steve
Solomon
http://www.librarything.com/work/160861
http://books.google.com/books?id=uc4-2jATIrEC
http://www.worldcat.org/oclc/19263031
~ Kindle book     ~ Nook book    allbookstores.com  bing.com      bookfinder.com


Guide to Canadian Vegetable Gardening; by Douglas Green
http://www.librarything.com/work/8408997
http://books.google.com/books?id=QSBkPgAACAAJ
http://www.worldcat.org/oclc/303026232     bookfinder.com       addall.com     booksprice.com


Hawaiian Organic Growing Guide: Hawaii's How-To-Grow-It Gardening Guidebook for the Tropics
and Subtropics; by Shunyam Nirav
http://www.librarything.com/work/3813024
http://books.google.com/books?id=sSpIAAAAYAAJ
http://www.worldcat.org/oclc/27663562    bookfinder.com  addall.com    booksprice.com
~
Healthy Soil: A Guide to Organic Gardening; by Soil Association of New Zealand
http://books.google.com/books?id=FgS_PAAACAAJ
http://www.worldcat.org/oclc/153729624


Heirloom Vegetable Gardening: A Master Gardener's Guide; by William Woys Weaver
librarything.com/376857 books.google.com/pqrTGwAACAAJ worldcat.org/oclc/34887017


Herbal Remedies of the Lumbee Indians; by Arvis Locklear Boughman
http://www.librarything.com/work/10349629
http://books.google.com/books?id=skjgx5jD4WUC
http://www.worldcat.org/oclc/53224826
~ Kindle book    ~ Nook book    allbookstores.com      bing.com   bookfinder.com


Here's Health Guide to Gardening without Chemicals: A Step-By-Step Guide to Growing Vegetable
and Soft Fruit the Organic Way; by Jack Temple
http://books.google.com/books?id=1aVSJgAACAAJ
http://www.worldcat.org/oclc/14360336


Herbs for Australian Gardens: A Practical Guide to Growing and Using Organic Herbs; by Penny
Woodward
http://www.librarything.com/work/6944418
http://books.google.com/books?id=vJdXPgAACAAJ
http://www.worldcat.org/oclc/271516862      bookfinder.com     addall.com    booksprice.com


Herbs for Texas; by John Howard Garrett
http://www.librarything.com/work/703801
http://books.google.com/books?id=4pAv0O5HWOQC
http://www.worldcat.org/oclc/43552593
~ Kindle book      allbookstores.com    bing.com bookfinder.com           yahoo.com


High Altitude Planting: A Practical Guide to Landscaping, Gardening, and Planting Above 6,000
Feet; by Ann Barrett
http://www.librarything.com/work/2966410
http://books.google.com/books?id=0aZWVvgYfPUC
http://www.worldcat.org/oclc/45446214        bookfinder.com     addall.com      booksprice.com
~
Hobby Hydroponics; by Howard M. Resh
http://www.librarything.com/work/2793250
http://books.google.com/books?id=_Ufzy0QqVHoC
http://www.worldcat.org/oclc/51586636
~ Kindle book     allbookstores.com   bing.com        bookfinder.com     yahoo.com

Home Hydroponic Gardens - CD book; by Peggy Bradley                                  carbon.org
google.com     bing.com     yahoo.com
books.google.com/books?id=lIHrNQAACAAJ              worldcat.org/oclc/223014089


Home Solar Gardening: Solar Greenhouses For Your House, Backyard or Apartment; by John H.
Pierce
http://www.librarything.com/work/1479431
http://books.google.com/books?id=LVCkAAAACAAJ
http://www.worldcat.org/oclc/25095722    bookfinder.com     addall.com    booksprice.com


Home Vegetable Gardening - Gardening Indoors and Under Glass; by Frederick Frye Rockwell
http://books.google.com/books?id=By_SAAAAMAAJ
~ Kindle book    ~ Nook book    allbookstores.com   bing.com       bookfinder.com


Homegrown: Community Agriculture and a Better Tomorrow; by Patrick Johnson
http://books.google.com/books?id=y-2LMQEACAAJ
~ Kindle book     ~ Nook book    allbookstores.com bing.com       bookfinder.com


How to Build a Small A-Frame Greenhouse with PVC Pipe and Plastic Sheeting for Less than $50; by
Taylor Birch
http://www.librarything.com/work/12764498
~ Kindle book     allbookstores.com   bing.com     bookfinder.com      yahoo.com


How to Build, Maintain, and Use a Compost System: Secrets and Techniques You Need to Know to
Grow the Best Vegetables; by Kelly Smith
http://books.google.com/books?id=hAQ60w2soC4C
http://www.worldcat.org/oclc/316834169
~ Kindle book     ~ Nook book      allbookstores.com bing.com     bookfinder.com


How to Easily Grow Organic Superfoods at Home Without a Garden; by Nate Lemmon
~ Kindle book    allbookstores.com    bing.com     bookfinder.com       yahoo.com
~
How to Farm Your Backyard the Mulch-Organic Way; by Max Alth
http://www.librarything.com/work/2209737
http://books.google.com/books?id=qcQi0JqAh1oC
http://www.worldcat.org/oclc/2189377   bookfinder.com    addall.com        booksprice.com


How to Get Your Lawn and Garden Off Drugs: Pesticide-Free Gardening for a Healthier
Environment; by Carole Rubin
http://www.librarything.com/work/141714
http://books.google.com/books?id=L-VDAAAACAAJ
http://www.worldcat.org/oclc/27980966   bookfinder.com       addall.com     booksprice.com


How to Get Your Lawn Off Grass: A North American Guide to Turning Off the Water Tap and
Going Native; by Carole Rubin
http://www.librarything.com/work/5409479
http://books.google.com/books?id=7WjoPAAACAAJ
http://www.worldcat.org/oclc/48579629    bookfinder.com     addall.com     booksprice.com


How to Grow a School Garden: A Complete Guide for Parents and Teachers ; by Arden Bucklin-
Sporer
http://www.librarything.com/work/10253392
http://books.google.com/books?id=X4Q2LZMUcU4C
http://www.worldcat.org/oclc/436623440
~ Kindle book     ~ Nook book    allbookstores.com  bing.com     bookfinder.com


How to Grow Fresh Air: 50 House Plants that Purify Your Home or Office; by B. C. Wolverton
http://www.librarything.com/work/3681
http://books.google.com/books?id=wtG61KIYpOEC
http://www.worldcat.org/oclc/36634843      bookfinder.com     addall.com       booksprice.com


How to Grow More Vegetables Than You Ever Thought Possible on Less Land Than You Can
Imagine; by John Jeavons
http://www.librarything.com/work/4331
http://books.google.com/books?id=1YdUYJN8X9cC
http://www.worldcat.org/oclc/5083177
~ Kindle book      ~ Nook book   allbookstores.com bing.com     bookfinder.com
~
How to Grow Organic Vegetables, Fruit, Herbs and Flowers: The Complete Guide to Cultivating a
Productive and Beautiful Garden the Natural Way, with 800 Step-By-Step Photographs; by Christine
Lavelle
http://www.librarything.com/work/5900225
http://books.google.com/books?id=zB-uPQAACAAJ
http://www.worldcat.org/oclc/181927690      bookfinder.com     addall.com    booksprice.com


How to Grow Perennial Vegetables: Low-Maintenance, Low-Impact Vegetable Gardening; by Martin
Crawford
http://www.librarything.com/work/12486841
http://books.google.com/books?id=OsgOywAACAAJ
http://www.worldcat.org/oclc/766340582    bookfinder.com  addall.com     booksprice.com


How to Grow Potatoes: Planting and Harvesting Organic Food From Your Patio, Rooftop, Balcony,
or Backyard Garden; by R.J. Ruppenthal
http://www.librarything.com/work/12679789
http://books.google.com/books?id=_D6DMAEACAAJ
~ Kindle book     allbookstores.com    bing.com      bookfinder.com   yahoo.com


How to Grow Practically Everything; by Zia Allaway
http://www.librarything.com/work/10270993
http://books.google.com/books?id=gmAuHkA7KjgC
http://www.worldcat.org/oclc/244058227      bookfinder.com     addall.com     booksprice.com


How To Grow Winter Vegetables; by Charles Dowding
http://www.librarything.com/work/11138596
http://books.google.com/books?id=vHWncQAACAAJ
http://www.worldcat.org/oclc/676727215
~ Kindle book    allbookstores.com    bing.com        bookfinder.com      yahoo.com


How to Grow World Record Tomatoes: a Guinness World Record Holder, Reveals His
All-Organic Secrets. His organic methods work with other crops; by Charles Wilber
http://librarything.com/work/1752882
http://books.google.com/books?id=hQdIAAAAYAAJ
http://worldcat.org/oclc/40948283    bookfinder.com      addall.com       booksprice.com
~
How to Grow Your Own Food: Creating and Maintaining an Organic Vegetable Garden, New
Zealand; by Adrienne Grant
http://books.google.com/books?id=Z2r9twAACAAJ
http://www.worldcat.org/oclc/213363176


How To Grow Vegetables Indoors: A Guide To Small Space and Container Gardening to Grow
Vegetables and Herbs at Home or In Your Apartment; by Andrew Macarthy
~ Kindle book    allbookstores.com    bing.com        bookfinder.com  yahoo.com


Hydroponics and Microfarms - CD book; by Institue of Simplified Hydroponics
carbon.org     google.com     bing.com      yahoo.com


I Garden - Urban Style; by Reggie Solomon
http://www.librarything.com/work/10952073
http://books.google.com/books?id=v9vi7QjUQsUC
~ Kindle book     ~ Nook book      allbookstores.com     bing.com      bookfinder.com


I'm Hungry, Let's Grow It: Organic Gardening and Recipes for Australian Families ; by Joanne Newell
http://books.google.com/books?id=xkxqPgAACAAJ
http://www.worldcat.org/oclc/299129156


In the Land of the Grasshopper Song; by Mary Ellicott Arnold
http://www.librarything.com/work/902649
http://books.google.com/books?id=iDYw0erYnH0C
http://www.worldcat.org/oclc/6143499
~ Kindle book      allbookstores.com     bing.com       bookfinder.com      yahoo.com


Incredible Vegetables from Self-Watering Containers: Using Ed's Amazing POTS System; by Edward
C. Smith
http://www.librarything.com/work/1406838
http://books.google.com/books?id=pwz7sD5x8YgC
http://www.worldcat.org/oclc/62302436      bookfinder.com       addall.com  booksprice.com

Indigenous Fruit Trees in the Tropics: Domestication, Utilization and Commercialization; by Festus K.
Akinnifesi
http://books.google.com/books?id=wKHs1gLiYYkC
http://www.worldcat.org/oclc/647686009
~
Indolent Kitchen Gardening: A Vegetable Growing and Cooking Guide For the Part-Time Canberra
Gardener Using Minimum Effort and Organic Gardening Techniques; by Libby Smith
http://www.librarything.com/work/85695
http://books.google.com/books?id=oHxqXwAACAAJ
http://www.worldcat.org/oclc/27535584    bookfinder.com    addall.com     booksprice.com


Indoor Vegetable Gardening: How to Grow Fresh Foods All Year Long; by Bob Henrichsen
http://www.librarything.com/work/652907
http://books.google.com/books?id=MH9CAQAACAAJ
http://www.worldcat.org/oclc/8762732    bookfinder.com     addall.com      booksprice.com


Intercropping: An Application of Ecological Principles to Improve Nitrogen Use Efficiency in
Organic Farming Systems; by Laurent Bedoussac
http://www.worldcat.org/oclc/746131316


Introduction to Permaculture; by Bill Mollison
http://scribd.com/doc/54165436


IPM for Gardeners: A Guide to Integrated Pest Management; by Raymond A. Cloyd
http://www.librarything.com/work/1341845
http://books.google.com/books?id=6DE-PwAACAAJ
http://www.worldcat.org/oclc/53369197     bookfinder.com      addall.com   booksprice.com


Kids in the Garden: Growing Plants For Food and Fun; by Elizabeth McCorquodale
http://www.librarything.com/work/10081625
http://books.google.com/books?id=z3qcQAAACAAJ
http://www.worldcat.org/oclc/501399804     bookfinder.com       addall.com   booksprice.com


Landscape You Can Eat; by Allan A. Swenson
http://www.librarything.com/work/3225770
http://books.google.com/books?id=DzEjAQAAMAAJ
http://www.worldcat.org/oclc/3204694    bookfinder.com        addall.com     booksprice.com
~
Landscaping with Fruit : Strawberry Ground Covers, Blueberry Hedges, Grape Arbors, and 39 Other
Luscious Fruits to Make Your Yard an Edible Paradise; by Lee Reich
http://www.librarything.com/work/7962908
http://books.google.com/books?id=bwxHIaLGnd0C
http://www.worldcat.org/oclc/213301159
~ Kindle book      ~ Nook book    allbookstores.com     bing.com   bookfinder.com


Landscaping With Fruits and Vegetables; by Fred Hagy
http://www.librarything.com/work/1141979
http://books.google.com/books?id=esMxPQAACAAJ
http://www.worldcat.org/oclc/45172206        bookfinder.com    addall.com      booksprice.com


Lasagna Gardening: A New Layering System for Bountiful Gardens: No Digging, No Tilling, No
Weeding; by Patricia Lanza
librarything.com/10115926 books.google.com/Zih2ggDzMSgC worldcat.org/oclc/39181782
http://lasagnagardeningbook.com


Lasagna Gardening for Small Spaces: A Layering System for Big Results in Small Gardens and
Containers; by Patricia Lanza
http://www.librarything.com/work/9959884
http://books.google.com/books?id=CpeGvUvjcAkC
http://www.worldcat.org/oclc/47930793      bookfinder.com     addall.com      booksprice.com


Less Usual Vegetables: How to Grow and How to Cook Them, United Kingdom; by Brian George
Furner
http://www.librarything.com/work/5119441
http://books.google.com/books?id=EAtPAAAACAAJ
http://www.worldcat.org/oclc/16281331    bookfinder.com   addall.com   booksprice.com


Let Nature Do the Growing: The Fertilizer-Free Vegetable Garden, Japan; by Gajin Tokuno
http://www.librarything.com/work/4309503
http://books.google.com/books?id=wK3oPAAACAAJ
http://www.worldcat.org/oclc/15680771      bookfinder.com     addall.com       booksprice.com
~
Linnea's Windowsill Garden; by Christina Björk
http://www.librarything.com/work/53830
http://books.google.com/books?id=oUjhAAAAMAAJ
http://www.worldcat.org/oclc/16005183        bookfinder.com    addall.com     booksprice.com


Little Veggie Patch: How to Grow Food in Small Spaces; by Fabian Capomolla
http://www.librarything.com/work/11935089
http://books.google.com/books?id=AoiRZwEACAAJ
http://www.worldcat.org/oclc/726150813    bookfinder.com        addall.com    booksprice.com


Living More with Less; by Doris Janzen Longacre
http://www.librarything.com/work/160053
http://books.google.com/books?id=u5k5SgAACAAJ
http://www.worldcat.org/oclc/6378842
~ Kindle book     ~ Nook book      allbookstores.com   bing.com     bookfinder.com


Lucky Ducks: Companions in the Organic Garden, Australia; by Phoebe Thorndyke
http://www.librarything.com/work/12701277
http://books.google.com/books?id=XwxEAAAACAAJ
http://www.worldcat.org/oclc/155413934    bookfinder.com       addall.com   booksprice.com


Made from Scratch: How to Start and Operate a Successful Organic Container Plant Business ; by
Louise Placek
http://www.librarything.com/work/8170276
http://books.google.com/books?id=hKgxAAAACAAJ
http://www.worldcat.org/oclc/53922312      bookfinder.com      addall.com     booksprice.com


Making Natural Milk Soap: Storey's Country Wisdom Bulletin A-199; by Casey Makela
http://www.librarything.com/work/2314309
http://books.google.com/books?id=IY_1jrhjw_0C
http://www.worldcat.org/oclc/41452745
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com
~
Making Peace with the Land: God's Call to Reconcile with Creation; by Fred Bahnson
http://www.librarything.com/work/12739868
http://books.google.com/books?id=3aWmfCxkpsIC
http://www.worldcat.org/oclc/774021102
~ Kindle book     allbookstores.com     bing.com      bookfinder.com        yahoo.com


McGee & Stuckey's Bountiful Container: Create Container Gardens of Vegetables, Herbs, Fruits,
and Edible Flowers; by Rose Marie Nichols McGee
http://www.librarything.com/work/80468
http://books.google.com/books?id=bInlEEdea4gC
http://www.worldcat.org/oclc/48013569
~ Kindle book    allbookstores.com       bing.com    bookfinder.com     yahoo.com


Manual of Minor Vegetables; by James M. Stephens
http://www.librarything.com/work/11511491
http://books.google.com/books?id=CmssGQAACAAJ
http://www.worldcat.org/oclc/18884855     bookfinder.com        addall.com       booksprice.com


Micro Eco-Farming: Prospering from Backyard to Small Acreage in Partnership with the Earth ; by
Barbara Berst Adams
librarything.com/592901 books.google.com/OW2oAAAACAAJ worldcat.org/oclc/54677648


MetroFarm: Growing for Profit In or Near the City; by Michael Olson
librarything.com/131465   books.google.com/oOKBNgAACAAJ   worldcat.org/oclc/30795120


Microgreens: A Guide to Growing Nutrient-Packed Greens; by Eric Franks
http://www.librarything.com/work/8492027
http://books.google.com/books?id=KQVrD5q7oy4C
http://www.worldcat.org/oclc/237325030
~ Kindle book    allbookstores.com    bing.com      bookfinder.com           yahoo.com


Mini Farming: Self-Sufficiency on 1/4 Acre; by Brett L. Markham
http://www.librarything.com/work/9724353
http://books.google.com/books?id=HfVygFIMI3sC
http://www.worldcat.org/oclc/458582333
~ Kindle book     ~ Nook book     allbookstores.com      bing.com      bookfinder.com
~
Mulch It: A Practical Guide to Using Mulch in the Garden and Landscape; by Stu Campbell
http://www.librarything.com/work/1868359
http://books.google.com/books?id=2rywY0P6c4QC
http://www.worldcat.org/oclc/44764178
~ Kindle book     ~ Nook book      allbookstores.com   bing.com     bookfinder.com


Muck and Magic: Start Your Own Natural Garden with Colorful, Simple Projects ; by Jo Readman
http://www.librarything.com/work/7542338
http://books.google.com/books?id=oDXSAAAACAAJ
http://www.worldcat.org/oclc/33382093    bookfinder.com    addall.com      booksprice.com


Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets
librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170
~ Kindle book    ~ Nook book     allbookstores.com     bing.com     bookfinder.com


Nature Farming and Microbial Applications; by Hiu-lian Xu
http://www.librarything.com/work/9350031
http://books.google.com/books?id=GNbe4eClXicC
http://www.worldcat.org/oclc/44468922    bookfinder.com       addall.com     booksprice.com


New Kitchen Garden: Organic Gardening and Cooking with Herbs, Vegetables, and Fruit ; by Adam
Caplin
http://www.librarything.com/work/2356756
http://books.google.com/books?id=QQ2PAAAACAAJ
http://www.worldcat.org/oclc/75713992    bookfinder.com   addall.com      booksprice.com


New Zealand Guide to Compost Gardening: A Guide to Gardening Without Digging; by David
Hornblow
http://www.worldcat.org/oclc/154650512


No-Till Farming Systems with CD; by Tom Goddard
http://www.echobooks.org
http://books.google.com/books?id=gou1LwAACAAJ
http://www.worldcat.org/oclc/225820611
~
No-Till Vegetable Production at the Cal Poly Organic Farm; by Nathaniel Harkleroad;
http://www.worldcat.org/oclc/697842329


Old-Fashioned Organic Gardening: Natural Wisdom from the Past for the Gardener of Today; by
Nigel Colborn
http://www.librarything.com/work/2687938
http://books.google.com/books?id=WgQCAAAACAAJ
http://www.worldcat.org/oclc/50566914    bookfinder.com    addall.com      booksprice.com


One Magic Square: The Easy, Organic Way to Grow Your Own Food on a 3-Foot Square; by Lolo
Houbein
http://www.librarything.com/work/8613957
http://books.google.com/books?id=V2xjXvDTr1QC
http://www.worldcat.org/oclc/426814504
~ Kindle book     ~ Nook book    allbookstores.com bing.com    bookfinder.com


Organic Avocado: Resource Guide, New Zealand; by Ewen Willis
http://books.google.com/books?id=anD7PAAACAAJ
http://www.worldcat.org/oclc/156741854


Organic Citrus: Resource Guide; by Allan Morton
http://books.google.com/books?id=mB-0PAAACAAJ
http://www.worldcat.org/oclc/156741849


Organic Coffee: Sustainable Development by Mayan Farmers; by Maria Elena Martinez-Torres
http://www.librarything.com/work/5161140
http://books.google.com/books?id=pkvKhxwfVMIC
http://www.worldcat.org/oclc/64335995    bookfinder.com      addall.com    booksprice.com


Organic Container Gardening: Grow Pesticide-Free Fruits and Vegetables in Small Spaces; by Barbara
Barker
http://www.librarything.com/work/9503189
http://books.google.com/books?id=UthPXwAACAAJ
http://www.worldcat.org/oclc/777003549      bookfinder.com      addall.com      booksprice.com
~
Organic Crops in Pots: How to Grow Your Own Vegetables, Fruits, and Herbs ; by Deborah
Schneebeli-Morrell
http://www.librarything.com/work/8325893
http://books.google.com/books?id=4n5uPQAACAAJ
http://www.worldcat.org/oclc/326877640   bookfinder.com      addall.com        booksprice.com


Organic Farming; by Nicolas Lampkin
http://www.librarything.com/work/1176589
http://books.google.com/books?id=mrz8PAAACAAJ
http://www.worldcat.org/oclc/762067926   bookfinder.com             addall.com   booksprice.com


Organic Farming: Crops, Fruits and Vegetables; by Jennifer Laffan
http://books.google.com/books?id=6fXQuAAACAAJ
http://www.worldcat.org/oclc/47039206


Organic Farming: Everything You Need to Know; by Peter V. Fossel
http://www.librarything.com/work/7848924
http://books.google.com/books?id=ATWaaXyA1VEC
http://www.worldcat.org/oclc/74568462
~ Kindle book     ~ Nook book    allbookstores.com    bing.com          bookfinder.com


Organic Farming: The Ecological Systems; by Charles Francis
http://www.librarything.com/work/11337802
http://books.google.com/books?id=8HMfbQpNq60C
http://www.worldcat.org/oclc/460638866      bookfinder.com          addall.com   booksprice.com


Organic Farming, Pest Control and Remediation of Soil Pollutants; by Eric Lichtfouse
http://books.google.com/books?id=66RV9Q1EtLcC
http://www.worldcat.org/oclc/495478491
~ Kindle book     allbookstores.com    bing.com       bookfinder.com         yahoo.com


Organic Fertilizers, Including: Compost, Seaweed Fertiliser, Fish Emulsion, Organic Fertilizer,
Cottonseed Meal, Uses of Compost, Fish Meal, Rockdust, Feather Meal, Fish Hydrolysate,
Maxicrop, Effluent Spreading
http://books.google.com/books?id=r3i5tgAACAAJ
~
Organic Fruit Production and Viticulture; by Stella Cubison
http://www.librarything.com/work/11344875
http://books.google.com/books?id=MTNRPgAACAAJ
http://www.worldcat.org/oclc/302077577         bookfinder.com    addall.com     booksprice.com


Organic Garden: Beginner's Guide; by Doctor Garden
~ Kindle book    allbookstores.com      bing.com        bookfinder.com       yahoo.com


Organic Gardener's Companion: Growing Vegetables in the West; by Jane Shellenberger
http://www.librarything.com/work/11510538
http://books.google.com/books?id=ken5tgAACAAJ
http://www.worldcat.org/oclc/709681309
~ Kindle book     ~ Nook book    allbookstores.com   bing.com       bookfinder.com


Organic Gardening, United Kingdom; by Geoff Hamilton
http://www.librarything.com/work/880332
http://books.google.com/books?id=MOBHny71tF4C
http://www.worldcat.org/oclc/617579941    bookfinder.com         addall.com     booksprice.com


Organic Gardening; by Peter Bennett
http://www.librarything.com/work/355051
http://books.google.com/books?id=BMs2AQAACAAJ
http://www.worldcat.org/oclc/156781107  bookfinder.com           addall.com     booksprice.com


Organic Gardening, New Zealand; by Moira Ryan
http://www.librarything.com/work/9460520
http://books.google.com/books?id=cfOeAAAACAAJ
http://www.worldcat.org/oclc/27616582    bookfinder.com         addall.com     booksprice.com


Organic Gardening: A Comprehensive Guide to Chemical-Free Growing; by Crow Miller
http://books.google.com/books?id=zvc4AQAAIAAJ
http://www.worldcat.org/oclc/43780957


Organic Gardening: A Growers Handbook for New Zealanders; by Moira Ryan
http://www.librarything.com/work/3693540
http://books.google.com/books?id=cvOeAAAACAAJ
http://www.worldcat.org/oclc/35167812
~
Organic Gardening: A Guide, New Zealand; by Valerie Freeman
http://books.google.com/books?id=QQ0MAgAACAAJ
http://www.worldcat.org/oclc/155835590


Organic Gardening: A Practical Guide to Natural Gardens, from Planning and Planting to Harvesting
and Maintenance; by Christine Lavelle
http://www.librarything.com/work/11859576
http://books.google.com/books?id=CA7pQgAACAAJ
http://www.worldcat.org/oclc/56837274     bookfinder.com      addall.com     booksprice.com


Organic Gardening: An Integrated Approach; by Curtis J Overdahl, University of Minnesota
http://books.google.com/books?id=9o0hPQAACAAJ
http://www.worldcat.org/oclc/4524486


Organic Gardening: The Natural No-Dig Way; by Charles Dowding
http://www.librarything.com/work/3214693
http://books.google.com/books?id=EM4LuwAACAAJ
http://www.worldcat.org/oclc/76852976    bookfinder.com      addall.com         booksprice.com


Organic Gardening: Your Guide to Growing Healthy Organic Produce; by Michelle Anderson
http://books.google.com/books?id=PlnTkQEACAAJ
~ Kindle book     allbookstores.com   bing.com      bookfinder.com      yahoo.com


Organic Gardening Beginner's Manual: Attracting Beneficial Insects and Animals ; by Lisa Van Til
http://www.google.com     http://www.bing.com
~ Kindle book    allbookstores.com     bing.com      bookfinder.com       yahoo.com


Organic Gardening Beginner's Manual: Soil Mechanics and Amendment; by Lisa Van Til
http://www.librarything.com/work/12790876
~ Kindle book     allbookstores.com   bing.com       bookfinder.com    yahoo.com


Organic Gardening Beginner's Manual: The Ultimate Take-You-By-the-Hand Beginner's Gardening
Manual for Creating and Managing Your Own Organic Garden; by Julie Turner
http://www.librarything.com/work/12638853
http://books.google.com/books?id=D0ZkkwEACAAJ
http://www.worldcat.org/oclc/825182238
~ Kindle book     allbookstores.com    bing.com     bookfinder.com      yahoo.com
~
Organic Gardening's Best Vegetables Guide; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/11707025
http://books.google.com/books?id=TVAjAQAAMAAJ
http://www.worldcat.org/oclc/12284714    bookfinder.com       addall.com   booksprice.com


Organic Gardening for Canada; by Laura Peters
http://www.librarything.com/work/9743132
http://books.google.com/books?id=RVRzRAAACAAJ
http://www.worldcat.org/oclc/499430338      bookfinder.com    addall.com     booksprice.com


Organic Gardening For Dummies; by Ann Whitman
http://www.librarything.com/work/427103
http://books.google.com/books?id=7MfmWEyF4dkC
http://www.worldcat.org/oclc/316346746
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Organic Gardening for Dummies, United Kingdom Edition; by Sue Fisher
http://books.google.com/books?id=Ne_IBOqWkOkC
http://www.worldcat.org/oclc/751742038
~ Nook book allbookstores.com      bing.com   bookfinder.com        yahoo.com


Organic Gardening for New Zealand Gardeners; by Judyth A. McLeod
http://www.librarything.com/work/8186189
http://books.google.com/books?id=Ux6hPQAACAAJ
http://www.worldcat.org/oclc/16145540    bookfinder.com     addall.com      booksprice.com


Organic Gardening in Australia: The Complete Guide to Natural and Chemical-Free Gardening; by
Jacqueline French
http://www.librarything.com/work/1456190
http://books.google.com/books?id=TnmkAAAACAAJ
http://www.worldcat.org/oclc/62537528    bookfinder.com      addall.com    booksprice.com


Organic Gardening in Cold Climates; by Sandra Perrin
http://www.librarything.com/work/407268
http://books.google.com/books?id=5iJIAAAAYAAJ
http://www.worldcat.org/oclc/48544159      bookfinder.com    addall.com     booksprice.com
~
Organic Gardening in Hawaii: With Methods and Principles Applicable to Mainland Gardens ; by
Richard L. Stevens
http://books.google.com/books?id=zyJsPQAACAAJ
http://www.worldcat.org/oclc/8210588


Organic Gardening in Montana and the Northwest; by Sandra Perrin
http://www.librarything.com/work/1921435
http://books.google.com/books?id=UtbBAAAACAAJ
http://www.worldcat.org/oclc/8176706   bookfinder.com       addall.com       booksprice.com


Organic gardening in New Zealand; by Richard Llewellyn Hudson
http://books.google.com/books?id=E4zZAAAACAAJ
http://www.worldcat.org/oclc/16145540


Organic Gardening in Tropical Climates; by Liz Sinnamon
http://books.google.com/books?id=kduZAAAACAAJ
http://www.worldcat.org/oclc/29887168


Organic Gardening in the American West: Raising Vegetables in a Short, Dry, Growing Season; by
Robert F. Smith
http://www.librarything.com/work/10182179
http://books.google.com/books?id=KXFpGHktWcwC
http://www.worldcat.org/oclc/39464745
~ Kindle book    allbookstores.com    bing.com       bookfinder.com      yahoo.com


Organic Gardening is Simple; by Jill Scott
http://www.google.com     http://www.bing.com


Organic Gardening Magic: Grow Healthy Garden Fresh Food - Electronic Book; by Laura Fox
http://www.organicgardeningmagic.com
http://www.google.com     http://www.bing.com


Organic Gardening Techniques; by Nick Hamilton
http://www.librarything.com/work/8669550
http://books.google.com/books?id=76vjvtZTJucC
http://www.worldcat.org/oclc/195728461    bookfinder.com        addall.com     booksprice.com
~
Organic Gardening Under Glass: Fruits, Vegetables, and Ornamentals in the Greenhouse; by George
Abraham
http://www.librarything.com/work/767869
http://books.google.com/books?id=-_6OAQAACAAJ
http://www.worldcat.org/oclc/1876834    bookfinder.com      addall.com      booksprice.com


Organic Gardening's All-time Best Gardening Secrets; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/1608013
http://books.google.com/books?id=jpFHYAAACAAJ
http://www.worldcat.org/oclc/23728857     bookfinder.com       addall.com    booksprice.com


Organic Gardening's Soil First Aid Manual; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/838309
http://books.google.com/books?id=sXuctwAACAAJ
http://www.worldcat.org/oclc/12483374      bookfinder.com      addall.com   booksprice.com


Organic Growing, New Zealand; by May Philip
http://books.google.com/books?id=LsX0MgAACAAJ
http://www.worldcat.org/oclc/154678397


Organic Growing 2, New Zealand; by May Philip
http://books.google.com/books?id=Ss55MQAACAAJ
http://www.worldcat.org/oclc/154135554


Organic Growing with Worms: A Handbook for a Better Environment; by David Murphy
http://www.librarything.com/work/5240016
http://books.google.com/books?id=ytJYAAAACAAJ


Organic Kitchen and Garden: Growing and Cooking Food the Natural Way, with Over 500 Growing
Tips and 150 Step-by-step Recipes; by Ysanne Spevack
http://www.librarything.com/work/843383
http://books.google.com/books?id=FY8AAAAACAAJ
http://www.worldcat.org/oclc/53912079      bookfinder.com addall.com      booksprice.com
~
Organic Kitchen Garden (Conran Octopus Gardening); by Juliet Roberts
http://www.librarything.com/work/1141041
http://books.google.com/books?id=WaI_PgAACAAJ
http://www.worldcat.org/oclc/264021925   bookfinder.com        addall.com      booksprice.com


Organic Kitchen Gardening: A Guide to Growing Produce in Small Urban Areas ; by Barbara Segall
http://www.librarything.com/work/1665655
http://books.google.com/books?id=DTBg5ERy-kQC
http://www.worldcat.org/oclc/51929741    bookfinder.com    addall.com     booksprice.com


Organic Methods of Pest and Disease Management; by K. Vijayalakshmi
http://books.google.com/books?id=5rwkPAAACAAJ
http://www.worldcat.org/oclc/271823772


Organic Methods for Vegetable Gardening in Florida; by Ginny Stibolt
http://books.google.com/books?id=SBSLMAEACAAJ
http://www.worldcat.org/oclc/806013180


Organic No Dig, No Weed Gardening: A Revolutionary Method For Easy Gardening; by Raymond P
Poincelot
librarything.com/4692899 books.google.com/jNR7AAAACAAJ worldcat.org/oclc/16756235
bookfinder.com      addall.com     booksprice.com


Organic No-Till Farming - Advancing No-Till Agriculture: Crops, Soil, Equipment; by Jeff Moyer
http://books.google.com/books?id=izRKXwAACAAJ
http://www.worldcat.org/oclc/731720202


Organic Pastoral: Resource Guide, New Zealand; by Barbara Gillatt
http://books.google.com/books?id=MzeRLQAACAAJ
http://www.worldcat.org/oclc/156602722


Organic Strawberry Production Manual; by Steven T Koike
http://books.google.com/books?id=HJ8biqTMpDAC
http://www.worldcat.org/oclc/801973485
~
Organic Surface Cultivation: Its Theory and Practice, United Kingdom; by Newton Gerard Smith
http://books.google.com/books?id=afNIAAAAIAAJ
http://www.worldcat.org/oclc/613203247


Organic Tree Fruit Management; by Linda Edwards, Canadian Organic Growers - British Columbia
http://www.worldcat.org/oclc/45818011


Organic Vegetable Gardening, Australia; by Annette McFarlane
http://www.librarything.com/work/1116249
http://books.google.com/books?id=O1xUAQAACAAJ
http://www.worldcat.org/oclc/156118755      bookfinder.com     addall.com     booksprice.com


Organic Vegetable Gardening, New Zealand; by Xanthe White
http://www.librarything.com/work/12784235
http://books.google.com/books?id=aOdlPgAACAAJ
http://www.worldcat.org/oclc/423373713    bookfinder.com       addall.com     booksprice.com


Organic Vegetable Gardening; by Subhashini Sridhar
https://www.google.com
http://www.bing.com


Organic Vegetable Gardening (30 Varieties), New Zealand; by Ray Dwyer
http://books.google.com/books?id=OE_pMQAACAAJ
http://www.worldcat.org/oclc/154202499


Organic Vegetable Growing, United Kingdom; by Brian George Furner
http://www.librarything.com/work/7183499
http://books.google.com/books?id=868jAAAACAAJ
http://www.worldcat.org/oclc/1047290   bookfinder.com      addall.com       booksprice.com


Organic Vegetable Growing: A Practical, Authoritative Guide to Producing Nutritious and
Flavourful Vegetables from Your Garden; by Robert Milne
http://www.worldcat.org/oclc/499092120
http://books.google.com/books?id=uXDXevCgtV0C
~ Kindle book     ~ Nook book    allbookstores.com     bing.com     bookfinder.com
~
Organic Vegetable Production: A Complete Guide; by Gareth Davies
http://www.librarything.com/work/8587813
http://books.google.com/books?id=AoBnAAAACAAJ
http://www.worldcat.org/oclc/61703020
~ Kindle book     ~ Nook book    allbookstores.com    bing.com       bookfinder.com


Organic Vegetable Production Manual; by Milton E. McGiffen
http://books.google.com/books?id=AQ60lYTCFzwC
http://www.worldcat.org/oclc/769436851


Organic Vegetable Production Manual; by Kasisi Agricultural Training Centre
http://books.google.com/books?id=FmLMtwAACAAJ
http://www.worldcat.org/oclc/289108180


Our Earth Our Cure: A Handbook of Natural Medicine for Today; by Raymond Dextreit
http://www.librarything.com/work/1863257
http://books.google.com/books?id=KiUNAQAAMAAJ
http://www.worldcat.org/oclc/15595537    bookfinder.com    addall.com     booksprice.com


Our Future Reborn: EM Technology Changes The World; by Dr. Teruo Higa
http://www.librarything.com/work/9217089
http://books.google.com/books?id=jjffSAAACAAJ
http://www.worldcat.org/oclc/556259884     bookfinder.com addall.com            booksprice.com


Perennial Vegetables, Canada; by D. H. Dabbs
http://books.google.com/books?id=sYE0PAAACAAJ
http://www.worldcat.org/oclc/70511251


Perennial Vegetables: From Artichoke to Zuiki Taro, a Gardener's Guide to Over 100 Delicious,
Easy-to-Grow Edibles; by Eric Toensmeier
http://www.librarything.com/work/3300317
http://books.google.com/books?id=CyAAXbCiQDcC
http://www.worldcat.org/oclc/77520604     bookfinder.com      addall.com     booksprice.com
~ Kindle book     ~ Nook book     allbookstores.com    bing.com      bookfinder.com
~
Permaculture: Garden Guidelines and Seed Catalogue: Dryland Coastal Regions ; by Julie Firth
http://books.google.com/books?id=SR6pAAAACAAJ
http://www.worldcat.org/oclc/36131752


Permaculture and Organic Gardening; by Josh Byrne
http://books.google.com/books?id=R9rBSgAACAAJ
http://www.worldcat.org/oclc/225024051


Permaculture in a Nutshell; by Patrick Whitefield
http://www.librarything.com/work/114614
http://books.google.com/books?id=ms6Vo5RdvI0C
http://www.worldcat.org/oclc/30510467
~ Kindle book     allbookstores.com       bing.com      bookfinder.com     yahoo.com


Pippa's Organic Kitchen Garden: A New Practical Guide to Growing your Own Fresh Fruit,
Vegetables and Herbs; by Pippa Greenwood
http://www.librarything.com/work/6882485
http://books.google.com/books?id=ph_zAAAACAAJ
http://www.worldcat.org/oclc/41925645    bookfinder.com      addall.com   booksprice.com


Planning Your Organic Herb Garden: From Pots on Patios to Larger Layouts, United Kingdom; by
Sue Stickland
http://www.librarything.com/work/4021326
http://books.google.com/books?id=tgFIAAAAYAAJ
http://www.worldcat.org/oclc/30028771    bookfinder.com      addall.com    booksprice.com


Plants for a Future: Edible and Useful Plants for a Healthier World; by Ken Fern
http://www.librarything.com/work/238954
http://books.google.com/books?id=uXDXevCgtV0C
http://www.worldcat.org/oclc/37824869        bookfinder.com      addall.com      booksprice.com


Pot It, Grow It, Eat It: Home-Grown Produce from Pot to Pan by Kathryn Hawkins
http://www.librarything.com/work/9827879
http://books.google.com/books?id=KymfQQAACAAJ
http://www.worldcat.org/oclc/436618302
~ Kindle book      allbookstores.com    bing.com       bookfinder.com    yahoo.com
~
Potato Growing the Organic Way, United Kingdom; by Pauline M. Pears
http://books.google.com/books?id=ea8NAQAACAAJ
http://www.worldcat.org/oclc/810769177


Prospering as God's Sharecropper, Vegetable Gardening Made Easy, God Inspired Ways; by
Wolfgang D. Sauer
http://books.google.com/books?id=HEmjoFYm8PoC
http://www.worldcat.org/oclc/57639878



Practical Organics for New Zealand Farmers; by Trisha Fisk
http://www.librarything.com/work/8186191
http://books.google.com/books?id=vQGFAAAACAAJ
http://www.worldcat.org/oclc/54778654    bookfinder.com        addall.com     booksprice.com


Protected Cultivation: Construction, Requirements and Use of Greenhouses in Various Climates; by
Ernst van Heurn, Agrodok, Agromisa Foundation
http://www.echobooks.org
http://books.google.com/books?id=dwbWz6lUa0kC


Raised Bed Gardening the Organic Way; by Pauline M. Pears
http://books.google.com/books?id=9horAAAACAAJ
http://www.worldcat.org/oclc/12512846


Ruffles on My Longjohns; by Isabel K. Edwards
http://www.librarything.com/work/3498929
http://books.google.com/books?id=-Qt6AAAAMAAJ
http://www.worldcat.org/oclc/8112857       bookfinder.com      addall.com     booksprice.com


Quick Ways to Better Soil: Steps to Ensure Your Gardening Success ; by Rodale Organic Gardening
Magazine
http://www.librarything.com/work/4518711
http://books.google.com/books?id=kCPAHAAACAAJ
http://www.worldcat.org/oclc/47057114      bookfinder.com    addall.com        booksprice.com
~
Rodale's Book of Practical Formulas: Easy-To-Make, Easy-To-Use, Recipes for Hundreds of
Everyday Activities and Tasks; by Paula Dreifus Bakule
http://www.librarything.com/work/190764
http://books.google.com/books?id=T3Nk4hYWADsC
http://www.worldcat.org/oclc/23732512       bookfinder.com  addall.com      booksprice.com


Rodale's Chemical-Free Yard and Garden: The Ultimate Authority on Successful Organic Gardening;
by Anna Carr
http://www.librarything.com/work/2187237
http://books.google.com/books?id=06wrwltOkuYC
bookfinder.com       addall.com   booksprice.com google.com        bing.com yahoo.com


Rodale's Ultimate Encyclopedia of Organic Gardening: The Indispensable Green Resource for Every
Gardener; by Fern Marshall Bradley
http://www.librarything.com/work/7712271
http://books.google.com/books?id=xwqqNwAACAAJ
http://www.worldcat.org/oclc/243544156     bookfinder.com     addall.com     booksprice.com


Restoring the Soil: A Guide for Using Green Manure/Cover Crops to Improve the Food Security for
Smallholder Farmer; by Roland Bunch
http://books.google.com/books?id=fKuaMQEACAAJ
http://www.worldcat.org/oclc/810526142


Salad Leaves for All Seasons: Organic Growing from Pot to Plot; by Charles Dowdin
http://www.librarything.com/work/4240398
http://books.google.com/books?id=qQhVn9ZN5jUC
http://www.worldcat.org/oclc/183149253     bookfinder.com       addall.com     booksprice.com


Secrets to Great Soil; by Elizabeth P. Stell
http://www.librarything.com/work/44650
http://books.google.com/books?id=DhgHh37org4C
http://www.worldcat.org/oclc/37742336        bookfinder.com    addall.com     booksprice.com
~
Secrets of Native American Herbal Remedies: A Comprehensive Guide to the Native American
Tradition of Using Herbs for Improving Health and Well-Being; by Anthony J. Cichoke
http://www.librarything.com/work/224533
http://books.google.com/books?id=h3Xcj5lw4rIC
http://www.worldcat.org/oclc/45556196
~ Kindle book     ~ Nook book     allbookstores.com    bing.com    bookfinder.com


Secrets to Successful Organic Gardening: Soils, Bugs, Sprays and Everything Else You Need to
Know to Make Your Organic Garden Thrive; by Fi McMurray, New Zealand
http://books.google.com/books?id=_SErYAAACAAJ
http://www.worldcat.org/oclc/48032477
~ Kindle book


Self-Watering Containers: The Missing Manual by Bill Bradley
~ Kindle book    allbookstores.com     bing.com       bookfinder.com       yahoo.com


Sepp Holzer: The Rebel Farmer; by Sepp Holzer
http://www.librarything.com/work/9529944
http://books.google.com/books?id=LI26xo9QR7kC
http://www.worldcat.org/oclc/60115859    bookfinder.com       addall.com     booksprice.com


Sepp Holzer's Permaculture: A Practical Guide to Small-Scale, Integrative Farming and
Gardening; by Sepp Holzer
librarything.com/11138591 books.google.com/jNXK9kE-lOoC worldcat.org/oclc/694395083
~ Kindle book    ~ Nook book     allbookstores.com     bing.com     bookfinder.com


Setting Up and Running a School Garden: A Manual for Teachers and Communities ; by Food and
Agriculture Organization of the United Nations
http://books.google.com/books?id=syTbAAAAMAAJ
http://www.worldcat.org/oclc/69172511      bookfinder.com   addall.com   booksprice.com
http://www.google.com      http://www.bing.com
http://www.fao.org - HTML Version, PDF Version


Shallow Bed Gardening: A Gardening Hint from ECHO; by ECHO
http://www.google.com
http://www.bing.com
http://www.echobooks.org
~
Shameless Shortcuts: 1,027 Tips and Techniques That Help You Save Time, Save Money, and Save
Work Every Day; by Fern Marshall Bradley
http://www.librarything.com/work/4798316
http://books.google.com/books?id=WwEUFTHZbA4C
http://www.worldcat.org/oclc/60524293     bookfinder.com    addall.com     booksprice.com

Simple Hydroponics Cookbook - CD book; by Institue of Simplified Hydroponics
http://www.carbon.org     google.com        bing.com      yahoo.com

Simple Organic Kitchen and Garden: A Complete Guide to Growing and Cooking Perfect Natural
Produce; by Ysanne Spevak
http://www.librarything.com/work/843383
http://books.google.com/books?id=zIf7ygAACAAJ
http://www.worldcat.org/oclc/757931825   bookfinder.com     addall.com    booksprice.com

Small Plot, High Yield Gardening: How to Grow Like a Pro, Save Money, and Eat Well by Turning
Your Back (or Front or Side) Yard Into An Organic Produce Garden; by Sal Gilbertie
http://www.librarything.com/work/9331893
http://books.google.com/books?id=g02VD8jbKvMC
http://www.worldcat.org/oclc/326542026       bookfinder.com    addall.com        booksprice.com

Small Scale Irrigation: A Manual of Low-Cost Water Technolog; by Peter H. Stern
http://books.google.com/books?id=fzNBAAAAYAAJ
http://www.worldcat.org/oclc/5955664


Small Space, Big Harvest: Turn Your Small Garden Into A Vegetable Garden Naturally; by Duane
G. Newcomb
http://www.librarything.com/work/204736
http://books.google.com/books?id=iAtIAAAAYAAJ
http://www.worldcat.org/oclc/26974793     bookfinder.com    addall.com     booksprice.com


Soil Biology Primer; by Elaine R Ingham
http://www.librarything.com/work/10366790
http://books.google.com/books?id=uoQflQEACAAJ
http://www.worldcat.org/oclc/47066686   bookfinder.com         addall.com      booksprice.com


Soil Food: 1372 Ways to Add Fertility to Your Soil; by Jackie French
http://www.librarything.com/work/4695783
http://books.google.com/books?id=mWjDAQAACAAJ
http://www.worldcat.org/oclc/35203273     bookfinder.com         addall.com    booksprice.com
~
Solar Gardening: Growing Vegetables Year-Round the American Intensive Way; by Leandre Poisson
http://www.librarything.com/work/326851
http://books.google.com/books?id=YQnRrUvFPoIC
http://www.worldcat.org/oclc/30624782
~ Kindle book    ~ Nook book    allbookstores.com   bing.com     bookfinder.com


Solar Growing Frame: Grows Fresh Vegetables Year Round Using Only Solar Energy; by Rodale
Press
http://www.librarything.com/work/11957510
http://books.google.com/books?id=otUnAQAAMAAJ
http://www.worldcat.org/oclc/5751201   bookfinder.com    addall.com     booksprice.com


Solar Heat-N-Grow Window: Combines a Window Greenhouse and Solar Air Heater in One Project ;
by Roger A Moyer
http://books.google.com/books?id=PMqUsuaSv1QC
http://www.worldcat.org/oclc/8553355


Solviva: How to Grow $500,000 on One Acre, and Peace on Earth; by Anna Edey
http://www.librarything.com/work/366689
http://books.google.com/books?id=QOoJAQAAMAAJ
http://www.worldcat.org/oclc/39119150   bookfinder.com     addall.com      booksprice.com


Sowing Seeds in the Desert: Natural Farming, Global Restoration, and Ultimate Food Security; by
Masanobu Fukuoka
http://www.librarything.com/work/12418163
http://books.google.com/books?id=k6hWTd2Baz8C
http://www.worldcat.org/oclc/759171802
~ Kindle book     ~ Nook book     allbookstores.com    bing.com      bookfinder.com


Starter Vegetable Gardens: 24 No-Fail Plans for Small Organic Gardens; by Barbara Pleasant
http://www.librarything.com/work/9524928
http://books.google.com/books?id=fCHKE--dKMEC
http://www.worldcat.org/oclc/436623382
~ Kindle book     ~ Nook book    allbookstores.com      bing.com    bookfinder.com
~
Step by Step to Organic Vegetable Growing; by Samuel Ogden
http://www.librarything.com/work/118019
http://books.google.com/books?id=z8WrZCxwj-QC
http://www.worldcat.org/oclc/141139    bookfinder.com      addall.com      booksprice.com


Straight Ahead Organic: A Step By Step Guide to Growing Great Vegetables in a Less-Than-Perfect
World; by Shepherd Ogden
http://www.librarything.com/work/1130349
http://books.google.com/books?id=Vu84AQAAIAAJ
http://www.worldcat.org/oclc/40408867    bookfinder.com     addall.com      booksprice.com


Square Foot Gardening: A New Way to Garden in Less Space with Less Work; by Mel
Bartholomew
http://www.librarything.com/work/3213
http://books.google.com/books?id=GcGciVvDTAkC
http://www.worldcat.org/oclc/6943565
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Straw Bale Gardens: The Breakthrough Method for Growing Vegetables Anywhere, Earlier and
with No Weeding; by Joel Karsten
http://www.librarything.com/work/9956274
http://books.google.com/books?id=M8GQMQEACAAJ
http://www.worldcat.org/oclc/808421742   bookfinder.com    addall.com    booksprice.com


Straw Bale Greenhouse
http://scribd.com/doc/50250383


Successful Indoor Organic Vegetable Gardening Manual; by Anthony Higgin
http://www.librarything.com/work/11672320
http://books.google.com/books?id=-EWfcQAACAAJ
http://www.worldcat.org/oclc/706697067
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Successful Small-Scale Farming: An Organic Approach; by Karl Schwenke
http://books.google.com/books?id=FDB1KTrEWv4C
http://www.librarything.com/work/126871
http://www.worldcat.org/oclc/22766714    bookfinder.com       addall.com     booksprice.com
~
Successful Self-Watering Containers: Converting Your Favorite Container to a Self-Waterer; by
Lorraine Ballato
http://books.google.com/books?id=uQ12PgAACAAJ


Sugar Snaps and Strawberries: Simple Solutions for Creating Your Own Small-Space Edible Garden;
by Andrea Bellamy
http://www.librarything.com/work/10780140
http://books.google.com/books?id=o409gk89VT4C
http://www.worldcat.org/oclc/535495586
~ Kindle book     allbookstores.com    bing.com        bookfinder.com   yahoo.com


Sustainable Agriculture in the Tropics: A Natural Farming System; by Keith O. Mikkelson
http://books.google.com/books?id=VaUD09gyRUwC
http://www.echobooks.org


Talking Dirt: The Dirt Diva's Down-To-Earth Guide to Organic Gardening; by Annie Spiegelman
http://www.librarything.com/work/9524952
http://books.google.com/books?id=AOKXOA9jxYoC
http://www.worldcat.org/oclc/426803606
~ Kindle book     ~ Nook book     allbookstores.com   bing.com     bookfinder.com


Teaming with Microbes: The Organic Gardener's Guide to the Soil Food Web; by Wayne Lewis
http://www.librarything.com/work/9475195
http://books.google.com/books?id=r3ZsL47QiVQC
http://www.worldcat.org/oclc/495597869
~ Kindle book     ~ Nook book    allbookstores.com   bing.com      bookfinder.com


Terrific Garden Tonics: 345 Do-It-Yourself, Fix 'em Formulas for Maintaining a Lush Lawn and
Gorgeous Garden; by Jerry Baker
http://www.librarything.com/work/659670
http://books.google.com/books?id=F4_UAAAACAAJ
http://www.worldcat.org/oclc/55475437      bookfinder.com      addall.com     booksprice.com
~
Texas Organic Vegetable Gardening : The Total Guide to Growing Vegetables, Fruits, Herbs, and
Other Edible Plants the Natural Way; by John Howard Garrett
http://www.librarything.com/work/392350
http://books.google.com/books?id=0wJIAAAAYAAJ
http://www.worldcat.org/oclc/39545722
~ Kindle book     allbookstores.com       bing.com     bookfinder.com  yahoo.com


The Apartment Farmer: The Hassle-Free Way to Grow Vegetables Indoors, on Balconies, Patios,
Roofs, and In Small Yards; by Duane G. Newcomb
http://www.librarything.com/work/2348812
http://books.google.com/books?id=DTQjAQAAMAAJ
http://www.worldcat.org/oclc/2146869      bookfinder.com  addall.com      booksprice.com


The Australian Organic Gardener's Handbook; by Keith Smith
http://www.librarything.com/work/1062708
http://books.google.com/books?id=Yqp2AAAACAAJ
http://www.worldcat.org/oclc/29630260    bookfinder.com       addall.com     booksprice.com


The Australian Organic Gardening Handbook; by Brenda Little
http://www.librarything.com/work/4755601
http://books.google.com/books?id=Ve2JAAAACAAJ
http://www.worldcat.org/oclc/155649090   bookfinder.com        addall.com      booksprice.com


The Backyard Vegetable Factory: Super Yields from Small Spaces; by Duane G. Newcomb
http://www.librarything.com/work/524835
http://books.google.com/books?id=UQNIAAAAYAAJ
http://www.worldcat.org/oclc/17875035     bookfinder.com    addall.com      booksprice.com


The Beautiful Food Garden: Creative Landscaping With Vegetables, Herbs, Fruits ; by Kate Rogers
Gessert
http://www.librarything.com/work/2178068
http://books.google.com/books?id=sEIjAQAAMAAJ
http://www.worldcat.org/oclc/15198566      bookfinder.com    addall.com       booksprice.com
~
The Best of Organic Gardening: Over 50 Years of Organic Advice and Reader-Proven Techniques
from America's Best-Loved Gardening Magazine; by Mike McGrath
http://www.librarything.com/work/142168
http://books.google.com/books?id=VksIAAAACAAJ
http://www.worldcat.org/oclc/32699254    bookfinder.com     addall.com     booksprice.com


The Biodome Garden Book: The Only Greenhouse Design That Needs No Electrical Ventilation or
Humidifying System; by Patricia Watters
http://www.librarything.com/work/12561067
http://books.google.com/books?id=uXNIXwAACAAJ
http://www.worldcat.org/oclc/767652177    bookfinder.com  addall.com     booksprice.com


The Canadian Garden Primer: An Organic Approach; by Mark Cullen
http://www.librarything.com/work/11677453
http://books.google.com/books?id=tPBDOQAACAAJ
http://www.worldcat.org/oclc/426079221    bookfinder.com     addall.com      booksprice.com


The Canadian Illustrated Guide to Green Gardening: All-New, All-Organic, Back to Basics
Gardening; by Trevor Cole
http://www.librarything.com/work/11472149
http://books.google.com/books?id=uGwsOAAACAAJ
http://www.worldcat.org/oclc/416971501


The Cobber's Companion: How to Build Your Own Earthen Home; by Michael G. Smith
http://www.librarything.com/work/606492
http://books.google.com/books?id=HeF5QgAACAAJ
http://www.worldcat.org/oclc/40140530   bookfinder.com    addall.com      booksprice.com


The Complete Technology Book On Bio-Fertilizer And Organic Farming; by Niir Board
http://books.google.com/books?id=ID1u7mzd-nUC
http://www.worldcat.org/oclc/174264194


The Complete Idiot's Guide to Small-Space Gardening; by Chris McLaughlin
http://books.google.com/books?id=OHAKCzbecp0C
http://www.worldcat.org/oclc/727703421
~ Kindle book     ~ Nook book    allbookstores.com      bing.com   bookfinder.com
~
The Complete Idiot's Guide to Year-Round Gardening; by Delilah Smittle
http://www.librarything.com/work/9764714
http://books.google.com/books?id=55MKiliSiYoC
http://www.worldcat.org/oclc/426803239
~ Kindle book      ~ Nook book     bookfinder.com     addall.com       booksprice.com


The Compost Fruit Grower: Organic Fruit Growing, United Kingdom; by Wilfred Edward Shewell-
Cooper
http://www.librarything.com/work/13172100
http://books.google.com/books?id=oVg7AAAACAAJ
http://www.worldcat.org/oclc/5322299    bookfinder.com     addall.com     booksprice.com


The Desert Shall Blossom: A Comprehensive Guide to Vegetable Gardening in the Mountain West ;
by David E. Whiting
http://www.librarything.com/work/12079388
http://books.google.com/books?id=aWVH76wVNJgC
http://www.worldcat.org/oclc/25122129    bookfinder.com      addall.com     booksprice.com


The Dirt Cheap Green Thumb: 400 Thrifty Tips for Saving Money, Time, and Resources in and
Around the Garden; by Rhonda Massingham Hart
http://www.librarything.com/work/8912322
http://books.google.com/books?id=QyoCnQZwvgEC
http://www.worldcat.org/oclc/768625607
~ Kindle book      ~ Nook book    bookfinder.com     addall.com   booksprice.com


The Earth Sheltered Solar Greenhouse Book; by Mike Oehler
http://www.librarything.com/work/4507903
http://books.google.com/books?id=5iKwGAAACAAJ
http://www.worldcat.org/oclc/184985256       bookfinder.com     addall.com     booksprice.com


The Eave Trough Garden: A Gardening Hint from ECHO; by ECHO
http://www.google.com
http://www.bing.com
http://www.echobooks.org


The Ecological Approach to Backyard Farming (Integrated Pest Management); by Jeff Van Hautte
http://www.librarything.com/work/8722861
~
The Edible Balcony: Growing Fresh Produce in Small Spaces; by Alex Mitchell
http://www.librarything.com/work/11880083
http://books.google.com/books?id=9Znv-k_bwqsC
http://www.worldcat.org/oclc/748331324
~ Kindle book    ~ Nook book    allbookstores.com    bing.com       bookfinder.com


The Edible Balcony: How to Grow Fresh Food in a Small Space Plus 60 Inspiring Recipes; by Indira
Naidoo
http://www.librarything.com/work/12005362
http://books.google.com/books?id=z5eKZwEACAAJ
http://www.worldcat.org/oclc/712025202    bookfinder.com       addall.com     booksprice.com


The Edible City Resource Manual; by Richard Britz
librarything.com/2389015 books.google.com/p_r6wNisWWQC worldcat.org/oclc/7555708


The Edible Container Garden: Growing Fresh Food in Small Spaces; by Michael Guerra
http://www.librarything.com/work/517225
http://books.google.com/books?id=6X9YHFG15GkC
http://www.worldcat.org/oclc/41967278   bookfinder.com    addall.com     booksprice.com


The Edible Indoor Garden: A Complete Guide to Growing over 60 Vegetables, Fruits, and Herbs
Indoors; by Peggy Ann Hardigree
http://www.librarything.com/work/1637987
http://books.google.com/books?id=Po7upwAACAAJ
http://www.worldcat.org/oclc/6707926    bookfinder.com      addall.com     booksprice.com


The Elements of Organic Gardening; by the Prince of Wales
http://www.librarything.com/work/3690504
http://books.google.com/books?id=LxmM_rZ4axgC
http://books.google.com/books?id=_UTKtgAACAAJ
http://www.worldcat.org/oclc/80180346      bookfinder.com     addall.com     booksprice.com


The Enlivened Rock Powders; by Harvey Lisle
http://www.librarything.com/work/596365
http://books.google.com/books?id=KfMGAAAACAAJ
http://www.worldcat.org/oclc/33209424    bookfinder.com       addall.com     booksprice.com
~
The Essential Urban Farmer; by Novella Carpenter
librarything.com/11860723   books.google.com/IRCkqDLpcW4C worldcat.org/oclc/744291854
~ Kindle book     ~ Nook book     allbookstores.com    bing.com     bookfinder.com


The Experts Book of Garden Hints: Over 1,500 Organic Tips and Techniques From 250 of America's
Best Gardeners; by Fern Marshall Bradley
http://www.librarything.com/work/72806
http://books.google.com/books?id=_ilIAAAAYAAJ
http://www.worldcat.org/oclc/27338955    bookfinder.com      addall.com    booksprice.com


The Food and Heat Producing Solar Greenhouse: Design, Construction, Operation; by Rick Fisher
http://www.librarything.com/work/1956314
http://books.google.com/books?id=_ykhAQAAIAAJ
http://www.worldcat.org/oclc/6170175   bookfinder.com     addall.com      booksprice.com


The Food Mission: Sustainable Food Production: a Manual of Sustainable Methods of Plant
Production Helpful in Meeting Food Needs Everywhere; by Don Sobkoviak
http://www.librarything.com/work/12097279
http://books.google.com/books?id=9cnBAAAACAAJ
http://www.worldcat.org/oclc/33315294    bookfinder.com      addall.com    booksprice.com


The Garden Organic Guide to Growing Vegetables; by Pauline Pears
http://www.librarything.com/work/10442667
http://books.google.com/books?id=NoVKPQAACAAJ
http://www.worldcat.org/oclc/261177919    bookfinder.com      addall.com      booksprice.com


The Garden Ville Method: Lessons in Nature; by Malcolm Beck
http://www.librarything.com/work/86117
http://books.google.com/books?id=s2YnlAEACAAJ
http://www.worldcat.org/oclc/29867781    bookfinder.com     addall.com       booksprice.com


The Gardener's A-Z Guide to Growing Organic Food; by Tanya L. K. Denckla
http://www.librarything.com/work/651194
http://books.google.com/books?id=4Y9tGKq-mwoC
http://www.worldcat.org/oclc/51726870   bookfinder.com      addall.com       booksprice.com
~
The Gardening from Which: Guide to Gardening Without Chemicals, United Kingdom; by Alistair
Ayres
http://www.librarything.com/work/11768150
http://books.google.com/books?id=qPRGHAAACAAJ
http://www.worldcat.org/oclc/59148657   bookfinder.com    addall.com     booksprice.com


The Good Food Revolution: Growing Healthy Food, People, and Communities; by Will Allen
librarything.com/11993624  books.google.com/nf55k2hlg-IC worldcat.org/oclc/757470632
calameo.com/00146760196286db0d170     calameo.com/0014676015b669d39046f
calameo.com/0014676011706f76df387 calameo.com/0014676011ef888557ff8
http://www.growingpower.org
~ Kindle book    ~ Nook book      allbookstores.com    bing.com      bookfinder.com


The Half-hour Allotment; by Lia Leendertz
http://www.librarything.com/work/2548117
http://books.google.com/books?id=hsv0B0up2ugC
http://www.worldcat.org/oclc/62891716     bookfinder.com      addall.com      booksprice.com


The Holistic Orchard: Tree Fruits and Berries the Biological Way; by Michael Phillips
http://www.librarything.com/work/11949597
http://books.google.com/books?id=zwHotVXtnfsC
http://www.worldcat.org/oclc/719429796
~ Kindle book     ~ Nook book      allbookstores.com     bing.com      bookfinder.com


The Ideal Soil: A Handbook for the New Agriculture; by Michael Astera
http://www.librarything.com/work/10283710
http://books.google.com/books?id=amv2SAAACAAJ
http://www.worldcat.org/oclc/696741259    bookfinder.com        addall.com     booksprice.com


The Indoor Kitchen Garden: Vegetable Growing in Limited Space; by Joy O. I. Spoczynska
http://www.librarything.com/work/1387335
http://books.google.com/books?id=WQNIAAAAYAAJ
http://www.worldcat.org/oclc/18415887     bookfinder.com     addall.com        booksprice.com


The Irish Gardener's Handbook: How to Grow Vegetables, Herbs, Fruit; by Michael Brenock
http://www.librarything.com/work/9696229
http://www.worldcat.org/oclc/751785794
~
The Intelligent Gardener: Growing Nutrient Dense Food; by Steve Solomon
http://www.librarything.com/work/12933706
http://books.google.com/books?id=SC6YjYyC8gEC
http://www.worldcat.org/oclc/783153248
~ Kindle book     ~ Nook book     allbookstores.com    bing.com      bookfinder.com


The Little Gardeners Guide: Gardening Know-How and Fun Activities For Young Greenthumbs; by
Niki Horin
http://www.librarything.com/work/12548763
http://books.google.com/books?id=qPs2YgEACAAJ
http://www.worldcat.org/oclc/712021918    bookfinder.com   addall.com     booksprice.com


The Living Garden: A Practical Guide To Gardening The Natural Way, United Kingdom; by Hamilton
Geoff
http://www.librarything.com/work/9300726
http://books.google.com/books?id=UEZOOQAACAAJ
http://www.worldcat.org/oclc/28135487    bookfinder.com     addall.com     booksprice.com


The Lost Crops of Africa; by National Academies of Science
http://www.librarything.com/work/8962486
http://books.google.com/books?id=MqGLARzj-6sC
http://www.worldcat.org/oclc/85851965      bookfinder.com    addall.com     booksprice.com


The Lost Crops of the Incas: Little-Known Plants of the Andes with Promise for Worldwide
Cultivation; by National Research Council
http://www.librarything.com/work/819947
http://books.google.com/books?id=XMM4uR_sdHgC
http://www.worldcat.org/oclc/20397360      bookfinder.com      addall.com     booksprice.com


The Low Desert Herb Gardening Handbook; by Anne Fischer
http://www.librarything.com/work/4125236
http://books.google.com/books?id=3V0eHQAACAAJ
http://www.worldcat.org/oclc/38524358    bookfinder.com        addall.com     booksprice.com
~
The Lychee and Lungan; by George Weidman Groff
http://books.google.com/books?id=W8kqAAAAYAAJ
http://www.worldcat.org/oclc/1601613
~ Nook book allbookstores.com      bing.com    bookfinder.com        yahoo.com


The Michigan Gardener's Companion: An Insider's Guide to Gardening in the Great Lakes State; by
Rita C. Henehan
http://www.librarything.com/work/5245461
http://books.google.com/books?id=rFozvuOHH0cC
http://www.worldcat.org/oclc/175218268   bookfinder.com      addall.com      booksprice.com


The Michigan Gardening Guide; by Jerry Minnich
http://www.librarything.com/work/648284
http://books.google.com/books?id=4MKtIRwfw6UC
http://www.worldcat.org/oclc/37854424     bookfinder.com      addall.com     booksprice.com


The Miracle Tree: The Multiple Attributes of Moringa; by Church World Service
http://www.librarything.com/work/11458407
http://books.google.com/books?id=V0bEOQAACAAJ
http://www.worldcat.org/oclc/223572371      bookfinder.com      addall.com    booksprice.com


The Natural Magic of Mulch: Organic Gardening Australian Style; by Michael J. Roads
http://www.librarything.com/work/4948348
http://books.google.com/books?id=uEc_AAAACAAJ
http://www.worldcat.org/oclc/24890703    bookfinder.com      addall.com       booksprice.com


The New Hampshire Gardener's Companion: An Insider's Guide to Gardening in the Granite State; by
Henry Homeyer
http://www.librarything.com/work/2941107
http://books.google.com/books?id=v307KIjlyK0C
http://www.worldcat.org/oclc/70864475    bookfinder.com   addall.com      booksprice.com


The New Organic Grower: Master's Manual of Tools and Techniques for the Home and Market
Gardener; by Francis Blake, Eliot Coleman
http://www.librarything.com/work/114053
http://books.google.com/books?id=zmJVlBrLtO8C
~ Kindle book      ~ Nook book      allbookstores.com bing.com   bookfinder.com
~
The Natural Gardener: A Complete Guide to Organic Gardening, Australia; by Jeff Hodges
http://www.librarything.com/work/6206018
http://books.google.com/books?id=N6WJGwAACAAJ
http://www.worldcat.org/oclc/38353338    bookfinder.com    addall.com         booksprice.com


The New Seed Starter's Handbook; by Nancy Bubel
http://www.librarything.com/work/524755
http://books.google.com/books?id=uXpJxgIUG4wC
http://www.worldcat.org/oclc/16873192     bookfinder.com      addall.com     booksprice.com


The NZ Fruit Garden: Growing Fruit and Nuts in New Zealand; by Sally Cameron
http://books.google.com/books?id=9UFBQwAACAAJ
http://www.worldcat.org/oclc/538967681


The New Zealand Organic Gardening Book; by Brenda Little
http://books.google.com/books?id=OFOYAAAACAAJ


The New Zealand Organic Gardening Year: A Month-By-Month Guide for Vegetables and Flowers;
by Jonathan Spade
http://www.librarything.com/work/8980050
http://books.google.com/books?id=YVP8PAAACAAJ
http://www.worldcat.org/oclc/154642673   bookfinder.com  addall.com     booksprice.com


The No-Work Garden Book; by Ruth Stout
http://www.librarything.com/work/247464
http://books.google.com/books?id=E1ZxAAAACAAJ
http://www.worldcat.org/oclc/156488   bookfinder.com       addall.com      booksprice.com


The Old-Fashioned Fruit Garden: The Best Way to Grow, Preserve, and Bake with Small Fruit; by Jo
Ann Gardner
http://www.librarything.com/work/12918919
http://books.google.com/books?id=kk_r8FWIw9YC
http://www.worldcat.org/oclc/779864671
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com
~
The Organic Backyard Vineyard: A Step-by-Step Guide to Growing Your Own Grapes; by Tom
Powers
http://www.librarything.com/work/12705131
http://books.google.com/books?id=f236F59EkLUC
http://www.worldcat.org/oclc/756377665
~ Kindle book     ~ Nook book    allbookstores.com   bing.com    bookfinder.com


The Organic Companion: Gleanings from Canadian Organic Growers; by Canadian Organic Growers
http://books.google.com/books?id=pvfttgAACAAJ
http://www.worldcat.org/oclc/317351463


The Organic Farming Manual: A Comprehensive Guide to Starting and Running a Certified Organic
Farm; by Anne Larkin Hansen
http://www.librarything.com/work/9524925
http://books.google.com/books?id=B0XP2bmNkdwC
~ Kindle book     ~ Nook book    allbookstores.com bing.com      bookfinder.com


The Organic Farming Source Book; by Claude Alvares
http://www.librarything.com/work/13423412
http://books.google.com/books?id=E-ATJQAACAAJ
http://www.worldcat.org/oclc/50506626    bookfinder.com     addall.com     booksprice.com


The Organic Gardener; by Catharine Osgood Foster
http://www.librarything.com/work/1375482
http://books.google.com/books?id=qoRFAAAAYAAJ
http://www.worldcat.org/oclc/210873     bookfinder.com    addall.com     booksprice.com


The Organic Gardener: How to Create Flower, Vegetable, Herb and Fruit Gardens Using Completely
Natural Techniques; by Christine Lavelle
http://www.librarything.com/work/10355394
http://books.google.com/books?id=CA7pQgAACAAJ
http://www.worldcat.org/oclc/56393006    bookfinder.com     addall.com     booksprice.com


The Organic Gardener's Companion; by Organic Gardening and Farming Society of Tasmania
http://www.librarything.com/work/8488228
http://books.google.com/books?id=pwCXGQAACAAJ
http://www.worldcat.org/oclc/27504408    bookfinder.com     addall.com     booksprice.com
~
The Organic Gardener's Home Reference: A Plant-By-Plant Guide to Growing Fresh, Healthy Food;
by Tanya Denckla
http://www.librarything.com/work/1791736
http://books.google.com/books?id=MtwOAQAAMAAJ
http://www.worldcat.org/oclc/28221586    bookfinder.com    addall.com     booksprice.com


The Organic Greenhouse and Conservatory; by Roy Lacey
http://www.librarything.com/work/2633391
http://books.google.com/books/about/Organic_Greenhouse_Cons_n_e.html?id=WdtZHNHPnW8C
http://www.worldcat.org/oclc/27896537    bookfinder.com   addall.com    booksprice.com


The Organic Gardener, United Kingdom; by Montagu Don
http://www.librarything.com/work/6731029
http://books.google.com/books?id=ak91PQAACAAJ
http://www.worldcat.org/oclc/156753643    bookfinder.com        addall.com    booksprice.com


The Organic Gardeners Handbook: An Expert’s Advice on The Art And Science of Organic
Gardening; by Frank Tozer
http://www.librarything.com/work/7816065
http://books.google.com/books?id=LTkjAQAAMAAJ
http://www.worldcat.org/oclc/179824430   bookfinder.com    addall.com     booksprice.com


The Organic Guide to Edible Gardens, Australia; by Jennifer Stackhouse
http://www.librarything.com/work/13250241
http://books.google.com/books?id=UCEptwAACAAJ
http://www.worldcat.org/oclc/758465359     bookfinder.com        addall.com   booksprice.com


The Organic Herb Gardener; by Graham Clarke
http://www.librarything.com/work/11635229
http://books.google.com/books?id=HSb7QwAACAAJ
http://www.worldcat.org/oclc/548555850    bookfinder.com        addall.com    booksprice.com


The Organic Method Primer; by Bargyla Rateaver
http://www.acresusa.com
http://www.librarything.com/work/950134
http://books.google.com/books?id=rYANAQAACAAJ
http://www.worldcat.org/oclc/29660866      bookfinder.com       addall.com    booksprice.com
~
The Organic Salad Garden; by Joy Larkcom
http://www.librarything.com/work/3028346
http://books.google.com/books?id=SsQ8XBJkGG8C
http://www.worldcat.org/oclc/59549813    bookfinder.com         addall.com     booksprice.com


The Organic Vegetable Garden: Improving the Soil - Naturally, Australia; by Mary Moody
http://books.google.com/books?id=WWwxAAAACAAJ
http://www.worldcat.org/oclc/27553380


The Organic Vegetable Gardener; by Yvonne Cuthbertson
http://www.librarything.com/work/12507921
http://books.google.com/books?id=cm9AYgEACAAJ
http://www.worldcat.org/oclc/727107975    bookfinder.com         addall.com     booksprice.com

The Organic Tradition: An Anthology of Writings on Organic Farming 1900 - 1950; by Philip Conford
books.google.com/x5sdAQAAMAAJ           bookfinder.com        addall.com     booksprice.com

The Permaculture Garden; by Graham Bell
http://www.librarything.com/work/1113145
http://books.google.com/books?id=2Od_K7SYiYIC
http://www.worldcat.org/oclc/30607872
~ Kindle book     ~ Nook book    allbookstores.com       bing.com     bookfinder.com

The Permaculture Handbook: Garden Farming for Town and Country; by Peter Bane
http://www.librarything.com/work/12029692
http://books.google.com/books?id=M5fZAnAEH7MC
http://www.worldcat.org/oclc/784293137
~ Kindle book    ~ Nook book    allbookstores.com  bing.com      bookfinder.com

The Permaculture Home Garden; by Linda Woodrow
http://www.librarything.com/work/739311
http://books.google.com/books?id=P9VUAAAACAAJ
http://www.worldcat.org/oclc/221992806   bookfinder.com          addall.com     booksprice.com


The Permaculture Way: Practical Steps to Create a Self-Sustaining World; by Graham Bell
http://www.librarything.com/work/330095
http://books.google.com/books?id=9sb-PG2osiAC
http://www.worldcat.org/oclc/59987308
~ Kindle book     ~ Nook book    allbookstores.com      bing.com     bookfinder.com
~
The Postage Stamp Garden Book: How to Grow All the Food You Can Eat in Very Little Space ; by
Duane Newcomb
http://www.librarything.com/work/687383
http://books.google.com/books?id=JdM-twAACAAJ
http://www.worldcat.org/oclc/1294524    bookfinder.com   addall.com     booksprice.com


The Postage Stamp Kitchen Garden Book; by Duane G. Newcomb
http://books.google.com/books?id=wwxIAAAAYAAJ
http://www.worldcat.org/oclc/37878700


The Practical Australian Gardener: Seasonal Tasks Using Sensible Organic Methods ; by Peter Cundall
http://www.librarything.com/work/355107
http://books.google.com/books?id=VAkaAAAACAAJ
http://www.worldcat.org/oclc/223881977      bookfinder.com      addall.com    booksprice.com


The Quarter-Acre Farm: How I Kept the Patio, Lost the Lawn, and Fed My Family for a Year; by Spring
Warren
librarything.com/10997398 books.google.com/hOs4988PX8kC worldcat.org/oclc/663102316
~ Kindle book      ~ Nook book      allbookstores.com      bing.com      bookfinder.com


The Resilient Gardener: Food Production and Self-Reliance in Uncertain Times; by Marylyn Abbott
http://www.librarything.com/work/10481246
http://books.google.com/books?id=Xf5Q4jo_mEEC
http://www.worldcat.org/oclc/746302068
~ Kindle book     ~ Nook book    allbookstores.com     bing.com      bookfinder.com


The Rhode Island Gardener's Companion: An Insider's Guide to Gardening in the Ocean State ; by
Barbara Gee
http://www.librarything.com/work/6399481
http://books.google.com/books?id=vLCS2Ek_BxAC
http://www.worldcat.org/oclc/175218273   bookfinder.com       addall.com      booksprice.com


The Secret Life of Compost; by Malcolm Beck
http://www.librarything.com/work/186462
http://books.google.com/books?id=2_hHAAAAYAAJ
http://www.worldcat.org/oclc/36379496       bookfinder.com          addall.com      booksprice.com
~
The Seed Savers' Handbook for Australia and New Zealand; by Michel Fanton
http://www.librarything.com/work/1062702
http://books.google.com/books?id=U13vAQAACAAJ
http://www.worldcat.org/oclc/28957043     bookfinder.com     addall.com       booksprice.com


The Small Ecological Garden; by Sue Stickland
http://www.librarything.com/work/4268793
http://books.google.com/books?id=S_iqAAAACAAJ
http://www.worldcat.org/oclc/60115287      bookfinder.com      addall.com     booksprice.com


The Small Food Garden: Growing Organic Fruit and Vegetables at Home, Australia; by Diana
Anthony
http://www.librarything.com/work/13250259
http://books.google.com/books?id=KiRcLwEACAAJ
http://www.worldcat.org/oclc/794003152    bookfinder.com     addall.com     booksprice.com


The Soul of Soil: A Soil-Building Guide for Master Gardeners and Farmers; by Joseph Smillie
librarything.com/984997 books.google.com/z_sVgV-WqagC worldcat.org/oclc/41049496
~ Kindle book     ~ Nook book     allbookstores.com     bing.com     bookfinder.com


The Speedy Vegetable Garden; by Lia Leendertz
http://www.librarything.com/work/13359585
http://books.google.com/books?id=fuinuAAACAAJ
http://www.worldcat.org/oclc/785870742     bookfinder.com       addall.com     booksprice.com


The Sprouters Handbook; by Edward Cairney
http://www.librarything.com/work/223142
http://books.google.com/books?id=NoyjZwEACAAJ
http://www.worldcat.org/oclc/43806613    bookfinder.com        addall.com     booksprice.com


The Sustainable Vegetable Garden: A Backyard Guide to and Higher Yields ; by John Jeavons
http://www.librarything.com/work/441930
http://books.google.com/books?id=wN9v1jAwd6EC
http://www.worldcat.org/oclc/40588583
~ Kindle book    ~ Nook book     allbookstores.com   bing.com     bookfinder.com
~
The Tui NZ Vegetable Garden: The Complete Guide to Growing Vegetables and Herbs in New
Zealand; by Sally Cameron
http://www.librarything.com/work/9322644
http://books.google.com/books?id=M8KZZwEACAAJ
http://www.worldcat.org/oclc/421587839   bookfinder.com    addall.com     booksprice.com


The Urban Christian: Effective Ministry in Today's Urban World; by Raymond J. Bakke
http://www.librarything.com/work/348108
http://books.google.com/books?id=XQ-LMlswbicC
http://www.worldcat.org/oclc/16980474
~ Kindle book     allbookstores.com      bing.com      bookfinder.com    yahoo.com


The Vegetable and Herb Expert; by D. G. Hessayon
http://www.librarything.com/work/622014
http://books.google.com/books?id=vq8swHca-vQC
http://www.worldcat.org/oclc/37204022     bookfinder.com      addall.com     booksprice.com


The Vegetable Gardener's Bible: Discover Ed's High-Yield W-O-R-D System for All North
American Gardening Regions; by Edward C. Smith
http://www.librarything.com/work/174886
http://books.google.com/books?id=JYIMJ9hbYZsC
http://www.worldcat.org/oclc/42690086
~ Kindle book     ~ Nook book    allbookstores.com     bing.com   bookfinder.com


The Vegetable Gardener's Container Bible: How to Grow a Bounty of Food in Pots, Tubs, and Other
Containers; by Edward C. Smith
http://www.librarything.com/work/10966276
http://books.google.com/books?id=ptmFAh2zDJUC
http://www.worldcat.org/oclc/681503215      bookfinder.com     addall.com     booksprice.com


The Vegetable Gardener's Guide to Permaculture: Creating an Edible Ecosystem; by Christopher
Shein
http://www.librarything.com/work/13344315
http://books.google.com/books?id=6uGsuAAACAAJ
http://www.worldcat.org/oclc/785870730
~ Kindle book     ~ Nook book    allbookstores.com     bing.com     bookfinder.com
~
The Vermont Gardener's Companion: An Insider's Guide to Gardening in the Green Mountain State ;
by Henry Homeyer
http://www.librarything.com/work/4286634
http://books.google.com/books?id=hp1LytmlwwoC
http://www.worldcat.org/oclc/148971634   bookfinder.com      addall.com     booksprice.com


The Winter Harvest Handbook: Year-Round Vegetable Production Using Deep-Organic Techniques
and Unheated Greenhouses; by Eliot Coleman
http://www.librarything.com/work/8075876
http://books.google.com/books?id=aAn2XI29yToC
http://www.worldcat.org/oclc/262883165
~ Kindle book     ~ Nook book     allbookstores.com bing.com    bookfinder.com


The Water Efficient Garden: Includes Detailed Information on Greywater Irrigation ; by Wendy van
Dok
http://www.librarything.com/work/6143125
http://books.google.com/books?id=GWJoAAAACAAJ
http://www.worldcat.org/oclc/52828879       bookfinder.com      addall.com      booksprice.com


The Winter Harvest Handbook: Year Round Vegetable Production Using Deep Organic Techniques
and Unheated Greenhouses
http://www.librarything.com/work/8075876
http://books.google.com/books?id=aAn2XI29yToC
http://www.worldcat.org/oclc/262883165
~ Kindle book    ~ Nook book    allbookstores.com   bing.com     bookfinder.com


The Worm Book: The Complete Guide to Worms in Your Garden; by Loren Nancarrow
http://www.librarything.com/work/653193
http://books.google.com/books?id=rmtZ91zbxLMC
http://www.worldcat.org/oclc/38067650
~ Kindle book    ~ Nook book    allbookstores.com bing.com      bookfinder.com


The Year Round Organic School Garden: A Guide to Designing, Creating and Using an Organic
School Garden; by Lucy Bell
http://books.google.com/books?id=XDGVSQAACAAJ
http://www.worldcat.org/oclc/465361174
~
The Year-Round Vegetable Gardener: How to Grow Your Own Food 365 Days a Year, No Matter
Where You Live; by Niki Jabbour
http://www.librarything.com/work/12029688
http://books.google.com/books?id=cr1A4wrB7KUC
http://www.worldcat.org/oclc/704380998
~ Kindle book     ~ Nook book    allbookstores.com bing.com   bookfinder.com


The Year-Round Vegetable Gardener: The Complete Guide to Growing Vegetables at Anytime of
the Year; by Anne Halpin
http://www.librarything.com/work/9081513
http://books.google.com/books?id=C_dHAAAAYAAJ
http://www.worldcat.org/oclc/24670767    bookfinder.com   addall.com    booksprice.com


This Common Ground: Seasons on an Organic Farm; by Scott Chaskey
http://www.librarything.com/work/703414
http://books.google.com/books?id=sBqieO2jcJAC
http://www.worldcat.org/oclc/57201355
~ Kindle book     ~ Nook book    allbookstores.com   bing.com    bookfinder.com


Time Savers for Smart Gardeners; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/12418352
http://books.google.com/books?id=vjDgHAAACAAJ
http://www.worldcat.org/oclc/25798897      bookfinder.com    addall.com      booksprice.com


Tomatoes for Everyone: A Practical Guide to Growing Tomatoes, All Year Round ; by Allen Gilbert
http://www.librarything.com/work/1410867
http://books.google.com/books?id=SbUAAAAACAAJ
http://www.worldcat.org/oclc/38413641     bookfinder.com   addall.com     booksprice.com


Tools for Organic Farming: A Manual of Appropriate Equipment and Treatments; by George
McRobie
http://www.librarything.com/work/11463490
http://books.google.com/books?id=UH0fAQAAMAAJ
http://www.worldcat.org/oclc/21999495    bookfinder.com    addall.com     booksprice.com
~
Tropical Food Gardens: A Guide to Growing Fruit, Herbs and Vegetables in Tropical and Sub-
tropical Climates; by Leonie Norrington
http://www.librarything.com/work/3080043
http://books.google.com/books?id=snZFAQAAIAAJ
http://www.worldcat.org/oclc/155720492    bookfinder.com     addall.com      booksprice.com


Tropical Organic Gardening: Hawaiian Style; by Richard Stevens
http://www.librarything.com/work/3648942
http://books.google.com/books?id=cr5xAAAACAAJ
http://www.worldcat.org/oclc/48063233    bookfinder.com        addall.com    booksprice.com


Trowel and Error: Over 700 Tips, Remedies and Shortcuts for the Gardener; by Sharon Lovejoy
http://www.librarything.com/work/44590
http://books.google.com/books?id=hae65llQFoAC
http://www.worldcat.org/oclc/50192230    bookfinder.com       addall.com      booksprice.com


Uncommon Fruits for Every Garden; by Lee Reich
http://www.librarything.com/work/1857569
http://books.google.com/books?id=DQKlPwAACAAJ
http://www.worldcat.org/oclc/52838215    bookfinder.com       addall.com     booksprice.com


Urban Agriculture: Growing Vegetables in Cities; by Jeroen Boland, Agrodok, Agromisa Foundation
http://books.google.com/books?id=DmEcsbKRHYIC
http://www.worldcat.org/oclc/56824504
http://www.echobooks.org
http://www.google.com     http://www.bing.com


Urban Farm Handbook: City Slicker Resources for Growing, Raising, Sourcing, Trading, and
Preparing What You Eat; by Annette Cottrell
librarything.com/11738731 books.google.com/g2VCN2W1HNEC worldcat.org/oclc/727705064


Urban Farming: Sustainable City Living in Your Backyard, in Your Community, and in the World ; by
Thomas Fox
librarything.com/11280180 books.google.com/RTZjQwAACAAJ worldcat.org/oclc/503073342
~ Kindle book    ~ Nook book     allbookstores.com     bing.com     bookfinder.com
~
Urban Gardening: How To Grow Food In Any City Apartment Or Yard No Matter How Small
(Growing Indoors, On Rooftop , Small Yards, Balcony Gardens, Planting In Containers, Aeroponic
Gardening Systems); by Will Cook
http://www.librarything.com/work/13279986
~ Kindle book    allbookstores.com     bing.com      bookfinder.com      yahoo.com


Urban Gardening For Dummies; by the National Gardening Association
http://books.google.com/books?id=y7wyFyE2gFgC
http://www.worldcat.org/oclc/816160435
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Urban Kitchen Garden: Grow and Cook Your Own Food in the City; by Tom Moggach
http://www.librarything.com/work/12933705
http://books.google.com/books?id=FicBywAACAAJ
http://www.worldcat.org/oclc/755072865    bookfinder.com   addall.com    booksprice.com


Valuable Vegetables: Growing for Pleasure and Profit, United Kingdom; by Mandy Pullen
http://www.librarything.com/work/4902844
http://books.google.com/books?id=AnnYAAAACAAJ


Veg Patch (River Cottage Handbook 4); by Mark Diacono
http://www.librarything.com/work/8063484
http://books.google.com/books?id=yDbVNwAACAAJ
http://www.worldcat.org/oclc/335739160     bookfinder.com     addall.com     booksprice.com


Veganic Gardening: The Alternative System for Healthier Crops, United Kingdom; by Kenneth
Dalziel O'Brien
http://books.google.com/books?id=2sBaAQAACAAJ
http://www.worldcat.org/oclc/13425106


Vegetable Affinities, Composting of Sawdust and Safe Pesticides, New Zealand; by George MacM
Fuller
http://books.google.com/books?id=dVKStgAACAAJ
http://www.worldcat.org/oclc/224334134
~
Vegetables: Rodale Organic Gardening Basics; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/7670922
http://books.google.com/books?id=2YHRLNuv4pAC
http://www.worldcat.org/oclc/42476802    bookfinder.com       addall.com   booksprice.com


Vegetables and Fruit in Pots: Simple Steps to Success; by Dorling Kindersley
http://books.google.com/books?id=YlR7ygAACAAJ
http://www.worldcat.org/oclc/755072238
http://www.librarything.com/work/8325893       bookfinder.com        addall.com      booksprice.com


Vegetables for the Irish Garden; by Klaus Laitenberger
http://www.librarything.com/work/11861236
http://books.google.com/books?id=0eM9YgEACAAJ
http://www.worldcat.org/oclc/750674646         bookfinder.com    addall.com        booksprice.com


Vegetable Gardening for Ontario; by Laura Peters
http://www.librarything.com/work/11781467
http://books.google.com/books?id=MNVQYgEACAAJ
http://www.worldcat.org/oclc/676689892       bookfinder.com      addall.com        booksprice.com


Vegetables in Patches and Pots: A Child's Guide to Organic Vegetable Gardening; by Lorelie Miller
Mintz
http://www.librarything.com/work/8703969
http://books.google.com/books?id=BQgfAgAACAAJ
http://www.worldcat.org/oclc/2525276      bookfinder.com     addall.com     booksprice.com


Vegetables of Canada; by Derek B. Munro
http://www.librarything.com/work/6267728
http://books.google.com/books?id=z_yezcnaUHQC
http://www.worldcat.org/oclc/44961565    bookfinder.com         addall.com        booksprice.com


Vermiculture and Organic Farming; by Sathe Tukaram Vithatran
http://www.librarything.com/work/13118363
http://books.google.com/books?id=lW5fB0sUDK0C
http://www.worldcat.org/oclc/427638359      bookfinder.com       addall.com        booksprice.com
~



VERTICAL Gardening
Vertical Vegetables and Fruit: Creative Gardening Techniques for Growing Up in
Small Spaces; by Rhonda Massingham Hart
http://www.librarything.com/work/12112878
http://books.google.com/books?id=ZS6DHy0naNsC
http://www.worldcat.org/oclc/704381000
~ Kindle book     ~ Nook book   allbookstores.com      bing.com      bookfinder.com


Vertical Gardening: Grow Up, Not Out, for More Vegetables and Flowers in Much Less Space; by
Derek Fell
http://www.librarything.com/work/11193216
http://books.google.com/books?id=auqpcQAACAAJ
http://www.worldcat.org/oclc/659769914
~ Kindle book     ~ Nook book    allbookstores.com   bing.com     bookfinder.com


Garden Up: Smart Vertical Gardening for Small and Large Spaces; by Susan Morrison
http://librarything.com/work/10878183
http://books.google.com/books?id=MX5eAZDG-PQC
http://www.worldcat.org/oclc/648923671
~ Kindle book      ~ Nook book   allbookstores.com    bing.com       bookfinder.com


Gardening Vertically: 24 Ideas for Creating Your Own Green Walls; by Noemie Vialard
http://www.librarything.com/work/12333863
http://books.google.com/books?id=ViQlKQEACAAJ
http://www.worldcat.org/oclc/732601932        bookfinder.com    addall.com     booksprice.com


Vertical Gardening: Climbing Plants, Hanging Plants, Trellises, Wall Plantings, Terraces, Steep
Banks, Window Boxes; by Caroline Boisset
http://www.librarything.com/work/819922
http://books.google.com/books?id=lq6LQgAACAAJ
http://www.worldcat.org/oclc/17551617      bookfinder.com        addall.com      booksprice.com
~
Vertical Garden: From Nature to the City; by Patrick Blanc
http://www.librarything.com/work/5955910
http://books.google.com/books?id=GRiV6E_xn8gC
http://www.worldcat.org/oclc/214934450          bookfinder.com    addall.com    booksprice.com


Vertical Gardens: Bringing the City to Life; by Anna Lambertini
http://www.librarything.com/work/4917724
http://books.google.com/books?id=MPA4AQAAIAAJ
http://www.worldcat.org/oclc/165407838


Vertical Garden: Construction And Analysis Of A Portable Vertical Plantscape; by Janani Kannan
http://books.google.com/books?id=iF9QAAAAYAAJ
http://www.worldcat.org/oclc/692998938



Wading Pool Garden: A Gardening Hint from ECHO; by ECHO
http://www.google.com
http://www.bing.com
http://www.echobooks.org


Wally's Down to Earth Gardening Guide, New Zealand; by Wally Richards
http://www.librarything.com/work/5802523
http://books.google.com/books?id=AJuiAwAACAAJ
http://www.worldcat.org/oclc/156765404   bookfinder.com       addall.com       booksprice.com


Wally's Gardening and Health, New Zealand; by Wally Richards
http://books.google.com/books?id=jQUhQwAACAAJ
http://www.worldcat.org/oclc/463639315


Water For Every Farm: Yeomans Keyline Plan; by P. A. Yeomans
http://www.librarything.com/work/2191599
http://books.google.com/books?id=cFebQQAACAAJ
http://www.worldcat.org/oclc/27598545
~ Kindle book     bookfinder.com    addall.com      booksprice.com
~




Water-Wise Vegetables: For the Maritime Northwest Gardener; by Steve Solomon
http://www.librarything.com/work/1284437
http://books.google.com/books?id=WloAAAAACAAJ
http://www.worldcat.org/oclc/27221876     bookfinder.com       addall.com    booksprice.com




What Every Gardener Should Know About Earthworms; by Henry Hopp
http://www.librarything.com/work/5011585
http://books.google.com/books?id=GrX12L3vfmgC
http://www.worldcat.org/oclc/777949    bookfinder.com     addall.com     booksprice.com
~ Kindle book    ~ Nook book    allbookstores.com   bing.com      bookfinder.com




Why Garden Organically: Organic Gardening for Beginners; by Jane Jame
~ Kindle book  allbookstores.com     bing.com       bookfinder.com      yahoo.com




Wide Row Planting: The Productive Miracle; by Dick Raymond
http://www.librarything.com/work/2701853
http://books.google.com/books?id=Rz1PClzlqeYC
http://www.worldcat.org/oclc/6063325
~ Nook book allbookstores.com      bing.com      bookfinder.com     yahoo.com




Wild Farming; by Lambert M. Surhone
http://books.google.com/books?id=9QccygAACAAJ
~




Windowsill Herb Garden; by John Prenis
http://www.librarything.com/work/303604
http://books.google.com/books?id=-x3LqlKQ7aYC
http://www.worldcat.org/oclc/22276933    bookfinder.com       addall.com     booksprice.com




Winter Gardening in the Maritime Northwest: Cool Season Crops for the Year-Round Gardener; by
Binda Colebrook
http://www.librarything.com/work/326916
http://books.google.com/books?id=6ovX1mZory0C
http://www.worldcat.org/oclc/19395171
~ Kindle book     ~ Nook book    allbookstores.com    bing.com      bookfinder.com




Working with Nature: Shifting Paradigms; by Heide Hermary
http://www.librarything.com/work/9241529
http://books.google.com/books?id=SCaSMwEACAAJ
http://www.worldcat.org/oclc/159897732      bookfinder.com    addall.com     booksprice.com




Year-Around Harvest: Winter Gardening on the Coast; by Linda Gilkeson
http://www.librarything.com/work/6042046
http://books.google.com/books?id=ApGZlAEACAAJ
http://www.worldcat.org/oclc/701014927    bookfinder.com       addall.com    booksprice.com
~


Year Round Vegetables, Fruits and Flowers For Metro Houston, A Natural Organic Approach Using
Ecology; by Bob Randall
http://www.librarything.com/work/7864051
http://books.google.com/books?id=-dPSPAAACAAJ
http://www.worldcat.org/oclc/40836180      bookfinder.com     addall.com     booksprice.com




Your Organic Allotment; by Pauline Pears
http://www.librarything.com/work/5665458
http://books.google.com/books?id=iAarAAAACAAJ
http://www.worldcat.org/oclc/77797432    bookfinder.com       addall.com     booksprice.com




Yates Green Guide to Gardening: A No Fuss Guide to Organic Gardening, Austrialia; by Allen Gilbert
http://www.librarything.com/work/1093366
http://books.google.com/books?id=KRctGwAACAAJ
http://www.worldcat.org/oclc/27492084    bookfinder.com     addall.com     booksprice.com




You Can Build a Chicken Tractor: Step-by-Step Instructions for Beginners; by Sue Merriam
http://www.librarything.com/work/8999243
http://books.google.com/books?id=X2GOQQAACAAJ
http://www.worldcat.org/oclc/458488182    bookfinder.com        addall.com      booksprice.com




Your Farm in the City: An Urban-Dweller's Guide to Growing Food and Raising Animals; by Lisa
Taylor
librarything.com/10874790 books.google.com/3OrIhF8XJ80C worldcat.org/oclc/664666698
~ Nook book allbookstores.com       bing.com      bookfinder.com      yahoo.com
~




SEAWEED Gardening
Fertility from the Ocean Deep: Nature's Perfect Nutrient Blend for the Farm; by Charles Walters
http://www.librarything.com/work/8911935
http://books.google.com/books?id=IOPyAQAACAAJ
http://www.worldcat.org/oclc/58994165        bookfinder.com       addall.com      booksprice.com


Food Power from the Sea: The Seaweed Story; by Lee Fryer
http://www.librarything.com/work/5150765
http://books.google.com/books?id=ews3AAAACAAJ
http://www.worldcat.org/oclc/2525278    bookfinder.com         addall.com     booksprice.com


Sea Energy Agriculture: Nature's Ideal Trace Element Blend for Farm, Livestock, Humans; by by
Maynard Murray
http://www.librarything.com/work/4623809
http://books.google.com/books?id=NpgFAAAACAAJ
http://www.worldcat.org/oclc/52379170        bookfinder.com     addall.com      booksprice.com


Seaweed: A User's Guide; by Sonia Surey-Gent
http://www.librarything.com/work/5325764
http://books.google.com/books?id=xlEVAQAAIAAJ
http://www.worldcat.org/oclc/16088902      bookfinder.com       addall.com      booksprice.com


Seaweed and Plant Growth; by T. L. Senn
http://www.librarything.com/work/8104499
http://books.google.com/books?id=bOVFAAAAYAAJ
http://www.worldcat.org/oclc/17170597    bookfinder.com         addall.com      booksprice.com


Seaweed in Agriculture and Horticulture; by William Anthony Stephenson
http://www.librarything.com/work/10269006
http://books.google.com/books?id=HZQXAQAAIAAJ
http://www.worldcat.org/oclc/3242474        bookfinder.com     addall.com     booksprice.com
~
Fertile Soil from the Sea: The Effective Use of Seaweed in the Garden; by Curtis Stuart Laughlin
http://books.google.com/books?id=IxIzGwAACAAJ
http://www.worldcat.org/oclc/27178068


Effect of Seaweed Extract on Yield and Maturity of Onions; by David John McGeary
http://books.google.com/books?id=YzSCAAAACAAJ
http://www.worldcat.org/oclc/27531327


DVD: Permaculture Design Certificate Course; DVD Collection with Bill Mollison and Geoff
Lawton
http://www.permaculture-design-courses.com
http://www.yahoo.com http://www.google.com        http://www.bing.com



Aquaponics Journal
backyardaquaponics.com aquaponicsjournal.com


Aquaponics UK and Australia
ukaquaponics.org aquaponics.org.uk aquaponics.net.au diyaquaponics.com


Aquaponics Systems and GREEN ROOFS MANUALS
http://en.calameo.com/books/00135160793af637917ef
http://www.scribd.com/doc/45480026


Aquaponic Gardening: A Step-By-Step Guide to Raising Vegetables; by Sylvia Bernstein
librarything.com/11672554 books.google.com/iiT7GbUoauUC worldcat.org/oclc/709681564
~ Kindle book     ~ Nook book      allbookstores.com     bing.com      bookfinder.com


Aquaponic Food Product: Raising fish and plants for food and profit ; by Rebecca L. Nelson
librarything.com/11556695 books.google.com/da1fPgAACAAJ aquaponics.com.au
~ Nook book allbookstores.com        bing.com      bookfinder.com       yahoo.com


Small Scale Aquaculture: A Hobbyist's Guide for Growing Fish in Recirculating Systems,
Greenhouses, Cages And Flowing Water; by Steven D. Van Gorder
librarything.com/1891250 books.google.com/ON2wAAAACAAJ worldcat.org/oclc/50995488
~
FOR MORE INFORMATION, please contact local gardeners and farmers who specialize in:
Organic gardening, Permaculture gardening, Biodynamic gardening, Japanese Kyusei Nature
gardening - Shizen Nouhou, Biointensive gardening, Heirloom gardening-Heritage Seeds, Lasagna
gardening, Square Foot gardening, Vertical gardening, Wall and Fence gardening, Roof Top and
Balcony gardening, Indoor gardening with LED Grow Lights and www.Solatube.com, Micro Greens
gardening, Windowsill gardening, Container gardening, African Keyhole gardening, Organic
Aquaponics gardening, African Bag Gardens, No Dig gardening, Agroforestry gardening, Biochar
gardening, Aeroponic gardening, Seaweed gardening, Israeli Greenhouses Technology for Hot
Climates, Organic Hydroponics gardening , Gardening Therapy, Native Plant gardening, Rain
Gardens, Xeriscape gardening , Rainwater Harvesting, Greywater gardening. Water Wise gardening
and Drought gardening.

Gardening is micro-climate specific. This means that Local Organic Gardeners might
know of gardening techniques and resources which are helpful for the location you live in.

Keep researching, reading, refining your gardening methods and experimenting with different
growing techniques.

Organic Gardening technology is changing and improving all the time. Also, as the climate changes,
you may need to learn other gardening techniques for various climates. For More Resources

Please Contact:
Local Harvest
http://localharvest.org



HOW to GROW FRESH AIR
How to Grow Fresh Air: 50 House Plants that Purify Your Home or Office; by B. C. Wolverton
http://www.librarything.com/work/3681
http://books.google.com/books?id=DLuFPwAACAAJ
http://www.worldcat.org/oclc/36634843
http://www.wolvertonenvironmental.com    bookfinder.com    addall.com        booksprice.com


Eco-friendly houseplants: 50 indoor plants that purify air in homes and offices ; by B. C. Wolverton
http://books.google.com/books?id=VbOuQgAACAAJ
http://www.worldcat.org/oclc/37703853
http://www.wolvertonenvironmental.com        bookfinder.com       addall.com         booksprice.com
~


Houseplants, Indoor Air Pollutants, and Allergic Reactions; by B. C. Wolverton
http://books.google.com/books?id=YFe1HAAACAAJ
http://www.worldcat.org/oclc/80973510
http://www.wolvertonenvironmental.com        bookfinder.com        addall.com        booksprice.com



Interior Landscape Plants for Indoor Air Pollution Abatement; by B. C. Wolverton
http://books.google.com/books?id=xgMaMwEACAAJ
http://www.worldcat.org/oclc/22655402
http://www.wolvertonenvironmental.com        bookfinder.com       addall.com     booksprice.com



Interior Plants and Their Role in Indoor Air Quality: An Overview; by B. C. Wolverton
http://books.google.com/books?id=ZxsPHQAACAAJ
http://www.worldcat.org/oclc/31915258
http://www.wolvertonenvironmental.com         bookfinder.com     addall.com      booksprice.com



Plants: Why You Can't Live Without Them; by B. C. Wolverton
http://www.librarything.com/work/10942269
http://www.worldcat.org/oclc/659760995
http://www.wolvertonenvironmental.com     bookfinder.com            addall.com       booksprice.com



50 Verrassende Kamerplanten - Dutch; by B. C. Wolverton
http://books.google.com/books?id=FE87twAACAAJ
http://www.worldcat.org/oclc/68692945
http://www.wolvertonenvironmental.com



Amiche piante: 50 piante per purificare l'aria in casa e in ufficio - Italian; by B. C. Wolverton
http://books.google.com/books?id=nbIOAQAACAAJ
http://www.worldcat.org/oclc/797753386
http://www.wolvertonenvironmental.com          bookfinder.com         addall.com        booksprice.com
~
ORGANIC PEST CONTROL and WEED CONTROL, IPM, and
BIOLOGICAL CONTROLS
1001 All Natural Secrets to Pest Control; by Myles H. Bader
http://www.librarything.com/work/8355873
http://books.google.com/books?id=P4A_twAACAAJ
http://www.worldcat.org/oclc/429908577        bookfinder.com     addall.com      booksprice.com


100% Natural Organic Pest Control for Home and Garden; by Tom Roberts
http://www.librarything.com/work/2196724
http://books.google.com/books?id=BQBNAAAAYAAJ
http://www.worldcat.org/oclc/38042977
~ Kindle book     allbookstores.com    bing.com     bookfinder.com          yahoo.com


Alternatives to Insecticides For Managing Vegetable Insects; by Kimberly A Stoner
http://books.google.com/books?id=gugnAQAAMAAJ
http://www.worldcat.org/oclc/42641805


An Ecological and Societal Approach to Biological Control; by Jørgen Eilenberg
http://www.librarything.com/work/8842491
http://books.google.com/books?id=u0SD6MZ2QcoC
http://www.worldcat.org/oclc/65466731     bookfinder.com        addall.com     booksprice.com


Aphids: How to Control Aphids Naturally; by D. R. Cook
~ Kindle book   allbookstores.com      bing.com        bookfinder.com       yahoo.com


Backyard Bugs: A Guide to Pest Control in the Home and Garden, New Zealand; by Ronald Bruce
Chapman
http://www.librarything.com/work/6045594
http://books.google.com/books?id=OSAYAAAACAAJ
http://www.worldcat.org/oclc/154726063      bookfinder.com   addall.com     booksprice.com


Banish Slugs Naturally (Green Essentials - Organic Guides); by Jeremy Stratton
http://www.librarything.com/work/8527295
http://books.google.com/books?id=AC8zAAAACAAJ
http://www.worldcat.org/oclc/502389932      bookfinder.com        addall.com     booksprice.com
~
Basic Gardening Without Poisons for Australia and New Zealand; by Jo-An Warren
http://www.librarything.com/work/4175022
http://books.google.com/books?id=aJPRygAACAAJ
http://www.worldcat.org/oclc/27621773    bookfinder.com     addall.com      booksprice.com


Best Ideas For Organic Vegetable Growing; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/368890
http://books.google.com/books?id=p_V-ntrP768C
http://www.worldcat.org/oclc/54881   bookfinder.com       addall.com    booksprice.com


Biodiversity and Pest Management in Agroecosystems; by Miguel A. Altieri
http://books.google.com/books?id=gQI0PCnnbI8C
http://www.worldcat.org/oclc/26128714


Biological and Biotechnological Control of Insect Pests; by Jack E. Rechcigl
http://www.librarything.com/work/7098194
http://books.google.com/books?id=9tJe6eBdOFAC
http://www.worldcat.org/oclc/41347093      bookfinder.com         addall.com     booksprice.com


Biological Control; by Roy Van Driesche
http://books.google.com/books?id=tcazZ-shA_QC
http://www.worldcat.org/oclc/32819777


Biological Control: Measures of Success; by Geoff Gurr
http://books.google.com/books?id=HvzB_xMfxCsC
http://www.worldcat.org/oclc/44550625


Biological Control by Augmentation of Natural Enemies: Insect and Mite Control with Parasites and
Predators; by R L Ridgway
http://www.librarything.com/work/5834186
http://books.google.com/books?id=t0YgAQAAMAAJ
http://www.worldcat.org/oclc/3273984    bookfinder.com      addall.com     booksprice.com


Biological Control by Natural Enemies; by Paul DeBach
http://www.librarything.com/work/1955523
http://books.google.com/books?id=K6dOAAAAIAAJ
http://www.worldcat.org/oclc/914654      bookfinder.com       addall.com       booksprice.com
~
Biological Control in IPM Systems in Africa; by Peter Neuenschwander
http://books.google.com/books?id=o-OWjhAymCwC
http://www.worldcat.org/oclc/4802909825


Biological Control in Plant Protection; by Neil Helyer
http://books.google.com/books?id=eOE9PAAACAAJ
http://www.worldcat.org/oclc/34083052


Biological Control of Insect Pests of Cabbage and Other Crucifers; by Susan E. Rice Mahr
http://www.librarything.com/work/9258145
http://books.google.com/books?id=EuUmAQAAMAAJ
http://www.worldcat.org/oclc/30531107


Biological Control of Insects and Mites: An Introduction to Beneficial Natural Enemies and Their
Use in Pest Management; by Daniel L. Mahr
http://www.librarything.com/work/9275381
http://books.google.com/books?id=xyNNMAAACAAJ
http://www.worldcat.org/oclc/30574145      bookfinder.com       addall.com      booksprice.com


Biological Control of Invasive Plants in the United States; by Eric M. Coombs
http://www.librarything.com/work/4342897
http://books.google.com/books?id=-uzwAAAAMAAJ
http://www.worldcat.org/oclc/54479883        bookfinder.com         addall.com   booksprice.com


Biological Control of Mosquitoes; by Harold C. Chapman,
http://www.librarything.com/work/11121642
http://books.google.com/books?id=Lq1aAAAAYAAJ
http://www.worldcat.org/oclc/12667282       bookfinder.com       addall.com      booksprice.com


Biological Control of Tropical Weeds Using Arthropods; by R Muniappan
http://www.librarything.com/work/8543434
http://books.google.com/books?id=RYNBMAEACAAJ
http://www.worldcat.org/oclc/233543954     bookfinder.com      addall.com         booksprice.com
~
Biological Control of Weeds: Proceedings of the VIII International Symposium on Biological
Control of Weeds; by Ernest S. Delfosse
http://books.google.com/books?id=5tUnAQAAMAAJ
http://www.worldcat.org/oclc/36787209


Biological Control of Weeds: Proceedings of the IX International Symposium on Biological Control
of Weeds; by V C Moran
http://books.google.com/books?id=exvbAAAAMAAJ
http://www.worldcat.org/oclc/36758595


Biological Control of Weeds: Proceedings of the XII International Symposium on Biological Control
of Weeds; by M. H. Julien
http://books.google.com/books?id=c_cCwli1NQcC
http://www.worldcat.org/oclc/798091773


Biological Control of Weeds: Theory and Practical Application; by Mic Julien
http://books.google.com/books?id=9BRIAAAAYAAJ
http://www.worldcat.org/oclc/39078715


Biological Control Programmes in Canada, 1981-2000; by Peter G. Mason
http://books.google.com/books?id=tDHWhOEhTckC
http://www.worldcat.org/oclc/46678324


Biological Methods in Crop Pest Control; by George Ordish
http://www.librarything.com/work/5838710
http://books.google.com/books?id=ex1DAAAAYAAJ
http://www.worldcat.org/oclc/642322059


Biological Pest Control; by Tukaram Vithalrao Sathe
http://books.google.com/books?id=LBT40I_-ixYC
http://www.worldcat.org/oclc/51795975


Biological Pest Control, including: Bird, Bacillus Thuringiensis, Predation, Companion Planting,
Disease Resistance In Fruit And Vegetables, Biocide, Parasitoid, Pyrethrum, Beetle Bank, Scoliidae,
Pyrethrin, Fire Ant, Integrated Pest Management, Tansy; by Hephaestus Books
http://books.google.com/books?id=OGmQSQAACAAJ
~
Bug, Slugs, and Other Thugs: Controlling Garden Pests Organically; by Rhonda Massingham Hart
http://www.librarything.com/work/1160552
http://books.google.com/books?id=JM4nAQAAMAAJ
http://www.worldcat.org/oclc/23139837     bookfinder.com      addall.com      booksprice.com


Bug: The Ultimate Gardener’s Guide to Organic Pest Control, Australia; by Tim Marshall
http://www.librarything.com/work/9478218
http://books.google.com/books?id=k44HQgAACAAJ
http://www.worldcat.org/oclc/427785925    bookfinder.com      addall.com       booksprice.com


Bug Off: How to Protect Your Plants the Organic Way; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/5193596
http://books.google.com/books?id=988EPQAACAAJ
http://www.worldcat.org/oclc/43981311     bookfinder.com      addall.com    booksprice.com


Chinese Herbal Pest Control Technology; by Chen Kang Zhu Bian
http://www.google.com     http://www.bing.com
http://www.amazon.com      bookfinder.com      addall.com    booksprice.com


Citrus: A Guide to Organic Management, Propagation, Pruning, Pest Control and Harvesting ; by Allen
Gilbert
http://books.google.com/books?id=6zkLGQAACAAJ
http://www.worldcat.org/oclc/174084148


Citrus Pests and Their Natural Enemies: Integrated Pest Management in Australia; by Dan Smith
http://books.google.com/books?id=dhBqAAAACAAJ
http://www.worldcat.org/oclc/38213617


Club the Bugs and Scare the Critters; by Myles H. Bader
http://www.librarything.com/work/5152612
http://books.google.com/books?id=_rOWGQAACAAJ
http://www.worldcat.org/oclc/53952310        bookfinder.com    addall.com     booksprice.com


Color Handbook of Biological Control in Plant Protection; by Neil Helyer
http://www.librarything.com/work/2077415
http://books.google.com/books?id=NwpNAAAAYAAJ
http://www.worldcat.org/oclc/52733389     bookfinder.com         addall.com   booksprice.com
~
Common Sense Pest Control: Least Toxic Solutions for Your Home, Garden, Pets and Community; by
William Olkowski
http://www.librarything.com/work/819968
http://books.google.com/books?id=jwmFQgAACAAJ
http://www.worldcat.org/oclc/800037527   bookfinder.com      addall.com     booksprice.com


Concepts in Integrated Pest Management; by Robert F. Norris
http://www.librarything.com/work/967656
http://books.google.com/books?id=yAUpAQAAMAAJ
http://www.worldcat.org/oclc/49699355      bookfinder.com       addall.com     booksprice.com


Control of Pests and Weeds by Natural Enemies: An Introduction to Biological Control; by Roy van
Driesche
http://www.librarything.com/work/7991872
http://books.google.com/books?id=0sLTMbNswecC
http://www.worldcat.org/oclc/173367808    bookfinder.com       addall.com     booksprice.com


Control Pests (Green Essentials - Organic Guides); by Richard Jones
http://books.google.com/books?id=Z-o3PQAACAAJ
http://www.worldcat.org/oclc/502390208


Control Slugs without Poison; by Marilyn Pokorney
~ Kindle book     allbookstores.com       bing.com      bookfinder.com       yahoo.com


Controlling Garden Weeds: Storey's Country Wisdom Bulletin A-171; by Barbara Pleasant
http://www.librarything.com/work/2435712
http://books.google.com/books?id=0bovHiolTAEC
http://www.worldcat.org/oclc/36621885
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com


Controlling Pests and Diseases (Rodale's Successful Organic Gardening); by Patricia S. Michalak
http://www.librarything.com/work/2673683
http://books.google.com/books?id=z3ICAAAACAAJ
http://www.worldcat.org/oclc/28665641      bookfinder.com      addall.com       booksprice.com
~



Controlling Pests and Diseases the Organic Way; by Jane Courtier
http://www.librarything.com/work/12964884
http://books.google.com/books?id=g7drHAAACAAJ
http://www.worldcat.org/oclc/28115599      bookfinder.com       addall.com   booksprice.com




Controlling Vegetable Pests; by Pam Peirce
http://www.librarything.com/work/1436736
http://books.google.com/books?id=Yw9IAAAAYAAJ
http://www.worldcat.org/oclc/25009778      bookfinder.com      addall.com    booksprice.com




Controlling Weeds (Rodale's Successful Organic Gardening); by Erin Hynes
http://www.librarything.com/work/1577455
http://books.google.com/books?id=0ta3OQAACAAJ
http://www.worldcat.org/oclc/31969014     bookfinder.com       addall.com    booksprice.com




Controlling Weeds: without Using Chemicals; by Joanna Readman
http://books.google.com/books?id=uqHLNQAACAAJ
http://www.worldcat.org/oclc/43718575




Dead Daisies Make Me Crazy: Garden Solutions without Chemical Pollution; by Loren Nancarrow
http://www.librarything.com/work/1234288
http://books.google.com/books?id=4P7S0jLrdDUC
http://www.worldcat.org/oclc/43060651
~ Kindle book     ~ Nook book    allbookstores.com   bing.com    bookfinder.com
~
Dead Snails Leave No Trails: Natural Pest Control for Home and Garden; by Loren Nancarrow
http://www.librarything.com/work/71467
http://books.google.com/books?id=RaWkPHkawM0C
http://www.worldcat.org/oclc/34356066
~ Kindle book     ~ Nook book    allbookstores.com      bing.com    bookfinder.com


Dear Dirt Doctor: Questions Answered the Natural Way; by Howard Garrett
http://www.librarything.com/work/703825
http://books.google.com/books?id=Uc_DLeNeNqkC
http://www.worldcat.org/oclc/51544218    bookfinder.com      addall.com      booksprice.com


Deer Proofing Your Yard and Garden; by Rhonda Massingham Hart
http://www.librarything.com/work/1283124
http://books.google.com/books?id=vG7RZC8qHhwC
http://www.worldcat.org/oclc/36930671    bookfinder.com    addall.com        booksprice.com


Disease Control in Crops: Biological and Environmentally-Friendly Approaches; by Dale Walters
http://www.librarything.com/work/8428875
http://books.google.com/books?id=sbJ4iMaf9GYC
http://www.worldcat.org/oclc/288986018      bookfinder.com     addall.com      booksprice.com


Ecologically Based Pest Management: New Solutions for a New Century; by Committee on Pest and
Pathogen Control
http://www.librarything.com/work/8803086
http://books.google.com/books?id=tbCHiHgq7MIC
http://www.worldcat.org/oclc/754030952   bookfinder.com      addall.com    booksprice.com


Ecological Engineering for Pest Management: Advances in Habitat Manipulation for Arthropods ; by
Geoff Gur
http://www.librarything.com/work/6736185
http://books.google.com/books?id=o00PxzH-X58C
http://www.worldcat.org/oclc/803728363    bookfinder.com      addall.com     booksprice.com


Ecological Management of Agricultural Weeds; by Matt Liebman
http://www.librarything.com/work/8829805
http://books.google.com/books?id=MjBuqk8-t2sC
http://www.worldcat.org/oclc/56416032    bookfinder.com      addall.com      booksprice.com
~
Ecological Weed Management for Organic Farming Systems; by Derek Law
http://www.worldcat.org/oclc/76787660


Emerging Technologies for Integrated Pest Management: Concepts, Research, and Implementation ; by
George G. Kennedy
http://www.librarything.com/work/2912579
http://books.google.com/books?id=K31FAQAAIAAJ
http://www.worldcat.org/oclc/44562808     bookfinder.com   addall.com      booksprice.com


Enhancing Biological Control: Habitat Management to Promote Natural Enemies of Agricultural
Pests; by Charles Hammond Pickett
http://www.librarything.com/work/10563267
http://books.google.com/books?id=fPi6eHMqdgMC
http://www.worldcat.org/oclc/34046524    bookfinder.com     addall.com    booksprice.com


Environment Friendly Antiviral Agents for Plants; by Baoan Song
http://books.google.com/books?id=HKUEdP_LJy4C
http://www.worldcat.org/oclc/701719301


Environmentally Friendly Pest Control; by Robert H. Stauffer
http://books.google.com/books?id=TI9IoVTVtyIC
http://www.worldcat.org/oclc/49727015
~ Kindle book     allbookstores.com       bing.com      bookfinder.com         yahoo.com


Environmentally Safe Approaches to Crop Disease Control; by Nancy A Rechcigl
http://books.google.com/books?id=hew4AQAAIAAJ
http://www.worldcat.org/oclc/36158715


Field Vegetable Production: Using Cover Crops for Integrated Weed Management; by Bonnie R Ball
Coelho
http://books.google.com/books?id=Dl1UMwEACAAJ
http://www.worldcat.org/oclc/729352736


Fruit and Vegetable Clinic; by Pippa Greenwood
http://www.librarything.com/work/11967419
http://books.google.com/books?id=lEbwGwAACAAJ
http://www.worldcat.org/oclc/28734288      bookfinder.com         addall.com     booksprice.com
~
Fruit Pest and Disease Control the Organic Way; by Lawrence D. Hills
http://books.google.com/books?id=H5qPAAAACAAJ
http://www.worldcat.org/oclc/12512849


Gardener to Gardener Almanac and Pest-Control Primer: A Month-By-Month Guide and Journal for
Planning, Planting, and Tending Your Organic Garden; by Vicki Mattern, Rodale Organic Gardening
Magazine
http://www.librarything.com/work/536884
http://books.google.com/books?id=3lolAQAAMAAJ
http://www.worldcat.org/oclc/44083925    bookfinder.com       addall.com      booksprice.com


Gardening for a Greener Planet: A Chemical-free Approach; by Jonathan Erickson
http://www.librarything.com/work/11459365
http://books.google.com/books?id=zSlIAAAAYAAJ
http://www.worldcat.org/oclc/24468352    bookfinder.com        addall.com     booksprice.com


Garden Success without Poison Sprays; by Jerome Irving Rodale
http://books.google.com/books?id=M5U_AAAAYAAJ
http://www.worldcat.org/oclc/7902477
bookfinder.com       addall.com   booksprice.com google.com            bing.com     yahoo.com


Gardening with Good Bugs; by Erin W. Hodgson
http://www.librarything.com/work/11468858
http://books.google.com/books?id=091nPQAACAAJ
http://www.worldcat.org/oclc/154744370    bookfinder.com        addall.com        booksprice.com


General Concepts in Integrated Pest and Disease Management ; by A Ciancio
http://www.librarything.com/work/8081237
http://books.google.com/books?id=EORpe3TF5A4C
http://www.worldcat.org/oclc/144228545      bookfinder.com       addall.com       booksprice.com


Getting the Bugs Out of Organic Gardening; by Barbara B. McKillip
http://www.librarything.com/work/2209937
http://books.google.com/books?id=_-dFAAAAYAAJ
http://www.worldcat.org/oclc/613782    bookfinder.com      addall.com         booksprice.com
~
Good Bug, Bad Bug: Who's Who, What They Do, and How to Manage Them Organically; by Jessica
Walliser
http://www.librarything.com/work/5775897
http://books.google.com/books?id=N22qcQAACAAJ
http://www.worldcat.org/oclc/184826566   bookfinder.com  addall.com   booksprice.com


Great Garden Fix-Its: Organic Remedies for Everything from Aphids to Weeds; by Christine Bucks
http://www.librarything.com/work/5157934
http://books.google.com/books?id=pCYLAAAACAAJ
http://www.worldcat.org/oclc/45879681     bookfinder.com     addall.com     booksprice.com


Great Garden Formulas: The Ultimate Book of Mix-It-Yourself Concoctions for Your Garden; by Joan
Benjamin, Rodale Books
http://www.librarything.com/work/1236213
http://books.google.com/books?id=e0YEAAAACAAJ
http://www.worldcat.org/oclc/38410048    bookfinder.com     addall.com     booksprice.com


Green, Healthy and Thrifty Gardening Helpful Hints: A Practical Guidebook of 1001 Wholesome
Living Solutions to Make Life Easier and Save Money with Safe and Natural Non-Toxic Tips; by Tui
Rose
http://books.google.com/books?id=iRTi83i1yyUC
http://www.worldcat.org/oclc/794300971


Grow Your Own Organic Fruit And Vegetables: A Complete Guide, United Kingdom; by John Fedor
http://books.google.com/books?id=7XZxKUP2Bg8C
http://www.worldcat.org/oclc/461271084


Grow Your Own Organic Fruit and Vegetables: An Easy-to-follow Directory Of Vegetables, Fruit
And Herbs, United Kingdom; by Christine Lavelle
http://www.librarything.com/work/1215045
http://books.google.com/books?id=nI6FAAAACAAJ
http://www.worldcat.org/oclc/57485512     bookfinder.com    addall.com    booksprice.com
~
Growing Healthy Vegetable Crops: Working with Nature to Control Diseases and Pests Organically;
by Brian Caldwell
http://www.librarything.com/work/11138598
http://books.google.com/books?id=PsSSQS-u2-MC
http://www.worldcat.org/oclc/676727210
~ Kindle book     ~ Nook book    allbookstores.com  bing.com      bookfinder.com


Hand Book of Biological Control in Horticultural Crops; by P. Parvatha Reddy
http://books.google.com/books?id=eGFqMwEACAAJ
http://www.worldcat.org/oclc/779808414


Handbook of Biological Control: Principles and Applications of Biological Control ; by T. W. Fishe
http://www.librarything.com/work/23912
http://books.google.com/books?id=u2X-rfgU0ewC
http://www.worldcat.org/oclc/42418644      bookfinder.com      addall.com     booksprice.com


Handbook of Sustainable Weed Management; by Harminder Pal Singh
http://www.librarything.com/work/9021671
http://books.google.com/books?id=Az-qoHPCnvYC
http://www.worldcat.org/oclc/57202209    bookfinder.com    addall.com           booksprice.com


Here's Health Guide to Gardening Without Chemicals: A Step-By-Step Guide to Growing Vegetable
and Soft Fruit the Organic Way, United Kingdom; by Jack Temple
http://books.google.com/books?id=pyxWAAAACAAJ
http://www.worldcat.org/oclc/14360336


Home Remedies for Pest Control; by Eric Vinje
http://www.google.com
http://www.bing.com


Homes That Heal; by Athena Thompson
http://www.librarything.com/work/2175564
http://books.google.com/books?id=qs9ev0aso0IC
http://www.worldcat.org/oclc/56632426    bookfinder.com         addall.com      booksprice.com
~
House and Garden Pests: How to Organically Control Common Invasive Species ; by James Kavanagh
http://www.worldcat.org/oclc/176926607


How Green is Your Garden: A Guide to Choosing Environmentally Safe Products, United Kingdom;
by Nick Branwell
http://www.librarything.com/work/8628264
http://books.google.com/books?id=SSJIAAAAYAAJ
http://www.worldcat.org/oclc/21164034    bookfinder.com   addall.com     booksprice.com


How to Get Your Lawn and Garden Off Drugs: A Basic Guide to Pesticide-Free Gardening in North
America; by Carole Rubin
http://www.librarything.com/work/141714
http://books.google.com/books?id=__2tbwAACAAJ
http://www.worldcat.org/oclc/51630649   bookfinder.com     addall.com     booksprice.com


Indian Insect Predators in Biological Control; by K. Sahayaraj
http://books.google.com/books?id=WCr4rV27J6sC
http://www.worldcat.org/oclc/57796692


Insects and Gardens: in Pursuit of a Garden Ecology; by Eric Grissell
http://www.librarything.com/work/407258
http://www.worldcat.org/oclc/46866205


Insect, Disease and Weed I.D. Guide: Find-It-Fast Organic Solutions for Your Garden (Rodale
Organic Gardening Book); by Jill Jesiolowski Cebenko
http://www.librarything.com/work/2710886
http://books.google.com/books?id=x_CjYwMzD4wC
bookfinder.com       addall.com      booksprice.com google.com         bing.com yahoo.com


Insect Pest Control in Colorado Organic Vegetable Gardens; by Whitney Cranshaw
http://books.google.com/books?id=chjIHAAACAAJ
http://www.worldcat.org/oclc/768865247


Insects Predators and Pest Management; by T.V. Sathe
http://books.google.com/books?id=xoy1KFnAne0C
http://www.worldcat.org/oclc/469320112
~
Integrated Disease and Pest Control in Irish Mushroom Tunnels; by Liam Staunton
http://books.google.com/books?id=stzvGwAACAAJ
http://www.worldcat.org/oclc/59461896


IPM for Gardeners: A Guide to Integrated Pest Management; by Raymond A. Cloyd
http://www.librarything.com/work/1341845
http://books.google.com/books?id=6DE-PwAACAAJ
http://www.worldcat.org/oclc/53369197     bookfinder.com      addall.com   booksprice.com


Intergrated Farm Management III: Practical guides to Dryland Farming; by World Neighbours
http://www.echobooks.org
http://books.google.com/books?id=KTmCGwAACAAJ
http://www.google.com     http://www.bing.com


Integrated Pest and Disease Management; by Rajeev K. Upadhyay
http://books.google.com/books?id=9CUD07Fcp_kC


Integrated Pest and Disease Management for Australian Summerfruit; by Shane Hetherington
http://www.worldcat.org/oclc/174039504


Integrated Pest and Disease Management in Greenhouse Crops; by Ramon Albajes
http://www.librarything.com/work/5223301
http://books.google.com/books?id=BINB9u06MsEC
http://www.worldcat.org/oclc/70738858     bookfinder.com     addall.com    booksprice.com


Integrated Pest and Disease Management in Strawberries; by N Shanmuganathan
http://books.google.com/books?id=aMiDAAAACAAJ
http://www.worldcat.org/oclc/38333828


Integrated Pest Management; by D. Dent
http://books.google.com/books?id=BNVLxXDBVr8C
http://www.worldcat.org/oclc/33062390
~
Integrated Pest Management: Concepts, Tactics, Strategies and Case Studies; by Edward B Radcliffe
http://www.librarything.com/work/8282229
http://books.google.com/books?id=P_5kF31fs9wC
http://www.worldcat.org/oclc/261342078     bookfinder.com       addall.com       booksprice.com


Integrated Pest Management: Innovation-Development Process; by Rajinder Peshin
http://books.google.com/books?id=xjhr2M1H_9IC
http://www.worldcat.org/oclc/494709604


Integrated Pest Management for Cole Crops and Lettuce; by University of California
http://www.librarything.com/work/4798246
http://books.google.com/books?id=m-jurKUqSscC
http://www.worldcat.org/oclc/13643352    bookfinder.com       addall.com       booksprice.com


Integrated Pest Management for Developing Countries: A Systemic Overview; by Chigozie Jesse
Uneke
http://books.google.com/books?id=dqLnb-GA--4C
http://www.worldcat.org/oclc/82472718


Integrated Pest Management For Greenhouse Tomatoes; by N.A. Martin, New Zealand Institute for
Crop
http://books.google.com/books?id=JEpOMwEACAAJ
http://www.worldcat.org/oclc/31807682


Integrated Pest Management for Potatoes in the Western United States; by Larry L. Strand
http://books.google.com/books?id=NDxpniwC1MwC
http://www.worldcat.org/oclc/15106781


Integrated Pest Management for Stone Fruits; by Larry L. Strand
http://www.librarything.com/work/4998778
http://books.google.com/books?id=Qb9F4jnuXiEC
http://www.worldcat.org/oclc/43001117     bookfinder.com        addall.com     booksprice.com


Integrated Pest Management for Strawberries; by Larry L. Strand
http://books.google.com/books?id=2ertGXmmwDwC
http://www.worldcat.org/oclc/30301088
~
Integrated Pest Management For Strawberries in the Northeastern United States: A Manual For
Growers and Scouts; by Daniel R Cooley
http://books.google.com/books?id=DLirHAAACAAJ
http://www.worldcat.org/oclc/36970821


Integrated Pest Management for Tomatoes; by Larry R. Strand
http://www.librarything.com/work/4988490
http://books.google.com/books?id=sf651bq4q0kC
http://www.worldcat.org/oclc/39107898     bookfinder.com        addall.com      booksprice.com


Integrated Pest Management in Rice-Vegetable Cropping Systems; by Madeline B. Quiamco
http://books.google.com/books?id=WAVIAAAAYAAJ
http://www.worldcat.org/oclc/99894081


Integrated Pest Management in Vegetable Production: A Guide for Extension Workers in West
Africa; by B. James
http://books.google.com/books?id=gb3Tp0Wb-DsC


Integrated Management of Insect Pests of Pome and Stone Fruits ; by Brian A. Croft
http://books.google.com/books?id=VN46WN3PXSQC
http://www.worldcat.org/oclc/8688382


Integrated Weed Management, Cover Crop, Mulch and Rotation Management in Vegetable
Production Systems; by Craig Henderson
http://books.google.com/books?id=-g0hAAAACAAJ
http://www.worldcat.org/oclc/223023305


Invisible Gardener's Natural Cockroach Control
~ Kindle book     allbookstores.com     bing.com        bookfinder.com       yahoo.com


Invisible Gardener's Natural Pest Control; by Invisible Gardener
~ Kindle book     allbookstores.com       bing.com         bookfinder.com    yahoo.com
~
Jerry Baker's Bug Off: 2,193 Super Secrets for Battling Bad Bugs, Outfoxing Crafty Critters,
Evicting Voracious Varmints and Much More; by Jerry Baker
http://www.librarything.com/work/2506577
http://books.google.com/books?id=UeDHKeYd0KcC
http://www.worldcat.org/oclc/55957158       bookfinder.com     addall.com     booksprice.com


Kill Pest Problems without Killing Yourself: 12 Techniques For Organic Pest Control in Your
Garden; by Emily Josephine
~ Kindle book      allbookstores.com    bing.com       bookfinder.com     yahoo.com


Killing without Poison: Natural and Effective Ways to Eliminate Garden Pests; by D A Eash
http://books.google.com/books?id=yvC4SgAACAAJ
http://www.worldcat.org/oclc/707932788
~ Kindle book     allbookstores.com      bing.com      bookfinder.com     yahoo.com


Least Toxic Pest Management: Greenhouses and Indoor Plants; by Bio Integral Resource Center
http://books.google.com/books?id=Egh8GwAACAAJ
http://www.worldcat.org/oclc/29240901


Managing Pests and Diseases: A Handbook for New Zealand Gardeners; by Rob Lucas
http://www.librarything.com/work/5161603
http://books.google.com/books?id=vuZ2AAAACAAJ
http://www.worldcat.org/oclc/156769112   bookfinder.com    addall.com      booksprice.com


Microbial Control of Weeds; by David O. TeBeest
http://books.google.com/books?id=TfHwAAAAMAAJ
http://www.worldcat.org/oclc/21116639


Mushroom Pest and Disease Control: A Color Handbook; by John T Fletche
http://books.google.com/books?id=LiIZhzUYYX8C
http://www.worldcat.org/oclc/13793072


Natural Ant Control; by Invisible Gardener
~ Kindle book    allbookstores.com         bing.com    bookfinder.com      yahoo.com
~
Natural Control of Garden Pests; by Jackie French
http://www.librarything.com/work/3540418
http://books.google.com/books?id=qnAOAQAACAAJ
http://www.worldcat.org/oclc/62538775        bookfinder.com     addall.com     booksprice.com


Natural Disease Control: A Common Sense Approach to Plant First Aid; by Beth Hanson, Brooklyn
Botanic Garden
http://www.librarything.com/work/5346708
http://books.google.com/books?id=KZKeXjVbGX0C
http://www.worldcat.org/oclc/44848714    bookfinder.com     addall.com       booksprice.com


Natural Enemies: An Introduction to Biological Control; by Ann E. Hajek
http://www.librarything.com/work/3579154
http://books.google.com/books?id=6zNey_Cdl3UC
http://www.worldcat.org/oclc/52455193     bookfinder.com        addall.com     booksprice.com


Natural Enemies Handbook: The Illustrated Guide to Biological Pest Control ; by Mary Louise Flint
http://www.librarything.com/work/3765024
http://books.google.com/books?id=FBJvpMqcV9UC
http://www.worldcat.org/oclc/39933890     bookfinder.com      addall.com        booksprice.com


Natural Enemies in Your Garden: A Homeowner's Guide to Biological Control ; by Jana Chin-Ting
Lee
http://www.librarything.com/work/9436306
http://books.google.com/books?id=z-2SgAACAAJ
http://www.worldcat.org/oclc/52823917    bookfinder.com    addall.com        booksprice.com


Natural Flea and Tick Control; by Andy Lopez
http://www.librarything.com/work/12177395
~ Kindle book     allbookstores.com      bing.com       bookfinder.com       yahoo.com


Natural Fruit Tree Care; by Andy Lopez
~ Kindle book      allbookstores.com     bing.com       bookfinder.com       yahoo.com
~
Natural Insect Control: The Ecological Gardener's Guide to Foiling Pests; by Warren Schultz;
Brooklyn Botanic Garden
http://www.librarything.com/work/819659
http://books.google.com/books?id=DsJsQZ70zSsC
http://www.worldcat.org/oclc/30837148      bookfinder.com       addall.com      booksprice.com


Natural Mosquito Control; by Invisible Gardener
~ Kindle book    allbookstores.com        bing.com      bookfinder.com      yahoo.com


Natural Pest Control, Don't Panic, It's Organic: Alternatives to Chemicals for the Home and Garden;
by Andrew Lopez
http://www.librarything.com/work/2522262
http://books.google.com/books?id=KecGAAAACAAJ
http://www.worldcat.org/oclc/36184524        bookfinder.com       addall.com      booksprice.com


Natural Pesticides from the Neem Tree and Other Tropical Plants; by H. and Ascher Schmutterer
http://www.librarything.com/work/11106136
http://books.google.com/books?id=it0EO7D2RssC
http://www.worldcat.org/oclc/12687465     bookfinder.com      addall.com       booksprice.com


Natural Solutions to Things That Bug You; by Myles Bader
http://www.librarything.com/work/13201492
http://books.google.com/books?id=lhpaNQEACAAJ
http://www.worldcat.org/oclc/813250170
~ Kindle book      allbookstores.com   bing.com       bookfinder.com        yahoo.com


Neem: A Treatise; by K. K. Singh
http://books.google.com/books?id=PyYRUCoIDk4C
http://www.worldcat.org/oclc/315479400


Neem: A Tree for Solving Global Problems; by National Research Council
http://www.librarything.com/work/3503203
http://books.google.com/books?id=reJEGbb3YooC
http://www.worldcat.org/oclc/42328520    bookfinder.com       addall.com       booksprice.com
~
Neem: A User's Guide; by Subhashini Sridhar
http://www.librarything.com/work/4551754
http://books.google.com/books?id=PAHKPgAACAAJ
http://www.worldcat.org/oclc/255007491      bookfinder.com      addall.com    booksprice.com


Neem Pesticides in Rice: Potential and Limitations; by Guan Soon Lim
http://books.google.com/books?id=1T0QlaY8J
http://www.worldcat.org/oclc/31062520


Neem Tree in Agriculture: Its Uses in Low-Input Pest Management; by Edwin van Latum
http://books.google.com/books?id=i5OkHAAACAAJ
http://www.worldcat.org/oclc/64293143


Non Chemical Methods of Pest Control; by K. Vijayalakshmi
http://www.librarything.com/work/7944826
http://books.google.com/books?id=UA48GQAACAAJ
http://www.worldcat.org/oclc/295033730      bookfinder.com      addall.com    booksprice.com


Non Chemical Weed Management: Principles, Concepts and Technology; by Mahesh K. Upadhyaya
http://www.librarything.com/work/10166394
http://books.google.com/books?id=CyBJuCcFNsQC
http://www.worldcat.org/oclc/123079235    bookfinder.com   addall.com     booksprice.com


Organic Control of Common Weeds, Australia; by Jackie French
http://www.librarything.com/work/85731
http://books.google.com/books?id=rQWoNgAACAAJ
http://www.worldcat.org/oclc/29008460  bookfinder.com        addall.com      booksprice.com


Organic Control of Household Pests, Australia; by Jackie French
http://www.librarything.com/work/2603956
http://books.google.com/books?id=fetaAAAACAAJ
http://www.worldcat.org/oclc/27628514     bookfinder.com        addall.com   booksprice.com


Organic Crop Production: Weed Management, Canada; by Kerry Foster
http://books.google.com/books?id=VTWjMQEACAAJ
http://www.worldcat.org/oclc/56302003
~
Organic Farming, Pest Control and Remediation of Soil Pollutants; by Eric Lichtfouse
http://books.google.com/books?id=66RV9Q1EtLcC
http://www.worldcat.org/oclc/495478491
~ Kindle book     allbookstores.com    bing.com       bookfinder.com         yahoo.com


Organic Farming; Garden Pests, How to Fight Them and Maintain A Healthy Garden ; by Elena
Pochegaeva
http://books.google.com/books?id=4lHINAEACAAJ
~ Kindle book     allbookstores.com    bing.com     bookfinder.com     yahoo.com


Organic Fertilisation, Soil Quality and Human Health; by Eric Lichtfouse
http://www.librarything.com/work/12299574
http://books.google.com/books?id=LSxv16xvdmkC
http://www.worldcat.org/oclc/793521334      bookfinder.com        addall.com      booksprice.com


Organic Food: Why You Should Care; by Centre for Indian Knowledge Systems
http://www.google.com
http://www.bing.com
http://uk.yahoo.com   bookfinder.com     addall.com      booksprice.com


Organic Garden Pests: Learn All the Simple Techniques For Organic Pest Control in Your Garden ; by
Doctor Garden
~ Kindle book    allbookstores.com      bing.com      bookfinder.com     yahoo.com


Organic Gardening Beginner's Manual: Nature-Friendly Pest Control; by Lisa Van Til
http://www.google.com     http://www.bing.com
~ Kindle book    allbookstores.com     bing.com      bookfinder.com        yahoo.com


Organic Gardening Harvest Book; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/366648
http://books.google.com/books?id=GDFOAQAAIAAJ
http://www.worldcat.org/oclc/26688929     bookfinder.com    addall.com           booksprice.com


Organic Gardening without Poisons; by Hamilton A. Tyler
http://www.librarything.com/work/2396125
http://books.google.com/books?id=5qEdAQAAMAAJ
http://www.worldcat.org/oclc/115658     bookfinder.com       addall.com        booksprice.com
~
Organic Management for the Professional: The Natural Way for Landscape Architects and
Contractors, Commercial Growers, Golf Course Managers, Park Administrators, Turf Managers, and
Other Stew; by Howard Garrett
http://www.librarything.com/work/12661085
http://books.google.com/books?id=qfm3JyefEIMC
http://www.worldcat.org/oclc/757935842     bookfinder.com     addall.com    booksprice.com


Organic Methods of Pest and Disease Management; by K. Vijayalakshmi
http://books.google.com/books?id=5rwkPAAACAAJ
http://www.worldcat.org/oclc/271823772


Organic No Dig, No Weed Gardening: A Revolutionary Method For Easy Gardening; by Raymond P
Poincelot
librarything.com/4692899 books.google.com/jNR7AAAACAAJ worldcat.org/oclc/16756235
bookfinder.com      addall.com     booksprice.com


Organic Pest and Disease Control: How to Grow a Healthy, Problem-Free Garden; by Barbara Ellis
http://www.librarything.com/work/4630091
http://books.google.com/books?id=KhksOlkC028C
http://www.worldcat.org/oclc/34564792
~ Kindle book     allbookstores.com     bing.com     bookfinder.com    yahoo.com


Organic Pest Control Using Essential Oils; by Susan Fairbairn
~ Kindle book    allbookstores.com       bing.com        bookfinder.com       yahoo.com


Organic Pest Control: Control Pests in Your Organic Garden; by Bill Vincent
http://books.google.com/books?id=eD2NMAEACAAJ


Organic Plant Protection: A Comprehensive Reference on Controlling Insects and Diseases in the
Garden, Orchard and Yard without Using Chemicals; by Roger B. Yepsen
http://www.librarything.com/work/326820
http://books.google.com/books?id=Gd8nAQAAMAAJ


Organic Soil-Fertility and Weed Management; by Steve Gilman
http://www.librarything.com/work/11138592
http://books.google.com/books?id=ty2LTvx4EuIC
http://www.worldcat.org/oclc/676727213    bookfinder.com         addall.com      booksprice.com
~
Organic Weed Management: A Project of the Northeast Organic Farming Association of
Massachusetts (Hands-On Organics); by Steve Gilman
http://www.librarything.com/work/3770411
http://www.worldcat.org/oclc/51460417


Panty Hose, Hot Peppers, Tea Bags, and More for the Garden: 1001 Ingenious Ways to Use
Common Household Items to Control Weeds, Beat Pests ; by Yankee Magazine
http://www.librarything.com/work/4052024
http://books.google.com/books?id=_XMGMstgtm8C
http://www.worldcat.org/oclc/58604552    bookfinder.com      addall.com     booksprice.com


Pest and Disease Management for Organic Farmers, Growers and Smallholders; by Gareth Davies
http://www.librarything.com/work/11858090
http://books.google.com/books?id=_-SNRAAACAAJ
http://www.worldcat.org/oclc/540161749    bookfinder.com     addall.com      booksprice.com


Pest Repellent Plants: Organic Solutions to Garden and Household Pests; by Penny Woodward
http://www.librarything.com/work/3635277
http://books.google.com/books?id=1J5_ygAACAAJ
http://www.worldcat.org/oclc/222194492       bookfinder.com    addall.com       booksprice.com


Pesticides and Breast Cancer: A WAKE UP CALL; by Dr Meriel Watts
http://books.google.com/books?id=JF6NNQAACAAJ
http://www.worldcat.org/oclc/229447336


Pests: How to Control Them on Fruit and Vegetables (Organic Handbook); by Pauline Pears
http://www.librarything.com/work/1740543
http://books.google.com/books?id=9QJaAAAACAAJ
http://www.worldcat.org/oclc/222135311    bookfinder.com      addall.com      booksprice.com


Pests of the Garden and Small Farm: A Grower's Guide to Using Less Pesticide ; by Mary Louise Flint
http://www.librarything.com/work/1518615
http://books.google.com/books?id=yJYyL9CC82sC
http://www.worldcat.org/oclc/41158879    bookfinder.com      addall.com        booksprice.com
~
Pests of the West: Prevention and Control for Today's Garden and Small Farm; by Whitney Cranshaw
http://www.librarything.com/work/6879738
http://books.google.com/books?id=OBkEO6eiavgC
http://www.worldcat.org/oclc/39313628       bookfinder.com     addall.com     booksprice.com


Pests (Gaia Organic Basics); by Charlie Ryrie
http://www.librarything.com/work/1953515
http://books.google.com/books?id=lY0SHAAACAAJ
http://www.worldcat.org/oclc/45580410        bookfinder.com    addall.com         booksprice.com


Pests: Organic Gardening Basics, Volume 7; by Rodale Books
http://www.librarything.com/work/11013731
http://books.google.com/books?id=4ZAMAAAACAAJ
http://www.worldcat.org/oclc/44090397    bookfinder.com        addall.com         booksprice.com


Pests of the Garden and Small Farm: A Grower's Guide to Using Less Pesticide ; by Mary Louise Flint
http://www.librarything.com/work/1518615
http://books.google.com/books?id=yJYyL9CC82sC
http://www.worldcat.org/oclc/41158879    bookfinder.com      addall.com        booksprice.com


Plant Disease Management for Organic Crops; by M. Gaskell
http://books.google.com/books?id=ObbrqQfF124C


Plant Protection in Organic Arable and Vegetable Crops: A Grower's Resource; by David A.J. Teulon
http://books.google.com/books?id=O5MkAAAACAAJ
http://www.worldcat.org/oclc/68695859


Protect Your Garden: Eco-Friendly Solutions for Healthy Plants; by Ed Rosenthal
http://books.google.com/books?id=m7U8ywAACAAJ
http://www.worldcat.org/oclc/823387429
~
Q and A: Hundreds of Can-Do Answers to a Gardener's Toughest Questions; by Rodale Organic
Gardening Magazine
http://www.librarything.com/work/1753376
http://books.google.com/books?id=fUogTwPNHVkC
http://www.worldcat.org/oclc/18559357    bookfinder.com    addall.com       booksprice.com


Robin Stewart’s Chemical Free Pest Control: Hundreds of Practical and Inexpensive Ways to
Control Pests without Chemicals; by Robin Stewart
http://www.librarything.com/work/7986349
http://books.google.com/books?id=4GwYoJUTEgwC
http://www.worldcat.org/oclc/155724391       bookfinder.com    addall.com     booksprice.com


Rodale's Color Handbook of Garden Insects; by Anna Carr
http://www.librarything.com/work/748260
http://books.google.com/books?id=8yjeNQAACAAJ
http://www.worldcat.org/oclc/4776728    bookfinder.com      addall.com     booksprice.com


Rodale's Complete Garden Problem Solver: Instant Answers to the Most Common Gardening
Questions; by Cheryl Long
http://www.librarything.com/work/1734793
http://books.google.com/books?id=QQs7AQAAIAAJ
http://www.worldcat.org/oclc/36647787    bookfinder.com      addall.com  booksprice.com


Rodale's Vegetable Garden Problem Solver: The Best and Latest Advice For Beating Pests, Diseases,
and Weeds and Staying A Step Ahead of Trouble in the Garden; by Fern Marshall Bradley
http://www.librarything.com/work/2516852
http://books.google.com/books?id=WKhVKocYN6wC
http://www.worldcat.org/oclc/70836655
~ Kindle book     allbookstores.com   bing.com       bookfinder.com      yahoo.com


Scat Pest-Proofing Your Garden: Storey's Country Wisdom Bulletin A-15; by Ruth Harley
http://www.librarything.com/work/5813308
http://books.google.com/books?id=VuKvF1-V9pkC
http://www.worldcat.org/oclc/6063322
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com
~
Shepherd's Purse: Organic Pest Control Handbook; by Tom Robert
http://www.librarything.com/work/7646604
http://books.google.com/books?id=gugnAQAAMAAJ
http://www.worldcat.org/oclc/26211339     bookfinder.com     addall.com       booksprice.com


Simple Green Pest and Disease Control: Bob's Basics; by Bob Flowerdew
http://www.librarything.com/work/12593861
http://books.google.com/books?id=l9Vp3Zuf_IoC
http://www.worldcat.org/oclc/755704765     bookfinder.com       addall.com     booksprice.com


Slug Bread and Beheaded Thistles: Amusing and Useful Techniques for Nontoxic Housekeeping and
Gardening; by Ellen Sandbeck
http://www.librarything.com/work/287619
http://books.google.com/books?id=W6TImqN5HpwC
http://www.worldcat.org/oclc/42733789   bookfinder.com      addall.com    booksprice.com


Smith and Hawken Hands-On Gardener: The Organic Management of Pests; by Elizabeth Miller
http://books.google.com/books/about/Pests.html?id=uF5L1VOp9D8C
http://www.worldcat.org/oclc/43118270


Spray Oils Beyond 2000: Sustainable Pest and Disease Management; by Roger Broadley
http://books.google.com/books?id=3pnGgZNXyY0C


Start With the Soil: The Organic Gardener's Guide to Improving Soil for Higher Yields, More
Beautiful Flowers, and a Healthy, Easy-Care Garden; by Grace Gershuny
http://www.librarything.com/work/1208561


Successful Organic Pest Control: Environmentally Friendly Ways to Deal with Unwanted Garden
Pests and Disease; by Trevor G. Forsythe
http://www.librarything.com/work/1206338
http://books.google.com/books?id=Yd5MAAAAYAAJ
http://www.worldcat.org/oclc/21299286    bookfinder.com      addall.com      booksprice.com


Sustainable Weed Management in Organic Herb and Vegetable Production; by Paul Erik Kristiansen
http://books.google.com/books?id=oGoONAAACAAJ
http://www.worldcat.org/oclc/224266578
~
Techniques For Reducing Pesticide Use: Economic and Environmental Benefits; by David Pimentel
http://books.google.com/books?id=nxDxAAAAMAAJ
http://www.worldcat.org/oclc/35029593


The All Natural Vegetable Garden Art and Science; by Donald A McAndrew
http://books.google.com/books?id=7EGxRwlhJDYC


The Biological Control of Insects; by Hugh Nicol
http://www.librarything.com/work/13325957
http://books.google.com/books?id=WB1DAAAAYAAJ


The Bug Book: Harmless Insect Controls; by Helen Philbrick
http://www.librarything.com/work/1352963
http://books.google.com/books?id=He46AQAAIAAJ
http://www.worldcat.org/oclc/1068202     bookfinder.com      addall.com      booksprice.com


The Conscientious Gardener: Cultivating a Garden Ethic; by Sarah Hayden Reichard
http://www.librarything.com/work/10721197
http://books.google.com/books?id=9d55ibqCVDsC
http://www.worldcat.org/oclc/606760526     bookfinder.com        addall.com    booksprice.com


The Encyclopedia of Natural Insect and Disease Control: The Most Comprehensive Guide to
Protecting Plants, Vegetables, Fruit, Flowers, Trees and Law; by Roger B. Yepsen
http://www.librarything.com/work/1122940
http://books.google.com/books?id=zbgSAQAAMAAJ
http://www.worldcat.org/oclc/10230091       bookfinder.com        addall.com    booksprice.com


The Gardener's Bug Book: Earth-Safe Insect Control; by Barbara Pleasant
http://www.librarything.com/work/2214306
http://books.google.com/books?id=DaUHYivaCbcC
http://www.worldcat.org/oclc/45732471    bookfinder.com        addall.com     booksprice.com


The Gardener's Guide to Common-Sense Pest Control: Least-Toxic Solutions for Your Home,
Garden, Pets and Community; by William Olkowski
http://www.librarything.com/work/819968
http://books.google.com/books?id=b3yYwDUNQiUC
http://www.worldcat.org/oclc/800037527    bookfinder.com    addall.com       booksprice.com
~
The Gardener's Weed Book: Earth-Safe Controls; by Barbara Pleasant
http://www.librarything.com/work/692483
http://books.google.com/books?id=BecPkE9B6HkC
http://www.worldcat.org/oclc/45732510   bookfinder.com        addall.com      booksprice.com


The Good Bug Book: Beneficial Organisms Commercially Available in Australia and New Zealand
for Biological Pest Control; by Richard Llewellyn
http://www.librarything.com/work/4271733
http://books.google.com/books?id=qH7uAAAACAAJ
http://www.worldcat.org/oclc/50571301        bookfinder.com addall.com    booksprice.com


The Green Methods Manual: The Original Bio-Control Primer; by Michael S Cherim
http://books.google.com/books?id=feYnAQAAMAAJ
http://www.worldcat.org/oclc/39261583


The Little Book of Garden Heroes (Centre for Alternative Technology); by Allan Shepherd
http://www.librarything.com/work/931293
http://books.google.com/books?id=RUAsmglNtYsC
http://www.worldcat.org/oclc/63199671     bookfinder.com      addall.com       booksprice.com


The Little Book of Slugs (Centre for Alternative Technology); by Allan Shepherd
http://www.librarything.com/work/4453840
http://books.google.com/books?id=1ISrFXqhN1AC
http://www.worldcat.org/oclc/51806352       bookfinder.com       addall.com     booksprice.com


The Neem Tree: An Inhibitor of Insect Feeding and Growth; by Henry Gilbert
http://books.google.com/books?id=KwI9HDeRoJQC
http://www.worldcat.org/oclc/20484822


The Neem Tree: Sources of Unique Natural Products for Integrated Pest Management; by the Neem
Tree: Sources of Unique Natural Products for Integrated Pest Management
google.com       bing.com   bookfinder.com        addall.com    booksprice.com


The Natural Formula Book for Home and Yard; by Dan Wallace
http://www.librarything.com/work/338892
http://books.google.com/books?id=ZSdyAAAACAAJ
http://www.worldcat.org/oclc/8347525    bookfinder.com     addall.com        booksprice.com
~
The Non-Toxic Farming Handbook; by Philip A. Wheeler
http://books.google.com/books?id=paodAQAAMAAJ
http://www.worldcat.org/oclc/40684103


The Organic Gardener's Handbook of Natural Insect and Disease Control: A Complete Problem-
Solving Guide to Keeping Your Garden and Yard Healthy without Chemicals ; by Barbara W. Ellis
http://www.librarything.com/work/23950
http://books.google.com/books?id=v5We-H9B4kcC
http://www.worldcat.org/oclc/25246554   bookfinder.com       addall.com      booksprice.com


The Organic Gardener's Handbook of Natural Pest and Disease Control: A Complete Guide to
Maintaining a Healthy Garden and Yard the Earth-Friendly Way; by Fern Marshall Bradley
http://www.librarything.com/work/9393502
http://books.google.com/books?id=GcWQQKJX1xEC
http://www.worldcat.org/oclc/419860680
~ Kindle book     allbookstores.com    bing.com       bookfinder.com     yahoo.com


The Organic Way to Plant Protection; by Jerome Irving Rodale
http://www.librarything.com/work/2071635
http://books.google.com/books?id=3I4ZTwEACAAJ
http://www.worldcat.org/oclc/155703462       bookfinder.com      addall.com     booksprice.com


The Organic Way to Plant Protection; by Glenn F. Johns
http://books.google.com/books?id=-QopAQAAMAAJ
http://www.librarything.com/work/461586
http://www.worldcat.org/oclc/10623779      bookfinder.com       addall.com     booksprice.com


The Pesticide Detox: Towards a More Sustainable Agriculture; by Jules Pretty
http://www.librarything.com/work/5224392
http://books.google.com/books?id=8p1WNFEA7P4C
http://www.worldcat.org/oclc/56807177    bookfinder.com        addall.com      booksprice.com


The Veggie Gardener's Answer Book: Solutions to Every Problem You'll Ever Face Answers to
Every Question You'll Ever Ask; by Barbara W. Ellis
http://www.librarything.com/work/5235368
http://books.google.com/books?id=IvlGCGPtCfMC
http://www.worldcat.org/oclc/183179542      bookfinder.com   addall.com     booksprice.com
~
The War on Bugs; by Will Allen
http://www.librarything.com/work/5059747
http://books.google.com/books?id=TnP_g4U49tUC
http://www.worldcat.org/oclc/153580282   bookfinder.com         addall.com    booksprice.com


West Coast Gardening: Natural Insect, Weed and Disease Control; by Linda A. Gilkeson
http://www.librarything.com/work/8688486
http://books.google.com/books?id=ZqjEAAAACAAJ
http://www.worldcat.org/oclc/70231319    bookfinder.com      addall.com      booksprice.com


Tiny Game Hunting: Environmentally Healthy Ways to Trap and Kill the Pests in Your House and
Garden; by Hilary Dole Klein
http://www.librarything.com/work/81492
http://books.google.com/books?id=MTRTagwnBP4C
http://www.worldcat.org/oclc/51825651
~ Kindle book      ~ Nook book   allbookstores.com  bing.com      bookfinder.com


Urban Gardening: A Hong Kong Gardener's Journal; by Arthur Van Langenberg
http://www.librarything.com/work/4487918
http://books.google.com/books?id=WJu8J-EuNJAC
http://www.worldcat.org/oclc/63508263    bookfinder.com      addall.com   booksprice.com


UnderGround Pests Controls (Natural Pest Control); by Invisible Gardener
~ Kindle book   allbookstores.com      bing.com         bookfinder.com     yahoo.com


Vegetable Pest and Disease Control the Organic Way; by Lawrence Donegan Hills
http://www.librarything.com/work/1736571
http://books.google.com/books?id=JsyYAQAACAAJ
http://www.worldcat.org/oclc/12512845     bookfinder.com      addall.com    booksprice.com


Weed: The Ultimate Gardener's Guide to Organic Weed Control, Australia; by Tim Marshall
http://www.librarything.com/work/10238767
http://books.google.com/books?id=334fWKO-TXAC
http://www.worldcat.org/oclc/472597796    bookfinder.com     addall.com       booksprice.com
~



Weed Management for Organic Farmers, Growers and Smallholders: A Complete Guide; by Gareth
Davies
http://books.google.com/books?id=tLAOPQAACAAJ
http://www.worldcat.org/oclc/271803309



Weed Management in Organic Small Grains; by Susan Tallman
http://books.google.com/books?id=10y2kwEACAAJ
http://www.worldcat.org/oclc/820786272



Weed Management in Organic Vegetable Production: A Practical Review of Applied Research; by Jed
Colquhoun, University of Wisconsin
http://books.google.com/books?id=at5RMAAACAAJ
http://www.worldcat.org/oclc/213391541



Weeding without Chemicals; by Bob Flowerdew
http://books.google.com/books?id=A7hCFd557OEC
http://www.worldcat.org/oclc/755704767



Weedless Gardening; by Lee Reic
http://www.librarything.com/work/2940169
http://books.google.com/books?id=tYBfUtb2eCUC
http://www.worldcat.org/oclc/44548931    bookfinder.com     addall.com     booksprice.com



Weeds: Control without Poisons; by Charles Walters
http://www.librarything.com/work/131478
http://books.google.com/books?id=4MUnAQAAMAAJ
http://www.worldcat.org/oclc/42860793      bookfinder.com   addall.com     booksprice.com
~
Weeds: How to Control and Love Them (The Organic Handbook 5); by Jo Readman
http://www.librarything.com/work/3834288
http://books.google.com/books?id=6Z0BAAAACAAJ
http://www.worldcat.org/oclc/29147748    bookfinder.com  addall.com      booksprice.com


Weeds and What They Tell; by Ehrenfried E. Pfeiffer
http://www.librarything.com/work/1679617
http://books.google.com/books?id=iXsKQwAACAAJ
http://www.worldcat.org/oclc/44566838      bookfinder.com    addall.com     booksprice.com


West Coast Gardening: Natural Insect, Weed and Disease Control; by Linda A. Gilkeson
http://www.librarything.com/work/8688486
http://books.google.com/books?id=ZqjEAAAACAAJ
http://www.worldcat.org/oclc/70231319    bookfinder.com      addall.com      booksprice.com


What's Wrong with My Plant? (And How Do I Fix It?): A Visual Guide to Easy Diagnosis and
Organic Remedies; by David Deardorff
http://www.librarything.com/work/9147994
http://books.google.com/books?id=6Xh35zXiNWYC
http://www.worldcat.org/oclc/311779871   bookfinder.com      addall.com     booksprice.com


What's Wrong with My Vegetable Garden: 100% Organic Solutions for All Your Vegetables, from
Artichokes to Zucchini; by David Deardorff
http://www.librarything.com/work/11949817
http://books.google.com/books?id=y2MMF72yhJ0C
http://www.worldcat.org/oclc/704381005     bookfinder.com  addall.com      booksprice.com


Wildlife in the Garden: How to Live in Harmony with Deer, Raccoons, Rabbits, Crows, and Other
Pesky Creatures; by Gene Logsdon
http://www.librarything.com/work/984989
http://books.google.com/books?id=qhhDbYzYnEIC
http://www.worldcat.org/oclc/9154635
~ Kindle book      allbookstores.com    bing.com     bookfinder.com     yahoo.com
~


HEIRLOOM GARDENING
Heirloom Vegetables, Heritage Fruits, Antique Roses

Gardening with Heirloom Seeds: Tried-and-True Flowers, Fruits, and Vegetables for a New
Generation; by Lynn Coulter
http://www.librarything.com/work/1857555
http://books.google.com/books?id=1uya8RqUs8kC
http://www.worldcat.org/oclc/62281621
~ Kindle book      ~ Nook book   allbookstores.com   bing.com       bookfinder.com


Heirloom Vegetable Gardening: A Master Gardener's Guide; by William Woys Weaver
http://www.librarything.com/work/376857
http://books.google.com/books?id=pqrTGwAACAAJ
http://www.worldcat.org/oclc/34887017
~ Kindle book     allbookstores.com   bing.com    bookfinder.com      yahoo.com


The Edible Heirloom Garden; by Rosalind Creasy
http://www.librarything.com/work/1141998
http://books.google.com/books?id=-OkJAQAAMAAJ
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Heirloom Vegetables: A Home Gardener's Guide to Finding and Growing Vegetables from the Past ;
by Sue Stickland
http://www.librarything.com/work/141693
http://books.google.com/books?id=dwZIAAAAYAAJ
http://www.worldcat.org/oclc/37310883   bookfinder.com      addall.com   booksprice.com


The Edible Flower Garden; by Rosalind Creasy
http://www.librarything.com/work/326878
http://books.google.com/books?id=AwGJVW948mwC
http://www.worldcat.org/oclc/39713714
~ Kindle book     ~ Nook book     allbookstores.com   bing.com     bookfinder.com
>{-}<


75 Exciting Vegetables For Your Garden; by Jack E. Staub
http://www.librarything.com/work/1358809
http://books.google.com/books?id=ZfSmSmC0WhMC
http://www.worldcat.org/oclc/56559168
~ Kindle book     ~ Nook book    allbookstores.com       bing.com   bookfinder.com


75 Remarkable Fruits For Your Garden; by Jack E. Staub
http://www.librarything.com/work/5343647
http://books.google.com/books?id=4NTKoIy2TcYC
http://www.worldcat.org/oclc/173218785
~ Kindle book     ~ Nook book    allbookstores.com     bing.com     bookfinder.com


100 Heirloom Tomatoes for the American Garden; by Carolyn J. Male,
http://www.librarything.com/work/748212
http://books.google.com/books?id=y4y_Fz2QLkIC
http://www.worldcat.org/oclc/40805462   bookfinder.com       addall.com    booksprice.com


100 Old Roses for the American Garden; by Clair G. Martin
http://www.librarything.com/work/289850
http://books.google.com/books?id=6jWGAvyBsvcC
http://www.worldcat.org/oclc/42690032      bookfinder.com     addall.com   booksprice.com


A Basic Middle Eastern Desert Survival Guide of Common Wild Foods ; by Linda Runyon
http://www.worldcat.org/oclc/48810358


A Celebration of Heirloom Vegetables: Growing and Cooking Old-Time Varieties; by Roger B.
Yepsen
http://www.librarything.com/work/176053
http://books.google.com/books?id=bi4NAQAAMAAJ
http://www.worldcat.org/oclc/38936671    bookfinder.com    addall.com     booksprice.com


A Guide to Pruning Heritage Roses; by Angela Adams
http://books.google.com/books?id=KJ7MPAAACAAJ
http://www.worldcat.org/oclc/222080253
~
A Heritage of Roses; by Hazel Le Rougetel
http://www.librarything.com/work/679750
http://books.google.com/books?id=VxdIAAAAYAAJ
http://www.worldcat.org/oclc/18464606     bookfinder.com        addall.com      booksprice.com


A Potted History of Vegetables: A Kitchen Cornucopia: by Lorraine Harrison
http://www.librarything.com/work/11945250
http://books.google.com/books?id=RGNjzgAACAAJ
http://www.worldcat.org/oclc/666237642     bookfinder.com      addall.com        booksprice.com


A Taste of The Unexpected: How to Grow your own Remarkable Fruit, Vegetables, Nuts, Herbs,
Spices and Flowers; by Mark Diacono
http://www.librarything.com/work/10484142
http://books.google.com/books?id=bWb3RQAACAAJ
http://www.worldcat.org/oclc/624417648    bookfinder.com   addall.com     booksprice.com


A Taste of The Unexpected; by Annette Swanberg
http://www.worldcat.org/oclc/47444480


Aboriginal Plant Use in Canada's Northwest Boreal Forest ; by Robin J. Marles
http://www.librarything.com/work/7675875
http://books.google.com/books?id=XPbaAAAAMAAJ
http://www.worldcat.org/oclc/43280421     bookfinder.com         addall.com     booksprice.com


African Indigenous Vegetables in Urban Agriculture; by Charlie M Shackleton
http://books.google.com/books?id=h2Rbq1YZO60C
http://www.worldcat.org/oclc/471807899
~ Kindle book     ~ Nook book     allbookstores.com     bing.com     bookfinder.com


Agrobiodiversity Conservation and Use in Asia, Pacific and Oceania Region; by L.S. Sebastian
http://books.google.com/books?id=uMmTtwAACAAJ
http://www.worldcat.org/oclc/773322663


All About Tomatoes: And Potatoes, Peppers and Other Relatives, Australia ; by Clive Blazey
http://books.google.com/books?id=Bmv7tgAACAAJ
http://www.worldcat.org/oclc/755283225
~
Antique and Heirloom Flowers, Fruit and Vegetables: A Catalogue; by by National Trust of Australia
http://books.google.com/books?id=1r_FtgAACAAJ
http://www.worldcat.org/oclc/39442891


Antique Roses For The South; by William C. Welch
http://www.librarything.com/work/403730
http://books.google.com/books?id=LCj5OqTO2mEC
http://www.worldcat.org/oclc/21374140      bookfinder.com          addall.com   booksprice.com


Asian Vegetable Research and Development Center; by Tim Griggs
http://books.google.com/books?id=_vRHAAAAYAAJ
http://www.worldcat.org/oclc/35295653


Asian Vegetables: A Guide to Growing Fruit, Vegetables and Spices from the Indian Subcontinent; by
Sally Cunningham
http://www.librarything.com/work/11138654
http://books.google.com/books?id=c-NpPgAACAAJ
http://www.worldcat.org/oclc/506235366     bookfinder.com      addall.com     booksprice.com


Attracting Native Pollinators: The Xerces Society Guide Protecting North America's Bees and
Butterflies
http://www.librarything.com/work/10501685
http://books.google.com/books?id=iTwPEDL3nvMC
http://www.worldcat.org/oclc/535495615
~ Kindle book     ~ Nook book      allbookstores.com    bing.com     bookfinder.com


Banana Diversity in the Middle East; by Bioversity International
http://books.google.com/books?id=F31GfnmBk0wC

Bio-Dynamic Gardening; by John Soper
http://www.librarything.com/work/1624111
http://books.google.com/books?id=B20OAAAACAAJ
http://www.worldcat.org/oclc/35830019    bookfinder.com            addall.com   booksprice.com


Biodynamics: New Directions for Farming and Gardening in New Zealand; by Herbert H Koepf
http://books.google.com/books?id=ApA_AAAAYAAJ
http://www.worldcat.org/oclc/24210770
~
Biodynamics in the Home Garden; by Peter Proctor
http://www.librarything.com/work/9783978
http://books.google.com/books?id=NQtlLwEACAAJ
http://www.worldcat.org/oclc/823861985     bookfinder.com       addall.com     booksprice.com


Bio-dynamics in the Home Garden; by Ruth Eastman
http://books.google.com/books?id=-89-QwAACAAJ
http://www.worldcat.org/oclc/387498


Blue Corn and Square Tomatoes: Unusual Facts About Common Vegetables ; by Rebecca Rupp
http://www.librarything.com/work/3338949
http://books.google.com/books?id=D_VHAAAAYAAJ
http://www.worldcat.org/oclc/15589106    bookfinder.com  addall.com        booksprice.com


Brother Crow, Sister Corn: Traditional American Indian Gardening; by Carol Buchanan
http://www.librarything.com/work/3725181
http://books.google.com/books?id=gZ51AAAAMAAJ
http://www.worldcat.org/oclc/35096005     bookfinder.com      addall.com      booksprice.com


Breed Your Own Vegetable Varieties: The Gardener's and Farmer's Guide to Plant Breeding and
Seed Saving; by Carol Deppe
http://www.librarything.com/work/837820
http://books.google.com/books?id=sNgMAAAACAAJ
~ Kindle book      allbookstores.com  bing.com       bookfinder.com     yahoo.com


Breeding of Neglected and Under-Utilized Crops, Spices, and Herbs; by Sergio Ochatt
http://books.google.com/books?id=uaRFAQAAIAAJ
http://www.worldcat.org/oclc/646769365


Breeding Tropical and Subtropical Fruits; by P.K. Ray
http://books.google.com/books?id=0l2JnsONxlAC
http://www.worldcat.org/oclc/50130185
~ Kindle book     allbookstores.com       bing.com      bookfinder.com     yahoo.com
~
Buffalo Bird Woman's Garden: Agriculture of the Hidatsa Indians; by Gilbert Wilson
http://www.librarything.com/work/262327
http://books.google.com/books?id=8r6-kcHIUDsC
http://www.worldcat.org/oclc/16352461
~ Kindle book     ~ Nook book    allbookstores.com     bing.com       bookfinder.com


Building and Using Our Sun-Heated Greenhouse: Grow Vegetables All Year-Round; by Helen
Nearing
http://www.librarything.com/work/1005535
http://books.google.com/books?id=p2XGQgAACAAJ
http://www.worldcat.org/oclc/3292675   bookfinder.com    addall.com     booksprice.com


Building with Earth: A Guide to Flexible-Form Earthbag Construction; by Paulina Wojciechowska
http://www.librarything.com/work/1411647
http://books.google.com/books?id=0TZSAAAAMAAJ
http://www.worldcat.org/oclc/46683761      bookfinder.com    addall.com        booksprice.com


Building Soils For Better Crops: Organic Matter Management; by Fred Magdoff
http://www.librarything.com/work/5971806
http://books.google.com/books?id=DN84AQAAIAAJ
http://www.worldcat.org/oclc/823514452     bookfinder.com       addall.com      booksprice.com


Blue Potatoes, Orange Tomatoes; by Rosalind Creasy
http://www.librarything.com/work/1315279
http://books.google.com/books?id=7XxMZGnOVXUC
http://www.worldcat.org/oclc/27149446      bookfinder.com     addall.com       booksprice.com


Build It Better Yourself; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/190040
http://books.google.com/books?id=aSZSAAAAMAAJ
http://www.worldcat.org/oclc/2633091        bookfinder.com    addall.com      booksprice.com


Build Your Own Earth Oven: A Low-Cost Wood-Fired Mud Oven; Simple Sourdough Bread;
Perfect Loaves; by Kiko Denzer
http://www.librarything.com/work/121460
http://books.google.com/books?isbn=096798467X
http://www.worldcat.org/oclc/126880248   bookfinder.com addall.com     booksprice.com
~
Building With Cob: A Step-by-step Guide; by Adam Weismann
http://www.librarything.com/work/1103587
http://books.google.com/books?id=ri45AQAAIAAJ
http://www.worldcat.org/oclc/66901843
~ Kindle book     ~ Nook book    allbookstores.com   bing.com        bookfinder.com


Canadian Home Gardening the Year 'round; by Alden Blair Cutting
http://www.librarything.com/work/6809412
http://books.google.com/books?id=BgjBlwEACAAJ
http://www.worldcat.org/oclc/38915212    bookfinder.com       addall.com      booksprice.com


Cities Feeding People: An Examination of Urban Agriculture in East Africa; by Axumite G. Egziabher
http://www.librarything.com/work/1084095
http://books.google.com/books?id=-XPvJxgWYZUC
http://www.worldcat.org/oclc/52916140     bookfinder.com      addall.com       booksprice.com


Cities Farming for the Future: Urban Agriculture for Green and Productive Cities; by René Van
Veenhuizen
http://www.librarything.com/work/12948771
http://books.google.com/books?id=n0QQqbw9MRoC
http://www.worldcat.org/oclc/175314013      bookfinder.com       addall.com      booksprice.com


Classic Roses: An Illustrated Encyclopaedia and Grower's Manual of Old Roses, Shrub Roses and
Climbers; by Peter Beales
http://www.librarything.com/work/96808
http://books.google.com/books?id=txgwOKbMhmsC
http://www.worldcat.org/oclc/12263001      bookfinder.com    addall.com      booksprice.com


Collection, Evaluation and Breeding of African Edible Vegetables; by Samuel Mendlinger
http://books.google.com/books?id=0JLvHAAACAAJ
http://www.worldcat.org/oclc/29947151


Common Sense Gardens: How to Plan and Plant Them; by Cornelius V. V. Sewell
http://books.google.com/books?id=sF5GAAAAYAAJ
http://www.worldcat.org/oclc/8287709
~ Nook book allbookstores.com      bing.com   bookfinder.com       yahoo.com
~
Conservation And Utilization Of Sweet Potato Genetic Diversity In Asia; by V. Ramanatha Rao
http://books.google.com/books?id=yJ6SOTpGnw0C


Conservation of Plant Genetic Resources: Grassroots Efforts in North America; by Kevin Dahl
http://books.google.com/books?id=Sa8fAQAAIAAJ
http://www.worldcat.org/oclc/27994607


Conserving Plant Genetic Diversity in Protected Areas; by José María Iriondo
http://www.librarything.com/work/6273760
http://books.google.com/books?id=tQVdFVnLPyUC
http://www.worldcat.org/oclc/226881602      bookfinder.com       addall.com     booksprice.com


Continuous Productive Urban Landscapes: Designing Urban Agriculture for Sustainable Cities; by
Andre Viljoen
http://www.librarything.com/work/5221352
http://books.google.com/books?id=SWuDgEfUqzIC
http://www.worldcat.org/oclc/60533269
~ Kindle book     ~ Nook book    allbookstores.com   bing.com     bookfinder.com


Cool Season Gardening: Extend the Harvest, Plan Ahead, and Grow Vegetables Year Round ; by Bill
Thorness
http://books.google.com/books?id=PNa-MQEACAAJ
http://www.worldcat.org/oclc/813301110


Cornucopia II: A Source Book of Edible Plants; by Stephen Facciola
http://www.librarything.com/work/384442
http://books.google.com/books?id=XzolAQAAMAAJ
http://www.worldcat.org/oclc/40692996     bookfinder.com       addall.com      booksprice.com


Crops in Pots: 50 Great Container Projects Using Vegetables, Fruit and Herbs; by Bob Purnell
http://www.librarything.com/work/3155841
http://books.google.com/books?id=dzSyAAAACAAJ
http://www.worldcat.org/oclc/171529907      bookfinder.com       addall.com       booksprice.com
~
Crops in Pots: Growing Vegetables, Fruits and Herbs in Pots, Containers and Baskets; by Rachelle
Strauss
http://www.librarything.com/work/12736847
http://books.google.com/books?id=J_WZuAAACAAJ
http://www.worldcat.org/oclc/743473266      bookfinder.com      addall.com     booksprice.com


Crop Wild Relatives; by Bioversity International
http://books.google.com/books?id=yqUUmqcYef0C


Crop Wild Relatives: A Manual of in Situ Conservation; by Danny Hunter
http://www.librarything.com/work/11220363
http://books.google.com/books?id=O4KJP40SBN4C
http://www.worldcat.org/oclc/642351938
~ Kindle book     ~ Nook book    allbookstores.com      bing.com    bookfinder.com


Descriptors for Mango (Mangifera indica L.); by Bioversity International
http://books.google.com/books?id=YW6TyOeAftYC
http://www.worldcat.org/oclc/20878851


Desert Problems and Desertification in Central Asia; by Agadzhan Gel'dyevich Babaev
http://books.google.com/books?id=ilTuAAAAMAAJ
http://www.worldcat.org/oclc/40881651


Designing and Maintaining Your Edible Landscape Naturally; by Robert Kourik
http://www.librarything.com/work/176424
http://books.google.com/books?id=rF3-RzZ0psoC
http://www.worldcat.org/oclc/14258849
~ Kindle book     ~ Nook book    allbookstores.com   bing.com       bookfinder.com


Dig On for Victory: Mr Middleton's All-Year-Round Gardening Guide From 1945; by C. H.
Middleton
http://www.librarything.com/work/9546895
http://books.google.com/books?id=dhlKPgAACAAJ
http://www.worldcat.org/oclc/551661241     bookfinder.com    addall.com   booksprice.com
~
Don't Eat This Book: Fast Food and the Supersizing of America; by Morgan Spurlock
http://www.librarything.com/work/18410
http://books.google.com/books?id=LLLuAAAAMAAJ
http://www.worldcat.org/oclc/57694996     bookfinder.com       addall.com     booksprice.com


Down to Earth Gardening, United Kingdom; by Lawrence D. Hills
http://www.librarything.com/work/2418646
http://books.google.com/books?id=dEkaOQAACAAJ
http://www.worldcat.org/oclc/955935   bookfinder.com     addall.com          booksprice.com


Eat Your Roses: Pansies, Lavender, and 49 Other Delicious Edible Flowers; by Denise Schreiber
http://www.librarything.com/work/12486309
http://books.google.com/books?id=1QdgSwAACAAJ
http://www.worldcat.org/oclc/650215987     bookfinder.com      addall.com      booksprice.com


Edible: An Illustrated Guide to the World's Food Plants; by National Geographic
http://www.librarything.com/work/7248157
http://books.google.com/books?id=HORIzBx17DYC
http://www.worldcat.org/oclc/212855174       bookfinder.com        addall.com   booksprice.com


Edible and Useful Plants of Texas and the Southwest: A Practical Guide; by Delena Tull
http://www.librarything.com/work/1828350
http://books.google.com/books?id=pnnHgcasN-cC
http://www.worldcat.org/oclc/39739735
~ Kindle book     ~ Nook book      allbookstores.com    bing.com     bookfinder.com


Edible Estates: Attack on the Front Lawn; by Fritz Haeg
http://www.librarything.com/work/4811709
http://books.google.com/books?id=rvM4AQAAIAAJ
http://www.worldcat.org/oclc/170057672        bookfinder.com    addall.com      booksprice.com


Edible Flower Garden: From Garden to Kitchen : Choosing, Growing and Cooking Edible Flowers ; by
Kathy Brown
http://www.librarything.com/work/314753
http://books.google.com/books?id=96rpNwAACAAJ
http://www.worldcat.org/oclc/41611171    bookfinder.com     addall.com    booksprice.com
~
Edible Heirlooms: Heritage Vegetables for the Maritme Garden; by Bill Thorness
http://www.librarything.com/work/10078345
http://books.google.com/books?id=xCobUshBhpoC
http://www.worldcat.org/oclc/316035485
~ Kindle book     allbookstores.com     bing.com      bookfinder.com       yahoo.com


Edible Medicinal and Non-medicinal Plants: Fruits, Volume 3; T. K. Lim
http://www.librarything.com/work/12522682
http://books.google.com/books?id=32rWbxUtjeMC
http://www.worldcat.org/oclc/777214147
~ Kindle book     allbookstores.com    bing.com        bookfinder.com       yahoo.com


Edible Plants and Animals: Unusual Foods from Aardvark to Zamia; by A. D. Livingston
http://www.librarything.com/work/2245452
http://books.google.com/books?id=BUuSQgAACAAJ
http://www.worldcat.org/oclc/27035871     bookfinder.com    addall.com       booksprice.com


Edible Wild Plants of Vietnam: The Bountiful Garden; by Yoshitaka Tanaka
http://www.librarything.com/work/6254592
http://books.google.com/books?id=3TddBAAACAAJ
http://www.worldcat.org/oclc/85840629     bookfinder.com       addall.com     booksprice.com


Epicure with Hoe: A Gardening Guide to Heirloom Vegetables; by William W. Weaver
http://www.worldcat.org/oclc/664376826


Experiments and Observations on Aboriginal Wild Plant Food Utilization in Eastern North America ;
by Patrick J Munson;
http://books.google.com/books?id=nG8aAQAAIAAJ
http://www.worldcat.org/oclc/11249200


Extend Your Garden Season: Row Covers and Mulches; by Fred Stetson
http://www.librarything.com/work/1655048
http://books.google.com/books?id=o39si0G_bDkC
http://www.worldcat.org/oclc/34029357
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com
~
Farming in the City: An Annotated Bibliography of Urban andf Peri-Urban Agriculture in Uganda; by
Sarah N. Kimeze
http://books.google.com/books?id=FSloIuxaTgIC


Feeding Plants the Organic Way; by Jim Hay
http://www.librarything.com/work/3175052
http://books.google.com/books?id=sYhFGwAACAAJ
http://www.worldcat.org/oclc/24647752      bookfinder.com       addall.com     booksprice.com


Feeding Plants the Organic Way: The Life Story of Britain's Best Known Organic Gardener by
Lawrence D. Hills
http://www.librarything.com/work/5682765
http://books.google.com/books?id=sAdIAAAAYAAJ
http://www.worldcat.org/oclc/20414756     bookfinder.com       addall.com    booksprice.com


Figs, Dates, Laurel, and Myrrh: Plants of the Bible and the Quran; by Lytton John Musselman
http://www.librarything.com/work/5159174
http://books.google.com/books?id=bVUXUygxSDMC
http://www.worldcat.org/oclc/124538759
~ Kindle book     ~ Nook book      allbookstores.com      bing.com      bookfinder.com


Five Borough Farm: Seeding the Future of Urban Agriculture in New York City by Nevin Cohen
http://www.librarything.com/work/12845552
http://books.google.com/books?id=m7eIMAEACAAJ
http://www.worldcat.org/oclc/808671055    bookfinder.com       addall.com    booksprice.com


Food in China: A Cultural and Historical Inquiry; by Frederick J. Simoons
http://www.librarything.com/work/384515
http://books.google.com/books?id=Fo087ZxohA4C
http://www.worldcat.org/oclc/20392910
~ Kindle book     allbookstores.com      bing.com         bookfinder.com     yahoo.com


Food Plants of the Sonoran Desert; by Wendy C Hodgson
http://www.librarything.com/work/1969053
http://books.google.com/books?id=_cq3v-RH5nMC
http://www.worldcat.org/oclc/43569323
~ Kindle book      allbookstores.com     bing.com     bookfinder.com         yahoo.com
~
For Hunger-Proof Cities: Sustainable Urban Food Systems; by Mustafa Koc
http://www.librarything.com/work/4558450
http://books.google.com/books?id=yr9D2-ZK4AwC
http://www.worldcat.org/oclc/52110558     bookfinder.com      addall.com         booksprice.com


Forest Gardening: Rediscovering Nature and Community in a Post-industrial Age; by Robert A. de J.
Hart
http://www.librarything.com/work/491105
http://books.google.com/books?id=vyVsAAAACAAJ
http://www.worldcat.org/oclc/34933167    bookfinder.com     addall.com      booksprice.com


Forgotten Fruit. The English Orchard and Fruit Garden; by Francesca Greenoak
http://www.librarything.com/work/1707600
http://books.google.com/books?id=o3MjAQAAMAAJ
http://www.worldcat.org/oclc/10753259      bookfinder.com       addall.com   booksprice.com


Forgotten Fruits: The Stories Behind Britain's Traditional Fruit and Vegetables: A Guide to Britain's
Traditional Fruit and Vegetables from Orange Jelly Gooseberries and Dan's Mistake Turnips ; by
Christopher Stocks
http://www.librarything.com/work/6000509
http://books.google.com/books?id=BqXHEkczrjMC
http://www.worldcat.org/oclc/191891319
~ Kindle book      ~ Nook book     allbookstores.com      bing.com      bookfinder.com


From the Ground Up: How Ireland is Growing Its Own: by Fionnuala Fallon
http://books.google.com/books?id=rhBNLwEACAAJ
http://www.worldcat.org/oclc/781501003


From Grass to Gardens: How to Reap Bounty from a Small Yard; by Janet Lembke
http://www.librarything.com/work/3994542
http://books.google.com/books?id=an6TnsAzW9wC
http://www.worldcat.org/oclc/61704762
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com
~
Fruit and Its Cultivation; The Cultivation of All Kinds of Hardy Fruits in Garden and Orchard ; by
Thomas William Sanders
http://www.librarything.com/work/9862736
http://books.google.com/books?id=5JKduAAACAAJ
http://www.worldcat.org/oclc/3021006        bookfinder.com      addall.com      booksprice.com


Fruits And Vegetables: IARC Handbook of Cancer Prevention; by IARC
http://www.librarything.com/work/8566127
http://books.google.com/books?id=RiKjvAzzwFYC
http://www.worldcat.org/oclc/55228997    bookfinder.com      addall.com          booksprice.com


Fruit and Vegetables for Scotland: What to Grow and How to Grow It; by Kenneth Cox
http://www.librarything.com/work/12646142
http://books.google.com/books?id=iyWUtgAACAAJ
http://www.worldcat.org/oclc/806457656      bookfinder.com    addall.com      booksprice.com


Fruit and Vegetable Juice Therapy; by N. N. Saha
http://www.librarything.com/work/2868132
http://books.google.com/books?id=C3oaSEWJaNwC
http://www.worldcat.org/oclc/469651828       bookfinder.com        addall.com      booksprice.com


Fruit and Vegetable Juice Therapy: Curative and Healing Powers of Fruit and Vegetables in
Ensuring a Healthy Body and Glowing Skin; by Syed Aziz Ahmad
http://books.google.com/books?id=L7w-QuPX3rAC
http://www.worldcat.org/oclc/59345018
~ Kindle book     ~ Nook book     allbookstores.com     bing.com     bookfinder.com


Fruits and Vegetables in Ancient India; by Priya Vrat Sharma
http://www.librarything.com/work/6678169
http://books.google.com/books?id=lhkumfD4TbIC
http://www.worldcat.org/oclc/6377881        bookfinder.com      addall.com      booksprice.com


Fruits and Vegetables in Brazil: A Special Report; by K J Kadow
http://books.google.com/books?id=XPu8lwEACAAJ
http://www.worldcat.org/oclc/6293533
~
Fruits of Queensland; by Albert H. Benson
http://books.google.com/books?id=pMdBAAAAIAAJ
http://www.worldcat.org/oclc/263027274
~ Kindle book     ~ Nook book       allbookstores.com   bing.com    bookfinder.com


Garden Mulches and Compost; by Duane Hatch
http://books.google.com/books?id=Pc7EGwAACAAJ
http://www.worldcat.org/oclc/10854138


Garden Seed Inventory: Inventory Of Seed Catalogs Listing All Non-Hybrid Vegetable Seeds,
Available in the United States and Canada; by Kent Whealy
http://www.librarything.com/work/1004841
http://books.google.com/books?id=ZYlFAQAAIAAJ
http://www.worldcat.org/oclc/18117099       bookfinder.com    addall.com   booksprice.com


Gardening: Naturally; by D. X. Fenten
http://www.librarything.com/work/12234407
http://books.google.com/books?id=r8vfpcnFpUoC
http://www.worldcat.org/oclc/538910    bookfinder.com      addall.com     booksprice.com


Gardening Guide: All the Year Round Flowers, Fruit, Vegetables; by Cecil Henry Middleton
http://www.librarything.com/work/5424521
http://books.google.com/books?id=oCklpwAACAAJ
http://www.worldcat.org/oclc/30255590    bookfinder.com      addall.com       booksprice.com


Gardening in School All Year Round: An Annual Programme of Gardening Activities Suitable for
Primary School; by Clare Revera
http://books.google.com/books?id=Aow-YgEACAAJ
http://www.worldcat.org/oclc/696740429


Gardening on Pavement, Tables, and Hard Surfaces: by George Schenk
http://www.librarything.com/work/2260721
http://books.google.com/books?id=cMEWV-ima-MC
http://www.worldcat.org/oclc/51967398    bookfinder.com     addall.com      booksprice.com
~
Gardening with Compost; by Frederic Charles King
http://www.librarything.com/work/5355240
http://books.google.com/books?id=tmA9PQAACAAJ
http://www.worldcat.org/oclc/4878042     bookfinder.com     addall.com    booksprice.com


Gardening with Composts, Mulches, and Row Covers; by by N S Mansour
http://books.google.com/books?id=6GFLOAAACAAJ
http://www.worldcat.org/oclc/15145090


Gardening with Conscience: The Organic-Intensive Method; by Marny Smith
http://www.librarything.com/work/2971154
http://books.google.com/books?id=yuYTAAAACAAJ
http://www.worldcat.org/oclc/7280839   bookfinder.com       addall.com    booksprice.com


Gardening With Heirloom Plants; by David Stuart
http://www.librarything.com/work/1857555
http://books.google.com/books?id=bOEKAAAACAAJ
http://www.worldcat.org/oclc/37220757     bookfinder.com     addall.com     booksprice.com


Gardening with Heirloom Seeds: Tried-and-True Flowers, Fruits, and Vegetables for a New
Generation; by Lynn Coulter
http://www.librarything.com/work/1857555
http://books.google.com/books?id=ktF6PfQcDcYC
http://www.worldcat.org/oclc/62281621
~ Kindle book      ~ Nook book   allbookstores.com   bing.com       bookfinder.com


Gardening with Old Roses; by John Scarman
http://www.librarything.com/work/403852
http://books.google.com/books?id=N4tCAAAACAAJ
http://www.worldcat.org/oclc/41465587     bookfinder.com     addall.com     booksprice.com


Garlic Healing Powers; by Bernard Jensen
http://www.librarything.com/work/10452504
http://books.google.com/books?id=VkdvPQAACAAJ
http://www.worldcat.org/oclc/30737968
~ Kindle book     ~ Nook book      allbookstores.com   bing.com    bookfinder.com
~
Gathering: Memoir of a Seed Saver; by Diane Ott Whealy
http://www.librarything.com/work/11603514
http://books.google.com/books?id=_ygdKQEACAAJ
http://www.worldcat.org/oclc/719429780      bookfinder.com       addall.com      booksprice.com


Gene Logsdon's Practical Skills: A Revival of Forgotten Crafts, Techniques, and Traditions; by Gene
Logsdon
http://www.librarything.com/work/121468
http://books.google.com/books?id=HtZKAAAACAAJ
http://www.worldcat.org/oclc/12022124      bookfinder.com       addall.com     booksprice.com


Genetic Resources and Utilization of Underutilized Crops in Southern and Eastern Africa ; by Kenneth
R. M. Anthony
http://books.google.com/books?id=tRzrAAAACAAJ
http://www.worldcat.org/oclc/42424013


Getting Food From Water: A Guide to Backyard Aquaculture; by Gene Logsdon
http://www.librarything.com/work/916666
http://books.google.com/books?id=P78vAAAAYAAJ
http://www.worldcat.org/oclc/4036797    bookfinder.com     addall.com     booksprice.com


Good Housekeeping's Unusual Vegetables: How to Grow, how to Cook; by Good Housekeeping
http://www.librarything.com/work/3435289
http://books.google.com/books?id=R1TVMgEACAAJ
http://www.worldcat.org/oclc/40829280    bookfinder.com   addall.com     booksprice.com


Greening the Garden: A Guide to Sustainable Growing; by Dan Jason
http://www.librarything.com/work/1646110
http://books.google.com/books?id=qQE5AQAAIAAJ
http://www.worldcat.org/oclc/26807478     bookfinder.com      addall.com       booksprice.com


Greening of the Revolution: Cuba's Experiment with Organic Agriculture; by Peter Rossett
http://www.librarything.com/work/1156025
http://books.google.com/books?id=JP9gAAAAMAAJ
~
Grow Fruits and Vegetables the Way They Used to Taste; by John Festus Adams
http://www.librarything.com/work/3720768
http://books.google.com/books?id=2f9HAAAAYAAJ
http://www.worldcat.org/oclc/17871706    bookfinder.com       addall.com    booksprice.com


Grow Organic: Over 250 Tips and Ideas for Growing Flowers, Veggies, Lawns and More ; by Doug
Oster
http://www.librarything.com/work/2882100
http://books.google.com/books?id=YANEAAAACAAJ
http://www.worldcat.org/oclc/122256399     bookfinder.com    addall.com     booksprice.com


Grow Your Own Fruit and Veg: Teach Yourself; by Michael Thurlow
http://www.librarything.com/work/11512911
http://books.google.com/books?id=D4K2ssHLuD8C
http://www.worldcat.org/oclc/649802943
~ Kindle book     ~ Nook book    allbookstores.com   bing.com      bookfinder.com


Grow Your Own Fruit and Veg in Plot, Pots or Growbags: The A-Z Guide to Growing and Cooking
Farm-fresh Food; by Steve Ott
http://www.librarything.com/work/8240710
http://books.google.com/books?id=JE9yNwAACAAJ
http://www.worldcat.org/oclc/244653116    bookfinder.com     addall.com    booksprice.com


Grow Your Own Fruit and Vegetables, United Kingdom; by Lawrence D. Hills
http://www.librarything.com/work/2677282
http://books.google.com/books?id=g0M3RWDO0q0C
http://www.worldcat.org/oclc/1805959
~ Kindle book     allbookstores.com   bing.com     bookfinder.com      yahoo.com


Grow Your Vegetables: For Your Nutritional and Financial Health; by Rod Stone
~ Kindle book   allbookstores.com      bing.com      bookfinder.com       yahoo.com


Growing Diversity: Genetic Resources and Local Food Security; by David Cooper
http://www.librarything.com/work/507525
http://books.google.com/books?id=gaMfAQAAIAAJ
http://www.worldcat.org/oclc/29475405    bookfinder.com       addall.com    booksprice.com
~
Growing Food for Health and Pleasure: A Comprehensive Guide to Practical Organic Gardening; by
Harold Hart
http://www.librarything.com/work/6303297
http://books.google.com/books?id=9vS9OQAACAAJ
http://www.worldcat.org/oclc/257662    bookfinder.com    addall.com      booksprice.com


Growing Old Fashioned Roses: In Australia and New Zealand; by Trevor Nottle
http://www.librarything.com/work/3070548
http://books.google.com/books?id=Lhy5GQAACAAJ
http://www.worldcat.org/oclc/27607900    bookfinder.com      addall.com     booksprice.com


Growing Uncommon Fruits and Vegetables in Australia; by Keith Smith
http://www.librarything.com/work/2559916
http://books.google.com/books?isbn=1864363541
http://www.worldcat.org/oclc/768488040   bookfinder.com        addall.com    booksprice.com


Growing Unusual Vegetables; by Alan Wilbur
http://books.google.com/books?id=C4sqOQAACAAJ
http://www.worldcat.org/oclc/7395531


Growing Unusual Vegetables; by Ralph Whitlock
http://books.google.com/books?id=aggkNAAACAAJ
http://www.worldcat.org/oclc/16436555


Growing Unusual Vegetables: Weird and Wonderful Vegetables and How to Grow Them; by Simon
Hickmott
http://www.librarything.com/work/857014
http://books.google.com/books?id=USssAAAACAAJ
http://www.worldcat.org/oclc/56197407   bookfinder.com     addall.com   booksprice.com



Growing Your Own Heirloom Vegetables: Bringing Carbon Dioxide Down to Earth ; by Clive Blazey
http://www.librarything.com/work/8166834
http://books.google.com/books?id=JEktOQAACAAJ
http://www.worldcat.org/oclc/255966637   bookfinder.com   addall.com    booksprice.com
~
Guide to Indian Herbs; by Raymond Stark
http://www.librarything.com/work/3095345
http://books.google.com/books?id=zvY6AQAAIAAJ
http://www.worldcat.org/oclc/8629696    bookfinder.com       addall.com     booksprice.com


Handy Farm Devices: And How to Make Them; by Rolfe Cobleigh
http://www.librarything.com/work/99433
http://books.google.com/books?id=N2w2lwEACAAJ
http://www.worldcat.org/oclc/33010298
~ Kindle book     allbookstores.com    bing.com    bookfinder.com         yahoo.com


Health Benefits and Healing Power of Fruits and Vegetables: Inflammation, Anti-aging, High Blood
Pressure and Much More; by Jack LaGrande
~ Kindle book     ~ Nook book     allbookstores.com    bing.com     bookfinder.com


Herbal Harvest: Commercial Organic Production of Quality Dried Herbs; by Greg Whitten
http://www.librarything.com/work/2049495
http://books.google.com/books?id=DCkjAQAAMAAJ
http://www.worldcat.org/oclc/55687840    bookfinder.com      addall.com      booksprice.com


Heritage and Dwarf Fruit Trees for Urban Backyards and Small Orchards; by Peter Allen
http://www.google.com
http://www.bing.com


Heirloom Beans: Great Recipes for Dips and Spreads, Soups and Stews, Salads and Salsas, and
Much More from Rancho Gordo; by Steve Sando
http://www.librarything.com/work/6151381
http://books.google.com/books?id=x4qDu_odrX8C
http://www.worldcat.org/oclc/212410193
~ Kindle book     ~ Nook book    allbookstores.com    bing.com     bookfinder.com


Heirloom Country Gardens: Timeless Treasures for Today's Gardeners; by Sarah Wolfgang Heffner,
Rodale Organic Gardening Magazine
http://www.librarything.com/work/392323
http://books.google.com/books?id=rGAlAQAAMAAJ
http://www.worldcat.org/oclc/41835124   bookfinder.com      addall.com       booksprice.com
~
Heirloom Fruits and Vegetables; by Toby Musgrave
http://www.librarything.com/work/12678782
http://books.google.com/books?id=EITkygAACAAJ
http://www.worldcat.org/oclc/767564464     bookfinder.com       addall.com     booksprice.com


Heirloom Flavor: Yesterday's Best-Tasting Vegetables, Fruits, and Herbs for Today's Cook; by Doreen
G. Howard
http://books.google.com/books?id=kEXuuSFzj2kC
http://www.worldcat.org/oclc/648923688
~ Kindle book     ~ Nook book     allbookstores.com    bing.com      bookfinder.com


Heirloom Gardens: Simple Secrets for Old-Fashioned Flowers and Vegetables; by Mimi
Luebbermann,
http://www.librarything.com/work/678683
http://books.google.com/books?id=mQhIAAAAYAAJ
http://www.worldcat.org/oclc/35638091    bookfinder.com     addall.com      booksprice.com


Heirloom Gardening in the South: Yesterday's Plants for Today's Gardens; by William C. Welch
http://www.librarything.com/work/11463888
http://books.google.com/books?id=_6nQ681qy-4C
http://www.worldcat.org/oclc/649419454
~ Kindle book     ~ Nook book    allbookstores.com      bing.com     bookfinder.com


Heirloom Herbs: Using Old Fashioned Herbs in Gardens, Recipes and Decorations ; by Mary Forsell,
http://www.librarything.com/work/109040
http://books.google.com/books?id=YQ1IAAAAYAAJ
http://www.worldcat.org/oclc/21409492   bookfinder.com      addall.com     booksprice.com


Heirloom Roses: A Passion for Roses; by Rayford Clayton Reddell
http://www.librarything.com/work/1355722
http://books.google.com/books?id=5ek4AQAAIAAJ
http://www.worldcat.org/oclc/39181655      bookfinder.com     addall.com      booksprice.com


Heirloom Seeds and Their Keepers: Marginality and Memory in the Conservation of Biological
Diversity; by Virginia Dimasuay Nazarea
http://www.librarything.com/work/5983186
http://books.google.com/books?id=j3IxSgc4cOsC
http://www.worldcat.org/oclc/56967130    bookfinder.com     addall.com     booksprice.com
~
Heirloom Vegetables: A Home Gardener's Guide to Finding and Growing Vegetables from the Past;
by Sue Stickland
http://www.librarything.com/work/141693
http://books.google.com/books?id=dwZIAAAAYAAJ
http://www.worldcat.org/oclc/37310883   bookfinder.com      addall.com   booksprice.com


Heritage Apples: A New Sensation; by Susan Lundy
http://books.google.com/books?id=iDjOK5EVDqkC
http://www.worldcat.org/oclc/819846451


Heritage Fruits and Vegetables; by Toby Musgrave
http://www.librarything.com/work/12678782
http://books.google.com/books?isbn=0500516138
http://www.worldcat.org/oclc/819846451      bookfinder.com       addall.com      booksprice.com


Heritage Gardening: With an Illustrated Directory of Heirloom Flowers, Fruit and Vegetables ; by
Judyth A. McLeod
http://www.librarything.com/work/11845034
http://books.google.com/books?id=aKZWAgAACAAJ
http://www.worldcat.org/oclc/38351815      bookfinder.com      addall.com      booksprice.com


Heritage Roses in Australia; by International Heritage Rose Conference
http://books.google.com/books?id=vjZaAAAACAAJ
http://www.worldcat.org/oclc/220384734


Heritage Vegetables: The Gardener's Guide to Cultivating Diversity; by Sue Strickland
http://www.librarything.com/work/363583
http://books.google.com/books?id=TgZIAAAAYAAJ


High-Yield Gardening: How to Get More from Your Garden Space and More from Your Gardening
Season by Marjorie B. Hunt
http://books.google.com/books?id=HwNIAAAAYAAJ
http://www.worldcat.org/oclc/12751397
~
Home Food Systems: Rodale's Catalog of Methods and Tools for Producing, Processing, and
Preserving Naturally Good Foods; by Roger B. Yepsen
http://www.librarything.com/work/1642031
http://books.google.com/books?id=T7KHPwAACAAJ
http://www.worldcat.org/oclc/6602735     bookfinder.com   addall.com      booksprice.com


Home Power; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/7483922
http://books.google.com/books?id=D6qrHAAACAAJ
http://www.worldcat.org/oclc/184759826   bookfinder.com     addall.com     booksprice.com

Homepower
http://www.homepower.com

Homeschoolers, Hippies, and Heirloom Tomatoes; by Philip Ward Newton
http://books.google.com/books?isbn=1935909401
http://www.worldcat.org/oclc/806323060
~ Kindle book     ~ Nook book    allbookstores.com     bing.com   bookfinder.com


Homesweet Homegrown: How to Grow, Make and Store Food Your Own Food, No Matter Where
You Live; by Jennifer Biggs
http://www.librarything.com/work/12670275
http://books.google.com/books?id=zjQQywAACAAJ
http://www.worldcat.org/oclc/781500741    bookfinder.com addall.com  booksprice.com


How to Buy Solar Heating Without Getting Burnt; by Malcolm Wells
http://www.librarything.com/work/899506
http://books.google.com/books?id=7cxSAAAAMAAJ
http://www.worldcat.org/oclc/781500741    bookfinder.com     addall.com    booksprice.com


How to Farm your Backyard the Mulch-Organic Way; by Max Alth
http://books.google.com/books?id=qcQi0JqAh1oC
http://www.worldcat.org/oclc/2189377


How to Grow Beans and Peas: Planting and Growing Organic Green Beans, Sugar Snap Peas, and
Heirloom Dry Beans and Peas; by R.J. Ruppenthal
http://www.librarything.com/work/13554588
~ Kindle book     allbookstores.com     bing.com   bookfinder.com     yahoo.com
~
How to Grow Food in Your Polytunnel: All Year Round; by Mark Gatter
http://www.librarything.com/work/11138597
http://books.google.com/books?id=aVBNSAAACAAJ
http://www.worldcat.org/oclc/610835244
~ Kindle book     allbookstores.com    bing.com     bookfinder.com         yahoo.com


How To Grow Sexy Tomatoes Upside Down, And Get A Bumper Crop; Brian Morris
~ Kindle book  allbookstores.com   bing.com     bookfinder.com    yahoo.com


How to Grow Vegetables and Fruits by the Organic Method; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/997045
http://books.google.com/books?id=DPRHAAAAYAAJ
http://www.worldcat.org/oclc/171305    bookfinder.com      addall.com    booksprice.com


How to Grow Vegetables Organically; by Jeff Cox
http://www.librarything.com/work/634076
http://books.google.com/books?id=_yBDAAAACAAJ
http://www.worldcat.org/oclc/16803517      bookfinder.com     addall.com     booksprice.com


How to Save Your Own Seeds: A Handbook for Home Seed Production; by Diane Joubert, Seeds of
Diversity Canada
http://www.librarything.com/work/5713984
http://books.google.com/books?id=xNxJAAAAYAAJ
http://www.worldcat.org/oclc/22705502    bookfinder.com addall.com       booksprice.com


Howard Garrett's Texas Organic Gardening; by Howard Garrett
http://www.librarything.com/work/3909479
http://books.google.com/books?id=pBkHAAAACAAJ
http://www.worldcat.org/oclc/25788833    bookfinder.com       addall.com     booksprice.com


In Search of Lost Roses; by Thomas Christopher
http://www.librarything.com/work/290178
http://books.google.com/books?id=MtBgyNQiF80C
http://www.worldcat.org/oclc/19778377      bookfinder.com     addall.com     booksprice.com
~
Indigenous Fruit Trees in the Tropics: Domestication, Utilization and Commercialization; by Festus K
Akinnifesi
http://books.google.com/books?id=wKHs1gLiYYkC
http://www.worldcat.org/oclc/647686009


Innovative Methods for Propagating Potatoes; by International Potato Center
http://books.google.com/books?id=YkTQNlWB7QoC
http://www.worldcat.org/oclc/13556929


Intensive Gardening Round the Year; by Paul Doscher
http://www.librarything.com/work/2642565
http://books.google.com/books?id=pzgjAQAAMAAJ
http://www.worldcat.org/oclc/6735397      bookfinder.com       addall.com     booksprice.com


IPM for Schools: A How-to Manual; by Sheila Daar
http://books.google.com/books?id=RwYRHAAACAAJ
http://www.worldcat.org/oclc/425255912


It Started in Eden: How the Plant Hunters and the Plants They Found Changed the Course of History;
by Bertha Sanford Dodge
http://www.librarything.com/work/5938371
http://books.google.com/books?id=mh5tAAAAMAAJ
http://www.worldcat.org/oclc/5008248       bookfinder.com      addall.com   booksprice.com


Jim Johnson's Heirloom Vegetable Guide; by Jim Johnson
http://books.google.com/books?id=ab8LtwAACAAJ
http://www.worldcat.org/oclc/6572162


Juice Fasting and Detoxification: Use the Healing Power of Fresh Juice to Feel Young and Look
Great; by Steve Meyerowitz
http://www.librarything.com/work/313425
http://books.google.com/books?id=yrO-YuI33SsC
http://www.worldcat.org/oclc/41821606      bookfinder.com      addall.com      booksprice.com
~
Kids' Container Gardening: Year-Round Projects for Inside and Out; by Cindy Krezel
http://www.librarything.com/work/1625136
http://books.google.com/books?id=kQIaQgAACAAJ
http://www.worldcat.org/oclc/57549488    bookfinder.com       addall.com      booksprice.com


Lawn Beauty: The Organic Way; by Glenn F. Johns
http://www.librarything.com/work/12097063
http://books.google.com/books?id=fnQlAQAAMAAJ
http://www.worldcat.org/oclc/125988   bookfinder.com         addall.com        booksprice.com


Lawn Food Cook Book: Groceries in the Backyard; by Linda Runyon
http://www.librarything.com/work/3712089
http://books.google.com/books?id=lSJPRAAACAAJ
http://www.worldcat.org/oclc/13582289    bookfinder.com     addall.com           booksprice.com


Let's Get Growing: A Dirt-Under-The-Nails Primer to Raising Vegetables, Fruits and Flowers
Organically; by Crow Miller
http://www.librarything.com/work/230832
http://books.google.com/books?id=kN_nNAAACAAJ
http://www.worldcat.org/oclc/31517800    bookfinder.com      addall.com      booksprice.com


Lost Crops of Africa, Volume I: Grains
http://www.librarything.com/work/5845213
http://books.google.com/books?id=87ou6aEaze8C
http://www.worldcat.org/oclc/439351797   bookfinder.com         addall.com        booksprice.com


Lost Crops of Africa, Volume II: Vegetables
http://www.librarything.com/work/6772813
http://books.google.com/books?id=e-UjAQAAMAAJ
http://www.worldcat.org/oclc/85851965     bookfinder.com       addall.com        booksprice.com


Lost Crops of Africa, Volume III: Fruits; by National Research Council
http://www.librarything.com/work/7788674
http://books.google.com/books?id=MqGLARzj-6sC
http://www.worldcat.org/oclc/798306541        bookfinder.com      addall.com      booksprice.com
~
Lost Crops of the Incas: Little-known Plants of the Andes With Promise for Worldwide Cultivation ;
by National Research Council
http://www.librarything.com/work/819947
http://books.google.com/books?id=iT0rAAAAYAAJ
http://www.worldcat.org/oclc/20397360       bookfinder.com      addall.com    booksprice.com


Maintaining Your Dwarf Fruit Orchard; by Lawrence Southwick, Storey Publishing
http://books.google.com/books?id=O0cr0jMYos0C
~ Kindle book     ~ Nook book    allbookstores.com    bing.com      bookfinder.com


Making Vegetables (Volume 1): Germinating Heirloom Seeds and Growing a Sustainable Garden
the Organic Way; by Shoshanna Easling
http://books.google.com/books?id=ZZiiuAAACAAJ
http://www.worldcat.org/oclc/811739619


Melons, An Heirloom Gallery for the Passionate Grower: With Practical Advice on Growing,
Pollinating, Picking, and Preparing; by Amy Goldman
http://www.librarything.com/work/711917
http://books.google.com/books?id=xqG22Ah3Hx4C
http://www.worldcat.org/oclc/48706948       bookfinder.com   addall.com     booksprice.com


Month-by-month Guide to Organic Gardening: The Green Gardener's Calendar, United Kingdom; by
Lawrence D. Hills
http://www.librarything.com/work/3434652
http://books.google.com/books?id=BAJhHwAACAAJ
http://www.worldcat.org/oclc/59174997    bookfinder.com   addall.com      booksprice.com


Native American Ethnobotany: A Database Of Foods, Drugs, Dyes And Fibers Of Native American
Peoples, Derived From Plants; by Daniel E Moerman
http://www.librarything.com/work/12880811
http://books.google.com/books?id=UXaQat5icHUC
http://www.worldcat.org/oclc/38002531      bookfinder.com  addall.com     booksprice.com
~
Native American Gardening: Buffalobird-Woman's Guide To Traditional Methods; by Gilbert L.
Wilson
http://books.google.com/books?id=lQMFMDGvoccC
http://www.worldcat.org/oclc/57564915


Native American Gardening: Stories, Projects, and Recipes for Families ; by Michael J. Caduto
http://www.librarything.com/work/1445555
http://books.google.com/books?id=4TNTbLYvufgC
http://www.worldcat.org/oclc/33665323     bookfinder.com       addall.com       booksprice.com


Native Harvest: Authentic Southwestern Gardening; by Kevin Dahl
http://www.librarything.com/work/3110507
http://books.google.com/books?id=1583690603
http://www.worldcat.org/oclc/57577355    bookfinder.com       addall.com      booksprice.com


Natural Gardening Handbook: Mulching and Composting, How To Use Organic Fertilizers, Pest
Control Without Synthetics, Soil Testing Laboratories: by Robert A. Wearne
http://www.librarything.com/work/11270407
http://books.google.com/books?id=SXRoPQAACAAJ
http://www.worldcat.org/oclc/38324909      bookfinder.com      addall.com  booksprice.com


New Ideas in Organic Gardening; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/2758526
http://books.google.com/books?id=FYzblwEACAAJ
http://www.worldcat.org/oclc/7074624     bookfinder.com     addall.com       booksprice.com


Newspaper, Pennies, Cardboard, and Eggs--For Growing a Better Garden: More than 400 New, Fun,
and Ingenious Ideas to Keep Your Garden Growing Great All Season Long ; by Roger Yepsen
http://www.librarything.com/work/4687168
http://books.google.com/books?id=h3fvGwAACAAJ
http://www.worldcat.org/oclc/85692923
~ Kindle book     allbookstores.com    bing.com     bookfinder.com       yahoo.com
~
New Zealand Guide to Compost Gardening: A Guide to Gardening Without Digging ; by David
Hornblow
http://www.librarything.com/work/10555384
http://books.google.com/books?id=QyanAQAACAAJ
http://www.worldcat.org/oclc/154650512    bookfinder.com   addall.com    booksprice.com


Nourishing Traditions: The Cookbook That Challenges Politically Correct Nutrition and the Diet
Dictocrats; by Sally Fallon
http://www.librarything.com/work/33864
http://books.google.com/books?id=89GTrR95aIoC
http://www.worldcat.org/oclc/49603939
~ Kindle book        allbookstores.com bing.com      bookfinder.com      yahoo.com


Old-Fashioned and David Austin Roses; by Barbara Lea Taylor
http://www.librarything.com/work/290316
http://books.google.com/books?id=s24xr3dcY6YC
http://www.worldcat.org/oclc/53131811     bookfinder.com         addall.com      booksprice.com


Old Fashioned Roses: Their Care and Cultivation; by Amanda Beales
http://www.librarything.com/work/1562204
http://books.google.com/books?id=OR85OAAACAAJ
http://www.worldcat.org/oclc/20691869     bookfinder.com      addall.com         booksprice.com


Old Roses; by Ethelyn Emery Keays
http://www.librarything.com/work/2095267
http://books.google.com/books?id=VVVEAAAAYAAJ
http://www.worldcat.org/oclc/1726937   bookfinder.com           addall.com     booksprice.com


Old Roses (Gardens by Design); by Graham Murphy
http://www.librarything.com/work/2771300
http://books.google.com/books?id=nYw77SS8HfQC
http://www.worldcat.org/oclc/52057129    bookfinder.com          addall.com      booksprice.com


Old Roses: An Illustrated Guide to Varieties, Cultivation and Care, with Step-By-Step Instructions; by
Andrew Mikolajski
http://www.librarything.com/work/2774399
http://books.google.com/books?id=F5W2lr9du9AC
http://www.worldcat.org/oclc/37257666       bookfinder.com      addall.com      booksprice.com
~
Old Roses: The Master List; by Brent C. Dickerson
http://www.librarything.com/work/2858546
http://books.google.com/books?id=N_m9IAAACAAJ
http://www.worldcat.org/oclc/228657825       bookfinder.com    addall.com     booksprice.com


Old Roses and English Roses; by David Austin
http://www.librarything.com/work/85575
http://books.google.com/books?id=xMMeQwAACAAJ
http://www.worldcat.org/oclc/805472444      bookfinder.com     addall.com     booksprice.com


Old Southern Apples: A Comprehensive History and Description of Varieties for Collectors,
Growers, and Fruit Enthusiasts; by Creighton Lee Calhoun, Jr.
http://www.librarything.com/work/4210220
http://books.google.com/books?id=XCFYuLbMuZQC
http://www.worldcat.org/oclc/31647065
~ Kindle book     ~ Nook book       allbookstores.com    bing.com bookfinder.com


Old Ways Rediscovered: Valuable Recipes and Information Collected by Three Generations of an
American Family; by Clarence Meyer
http://www.librarything.com/work/2827063
http://books.google.com/books?id=Fg4hAAAACAAJ
http://www.worldcat.org/oclc/18015151    bookfinder.com     addall.com     booksprice.com


Organic Avocado: Resource Guide;
http://books.google.com/books?id=anD7PAAACAAJ
http://www.worldcat.org/oclc/156741854


Organic Citrus: Resource Guide
http://books.google.com/books?id=mB-0PAAACAAJ
http://www.worldcat.org/oclc/156741849


Organic Fertilizing Secret of Garden Experts; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/10808299
http://books.google.com/books?id=P7EXYAAACAAJ
http://www.worldcat.org/oclc/18997575      bookfinder.com       addall.com    booksprice.com
~
Organic Gardening; by Charles W. Basham
http://books.google.com/books?id=OlF1lwEACAAJ
http://www.worldcat.org/oclc/6772986


Organic Gardening; by Lawrence Donegan Hills
http://www.librarything.com/work/658600
http://books.google.com/books?id=As1wQgAACAAJ
http://www.worldcat.org/oclc/3772079    bookfinder.com      addall.com      booksprice.com


Organic Gardening: How to Grow Healthy Vegetables,fruits,and Flowers Using Nature's Own
Methods; by Organic Gardening Magazine
http://www.librarything.com/work/6745681
http://books.google.com/books?id=yuxJAAAAYAAJ
http://www.worldcat.org/oclc/561284    bookfinder.com     addall.com    booksprice.com


Organic Gardening - LP: Learn New Gardening Techniques To Give You And Your Family Healthy
Fruit, Vegetables, Herbs And Plants; by Patsy Powell
http://www.google.com
http://www.bing.com      bookfinder.com        addall.com booksprice.com


Organic Gardening and Farming; by Joseph A Cocannouer
http://www.librarything.com/work/2813829
http://books.google.com/books?id=DkMtAQAAMAAJ
http://www.worldcat.org/oclc/768090461     bookfinder.com      addall.com     booksprice.com


Organic Gardening and Farming: Using Natural Compost to Achieve a Fertile Soil; by George Joseph
Binding
http://books.google.com/books?id=ufemOAAACAAJ
http://www.worldcat.org/oclc/16433071


Organic Gardening Down South: Deep South Gardening the Organic Way; by Nellie Neal
http://www.librarything.com/work/6629703
http://books.google.com/books?id=EijAOgAACAAJ
http://www.worldcat.org/oclc/245588033
~ Kindle book     allbookstores.com    bing.com    bookfinder.com      yahoo.com
~
Organic Gardening for City Dwellers; by Walter Harter
http://www.librarything.com/work/3605472
http://books.google.com/books?id=gyulGwAACAAJ
http://www.worldcat.org/oclc/629164      bookfinder.com        addall.com      booksprice.com


Organic Gardening for Health and Nutrition: An Introduction to the Method of Bio-dynamic
Gardening Inaugurated by Rudolf Steiner
http://www.librarything.com/work/2924530
http://books.google.com/books?id=86Y6qCo8-tAC
http://www.worldcat.org/oclc/550329     bookfinder.com      addall.com     booksprice.com


Organic Gardening in Australia: The Complete Guide to Natural and Chemical-Free Gardening; by
Pauline Pears
http://www.librarything.com/work/1456190
http://books.google.com/books?id=TnmkAAAACAAJ
http://www.worldcat.org/oclc/62537528    bookfinder.com       addall.com   booksprice.com


Organic Gardening for Kids; by Elizabeth J. Scholl
http://www.librarything.com/work/8369060
http://books.google.com/books?isbn=1584158158
http://www.worldcat.org/oclc/302188955        bookfinder.com      addall.com      booksprice.com


Organic Orcharding: A Grove of Trees to Live In; by Gene Logsdon
http://www.librarything.com/work/1005577
http://books.google.com/books?id=N_A4AQAAIAAJ
http://www.worldcat.org/oclc/7572475     bookfinder.com      addall.com         booksprice.com


Organic Summerfruit: Resource Guide
http://www.worldcat.org/oclc/156741857


Oriental Vegetables: The Complete Guide for the Gardening Cook; by Joy Larkcom
http://www.librarything.com/work/819973
http://books.google.com/books?id=Reqk636tqWAC
http://www.worldcat.org/oclc/23286099    bookfinder.com      addall.com      booksprice.com
~
Our Heritage of Old Roses; by Judyth A. McLeod
http://www.librarything.com/work/3430454
http://books.google.com/books?id=gZE_AAAAYAAJ
http://www.worldcat.org/oclc/18569608      bookfinder.com       addall.com     booksprice.com


Passionate Gardening: Good Advice for Challenging Climates; by Lauren Springer
http://books.google.com/books?id=p0qDdFXBP-YC
http://www.librarything.com/work/177018
http://www.worldcat.org/oclc/42580378    bookfinder.com       addall.com     booksprice.com


Patio Produce: How to Cultivate a Lot of Home-grown Vegetables from the Smallest Possible Space;
by Paul Peacock
http://www.librarything.com/work/9820106
http://books.google.com/books?id=QL11PAAACAAJ
http://www.worldcat.org/oclc/666975438     bookfinder.com    addall.com     booksprice.com


Patio Rooftop and Balcony Gardening; by Violet W. Stevenson
http://books.google.com/books?id=aMI_AAAAYAAJ
http://www.worldcat.org/oclc/2753543


Pay Dirt: Farming and Gardening with Composts; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/1889982
http://books.google.com/books?id=ZhyNuQAACAAJ
http://www.worldcat.org/oclc/3441125   bookfinder.com       addall.com    booksprice.com


Planning the Organic Vegetable Garden: For Healthy Crops Throughout the Year; by Dick Kitto
http://www.librarything.com/work/1284115
http://books.google.com/books?id=PwNIAAAAYAAJ
http://www.worldcat.org/oclc/28854313    bookfinder.com      addall.com    booksprice.com


Plant Hunters In The Andes; by Thomas Harper Goodspeed
http://www.librarything.com/work/385738
http://books.google.com/books?id=W_k2OoJIsSYC
http://www.worldcat.org/oclc/487689    bookfinder.com         addall.com     booksprice.com
~
Plant Hunting, Volume 1; by Ernest H. Wilson
http://www.librarything.com/work/9414707
http://books.google.com/books?id=H_IIAAAACAAJ
http://www.worldcat.org/oclc/792106871       bookfinder.com     addall.com      booksprice.com


Plant Hunting, Volume 2; by Ernest H. Wilson
http://www.librarything.com/work/9414722
http://books.google.com/books?id=Svj0PAAACAAJ
http://www.worldcat.org/oclc/791733587       bookfinder.com     addall.com      booksprice.com


Plant Hunting in China: A History of Botanical Exploration in China and the Tibetan Marches; by
Euan Hillhouse Methven Cox
http://www.librarything.com/work/2261689
http://books.google.com/books?id=_AYQAQAAMAAJ
http://www.worldcat.org/oclc/1892343     bookfinder.com       addall.com      booksprice.com


Plant Hunting on the Edge of the World: Travels of a Naturalist in Assam and Upper Burma
http://www.librarything.com/work/1741975
http://books.google.com/books?id=HQBHAAAAYAAJ
http://www.worldcat.org/oclc/2508235     bookfinder.com        addall.com    booksprice.com


Plants and People of Nepal; by Narayan P. Manandha
http://www.librarything.com/work/2248639
http://books.google.com/books?id=klAFeYz4YdYC
http://www.worldcat.org/oclc/47136567      bookfinder.com      addall.com      booksprice.com


Plant Genetic Resources Conservation and Use in China; by Weidong Gao
http://books.google.com/books?id=-uSQL5cE_7EC
http://www.worldcat.org/oclc/54531182


Potatoes on Rooftops: Farming in the City; by Hadley Dyer
http://www.librarything.com/work/13294003
http://books.google.com/books?id=hg6xuAAACAAJ
http://www.worldcat.org/oclc/780360587        bookfinder.com    addall.com      booksprice.com
~
Potted Plant Organic Care; by Jody Main
http://books.google.com/books?id=jwHjPQAACAAJ
http://www.worldcat.org/oclc/5494162


Practical Organic Gardening; by Ben Easey
http://www.librarything.com/work/2151831
http://books.google.com/books?id=EKiWPwAACAAJ
http://www.worldcat.org/oclc/2597501      bookfinder.com      addall.com     booksprice.com


Practical Organic Gardening; by David Palliser
http://www.librarything.com/work/11601590
http://www.worldcat.org/oclc/28926555


Promoting the Conservation and Use of Underutilized and Neglected Crops
http://books.google.com/books?id=zZWylgEACAAJ
http://www.worldcat.org/oclc/183241733


Producing Your Own Power: How to Make Nature's Energy Sources Work for You ; by Carol Hupping
Stoner
http://www.librarything.com/work/898813
http://books.google.com/books?id=k6QDlwEACAAJ
http://www.worldcat.org/oclc/934750   bookfinder.com   addall.com    booksprice.com


Purple Citrus and Sweet Perfume: Cuisine of the Eastern Mediterranean ; by Silvena Rowe
http://www.librarything.com/work/9859257
http://books.google.com/books?id=o8-Q-QgKvH0C
http://www.worldcat.org/oclc/670475456
~ Kindle book     ~ Nook book    allbookstores.com      bing.com     bookfinder.com


Quaker Plant Hunters: From North America's Early Frontier to the South Pacific; by David Sox
http://www.librarything.com/work/5706424
http://books.google.com/books?id=7P8fAQAAIAAJ
http://www.worldcat.org/oclc/55222778    bookfinder.com        addall.com     booksprice.com
~
Rapid Tomato Ripening for Nurseryman and Amateur. With Notes on Possible Application to Other
Fruit; by Lawrence D. Hills
http://books.google.com/books?id=2DMQMwEACAAJ
http://www.worldcat.org/oclc/8015039


Recovering Our Ancestors' Gardens: Indigenous Recipes And Guide to Diet And Fitness; by Devon
Abbott Mihesuah
http://www.librarything.com/work/3146467
http://books.google.com/books?id=OKoiCm09p6sC
http://www.worldcat.org/oclc/62147981    bookfinder.com    addall.com      booksprice.com


Redwoods and Roses: The Gardening Heritage of California and the Old West ; by Maureen Gilmer
http://www.librarything.com/work/7525672
http://books.google.com/books?id=bsI-TTBhJ-8C
http://www.worldcat.org/oclc/32822463    bookfinder.com     addall.com       booksprice.com


RHS Grow Your Own Crops in Pots: with 30 Step-by-Step Projects Using Vegetables, Fruit and
Herbs; by Kay Maguire
http://books.google.com/books?id=ZqZxMAEACAAJ
~ Kindle book     allbookstores.com  bing.com      bookfinder.com     yahoo.com


Rodale's Encyclopedia of Indoor Gardening; by Anne Moyer Halpin
http://www.librarything.com/work/1240753
http://books.google.com/books?isbn=0878573194
http://www.worldcat.org/oclc/6421388    bookfinder.com      addall.com       booksprice.com


Rodale's Illustrated Encyclopedia of Herbs; by Claire Kowalchik
http://www.librarything.com/work/44867
http://books.google.com/books?id=htGD3Y7WNxwC
http://www.worldcat.org/oclc/16128781        bookfinder.com     addall.com    booksprice.com


Rodale's Illustrated Encyclopedia of Organic Gardening; by Anna Kruger
http://www.librarything.com/work/1335949
http://books.google.com/books?id=kcHZAAAACAAJ
http://www.worldcat.org/oclc/49936222      bookfinder.com       addall.com    booksprice.com
~
Roots: The Definitive Compendium with more than 225 Recipes; by Diane Morgan
http://www.librarything.com/work/12965169
http://books.google.com/books?id=EvaYfje1TCIC
http://www.worldcat.org/oclc/783157666
~ Kindle book     ~ Nook book    allbookstores.com   bing.com      bookfinder.com


Roots, Shoots, Buckets and Boots: Gardening Together With Children; by Sharon Lovejoy
http://www.librarything.com/work/32322
http://books.google.com/books?id=gQ6bCIOo7xUC
http://www.worldcat.org/oclc/40856801     bookfinder.com    addall.com       booksprice.com


Russian Comfrey: A Hundred Tons an Acre of Stock Feed or Compost for Farm, Garden or Small-
holding; by Lawrence D. Hills
http://www.librarything.com/work/9779309
http://books.google.com/books?id=RbdrQgAACAAJ
http://www.worldcat.org/oclc/630857   bookfinder.com     addall.com     booksprice.com


Save Your Own Seed, United Kingdom; by Lawrence Donegan Hills
http://www.librarything.com/work/10627157
http://books.google.com/books?id=toauMwEACAAJ
http://www.worldcat.org/oclc/16431723   bookfinder.com    addall.com         booksprice.com


Secrets of Master Gardeners; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/2685007
http://books.google.com/books?id=k2gjAQAAMAAJ
http://www.worldcat.org/oclc/10208123      bookfinder.com    addall.com      booksprice.com


Seed Production for the Australian Home Vegetable Gardener; by Allen Barry
http://www.librarything.com/work/4683126
http://books.google.com/books?id=jpsgAQAACAAJ
http://www.worldcat.org/oclc/27611231    bookfinder.com        addall.com    booksprice.com


Seed Saving Techniques of the National Colonial Farm; by Mary Ann Klein
http://books.google.com/books?id=dhRIAAAAYAAJ
http://www.worldcat.org/oclc/13029646
~
Seeds: The Definitive Guide To Growing, History, And Lore; by H. Peter Loewer
http://www.librarything.com/work/1933582
http://books.google.com/books?id=Yorr0tXFx2IC
http://www.worldcat.org/oclc/33007755    bookfinder.com       addall.com      booksprice.com


Seeds Blüm: Heirloom Seeds and Other Garden Gems, 1989-90; by Jan Blüm
http://books.google.com/books?id=mFUEHAAACAAJ
http://www.worldcat.org/oclc/41769983


Sonoran Desert Food Plants: Edible Uses for the Desert's Wild Bounty; by Charles W. Kane
http://www.librarything.com/work/12390574
http://books.google.com/books?id=DpgqKQEACAAJ
http://www.worldcat.org/oclc/721825958      bookfinder.com      addall.com       booksprice.com


South Indian Fruits and Their Culture; by Kullal Chickappu Naik
http://books.google.com/books?id=WhpBAAAAYAAJ
http://www.worldcat.org/oclc/151839


Sowing Seeds for Change: Sustainable Agriculture, Biodiversity and Food Security; by Unitarian
Service Committee of Canada
http://books.google.com/books?id=ZsD3MgAACAAJ
http://www.worldcat.org/oclc/181786488


Small Green Roofs: Low-Tech Options for Homeowners; by Nigel Dunnett
http://www.librarything.com/work/11164186
http://books.google.com/books?id=ENYxgGk_5DMC
http://www.worldcat.org/oclc/666223954    bookfinder.com     addall.com         booksprice.com


Small Is Bountiful: Grow Your Own Vegetables and Fruit in Small Spaces; by Liz Dobbs
http://www.librarything.com/work/12500919
http://books.google.com/books?id=-4xNtQAACAAJ
http://www.worldcat.org/oclc/762992186    bookfinder.com     addall.com        booksprice.com
~
Small-Space Gardening: How To Successfully Grow Flowers And Fruits In Containers And Pots; by
H. Peter Loewer
http://www.librarything.com/work/177197
http://books.google.com/books?id=F2F8vBXKNn4C
http://www.worldcat.org/oclc/51258326   bookfinder.com    addall.com     booksprice.com


Small-Space Container Gardens: Transform Your Balcony, Porch, or Patio with Fruits, Flowers,
Foliage, and Herbs; by Fern Richardson
http://www.librarything.com/work/12036792
http://books.google.com/books?id=JfWtESZLP4EC
http://www.worldcat.org/oclc/704380959
~ Kindle book     ~ Nook book      allbookstores.com bing.com     bookfinder.com


Soil Fertility, Renewal & Preservation. Bio-dynamic Farming and Gardening; by Ehrenfried Pfeiffer
http://www.librarything.com/work/9469391
http://books.google.com/books?id=zKsIMwEACAAJ
http://www.worldcat.org/oclc/12449048       bookfinder.com    addall.com      booksprice.com


Sprouts The Miracle Food: The Complete Guide to Sprouting; by Steve Meyerowitz
http://www.librarything.com/work/1036396 http://www.bookfinder.com
http://books.google.com/books?id=dkzs8HHDDtsC
http://www.worldcat.org/oclc/42694430


Step by Step Organic Vegetable Gardening: The Gardening Classic Revised; by Shepherd Ogden
http://www.librarything.com/work/118018 http://www.bookfinder.com
http://books.google.com/books?id=REeAu6rjifQC
http://www.worldcat.org/oclc/25914761    bookfinder.com     addall.com       booksprice.com


Sunshine to Dollars: Capturing Free Solar Energy at Little Or No Cost; by Steven E. Harris
http://www.librarything.com/work/2495217
http://books.google.com/books?id=_4UWMwAACAAJ
http://www.worldcat.org/oclc/692637668      bookfinder.com       addall.com       booksprice.com


Super Nutrition Gardening: How to Grow Your Own Powercharged Foods; by Dr. William S. Peavy
http://www.librarything.com/work/509355
http://books.google.com/books?id=YSHVGuHLBkQC
http://www.worldcat.org/oclc/26303775   bookfinder.com   addall.com      booksprice.com
~
Survival Gardening; by John A. Freeman
http://www.librarything.com/work/755306
http://books.google.com/books?id=6q8QAQAAMAAJ
http://www.worldcat.org/oclc/10244668   bookfinder.com        addall.com        booksprice.com


Suppliers of organic, non-GE, or heirloom vegetable seed; by Katherine L Adam
http://books.google.com/books?id=zeVXHQAACAAJ
http://www.worldcat.org/oclc/46956657


Survival Acre: 50 Nationwide Wild Foods and Medicines; by Linda Runyon
http://www.librarything.com/work/2924946
http://books.google.com/books?id=5YVcSnpt7Z4C
http://www.worldcat.org/oclc/525219531    bookfinder.com       addall.com        booksprice.com


Success with Organic Fruit; by Yvonne Cuthbertson
http://www.librarything.com/work/3323832
http://books.google.com/books?id=vVcmAAAACAAJ
http://www.worldcat.org/oclc/85839068      bookfinder.com     addall.com        booksprice.com


Sustainable Agriculture and Resistance: Transforming Food Production in Cuba; by Fernando Funes
http://www.librarything.com/work/1314816
http://books.google.com/books?id=U0FgAAAAMAAJ
http://www.worldcat.org/oclc/48557628      bookfinder.com     addall.com     booksprice.com


Sustainable Market Farming: Intensive Vegetable Production on a Few Acres; by Lynn Byczynski
http://www.librarything.com/work/13371090
http://books.google.com/books?id=JlIwbBcglxEC
http://www.worldcat.org/oclc/816764351
~ Kindle book     ~ Nook book    allbookstores.com    bing.com      bookfinder.com



Taylor's Pocket Guide to Old-Fashioned Roses; by Maggie Oster
http://www.librarything.com/work/5162346
http://books.google.com/books?id=9HEjAQAAMAAJ
http://www.worldcat.org/oclc/20998199    bookfinder.com       addall.com        booksprice.com
~
Taylor's Guide to Heirloom Vegetables: A Complete Guide to the Best Historic and Ethnic Varieties;
by Benjamin A Watson
http://www.librarything.com/work/258380
http://books.google.com/books?id=wTYcr8mgXbcC
http://www.worldcat.org/oclc/32891387     bookfinder.com     addall.com      booksprice.com


Texas Fruit and Vegetable Gardening: Plant, Grow, and Eat the Best Edibles for Texas Gardens ; by
Greg Grant
http://books.google.com/books?id=LdR9QPutjHgC
http://www.worldcat.org/oclc/711045857


The A-Z of Vegetable Gardening in South Africa: Everthing You Need to Know for Successful
Vegetable Gardening; by Jack Hadfield
http://www.librarything.com/work/9182990
http://books.google.com/books?id=k9VPtbNk2asC
http://www.worldcat.org/oclc/14966726    bookfinder.com      addall.com   booksprice.com


The All Natural Vegetable Garden Art and Science; by Donald A. McAndrew
http://books.google.com/books?id=7EGxRwlhJDYC


The Alternative Kitchen Garden: An A-Z; by Emma Cooper
http://www.librarything.com/work/9954969
http://books.google.com/books?id=_MBl1madZfgC
http://www.worldcat.org/oclc/613439133      bookfinder.com       addall.com     booksprice.com


The Apple Grower: Guide for the Organic Orchardist; by Michael Phillips
http://www.librarything.com/work/1376088
http://books.google.com/books?id=G0Faik1mSp0C
http://www.worldcat.org/oclc/38731995
~ Kindle book     ~ Nook book    allbookstores.com      bing.com      bookfinder.com


The Arrows Cookbook: Cooking and Gardening from Maine's Most Beautiful Farmhouse Restaurant;
by Clark Frasier,
http://www.librarything.com/work/114040
http://books.google.com/books?id=1WDmacEqXPoC
http://www.worldcat.org/oclc/51607604
~ Kindle book     ~ Nook book    allbookstores.com bing.com    bookfinder.com
~
The Australian Vegetable Garden: What's New is Old; by Clive Blazey
http://www.librarything.com/work/181491
http://books.google.com/books?id=yT89twAACAAJ
http://www.worldcat.org/oclc/222605336    bookfinder.com        addall.com      booksprice.com


The Art of Natural Farming and Gardening; by Ralph Engelken
http://www.librarything.com/work/9665299
http://books.google.com/books?id=3_k4AQAAIAAJ
http://www.worldcat.org/oclc/8462536    bookfinder.com      addall.com        booksprice.com


The Art of Promoting The Growth of The Cucumber And Melon: In A Series of Directions for The
Best Means To Be Adopted In Bringing Them To A Complete State of Perfection ; by Thomas
Watkins
http://books.google.com/books?id=W88GAAAAQAAJ
http://www.worldcat.org/oclc/747739218
~ Kindle book     ~ Nook book    allbookstores.com bing.com      bookfinder.com


The Australian Vegetable Gardening Encyclopedia; by Brenda Little
http://www.librarything.com/work/3248458
http://books.google.com/books?id=QRm2AAAACAAJ
http://www.worldcat.org/oclc/27547543    bookfinder.com       addall.com       booksprice.com


The Backyard Berry Book: A Hands-On Guide to Growing Berries, Brambles, and Vine Fruit in the
Home Garden; by Stella Otto
http://www.librarything.com/work/67303
http://books.google.com/books?id=XaIQAQAAMAAJ
http://www.worldcat.org/oclc/32324896  bookfinder.com     addall.com     booksprice.com


The Basic Book of Organic Gardening; Rodale Organic Gardening Magazine
http://www.librarything.com/work/433000
http://books.google.com/books?id=I76gHAAACAAJ
http://www.worldcat.org/oclc/117865   bookfinder.com     addall.com    booksprice.com


The Basic Book of Organically Grown Foods; by M. C. Goldman
http://www.librarything.com/work/7481557
http://books.google.com/books?id=FuAMRAAACAAJ
http://www.worldcat.org/oclc/570540   bookfinder.com      addall.com         booksprice.com
~
The Beginner's Guide to Growing Heirloom Vegetables: The 100 Easiest-to-Grow, Tastiest-to-Eat
Vegetables for Your Garden; by Marie Iannotti
http://www.librarything.com/work/12027023
http://books.google.com/books?id=VqRG_6KQewwC
http://www.worldcat.org/oclc/704380983
~ Kindle book     ~ Nook book     allbookstores.com  bing.com     bookfinder.com


The Bio-Gardener's Bible; by Lee Fryer
http://www.librarything.com/work/2625846
http://books.google.com/books?id=iJlFAAAAYAAJ
http://www.worldcat.org/oclc/8628421   bookfinder.com       addall.com     booksprice.com


The Bountiful Solar Greenhouse: A Guide to Year-Round Food Production; by Shane Smith
http://www.librarything.com/work/2426151
http://books.google.com/books?id=p3OQHQAACAAJ
http://www.worldcat.org/oclc/8520492    bookfinder.com    addall.com       booksprice.com


The Broccoli Sprouts Breakthrough: The New Miracle Food for Cancer Prevention; by Deborah
Mitchell
http://www.librarything.com/work/4760673
http://books.google.com/books?id=VtpdHAAACAAJ
http://www.worldcat.org/oclc/39889843    bookfinder.com     addall.com     booksprice.com


The City People's Book of Raising Food; by Helga Olkowski
http://www.librarything.com/work/3501360
http://books.google.com/books?id=z8WrZCxwj-QC
http://www.worldcat.org/oclc/1177811      bookfinder.com    addall.com     booksprice.com


The Complete Book of Fruit Growing in Australia: Over 200 Temperate and Subtropical Fruits, Nuts
and Berries to Grow in Gardens, Farms Or Orchards; by Louis Glowinski
http://www.librarything.com/work/181512
http://books.google.com/books?id=z0D1PgAACAAJ
http://www.worldcat.org/oclc/222049322    bookfinder.com       addall.com   booksprice.com
~
The Complete Book of Garlic: A Guide for Gardeners, Growers, and Serious Cooks ; by Ted Jordan
Meredith
http://www.librarything.com/work/5672975
http://books.google.com/books?id=Hsf-43XvEnkC
http://www.worldcat.org/oclc/172521653    bookfinder.com      addall.com    booksprice.com


The Complete Book of Potatoes: What Every Grower and Gardener Needs to Know; by Hielke De
Jong
http://www.librarything.com/work/11128468
http://books.google.com/books?id=H0oIth3qOnMC
http://www.worldcat.org/oclc/656556669
~ Kindle book     ~ Nook book    allbookstores.com  bing.com    bookfinder.com


The Complete Chilli Pepper Book: A Gardener's Guide to Choosing, Growing, Preserving, and
Cooking; by Dave DeWitt
http://www.librarything.com/work/9045114
http://books.google.com/books?id=90M5Tw0530gC
http://www.worldcat.org/oclc/310224857
~ Kindle book     ~ Nook book    allbookstores.com    bing.com    bookfinder.com


The Complete Compost Gardening Guide: Banner Batches, Grow Heaps, Comforter Compost, and
Other Amazing Techniques for Saving Time and Money, and Producing the Most Flavorful,
Nutritous Vegetables Ever; by Barbara Pleasant
http://www.librarything.com/work/5022973
http://books.google.com/books?id=lV5QKHxICbgC
http://www.worldcat.org/oclc/171113154
~ Kindle book     ~ Nook book      allbookstores.com bing.com   bookfinder.com


The Complete Guide to Saving Seeds: 322 Vegetables, Herbs, Fruits, Flowers, Trees, and Shrub ; by
Robert E. Gough
http://www.librarything.com/work/11050047
http://books.google.com/books?id=EuQ4eWtUGlwC
http://www.worldcat.org/oclc/681503214
~ Kindle book     ~ Nook book    allbookstores.com   bing.com       bookfinder.com


The Complete Handbook of Solar Air Heating Systems; by Steve Kornher
http://www.librarything.com/work/1956010
http://books.google.com/books?id=ltUhPQAACAAJ
http://www.worldcat.org/oclc/9619424   bookfinder.com       addall.com       booksprice.com
~
The Complete Idiot's Guide to Heirloom Vegetables; by Chris McLaughlin
http://www.librarything.com/work/10957629
http://books.google.com/books?id=r3IaTHvsFQEC
http://www.worldcat.org/oclc/555647743
~ Kindle book     ~ Nook book     allbookstores.com     bing.com    bookfinder.com


The Compleat Squash: A Passionate Grower's Guide to Pumpkins, Squashes, and Gourds ; by Amy
Goldman
http://www.librarything.com/work/1604533
http://books.google.com/books?id=yzPyDsVBmGcC
http://www.worldcat.org/oclc/55595969    bookfinder.com    addall.com     booksprice.com


The Edible Flower Garden; by Rosalind Creasy
http://www.librarything.com/work/326878
http://books.google.com/books?id=AwGJVW948mwC
http://www.worldcat.org/oclc/39713714
~ Kindle book     ~ Nook book     allbookstores.com   bing.com      bookfinder.com


The Edible Heirloom Garden; by Rosalind Creasy
http://www.librarything.com/work/1141998
http://books.google.com/books?id=-OkJAQAAMAAJ
http://www.worldcat.org/oclc/39748087     bookfinder.com     addall.com    booksprice.com


The Edible Mexican Garden; by Rosalind Creasy
http://www.librarything.com/work/1141988
http://books.google.com/books?id=hAgHAAAACAAJ
http://www.worldcat.org/oclc/42603342     bookfinder.com     addall.com    booksprice.com


The Encyclopaedia of Antique Roses, Volume 4; by Robert E. Edberg
http://books.google.com/books?id=oI78ewEACAAJ
http://www.worldcat.org/oclc/62696925


The Everything Small-Space Gardening Book; by Catherine Abbott
http://www.librarything.com/work/12342322
http://books.google.com/books?id=uaafcoXyWvgC
http://www.worldcat.org/oclc/731912727
~ Kindle book     ~ Nook book    allbookstores.com    bing.com      bookfinder.com
~
The Field and Garden Vegetables of America; by Fearing Burr
http://www.librarything.com/work/1927023
http://books.google.com/books?id=iosMAAAAYAAJ
http://www.worldcat.org/oclc/11110977
~ Kindle book     ~ Nook book    allbookstores.com      bing.com      bookfinder.com


The Findhorn Garden Story; by The Findhorn Community
http://www.librarything.com/work/6109522
http://books.google.com/books?id=Uv4jetYoAvMC
http://www.worldcat.org/oclc/182735547
~ Kindle book     ~ Nook book     allbookstores.com  bing.com         bookfinder.com


The Founding Gardeners: How the Revolutionary Generation created an American Eden ; by Andrea
Wulf
http://www.librarything.com/work/10919003
http://books.google.com/books?id=0LvbOyzZFocC
http://www.worldcat.org/oclc/694616489
~ Kindle book     ~ Nook book    allbookstores.com  bing.com      bookfinder.com


The Fruits and Fruit Trees of Monticello; by Peter J. Hatch
http://www.librarything.com/work/1375508
http://books.google.com/books?id=lDHz7htpBTUC
http://www.worldcat.org/oclc/36499097         bookfinder.com   addall.com      booksprice.com


The Gourmet Gardener: Growing Choice Fruits and Vegetables With Spectacular Results; by Annie E.
Proulx
http://www.librarything.com/work/2749360
http://books.google.com/books?id=KukqX3npryMC
http://www.worldcat.org/oclc/15645025    bookfinder.com    addall.com     booksprice.com


The Great Exotic Fruit Book: A Handbook of Tropical and Subtropical Fruits, With Recipes ; by by
Norman Van Aken
http://www.librarything.com/work/772029
http://books.google.com/books?id=41JIi52wYP0C
http://www.worldcat.org/oclc/31867506    bookfinder.com      addall.com      booksprice.com
~
The Guide to Antique Roses; by Antique Rose Emporium
http://www.librarything.com/work/10771704
http://books.google.com/books?id=NCyaMwAACAAJ
http://www.worldcat.org/oclc/182540828      bookfinder.com        addall.com      booksprice.com


The Handbook for Fruit Explorers; by Ram Fishman
http://www.librarything.com/work/366720
http://books.google.com/books?id=RVMjAQAAMAAJ
http://www.worldcat.org/oclc/14719291     bookfinder.com         addall.com      booksprice.com


The Heirloom Gardener: Collecting and growing old and rare varieties of vegetables and fruits ; by
Carolyn Jabs
http://www.librarything.com/work/486969
http://books.google.com/books?id=PoIgPwAACAAJ
http://www.worldcat.org/oclc/9441927    bookfinder.com      addall.com       booksprice.com


The Heirloom Life Gardener: The Baker Creek Way of Growing Your Own Food Easily and
Naturally; by Jere And Emilee Gettle
http://www.librarything.com/work/11593525
http://books.google.com/books?id=2BBlyrmxUBoC
http://www.worldcat.org/oclc/703206541
~ Kindle book       ~ Nook book     allbookstores.com bing.com  bookfinder.com


The Heirloom Tomato: From Garden to Table: Recipes, Portraits, and History of the World's Most
Beautiful Fruit; by Amy Goldman
http://www.librarything.com/work/5971485
http://books.google.com/books?id=ZPK5PgAACAAJ
http://www.worldcat.org/oclc/180751483   bookfinder.com        addall.com      booksprice.com


The Heirloom Vegetable Garden: Gardening in the 19th Century; by Roger A Kline
http://www.librarything.com/work/8419039
http://books.google.com/books?id=SEqIAAAACAAJ
http://www.worldcat.org/oclc/8614087   bookfinder.com      addall.com      booksprice.com
~
The History and Survival of Traditional Heirloom Vegetable Varieties and Strategies for the
Conservation of Crop Biodiversity in the Southern Appalachian Mountains of Western North
Carolina; by James Robert Veteto
http://books.google.com/books?id=IvqYNwAACAAJ
http://www.worldcat.org/oclc/64173401


The Juice Lady's Guide to Juicing for Health: Unleashing the Healing Power of Whole Fruits and
Vegetables; by Cherie Calbom
http://www.librarything.com/work/746461
http://books.google.com/books?id=edLAjKSWvWQC
http://www.worldcat.org/oclc/59345018
~ Kindle book      ~ Nook book     allbookstores.com    bing.com      bookfinder.com


The Healing Powers of Fruits And Vegetables; by Bernard Jensen
http://books.google.com/books?id=2_JWpOI-4jcC
http://www.worldcat.org/oclc/427638780


The Healing Power of Chlorophyll from Plant Life; by Bernard Jensen
http://www.librarything.com/work/2082071
http://books.google.com/books?id=T6HolwEACAAJ
http://www.worldcat.org/oclc/31819287    bookfinder.com        addall.com     booksprice.com


The Healing Power of Fruits Vegetables and Herbs; by Doctor John Heinerman
http://www.librarything.com/work/1004911
http://books.google.com/books?id=4UqQYgEACAAJ
http://www.worldcat.org/oclc/663975325
~ Kindle book     allbookstores.com     bing.com       bookfinder.com    yahoo.com


The Healing Power of Juicing; by Doctor John Heinerman
~ Kindle book   ~ Nook book        allbookstores.com   bing.com      bookfinder.com


The Gardner's Guide to Better Soil; by Gene Logsdon
http://www.librarything.com/work/1697092
http://books.google.com/books?id=lr0dAQAAMAAJ
http://www.worldcat.org/oclc/1733769       bookfinder.com     addall.com     booksprice.com
~
The Grape Grower: A Guide to Organic Viticulture; by Lon J. Rombough
http://www.librarything.com/work/372432
http://books.google.com/books?id=RlcIZ2HbUvYC
http://www.worldcat.org/oclc/49351733
~ Kindle book     ~ Nook book    allbookstores.com     bing.com    bookfinder.com


The Great Vegetable Plot: Delicious Varieties to Grow and Eat; by Sarah Raven
http://www.librarything.com/work/2860467
http://books.google.com/books?id=s2-LajPCjG8C
http://www.worldcat.org/oclc/85839031      bookfinder.com       addall.com    booksprice.com


The Green Gardener: Sustainable Gardening in Your Own Backyard; by Cundall Byrne
http://www.librarything.com/work/4272825
http://books.google.com/books?id=jRfWAAAACAAJ
http://www.worldcat.org/oclc/156660891    bookfinder.com    addall.com      booksprice.com


The Holistic Orchard: Tree Fruits and Berries the Biological Way; by Michael Phillips
http://www.librarything.com/work/11949597
http://books.google.com/books?id=zwHotVXtnfsC
http://www.worldcat.org/oclc/719429796
~ Kindle book     ~ Nook book      allbookstores.com     bing.com      bookfinder.com


The Issues of Organic Foods and Organic Gardening; by Adams E. Blakely
http://www.google.com
http://www.bing.com


The Kitchen Gardener's Guide; by Donald J. Berg
http://www.librarything.com/work/819853
http://books.google.com/books?id=Rw1IAAAAYAAJ
http://www.worldcat.org/oclc/16349405      bookfinder.com     addall.com      booksprice.com


The Little Book of Old Roses; by Hazel Le Rougetel
http://www.librarything.com/work/1527206
http://books.google.com/books?id=UPhHAAAAYAAJ
http://www.worldcat.org/oclc/25914678      bookfinder.com     addall.com      booksprice.com
~
The Last Great Plant Hunt: The Story of Kew’s Millenium Seed Bank by Carolyn Fry
http://www.librarything.com/work/12301674
http://books.google.com/books?id=to0GRQAACAAJ
http://www.worldcat.org/oclc/587209618     bookfinder.com     addall.com    booksprice.com


The MacMillan Book of Organic Gardening; by Marie Luise Kreuter
http://www.librarything.com/work/1306533
http://books.google.com/books?id=4utFAAAAYAAJ
http://www.worldcat.org/oclc/11971269    bookfinder.com     addall.com       booksprice.com


The Magic of Findhorn; by Paul Hawken
http://www.librarything.com/work/136955
http://books.google.com/books?id=a_s9d85m2jAC
http://www.worldcat.org/oclc/1217386    bookfinder.com      addall.com      booksprice.com


The Maritime Northwest Garden Guide: Planning Calendar for Year-round Organic Gardening; by
Carl W. Elliott
http://www.librarything.com/work/326799
http://books.google.com/books?id=Zo3FMQAACAAJ
http://www.worldcat.org/oclc/39671810   bookfinder.com      addall.com    booksprice.com


The Mexican Kitchen Garden; by John Meeker
http://www.librarything.com/work/4894087
http://books.google.com/books?id=hAgHAAAACAAJ
http://www.worldcat.org/oclc/37310846    bookfinder.com       addall.com     booksprice.com


The Middle East Garden Traditions, Unity, and Diversity: Questions, Methods and Resources in a
Multicultural Perspective
http://www.librarything.com/work/8200503
http://books.google.com/books?id=U-NDmuj9I8cC
http://www.worldcat.org/oclc/85830776     bookfinder.com       addall.com    booksprice.com


The Natural Gardener; by Roger Grounds
http://books.google.com/books?id=8RM2AAAAMAAJ
http://www.worldcat.org/oclc/2213136
~
The New Zealand Compost Book; by David A. Taylor
http://www.librarything.com/work/12141317
http://books.google.com/books?id=DsehPQAACAAJ
http://www.worldcat.org/oclc/154631290    bookfinder.com       addall.com      booksprice.com


The Organic Garden Book; by Geoff Hamilton
http://www.librarything.com/work/338265
http://books.google.com/books?id=V9FFAAAAYAAJ
http://www.worldcat.org/oclc/617579941     bookfinder.com      addall.com      booksprice.com


The Organic Home Garden: How to Grow Fruits and Vegetables Naturally; by Patrick Lima
http://www.librarything.com/work/572230
http://books.google.com/books?id=k-zelpmUSHcC
http://www.worldcat.org/oclc/54498090
~ Kindle book     ~ Nook book    allbookstores.com bing.com     bookfinder.com


The Organic Gardener's Complete Guide to Vegetables and Fruits; by Rodale Organic Gardening
Magazine
http://www.librarything.com/work/7488528
http://books.google.com/books?id=ITkjAQAAMAAJ
http://www.worldcat.org/oclc/7922881   bookfinder.com      addall.com       booksprice.com


The Organic Method Primer Update, A Practical Explanation: The How and Why for the Beginner
and the Experience; by Bargyla Rateaver
http://www.librarything.com/work/950134
http://books.google.com/books?id=rYANAQAACAAJ
http://www.worldcat.org/oclc/29660866   bookfinder.com       addall.com  booksprice.com


The Organic Vegetable Garden: Improving the Soil Naturally; by Mary Moody
http://www.librarything.com/work/2569597
http://books.google.com/books?id=WWwxAAAACAAJ
http://www.worldcat.org/oclc/27553380    bookfinder.com        addall.com     booksprice.com


The Organic Way to Mulching; by Robert Rodale
http://www.librarything.com/work/1184465
http://books.google.com/books?id=5JsdAQAAMAAJ
http://www.worldcat.org/oclc/238315    bookfinder.com       addall.com      booksprice.com
~
The Ornamental Kitchen Garden; by Janet W. MacDonald
http://www.librarything.com/work/1590603
http://books.google.com/books?id=JRBIAAAAYAAJ
http://www.worldcat.org/oclc/32859065     bookfinder.com         addall.com      booksprice.com


The Pepper Garden: From the Sweetest Bell to the Hottest Habanero; by Dave DeWitt
http://www.librarything.com/work/257612
http://books.google.com/books?id=mjKwHAAACAAJ
http://www.worldcat.org/oclc/28710727    bookfinder.com       addall.com     booksprice.com


The Perfect Plot: Starting an Allotment from Scratch; by Kim Sayer
http://books.google.com/books?id=ME8HywAACAAJ
http://www.worldcat.org/oclc/766340083


The Plant Hunters: The Adventures of the World's Greatest Botanical Explorers; by Carolyn Fry
http://www.librarything.com/work/8542919
http://books.google.com/books?id=rRmDtwAACAAJ
http://www.worldcat.org/oclc/276647746    bookfinder.com       addall.com       booksprice.com


The Plant Hunters: Two Hundred Years of Adventure and Discovery Around the World ; by Toby
Musgrave
http://www.librarything.com/work/630189
http://books.google.com/books?id=JO-jQgAACAAJ
http://www.worldcat.org/oclc/40250278
~ Kindle book     ~ Nook book    allbookstores.com   bing.com    bookfinder.com


The Plant Hunters: True Stories of Their Daring Adventures to the Far Corners of the Earth ; by Anita
Silvey
http://www.librarything.com/work/11743215
http://books.google.com/books?id=ak8lKQEACAAJ
http://www.worldcat.org/oclc/707626602       bookfinder.com      addall.com      booksprice.com


The Plant Hunters or Adventures Among the Himalaya Mountainsthe Plant Hunters Or Adventures
Among the Himalaya Mountains; by Mayne Reid
http://www.librarything.com/work/7037061
http://books.google.com/books?id=Ra0BAAAAQAAJ
http://www.worldcat.org/oclc/47292299
~ Kindle book     ~ Nook book    allbookstores.com  bing.com     bookfinder.com
~
The Plant Hunter's Garden: The New Explorers and Their Discoveries; by Bobby J. Ward
http://www.librarything.com/work/2761601
http://books.google.com/books?id=FQIIHEHu1EQC
http://www.worldcat.org/oclc/54881927    bookfinder.com      addall.com      booksprice.com


The Polytunnel Book: Fruit and Vegetables All Year Round; by Joyce Russell
http://www.librarything.com/work/11432199
http://books.google.com/books?id=j-f9Xi0Q7QkC
http://www.worldcat.org/oclc/656451029     bookfinder.com       addall.com     booksprice.com


The Playground Potting Shed: A Foolproof Guide to Gardening with Children ; by Dominic Murphy
http://www.librarything.com/work/12922250
http://books.google.com/books?id=tHUFHwAACAAJ
http://www.worldcat.org/oclc/477270934
~ Kindle book     allbookstores.com    bing.com      bookfinder.com     yahoo.com


The Rancho Gordo Heirloom Bean Grower's Guide: Steve Sando's 50 Favorite Varieties; by Steve
Sando
http://www.librarything.com/work/11448571
http://books.google.com/books?id=kN-TGgPPPykC
http://www.worldcat.org/oclc/666223958
~ Kindle book     ~ Nook book    allbookstores.com bing.com      bookfinder.com


The Rodale Herb Book: How to Use, Grow, and Buy Nature's Miracle Plants; by William H. Hylton
http://www.librarything.com/work/465044
http://books.google.com/books?id=bykhAQAAIAAJ
http://www.worldcat.org/oclc/865983   bookfinder.com     addall.com      booksprice.com


The Seeds of Kokopelli: A Manual for the Production of Seeds in the Family Garden, a Directory of
Heritage Seeds; by Dominique Guillet
http://books.google.com/books?id=q9LvHAAACAAJ
http://www.worldcat.org/oclc/61214528


The Seed Underground: A Growing Revolution to Save Food; by Janisse Ray
http://www.librarything.com/work/12583401
http://books.google.com/books?id=TKLJxZPdyyQC
http://www.worldcat.org/oclc/759171799
~ Kindle book     ~ Nook book    allbookstores.com  bing.com       bookfinder.com
~
The Self-Sufficiency Bible: Window Boxes to Smallholdings - Hundreds of Ways to Become Self-
Sufficient; by Simon Dawson
http://www.librarything.com/work/12309935
http://books.google.com/books?id=J4_LQgAACAAJ
http://www.worldcat.org/oclc/805397174
~ Kindle book       ~ Nook book  allbookstores.com    bing.com    bookfinder.com


The Socio-Economic Causes and Consequences of Desertification in Central Asia; by Roy Behnke
http://www.librarything.com/work/8740971
http://books.google.com/books?id=dEM0J1Iyhy0C
http://www.worldcat.org/oclc/272298646   bookfinder.com      addall.com      booksprice.com


The Ten-Minute Gardener's Fruit-Growing Diary; by Val Bourne
http://www.librarything.com/work/11834016
http://books.google.com/books?id=Ziz9cYpzFQ4C
http://www.worldcat.org/oclc/751788965    bookfinder.com     addall.com      booksprice.com


The Ten-Minute Gardener's Vegetable-Growing Diary; by Val Bourne
http://www.librarything.com/work/11834015
http://books.google.com/books?id=h_SriF7MoUwC
http://www.worldcat.org/oclc/751788970    bookfinder.com     addall.com      booksprice.com


The Terrace Gardener's Handbook: Raising Plants on a Balcony, Terrace, Rooftop, Penthouse or
Patio; by Linda Yang
http://www.librarything.com/work/1691339
http://books.google.com/books?id=zQhIAAAAYAAJ
http://www.worldcat.org/oclc/1054140    bookfinder.com      addall.com     booksprice.com


The Underground Gardener: A Low Cost Way to Year-Round Gardening Under Glass; by Jack
Kramer
http://www.librarything.com/work/8050041
http://books.google.com/books?id=WmElAQAAMAAJ
http://www.worldcat.org/oclc/2035186   bookfinder.com  addall.com    booksprice.com


The Vegetable Finder, United Kingdom; by Lawrence Donegan Hills
http://www.librarything.com/work/2418689
http://books.google.com/books?id=F1-eAQAACAAJ
http://www.worldcat.org/oclc/3765910     bookfinder.com   addall.com       booksprice.com
~
The Wilderness Garden: Beyond Organic Gardening, Australia; by Jackie French
http://www.librarything.com/work/1089170
http://books.google.com/books?id=LTQ-GQAACAAJ
http://www.worldcat.org/oclc/225185954   bookfinder.com        addall.com    booksprice.com


Two Acre Eden; by Gene Logsdon
http://www.librarything.com/work/984987
http://books.google.com/books?id=_409NwAACAAJ
http://www.worldcat.org/oclc/195733   bookfinder.com          addall.com     booksprice.com


The Year-Round Vegetable Gardener: How to Grow Your Own Food 365 Days a Year, No Matter
Where You Live; by Niki Jabbour
http://www.librarything.com/work/12029688
http://books.google.com/books?id=cr1A4wrB7KUC
http://www.worldcat.org/oclc/704380998
~ Kindle book     ~ Nook book    allbookstores.com bing.com   bookfinder.com


The Year-Round Vegetable Gardener: The Complete Guide to Growing Vegetables and Herbs Any
Time of the Year; by Anne Moyer Halpin
http://www.librarything.com/work/9081513
http://books.google.com/books?id=C_dHAAAAYAAJ
http://www.worldcat.org/oclc/24670767    bookfinder.com   addall.com    booksprice.com


The Year-Round Harvest: A Seasonal Guide to Growing, Eating, and Preserving the Fruits and
Vegetables of Your Labor; by Catherine Abbott
http://books.google.com/books?id=yKjGtrh30V4C
http://www.worldcat.org/oclc/774595111


Tibetan Medicinal Plants; by Christa Kletter
http://www.librarything.com/work/6179434
http://books.google.com/books?id=ODrIXj-48RsC
http://www.worldcat.org/oclc/44270438        bookfinder.com     addall.com     booksprice.com


Top 100 Exotic Food Plants; by Ernest Small
http://www.librarything.com/work/8657363
http://books.google.com/books?id=1umZcQAACAAJ
http://www.worldcat.org/oclc/659750596
~ Kindle book     ~ Nook book      allbookstores.com    bing.com      bookfinder.com
~
Transition Farms: Story of 18 Farms Changing the Face of Farming in Australia; by Bev Buckley
http://books.google.com/books?id=rz70pwAACAAJ


Uncommon Fruits and Vegetables: A Commonsense Guide; by Elizabeth Schneider
http://www.librarything.com/work/23782
http://books.google.com/books?id=8z052AtUOiUC
http://www.worldcat.org/oclc/13003343   bookfinder.com    addall.com     booksprice.com


Uncommon Fruits for Every Garden; by Lee Reich
http://www.librarything.com/work/1857569
http://books.google.com/books?id=DQKlPwAACAAJ
http://www.worldcat.org/oclc/52838215
~ Kindle book     allbookstores.com    bing.com bookfinder.com             yahoo.com


Uncommon Fruits Worthy of Attention: A Gardener's Guide; by Lee Reich
http://www.librarything.com/work/114064
http://books.google.com/books?id=yiwjAQAAMAAJ
http://www.worldcat.org/oclc/22278502   bookfinder.com       addall.com         booksprice.com


Uncommon Vegetables and Fruits: How to Grow and How to Cook; by Eleanour Sinclair Rohde
http://www.librarything.com/work/2213263
http://books.google.com/books?id=uabtMgEACAAJ
http://www.worldcat.org/oclc/6402615   bookfinder.com   addall.com      booksprice.com


Underutilized and Underexploited Horticultural Crops, Volume 4; by K.V. Peter
http://books.google.com/books?id=lPo-7-zmrZcC
http://www.worldcat.org/oclc/191029038


Underutilized and Underexploited Horticultural Crops, Volume 5; by K.V. Peter
http://books.google.com/books?id=5VF1tgAACAAJ

Underutilized Crops: Canna, Flax, Cassava, Cannabis, Amaranth, Typha, Teff, Guar, Turnip,
Breadfruit, Sorghum, Plantain, Kudzu, Sorrel; by LLC
http://books.google.com/books?id=VwOOSQAACAAJ
~
Underutilized Vegetable Crops; by A K Pandey
http://books.google.com/books?id=ABTZygAACAAJ
http://www.worldcat.org/oclc/309702056


Underutilized Vegetable and Spice Crops; by S K Sanwal
http://books.google.com/books?id=ehFePgAACAAJ
http://www.worldcat.org/oclc/291122159


Unusual Vegetables; by Erma Harvey James
http://books.google.com/books?id=rCONQAAACAAJ
http://www.worldcat.org/oclc/11523291


Unusual Vegetables: Something New for This Year's Garden; by Anne Moyer Halpin
http://www.librarything.com/work/563424
http://books.google.com/books?id=wjIWAQAACAAJ
http://www.worldcat.org/oclc/3627752    bookfinder.com      addall.com   booksprice.com


Unusual Vegetables, Herbs And Other Edible Plants; by Alan J Hartley
http://books.google.com/books?id=1-OHp50kX1IC


Urban Agriculture: Growing Healthy, Sustainable Places; by Kimberly Hodgson
http://www.librarything.com/work/11293017
http://books.google.com/books?id=ZhBFYgEACAAJ
http://www.worldcat.org/oclc/687694235     bookfinder.com       addall.com    booksprice.com


Urban Harvest; by International Potato Center
http://books.google.com/books?id=fVxP2r9IYH0C


Using the Biodynamic Compost Preparations and Sprays in Garden, Orchard, and Farm; by Ehrenfried
Pfeiffer
http://www.librarything.com/work/8921160
http://books.google.com/books?id=OjbbXP21WwsC
http://www.worldcat.org/oclc/26499900
~ Kindle book     allbookstores.com   bing.com      bookfinder.com     yahoo.com
~
Varieties Of Vegetable Crops In India; by Hazra P. Banerjee
http://books.google.com/books?id=Vl86YgEACAAJ
http://www.worldcat.org/oclc/664653125


Vegetable Crops in India; by T. K. Bose
http://books.google.com/books?id=sHk_AAAAYAAJ
http://www.worldcat.org/oclc/13621876


Vegetable Crops of India; by K. S. Yawalkar
http://books.google.com/books?id=kCtBAAAAYAAJ
http://www.worldcat.org/oclc/2825467

Vegetable, Fruit and Herb Growing in Small Spaces; by John Harrison
http://books.google.com/books?id=AZv_gPfUwNMC
~ Kindle book      ~ Nook book   allbookstores.com      bing.com    bookfinder.com


Vegetable Gardening in Malaya; by John Noel Milsum
http://books.google.com/books?id=USFBAAAAYAAJ
http://www.worldcat.org/oclc/27835957


Vegetable Gardening the Colonial Williamsburg Way: 18th-Century Methods for Today's Organic
Gardeners; by Wesley Greene
http://www.librarything.com/work/12148424
http://books.google.com/books?id=KFQMt1Ww6osC
http://www.worldcat.org/oclc/740628585
~ Kindle book     ~ Nook book    allbookstores.com   bing.com    bookfinder.com


Vegetable Genetic Resources in Ghana; by FAO
http://www.worldcat.org/oclc/197864712


Vegetable Growing in New South Wales; by A. J. Pinn
http://books.google.com/books?id=C8dBAAAAIAAJ
http://www.worldcat.org/oclc/220054630


Vegetable Pigeonpea: A Promising Crop for India
http://books.google.com/books?id=I964XwAACAAJ
http://www.worldcat.org/oclc/17965175
~

Vegetable Seeds: A Pictorial Field Guide; by Terry A. Woodger
http://books.google.com/books?id=CzCu60l2BV0C
http://www.worldcat.org/oclc/747385660


Vegetables: For the Irish Garden; by Klaus Laitenberger
http://www.librarything.com/work/11861236
http://books.google.com/books?id=0eM9YgEACAAJ
http://www.worldcat.org/oclc/750674646


Vegetables All The Year Round; by Harry George Witham Fogg
http://books.google.com/books?id=sSxBAAAAYAAJ
http://www.worldcat.org/oclc/7404259


Vegetables and Fruits: A Guide to Heirloom Varieties and Community-Based Stewardship; by
National Agricultural Library
http://books.google.com/books?id=twAUAAAAYAAJ
http://www.worldcat.org/oclc/40474000


Vegetables in a Small Garden: Simple Steps to Success; Dorling Kindersley
http://www.librarything.com/work/5103221#
http://books.google.com/books?id=rUbjQgAACAAJ
http://www.worldcat.org/oclc/213379759      bookfinder.com      addall.com       booksprice.com


Vegetables in Patches and Pots: A Child's Guide to Organic Vegetable Gardening ; by Lorelie Miller
Mintz
http://www.librarything.com/work/8703969
http://books.google.com/books?id=BQgfAgAACAAJ
http://www.worldcat.org/oclc/2525276      bookfinder.com     addall.com     booksprice.com


Vegetables Naturally: An Organic Gardening Guide; by Harry George Witham Fogg
http://www.librarything.com/work/2025622
http://books.google.com/books?id=CtioAAAACAAJ
http://www.worldcat.org/oclc/2727154    bookfinder.com      addall.com    booksprice.com
~
Vegetables Naturally: Organic Growing for Small Gardens; by Jim Hay
http://books.google.com/books?id=eFRNNwAACAAJ
http://www.worldcat.org/oclc/11671050


Vegetables of Canada; by Derek B. Munro
http://www.librarything.com/work/6267728
http://books.google.com/books?id=z_yezcnaUHQC
http://www.worldcat.org/oclc/44961565    bookfinder.com      addall.com     booksprice.com


What Makes Heirloom Plants So Great: Old-Fashioned Treasures to Grow, Eat, and Admire; by Judy
Barrett
http://www.librarything.com/work/11496142
http://books.google.com/books?id=0oOj1KMYgegC
http://www.worldcat.org/oclc/610466231
~ Kindle book     allbookstores.com    bing.com     bookfinder.com     yahoo.com


Wild Crop Relatives: Genomic and Breeding Resources: Legume Crops and Forages ; by Chittaranjan
Kole
http://www.librarything.com/work/11472286
http://books.google.com/books?id=kAJ_mUrdpWMC
http://www.worldcat.org/oclc/710150948
~ Kindle book     ~ Nook book    allbookstores.com   bing.com   bookfinder.com


Wild Foods of the Sonoran Desert; by Kevin Dahl
http://www.librarything.com/work/1691333
http://books.google.com/books?id=Br5QAQAAIAAJ
http://www.worldcat.org/oclc/34190785      bookfinder.com    addall.com     booksprice.com


World Hunger: Twelve Myths; by Frances Moore Lappe
http://www.librarything.com/work/504026
http://books.google.com/books?id=CxbxAAAAMAAJ
http://www.worldcat.org/oclc/14372267   bookfinder.com       addall.com     booksprice.com


Yates Green Guide to Gardening: A No Fuss Guide to Organic Gardening; by Allen Gilbert
http://www.librarything.com/work/1093366
http://books.google.com/books?id=KRctGwAACAAJ
http://www.worldcat.org/oclc/27492084    bookfinder.com     addall.com      booksprice.com
~
Year-Around Harvest: Winter Gardening on the Coast; by Linda A. Gilkeson
http://books.google.com/books?id=dgsnlwEACAAJ
http://www.worldcat.org/oclc/701014927


Yesterday's Ways, Tomorrow's Treasures: Heirloom Plants And Memory Banking ; by by Virginia D
Nazarea
http://www.librarything.com/work/714614
http://books.google.com/books?id=UYddAAAACAAJ
http://www.worldcat.org/oclc/55629997    bookfinder.com     addall.com  booksprice.com




GARDENING with          NATIVE PLANTS and FLOWERS
NATIVE PLANT SOCIETIES: Providing Native Plant Information for their Area
North American Native Plant Society
http://www.nanps.org

Native Plant Conservation Campaign
http://www.plantsocieties.org


New England Wild Flower Society
http://www.newfs.org

Alabama Wildflower Society - Native Plant Society
http://www.alwildflowers.org/

Alaska Native Plant Society
http://aknps.org

Arizona Native Plant Society
http://www.aznps.com

Arkansas Native Plant Society
http://anps.org

California Native Plant Society
http://www.cnps.org
~
Colorado Native Plant Society
http://www.conps.org

Connecticut Botanical Society
http://ct-botanical-society.org

Delaware Native Plant Society
http://www.delawarenativeplants.org

Florida Native Plant Society
http://www.fnps.org

Georgia Native Plant Society
http://www.gnps.org

Hawaiian Native Plant Society
http://www.hear.org/nhps

Idaho Native Plant Societ
http://www.idahonativeplants.org

Illinois Native Plant Society
http://www.ill-inps.org

Iowa Native Plant Society
http://www.public.iastate.edu/~herbarium/inps/index.php

Iowa Prairie Network
http://www.iowaprairienetwork.org

Kansas Native Plant Society
http://www.kansasnativeplantsociety.org

Kauai Native Plant Society
http://www.kauainativeplantsociety.org

Kentucky Native Plant Society
http://www.knps.org

Lady Bird Johnson Wildflower Center
http://www.wildflower.org

Louisiana Native Plant Society
http://www.lnps.org
~

Maryland Native Plant Society
http://mdflora.org

Michigan Botanical Club
http://www.michbotclub.org

Midwest Native Plant Society
http://www.midwestnativeplants.org/

Minnesota Native Plant Society
http://www.mnnps.org

Minnesota Wildflowers
http://www.minnesotawildflowers.info

Mississippi Native Plant Society
http://www.mississippinativeplantsociety.org

Missouri Native Plant Society
http://www.missourinativeplantsociety.org

Missouri Prairie Foundation
http://www.moprairie.org

Montana Native Plant Society
http://www.mtnativeplants.org

Nevada Native Plant Society
http://www.nvnps.org

New Jersey Native Plant Society
http://www.npsnj.org

New Mexico Native Plant Society
http://www.npsnm.org

New York Flora Association
http://www.nyflora.org

North Carolina Native Plant Society
http://www.ncwildflower.org
~
Ohio Northeast Native Plant Society
http://nativeplantsocietyneohio.org

Ohio Prairie Association
http://www.ohioprairie.org

Oklahoma Native Plant Society
http://www.oknativeplants.org

Oregon Native Plant Society
http://www.npsoregon.org

Pennsylvania Native Plant Society
http://www.pawildflower.org

Rhode Island Wild Plant Society
http://www.riwps.org/nativeplantnurseries.htm

South Carolina Native Plant Society
http://scnps.org

Tennessee Native Plant Society
http://www.tnps.org

Texas Native Plant Society
http://www.npsot.org

Texas Native Prairies Association
http://www.texasprairie.org/

Utah Native Plant Society
http://www.unps.org

Virginia Native Plant Society
http://www.vnps.org

Washington Native Plant Society
http://www.wnps.org

West Virginia Native Plant Society
http://www.wvnps.org

Wyoming Native Plant Society
http://www.wynps.org
~
AL - Blanche Dean Wildflower Society
http://alabamawildflower.org

AL - Huntsville Wildflower Society
http://huntsville.org.alwildflowers.org

AL - Shoals Wildflower Society
http://shoalswildflower.blogspot.com

CA - Bristlecone Native Plant Society
http://bristleconecnps.org

CA - Channel Islands Native Plant Society
http://www.cnpsci.org

CA - Dorothy King Young Native Plant Society
http://www.dkycnps.org

CA - East Bay Native Plant Society
http://www.ebcnps.org

CA - El Dorado Native Plant Society
http://www.eldoradocnps.org

CA - Los Angeles-Santa Monica Mountains Native Plant Society
http://lasmmcnps.org

CA - Milo Baker Native Plant Society
http://www.cnpsmb.org

CA - Mojave Desert Native Plant Society
http://www.mojavecnps.org

CA - Monterey Bay Native Plant Society
http://montereybay.cnps.org

CA - Mount Lassen Native Plant Society
http://mountlassen.cnps.org

CA - Napa Valley Native Plant Society
http://www.napavalleycnps.org

CA - North Coast Native Plant Society
http://northcoastcnps.org
~
CA - North San Joaquin ValleyNative Plant Society
http://nsj.cnps.org

CA - Orange County Native Plant Society
http://www.occnps.org

CA - Redbud Native Plant Society
http://www.redbud-cnps.org

CA - Riverside-San Bernardino Native Plant Society
http://www.enceliacnps.org

CA - Sacramento Valley Native Plant Society
http://www.sacvalleycnps.org

CA - San Diego Native Plant Society
http://www.cnpssd.org/

CA - San Gabriel Mountains Native Plant Society
http://www.cnps-sgm.org

CA - San Luis Obispo Native Plant Society
http://www.cnps-slo.org

CA - Sanhedrin Native Plant Society
http://www.cnps-sanhedrin.org

CA - Santa Clara Valley Native Plant Society
http://www.cnps-scv.org

CA - Santa Cruz County Native Plant Society
http://www.cnps-scv.org

CA - Sequoia Native Plant Society
http://www.cnps-sequoia.org

CA - Shasta Native Plant Society
http://www.shastacnps.org

CA - Sierra Foothills Native Plant Society
http://www.sierrafoothillscnps.org

CA - South Coast Native Plant Society
http://www.sccnps.org
~
CA - Willis Linn Jepson Native Plant Society
http://cnpsjepson.dreamhosters.com

CA - Yerba Buena Native Plant Society
http://www.cnps-yerbabuena.org

FL - Magnolia Native Plant Society
http://magnolia.fnpschapters.org

FL - Nature Coast Native Plant Society
http://naturecoast.fnpschapters.org

FL - Sea Oats Native Plant Society
http://seaoats.fnpschapters.org

IL - Grand Prairie Friends
http://grandprairiefriends.org

LA - Folsom Native Plant Society
http://folsomnps.org

MO - Hawthorn Chapter of the Missouri Native Plant Society
http://columbianativeplants.org

MO - Southeast Chapter of Missouri Native Plant Society
http://www.semonps.org

NY - Finger Lakes Native Plant Society
http://flnps.org

OH - Cincinnati Wildflower Preservation Society
http://cincywildflower.org

PA - Delaware Valley Fern and Wildflower Society
http://www.dvfws.org

SC - Southern Appalachian Botanical Society
http://www.sabs.appstate.edu

VA - Blue Ridge Wildflower Society
http://brwfs.org

VA - John Clayton Native Plant Society
http://www.claytonvnps.org
~



VA - Pocahontas Native Plant Society
http://pocahontaschapter-vnps.org


VA - Potowmack Native Plant Society
http://www.vnps-pot.org


WI - North Woods Native Plant Society
http://www.northwoodsnativeplantsociety.org


WV - Eastern Panhandle Native Plant Society
http://www.epnps.org


British Columbia Native Plant Society
http://www.npsbc.org


Nova Scotia Wild Flower Society
http://www.nswildflora.ca


Saskatchewan Native Plant Society
http://www.npss.sk.ca




ORGANIC GARDENING TECHNOLOGIES
INCREASING Plant Yields by over 400 PERCENT
http://www.scribd.com/doc/75160339
http://www.calameo.com/books/0010511867e619fa5b018
~

                 Worms Eat My Garbage

      WASTE NOT, WANT NOT
Organic Composting with Earthworms and Recycling

book: Worms Eat My Garbage; by Mary Appelhof
librarything.com/129657   books.google.com/Z-FjPwAACAAJ        worldcat.org/oclc/9210284
http://wormbooks.com      http://www.wormwoman.com http://wormdigest.org
http://vermico.com http://www.happydranch.com http://www.rainbowworms.com
http://worms.com       http://unclejimswormfarm.com http://www.nyworms.com

Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by
Marc Remillard
http://www.librarything.com/work/11197572
http://books.google.com/books?id=PZHObwAACAAJ
http://www.worldcat.org/oclc/744677817
~ Kindle book    allbookstores.com   bing.com      bookfinder.com     yahoo.com


A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra
Truax
~ Kindle book    allbookstores.com bing.com  bookfinder.com       yahoo.com
http://vermico.com



SoilSoup Compost Tea ~ Healthy Soil,             Healthy Plants, Healthy People
http://soilsoup.com
SoilSoup Compost Tea is an excellent soil builder and organic fertilizer.
Soil Soup is very easy to handle and use.



Growing Solutions ~ Healthy Soil,          Healthy Plants, Healthy People
http://www.growingsolutions.com

Zing Bokashi: Recycling Organic Waste with Effective Microorganisms (EM)
http://www.zingbokashi.co.nz
~
Remineralize your Soil ~ Healthy Soil,            Healthy Plants, Healthy People
http://remineralize.org

Soil Regeneration with Volcanic Rock Dust
http://calameo.com/books/00062163120384c54b373
http://scribd.com/doc/30402511
Volcanic Rock Dust added to soil can double plant or lawn growth.


What Every Gardener Should Know About Earthworms, Bulletin A-21; by Henry Hopp
http://www.librarything.com/work/5011585
http://books.google.com/books?id=GrX12L3vfmgC
http://www.worldcat.org/oclc/777949
~ Kindle book     allbookstores.com   bing.com   bookfinder.com       yahoo.com


Recycle with Earthworms; by Shelley C. Grossman
http://www.librarything.com/work/11924887
http://books.google.com/books?id=635wPQAACAAJ          http://www.worldcat.org/oclc/38889546
allbookstores.com google.com bookfinder.com            booksprice.com bing.com yahoo.com



Let an Earthworm be Your Garbage Man: All about Earthworms, for Garbage Disposal and Soil
Fertility
http://www.librarything.com/work/13102639
http://books.google.com/books?id=-vJgAQAACAAJ       http://www.worldcat.org/oclc/1429548
allbookstores.com google.com bookfinder.com         booksprice.com bing.com yahoo.com



Harnessing the Earthworm; a Practical Inquiry Into Soil-Building, Soil-Conditioning and Plant
Nutrition Through the Action of Earthworms; by Thomas Jason Barrett
http://www.librarything.com/work/941755
http://books.google.com/books?id=ZZssrk1M5zUC             http://www.worldcat.org/oclc/2505704
allbookstores.com google.com bookfinder.com             booksprice.com bing.com yahoo.com


As the Worm Turns: New and Easy Methods for Raising Earthworms; by Roy Fewell
http://www.librarything.com/work/3752722
http://books.google.com/books?id=-aTbPQAACAAJ        http://www.worldcat.org/oclc/43960994
allbookstores.com google.com bookfinder.com        booksprice.com bing.com yahoo.com
~
Worms Eat Our Garbage: Classroom Activities for a Better Environment; by Mary Appelhof
http://www.librarything.com/work/4048089
http://books.google.com/books?id=vI-ihPW04c8C
http://www.worldcat.org/oclc/28532138 allbookstores.com        bing.com      bookfinder.com


The Worm Cafe: Mid-scale Vermicomposting of Lunchroom Wastes; by Binet Payne
http://www.librarything.com/work/1124844
http://books.google.com/books?id=IsUKAAAACAAJ
http://www.worldcat.org/oclc/41343935    allbookstores.com bing.com      bookfinder.com


The Worm Book For Beginners: A Vermiculture Starter or How To Be A Backyard Worm Farmer
And Make The Best Natural Compost From Worms; by Frank Randall
http://www.librarything.com/work/12326569
~ Kindle book     allbookstores.com   bing.com      bookfinder.com   yahoo.com


Commercial Vermiculture: How to Build a Thriving Business in Redworms ; by Peter Bogdanov
http://www.librarything.com/work/8602513
http://books.google.com/books?id=3SrcAAAACAAJ
http://www.worldcat.org/oclc/38410758
~ Kindle book     allbookstores.com   bing.com      bookfinder.com      yahoo.com


A-Worming We Did Go; by Ruth Myers
http://books.google.com/books?id=Mx8MuwAACAAJ
http://www.worldcat.org/oclc/2385483 allbookstores.com      bing.com     bookfinder.com


A Guide to Worm Composting: Help Nature to Help You, New Zealand;
http://books.google.com/books?id=ofJuYgEACAAJ
http://www.worldcat.org/oclc/154272498 allbookstores.com   bing.com         bookfinder.com


A Manual on Compost and Other Organic Manures; by R. Krishna Murthy
http://books.google.com/books?id=vWVCAAAAYAAJ
http://www.worldcat.org/oclc/4331209 allbookstores.com      bing.com     bookfinder.com


An Ecological Treatment System for the Re-Use of Bio-Digested Food Waste; by Hui Lin
http://books.google.com/books?id=lpWnuAAACAAJ
http://www.worldcat.org/oclc/671765100 allbookstores.com       bing.com      bookfinder.com
~
Application of Vermicompost for Crop Cultivation in Semi Arid Soil: Significance of Organic
Farming; by Rajeev Kumar Niranjan
http://books.google.com/books?id=4Q2spwAACAAJ allbookstores.com bing.com


As the Worm Turns; by Brian Rosenberger
http://www.librarything.com/work/10913183
http://books.google.com/books?id=DMeqcQAACAAJ
http://www.worldcat.org/oclc/733731575
~ Kindle book     allbookstores.com     bing.com bookfinder.com           yahoo.com


As the Worm Turns: New and Easy Methods for Raising Earthworms; by Roy Fewell
http://www.librarything.com/work/3752722
http://books.google.com/books?id=-aTbPQAACAAJ
http://www.worldcat.org/oclc/43960994    allbookstores.com  bing.com     bookfinder.com


Basic Guide to Worm Composting; by Gillian Elcock
google.com     allbookstores.com    bing.com      yahoo.com      bookfinder.com     addall.com


Best Practice Guideline to Managing On-Site Vermiculture Technologies; by Amanda Ferris
http://books.google.com/books?id=mYrqAQAACAAJ
http://www.worldcat.org/oclc/223347135     allbookstores.com   bing.com      bookfinder.com


Beyond Compost: A VermiChester Guide to Converting Organic Waste Beyond Compost Using
Worms in a Medium-Scale Composting System; by Tom Wilkinson
http://www.librarything.com/work/8739373
http://books.google.com/books?id=c4nbQQAACAAJ
http://www.worldcat.org/oclc/449905490   allbookstores.com  bing.com    bookfinder.com


Biowastes' Into Value Addition By Semi-Scientific Vermitechnology: Mitigation Of GHGs By
Abatement Of Organic Pollution; by Sunitha N. Seenappa
http://books.google.com/books?id=sGuqMQEACAAJ


Charles Darwins Plough Tool for Vermitechnology; by Madhab Chandra Dash
http://books.google.com/books?id=tn95tgAACAAJ
~
Compendium on Solid Waste Management By Vermicomposting; by Municipal Environmental
Research Laboratory
http://books.google.com/books?id=qAdSAAAAMAAJ
http://www.worldcat.org/oclc/7158379  allbookstores.com bing.com      bookfinder.com


Compost, by Gosh: An Adventure with Vermicompostingp; by Michelle Eva Portman
http://www.librarything.com/work/838602
http://books.google.com/books?id=ILYJAAAACAAJ
http://www.worldcat.org/oclc/52223212   allbookstores.com   bing.com      bookfinder.com


Compost, Vermicompost and Compost Tea: Feeding the Soil on the Organic Farm; by Grace
Gershuny
http://www.librarything.com/work/9379681
http://books.google.com/books?id=Xub8aChfFsIC
http://www.worldcat.org/oclc/676727212
~ Kindle book     ~ Nook book    allbookstores.com bing.com      bookfinder.com


Composting: Worm Recycling; by King County, WA
http://books.google.com/books?id=h01vuAAACAAJ
http://www.worldcat.org/oclc/56367025    allbookstores.com     bing.com     bookfinder.com


Composting Made Easy: A Guide for Schools, Composting, Mulching and Wormeries; by John Laffin
http://books.google.com/books?id=8D0CtwAACAAJ
http://www.worldcat.org/oclc/38384250  allbookstores.com    bing.com    bookfinder.com


Composting with Worms: Why Waste Your Waste, United Kingdom; by G. Pilkington
http://www.librarything.com/work/3963878
http://books.google.com/books?id=szGwPAAACAAJ
http://www.worldcat.org/oclc/604935405   allbookstores.com bing.com       bookfinder.com


Dear Charlie: A Collection Of Correspondence Between The Late Charlie Morgan, The World's
Most Renowned Wormologist, And Worm Farmers Around The World ; by Charlie Morgan
http://wormbooks.com
google.com bing.com yahoo.com          bookfinder.com    allbookstores.com booksprice.com
~
Deep Burrowing Earthworms Boost Pasture; by Mark Seeliger
http://books.google.com/books?id=4XGKAAAACAAJ
http://www.worldcat.org/oclc/43413338     allbookstores.com     bing.com      bookfinder.com


Diversity And Abundance Of Earthworms As Indicators Of Soil Pollution; by Addisu Mergia
http://books.google.com/books?id=-GUJTwEACAAJ        google.com bing.com yahoo.com


Domestic Wastewater Treatment By Constructed Wetland And Vermifilter: Wastewater Engineering ;
by Navin Pise
http://books.google.com/books?id=uGr1ugAACAAJ       google.com bing.com yahoo.com


Don't Rubbish Green Waste: Mulch, Compost, Worm Farms; by Peter Rutherford, Chatswood, New
South Wales, Australia
http://books.google.com/books?id=NqhrAAAACAAJ
http://www.worldcat.org/oclc/38758799   allbookstores.com     bing.com      bookfinder.com


Earthworms: Their Ecology And Relationships With Soils And Land Use; by Kenneth Ernest Lee
http://books.google.com/books?id=C4bwAAAAMAAJ
http://www.worldcat.org/oclc/13069479    allbookstores.com    bing.com      bookfinder.com


Earthworm Breeding For Profit : Practical Production And Marketing Of Earthworms in Australia
and New Zealand; by David Lambert
http://books.google.com/books?id=yWgyAgAACAAJ
http://www.worldcat.org/oclc/35283653       allbookstores.com   bing.com    bookfinder.com


Earthworm Buyer's Guide and Directory: Directory of Earthworm Hatcheries in the U. S. A. and
Canada; by Patrick H. Shields
http://wormbooks.com
http://books.google.com/books?id=8xgSAAAACAAJ           google.com bing.com yahoo.com


Earthworm Culture for the Gardener: Poultryman and Fisherman; by Elpam gardens, Burlington,
Ontario
http://books.google.com/books?id=qWCwHAAACAAJ
http://www.worldcat.org/oclc/62965506      allbookstores.com    bing.com     bookfinder.com
~
Earthworm Ecology; by Clive A. Edwards
http://www.librarything.com/work/1226709
http://books.google.com/books?id=7mHvxY-1BKsC
http://www.worldcat.org/oclc/38243637
~ Kindle book     allbookstores.com    bing.com       bookfinder.com       yahoo.com



Earthworm Ecology and Environment; by Satyendra M. Singh
http://books.google.com/books?id=8tZfsCu2eQkC
http://www.worldcat.org/oclc/317588499     allbookstores.com     bing.com      bookfinder.com


Earthworm Ecology and Application of Vermicompost Technology for Sugarcane production; by K
Sreenivasulu Reddy
http://books.google.com/books?id=nWHoZwEACAAJ
http://www.worldcat.org/oclc/703917448    allbookstores.com  bing.com      bookfinder.com


Earthworm Feeds and Feeding; by Charlie Morgan
http://www.librarything.com/work/4849362
http://books.google.com/books?id=yOc7uwAACAAJ
http://www.worldcat.org/oclc/6473662     allbookstores.com     bing.com     bookfinder.com


Earthworm Management In Tropical Agroecosystems; by Patrick Lavelle
http://books.google.com/books?id=VX5FAQAAIAAJ
http://www.worldcat.org/oclc/40675052  allbookstores.com      bing.com        bookfinder.com


Earthworm Resources And Vermiculture, India; by J M Julka
http://books.google.com/books?id=9u1JAAAAYAAJ
http://www.worldcat.org/oclc/41650058    allbookstores.com      bing.com      bookfinder.com


Earthworm Response To Soil Management Practices In Vineyards; by Katie A Webster
http://books.google.com/books?id=9-zoSAAACAAJ
http://www.worldcat.org/oclc/503244349   allbookstores.com      bing.com    bookfinder.com


Earthworm Selling and Shipping Guide; by Charlie Morgan
http://books.google.com/books?id=8ukmAAAACAAJ
http://www.worldcat.org/oclc/4769721     allbookstores.com     bing.com     bookfinder.com
~
Earthworm Vermicompost: A Sustainable Alternative to Chemical Fertilizers for Organic Farming ; by
Rajiv K. Sinha
http://books.google.com/books?id=NQ6gcQAACAAJ
http://www.worldcat.org/oclc/663102403    allbookstores.com    bing.com        bookfinder.com


Earthworms: Improving Soil for Agriculture, Proceedings of a Conference Held at TAFE College ; by
Philip James Haines
http://books.google.com/books?id=NwFrYgEACAAJ
http://www.worldcat.org/oclc/27595221      allbookstores.com    bing.com      bookfinder.com


Earthworms: Technology Information To Enable The Development Of Earthworm Production, a
report for the Rural Industries Research and Development Corporation ; by Robyn A Dynes
http://www.worldcat.org/oclc/224036092        allbookstores.com   bing.com       bookfinder.com


Earthworms, The Soil Managers: Their Role in Restoration and Improvement of Soil Fertility; by
Rajiv K. Sinha
http://books.google.com/books?id=wIMgkgAACAAJ
http://www.worldcat.org/oclc/673417997     allbookstores.com     bing.com    bookfinder.com


Earthworms, The Waste Managers: Their Role in Sustainable Waste Management Converting Waste
into Resource While Reducing Greenhouse Gases; by Rajiv K. Sinha
http://books.google.com/books?id=VUafcQAACAAJ
http://www.worldcat.org/oclc/663102404    allbookstores.com      bing.com  bookfinder.com


Earthworms: Their Intensive Propagation and Use in Biological Soil-building; by Thomas J. Barrett
http://www.librarything.com/work/8595954
http://books.google.com/books?id=grNBAAAAIAAJ
http://www.worldcat.org/oclc/1826279     allbookstores.com     bing.com       bookfinder.com


Earthworms: Underground Farmers; by Patricia Laube
http://www.librarything.com/work/310494
http://books.google.com/books?id=8fTfbpIN6ToC
http://www.worldcat.org/oclc/31174079     allbookstores.com      bing.com      bookfinder.com

Earthworms for Ecology and Profit, Volume 1; by Ronald E. Gaddie
http://www.librarything.com/work/8806683
http://books.google.com/books?id=j2r6SAAACAAJ
http://www.worldcat.org/oclc/3787427    allbookstores.com     bing.com        bookfinder.com
~
Earthworms for Ecology and Profit, Volume 2; by Ronald E. Gaddie
http://books.google.com/books?id=PxVHAAAAYAAJ
http://www.worldcat.org/oclc/732742442     allbookstores.com     bing.com      bookfinder.com


Earthworms For Gardeners And Fishermen; by Kevin Handreck
http://www.librarything.com/work/2217922
http://books.google.com/books?id=0b_qAAAACAAJ
http://www.worldcat.org/oclc/28209451    allbookstores.com     bing.com     bookfinder.com


Earthworms for Monitoring Metal Contamination; by Barbara Plytycz
http://books.google.com/books?id=35ApAQAAMAAJ
http://www.worldcat.org/oclc/662458795   allbookstores.com      bing.com     bookfinder.com


Earthworms for Solid Waste Management; by Satyendra M. Singh
http://books.google.com/books?id=Bl648_wspRwC
http://www.worldcat.org/oclc/630057584    allbookstores.com     bing.com     bookfinder.com


Earthworms in Australia: A Blueprint for a Better Environment; by David Murphy
http://www.librarything.com/work/354871
http://books.google.com/books?id=h3MQAAAACAAJ
http://www.worldcat.org/oclc/29252871      allbookstores.com      bing.com   bookfinder.com


Earthworms in New Zealand; by Amy Brown
http://www.worldcat.org/oclc/154692781  allbookstores.com       bing.com       bookfinder.com

Earthworms in Waste And Environmental Management; by Clive Arthur Edwards
http://books.google.com/books?id=UD_xAAAAMAAJ
http://www.worldcat.org/oclc/19496912  allbookstores.com    bing.com     bookfinder.com


Earthworms Life Cycle, Compost and Therapy; by Kasi Parthasarathi
http://books.google.com/books?id=pfKucQAACAAJ         google.com    bing.com     yahoo.com

Effects of Application of Vermicompost and FYM on Release of Nutrients and Their Uptake by
Maize in Different Textured Soils; by N K Patil
http://books.google.com/books?id=-IoUMwEACAAJ
http://www.worldcat.org/oclc/778037247        allbookstores.com bing.com     bookfinder.com
~
Effect of Application Of Vermicompost On The Availability And Uptake Of Micronurients by
sunflower in medium black calcareous and non-calcareous soils; by S S Damshett
http://www.worldcat.org/oclc/781251648     allbookstores.com       bing.com    bookfinder.com


Effects of Compost, Legume Cover Cropping And Vermicompost Extract Foliar Applications On
Nutrition and Yield of Washington Navel Oranges; by William Payton Carling
http://www.worldcat.org/oclc/817718944     allbookstores.com     bing.com  bookfinder.com


Effect of Nutrient And Microbially Rich Vermicompost On Pomegrante: Soil Microbiology Nutrient
Management and Fruit Production; by Bishwanath Nandi
http://books.google.com/books?id=HdlCLgEACAAJ         google.com bing.com yahoo.com


Effect of NPK and Vermicompost in Tomato; by Narender Pal
http://books.google.com/books?id=P--vYgEACAAJ
http://www.worldcat.org/oclc/652231475    allbookstores.com        bing.com      bookfinder.com


Effect of Vermicompost and Pressmud on Soil Fertility, Plant Nutrition, Yield and Quality of Onion ;
by P. Sreedevi
http://books.google.com/books?id=olflZwEACAAJ
http://www.worldcat.org/oclc/703926231    allbookstores.com        bing.com      bookfinder.com


Environmental Biotechnologies for Bioremediation of Contaiminated Lands and Soil by Microbes,
Plants and Earthworms; by Rajiv K. Sinha
http://books.google.com/books?id=66UoAQAAMAAJ
http://www.worldcat.org/oclc/505420620    allbookstores.com     bing.com     bookfinder.com


Feasibility of Low Cost Vermicompost Production in Accra, Ghana; by Nana-Osei K. Mainoo
http://books.google.com/books?id=4ykSAk0AMSkC
http://www.worldcat.org/oclc/704029257    allbookstores.com     bing.com      bookfinder.com


Fletcher Sims Compost; by Fletcher Sims
http://www.librarything.com/work/8170309
http://books.google.com/books?id=wo0UAQAAMAAJ
http://www.worldcat.org/oclc/31294906    allbookstores.com       bing.com      bookfinder.com
~
Gardening with Worms: A Manual for New Zealanders; by John Stemmer
http://books.google.com/books?id=xbHtXwAACAAJ
http://www.worldcat.org/oclc/156005711  allbookstores.com      bing.com          bookfinder.com


Green Home Recycling: 16 Ways to Compost and Worm Farm, Landcare for Every Household; by
Allan Windust
http://books.google.com/books?id=A6QlAQAACAAJ
http://www.worldcat.org/oclc/222706413  allbookstores.com  bing.com     bookfinder.com


Green Tips: Vermicomposting; by Ontario Ministry of the Environment
 google.com bing.com yahoo.com
~ Nook book allbookstores.com      allbookstores.com      bing.com      bookfinder.com


Hand Book of Biofertilizers and Vermiculture; by Engineers India Research Institute
http://books.google.com/books?id=fX6mA1jE72oC
http://www.worldcat.org/oclc/295034947      allbookstores.com      bing.com       bookfinder.com


Hand Book of Organic Farming and Organic Foods with Vermi-composting and Neem Products; by
by Engineers India Research Institute
http://books.google.com/books?id=T354WbwT7ZIC
http://www.worldcat.org/oclc/295034946   allbookstores.com   bing.com     bookfinder.com


Harnessing the Earthworm; a Practical Inquiry Into Soil-Building, Soil-Conditioning and Plant
Nutrition Through the Action of Earthworms; by Thomas Jason Barrett
http://www.librarything.com/work/941755
http://books.google.com/books?id=ZZssrk1M5zUC
http://www.worldcat.org/oclc/2505704     allbookstores.com      bing.com      bookfinder.com


How to Raise, Store and Sell Nightcrawlers: (Lumbricus Terrestris) Or Northern Native; by Charlie
Morgan
http://books.google.com/books?id=VnQVPwAACAAJ
http://www.worldcat.org/oclc/10768827      allbookstores.com     bing.com     bookfinder.com


How To Start A Worm Farm: Worm Farming And Using Worms For Composting ; by Robin Harris
http://books.google.com/books?id=9FyMMAEACAAJ     google.com bing.com yahoo.com
~
Improving Sanitization and Fertiliser Value of Dairy Manure and Waste Paper Mixtures Enriched
with Rock Phosphate Through Combined Thermophilic Composting and Vermicomposting ; by
Lushian Tapiwa Mupondi
http://books.google.com/books?id=ePhzMwEACAAJ
http://www.worldcat.org/oclc/796918596       allbookstores.com   bing.com    bookfinder.com


In Their Own Words: Interviews with Vermiculture Experts; by Peter Bogdanovich
http://www.librarything.com/work/11957519
http://books.google.com/books?id=5uCTAAAACAAJ
http://www.worldcat.org/oclc/45487223
~ Kindle book     allbookstores.com    bing.com     bookfinder.com       yahoo.com


Laverme's Handbook of Indoor Worm Composting; by Ellen Sandbeck
http://books.google.com/books?id=aGNmGwAACAAJ
http://www.worldcat.org/oclc/48024159
~ Kindle book     allbookstores.com   bing.com      bookfinder.com          yahoo.com


Le Compost de vers de terre; by Jack Temple - French
http://books.google.com/books?id=t5zfOwAACAAJ
http://www.worldcat.org/oclc/462433116       allbookstores.com   bing.com      bookfinder.com


Let an Earthworm be Your Garbage Man: All about Earthworms, for Garbage Disposal and Soil
Fertility
http://www.librarything.com/work/13102639
http://books.google.com/books?id=-vJgAQAACAAJ
http://www.worldcat.org/oclc/1429548   allbookstores.com   bing.com     bookfinder.com


Lunch Munchers: An Education Kit for Primary Schools to Develop Worm Composting and
Recycling Programs in New South Wales, Australia; by Tammy Small
http://books.google.com/books?id=koasXwAACAAJ
http://www.worldcat.org/oclc/320288613   allbookstores.com    bing.com   bookfinder.com


Make a Worm Farm; by Jill McDougall
http://www.librarything.com/work/9001373
http://books.google.com/books?id=YMdDs0l5AqYC
http://www.worldcat.org/oclc/155445530   allbookstores.com       bing.com      bookfinder.com
~
Making a Worm Farm, Springboard Level 16A; by Nicole Ward
http://books.google.com/books?id=ljKxtJTI6PcC
http://www.worldcat.org/oclc/324952072    allbookstores.com       bing.com      bookfinder.com


Management of Water Hyacinth Biomass Along with Industrial Effluents: Mushroom Culturing And
Vermicomposting; by Priyanka Anand
http://books.google.com/books?id=WRiqZwEACAAJ       google.com bing.com yahoo.com


Manual of Therapeutic Medications and Pesticides for Worm Growers; by Charlie Morgan
http://books.google.com/books?id=XsDqGwAACAAJ
http://www.worldcat.org/oclc/8803512    allbookstores.com   bing.com       bookfinder.com


Marty McGuire Digs Worms; by Kate Messner
http://www.librarything.com/work/11618797
http://books.google.com/books?id=g5L-A0UdPH4C
http://www.worldcat.org/oclc/732967751
~ Kindle book     allbookstores.com    bing.com        bookfinder.com        yahoo.com


Mini Farming: Self-Sufficiency on 1/4 Acre; by Brett L. Markham
http://www.librarything.com/work/9724353
http://books.google.com/books?id=HfVygFIMI3sC
http://www.worldcat.org/oclc/458582333       allbookstores.com     bing.com     bookfinder.com


Nature Farming and Microbial Applications; by Hiu-lian Xu
http://www.librarything.com/work/9350031
http://books.google.com/books?id=GNbe4eClXicC
http://www.worldcat.org/oclc/44468922    allbookstores.com        bing.com     bookfinder.com


Organic farming and vermiculture; by Gaurav Singh
http://books.google.com/books?id=kjt0QwAACAAJ
http://www.worldcat.org/oclc/398315852      allbookstores.com     bing.com      bookfinder.com


Organic Farming and Vermiculture; Linga Raj Patro
http://books.google.com/books?id=W9-TkgEACAAJ
http://www.worldcat.org/oclc/818319567   allbookstores.com        bing.com      bookfinder.com
~
Organic Growing with Worms: A Handbook for a Better Environment; by David Murphy
http://www.librarything.com/work/5240016
http://books.google.com/books?id=ytJYAAAACAAJ
http://www.worldcat.org/oclc/224612833   allbookstores.com  bing.com       bookfinder.com


Pee Wee’s Great Adventure: A guide to Vermicomposting; by Larraine Roulston
http://www.librarything.com/work/6262779
http://books.google.com/books?id=np8MPwAACAAJ
http://www.worldcat.org/oclc/43283553    allbookstores.com   bing.com      bookfinder.com


Pitting Friends Against Foes: Weed Management by Vermicomposting; by Astha Thakur
http://books.google.com/books?id=pq_llwEACAAJ      google.com bing.com yahoo.com


Profitable Earth Worm Farming: A complete raising and marketing manual for those who want to
raise their own bait, or those who want to raise bait for fun and profit; by Charlie Morgan
http://www.librarything.com/work/8539906
http://books.google.com/books?id=4VLsQgAACAAJ
http://www.worldcat.org/oclc/8710868        allbookstores.com       bing.com        bookfinder.com


Raising the African Nightcrawler or Tropical Giant Worm: A Complete Production and Sales
Manual; by Charlie Morgan
http://www.librarything.com/work/8595978
http://books.google.com/books?id=cKlfNQAACAAJ
http://www.worldcat.org/oclc/3343215      allbookstores.com  bing.com     bookfinder.com


Raising Composting Earthworms for Fun and Profit; by Daniel C Merrill
http://books.google.com/books?id=Yh26a_Th6scC
http://www.worldcat.org/oclc/748328186
~ Kindle book     allbookstores.com    bing.com       bookfinder.com         yahoo.com


Recycle With Earthworms: The Red Wiggler Connection; by Shelley C. Grossman
http://www.librarything.com/work/9345776
http://books.google.com/books?id=635wPQAACAAJ
http://www.worldcat.org/oclc/38889546    allbookstores.com    bing.com    bookfinder.com
~
Raising Fishworms with Rabbits: A Profitable Combination; by Howard Lucky Mays
http://www.librarything.com/work/1486785
http://books.google.com/books?id=5UiKPQAACAAJ
http://www.worldcat.org/oclc/8734203     allbookstores.com    bing.com    bookfinder.com


Recycling of Horse Manure by Vermicomposting; by Lai-yee Joyce Ng
http://books.google.com/books?id=BzQAywAACAAJ
http://www.worldcat.org/oclc/51348900  allbookstores.com      bing.com      bookfinder.com


Red Worm Composting: Guide to Vermicomposting; by Bentley Christie
google.com allbookstores.com     bing.com    bookfinder.com yahoo.com


Reduction of Heavy Metals Sludge By Vermicomposting Technique: Treatment of the Industrial
Sludge by Earthworms; by Shaymaa Ahmed Hamdi
http://books.google.com/books?id=4xqlpwAACAAJ


Revolution in a Bottle: How TerraCycle Is Redefining Green Business; by Tom Szaky
http://www.librarything.com/work/8039516
http://books.google.com/books?id=aMItfTftcqYC
http://www.worldcat.org/oclc/276138230
~ Kindle book     allbookstores.com     bing.com      bookfinder.com      yahoo.com


Russian Worm Conference: Earthworms and Soil's Fertility Abstracts; by Green-PIK
google.com allbookstores.com     bing.com       bookfinder.com yahoo.com


Save The Planet: Start Your Own Worm Farm; by Gregory Vanden Berge
~ Kindle book     allbookstores.com   bing.com      bookfinder.com       yahoo.com


Solid waste management with earthworms; by S A Abbasi
http://books.google.com/books?id=UdOiAAAACAAJ
http://www.worldcat.org/oclc/60691668    google.com     bing.com    yahoo.com
~
Start A Worm Farm For A Green Home Garden: Make Natural Garden Fertilizer Following This
Worm Farming Beginner's Guide With All The Basic Details; by Becca D. Nigel
http://books.google.com/books?id=gAhCXwAACAAJ
~ Nook book allbookstores.com     bing.com    bookfinder.com        yahoo.com


Starting a Worm Farm: Also Known as Vermicomposting Or Vermiculture; by M L Robinson
http://books.google.com/books?id=30X7HAAACAAJ
http://www.worldcat.org/oclc/46674850  allbookstores.com  bing.com       bookfinder.com


The ABC's of the Earthworm Business; by Ruth Myers
http://www.librarything.com/work/10164470
http://books.google.com/books?id=dMiQpwAACAAJ
http://www.worldcat.org/oclc/10306006     allbookstores.com   bing.com      bookfinder.com


The Australian Compost and Worm Book: A Practical Guide For Homes, Schools And Businesses; by
Peter W. Rutherford
http://www.librarything.com/work/1665718
http://books.google.com/books?id=VRBxHAAACAAJ
http://www.worldcat.org/oclc/39131057    allbookstores.com  bing.com    bookfinder.com


The Average Joe's Guide To Indoor Worm Composting; by Barbara Shaw
http://www.librarything.com/work/12785238
~ Kindle book      bookfinder.com   allbookstores.com addall.com         booksprice.com


The Best Place for Garbage: The Essential Guide To Recycling With Composting Worms; by Sandra
Wiese
http://books.google.com/books?id=K62suAAACAAJ
http://www.worldcat.org/oclc/711102018
~ Kindle book     allbookstores.com     bing.com      bookfinder.com   yahoo.com


The Complete Guide to Working With Worms: Using the Gardener's Best Friend for Organic
Gardening and Composting; by Wendy M. Vincent
http://www.librarything.com/work/10080771
http://books.google.com/books?id=vlKbRNzhM1AC
http://www.worldcat.org/oclc/768607157
~ Kindle book     allbookstores.com    bing.com   bookfinder.com      yahoo.com
~
The Complete Technology Book On Vermiculture and Vermicompost; by Niir Board
http://www.librarything.com/work/13117042
http://books.google.com/books?id=PwxPUGpRyQkC
http://www.worldcat.org/oclc/174263493    allbookstores.com bing.com      bookfinder.com


The Earth Moved: On the Remarkable Achievements of Earthworms; by Amy Stewart
http://www.librarything.com/work/118073
http://books.google.com/books?id=ETE8qhmc2SEC
http://www.worldcat.org/oclc/52814414
~ Kindle book     allbookstores.com   bing.com     bookfinder.com     yahoo.com


The Earthworm Book: How to Raise and Use Earthworms for Your Farm and Garden ; by Jerry
Minnich
http://www.librarything.com/work/1821430
http://books.google.com/books?id=ngTxAAAAMAAJ
http://www.worldcat.org/oclc/3311468   allbookstores.com  bing.com    bookfinder.com


The Farmer's Earthworm Handbook: Managing Your Underground Money-Makers; by David Ernst
http://www.librarything.com/work/5971800
http://books.google.com/books?id=hdMnAQAAMAAJ
http://www.worldcat.org/oclc/33820604    allbookstores.com bing.com bookfinder.com


The Good Worm on Compost; by Gold Coast City Council
http://books.google.com/books?id=XpOyMwEACAAJ
http://www.worldcat.org/oclc/794929036  allbookstores.com        bing.com      bookfinder.com


The Nightcrawler Manual: A Complete Guide to the Collecting and Storing of the Nightcrawler; by
Ray Edwards
http://books.google.ca/books?id=ZNRjMwEACAAJ
http://www.worldcat.org/oclc/22960548  allbookstores.com      bing.com       bookfinder.com


The Production and Sale of Larger Red Worms; by George H. Holwager
http://www.librarything.com/work/5153407
http://books.google.com/books?id=Dt9HAAAACAAJ
http://www.worldcat.org/oclc/756886    allbookstores.com    bing.com        bookfinder.com
~
The Role of Earthworms in Agriculture and Land Management; by Mike Temple-Smith
http://books.google.com/books?id=_Yf7tgAACAAJ
http://www.worldcat.org/oclc/38397782    allbookstores.com    bing.com    bookfinder.com


The Worm Book: The Complete Guide to Gardening and Composting with Worms; by Loren
Nancarrow
http://www.librarything.com/work/653193
http://books.google.com/books?id=rmtZ91zbxLMC
http://www.worldcat.org/oclc/38067650
~ Kindle book     allbookstores.com   bing.com    bookfinder.com    yahoo.com


The Worm Book For Beginners: A Vermiculture Starter or How To Be A Backyard Worm Farmer
And Make The Best Natural Compost From Worms; by Frank Randall
http://www.librarything.com/work/12326569
~ Kindle book     allbookstores.com   bing.com      bookfinder.com   yahoo.com


The Worm Cafe: Mid-scale Vermicomposting of Lunchroom Wastes; by Binet Payne
http://www.librarything.com/work/1124844
http://books.google.com/books?id=IsUKAAAACAAJ
http://www.worldcat.org/oclc/41343935    allbookstores.com bing.com      bookfinder.com


The Worm Farm: a Diary: Complete Story of Building and Operating a $20,000.00 Worm Business ;
by Charlie Morgan
http://books.google.com/books?id=X9y1GAAACAAJ
http://www.worldcat.org/oclc/220271918   allbookstores.com    bing.com      bookfinder.com


The Worm Guide: A Vermicomposting Guide for Teachers; by Tavia Pagan
http://books.google.com/books?id=1IL4PAAACAAJ
http://www.worldcat.org/oclc/49339696  allbookstores.com    bing.com      bookfinder.com


The Worm Guide: A Vermicomposting Guide for Teachers; by California Integrated Waste
Management Board
http://www.librarything.com/work/11236245
http://www.worldcat.org/oclc/316871428    allbookstores.com   bing.com       bookfinder.com
~
Using Earthworms to Make Super Vermicompost, South Africa; by Charl Pienaar
http://books.google.com/books?id=e7SWXwAACAAJ
http://www.worldcat.org/oclc/467149455 allbookstores.com       bing.com     bookfinder.com


Value Addition on Biogas Effluent Through Vermicomposting Using Earthworms
google.com allbookstores.com        bing.com    bookfinder.com      yahoo.com


Vermi Composting Techniques; by Marcie Snyder
~ Kindle book   allbookstores.com      bing.com     bookfinder.com     yahoo.com


Vermicompost: A Bio-Organic Fertilizer: Vermicompost: Rich Supplement for Your Home
Gardening
http://books.google.com/books?id=1reeZwEACAAJ


Vermicompost Amended Pine Bark Substrate Improves Nursery Crop Production ; by Michelle S.
McGinnis
http://books.google.com/books?id=3ac980LCk8QC
http://www.worldcat.org/oclc/183034860 allbookstores.com   bing.com      bookfinder.com


Vermicompost and NPK on Wheat: Growth, Chemical Composition and Yield; by Mohammad Saiful
Islam Bhuiyan
http://books.google.com/books?id=GWmmMQEACAAJ


Vermicomposting; by Ontario Environment
http://www.worldcat.org/oclc/670416286    allbookstores.com    bing.com     bookfinder.com


Vermicomposting: 1-2-3 Worm Composting Bin; by Recycling Council of Ontario
http://books.google.com/books?id=9fMrHAAACAAJ
http://www.worldcat.org/oclc/40153236  allbookstores.com    bing.com      bookfinder.com


Vermicomposting: A Beginners Guide to making Organic Compost with a Home Made Worm Farm;
by Jana Wilcox
~ Kindle book  allbookstores.com    google.com bing.com yahoo.com
~
Vermicomposting: A Boon for Soil, Plant and Environment ; by Keshav Singh
http://books.google.com/books?id=1reeZwEACAAJ


Vermicomposting: A Teachers Guide for Composting with Worms; by Wisconsin. Dept. of Natural
Resources
http://books.google.com/books?id=EzHmGwAACAAJ
http://www.worldcat.org/oclc/41477048   allbookstores.com  bing.com       bookfinder.com


Vermicomposting: An Eco Approach Towards Pollution Management; Usha Damodharan; by Arun
Karnwal
http://books.google.com/books?id=cX91MAEACAAJ


Vermicomposting: From Microbial and Earthworm Induced Effects in Bacterial Sanitation to the
Chemistry of Biodegradation Under Batch Or Continuous Operation
http://books.google.com/books?id=IbkBuyICJ9wC
http://www.worldcat.org/oclc/665191603    allbookstores.com    bing.com     bookfinder.com


Vermicomposting: Recycling Wastes Into Valuable Organic Fertilizer; by K P Nagavallemma
http://books.google.com/books?id=d6pKAAAAYAAJ
http://www.worldcat.org/oclc/57914891   allbookstores.com      bing.com      bookfinder.com


Vermicomposting: Solid Waste Management and Crop Improvement: Home Gardening with Home
Waste; by Nandita Mehta
http://books.google.com/books?id=QaCcMQEACAAJ
http://www.worldcat.org/oclc/823319973  allbookstores.com  bing.com    bookfinder.com


Vermicomposting: Selected Articles; by Mary Appelhof
http://books.google.com/books?id=YlIoAAAACAAJ
http://www.worldcat.org/oclc/10374523      allbookstores.com   bing.com     bookfinder.com


Vermicomposting and Vermiwash; by L L Somani
http://www.worldcat.org/oclc/297212101 allbookstores.com        bing.com    bookfinder.com
~
Vermicomposting Brings Better Yields and Returns A Small Farmer Shows the Way; by AME
Foundation
http://www.google.com
http://www.bing.com


Vermicomposting for Sustainable Agriculture; by P K Gupta
http://books.google.com/books?id=jUinAQAACAAJ
http://www.worldcat.org/oclc/65174861     allbookstores.com     bing.com     bookfinder.com


Vermicomposting for Sustainable Agriculture; by R K Pawar
http://books.google.com/books?id=OGpiPgAACAAJ
http://www.worldcat.org/oclc/277278415      allbookstores.com    bing.com     bookfinder.com


Vermicomposting of Cow Slurry; by Paul Hand
http://books.google.com/books?id=ILw5MwEACAAJ
http://www.worldcat.org/oclc/704196282     allbookstores.com     bing.com     bookfinder.com


Vermiculture and Organic Farming; by Sathe Tukaram Vithatran
http://www.librarything.com/work/13118363
http://books.google.com/books?id=lW5fB0sUDK0C
http://www.worldcat.org/oclc/427638359      allbookstores.com   bing.com     bookfinder.com


Vermicomposting Horse Manure; by A B Card
http://www.worldcat.org/oclc/123776008    allbookstores.com      bing.com     bookfinder.com


Vermicomposting Toilets, An Alternative To Latrine Style Microbial Composting Toilets, Prove Far
Superior In Mass Reduction, Pathogen Destruction, Compost Quality, And Operational Cost
http://www.worldcat.org/oclc/4906909633      allbookstores.com     bing.com    bookfinder.com


Vermiculture Revolution; by Rajiv K. Sinha
http://books.google.com/books?id=K6q6cQAACAAJ
http://www.worldcat.org/oclc/663773365     allbookstores.com     bing.com      bookfinder.com
~
Vermiculture Technology: Earthworms, Organic Wastes, and Environmental Management ; by Clive
A. Edwards
http://www.librarything.com/work/10973239
http://books.google.com/books?id=_JJ5Cw5BBxEC
http://www.worldcat.org/oclc/645676613
~ Kindle book     allbookstores.com    bing.com     bookfinder.com    yahoo.com


Vermitechnology; by M. Seetha Lekshmy
http://www.google.com      allbookstores.com   bing.com      bookfinder.com


Vermitechnology: Permutations And Combinations Of Organic Waste; by Abdullah Adil Ansari
http://books.google.com/books?id=LpD1ugAACAAJ


Vermitechnology for Solid Waste Management; by V K Garg
http://books.google.com/books?id=EmM5LgEACAAJ


Vermitechnology, Vermiculture, Vermicompost and Earthworms; by Avnish Chauhan
http://books.google.com/books?id=4oRkLwEACAAJ


Verms and Vermitechnology; by Arvind Kumar
http://books.google.com/books?id=ODwS49rFHeMC
http://www.worldcat.org/oclc/297506435    allbookstores.com      bing.com     bookfinder.com


Waste Recycling: Utilization of Coffee Grounds and Kitchen Waste in Vermicomposting; by Adi
Ainurzaman Jamaludin
http://books.google.com/books?id=PExBLgEACAAJ


Wellington Vermicomposting Trials, 1995/96: Medium Scale Collection and Composting of
Commercial Food Waste Using Tiger Worms in Outdoor Low Capital Cost Systems, New Zealand; by
Dana R Peterson
http://books.google.com/books?id=qYYPMgAACAAJ
http://www.worldcat.org/oclc/153809023      allbookstores.com   bing.com    bookfinder.com
~
What Every Gardener Should Know About Earthworms, Bulletin A-21; by Henry Hopp
http://www.librarything.com/work/5011585
http://books.google.com/books?id=GrX12L3vfmgC
http://www.worldcat.org/oclc/777949
~ Kindle book     allbookstores.com   bing.com   bookfinder.com       yahoo.com


What is vermicomposting; by Illinois
http://www.worldcat.org/oclc/57671629      allbookstores.com     bing.com     bookfinder.com


Wine Country Worms DVD
http://www.happydranch.com
http://www.vermico.com
http://www.sonomavalleyworms.com


With Tails We Win; by Mary Crowe
http://books.google.com/books?id=dTqltwAACAAJ
http://www.worldcat.org/oclc/4557323    allbookstores.com      bing.com     bookfinder.com


Workshop on the Role of Earthworms in the Stabilization of Organic Residues, Volume 1; by Mary
Appelhof
http://books.google.com/books?id=xUE-AQAAIAAJ
http://www.worldcat.org/oclc/9151455     allbookstores.com      bing.com     bookfinder.com


Workshop on the Role of Earthworms in the Stabilization of Organic Residues, Volume 2; by Mary
Appelhof
http://www.worldcat.org/oclc/257394731     allbookstores.com      bing.com     bookfinder.com


Worm Composting; by Joshua D. Nelson
http://books.google.com/books?id=E_fsOMYk0Z0C
http://www.worldcat.org/oclc/39786612
~ Kindle book     allbookstores.com   bing.com        bookfinder.com      yahoo.com


Worm Composting: A Practical Guide by Young Urban Farmers; by Christopher Wong
~ Kindle book  allbookstores.com      bing.com    bookfinder.com       yahoo.com
~
Worm Composting: Composting Ideas for use in Organic Gardening and Growing of Vegetables and
Herbs; by Jack Pollard
http://www.librarything.com/work/13551292
~ Kindle book       allbookstores.com bing.com      bookfinder.com    yahoo.com


Worm Composting: Let Worms Eat Your Garbage; by San Francisco League of Urban Gardeners
http://books.google.com/books?id=NbHzPgAACAAJ
http://www.worldcat.org/oclc/47728382   allbookstores.com    bing.com     bookfinder.com


Worm Composting Bin; by Suzanne Smith Hirrel
http://books.google.com/books?id=oBQhHQAACAAJ
http://www.worldcat.org/oclc/029239848     allbookstores.com     bing.com      bookfinder.com


Worm Composting: Woodworking Plans and Worm Bin Ideas for Use in Organic Gardening ; by Jack
Pollard
http://www.librarything.com/work/13552900
~ Kindle book     allbookstores.com   bing.com  bookfinder.com      yahoo.com


Worm Farm Management: Practices, Principles, Procedures; by Eric Wilson
http://www.librarything.com/work/599056
http://books.google.com/books?id=6DkPAAAACAAJ
http://www.worldcat.org/oclc/42277941   allbookstores.com       bing.com     bookfinder.com


Worm Farming: The Fun and Easy Way to Turn your Waste into Amazing Fertilizer; by Kay
Summers
~ Kindle book  allbookstores.com    bing.com     bookfinder.com     yahoo.com


Worm Farming by Kids for Kids; by Hannah
~ Kindle book  allbookstores.com       bing.com       bookfinder.com       yahoo.com


Wormania: Teaching Guide; by Caton Gauthier
http://www.librarything.com/work/12349310
http://www.worldcat.org/oclc/33927566       allbookstores.com    bing.com      bookfinder.com
~
Worming Your Way to Better Compost; by New Hampshire Governor's Recycling Program
http://books.google.com/books?id=Pv0IHQAACAAJ
http://www.worldcat.org/oclc/32997723    allbookstores.com  bing.com      bookfinder.com


Worms and Waste Management In California: A Question And Answer Factsheet On Vermiculture;
by California Integrated Waste Management Board
http://www.worldcat.org/oclc/34444065      allbookstores.com bing.com    bookfinder.com


Worms and Wormeries: Composting Your Kitchen Waste and More; by Mike Woolnough
http://www.librarything.com/work/12354489
http://books.google.com/books?id=HaAZQwAACAAJ
http://www.worldcat.org/oclc/495273629    allbookstores.com bing.com    bookfinder.com


Worms Downunder Downunder: For Farm, Garden, Schools, Profit and Recycling; by Allan Windust
http://www.librarything.com/work/10169485
http://books.google.com/books?id=ksxdMQAACAAJ
http://www.worldcat.org/oclc/38352918   allbookstores.com bing.com      bookfinder.com


Worms Garden for You; by Allan Windust
http://books.google.com/books?id=NxOmAAAACAAJ
http://www.worldcat.org/oclc/40871977  allbookstores.com        bing.com    bookfinder.com


Worms the Mechanics of Organics; by Kellie Bollard
http://books.google.com/books?id=itGZSQAACAAJ
http://www.worldcat.org/oclc/693545699      allbookstores.com   bing.com    bookfinder.com


Worms, Worms and Even More Worms: A Vermicomposting Guide for Teachers; by Anthony Eulo
http://books.google.com/books?id=UEECAAAACAAJ
http://www.worldcat.org/oclc/40865304  allbookstores.com bing.com     bookfinder.com


Worms, Worms, Worms, New Zealand; by Joy Allcock
http://books.google.com/books?id=potkewAACAAJ
http://www.worldcat.org/oclc/665171480   allbookstores.com       bing.com    bookfinder.com
~


GREY WATER RECYLING
The New Create an Oasis with Greywater: Choosing, Building and Using Greywater Systems -
Includes Branched Drains; by Art Ludwig
http://www.librarything.com/work/2194973
http://books.google.com/books?id=VQNDAQAACAAJ
http://www.worldcat.org/oclc/319646247   allbookstores.com    bing.com    bookfinder.com


Branched Drain Greywater Systems: Reliable, Sanitary, Low Maintenance Distribution of Household
Greywater to Downhill Plants Without Filtration Or Pumping; by Art Ludwig
http://www.librarything.com/work/2194999
http://books.google.com/books?id=AJkNAAAACAAJ
http://www.worldcat.org/oclc/46820337     allbookstores.com     bing.com   bookfinder.com


Builder's Greywater Guide: Installation of Greywater Systems in New Construction and Remodeling ;
by Art Ludwig
http://www.librarything.com/work/2168145
http://books.google.com/books?id=PZS1QwAACAAJ
http://www.worldcat.org/oclc/45833015       allbookstores.com    bing.com    bookfinder.com


Create an Oasis With Greywater: Your Complete Guide to Choosing, Building and Using Greywater
Systems; by Art Ludwig (2000)
http://www.librarything.com/work/326733
http://books.google.com/books?id=y-kLAQAAMAAJ
http://www.worldcat.org/oclc/76901413   allbookstores.com    bing.com      bookfinder.com


Domestic Greywater: A Review of Alternatives for Its Treatment and Uses; by Martin M Karpiscak
http://books.google.com/books?id=griKHAAACAAJ
http://www.worldcat.org/oclc/71320428     allbookstores.com     bing.com      bookfinder.com


Every Drop is Precious: Greywater as an Alternative Water Source, Australia; by Glenda Emmerson
http://books.google.com/books?id=_Ty3twAACAAJ
http://www.worldcat.org/oclc/222251354        allbookstores.com    bing.com        bookfinder.com


Graywater Systems, Composting Toilets And Rainwater Collection Systems : A Resource List ; by
Rocky Mountain Institute
http://www.worldcat.org/oclc/40136853    allbookstores.com     bing.com     bookfinder.com
~
Greywater and Rainwater Systems: Recommended UK Requirements; by S Mustow
http://books.google.com/books?id=bJZnAAAACAAJ
http://www.worldcat.org/oclc/43726768   allbookstores.com bing.com      bookfinder.com


Greywater Management in Low an And Middle-income Countries: Review of Different Treatment
Systems for Households or Neighbourhoods; by Stefan Diener
http://www.librarything.com/work/11556394
http://books.google.com/books?id=Nj0OtwAACAAJ


Greywater Reuse for the Irrigation of Food Crops; by Sara Finley
http://books.google.com/books?id=v1DjSAAACAAJ
http://www.worldcat.org/oclc/429188579       allbookstores.com     bing.com     bookfinder.com


Greywater Reuse In Rural Schools; by Nehru Marg
http://www.worldcat.org/oclc/385258373       allbookstores.com      bing.com     bookfinder.com


Greywater Treatment Within Semi-centralised Supply and Treatment Systems by the Example of the
People's Republic of China; by Yue Chang
http://books.google.com/books?id=oz3fZwEACAAJ
http://www.worldcat.org/oclc/670416927      allbookstores.com   bing.com     bookfinder.com


Greywater Use in the Middle East: Technical, Social, Economic and Policy Issues; by Stephen
McIlwaine
http://www.librarything.com/work/11357398
http://books.google.com/books?id=De0_BrweA1UC


Introduction to Greywater Management, Australia; by Peter Ridderstolpe
http://books.google.com/books?id=2vDpCV9-37wC
http://www.worldcat.org/oclc/38387945      allbookstores.com        bing.com     bookfinder.com


Laundry to Landscape Grey Water Systems: A Simple, Efficient, Economical, Easy-to-Use
Greywater System; by Art Ludwig
http://books.google.com/books?id=QdEwQwAACAAJ
http://www.worldcat.org/oclc/556147645   allbookstores.com     bing.com     bookfinder.com
~
Making the Most of the Water We Have: The Soft Path Approach to Water Management; by David B
Brooks
http://books.google.com/books?id=FBEsMk76kyIC
http://www.worldcat.org/oclc/586098202    allbookstores.com    bing.com    bookfinder.com


Manual of Grey Water Treatment Practice; John H. Timothy Winneberger
http://books.google.com/books?id=nRFSAAAAMAAJ
http://www.worldcat.org/oclc/2585925       allbookstores.com  bing.com        bookfinder.com


Rainwater and Greywater Use in Buildings: Best Practice Guidance; by Daniel J. Leggett
http://books.google.com/books?id=nXe5PAAACAAJ
http://www.worldcat.org/oclc/48894192       allbookstores.com      bing.com       bookfinder.com


Rainwater and Greywater Use in Buildings: Decision-Making for Water Conservation; by Daniel J.
Leggett
http://books.google.com/books?id=8vlRPQAACAAJ
http://www.worldcat.org/oclc/48886913      allbookstores.com   bing.com     bookfinder.com


Rainwater and Greywater in Buildings: Project Report and Case Studies; by D. Brewer
http://www.librarything.com/work/12859611
http://books.google.com/books?id=Dz9dAAAACAAJ
http://www.worldcat.org/oclc/48255587     allbookstores.com    bing.com        bookfinder.com


Simulation of Domestic Water Re-use Systems: Greywater and Rainwater in Combination; by Andrew
Martin Dixon
http://books.google.com/books?id=ma9CHQAACAAJ
http://www.worldcat.org/oclc/53551527      allbookstores.com   bing.com     bookfinder.com


The Complete Guide to Water Storage: How to Use Gray Water and Rainwater Systems, Rain
Barrels, Tanks, and Other Water Storage Techniques for Household and Emergency Use; by Julie Frye
http://books.google.com/books?id=SINk832GJa4C
http://www.worldcat.org/oclc/741710615       allbookstores.com     bing.com   bookfinder.com


The Evaluation of a Domestic On-site System Incorporating a Composting Toilet and Greywater
Reedbed; by Andrew George Edward
http://books.google.com/books?id=YW3vNAAACAAJ
http://www.worldcat.org/oclc/222730926        allbookstores.com   bing.com      bookfinder.com
~


Water For Every Farm: Yeomans Keyline Plan; by P. A. Yeomans
http://www.librarything.com/work/2191599
http://books.google.com/books?id=cFebQQAACAAJ
http://www.worldcat.org/oclc/27598545
~ Kindle book    allbookstores.com   bing.com         bookfinder.com     yahoo.com


Water Not Just down the Drain: a Guide to Reusing and Treating Your Household Water, Australia;
by Stuart McQuire
http://www.librarything.com/work/11165284
http://books.google.com/books?id=wIkXIgAACAAJ
http://www.worldcat.org/oclc/225372999     allbookstores.com    bing.com     bookfinder.com



FREE RAIN WATER HARVESTING MANUALS and Much More
http://www.scribd.com/doc/75160853
http://www.calameo.com/books/00105118622f34ba7dbe7



FREE WATER WISE Gardening, DROUGHT Gardening, XERISCAPE Gardening
MANUALS, Books and Much More
http://www.scribd.com/doc/105267038
http://calameo.com/books/001698854129dced31cc9



FREE RAIN GARDEN MANUALS, BROCHURES and INFORMATION SHEETS
http://www.scribd.com/doc/75162927
http://www.calameo.com/books/00105118638b46251e05d


FREE ROOF GARDENS - GREEN ROOFS MANUALS Links and Aquaponics Systems
http://www.scribd.com/doc/45480026
http://calameo.com/books/00135160793af637917ef


GREEN CHURCHES
http://www.scribd.com/doc/75171088
http://calameo.com/books/0010511867f3f30cfdf12
~

REED BEDS Water Recycling
On-site Domestic Wastewater Treatment by Reed Bed and Sand Filter; by Mark Laurence Bayley
http://books.google.com/books?id=stNBNQAACAAJ
http://www.worldcat.org/oclc/223412885    allbookstores.com    bing.com      bookfinder.com


Reed Beds: For the Treatment of Domestic Wastewater; by Nick Grant
http://www.librarything.com/work/5575369
http://books.google.com/books?id=IYKCAAAACAAJ
http://www.worldcat.org/oclc/59496097    allbookstores.com     bing.com    bookfinder.com


Reedbeds for Greywater Treatment-Case Study in Santa Elena-Monteverde, Costa Rica, Central
America; by Stewart Dallas
http://www.worldcat.org/oclc/648856080   allbookstores.com    bing.com     bookfinder.com


Sewage Solutions: Answering the Call of Nature; by Nick Grant
http://www.librarything.com/work/1901790
http://books.google.com/books?id=AT6lOAAACAAJ
http://www.worldcat.org/oclc/48232389    allbookstores.com      bing.com   bookfinder.com


Sludge Management Using Reed Bed System Palestine Case Study; by Abdelmajid Nassar
http://books.google.com/books?id=BYJTRwAACAAJ
http://www.worldcat.org/oclc/500463298  allbookstores.com      bing.com     bookfinder.com


The Performance of Two Reed Bed Greywater Treatment Systems in North Eastern New South
Wales; by Meg Kezia Edmonds
http://books.google.com/books?id=-mKKNAAACAAJ
http://www.worldcat.org/oclc/223301040  allbookstores.com     bing.com     bookfinder.com

Reedbed Management For Commercial And Wildlife Interests; by Carl Hawke
http://books.google.com/books?id=lXbwAAAAMAAJ

Small-Scale Constructed Wetland Treatment Systems; by Scott D. Wallace
http://books.google.com/books?id=YVcOAQAACAAJ

Sludge Management Using Reed Bed System Palestine Case Study; by Abdelmajid Nassar
http://books.google.com/books?id=BYJTRwAACAAJ
~

COMPOSTING Animal MANURE
An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural,
Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism
http://www.librarything.com/work/5162954
http://books.google.com/books?id=drOMQQAACAAJ
http://www.worldcat.org/oclc/54830842     allbookstores.com  bing.com     bookfinder.com


A Comparison of Composting Shavings-Based Horse Manure with Straw-based Horse Manure; by
Matthew Robert James
http://books.google.com/books?id=dCFWMwEACAAJ
http://www.worldcat.org/oclc/795949716  allbookstores.com   bing.com     bookfinder.com


A Comparison of Three Animal Manure Composts on the Growth of Potatoes; by Peter John Rich
http://books.google.com/books?id=STxOMwEACAAJ
http://www.worldcat.org/oclc/795967801 allbookstores.com    bing.com       bookfinder.com


A Guide to Composting Horse Manure; by Jessica Paige
https://www.google.com    allbookstores.com    bing.com      bookfinder.com


A Manual on Compost and Other Organic Manures; by R. Krishna Murthy
http://books.google.com/books?id=vWVCAAAAYAAJ
http://www.worldcat.org/oclc/4331209   allbookstores.com     bing.com       bookfinder.com


An Assessment of the Effectiveness of Micro Aid Treatment in Solids Reduction and Composting of
Beef Cattle Feedlot Manure; by Jim Fujikawa
http://books.google.com/books?id=vAccHAAACAAJ
http://www.worldcat.org/oclc/70376938     allbookstores.com     bing.com     bookfinder.com


Characterizing The Process Of Composting Mink Manure; by Jennifer L Ferguson
http://www.worldcat.org/oclc/228977263    allbookstores.com    bing.com      bookfinder.com
~
Cold Climate Composting: An Opportunity for Enhanced Manure Management; by Jeremy James
Leonard
http://books.google.com/books?id=jnGvGwAACAAJ
http://www.worldcat.org/oclc/70492476    allbookstores.com  bing.com    bookfinder.com


Comparative Study of Methods of Aeration for Composting Manure Slurries;; by Majid Sartaj
http://www.worldcat.org/oclc/46508836      allbookstores.com  bing.com       bookfinder.com


Composted Manures Offer Yield and Disease Resistance Benefits; by University of Wisconsin
http://books.google.com/books?id=xJg0OAAACAAJ
http://www.worldcat.org/oclc/47165846    allbookstores.com      bing.com     bookfinder.com


Composted Swine Manure for Vegetable Crop Application; by Halina Maria Zaleski
http://books.google.com/books?id=SadgNwAACAA
http://www.worldcat.org/oclc/74200328   allbookstores.com     bing.com     bookfinder.com


Composted Versus Stacked Cattle Manure on Ontario Farms; by George M Karanja
http://www.worldcat.org/oclc/46534522   allbookstores.com    bing.com    bookfinder.com


Composting: An Alternative for Livestock Manure Management; by Andrew Thomas Sandeen
http://www.worldcat.org/oclc/57948653     allbookstores.com  bing.com    bookfinder.com


Composting: The Safe Conversion of Village Refuse and Nightsoil into a Valuable Manure; by J W
Scharff
http://www.worldcat.org/oclc/642508781 allbookstores.com       bing.com      bookfinder.com


Composting Animal Manures: A Guide to the Process and Management of Animal Compost; by
Chris Augustin
http://books.google.com/books?id=sRQBcgAACAAJ
http://www.worldcat.org/oclc/642010770   allbookstores.com   bing.com    bookfinder.com


Composting as a Manure Management Strategy for a Calf Farm in Northeast Wisconsin; by Paul C
Robertson
http://books.google.com/books?id=K01dOAAACAAJ
http://www.worldcat.org/oclc/60652912   allbookstores.com     bing.com     bookfinder.com
~
Composting as a Manure Management Alternative; by Francis J Larney
http://books.google.com/books?id=GMsQtwAACAAJ
http://www.worldcat.org/oclc/70594044   allbookstores.com      bing.com         bookfinder.com


Composting Cage Layer Manure with Poulry Litter and The Use of Compost as A Source of
Nitrogen for Ruminants; by A K M Aminul Haque
http://www.worldcat.org/oclc/30531388   allbookstores.com     bing.com     bookfinder.com


Composting Characteristics of Mixed Dairy Manure with Bulking Agent; by Hong, Ji Hyoung
http://www.worldcat.org/oclc/677412605     allbookstores.com    bing.com     bookfinder.com


Composting for Manure Management; by BioCycle
http://books.google.com/books?id=U44dAQAAMAAJ


Composting for Small Scale Livestock Operations, by University of Illinois Extension
https://www.google.com      allbookstores.com    bing.com      bookfinder.com



Composting Horse Manure; by Brent Walter Auvermann, Texas A&M
http://www.worldcat.org/oclc/42291763    allbookstores.com  bing.com           bookfinder.com
https://www.google.com



Composting Horse Manure; by Brian Van Der Wege, Thal Equine
https://www.google.com      allbookstores.com   bing.com    bookfinder.com


Composting Horse Manure; by Kathy Corwin Doesken, Colorado State University
https://www.google.com      allbookstores.com  bing.com      bookfinder.com



Composting Horse Manure; by E A Ott
http://www.worldcat.org/oclc/48269631      allbookstores.com     bing.com      bookfinder.com
~
Composting Horse Manure; by Gibbs Ferris, The Livestock and Land Program
https://www.google.com   allbookstores.com     bing.com      bookfinder.com



Composting Horse Manure; by Maryland Department of Agriculture
https://www.google.com allbookstores.com    bing.com      bookfinder.com



Composting Horse Manure: A Field Guide for Recycling Equestrian Waste, by Cooperative
Extension and County of San Diego
https://www.google.com      allbookstores.com  bing.com       bookfinder.com



Composting Horse Manure in Dynamic Windrows; by A B Card
http://www.worldcat.org/oclc/123775199
https://www.google.com        allbookstores.com bing.com       bookfinder.com



Composting horse manure in static windrows, passively aerated windrow method; by A B Card
http://www.worldcat.org/oclc/123899091      allbookstores.com    bing.com     bookfinder.com


Composting liquid pig manure folder; by Ron Fleming
http://www.worldcat.org/oclc/629033812     allbookstores.com    bing.com      bookfinder.com


Composting Manure: Turn Horse Manure into Black Gold; by Environmental Equine
~ Kindle book  allbookstores.com    bing.com       bookfinder.com    yahoo.com


Composting Manure and Other Organic Residues; Bahman Eghball
http://books.google.com/books?id=8V3ctgAACAAJ
http://www.worldcat.org/oclc/41268311 allbookstores.com   bing.com         bookfinder.com


Composting Manure for Value-Added Products; by JG Press
http://books.google.com/books?id=ymDUPQAACAAJ
http://www.worldcat.org/oclc/49918878  allbookstores.com       bing.com    bookfinder.com
~
Composting of farm manure; by Small Farm Energy Projec
http://www.worldcat.org/oclc/25146410   allbookstores.com       bing.com      bookfinder.com


Composting of High Moisture Dairy Manure Using Sawdust Or Mixed Paper as Amendments and
Wood Chips as the Bulking Agent; by Md Shahjahan Mollah
http://books.google.com/books?id=r9yQtgAACAAJ
http://www.worldcat.org/oclc/156679489    allbookstores.com  bing.com     bookfinder.com


Composting on Horse Farms; by H.M. Keener, Ohio State University
https://www.google.com   allbookstores.com    bing.com      bookfinder.com



Composting Solid Manure; by Katherine E Buckley
http://www.worldcat.org/oclc/629684903    allbookstores.com        bing.com     bookfinder.com


Contour ripping and composted dairy manure for erosion control on Fort Hood Military Installation;
by Lisa J Prcin
http://www.worldcat.org/oclc/662322787    allbookstores.com      bing.com    bookfinder.com


Composting System for Small Horse Farms; by Douglas W. Hamilton, Oklahoma Cooperative
Extension Service
http://www.worldcat.org/oclc/648264554
https://www.google.com       allbookstores.com bing.com     bookfinder.com


Covering Tree Line with Black Poly Ethylene Sheets for Composting Fresh Animal Manures
Reduces Weeds and Improves Tree Growth in Newly Established Orchards; by Barakat Abu
Irmaileh;
http://www.worldcat.org/oclc/825462839 allbookstores.com       bing.com     bookfinder.com


Effect of Aeration and Turning on Decomposition and Odor Emission in Cattle Manure Composting;
by Joko Nugroho Wahyu Karyadi
http://www.worldcat.org/oclc/702866699    allbookstores.com    bing.com      bookfinder.com
~
Effect of Air Flow Rate on Cattle Manure Composting with Forced Aeration; by J.N.W.K. Karyadi
http://www.worldcat.org/oclc/692264521     allbookstores.com   bing.com      bookfinder.com


Effects of Bioadditive With Yeast and Zeolite on The Performance and Odor Emission From Poultry
Manure Composting Process; by Zhiping Wen
http://www.worldcat.org/oclc/607131125       allbookstores.com   bing.com    bookfinder.com


Effect Of Compost Manure Age On Root-Gall Nematode Disease And Yield Of African Yam Bean;
by Agu, C M
http://www.worldcat.org/oclc/810505295  allbookstores.com   bing.com     bookfinder.com


Evaluation of Enriched Farm Manure and Coir Compost for Nitrogen And Moisture Mangement in
Rainfed Sorghum; by K Anabayan
http://www.worldcat.org/oclc/698550768   allbookstores.com    bing.com     bookfinder.com


Experimental Observations of Composting Dairy Manure Solids; by Stephen Earl Ferns
http://books.google.com/books?id=Yl3RNwAACAAJ
http://www.worldcat.org/oclc/19643033    allbookstores.com    bing.com      bookfinder.com


Fertilization with Fresh and Composted Chicken Manure: Effect on Soil Fertility and Mixed Hay
Quality; by Julia Mary Cooper
http://books.google.com/books?id=kEXmNAEACAAJ
http://www.worldcat.org/oclc/228946018      allbookstores.com    bing.com        bookfinder.com


Fertilizer Pellets Made from Composted Livestock Manure; by Masayuki Hara
http://books.google.com/books?id=N3pAygAACAAJ
http://www.worldcat.org/oclc/760010797     allbookstores.com   bing.com       bookfinder.com


Fletcher Sims Compost; by Fletcher Sims
http://www.librarything.com/work/8170309
http://books.google.com/books?id=wo0UAQAAMAAJ
http://www.worldcat.org/oclc/31294906    allbookstores.com     bing.com      bookfinder.com


High Rapid Composting of Dairy Cattle Manure with Crop and Forest Residues; by J. H. Hong
https://www.google.com    allbookstores.com    bing.com     bookfinder.com
~
Horse Manure Management and Composting; by Betsy Wieland
http://books.google.com/books?id=QLREQwAACAAJ
http://www.worldcat.org/oclc/430839604


How to Compost and Use Horse Manure, by Horses for Clean Water, University of Illinois
Extension
https://www.google.com
http://www.bing.com


How to Compost and Use Horse Manure; by Skagit Conservation District
https://www.google.com
http://www.bing.com



How to Compost Manure; by Jack Pollard
~ Kindle book  allbookstores.com http://howtocompostmanure.com         bing.com


Identification of Techniques to Produce Poultry Manure and Compost-tea and Their Benefits in
Vegetable Production; by Steven David
http://books.google.com/books?id=PCwHtwAACAAJ
http://www.worldcat.org/oclc/62542108       allbookstores.com  bing.com      bookfinder.com


Improving Sanitization and Fertiliser Value of Dairy Manure and Waste Paper Mixtures Enriched
with Rock Phosphate Through Combined Thermophilic Composting and Vermicomposting; by
Lushian Tapiwa Mupondi
http://books.google.com/books?id=ePhzMwEACAAJ
http://www.worldcat.org/oclc/796918596        allbookstores.com  bing.com      bookfinder.com


Innovations in Composting Pig Manure; by Dale Philip Rudrum
http://books.google.com/books?id=OG4SAAAACAAJ
http://www.worldcat.org/oclc/70109230     allbookstores.com     bing.com     bookfinder.com


Intensive Vegetable Production Using Composted Animal Manures; by Abigail Abbot Maynard
http://books.google.com/books?id=jD6wMQEACAAJ
http://www.worldcat.org/oclc/25820384    allbookstores.com   bing.com      bookfinder.com
~
Large Scale Vermicomposting - Worm Power
https://www.google.com    allbookstores.com      bing.com     bookfinder.com



Large-Scale Vermicomposting of Dairy Manure
https://www.google.com       allbookstores.com     bing.com     bookfinder.com



Learn How to Make and Use Compost Manure in Farming; by Pius B Ngeze
http://books.google.com/books?id=f4UvtwAACAAJ
http://www.worldcat.org/oclc/48632909   allbookstores.com    bing.com      bookfinder.com


Liquid Fertilizer from Organic Waste Using Anaerobic Process; by Ripan Kumar Saha
http://books.google.com/books?id=wacqOAAACAAJ
http://www.worldcat.org/oclc/50436225      allbookstores.com     bing.com    bookfinder.com


Liquid Organic Fertilizer: An Approach Towards Organic Vegetable Production; Gopal Deore
http://books.google.com/books?id=IwOdpwAACAAJ


Manures and Compost; by A J MacLean
http://www.librarything.com/work/9002114
http://books.google.com/books?id=6oi0MwEACAAJ
http://www.worldcat.org/oclc/15693323    allbookstores.com    bing.com     bookfinder.com


Manure and Composted Manure Application for Corn Production; by Dave Venhaus
http://www.worldcat.org/oclc/57146012  allbookstores.com     bing.com    bookfinder.com


Manure Composting as a Pathogen Reduction Strategy; by Hugh Douglas Martin
http://books.google.com/books?id=9xaaNwAACAAJ
http://www.worldcat.org/oclc/227507239   allbookstores.com    bing.com     bookfinder.com


Manure Composting Converts Raw Organic Waste into a Dark, Soil-Enriching Product; by South
Carolina Conservation
http://www.worldcat.org/oclc/39634842  allbookstores.com     bing.com      bookfinder.com
~
Manure Composting Manual; by Alberta Agriculture
http://books.google.com/books?id=vBb4GgAACAAJ
http://www.worldcat.org/oclc/57021570


MARVEL Composting Technology: A System to Compost Liquid Swine Manure; by Ron Fleming
http://books.google.com/books?id=pob-cQAACAAJ
http://www.worldcat.org/oclc/629773355


Manual of On-Farm Vermicomposting - All Things Organic
https://www.google.com   allbookstores.com     bing.com       bookfinder.com



Manual of On-Farm Vermicomposting and Vermiculture - Organic Agriculture Centre of Canada
https://www.google.com   allbookstores.com   bing.com      bookfinder.com



Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets
librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170
allbookstores.com   google.com    bookfinder.com     booksprice.com     bing.com   yahoo.com

On-Farm Composting: A Method for Converting Manure into Soil-Building Humus While Saving
Time, Money and Fuel; by Land Stewardship Project
http://www.worldcat.org/oclc/23765590


On-Farm Composting of Horse Manure and Its Use As A Fertilizer for Common Forages in North
Florida; by Sarah Courtney Dilling
http://www.worldcat.org/oclc/664030741


On-farm Manure Management Through Composting by Nova Scotia
http://books.google.com/books?id=EYhENwAACAAJ
http://www.worldcat.org/oclc/229200805


On-farm Manure Composting Techniques: Understanding Nitrogen and Carbon Conservation; by
Richard St Jean
http://books.google.com/books?id=G0mDHAAACAAJ
http://www.worldcat.org/oclc/45527906
~
Organic Fertilizers: Which Ones and How to Use Them; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/843239
http://books.google.com/books?id=CGLdAAAACAAJ
http://www.worldcat.org/oclc/673074    bookfinder.com      addall.com    booksprice.com


Organic Fertilizing, Secret of Garden Experts; by Rodale Organic Gardening Magazine
http://www.librarything.com/work/10808299
http://books.google.com/books?id=P7EXYAAACAAJ
http://www.worldcat.org/oclc/18997575      bookfinder.com        addall.com   booksprice.com


Pig Manure Vermicompost as a Component of a Horticultural Bedding Plant Medium
https://www.google.com
http://www.bing.com


Poultry Manure and Composted Yard Trimmings for Organic Vegetable Production in Delta, B.C.;
by Katrina Nolan
http://www.worldcat.org/oclc/606269762


Preliminary Design of a Co Composting System for Dairy Manure and Food Wastes; by David
Profusek
http://books.google.com/books?id=RvtHAAAAYAAJ
http://www.worldcat.org/oclc/688656001


Preventive Control of Ammonia and Odor Emissions During the Active Phase of Poultry Manure
Composting; by Zhang, Wenxiu
http://www.worldcat.org/oclc/680290299


Static Pile Passive Aeration Composting of Poultry Manure Slurry; by Weiguo Zhan
http://www.worldcat.org/oclc/35941805


Studies on the Fermentation of Compost Manure; by G B Masefield
http://www.worldcat.org/oclc/270954740
http://books.google.com/books?id=1iTdPgAACAAJ
~
Successive Rapid Reductive Dehalogenation and Mineralization of Pentachlorophenol by the
Indigenous Microflora of Farmyard Manure Compost; by Jaspers, Charles
http://www.worldcat.org/oclc/803471704


The Composting of Farmyard Manure with Mineral Additives and Under Forced Aeration, and the
Utilization of Fym and Fym Compost in Crop Production; by Pierre R Ott
http://www.worldcat.org/oclc/256321581


The Development and Testing of a Dairy Manure Composting Operation; by James Craig Simmons
http://books.google.com/books?id=GSE9OAAACAA
http://www.worldcat.org/oclc/42705843


The Development of a Manure Composting System for West Virginia Dairy Producers; by James
Simmons
http://books.google.com/books?id=i5c0AwEACAAJ
http://www.worldcat.org/oclc/43272070


The Composting of Poultry Manure with Two Paper Waste Materials; by T S J Budd
http://books.google.com/books?id=D5f4cQAACAAJ
http://www.worldcat.org/oclc/643389302


The effect of sheep-manure vermicompost on quantitative and qualitative properties of cucumber
grown in the greenhouse
https://www.google.com
http://www.bing.com


The Use of Composted Dairy Cow Manure as a Peat Moss Substitute in a Greenhouse Growing
Substrate; by Wesley Dean Bannister
http://books.google.com/books?id=X_77tgAACAAJ
http://www.worldcat.org/oclc/318355456


The Use of Dairy Manure Compost for Sustainable Maize Production; by Vania Cabus De Toledo
http://www.worldcat.org/oclc/53653943
~



The Use of Hartpury College Composted Horse Manure as Medium for Tomato Production; by
Caphas Chisangowerota
http://www.worldcat.org/oclc/795967684



The Use of Spent Mushroom Compost as an Organic Manure; by John Anthony Duggan
http://books.google.com/books?id=x6jUSAAACAAJ
http://www.worldcat.org/oclc/605203133



Under-Cage Drying and Windrow Composting of Manure; by William C Fairbank
http://www.worldcat.org/oclc/16789029



Use of wood ash and composted manure as an alternative to limestone and fertilizer; by Jaote Makau
Wawatu
http://www.worldcat.org/oclc/163586549



Vermicomposting Horse Manure; by .B. Card, Colorado State University, Equine Extension
https://www.google.com
http://www.bing.com



Windrow Management Methods for Composting Straw Amended Dairy Manure; by Michael C
Kenny
http://www.worldcat.org/oclc/44916229



Vermicomposting of Cow Slurry; by Paul Hand
http://books.google.com/books?id=ILw5MwEACAAJ
http://www.worldcat.org/oclc/704196282
~

COMPOSTING WATERLESS TOILETS
The Composting Toilet System Book: A Practical Guide to Choosing, Planning and Maintaining
Composting Toilet Systems, a Water-Saving, Pollution-Preven; by David Del Porto
http://www.librarything.com/work/606354
http://books.google.com/books?id=HRWKkgEACAAJ
http://www.worldcat.org/oclc/44413552    bookfinder.com       addall.com      booksprice.com


Appraisal of the Pilot Trials of Compost Toilets on Kiritimati Island ; by AusAID
http://books.google.com/books?id=UoxrcgAACAAJ
http://www.worldcat.org/oclc/640510854


Aerobic Thermophilic Composting of Piggery Solid Wastes; by Surya Prakash Pandey
http://books.google.com/books?id=lKa9MgAACAAJ
http://www.worldcat.org/oclc/155517687


Cheap Tricks for North Country Compost Toilets, Wastewater Recycling and Methane Digesters ; by
Zandy Clark
http://books.google.com/books?id=GJzgHAAACAAJ
http://www.worldcat.org/oclc/41706925


Compost Toilets:A Guide for Owner-Builders; by Ida Daniels, National Center for Appropriate
Technology
http://books.google.com/books?id=Ef3fZwEACAAJ
http://www.worldcat.org/oclc/6604184


Compost Toilets: A Practical DIY Guide: by Dave Darby
http://books.google.com/books?id=p9xPLwEACAAJ
http://www.worldcat.org/oclc/812342721 bookfinder.com             addall.com        booksprice.com


Compost Toilets: An Option for Human Waste Disposal at Remote Sites; by Paul Donald Chapman
http://books.google.com/books?id=rykUMgAACAAJ
http://www.worldcat.org/oclc/152376261
~
Compost Toilets as an Alternative to the Honeybucket in a Rural Alaska Native Village ; by Simone
Magyari Sebalo
http://books.google.com/books?id=K7NNQwAACAAJ
http://www.worldcat.org/oclc/436237016


Composting Toilet: Septic Tank, Composting, Sewage Treatment, Sewer, Latrine, Pit Toilet,
Arborloo, Tree Bog, Chemical Toilet, Clivus Multrum, Ecological Sanitation, Humanure,
Incinerating Toilet; by Frederic P. Miller
http://books.google.com/books?id=lOwtQwAACAAJ


Composting Toilet from Alley Scraps; by Allen Killian-Moore
http://www.librarything.com/work/11827113
http://books.google.com/books?id=XexkMwEACAAJ
http://www.worldcat.org/oclc/794452328      bookfinder.com       addall.com     booksprice.com


Composting Toilets: A Critical Guide to Their Application and Operation in Canada; by Canada.
Water Pollution Control Directorate
http://books.google.com/books?id=D8iPXwAACAAJ
http://www.worldcat.org/oclc/320852518


Composting Toilets and Greywater Disposal: Building Your Own; by Zandy Clark
http://books.google.com/books?id=r_CBHAAACAAJ
http://www.worldcat.org/oclc/41823653 bookfinder.com       addall.com      booksprice.com


Composting Toilets Search; by Small Flows Clearinghouse
http://books.google.com/books?id=indMkgAACAAJ
http://www.worldcat.org/oclc/41815854


Composting Toilet System: Plans and Instruction Manual; by James D. Beard
http://books.google.com/books?id=YZgGaAEACAAJ
http://www.worldcat.org/oclc/707489613


Design Examples of Waterless Composting Toilets; by Derrick Depledge
http://books.google.com/books?id=QbGdNQAACAAJ
http://www.worldcat.org/oclc/223787240
~
Do-It-Yourself: Composting Toilets; by Charlotte Adelaide
http://books.google.com/books?id=pratZwEACAAJ
http://www.worldcat.org/oclc/799057658 bookfinder.com           addall.com      booksprice.com


Double-Vault Composting Toilets: A State-of-the-art Review; by Witold Rybczynski
http://books.google.com/books?id=leNMNAAACAAJ
http://www.worldcat.org/oclc/220181279


An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural,
Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism
http://www.librarything.com/work/5162954
http://books.google.com/books?id=drOMQQAACAAJ
http://www.worldcat.org/oclc/54830842     bookfinder.com   addall.com     booksprice.com


Fletcher Sims' Compost; by Charles Walters
http://www.librarything.com/work/8170309
http://books.google.com/books?id=wo0UAQAAMAAJ
http://www.worldcat.org/oclc/31294906      bookfinder.com        addall.com      booksprice.com


Future Fertility: Transforming Human Waste in to Human Wealth ; by John Beeby
http://www.librarything.com/work/4546863
http://books.google.com/books?id=XexkMwEACAAJ
http://www.worldcat.org/oclc/35304581    bookfinder.com     addall.com       booksprice.com


Goodbye to the Flush Toilet: Water-Saving Alternatives to Cesspools, Septic Tanks, and Sewers; by
Carol Hupping Stoner
librarything.com/work/5011494
http://books.google.com/books?id=gjM5AQAAIAAJ
http://www.worldcat.org/oclc/154090382     bookfinder.com       addall.com     booksprice.com


How to Build a Compost Toilet; by Dan Martin
~ Kindle book    allbookstores.com     bing.com        bookfinder.com        yahoo.com


How to Build a Compost Toilet and Save a Piece of the Earth: A Guide for the Homeowner/builde ; by
Ron Davis
http://books.google.com/books?id=J29yHAAACAAJ
http://www.worldcat.org/oclc/19875690
~
Lifting the Lid: An Ecological Approach to Toilet Systems; by Peter Harper
http://www.librarything.com/work/2828721
http://books.google.com/books?id=W5eEJQ7ezFkC
http://www.worldcat.org/oclc/44059281      bookfinder.com        addall.com    booksprice.com


Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets
librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170


On-site Domestic-Wastewater Treatment Units, Part 2: Waterless composting toilets ; by Standards
Australia
http://books.google.com/books?id=BhLZQgAACAAJ
http://www.worldcat.org/oclc/232969281


Recycling Human Waste: Composting Toilets as a Remedial Action in Hamilton Harbour ; by Wendy
Wynia
http://books.google.com/books?id=3_wUtwAACAAJ
http://www.worldcat.org/oclc/761892733


Skycrapper: An Above-Ground Aerobic and Solar-Assisted Composting Toilet
http://www.worldcat.org/oclc/4433333604 bookfinder.com     addall.com            booksprice.com


Solar Energy Utilization in Composting Toilets; by Max L. Kroschel
http://books.google.com/books?id=Y8x7ugAACAAJ
http://www.worldcat.org/oclc/9056048


Solar Evaporation of Liquid Effluent from Composting Toilets in Cool Temperate Climates ; by David
Paul Holman
http://books.google.com/books?id=Xg9wNAAACAAJ
http://www.worldcat.org/oclc/225063895


The Application of Solar Technologies to Composting Toilets in Cold Remote Locations ; by Matthew
Thomas Dickson
http://books.google.com/books?id=oLOttgAACAAJ
http://www.worldcat.org/oclc/224957757
~
The Composting Toilet System, Or, The Waterless Toilet; by Ian E. Howarth
http://books.google.com/books?id=mRWltgAACAAJ
http://www.worldcat.org/oclc/154090382


The Humanure Handbook: A Guide to Composting Human Manure; by Joseph C. Jenkins
http://www.librarything.com/work/560303
http://books.google.com/books?id=pIArAAAAYAAJ
http://www.worldcat.org/oclc/794452328  bookfinder.com addall.com        booksprice.com


The Last Taboo: Opening the Door on the Global Sanitation Crisis; by Maggie Black
http://www.librarything.com/work/5045343
http://books.google.com/books?id=TV0YWguY3nEC
http://www.worldcat.org/oclc/677426915    bookfinder.com       addall.com      booksprice.com


The Raw Guide To Construction Of Composting Toilets And Natural Greywater Systems; by Raw Press
http://books.google.com/books?id=tfc7AAAACAAJ
http://www.worldcat.org/oclc/225949468


The Toilet Paper: A Dry Composting Toilet Design-Build Venture in Yunnan, China; by Deborah Go
http://www.worldcat.org/oclc/755811183
http://www.google.com     http://www.bing.com


The Toilet Papers: Recycling Waste and Conserving Water; by Sim Van der Ryn
http://www.librarything.com/work/606534
http://books.google.com/books?id=h5YJu6wFYmMC
http://www.worldcat.org/oclc/32236516    bookfinder.com       addall.com    booksprice.com


Toilets That Make Compost: Low-Cost, Sanitary Toilets That Produce Valuable Compost for Crops
in an African Context; by Peter Morgan
http://www.librarything.com/work/5341119
http://books.google.com/books?id=CGzYBM2G2EwC
http://www.worldcat.org/oclc/228374257   bookfinder.com       addall.com     booksprice.com


The Waterless Toilet: Is it for You (Garden Way Bulletin); by Ron Poitras
http://www.librarything.com/work/10182207
http://books.google.com/books?id=9sKSGAAACAAJ
http://www.worldcat.org/oclc/5882212       bookfinder.com       addall.com   booksprice.com
~
Toilets That Make Compost: Low-Cost, Sanitary Toilets That Produce Valuable Compost for Crops
in an African Context; by Peter Morgan
http://www.librarything.com/work/5341119
http://books.google.com/books?id=CGzYBM2G2EwC
http://www.worldcat.org/oclc/228374257   bookfinder.com       addall.com     booksprice.com


Using Human Waste Safely for Livelihoods, Food Production and Health: Information Kit on the
Third Edition of the Guidelines for the Safe Use of Wastewater, Excreta and Greywater in
Agriculture and Aquaculture; by World Health Organization
http://www.librarything.com/work/11663724


Water Conservation: Shower, Composting Toilet, Reclaimed Water, Greywater, Water Purification,
Evaporation, Surface Runoff, Pan Evaporation, Surface Irrigation, Irrigation, Drip Irrigation; by
Lambert M. Surhone
http://www.librarything.com/work/9993288
http://books.google.com/books?id=SM35QwAACAAJ


Wastewater Irrigation and Health: Assessing and Mitigating Risk in Low-Income Countries; by Pay
Drechsel
http://books.google.com/books?id=eteKb8lnef4C
http://www.worldcat.org/oclc/593329239 bookfinder.com          addall.com    booksprice.com


WHO Guidelines for the Safe Use of Wastewater, Excreta And Greywater; by World Health
Organization
http://www.librarything.com/work/8566179 bookfinder.com       addall.com      booksprice.com
http://books.google.com/books?id=uJJ3UIPGtFIC


Liquid Gold: The Lore and Logic of Using Urine to Grow Plants; by Carol Steinfeld
http://www.librarything.com/work/2168127
http://books.google.com/books?id=a_HqYKTMXxAC
http://www.worldcat.org/oclc/137295284    bookfinder.com        addall.com      booksprice.com


Holy Shit: Managing Manure To Save Mankind; by Gene Logsdon
librarything.com/work/10365968
http://www.librarything.com/work/10365968
http://books.google.com/books?id=a_HqYKTMXxAC
http://www.worldcat.org/oclc/610835212
~ Kindle book     allbookstores.com  bing.com       bookfinder.com        yahoo.com
~

Growing Clean Water
Growing Clean Water: Nature's Solution to Water Pollution; by B. C. Wolverton
http://books.google.com/books?id=HnJOAAAAYAAJ
http://www.wolvertonenvironmental.com      bookfinder.com        addall.com     booksprice.com


Aquatic Plants for Ph Adjustment and Removal of Toxic Chemicals and Dissolved Minerals from
Water Supplies; by B. C. Wolverton
http://books.google.com/books?id=5eTpGwAACAAJ
http://www.wolvertonenvironmental.com


Aquatic Plants for Removal of Mevinphos from the Aquatic Environment; by B. C. Wolverton
http://books.google.com/books?id=HDMJAQAAMAAJ
http://www.wolvertonenvironmental.com


Aquatic Plant Microbial Filters for Treating Septic Tank Effluent; by B. C. Wolverton
http://books.google.com/books?id=z8lCNAAACAAJ
http://www.worldcat.org/oclc/32531696
http://www.wolvertonenvironmental.com         bookfinder.com       addall.com     booksprice.com


Application of Vascular Aquatic Plants for Pollution Removal, Energy and Food Production in a
Biological System; by B. C. Wolverton
http://books.google.com/books?id=TwrTtgAACAAJ
http://www.wolvertonenvironmental.com


Artificial Marshes for Wastewater Treatment; by B. C. Wolverton
http://books.google.com/books?id=BSpEtwAACAAJ
http://www.worldcat.org/oclc/24120869
http://www.wolvertonenvironmental.com       bookfinder.com      addall.com      booksprice.com


Basic Engineering Criteria and Cost Estimations for Hybrid Microbial Filter-reed (Phragmites
Communis) Wastewater Treatment Concept; by B. C. Wolverton
http://books.google.com/books?id=JSoXHQAACAAJ
http://www.wolvertonenvironmental.com
~

Bio-conversion of Water Hyacinths Into Methane Gas, Part 1; by B. C. Wolverton
http://books.google.com/books?id=XPIatwAACAAJ
http://www.wolvertonenvironmental.com



Higher Plants for Recycling Human Waste Into Food, Potable Water and Revitalized Air in a Closed
Life Support System; by B. C. Wolverton
http://books.google.com/books?id=_loJMwEACAAJ
http://www.wolvertonenvironmental.com



Natural systems for wastewater treatment and water reuse for space and earthly applications ; by B. C.
Wolverton
http://books.google.com/books?id=Mw5ZAAAAYAAJ
http://www.wolvertonenvironmental.com



The Role of Plants and Microorganisms in Assuring a Future Supply of Clean Air and Water ; by B. C.
Wolverton
http://books.google.com/books?id=0LbgAAAAMAAJ
http://www.wolvertonenvironmental.com



Water Hyacinths and Alligator Weeds for Final Filtration Or Sewage; by B. C. Wolverton
http://books.google.com/books?id=ZJKftgAACAAJ
http://www.wolvertonenvironmental.com



Water Hyacinths and Alligator Weeds for Removal of Lead and Mercury from Polluted Waters; by B.
C. Wolverton
http://books.google.com/books?id=lBq7tgAACAAJ
http://www.wolvertonenvironmental.com
~



Water Hyacinths and Alligator Weeds for Removal of Silver, Cobalt and Strontium from Polluted
Waters; by B. C. Wolverton
http://books.google.com/books?id=OBemtgAACAAJ
http://www.wolvertonenvironmental.com




Water Hyacinths for Removal of Cadmium and Nickel from Polluted Waters; by B. C. Wolverton
http://books.google.com/books?id=LnOJtgAACAAJ
http://www.wolvertonenvironmental.com




Water Hyacinths for Removal of Phenols from Polluted Waters; by B. C. Wolverton
http://books.google.com/books?id=N49ytgAACAAJ
http://www.wolvertonenvironmental.com



Water Hyacinthis for Upgranding Sewage Lagoons to Meet Advanced Wastewater Treatment
Standards, Part 1; by B. C. Wolverton
http://books.google.com/books?id=3Uq1XwAACAAJ
http://www.wolvertonenvironmental.com



Water Hyacinths for Upgrading Sewage Lagoons to Meet Advanced Wastewater Treatment
Standards, Part 2; by B. C. Wolverton
http://books.google.com/books?id=bCQcYAAACAAJ
http://www.wolvertonenvironmental.com



Water Hyacinth Sorption Rates of Lead, Mercury and Cadmium; by B. C. Wolverton
http://books.google.com/books?id=wkp1twAACAAJ
http://www.wolvertonenvironmental.com
~
Wetlands for Wastewater Treatment, Pollution Control and Sustainable Water Supplies
A Handbook of Constructed Wetlands: Domestic wastewater; by Luise Davis
http://books.google.com/books?id=ExxJPgAACAAJ
http://www.worldcat.org/oclc/35624329
~ Kindle book      ~ Nook book    bookfinder.com   addall.com       booksprice.com


A Pilot Constructed Treatment Wetland for Pulp and Paper Mill Wastewater, Kenya ; by Margaret
Akinyi Abira
http://books.google.com/books?id=-P4xSv7j9S0C
http://www.worldcat.org/oclc/217265016
~ Kindle book     allbookstores.com    bing.com       bookfinder.com     yahoo.com


Abstracts: Constructed Wetlands for Water Quality Improvement - an International Symposium; by
Wetlands Laboratory
http://books.google.com/books?id=hK9cGwAACAAJ
http://www.worldcat.org/oclc/25454441


An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural,
Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism
http://www.librarything.com/work/5162954
http://books.google.com/books?id=drOMQQAACAAJ
http://www.worldcat.org/oclc/54830842     bookfinder.com   addall.com     booksprice.com



Biocontrol of Heavy Metals Polluted Wastewater: Recovery of wastewater via microbial genetic
systems; by Khalifa Abd
http://books.google.com/books?id=2nhHYgEACAAJ
allbookstores.com google.com bookfinder.com          booksprice.com bing.com yahoo.com



Biological Treatment of Wastewater: Use of Suspended and Attach Growth Bioreactors for
Wastewater Reclamation; by Bushra Zaman
http://books.google.com/books?id=ZTWyuAAACAAJ
allbookstores.com google.com bookfinder.com           booksprice.com bing.com yahoo.com

Biological Treatment of Dairy Industry Wastewater: Study of Kinetic coefficients for dairy industry
wastewater; by Ambreen Lateef
http://books.google.com/books?id=lEgJlAEACAAJ
~
Biological Wastewater Treatment in Warm Climate Regions; by Marcos Von Sperling
http://books.google.com/books?id=Pi4fMNY-hJYC
http://www.worldcat.org/oclc/62306180

Bioremediation, including: Phytoremediation, Constructed Wetland, Applied Ecology, Restoration
Ecology, Mycoremediation, Mycofiltration, Tree Bog; by Hephaestus Books
http://books.google.com/books?id=ypietgAACAAJ

Bioremediation of Contamined Soils; by Donald Lee Wise
http://books.google.com/books?id=kJ_IULMoN68C
http://www.worldcat.org/oclc/44172880

Bioremediation Process for Decolourisation of Textile Wastewater: Microbial Consortium for
Textile Wastewater Decolourisation; by Khadijah Omar
http://books.google.com/books?id=2T37ugAACAAJ
allbookstores.com google.com bookfinder.com            booksprice.com bing.com yahoo.com

Carbon Dynamics in Natural Vs. Constructed Wetland Systems: Implications for Wastewater
Treatment; by Eliska Rejmankova
http://books.google.com/books?id=hztBHQAACAAJ
http://www.worldcat.org/oclc/40547236


Constructed and Natural Wetlands for Pollution Control: developed from "V international INTECOL
wetlands conference; by Chris C. Tanner
http://books.google.com/books?id=JftsHAAACAAJ
http://www.worldcat.org/oclc/66868690

Constructed Wetland for Domestic Wastewater Treatment: A Case Study in Addis Ababa, Ethiopia;
by Birhanu Genet
http://books.google.com/books?id=iGLUygAACAAJ
http://www.worldcat.org/oclc/809695017 bookfinder.com       addall.com     booksprice.com

Constructed Wetland System for Water Quality Improvement of Irrigation Wastewater; by J. Chris
Hoag
http://books.google.com/books?id=Bbe_SgAACAAJ
http://www.worldcat.org/oclc/49644956


Constructed Wetlands: A Promising Wastewater Treatment System for Small Localities: Experiences
from Latin America; by Martin Gauss
http://www.librarything.com/work/12251194
http://www.worldcat.org/oclc/429047675
~
Constructed Wetlands Domestic Wastewater, Volume 2; by EPA
http://books.google.com/books?id=w0qsNAEACAAJ


Constructed Wetlands for Ground Water Quality Improvement; by Ryan C. Molsee
http://books.google.com/books?id=x5Q9OAAACAAJ
http://www.worldcat.org/oclc/51091714


Constructed Wetlands for High Strength Wastewater Treatment and Nutrient Removal; by Rajendra
Kurup
http://books.google.com/books?id=ko3VNwAACAAJ
http://www.worldcat.org/oclc/475008068


Constructed Wetlands for Hydrocarbon Removal; by Paul Emeka Eke
http://books.google.com/books?id=MLN7QwAACAAJ
allbookstores.com google.com bookfinder.com           booksprice.com      bing.com    yahoo.com


Constructed Wetlands for Livestock Wastewater Management ; by Payne Engineering
http://www.librarything.com/work/10339043
http://books.google.com/books?id=9SNxGwAACAAJ
bookfinder.com       addall.com   booksprice.com


Constructed Wetlands for On-Site Septic Treatment: A Guide to Selecting Aquatic Plants for Low-
Maintenance Micro-Wetlands; by USDA
http://www.google.com       http://www.bing.com
~ Nook book allbookstores.com       bing.com     bookfinder.com       yahoo.com


Constructed Wetlands for Pollution Control; by R H Kadlec
allbookstores.com google.com bookfinder.com             booksprice.com    bing.com    yahoo.com



Constructed Wetlands for Pollution Control: Processes, Performance, Design and Operation ; by Jan
Vymazal
http://books.google.com/books?id=cQt0QgAACAAJ
allbookstores.com google.com bookfinder.com             booksprice.com bing.com yahoo.com
~
Constructed Wetland for the Treatment of Brewery Wastewater: Performance evaluation ; by Kenatu
Angassa
http://books.google.com/books?id=uym_uAAACAAJ


Constructed Wetlands for the Treatment of Landfill Leachates; by George Mulamoottil
http://www.librarything.com/work/6550683
http://books.google.com/books?id=hMYYZmcQdlIC
http://www.worldcat.org/oclc/39033560      bookfinder.com        addall.com   booksprice.com


Constructed Wetland for Wastewater Treatment and Resource Recovery; by L. Poh-Eng
http://books.google.com/books?id=uo5vNAAACAAJ
http://www.worldcat.org/oclc/475525436


Constructed Wetlands for Wastewater Treatment in Cold Climates; by Ülo Mander
http://books.google.com/books?id=LQ9SAAAAMAAJ
http://www.worldcat.org/oclc/48628996    bookfinder.com      addall.com     booksprice.com


Constructed Wetlands for Water Quality Improvement; by Gerald A. Moshiri
http://www.librarything.com/work/6015208
http://books.google.com/books?id=_PQJ7wGG_2cC
http://www.worldcat.org/oclc/27226472


Constructed Wetlands in the Sustainable Landscape; by Craig S. Campbell
http://www.librarything.com/work/1324972
http://books.google.com/books?id=CNNml_0IfKoC


Constructed Wetlands for Wastewater Treatment: Municipal, Industrial, and Agricultural ; by Donald
A. Hammer
http://www.librarything.com/work/3496698
http://books.google.com/books?id=BCdPHXm677kC


Dye Treatment with Fungi: Azo Dye Decolorization by Phanerochaete Chrysosporium; by Yesim
Erler Kubilay
http://books.google.com/books?id=1KNWPgAACAAJ
~
Emerging Compounds Removal from Wastewater: Natural and Solar Based Treatments ; by Giusy
Lofrano
http://books.google.com/books?id=QscF-Kfr6-EC


Enhancements of Nutrient Removal Performance in Constructed Wetlands for Domestic Wastewater
Treatment; by Carlos A. Arias
http://books.google.com/books?id=uj_PSAAACAAJ
http://www.worldcat.org/oclc/475443151


Evaluation of the Subsurface Vegetated Bed Form of Constructed Wetlands for Domestic
Wastewater Treatment; by Jie Huang
http://books.google.com/books?id=ginftgAACAAJ
http://www.worldcat.org/oclc/34176461


Evaluation of the Performance of Constructed Wetlands Treating Domestic Wastewater in the
Waikato Region, New Zealand; by James Peter Sarkis Sukias
http://books.google.com/books?id=kW26MgAACAAJ
http://www.worldcat.org/oclc/156741057


Heat Recovery from Wastewater The Case Study of Amsterdam: Energy in the Urban Water Cycle ;
by Sergio Nauffal Monsalve
http://books.google.com/books?id=fiX6ugAACAAJ


Heavy Metals Removal from Swine Wastewater Using Constructed Wetlands with Horizontal Sub-
Surface Flow; by Jorge A Cortes-Esquivel
http://www.worldcat.org/oclc/4903923389


Landscape Ecological Applications in Man-Influenced Areas: Linking Man and Nature System; by
Sŏn-gi Hong
http://books.google.com/books?id=gWWgqQv2YIAC
http://www.worldcat.org/oclc/187915804


Leachate Treatment In Constructed Wetlands; by Aeslina Abdul Kadir
http://books.google.com/books?id=y6WJSQAACAAJ
~
Manual: Constructed Wetlands Treatment of Municipal Wastewaters ; by EPA
http://books.google.com/books?id=nXpVdmJI_NIC
http://www.worldcat.org/oclc/45605155


Microbial Decolorization and Degradation of Azo dyes: An approach to Biotreatment of Textile and
dye manufacturing Industries wastewaters; by Manjinder Singh
http://books.google.com/books?id=6NJXYgEACAAJ


Microbial Decolourization of Cane-molasses Based Distillery Effluent: Microbial Decolourization of
Distillery Effluent for its application in Wasteland Reclamation; by Deepak Pant
http://books.google.com/books?id=ftEtQwAACAAJ


Microbial Fuelcell: Power from Wastewater in Cost Effective Manner: A New Approach of
Wastewater Treatment with Power Generation in a Cost Effective Manner; by Saumya Mary Mathew
http://books.google.com/books?id=SmE2LgEACAAJ


Natural and Constructed Wetlands: Nutrients, Metals and Management ; by Jan Vymazal
http://books.google.com/books?id=nyBFAQAAIAAJ
http://www.worldcat.org/oclc/60375192


Performance and Feasibility of Constructed Wetlands for the Treatment of Domestic Wastewater in
Nepal; by D. R. Adhikari
http://books.google.com/books?id=t0s-cgAACAAJ
http://www.worldcat.org/oclc/637047629


Performance of Up Flow Fixed Film Fixed Bed Reactor System: Performance at various pH using
Vegetable Oil Refinery Wastewater; by Narendra Shinkar
http://books.google.com/books?id=rZGsuAAACAAJ


Performance of Various Tree Species as Irrigated by Urban Wastewater: Raising of forest trees using
urban Wastewate; by Muhammad Ayyoub Tanvir
http://books.google.com/books?id=LeKkcQAACAAJ
http://www.worldcat.org/oclc/724431618
~
Physical, Chemical, and Microbial Analysis of Domestic Wastewater Treated by Small Constructed
Wetlands Designed for Individual Households; by Keith R Hench
http://books.google.com/books?id=2XhENwAACAAJ
http://www.worlcat.org/oclc/39931722


Phytoremediation Potential of Plants in Tannery Wastewater Treatment ; by Tadesse Alemu
http://books.google.com/books?id=VECFkQEACAAJ


Phytotreatment for Wastewater: Strategies and Practices for High Concentrations of Organic Matter ;
by Sarwoko Mangkoedihardjo
http://books.google.com/books?id=VXFOYgEACAAJ


Planting Wetlands and Dams: A Practical Guide; by Nick Romanowski
http://books.google.com/books?id=bO21HSBBcX0C
http://www.worldcat.org/oclc/609408538


Pollutant Removal from Domestic Wastewater Using Constructed Wetlands (reed Beds); by Peter
Cottingham
http://books.google.com/books?id=wWq6ugAACAAJ
http://www.worldcat.org/oclc/221738418


Possibilities for Recycling Domestic Wastewater with Vertical Flow Constructed Wetlands ; by R
Shrestha
http://books.google.com/books?id=QDFJcgAACAAJ
http://www.worldcat.org/oclc/637056724


Removal of Heavy Metals In Constructed Wetlands For Treatment Of Domestic Wastewater in
Flanders, Belgium; by Els Lesage
http://www.worldcat.org/oclc/730356000


River Hebert Marsh: Constructed Wetlands for Wildlife and Tertiary Treatment of Domestic
Wastewater; by Ducks Unlimited
http://books.google.com/books?id=YVqlNwAACAAJ
http://www.worldcat.org/oclc/228951639
~
Sanitation Ventures Technology Landscaping Report: New Concepts in On-Site Sanitation based on
Bioadditives and Pit Design
http://www.google.com      http://www.bing.com


Small-Scale Constructed Wetland Treatment Systems: Feasibility, Design Criteria; by Scott D.
Wallace
http://books.google.com/books?id=YVcOAQAACAAJ
http://www.worldcat.org/oclc/156772669


Subsurface Flow Constructed Wetlands For WasteWater Treatment: A Technology Assessment ; by
Sherwood C. Reed
http://books.google.com/books?id=P21GAAAAYAAJ
http://www.worldcat.org/oclc/56338655
~ Nook book allbookstores.com      bing.com    bookfinder.com     yahoo.com


Sustainable Wastewater Management in Developing Countries; by Carsten Hollander Laugese
http://books.google.com/books?id=p4YJWoa_t9kC
http://www.worldcat.org/oclc/432442097


The Constructed Wetlands Manual: Volume 1; by New South Wales, Australia
http://www.librarything.com/work/10902198
http://www.worldcat.org/oclc/40500618


The Constructed Wetlands Manual: Volume 2; by New South Wales, Australia
http://www.librarything.com/work/10902242
http://books.google.com/books?id=j_yatwAACAAJ
http://www.worldcat.org/oclc/223631664    bookfinder.com    addall.com          booksprice.com


The Use of Constructed Wetlands as an Alternative Form of On-site Wastewater Treatment in a
Temperate Climate; by Sam Bayley
http://books.google.com/books?id=ETqQNAAACAAJ
http://www.worldcat.org/oclc/224941117


The Use of Constructed Wetlands for Treatment of Domestic Wastewater in Senegal, West Africa; by
Michael E. Babcock
http://books.google.com/books?id=1MX3NwAACAAJ
http://www.worldcat.org/oclc/56638440
~
The Use of Constructed Wetlands for Wastewater Treatment; by Sim Cheng Hua
http://books.google.com/books?id=fyLRAAAACAAJ
http://www.worldcat.org/oclc/85517476


Treatment Efficiency of Constructed Wetlands for Domestic Wastewater Treatment in Giessen,
Germany and Its Possibility to Construct it in Indonesia; by Denny Kurniadie
http://books.google.com/books?id=Ze2uAQAACAAJ
http://www.worldcat.org/oclc/48457807


Treatment of Dairy Wastewater by Aerobic Biodegradetion and Coagulation: Natural Remedy by
Harush
http://books.google.com/books?id=0CDgQ6AEwAA


Use of Constructed Wetlands for Protection of Water Quality in Water Supply Reservoirs ; by Woody
Frossard
http://books.google.com/books?id=sgLOX1W0OJ4C
http://www.worldcat.org/oclc/36159866


Vertical Flow Constructed Wetlands for the Treatment of Inorganic Industrial Wastewater ; by Sergio
S. Domingos
http://books.google.com/books?id=NTR3MwEACAAJ
http://www.worldcat.org/oclc/793315404


Walter Giger; by Jesse Russell
http://books.google.com/books?id=qBi9MQEACAAJ


Wastewater Irrigation and Health: Assessing and Mitigating Risk in Low-income Countries; by Akissa
Bahri
http://books.google.com/books?id=TuYSEX4dwGEC
http://www.worldcat.org/oclc/668138381


Wastewater Treatment by Natural and Artificial Marshes; by Frederic L Spangler
http://books.google.com/books?id=8SoYAQAAIAAJ
http://www.worldcat.org/oclc/2920272
~


Wastewater Treatment by a Natural Wetland: The Nakivubo Swamp, Uganda ; by Frank Kansiime
http://books.google.com/books?id=i5IVXoP-geYC
http://www.worldcat.org/oclc/42275919


Wastewater Treatment in Constructed Wetlands with Horizontal Sub-Surface Flow; by Jan Vymazal
http://books.google.com/books?id=IfqerCqRvg8C
http://www.worldcat.org/oclc/272298648



Wastewater Use in Irrigated Agriculture: Confronting the Livelihood and Environmental Realities ; by
C. A. Scott
http://www.librarything.com/work/5749121
http://books.google.com/books?id=Z3RiPwAACAAJ
http://www.worldcat.org/oclc/668138381      bookfinder.com       addall.com    booksprice.com



Water and Nutrient Management in Natural and Constructed Wetlands; by Jan Vymazal
http://books.google.com/books?id=bgTZ-DQZ7CEC
http://www.worldcat.org/oclc/669985678



Water Hyacinth Treatment of Industrial Wastewater: A Case Study of Reclamation ; by Mahendra
Pratap Choudhary
http://books.google.com/books?id=NyWquAAACAAJ
http://www.worldcat.org/oclc/707105286



Wetlands for Tropical Applications: Wastewater Treatment by Constructed Wetlands ; by Norio
Tanaka
http://books.google.com/books?id=Vel-tREZnF0C
http://www.worldcat.org/oclc/369140693



Wetland Macrophytes Purify Water; by Sukumar Ghosh
http://books.google.com/books?id=bumilQEACAAJ
~


Spanish Language Books
25 años de agricultura orgánica: una experiencia en el archipiélago de Chiloé; by Estudios Agrarios
Ancud
http://books.google.com/books?id=-OE4AQAAIAAJ
http://www.worldcat.org/oclc/23366868


Abonos, lombricultura y compostaje; by Doris Liliana Osorio Díaz
http://books.google.com/books?id=u4WdZwEACAAJ
http://www.worldcat.org/oclc/777895366


Abonos, lombricultura y compostaje: metodos, sistemas, preparados, aplicacion; by Felipe Durán
Ramírez
http://books.google.com/books?id=cLyLZwEACAAJ
http://www.worldcat.org/oclc/689995238


Agricultura ecológica: Manual y guía didáctica; by Javier Flórez Serrano
http://books.google.com/books?id=GxYfKYV_9awC
http://www.worldcat.org/oclc/804227322


Agricultura ecológica para jóvenes: aventuras de dos escolares en su primer verano en el campo; by
Irmgard Heck
http://www.librarything.com/work/6641315
http://books.google.com/books?id=Hi95AAAACAAJ
http://www.worldcat.org/oclc/435081856        bookfinder.com       addall.com    booksprice.com


                     ; by
http://www.worldcat.org/oclc/169947645


Agricultura Organica; Asociación Cubana de Agricultura Orgánica
http://books.google.com/books?id=lu4NAQAAIAAJ
~
Agricultura orgánica: experiencias de cultivo ecológico en la Argentina; by Guillermo Schnitman
http://books.google.com/books?id=GcpgAAAAMAAJ
http://www.worldcat.org/oclc/28254823


Agricultura orgánica: memoria sobre el Simposio Centroamericano; by Jaime E. García
http://books.google.com/books?id=LqYfAQAAIAAJ
http://www.worldcat.org/oclc/36069507


Agricultura orgánica: proyecto piloto de zonas de reserva campesina; by IICA Biblioteca Venezuela
http://books.google.com/books?id=M8UqAAAAYAAJ


Agricultura Organica, Ambiente y Seguridad Alimentaria; by Nadia El-Hage
http://books.google.com/books?id=HlQhvUKrhxMC
http://www.worldcat.org/oclc/503172436       bookfinder.com       addall.com       booksprice.com


Agricultura Organica en Costa Rica; by Jaime Garcia
http://www.librarything.com/work/1212008
http://www.worldcat.org/oclc/40945696


Agricultura Organica en la Amazinía Ecuatoriana: Abonos Orgánicos y Faces Lunares; by Beatriz
Fischersworring
http://www.librarything.com/work/11652897


Agricultura Organica Practica: Tecnologias Sostenibles Y Regeneradoras Del Medio Ambiente; by
Antonio Rosas Roa
allbookstores.com    google.com     bookfinder.com      booksprice.com      bing.com     yahoo.com



Agricultura Orgánica, Ambiente Y Seguridad Alimentaria; by Nadia El-Hage Scialabba
http://books.google.com/books?id=HlQhvUKrhxMC
http://www.worldcat.org/oclc/503172436


Agricultura orgánica de México: datos básicos; by Manuel Angel Gómez Cruz
http://books.google.com/books?id=lv1gAAAAMAAJ
~
                                 ; by
http://books.google.com/books?id=W6YfAQAAIAAJ
http://www.worldcat.org/oclc/77415383


Agricultura organica en pequeña escala: huerto doméstico y huerta comunitaria; by
http://books.google.com/books?id=oWe4PgAACAAJ
http://www.worldcat.org/oclc/236142247


Agricultura orgánica práctica: Tecnologías sostenibles y regeneradoras del medio ambiente; by
Antonio Rosas Roa
http://www.worldcat.org/oclc/777060491
http://books.google.com/books?id=p7WhZwEACAAJ



Agricultura Urbana y Suburbana en Cuba; by Carlos Alberto Hernández Medina
http://books.google.com/books?id=AKORtgAACAAJ
allbookstores.com google.com bookfinder.com             booksprice.com bing.com             yahoo.com


Agroindustria rural: recursos técnicos y alimentación; by François Boucher
http://books.google.com/books?id=jyAOAQAAIAAJ
http://www.worldcat.org/oclc/39114615


Agrosistemas Sostenibles y Ecologicos: La Reconversion Agropecuaria; by Ramon Fuentes Colmeiro
http://books.google.com/books?id=oHtVPwP1vpsC
http://www.worldcat.org/oclc/166868154
allbookstores.com google.com bookfinder.com            booksprice.com bing.com yahoo.com


Alternativas: tecnología, recursos, energía, construcción, habitat, alimentación, sanidad, agricultura;
by Colegio de Arquitéctos Técnicos de Navarra
http://books.google.com/books?id=Q88MAQAAIAAJ
http://www.worldcat.org/oclc/6250798


Alternativas de uso del bromuro de metilo en la produccion de semilla de papa de calidad; by
Division de Manejo Integrado de Cultivos
http://books.google.com/books?id=ekfD7Ab7DREC
~
Alternativas Para El Desarrollo de Una Agricultura Sostenida; by CATIE
http://books.google.com/books?id=epgOAQAAIAAJ
http://www.worldcat.org/oclc/805599316


Aprender sirviendo: un paradigma de formación integral universitaria; by Diana Pacheco Pinzón
http://books.google.com/books?id=ietnHAAACAAJ
http://www.worldcat.org/oclc/56097770


Apuntes para el desarrollo comunitario: manual de hidroponia popular urbana; by Alaldía de Medellín
http://www.librarything.com/work/12499384
http://books.google.com/books?id=UDziMgEACAAJ


Bases de Datos y Sistemas de Informacion Disponibles en el IICA; by IICA
http://books.google.com/books?id=rSwOAQAAIAAJ
http://www.worldcat.org/oclc/633132100


Biojardinería: Manual Práctico de Horticultura y Jardinería Ecológica; by Francisco Barranco Espinar
http://books.google.com/books?id=1VXdPQAACAAJ
http://www.worldcat.org/oclc/49319053


Buenas prácticas para el desarrollo de la cadena productiva de la papa: experiencias con el proyecto
INCOPA en el Perú; by Gladys Triveno
http://books.google.com/books?id=67sotGFKdHwC
http://www.worldcat.org/oclc/780330551


Cartilha tecnologica de hidroponia; by A. Bliska Junior
http://books.google.com/books?id=bCRVygAACAAJ
http://www.worldcat.org/oclc/709851213


Cómo Hacer Cría de Lombrices; by Eduardo C. Foncini
http://books.google.com/books?id=jAtEPQAACAAJ
http://www.worldcat.org/oclc/149529577
~
Compostaje; by Joaquín Moreno Casco
http://books.google.com/books?id=APuzwas6rrcC
http://www.worldcat.org/oclc/645289619   bookfinder.com           addall.com     booksprice.com


Conceptos básicos de gestión ambiental y desarrollo sustentable; by Arturo Sánchez Gándara
http://books.google.com/books?id=L8v8CRDFm-oC


Conservación del medio ambiente peruano; by José Félix Aparcana Pisconte
http://books.google.com/books?id=FDN_AAAAMAAJ
http://www.worldcat.org/oclc/50198906


Construcción de un invernadero para el cultivo de forraje verde hidropónico en Quintanavides
http://books.google.com/books?id=XfP8cQAACAAJ
http://www.worldcat.org/oclc/628421338


Control de Plagas y Malezas por Enemigos Naturales; by Roy Van Driesche
http://www.worldcat.org/oclc/205944702


Conversion de pulpa y mucilago del cafe en vermicomposta mediante el uso de la lombriz Eisenia
foetida;
http://books.google.com/books?id=QcmpISns5UMC


Creación de alternativas en México; by Lucía Alvarez Enríquez
http://books.google.com/books?id=ndRowM32mhcC
http://www.worldcat.org/oclc/760456138


Cria Casera De Lombrices: Manual Practico Para Su Aprovechamiento Ecologico; by Jose Gabetta
http://books.google.com/books?id=2vMHPQAACAAJ
http://www.worldcat.org/oclc/62293537      bookfinder.com     addall.com      booksprice.com


Cria de Lombrices: su empresa de lombricultura; by José Luis Barbado
http://books.google.com/books?id=fccwMYM4CWEC
http://www.worldcat.org/oclc/166290273
~
Crianza Y Manejo de Lombrices de Tierra Con Fines Agricolas; by CATIE
http://books.google.com/books?id=occOAQAAIAAJ


Cultivo de alface pela técnica de hidroponia: NFT; by Pedro Roberto Furlani
http://books.google.com/books?id=jGuKHAAACAAJ
http://www.worldcat.org/oclc/52368560


Cultivo de Champiñones; by María Laura Martínez
http://books.google.com/books?id=Hyr4mf9u62gC
http://www.worldcat.org/oclc/149529638


Cultivo de Hortalizas; by Vicente Giaconi M.
http://books.google.com/books?id=-K9xgvfdGGYC
http://www.worldcat.org/oclc/30600919

Cultivo de hortalizas en la Amazonía colombiana; by César H. Marulanda
http://books.google.com/books?id=DUdjAAAAMAAJ
http://www.worldcat.org/oclc/10437673

Cultivo de jitomate en hidroponia e invernadero; by Ezequiel Velasco Hernández
http://books.google.com/books?isbn=9680201953
http://www.worldcat.org/oclc/651398195


Cultivo hidropônico de plantas; by Pedro Roberto Furlani
http://books.google.com/books?id=6tL2GwAACAAJ
http://www.worldcat.org/oclc/53851683


Cultivo sem solo; hidroponia; by P.D. Castellane
http://books.google.com/books?id=PAnHjwEACAAJ


Cultivos hidropónicos: Nuevas técnicas de producción; by Howard M. Resh
http://books.google.com/books?id=O74no8Jcz8IC
http://www.worldcat.org/oclc/52491540

Cultivos hidrop nicos en invernadero:gu a t cnica de sus principios y manejo; by Juan Antonio Del
Castillo Garc a
http://books.google.com/books?id=7lIrMwEACAAJ
http://www.worldcat.org/oclc/804674137
~
Cultivos sin tierra: la hidroponía popular, una opción para superación de la pobreza; by Jorge Zapp
http://books.google.com/books?id=Psj4ZwEACAAJ
http://www.worldcat.org/oclc/710016306


Curso Básica de Hidroponía; by Jorge H. Bosques Vargas
http://books.google.com/books?id=HxOucQAACAAJ


                                                       ; by Beatriz   Borda G
http://www.worldcat.org/oclc/318454904


Curso nacional de lombricultura; by Fundacion para la Integracion e Investigacion Pecuaria
http://www.worldcat.org/oclc/777744209


De la Necesidad Al Servicio; by Compromiso Fundacion, Granica
http://books.google.com/books?id=lg9AB4xfsMoC
http://www.worldcat.org/oclc/44560951


Dónde encontrar las bases de una agricultura alternativa; by Paul Coeytaux
http://books.google.com/books?id=jDpgAAAAMAAJ
http://www.worldcat.org/oclc/31163992


El compost com a substrat alternatiu en viverisme i hidroponia; by J. M. Vergara, M. Colombàs
http://books.google.com/books?id=ZwMFcgAACAAJ
http://www.worldcat.org/oclc/433706649


El Compostaje Proyectado a La Lombricultura; by Emilio Mirabelli
http://books.google.com/books?id=jAZOQwAACAAJ
http://www.worldcat.org/oclc/469107705       bookfinder.com              addall.com   booksprice.com


El cuidado orgánico de las plantas: cómo controlar las plagas en el jardín y la huerta sin insecticidas;
by Ernesto Flores
http://books.google.com/books?id=FnFAAAACAAJ
http://www.worldcat.org/oclc/31327832
~
El desarrollo local en el Ecuador: historia, actores y métodosd; by Galo Ramón Valarezo
http://books.google.com/books?id=HJgwp0K240UC


El Huerto biológico: cómo cultivar todo tipo de hortalizas sin productos químicos ni tratamientos
tóxicos; by Claude Aubert
http://www.librarything.com/work/9042646
http://books.google.com/books?id=MywjPwAACAAJ


El huerto casero: manual de agricultura orgánica; by Nelson Álvarez Febles
http://books.google.com/books?id=NH5ASQAACAAJ
allbookstores.com google.com bookfinder.com              booksprice.com bing.com          yahoo.com


El huerto ecologico del convento; by Crista Weinrich
http://books.google.com/books?id=aNCCPgAACAAJ


El Huerto Escolar Ecológico; by Montse Escutia
http://books.google.com/books?id=jDF_j8Nz_6EC


El Huerto Familiar Ecologico: la gran guía práctica del cultivo natural; by Mariano Bueno
http://www.librarything.com/work/2249892
http://books.google.com/books?id=H1p1AAAACAAJ
http://www.worldcat.org/oclc/46925668          bookfinder.com       addall.com       booksprice.com


El jardin biologico rapido y facil; by Wolfgang Hensel
http://books.google.com/books?id=kN_4VjhbbscC
http://www.worldcat.org/oclc/723362588            bookfinder.com    addall.com     booksprice.com


El Jardin Organico; by Bob Flowerdew
http://books.google.com/books?id=JAquAAAACAAJ
http://www.worldcat.org/oclc/539423342   bookfinder.com             addall.com     booksprice.com
~
                 ; by Richard
                          Bird
http://books.google.com/books?id=1x-hAAAACAAJ
http://www.worldcat.org/oclc/38155199   bookfinder.com             addall.com      booksprice.com


                                       ; by Pedro
                                         González Guerrero
http://books.google.com/books?id=ThyRXwAACAAJ


El Rebost de la ciutat: manual de permacultura urbana; by Jordi Romero Lengua
http://www.librarything.com/work/12373610
http://books.google.com/books?id=gpanXwAACAAJ
http://www.worldcat.org/oclc/807345667


El sonido de la unida; by CATIE
http://books.google.com/books?id=VdcOAQAAIAAJ


Estudio y adecuacion a las condiciones de nuestro medio de la hidroponia como tecnica para el
cultivo de hortalizas; by Gustavo Goez Morales,
http://books.google.com/books?id=IyrGMgEACAAJ
http://www.worldcat.org/oclc/778164172


Evaluación de tres soluciones nutritivas y tres sustratos en el cultivo de tomate (Lycopersicon
esculentum Mill) en hidroponia; by Luis Javier Torres Barragán
http://books.google.com/books?id=T9XnZwEACAAJ
http://www.worldcat.org/oclc/689596741


Evaluacion economica de un sistema de vermicomposta para la industria cafetalera de Puerto Rico;
by Milton F. Estupinan
http://books.google.com/books?id=TdVTH3QzpJUC


Estado de la agricultura orgánica en Nicaragua: propuesta del movimiento orgánico para su
fomento y desarrollo; by IICA
http://books.google.com/books?id=LeFUcCB_ltoC
~
Explotaciones alternativas: Salmonicultura, zoro azul, lombricultura; by M. Teresa Benito Hernández
http://books.google.com/books?id=7ThnAAAACAAJ


Falta Petroleo: perspectives on the emergence of a more ecological farming and food system in post-
crisis Cuba; by Julia Emma Wright
http://books.google.com/books?id=W2TRkQEACAAJ
http://www.worldcat.org/oclc/61041656


Floricultura Y Medio Ambiente: Producción de Flores Sin Bromura de Metilo; by Marta Pizano de
Márquez
http://books.google.com/books?id=u2juv09M_OwC
http://www.worldcat.org/oclc/162127135


Guía de los cultivos protegidos de hortalizas en zona tropical húmeda; by Christian Langlais
http://books.google.com/books?id=UoN0kej0PVwC
http://www.worldcat.org/oclc/470052090


Guía para compostaje y manejo de suelos; by Elkin Bongcam V squez
http://books.google.com/books?id=BUDmjTQxKhQC
http://www.worldcat.org/oclc/56590474


Guía para la cría, manejo y aprovechamiento sostenible de algunas especies animales promisorias y
otras domésticas; by Jaime L. De la Ossa Velásquez
http://books.google.com/books?id=ezpvt2lA788C
http://www.worldcat.org/oclc/55989215


Hidrocultivos al alcance de todos: los principios fundamentales de la hidroponia bajo invernadero; by
by Sergio Enrique Giraldo R
http://www.worldcat.org/oclc/778032391


Hidroponia: su empresa de cultivos en agua; by José Luis Barbado
http://www.librarything.com/work/5845557
http://books.google.com/books?id=aa4A0GakMRsC
http://www.worldcat.org/oclc/65223814
~
Hidroponia: cultivo de plantas sin tierra; by G. O. Huterwal
http://www.librarything.com/work/9720927
http://books.google.com/books?id=6Up4pwAACAAJ
http://www.worldcat.org/oclc/22937736


Hidropon a: cultivo sin tierra: elementos b sicos para desarrollar la t cnica simple de cultivar plantas
sin tierra en peque os espacios; by Laura Alpízar Antillón
http://books.google.com/books?id=xvuGzvNxR9UC
http://www.worldcat.org/oclc/228298661


Hidropon a: una gu a esencial para el cultivo en agua de frutas, hortalizas y plantas florales; by
Martha Alvarez
http://books.google.com/books?id=kh-auAAACAAJ
http://www.worldcat.org/oclc/778704105


Hidroponia; by UNICAMP
http://books.google.com/books?id=yLVXygAACAAJ
http://www.worldcat.org/oclc/709851589


Hidroponia: cómo cultivar sin tierra; by James Sholto Douglas
http://books.google.com/books?id=v5WKAAAACAAJ
http://www.worldcat.org/oclc/48962585


Hidroponia: como cultivar tomates em sistema NFT (tecnica do fluxo laminar de nutrientes); by C. A.
G. de Moraes
http://books.google.com/books?id=o4TJZwEACAAJ
http://www.worldcat.org/oclc/709530510


Hidroponia: como instalar e manejar o plantio de hortali as dispensando o uso do solo: alface,
agri o, rucula, rabanete, chicoria, almeir o; by Robson de Barros Alberoni
http://books.google.com/books?id=hCXvE53h924C
http://www.worldcat.org/oclc/817614192


Hidroponia: cultivo de plantas sin tierra: aplicaciones de la hidroponia, sistemas de cultivo, la
soluci n nutritiva, cuidados culturales; by Ulises Durany Carol
http://books.google.com/books?id=VOBzbwAACAAJ
http://www.worldcat.org/oclc/37477308
~
Hidroponía: cultivos sin tierra; by Angel Ignacio Godoy
http://books.google.com/books?id=2qUfAQAAIAAJ
http://www.worldcat.org/oclc/49516232


Hidroponia: cultivo sin tierra; by Juan Grass de la Fuente
http://books.google.com/books?id=BDHRtgAACAAJ
http://www.worldcat.org/oclc/34879727


Hidroponía: cultivo de plantas sin tierra; by G. O. Huterwal
http://books.google.com/books?isbn=9502400763
http://www.worldcat.org/oclc/22937736


Hidroponia: guia pratico; by S. Ueda
http://books.google.com/books?id=7-uWXwAACAAJ
http://www.worldcat.org/oclc/708384743


Hidroponia: produção alternativa de hortaliças folhosas; by Claudir Padova
http://books.google.com/books?id=3dx7kgEACAAJ
http://www.worldcat.org/oclc/819734747


Hidroponía: una esperanza para Latinoamérica; by Rodríguez Delfín
http://books.google.com/books?id=mHv0cQAACAAJ


Hidroponía básica; by Rodolfo Pezzani Ramaciotti
http://books.google.com/books?id=EBsFtwAACAAJ
http://www.worldcat.org/oclc/55245914


Hidroponia basica: El Cultivo Facil Y Rentable De Plantas Sin Tierra; by Gloria Samperio Ruiz
http://www.librarything.com/work/8493358
http://books.google.com/books?id=weZNPgAACAAJ
http://www.worldcat.org/oclc/38839564


Hidroponia comercial; by Gloria Samperio Ruiz
http://books.google.com/books?id=1CAwAAAACAAJ
http://www.worldcat.org/oclc/43702262
~
Hidroponía comercial: una buena opción en agronegocios; by Alfredo Rodríguez Delfín
http://books.google.com/books?id=ffP8cQAACAAJ
http://www.worldcat.org/oclc/628658000


Hidropon a comercial fresas ; by Karen Palomino Velsquez
http://www.worldcat.org/oclc/790514287


Hidroponía comercial (tomates y lechugas); by Karen Palomino Velsquez
http://books.google.com/books?isbn=6034007550
http://www.worldcat.org/oclc/790700569


Hidroponia Como Cultivar Sin Tierra; by James Sholto
http://books.google.com/books?isbn=9500230704
http://www.worldcat.org/oclc/48962585


Hidroponia em substratos: a hidroponia ao alcance de todos; by Raul Vergueiro Martins
http://books.google.com/books?id=2LD7kQEACAAJ
http://www.worldcat.org/oclc/817882122


Hidroponía familiar: guía técnica; by César H. Marulanda
http://books.google.com/books?id=EodjHAAACAAJ
http://www.worldcat.org/oclc/49319863

Hidroponía familiar en Colombia desde el eje cafetero: cultivo de esperanzas con rendimientos de
paz; by César H. Marulanda Tabares
http://books.google.com/books?id=_MY1twAACAAJ
http://www.worldcat.org/oclc/318273876

Hidroponia orgânica e bioponia: a hidroponia orgânica ao seu alcance; by Raul Vergueiro Martins
http://books.google.com/books?id=K46RkQEACAAJ
http://www.worldcat.org/oclc/817882144

Hidroponia facil: Para jovenes (y no tan jovenes); by Gloria Samperio
http://books.google.com/books?id=qU2APgAACAAJ
http://www.worldcat.org/oclc/260339729

Hidroponia Para Dummies; by Gloria Samperio
http://books.google.com/books?id=JOS8MgEACAAJ
http://www.worldcat.org/oclc/812068839
~
Hidroponia paso a paso: cultivo sin tierra; by Cristian Sánchez Reyes
http://books.google.com/books?isbn=9972977064
http://www.worldcat.org/oclc/681759316


Hierbas aromaticas para el jardin y la cocina. Jardin practico; by Renate Hudak
http://books.google.com/books?id=L9_7TeqR1hUC
http://www.worldcat.org/oclc/351320469          bookfinder.com        addall.com   booksprice.com


Horticultur: Aeroponía, Cultivo de Tejidos Vegetales, Injerto, Agricultura de Conservación,
Micropropagación, Horticultura Orgánica
http://books.google.com/books?id=BvWWZwEACAAJ


Huerta casera: manual de hidroponía popular; by EUNED
http://books.google.com/books?id=wpZJ9qwfwKAC


Huerta Jardin organica: Una Guia Esencial Para El Diseno Y El Cultivo De Una Huerta Ornamental
Con Tecnicas Ecoologicas
http://books.google.com/books?id=Q_N_AAAACAAJ
http://www.worldcat.org/oclc/148667342        bookfinder.com        addall.com    booksprice.com


                ; by Alda
                      Rodríguez
http://books.google.com/books?id=aoUmAwEACAAJ
http://www.worldcat.org/oclc/742679357


                ; by Pippa
                       Greenwood
http://books.google.com/books?id=Q0rMAAAACAAJ
http://www.worldcat.org/oclc/54443680


                                                  ; by                  rre
http://books.google.com/books?id=E20nAQAACAAJ
http://www.worldcat.org/oclc/63280975
~
                                                                                                    ; by
Pilar Moreno
http://books.google.com/books?id=vsaVGQAACAAJ
http://www.worldcat.org/oclc/166377930   bookfinder.com            addall.com           booksprice.com


Huerta Organica: Guia Esencial Para la Planificacion, El Cultivo Y El Mantenimiento de Especies
Horticolas Con Tecnicas Ecologicas; by Maria Gabriela Escriva
http://books.google.com/books?id=N6LXPAAACAAJ
http://www.worldcat.org/oclc/71832914         bookfinder.com        addall.com    booksprice.com


                                       ; by Edith
                                        Stojanov
http://books.google.com/books?id=dm8HAAAACAAJ
http://www.worldcat.org/oclc/54346642


                                                               ; by Sandra   Quintans
http://books.google.com/books?id=S_W0tgAACAAJ
http://www.worldcat.org/oclc/253425051



Huerta Orgánica Casera; by Mirtha Jewtuszyk
allbookstores.com google.com bookfinder.com              booksprice.com        bing.com      yahoo.com



Huerta Orgánica en Macetas: Guia esencial para el cultivo de hortalizas y hierbas aromaticas en
balcones, terrazas o patios; by Maria Gabriela Escriva
http://books.google.com/books?id=L5_QQs4j7PcC
http://www.worldcat.org/oclc/56033900


Huerta Organica Rentable; by Jewtuszyk-Sackewitz
books.google.com/books?id=9mi0GAAACAAJ bookfinder.com                addall.com         booksprice.com



Identificacao, em hidroponia, de genotipos de girassol (Helianthus annuus, L.) tolerantes ao
aluminio; by N.C. Astafeief
http://books.google.com/books?id=xrkoygAACAAJ
http://www.worldcat.org/oclc/708515256
~
                                                                              ; by Unicef
http://books.google.com/books?id=-pOWMwEACAAJ
http://www.worldcat.org/oclc/803164534


Instrucoes para o cultivo de hortalicas de folhas pela tecnica de hidroponia - NFT; by P. R. Furlani
http://books.google.com/books?id=tFolQwAACAAJ
http://www.worldcat.org/oclc/427853180


Introdução ao cultivo hidropônico de plantas; by Herminia Emilia Prieto Martinez
http://books.google.com/books?id=nPpwBAAACAAJ
http://www.worldcat.org/oclc/817766640


Introduccion: A La Permacultura; by Bill Mollison
http://www.librarything.com/work/5911731
http://books.google.com/books?id=fL47PwAACAAJ


Introducción a la Olericultura; by EUNED
http://books.google.com/books?id=vBS_GwIrE1MC


Invernadero para el cultivo de gerbera en Burgos; by Mar a Pino Mara n
http://books.google.com/books?id=HMzwcQAACAAJ
http://www.worldcat.org/oclc/628431149


Jardín y huerto biológicos: manual práctico para el cultivo biológico de hortalizas, frutas y flores; by
Marie-Luise Kreuter
http://www.librarything.com/work/12239055
http://books.google.com/books?id=Rml9AAAACAAJ
http://www.worldcat.org/oclc/45782447


http://books.google.com/books?id=WUDk-S25hyMC
http://www.worldcat.org/oclc/753701262

Jardines Hidropónicos Domésticos - Hidroponia Simplificada; by Cesar Marulanda
carbon.org       google.com        bing.com       yahoo.com        bookfinder.com           addall.com
~
La Agricultura Organica: Limitaciones y Potencialidades para el Desarrollo de Sistemas de
Produccion Andinos; by IICA Biblioteca Venezuela
http://books.google.com/books?id=sIsgAQAAIAAJ


L 'Agricultura ecològica a la Comunitat Valenciana: per un menjar sa i segur; by Universitat Jaume
http://books.google.com/books?id=2PG_zhyjDYcC
http://www.worldcat.org/oclc/432893731


La Agricultura Orgánica: Una Alternativa para la Economía Campesina de la Globalización; by Felipe
Torres Torres
http://books.google.com/books?id=4m9gK5E9q1QC
http://www.worldcat.org/oclc/38369840


                                                                                               ; by
Gui
http://books.google.com/books?id=WIRFAQAAIAAJ
http://www.worldcat.org/oclc/221695257


                          contexto guatemalteco; by
http://books.google.com/books?id=qbpgAAAAMAAJ
http://www.worldcat.org/oclc/034433445


La Agricultura Orgánica en Costa Rica; by Jaime E. García
http://books.google.com/books?id=YoloBbw-zRsC
http://www.worldcat.org/oclc/40945696


La agricultura orgánica y el desarrollo sostenible en los países del Convenio Andrés Bello; by ITACAB
http://books.google.com/books?id=UbxgAAAAMAAJ
http://www.worldcat.org/oclc/43499980


La Esperanzita: hacia una agricultura orgánica en el trópico húmedo; by Manuel Fandiño
http://books.google.com/books?id=5yZIAAAAYAAJ
http://www.worldcat.org/oclc/51599003
~
La huerta hidroponica popular: manual tecnico del curso audiovisual; by Cesar Marulanda
http://books.google.com/books?id=cPLJMgEACAAJ
http://www.worldcat.org/oclc/778032394


La huerta organica; by Terre des Hommes
http://www.librarything.com/work/11988554
http://www.worldcat.org/oclc/34678188


La Huerta en la Escuela; by Miriam Kaufman
http://books.google.com/books?id=Ws9dOF2D2cgC
http://www.worldcat.org/oclc/434256075


La huerta organica familiar; by Alda Rodríguez
http://books.google.com/books?id=GfKGuAAACAAJ
http://www.worldcat.org/oclc/34678188          bookfinder.com             addall.com      booksprice.com



La Lombricultura Y Sus Fundamentos; by Rufino Rivero Hernández
http://books.google.com/books?id=Jo6-AAAACAAJ
http://www.worldcat.org/oclc/434791022        bookfinder.com   addall.com                  booksprice.com


La Materia orgánica en los agrosistemas: aproximación al conocimiento de la dinámica, la gestión y
la reutilización de la materia orgánica en los agrosistemas; by Juana Labrador Moreno
http://books.google.com/books?id=EbmLHLY3qssC
http://www.worldcat.org/oclc/41339921


La ruta andina: turismo y desarrollo sostenible en Perú y Bolivia; by Jorge Gómez Rendón
http://books.google.com/books?id=gTCE_v7g24UC
http://www.worldcat.org/oclc/213299411


La solución nutritiva universal de Steiner: una solución balanceada para cultivos en hidroponia; by
Eduardo Rodríguez Guzmán
http://books.google.com/books?id=5zTBYgEACAAJ
http://www.worldcat.org/oclc/651360398
~
Lombrices de tierra con valor comercial: biología y técnicas de cultivo; by Carlos Aragonés
http://books.google.com/books?id=xkFMHsqQqVYC
http://www.worldcat.org/oclc/52177103


Lombricultura; by Centro de Estudios Agropecuarios
http://books.google.com/books?id=O-EVAAAACAAJ
http://www.worldcat.org/oclc/777880061


Lombricultura; by
http://www.worldcat.org/oclc/780170766


Lombricultura; by Juan B. Lobera Lössel
http://books.google.com/books?id=mPduNQAACAAJ
http://www.worldcat.org/oclc/806373093



Lombricultura; by Mabel Abiatte
http://books.google.com/books?id=N2MCAAAACAAJ
allbookstores.com google.com bookfinder.com                booksprice.com      bing.com     yahoo.com



Lombricultura: cultivo y utilizacion de la lombriz de tierra; by Secretaria de Agricultura del Quindio
http://books.google.com/books?id=SVRJMwEACAAJ
http://www.worldcat.org/oclc/777753269


Lombricultura: conceptos básicos; biotecnología para transformar los desechos orgánicos en
humus; by Guerrero B., Juan
http://www.worldcat.org/oclc/773117735


Lombricultura: conocer y cuidar las lombrices para obtener abono orgánico; by Martha Reines
Alvarez
http://books.google.com/books?id=iz_MYgEACAAJ
http://www.worldcat.org/oclc/651367407
~
Lombricultura: desarrollo sostenible; by Editorial Universitaria
http://www.worldcat.org/oclc/752453484


Lombricultura: otra fuente promisoria de explotacion comercial: la aternativa ecologica para el
futuro; by Luz Elena Acosta M
http://www.worldcat.org/oclc/778034501


Lombricultura: Teoria Y Practica ; by Miguel Schuldt
http://books.google.com/books?id=gRU078M8nZYC
http://www.worldcat.org/oclc/803241517          bookfinder.com            addall.com    booksprice.com


                                                    ; by Miguel   Ángel Cacciamani
http://books.google.com/books?id=jTWSAAAACAAJ
http://www.worldcat.org/oclc/123894257   bookfinder.com                   addall.com    booksprice.com


                                                                   ; by


http://books.google.com/books?id=Uag-twAACAAJ
http://www.worldcat.org/oclc/756591929


                                                            ; by Universidad   de Guadalajara
http://books.google.com/books?id=HBzeYgEACAAJ
http://www.worldcat.org/oclc/651322128


Lombricultura: una actividad ecológica y rentable; by Miguel Ángel Cacciamani
http://books.google.com/books?id=jTWSAAAACAAJ
http://www.worldcat.org/oclc/123894257        bookfinder.com       addall.com           booksprice.com


Lombricultura Para Pequeños Emprendedores; by Fabián Rodríguez
http://books.google.com/books?id=F00Ky06O2qwC


Lombricultura Rentable: Manual Teorico-practico Para La Cria Comercial De Lombri; by Jose Gabetta
http://books.google.com/books?id=yOY0AAAACAAJ
http://www.worldcat.org/oclc/62392230      bookfinder.com      addall.com    booksprice.com
~
Lombricultura Y Abonos Organicos; by IICA Biblioteca Venezuela
http://books.google.com/books?id=vJ8qAAAAYAAJ


Lombricultura y agricultura sustentable; by
http://books.google.com/books?id=3n9bAwAACAAJ
http://www.worldcat.org/oclc/76045936


Manual de Lombricultura; by Hector Quiroz
http://books.google.com/books?id=UGjtMgEACAAJ
http://www.worldcat.org/oclc/777831659



                                                                                            ; by Carlo
Ferruzzi
http://books.google.com/books?id=Bxa3OwAACAAJ
http://www.worldcat.org/oclc/630609035  bookfinder.com             addall.com      booksprice.com



Manual De Lombricultura. Crianza De La Lombriz Roja Californiana Eisenia Foetida; by Rodrigo
Vásquez Romero
allbookstores.com google.com bookfinder.com           booksprice.com bing.com yahoo.com



Manual cría de la lombriz de tierra: una alternativa ecológica y rentable; by Mary Ruth García Conde
http://books.google.com/books?id=uHlB89_Y_P0C
http://www.worldcat.org/oclc/70669485


Más Allá del Compost: Una Guía de VermiChester para Convertir Orgánicos Residuos Más Allá del
Compost Con las Lombrices en Una Mediana Escala Compostaje Sistema; by Tomas Wilkinson
http://books.google.com/books?id=bfgFywAACAAJ
http://www.worldcat.org/oclc/824470505


Memorias del Seminario de Lombricultura y Uso del Estiercol Porcino en la Produccion de Humus; by
http://books.google.com/books?id=2SctNQEACAAJ
http://www.worldcat.org/oclc/777744202
~
Manual abecedario ecológico: la más completa guía de términos ambientales; by Néstor Julio Fraume
http://books.google.com/books?id=rrGMx_DpbfAC
http://www.worldcat.org/oclc/777597464


Manual de prácticas agroecológicas de los Andes ecuatorianos; by Zhofre Aguirre
http://books.google.com/books?id=O2i6qooj_PYC
http://www.worldcat.org/oclc/37680788


Manual de Reciclaje Compostaje y Lombricompostaje; by Fabricio Capistran
http://www.librarything.com/work/8215085
http://books.google.com/books?id=33m9AAAACAAJ
http://www.worldcat.org/oclc/51611434     bookfinder.com        addall.com        booksprice.com


Manual práctico de hidroponía; by Rodríguez Delfín
http://books.google.com/books?isbn=8459110834
http://www.worldcat.org/oclc/817727797


                                                ; by
http://www.worldcat.org/oclc/804604470


Manual práctico del huerto ecológico; by Mariano Bueno Bosch
http://books.google.com/books?id=aOSmcQAACAAJ
http://www.worldcat.org/oclc/733965263


Manual tecnologico: hidroponia; by A. Bliska Junior
http://books.google.com/books?id=ugQQtwAACAAJ
http://www.worldcat.org/oclc/45777558


Micro Huertas Familiares - CD book; by Cesar Marulanda
carbon.org     google.com        bing.com     yahoo.com        bookfinder.com       addall.com


Minna-de Tamesu Mimizu Conposuto Manyuaru: Gakkou, Chiiki-de Manabu Risaikuru; by Binet
Payne
http://www.google.com   http://www.bing.com
~
Mujeres, tecnólogas invisibles: experiencias desde América Latina; by Carlos Frías Coronado
http://books.google.com/books?id=XycGi-WGIkAC
http://www.worldcat.org/oclc/38855280


Nuestra forma de hacer las cosas Experiencias campesinas: agricultura orgánica, recursos loca; by
Pedro Figueroa B
allbookstores.com      google.com     bookfinder.com       booksprice.com       bing.com     yahoo.com



Permacultura: una guía para principiantes; by Graham Burnett
http://books.google.com/books?id=5puoPQAACAAJ
http://www.worldcat.org/oclc/433472941         bookfinder.com         addall.com       booksprice.com


Permacultura per tutti. Oltre l'agricoltura biologica, per curare la Terra e guarire il pianeta; Patrick
Whitefield
http://books.google.com/books?id=U4OXtgAACAAJ
http://www.worldcat.org/oclc/793322719


Permacultura: Principi e percorsi oltre la sostenibilità by David Holmgren
http://www.librarything.com/work/12465756
http://books.google.com/books?id=Gwq3QQAACAAJ


Permacultura: una guía para principiantes; by Graham Burnett
http://books.google.com/books?id=5puoPQAACAAJ
http://www.worldcat.org/oclc/433472941         bookfinder.com         addall.com       booksprice.com


Permacultura en Salgueiron Masso; by Antonio Palma Rico
~ Nook book allbookstores.com      bing.com      bookfinder.com            yahoo.com


Plantas Amigas de Interior; by B. C. Wolverton
http://books.google.com/books?id=HFckAgAACAAJ
http://www.wolvertonenvironmental.com          bookfinder.com         addall.com       booksprice.com
~
Práctica elemental de huerta orgánica; by Hemisferio Sur
http://books.google.com/books?id=Yn9nAAAACAAJ


Potencial de                                                      ; by
http://books.google.com/books?id=QbCjZwEACAAJ
http://www.worldcat.org/oclc/36890009


Prefactibilidad comparativa de un sistema de valorización de residuos sólidos urbanos
biodegradables: compostaje versus lombricultura; by Conrado Ernesto Canales Schulin-Zeuthen
http://books.google.com/books?id=5kT-MQAACAAJ
http://www.worldcat.org/oclc/154331561


Primera Jornada Nacional de Lombricultura; by Universidad de Santiago de Chile
http://books.google.com/books?id=hh24tgAACAAJ
http://www.worldcat.org/oclc/182538019


Principales Avances en Investigacion Y Desarrollo Tecnologico Por Sistemas de Prodccion Agricola;
by Corpoica
http://books.google.com/books?id=6tzUDwLYA_kC
http://www.worldcat.org/oclc/777765558


Princípios de hidroponia; by Carrijo. O. A.
http://books.google.com/books?id=CDfQZwEACAAJ
http://www.worldcat.org/oclc/709099426


Priorizando Areas Para la Conservacion de Suelos en la Microcuenca la Encanada
http://books.google.com/books?id=8CQNxjulBcoC


Produção de batata-semente pré-básica em canteiros, vasos e hidroponia; by Ricardo Monteiro Corrêa
http://books.google.com/books?id=o4f3HAAACAAJ
http://www.worldcat.org/oclc/61244492
~
Produccion de Abonos Organicos de Buena Calidad; by Corpoica
http://books.google.com/books?id=O7u8_I1rrnAC


Producción de jitomate en hidroponia bajo invernadero: manual de manejo; by Antonio Domínguez
Deheza
http://books.google.com/books?id=vs_aAAAACAAJ
http://www.worldcat.org/oclc/62365677


Produccion de Lombriz Roja Californiana Con Bovinaza; by Corpoica
http://books.google.com/books?id=hsmV_w4VVP8C


Recirculación de soluciones nutritivas en cultivo de tomate en hidroponía en San Sebastián
(Guipúzcoa); by María Elena Blázquez Sanz
http://books.google.com/books?id=8S4jcgAACAAJ
http://www.worldcat.org/oclc/637593291


Producción del avestruz: aspectos clave; by Carlos Buxadé Carbó
http://books.google.com/books?id=MoHuSfib4h0C



http://books.google.com/books?id=LeFUcCB_ltoC
http://www.worldcat.org/oclc/55205030


Simposio Centroamericano sobre Agricultura Orgánica; by Jaime E. García
http://books.google.com/books?id=G8xgAAAAMAAJ
http://www.worldcat.org/oclc/33948466


Seminario Taller El Tratamiento Anaerobico de los Residuos del Cafe: Una Alternativa Energitica
Para la Disminucion del Impacto Ambiental en el Sector; by CATIE
http://books.google.com/books?id=--YNAQAAIAAJ


Soluciones nutritivas en hidroponía: formulación y preparación; by Alfredo Rodríguez Delfín
http://books.google.com/books?isbn=630008017X
~
Sostenibilidad y Medio Ambiente: Políticas, Estrategias y Caminos de Acción; by Antonio Villa L.
http://books.google.com/books?id=w_94NpmZDqcC
http://www.worldcat.org/oclc/41538924


Sostenibilidad y desarrollo: el valor agregado de la agricultura orgánica; by Liven Martínez
http://www.google.com        http://www.bing.com


Soluções Sustentáveis - Permacultura Urbana by Lucia Legan
http://www.librarything.com/work/8460851


Taller De Abonos Organicos; by CATIE
http://books.google.com/books?id=HtUOAQAAIAAJ


Técnicas Agrícolas: Aeroponía, Hidroponía, Rotación de Cultivos, Ecoquema, Siembra Directa,
Ensilado, Trilla, Bancal, Pool de Siembra; by Fuente: Wikipedia
http://books.google.com/books?id=9TCbZwEACAAJ


Técnicas agrarias: Cunicultura Lombricultura; by Centro de Cultura por Correspondencia
http://books.google.com/books?id=NuI7QwAACAAJ


Tecnología de Suelos: Estudio de Casos; by Asunción Usón Murillo
http://books.google.com/books?id=b2h1gY9dPuoC
http://www.worldcat.org/oclc/733969014


                                                     ; by Ricard   Viladomiu Marnet
http://www.worldcat.org/oclc/807514710


Tecnologías alternativas para el desarrollo urbano; by Alvaro Portillo
http://books.google.com/books?id=77ZFAAAAYAAJ
http://www.worldcat.org/oclc/21567853


Temas de agricultura organica. Lombricultura; by Centro de Estudios para la Democracia Uruguaya
http://books.google.com/books?id=i3w1HQAACAAJ
http://www.worldcat.org/oclc/36320183
~



Tikapapa. Vinculando consumidores urbanos y pequeños productores andinos con la biodiversidad
de la papa; by Centro Internacional de la Papa
http://books.google.com/books?id=8-rQxFbg1WwC
http://www.worldcat.org/oclc/712865187



Tomate: produção em campo, em casa-de-vegetação e em hidroponia; by Marco Antônio Rezende
Alvarenga
http://books.google.com/books?isbn=8587692208
http://www.worldcat.org/oclc/709890231



Tratado de cultivo sin suelo; by Miguel Urrestarazu; by Miguel Urrestarazu
http://books.google.com/books?isbn=8484761398
http://www.worldcat.org/oclc/55509848



Utilización de compost en los sistemas de cultivo hortícola; by Peter J. Stofella
http://books.google.com/books?id=qiVQOERQSOIC
http://www.worldcat.org/oclc/57548400




                                                                                     ; by
Montavon
http://books.google.com/books?id=2EaQtwAACAAJ
http://www.worldcat.org/oclc/84686989



Vamos a hacer un huerto: manual práctico para el huerto escolar ecológico; by Jesús María Cantero
http://books.google.com/books?id=_nKRygAACAAJ
http://www.worldcat.org/oclc/431623934      bookfinder.com       addall.com       booksprice.com
~

Remineralize your Soil ~ Healthy Soil,               Healthy Plants, Healthy People
http://remineralize.org

Soil Regeneration with Volcanic Rock Dust
http://calameo.com/books/00062163120384c54b373
http://scribd.com/doc/30402511
Volcanic Rock Dust added to soil can double plant or lawn growth.




Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by
Marc Remillard
librarything.com/11197572    books.google.com/PZHObwAACAAJ        worldcat.org/oclc/744677817


A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra
Truax
~ Kindle book    allbookstores.com bing.com    bookfinder.com       yahoo.com
http://vermico.com




SoilSoup Compost Tea ~ Healthy Soil,             Healthy Plants, Healthy People
http://soilsoup.com
SoilSoup Compost Tea is an excellent soil builder and organic fertilizer.
Soil Soup is very easy to handle and use.


Growing Solutions ~ Healthy Soil,          Healthy Plants, Healthy People
http://www.growingsolutions.com




Keep Our Country Strong Like a Rock
Please Support your LOCAL Organic FAMILY Farmers
http://localharvest.org
~




Healthy Soil,       Healthy Plants, Healthy People
eat LOCAL FRESH ORGANIC Food
localharvest.org
 http://greenpeople.org http://eatwellguide.org
http://biodynamics.com http://greenamerica.org http://localsustainability.net
http://sustainabletable.org http://startnow.org
http://harvestontario.com http://tilth.org


GOOD FOOD is GOOD MEDICINE
Let food be thy medicine; by the Great Physician Hippocrates, from Ancient Greece

Your Health (Wholeness) is your Wealth.

You can not be of much service to God and to Others, if you are not healthy.

Do you Eat to Live, or do you Live to Eat; by Mohandas K. Gandhi

Vegetarian Health Recipes for Super Energy and Long Life; by Paul C. Bragg
librarything.com/10453101 books.google.com/xHR2MQAACAAJ worldcat.org/oclc/259194344
http://www.scribd.com/doc/122845795
~ Nook book allbookstores.com        bing.com      bookfinder.com      yahoo.com
~

Healthy Heart: Keep Your Cardiovascular System Healthy and Fit at any Age by Patricia
Bragg
http://www.librarything.com/work/5143835
http://books.google.com/books?id=4Hu8zxU35y8C
http://www.worldcat.org/oclc/54054103
~ Kindle book    allbookstores.com   bing.com           bookfinder.com      yahoo.com


Eat Fat Look Thin: A Safe and Natural Way to Lose Weight Permanently; by Bruce Fife
librarything.com/2179732   books.google.com/rFF30fhh7SoC worldcat.org/oclc/50291097



Raw Kids : Transitioning Children To A Raw Food Diet; by Cheryl Stoycoff
librarything.com/work/3459281 books.google.com/DLJWPQAACAAJ worldcat.org/oclc/48399326
raweugene.homestead.com/resources.html rawbc.org


Disease-Proof Your Child: Feeding Kids Right; by Joel Fuhrman
librarything.com/1445760 books.google.com/-W_LYnBFIY8C worldcat.org/oclc/57452540
~ Kindle book     allbookstores.com      bing.com       bookfinder.com      yahoo.com


   Copy Kids Eat Fruits and Vegetables - Director: Malona Badelt
dvd:
worldcat.org/oclc/796662340     amazon.com           google.com         bing.com        yahoo.com


MIRACLE in WISCONSIN – a different kind of school lunch
feingold.org/PF/wisconsin1.html    foodrevolution.org/askjohn/43.htm
http://advancedhealthplan.com/miracleschool.html


Feeding Your Allergic Child: Happy Food for Healthy Kids; by Elisa Meyer
calameo.com/000621631d8dc30d0b504 books.google.com/rhQesLhrDMEC worldcat.org/oclc/35651131



Build Powerful Nerve Force: It Controls Your Life, Keep It Healthy; by Patricia Bragg
librarything.com/7071960 books.google.com/dm2NQ5OQL_4C worldcat.org/oclc/54051952
~ Nook book allbookstores.com         bing.com      bookfinder.com      yahoo.com


A healthy body is a guest chamber for the soul,
A sick body is a Prison ~ Francis Bacon
~
Why be Sick?
Garbage In, Garbage Out
Junk Food In, Fat Sick People Dying Out
calameo.com/000621631d8dc30d0b504

DIET DRINK POISON
http://calameo.com/books/000621631c357ae38ec3c

The Stevia Organic Sweetener Story and the Burning of Stevia Books by the FDA
scribd.com/doc/108619027       calameo.com/books/0017253189620d6a1a4cb

Why Can't My Child Behave: Why Can't She Cope, Why Can't He Learn; by Jane Hersey
librarything.com/6297660    books.google.com/3dDvQgAACAAJ worldcat.org/oclc/34765077

Little Sugar Addicts: End the Mood Swings, Meltdowns, Tantrums, and Low Self-Esteem in
Your Child Today; by Kathleen DesMaisons
librarything.com/work/950397   books.google.com/QmWLCShPhd0C worldcat.org/oclc/54001427

Born With a Junk Food Deficiency: How Flaks, Quacks, and Hacks Pimp the Public Health; by Martha
Rosenberg
librarything.com/12367474    books.google.com/wW_ApwAACAAJ       worldcat.org/oclc/764387194
~ Kindle book       ~ Nook book    allbookstores.com    bing.com      bookfinder.com

Victory Over ADHD: A Holistic Approach for Helping Children with Attention Deficit Hyper-
activity Disorder; by Deborah Merlin
librarything.com/work/5263917 books.google.com/zylPPgAACAAJ worldcat.org/oclc/244062818
http://victoryoveradhd.com http://feingold.org

Healing ADD: The Breakthrough Program That Allows You to See and Heal the 6 Types of
ADD, by Doctor Daniel G. Amen, M.D.
librarything.com/174213 books.google.com/cdNpm0rtpaAC worldcat.org/oclc/45100517
~ Kindle book       ~ Nook book    allbookstores.com    bing.com      bookfinder.com

Coconut Oil Cures Alzheimer and Other Diseases
scribd.com/doc/122169282               calameo.com/books/00203825869b8b318cce3
librarything.com/work/12181672     books.google.com/IeawZwEACAAJ worldcat.org/oclc/738374964
~ Kindle book       ~ Nook book    allbookstores.com    bing.com      bookfinder.com

The Coconut     Oil Miracle; by Bruce Fife
librarything.com/1140258    books.google.com/tSGmnBeRpLkC     worldcat.org/oclc/54905936
allbookstores.com     google.com     bookfinder.com    booksprice.com      bing.com    yahoo.com
~
Drugging Our Children: How Profiteers Are Pushing Antipsychotics on Our Youngest, and What
We Can Do to Stop It; by Sharna Olfman
http://books.google.com/books?id=LYvOnrx-wfYC       http://www.worldcat.org/oclc/745980498
~ Kindle book       ~ Nook book       allbookstores.com   bing.com       bookfinder.com

Feed Your Kids Right: Dr. Smith's Program for Your Child's Total Health; by Lendon H. Smith
librarything.com/work/551514        books.google.com/q2aPdv1y8-UC     worldcat.org/oclc/4493409
~ Nook book allbookstores.com           bing.com     bookfinder.com       yahoo.com

Detecting Your Hidden Allergies: Foods You Eat Everyday Can Cause Asthma, Sinus, Headaches,
Fatigue, Nervousness, Digestive Problems, Arthritis and Many Other Disorders; by William G Crook
librarything.com/work/2410176          books.google.com/books?id=w3UrPQAACAAJ
http://www.worldcat.org/oclc/19068905       bookfinder.com      addall.com      booksprice.com


Food Allergy Relief: The Joys of Being Food-Allergy Free, the Natural Way; by James Braly
librarything.com/work/5317883            books.google.com/books?id=P7_akdEOJOAC
http://www.worldcat.org/oclc/44268078        bookfinder.com       addall.com      booksprice.com


Dr. Braly's Food Allergy and Nutrition Revolution: Change Your Food , Change Your Life, Featuring
the Top 10 Research Breakthroughs; by James Braly
librarything.com/work/2709970           books.google.com/books?id=upaYVKLIosUC
http://www.worldcat.org/oclc/44965038         bookfinder.com     addall.com     booksprice.com

Disease-Proof Your Child: Feeding Kids Right; by Joel Fuhrman
librarything.com/1445760 books.google.com/-W_LYnBFIY8C worldcat.org/oclc/57452540
~ Kindle book       ~ Nook book       allbookstores.com   bing.com       bookfinder.com


The Healing Power of Nature Foods; by Susan Smith Jones
librarything.com/5850867 books.google.com/raxZgkAhOw0C worldcat.org/oclc/173239121
~ Kindle book       ~ Nook book       allbookstores.com   bing.com       bookfinder.com


Let's Get Well; by Adelle Davis
librarything.com/153373           books.google.com/0CDoQ6AEwAA       worldcat.org/oclc/271938
allbookstores.com     google.com        bookfinder.com    booksprice.com      bing.com       yahoo.com

Nutrition and Your Mind: The Psychochemical Response; by George Watson
librarything.com/work/2933656       books.google.com/books?id=CJMjAAAACAAJ
http://www.worldcat.org/oclc/277194     bookfinder.com      addall.com booksprice.com
~
Change Your Brain, Change Your Life: The Breakthrough Program for Conquering Anxiety,
Depression, Obsessiveness, Anger, and Impulsiveness; by Daniel G. Amen, M.D.
librarything.com/302455        books.google.com/qB9vnlTv6Z4C          worldcat.org/oclc/40943377
~ Kindle book       ~ Nook book        allbookstores.com       bing.com       bookfinder.com

Natural Baby Care; by Colleen K. Dodt
librarything.com/637409        books.google.com/zngeIWEPqsIC           worldcat.org/oclc/44954019

Apple Cider Vinegar: Control Weight, Banish Obesity and Diabetes; by Paul C. Bragg
librarything.com/771911     books.google.com/GWMlSwAACAAJ               worldcat.org/oclc/16445073

The Miracle of MSM: The Natural Solution for Pain; by Stanley W. Jacob
librarything.com/1229935       books.google.com/QXXnCgcoDIAC           worldcat.org/oclc/40200470
~ Kindle book       ~ Nook book        allbookstores.com       bing.com       bookfinder.com

The Yeast Connection: A Medical Breakthrough; by William G Crook
librarything.com/work/26945 books.google.com/wPCb1rjN2Q8C worldcat.org/oclc/13796406
~ Kindle book       ~ Nook book        allbookstores.com       bing.com       bookfinder.com

The Food Factor in Disease; by Francis Washington Everard Hare, M. D.
http://books.google.com/books?id=zgA1AQAAMAAJ
http://www.worldcat.org/oclc/1620178

How to Heal the Sick; by Charles Hunter
librarything.com/953145 books.google.com/TmxrPAAACAAJ worldcat.org/oclc/8010289
~ Kindle book     ~ Nook book     allbookstores.com bing.com bookfinder.com

Chemical Cuisine: Do You Really Know What You're Eating; by Gloria Gilbere
librarything.com/12421182     worldcat.org/oclc/48523377
~ Kindle book    bookfinder.com     addall.com     booksprice.com

Excitotoxins: The Taste That Kills; by Russell L Blaylock
librarything.com/854055     books.google.com/gav_LL7olqQC          worldcat.org/oclc/36060015
~ Kindle book       ~ Nook book        allbookstores.com       bing.com       bookfinder.com

Toxic Sludge is Good For You: Lies, Damn Lies and the Public Relations Industry; by John Stauber
scribd.com/doc/106751750       librarything.com/5514       worldcat.org/oclc/32665064

Are Your Children and Grandchildren Eating Food Fertilized with Toxic Sewage Sludge
scribd.com/106751638 scribd.com/106751750 scribd.com/106751911

Fateful Harvest: The True Story of a Small Town, a Global Industry, and a Toxic Secret; by Duff Wilson
http://librarything.com/work/569636         http://safefoodandfertilizer.org
~ Kindle book       ~ Nook book       allbookstores.com       bing.com         bookfinder.com
~
The Unhealthy Truth: One Mother's Shocking Investigation into the Dangers of America's Food
Supply; by Rachel Kranz
librarything.com/10215853    books.google.com/Lrtuyrh8h2gC worldcat.org/oclc/462880202
~ Kindle book       ~ Nook book      allbookstores.com      bing.com       bookfinder.com

Guess What Came to Dinner: Parasites and Your Health; by Ann Louise Gittleman
librarything.com/work/2395722     books.google.com/CgA8AjjGwD0C
worldcat.org/oclc/45668924     bookfinder.com      addall.com       booksprice.com

Pesticide Alert: A Guide to Pesticides in Fruits and Vegetables; by Lawrie Mott
librarything.com/work/7535180            books.google.com/books?id=X5NKAAAAYAAJ
http://www.worldcat.org/oclc/17106638           bookfinder.com       addall.com booksprice.com

Empty Harvest: Understanding the Link Between Our Food, Our Immunity and Our Planet; by Bernard Jensen
librarything.com/1237077    books.google.com/Fp7eN8Ghg60C         worldcat.org/oclc/20454798
allbookstores.com      google.com      bookfinder.com       booksprice.com       bing.com      yahoo.com

Stuffed and Starved: The Hidden Battle For The World Food System; by Raj Patel
librarything.com/3657642 books.google.com/oAeFUSm5bAEC worldcat.org/oclc/182529373
~ Kindle book       ~ Nook book      allbookstores.com      bing.com       bookfinder.com


dvd: Super Size Me; director: Morgan Spurlock
http://worldcat.org/oclc/5658213        google.com          bing.com       yahoo.com

dvd: Fast Food Nation; director: Richard Linklater
http://worldcat.org/oclc/77539187          google.com        bing.com       yahoo.com

dvd:King Corn; director: Aaron Woolf
http://worldcat.org/oclc/213373700          google.com        bing.com       yahoo.com

Beyond Antibiotics: Strategies for Living in a World of Emerging Infections and Antibiotic-
Resistant Bacteria; by Michael A. Schmidt
librarything.com/8585344    books.google.com/dvSYdNLxNgMC worldcat.org/oclc/227929988
bookfinder.com       addall.com        booksprice.com


The Bible Cure; by Reginald B. Cherry, M.D.
librarything.com/work/355159         books.google.com/books?id=nXaH6FtiZFoC
worldcat.org/oclc/38898046     bookfinder.com     addall.com   booksprice.com
Praying God's Word: Biblically Based Prayers and Faith Confessions; by Hazel Hill
librarything.com/2845289        books.google.com/a5P9ewEACAAJ           worldcat.org/oclc/27036064
~ Kindle book       allbookstores.com       bing.com        bookfinder.com       yahoo.com
~
An Integrative Approach to Healing Chronic Illness: Revealing the Root Causes of Modern Disease;
by Richard   Brightheart
http://books.google.com/books?id=lly0IAAACAAJ
http://www.worldcat.org/oclc/778566973 allbookstores.com bing.com bookfinder.com
The Probiotics Revolution: The Definitive Guide to Safe, Natural Health Solutions Using Probiotic
and Prebiotic Foods and Supplements; by Sarah Wernick
librarything.com/7569726 books.google.com/GSrjqYV2uVsC worldcat.org/oclc/137221392
~ Kindle book          ~ Nook book         allbookstores.com   bing.com       bookfinder.com

Probiotics - Protection Against Infection: Using Nature's Tiny Warriors To Stem Infection and Fight
Disease; by Casey Adams
librarything.com/10335947           books.google.com/KhppPgAACAAJ           worldcat.org/oclc/727198870
~ Kindle book              ~ Nook book      bookfinder.com     addall.com      booksprice.com

The Complete Book of Enzyme Therapy: A Complete and Up-to-Date Reference to Effective
Remedies; by Anthony J. Cichoke
librarything.com/1118293 books.google.com/gJy5neC07YsC worldcat.org/oclc/39007146

Enzyme Nutrition; by Doctor Edward Howell
librarything.com/1827688 books.google.com/h9EgG8O7GgIC worldcat.org/oclc/12103275
allbookstores.com            google.com      bookfinder.com    booksprice.com      bing.com     yahoo.com

Resetting the Clock: Five Anti-Aging Hormones That Improve and Extend Life; by Elmer Cranton
librarything.com/work/6602028        books.google.com/books?id=bzVZ2aKBkysC
http://www.worldcat.org/oclc/34788336   bookfinder.com     addall.com    booksprice.com

Nurtured by Love: The Classic Approach to Talent Education; by Shinichi Suzuki
librarything.com/work/557451             books.google.com/-Qvd7Wsmb48C worldcat.org/oclc/61038074
~ Kindle book          allbookstores.com         bing.com      bookfinder.com      yahoo.com

Game: Harvest Time ~ CO-OPERATIVE Games; by Family Pastimes
http://familypastimes.com

Go for Kids; by Milton N Bradley
librarything.com/work/1567424                books.google.com/books?id=1tt_AAAACAAJ
http://worldcat.org/oclc/48923942              bookfinder.com    addall.com   booksprice.com

Chess is Child's Play: Teaching Techniques That Work; by Laura Sherman
librarything.com/work/12340948       books.google.com/books?id=vsIMywAACAAJ
http://www.worldcat.org/oclc/759173209     bookfinder.com     addall.com booksprice.com

65 Promises from God for Your Child: Powerful Prayers for Supernatural Results; by Mike Shreve
books.google.com/books?id=CCCHy5PdQe0C ~ Kindle book     ~ Nook book allbookstores.com
~
ORGANIC GARDENING TECHNOLOGIES
INCREASING Plant Yields by over 400 PERCENT
http://www.scribd.com/doc/75160339
http://www.calameo.com/books/0010511867e619fa5b018




Boost your Garden Yields with Companion Planting Technologies
http://www.scribd.com/doc/124719796
http://calameo.com/books/0021353034dd0a1c03d43


CITY FARMING, BACKYARD FARMING, and URBAN FARMING
http://www.scribd.com/doc/96622044
http://en.calameo.com/books/001467601ef8c64105f4c




FREE RAIN WATER HARVESTING MANUALS and Much More
http://www.scribd.com/doc/75160853
http://www.calameo.com/books/00105118622f34ba7dbe7



FREE RAIN GARDEN MANUALS, BROCHURES and INFORMATION SHEETS
http://www.scribd.com/doc/75162927
http://www.calameo.com/books/00105118638b46251e05d



FREE WATER WISE Gardening, DROUGHT Gardening, XERISCAPE Gardening
MANUALS, Books and Much More
http://www.scribd.com/doc/105267038
http://en.calameo.com/books/001698854129dced31cc9



FREE ROOF GARDENS - GREEN ROOFS MANUALS Links and Aquaponics
Systems
http://www.scribd.com/doc/75160952
http://www.calameo.com/books/0010511860c2e578571b1
~
Straight VEGETABLE OIL Cars, Trucks, Electric Generators, Water Pumps-Irrigation
Straight Vegetable Oil Links to Books, Manuals, Articles and Much More
http://www.scribd.com/doc/93406879
http://www.calameo.com/books/00139810833f44e83a7d4


SOLAR ENERGY TRAINING and Development Projects
solarenergy.org homepower.com norcalsolar.org ises.org dgs.de protermosolar.com energy.sourceguides.com


Dean's Coffee Beans Eco Development Projects - Organic and Fair Trade
deansbeans.com        books.google.com/IqXuk9mURjUC


Growing Power - Training People for Creating Community Food Systems by Will Allen
http://www.growingpower.org
librarything.com/11993624     books.google.com/nf55k2hlg-IC worldcat.org/oclc/757470632
~ Kindle book      ~ Nook book      allbookstores.com     bing.com      bookfinder.com


Unlocking the Secrets of Living Your Dreams ~ Chicken Soup for the
Soul ; by Mark Victor Hansen
http://librarything.com/work/7580935
http://books.google.com/books?id=TuESYqr9mQIC
http://worldcat.org/oclc/52854787
~ Nook book allbookstores.com       bing.com bookfinder.com              yahoo.com


You Can If You Think You Can; by Norman Vincent Peale
http://librarything.com/work/125895
http://books.google.com/books?id=xpzYyyN2XkUC
http://www.worldcat.org/oclc/730748
~ Kindle book       ~ Nook book   allbookstores.com       bing.com      bookfinder.com


Coach Wooden's Pyramid of Success: Building Blocks For a Better Life; by John Wooden
http://librarything.com/work/303206
http://books.google.com/books?id=tu23SID_8WwC
http://www.worldcat.org/oclc/57366457
~ Kindle book       ~ Nook book   allbookstores.com       bing.com      bookfinder.com


Every day help someone who can never reciprocate. This is my obligation.
~ John Wooden's PHILOSOPHY, The great UCLA basketball coach
calameo.com/books/00127522718a6e0fef72d scribd.com/doc/87058897
~
FREE GARDEN THERAPY MANUALS: HELPING the DISABLED
scribd.com/doc/64621010           calameo.com/books/000877896a16a5245c71a




Free Garden Posters
http://www.scribd.com/doc/124386408


How to Heal the Sick; by Charles Hunter
librarything.com/953145 books.google.com/TmxrPAAACAAJ worldcat.org/oclc/8010289
~ Kindle book     ~ Nook book  allbookstores.com bing.com  bookfinder.com

Super Power Breathing: For Super Energy, High Health and Longevity; by Patricia Bragg
librarything.com/9216551    books.google.com/l0LxOy_M-5YC          worldcat.org/oclc/41437619
~ Nook book allbookstores.com         bing.com      bookfinder.com        yahoo.com

George Muller: Man of Faith and Miracles; by Basil Miller
librarything.com/1547177 books.google.com/QKweK4HIxX4C worldcat.org/oclc/21343056
bookfinder.com       addall.com      booksprice.com      google.com      bing.com     yahoo.com

Experiencing The Great I Am: 40 Faith-building Stories From Contemporary Christians; by Bryant Heflin
librarything.com/work/4540159 books.google.com/Wb8k-IQve48C worldcat.org/oclc/58546923

Always Enough: Gods Miraculous Provision among the Poorest Children on Earth; by Heidi Baker
librarything.com/737793      books.google.com/RefRPAAACAAJ         worldcat.org/oclc/52341800
~ Kindle book      ~ Nook book      allbookstores.com     bing.com      bookfinder.com
~




We need Your Help. Please Plant a Row for the Hungry. Thank YOU!

Please use search engines to find "Plant A Row For The Hungry"
locations, people, Food Banks and churches near you. Thank you.
http://www.google.com
http://www.scribd.com/doc/106198571
calameo.com/00127522718a6e0fef72d
http://www.scribd.com/doc/75163916
http://www.yahoo.com
http://www.bing.com
Dig for Victory




Faith Like Potatoes; by Angus Buchan
http://www.librarything.com/work/2886793
http://books.google.com/books?id=LUN2Ci003esC
http://www.worldcat.org/oclc/314188733
http://shalomtrust.co.za  bookfinder.com  addall.com      booksprice.com

Companion Planting - Ning

  • 1.
    COMPANION PLANTING Practiced bymany in the past and a natural order in the forest, companion planting is once again becoming of interest. Though controversy exists in its scientific implications, many of those who practice it believe it is very beneficial. Basically, companion planting is the placing of certain plants in various combinations or “stands” due to the mutual influences they have on one another. Due to the ever-increasing interest in organic gardening, the following list has been compiled from various sources. Vegetable Relationships Asparagus ------------------- Tomato and asparagus directly benefit one another. Asparagus has been isolated as a substance, which controls some of the soil pests that frequent tomatoes. Beans ------------------------- Corn and pole beans benefit one another. The beans can climb up the cornstalks. Beans thrive best with carrots and cauliflower inter-planted. Beans add nitrogen to the soil and pole beans are an excellent border to act as a windbreaker. Beets -------------------------- Do well near dwarf beans, onions and kohlrabi but are adversely affected by pole beans. Lettuce and cabbage also benefit from beets. Cabbage Family ------------ Positively influenced by dill, camomile, sage, wormwood, rosemary and mint. Tomatoes are said to repel the white cabbage fly. Carrots ----------------------- Raising flax or soybeans one year prior to planting carrots helps to loosen up the soil and make it flexible. Carrots grow best with leaf lettuce, chives, and red radishes, Onions and leeks are said to repel the carrot fly. Corn -------------------------- Early potatoes, beans and peas are good neighbors for corn. Corn is also a good shade-making plant, which makes a good shelter for the cucurbit family. Cucumbers ------------------ These are benefited by sunflowers, corn, alternate rows of early potatoes and early cabbage. Radishes inter-planted are said to repel cucumber beetles. Eggplant --------------------- A border of eggplant surrounding the potato field acts as a trap for potato beetles where they may be controlled. Garlic ------------------------- Roses and garlic have mutual benefits. Garlic inhibits peas and beans. Kohlrabi --------------------- This inhibits tomatoes and does not do well near pole beans. Peas -------------------------- Peas grow well with radishes, carrots, cucumbers, sweet corn, beans and turnips. Potatoes --------------------- Early potatoes, beans, sweet corn, cabbage and peas do well together. Rye followed by potatoes is beneficial to the potatoes. Potatoes and sunflowers are said to inhibit one another.
  • 2.
    Radishes -------------------- Radishesand peas are mutually beneficial. Leaf lettuce is said to make radishes tender. Pole beans and radishes are not good combination. Spinach ---------------------- Strawberries are a good intermingling crop for spinach. Tomatoes ------------------- Asparagus, parsley and early cabbage all do well near tomatoes. Herb Relationships Most herbs are beneficial to plants. Their aroma is proclaimed to repel and prevent insect pests and diseases. Many teas made from various herb combinations can be used as insect repellants. Basil -------------------------- Basil is an aromatic herb which grows well with most plants with the exception of rue. Borage ----------------------- Strawberries are aided by a sparse scattering of borage. Borage also attracts honey bees. Camomile ------------------- In small ratios it is beneficial to peppermint, wheat, onions and cabbage. Chervil ---------------------- Radishes growing near chervil have a hotter tang. Chives ----------------------- Chives are hardly ever bothered by insects or diseases. They benefit carrot uniformity and are proclaimed to prevent apple scab when planted near roots. Corriander ----------------- In flowers it attracts bees and other beneficial insects. Dill --------------------------- Sown in garden corners it attracts bees. It is also beneficial near lettuce, onions and cucumbers. Hyssop ---------------------- This herb increases grape yields, acts as a trap to cabbage butterfly and inhibits radishes. Mint ------------------------- It repels ants, black flea beetles and cabbage butterfly. Parsley ---------------------- It aids roses and tomatoes and also attracts honey bees. Rosemary ------------------- It repels carrot worm butterfly and stimulates sage. Summer Savory ------------ This is beneficial to onions and green beans. Spurge ----------------------- This herb repels mole and mice. Stinging Nettle ------------- It helps plants’ resistance to spoiling, increases essential oil content of herbs and promotes humus formation. Thyme ----------------------- It repels cabbage worms. Valerian --------------------- It attracts earthworms and promotes phosphorus activity in root area.
  • 3.
    Yarrow ---------------------- This increases aromatic quality of herbs and fiber content of grasses. Flower Relationships Bachelor’s Buttons -------- In small ratios is beneficial to small grains. Foxgloves ------------------- A good companion to pines. French Marigolds --------- I excretes a substance fatal to nematodes, repels Mexican bean beetle, very beneficial to tomatoes and a recommended “constant companion” in all gardens. Lupine ----------------------- Used to increase the friability of sandy soils. Morning Glory ------------- I is said to increase the germination of melon seeds. Nasturtium ----------------- Combats white fly in greenhouses, repels squash bugs and is beneficial to radishes. Roses ------------------------ Garlic and roses are good companions. Lupines and parsley are beneficial to roses. Boxwood and roses do not do well together, Sunflowers ----------------- They stunt potatoes, are a good wind border, and attract birds and bees for pollination. Cucumbers benefit from the protection of sunflowers. Tansy ------------------------ It repels flies, ants and moths. Warning: Stems and leaves are poisonous to man and livestock. Adapted from Companion Plants and How to grow Them. Philbrick, Helen and Gregg, Prichard. Remineralize your Soil ~ Healthy Soil, Healthy Plants, Healthy People http://remineralize.org Soil Regeneration with Volcanic Rock Dust http://calameo.com/books/00062163120384c54b373 http://scribd.com/doc/30402511 Volcanic Rock Dust added to soil can double plant growth. SoilSoup Compost Tea ~ Healthy Soil, Healthy Plants, Healthy People http://soilsoup.com SoilSoup Compost Tea is an excellent soil builder and organic fertilizer. Soil Soup is very easy to handle and use. Growing Solutions ~ Healthy Soil, Healthy Plants, Healthy People http://www.growingsolutions.com
  • 4.
    ~ Companion Planting INCREASESFood Production by 250 Percent One of the goals of research in South Africa is to look at ways to boost food production with the practice of intercropping (companion planting, or growing crops together) a cereal grain crop, like sorghum, with bean crops. We have been intercropping sorghum with legumes planted in row of zai pits. Why grow beans? Being legumes, bean crops can improve soils by converting nitrogen from the air into forms that crops can use. The crops we are working with are quite tolerant of dry conditions and produce vines that cover the ground, protect6ing it from the intense tropical sun and creating an environments in which soil microorganisms, can thrive. Moreover, the legumes provide the farmer with a harvest of dried, edible beans. What are zai holes? The zai system originated in West Africa as a way to cope with drought and hard encrusted soil. Drought tolerant grain crops such as sorghum or millet are planted in pits about 12 inches, 6 inches deep. With the excavated soil thrown to the downhill side, the pits act as tiny water catchment basins, making maximum use of what little rainfall is received. Several handfuls of manure are traditionally placed in each pit, concentrating nutrients near the crop roots. Have we seen any benefits? The results we have so far are from year one of a sorghum-legumes intercropping strategy within the zai system. Most of the legumes we have tried have grown very well, but cowpea produced the most dried beans. It increases total grain production by 1,000 kilograms (250%) from 400 kilograms per hectare when grown sorghum alone to about 1,400 kilograms per hectare when grown together with cowpeas. It also increased soil nitrogen as well as nitrogen taken up by the sorghum plants. All of this is very encouraging from the perspective of the smallholder farmer, because it means they have a way to improve their soils while greatly increasing food production.
  • 5.
    ~ NATURAL SOLUTIONS inAfrica by Using Companion Planting Across East Africa, thousands of farmers are planting weeds in their maize fields (Companion Planting). Bizarre as it sounds, their technique is actually raising yields by giving the insect pests something else to chew on besides maize. It is better than pesticides and a lot cheaper, said Ziadin Khan, whose idea it is. And it has raised farm yields by 60-70 Percents. In East Africa, maize fields face two major pests, and Khan has a solution to both. The first is an insect called the stem borer. True to its name, it s larvae eat their way through a third of the regions' maize most years. But Khan discovered that the borer in even fonder of a local weed, napier grass. By planting napier grass in their fields , farmers can lure the stem borers away from the maize and into a honey trap. For the grass produces a sticky substance that traps and kills stem borer larvae. The second major pest is Striga, a parasitic plant that wrecks 10 billion dollars worth damage on maize crops every year, threating the livelihoods of one hundred million Africans. Weeding Striga is one of the most time consuming activities for millions of African women farmers, says Khan. But he has an antidote: another weed, called Desmodium. It seems to release some sort of chemical that Striga does not like. At any rate, where farmers plant Desmodium between rows of maize, Striga will not grow. Khan's cheap fixes for Striga and stem borer are spreading like wildfire through the fields of East Africa. Trials on more than 2,000 farms are finished. It is out of our hands now, says Khan's boss Hans Herren , who is the director of the International Centre for Insect Physiology and Ecology in Nairobi. The ideas are being taken up by framers in countries such as Ethiopia where we have never worked. Khan's novel way of fighting pests is one of the host of Low-Tech Innovations boosting production by 100 percent or more on millions of poor Thirds World farms in the past decade. This Sustainable Agriculture just happens to be the biggest movement in Third World Farming today, dwarfing the tentative forays in genetic manipulation. It seems peasant farmers have a long way to go before they exhaust the possibilities of traditional agriculture
  • 6.
    ~ COMPANION PLANTING BOOKS (IntercroppingGardening, Mixed Vegetables Gardening, Polycultures Gardening): Carrots Love Tomatoes and Roses Love Garlic: Secrets of Companion Planting for Successful Gardening; by Louise Riotte http://www.librarything.com/work/141405 http://books.google.com/books?id=MtFvQnYDy_sC http://www.worldcat.org/oclc/37688263 bookfinder.com addall.com booksprice.com A-Z of Companion Planting; by Pamela Allardice http://www.librarything.com/work/10584295 http://books.google.com/books?id=OD4iHQAACAAJ http://www.worldcat.org/oclc/29456594 bookfinder.com addall.com booksprice.com A Crash Course on Companion Planting; by Ralph Cummings ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Bob's Basics Companion Planting; by Bob Flowerdew http://www.librarything.com/work/12593858 http://books.google.com/books?id=LyWr_nVIKNYC http://www.worldcat.org/oclc/755704762 bookfinder.com addall.com booksprice.com Biological Pest Control, including: Bird, Bacillus Thuringiensis, Predation, Companion Planting, Disease Resistance In Fruit And Vegetables, Biocide, Parasitoid, Pyrethrum, Beetle Bank, Scoliidae, Pyrethrin, Fire Ant, Integrated Pest Management, Tansy; by Hephaestus Books http://books.google.com/books?id=OGmQSQAACAAJ Companion Gardening in New Zealand: Working with Mother Nature; by Judith Collins http://books.google.com/books?id=gvJIHQAACAAJ Companion Planting; by Jeannine Davidoff - South African Organic Gardener http://www.blurb.com http://www.yahoo.com http://www.google.com
  • 7.
    ~ Companion Planting; byMargaret Roberts http://books.google.com/books?id=U4FZAAAACAAJ http://www.worldcat.org/oclc/139975988 Companion Planting; by Richard Bird http://www.librarything.com/work/729518 http://books.google.com/books?id=5xsGAAAACAAJ http://www.worldcat.org/oclc/23667555 bookfinder.com addall.com booksprice.com Companion Planting and Intensive Cultivation; by Nancy Lee Maffia http://www.librarything.com/work/4993593 http://books.google.com/books?id=cQfatgAACAAJ http://www.worldcat.org/oclc/43414392 bookfinder.com addall.com booksprice.com Companion Planting Boost Your Garden's Health, Secure It From Pests And Grow More Vegetables; by Ephraim Acre http://www.amazon.co.uk http://www.dealzilla.co.uk http://www.yahoo.com http://www.google.com http://www.bing.com ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Companion Planting for Australian Gardens; by Kelly Morris http://books.google.com/books?id=OXicOO4HMFUC Companion Planting For Beginners; by Wendi Eaton ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Companion Planting for Successful Gardening; by Louise Riotte http://www.librarything.com/work/4821536 Companion Planting for Veggies; by Annette Welsford http://www.companionplantingguide.com http://www.librarything.com/work/8981096 http://www.yahoo.com http://www.google.com http://www.bing.com Companion Planting Guide; by Julie Villani http://www.yahoo.com http://www.google.com http://www.bing.com
  • 8.
    ~ Companion Planting InAustralia; by Brenda Little http://www.librarything.com/work/424991 http://books.google.com/books?id=WcV0PQAACAAJ http://www.worldcat.org/oclc/154645816 bookfinder.com addall.com booksprice.com Companion Planting in New Zealand; by Brenda Little http://www.librarything.com/work/4174999 http://books.google.com/books?id=y0EtOAAACAAJ http://www.worldcat.org/oclc/154585972 bookfinder.com addall.com booksprice.com Companion Planting Made Easy; by Editors of Organic Gardening Magazine http://www.librarything.com/work/3406736 google.com bing.com bookfinder.com addall.com booksprice.com Companion Planting: Successful Gardening the Organic Way; by Gertrud Franck http://www.librarything.com/work/4820831 http://books.google.com/books?id=C7M4AQAACAAJ http://www.worldcat.org/oclc/11197884 bookfinder.com addall.com booksprice.com Companion Plants and How to Use Them: A Guide to Planting the Right Plants to Ward off Plant Diseases; by Helen Louise Porter Philbrick http://www.librarything.com/work/940350 http://books.google.com/books?id=GqyMAAAACAAJ http://www.worldcat.org/oclc/2323470 bookfinder.com addall.com booksprice.com Complete Guide to Companion Planting: Everything You Need to Know to Make Your Garden Successful; by Dale Mayer http://www.librarything.com/work/10080769 http://books.google.com/books?id=32xpkvpXyvIC http://www.worldcat.org/oclc/316834155 bookfinder.com addall.com booksprice.com Garden Companion to Native Plants. Selecting, Planting and Caring for over 400 Australian Native Plants; by Allan Seale http://www.librarything.com/work/4264765 http://books.google.com/books?id=mW_gPAAACAAJ http://www.worldcat.org/oclc/38406971 bookfinder.com addall.com booksprice.com
  • 9.
    ~ Good Companions: AGuide to Gardening with Plants that Help Each Other; by Bob Flowerdew http://www.librarything.com/work/1177805 http://books.google.com/books?id=AnF5qClHJqsC http://www.worldcat.org/oclc/24246840 bookfinder.com addall.com booksprice.com Good Neighbors: Companion Planting for Gardeners; by Anna Carr http://www.librarything.com/work/819899 http://books.google.com/books?id=2yNIAAAAYAAJ http://www.worldcat.org/oclc/11397323 bookfinder.com addall.com booksprice.com Great Garden Companions: A Companion-Planting System for a Beautiful, Chemical-Free Vegetable Garden; by Sally Jean Cunningham http://www.librarything.com/work/392320 http://books.google.com/books?id=bYOPlJt6SfAC http://www.worldcat.org/oclc/37792416 bookfinder.com addall.com booksprice.com Growing Together: the A to Z of Companion Planting; by Susan Tomnay http://www.librarything.com/work/10090519 http://books.google.com/books?id=zJafPQAACAAJ http://www.worldcat.org/oclc/219996984 bookfinder.com addall.com booksprice.com How to Grow World Record Tomatoes: a Guinness World Record Holder, Reveals His All-Organic Secrets. His organic methods work with other crops; by Charles Wilber http://librarything.com/work/1752882 http://books.google.com/books?id=hQdIAAAAYAAJ http://worldcat.org/oclc/40948283 bookfinder.com addall.com booksprice.com Intercropping: A Step Towards Sustainability; by Haseeb ur Rehman http://books.google.com/books?id=0a8RTwEACAAJ Jackie French's Guide to Companion Planting in Australia and New Zealand; by Jackie French http://www.librarything.com/work/2209675 http://books.google.com/books?id=aAvWAAAACAAJ http://www.worldcat.org/oclc/25753761 bookfinder.com addall.com booksprice.com
  • 10.
    ~ List of CompanionPlants; by Frederic P Miller http://www.alibris.com http://books.google.com/books?id=y1EzygAACAAJ My Garden Companion: A Complete Guide for the Beginner, With a Special Emphasis on Useful Plants and Intensive Planting in the Wayside, Dooryard, Patio, Rooftop, and Vacant Lot; by Jamie Jobb http://www.librarything.com/work/1129726 http://books.google.com/books?id=MbhFAAAAYAAJ http://www.worldcat.org/oclc/2681054 bookfinder.com addall.com booksprice.com Organic Gardening Books, Eco Farming Books, DVD's, Newsletter and Much More http://www.acresusa.com Planting The Future: Saving Our Medicinal Herbs; by Rosemary Gladstar http://www.librarything.com/work/4402479 http://books.google.com/books?id=ndk42wxMBzUC http://www.worldcat.org/oclc/43894470 bookfinder.com addall.com booksprice.com Primer of Companion Planting: Herbs and Their Part in Good Gardening; by Richard B. Gregg http://www.librarything.com/work/10966145 http://books.google.com/books?id=ZtXIMAEACAAJ http://www.worldcat.org/oclc/153273738 bookfinder.com addall.com booksprice.com Principles and Practice of Plant Conservation; by David R. Given http://www.librarything.com/work/8843936 http://books.google.com/books?id=tHvwAAAAMAAJ http://www.worldcat.org/oclc/28338097 bookfinder.com addall.com booksprice.com Rodale's Successful Organic Gardening: Companion Planting; by Susan McClure http://www.librarything.com/work/204704 http://books.google.com/books?id=nRdVNgAACAAJ http://www.worldcat.org/oclc/29388690 bookfinder.com addall.com booksprice.com
  • 11.
    ~ Sharing the Harvest:A Citizen's Guide to Community Supported Agriculture; by Elizabeth Henderson librarything.com/4557502 books.google.com/13sDbCIz0ooC worldcat.org/oclc/144328213 http://localharvest.org Secrets of Companion Planting: Plants That Help, Plants That Hurt; by Brenda Little http://www.librarything.com/work/2596731 http://books.google.com/books?id=byjoAAAACAAJ http://www.worldcat.org/oclc/148670035 bookfinder.com addall.com booksprice.com Soil Mates: Companion Plants for Your Vegetable Garden; by Sara Alway http://www.librarything.com/work/10746015 http://books.google.com/books?id=TV_wRQAACAAJ http://www.worldcat.org/oclc/690917742 bookfinder.com addall.com booksprice.com South African Planting and Companion Planting Guide; by Jeannine Davidoff http://www.yahoo.com http://www.google.com http://www.bing.com Sustainable Gardening, including: Raised Bed Gardening, Energy-efficient Landscaping, Permaculture, Masanobu Fukuoka, Companion Planting, Biological Pest Control, Leaf Mold, Spent Mushroom Compost, Green Roof, Agroecology, Wildlife Garden, Mulch; by Hephaestus Books http://books.google.com/books?id=qhaLtgAACAAJ Tending The Wild: Native American Knowledge and the Management of California's Natural Resources; by M. Kat Anderson http://www.librarything.com/work/1300650 http://books.google.com/books?id=WM--vVFtnvkC http://www.worldcat.org/oclc/56103978 bookfinder.com addall.com booksprice.com The A-Z of Companion Planting; by Jayne Neville http://www.librarything.com/work/10584295 http://books.google.com/books?id=f80bQwAACAAJ http://www.worldcat.org/oclc/495273643 bookfinder.com addall.com booksprice.com
  • 12.
    ~ The Best GardeningIdeas I Know: Foolproof way to start any seed, Compost piles that work, Practical companion planting, More vegetables in less space, Succession planting chart, Natural weed controls, Mulching with weeds, Midsummer feeding; by Robert Rodale http://www.librarything.com/work/767913 http://books.google.com/books?id=H3esPwAACAAJ http://www.worldcat.org/oclc/6449670 bookfinder.com addall.com booksprice.com Climate Change, Intercropping, Pest Control and Beneficial Microorganisms; by Eric Lichtfouse http://books.google.com/books?id=RNsyKTwTfgY http://www.worldcat.org/oclc/489218897 Intercropping And The Scientific Basis Of Traditional Agriculture; by Donald Quayle Innis http://books.google.com/books?id=pPk4AQAAIAAJ http://www.worldcat.org/oclc/37454497 The Complete Book of Herbs: A Practical Guide to Cultivating, Drying, and Cooking With More Than 50 Herbs; by Emma Callery http://www.librarything.com/work/1420424 http://books.google.com/books?id=GehUsea2PqcC http://www.worldcat.org/oclc/30264455 bookfinder.com addall.com booksprice.com The Complete Guide to Companion Planting: Everything You Need to Know to Make Your Garden Successful; by Dale Mayer http://www.librarything.com/work/10080769 http://books.google.com/books?id=32xpkvpXyvIC http://www.worldcat.org/oclc/316834155 bookfinder.com addall.com booksprice.com The Cook and the Gardener: A Year of Recipes and Writings for the French Countryside; by Amanda Hesser http://www.librarything.com/work/150161 http://books.google.com/books?id=7mYoAAAACAAJ http://www.worldcat.org/oclc/40354856 bookfinder.com addall.com booksprice.com
  • 13.
    ~ The Ecology ofIntercropping; by John H. Vandermeer http://www.librarything.com/work/12183339 http://books.google.com/books?id=CvyyTVq_o70C http://www.worldcat.org/oclc/17202869 bookfinder.com addall.com booksprice.com The Huge Book of Organic Gardening and Companion Planting; by Billie Rex http://books.google.com/books?id=ZuKIZwEACAAJ The Natural Garden: A New Zealander's Guide to Companion Gardening, Natural Pest Control and Soil Health; by Michael Crooks http://books.google.com/books?id=0oS6AQAACAAJ http://www.worldcat.org/oclc/154277336 Your Backyard Herb Garden: A Gardener's Guide to Growing Over 50 Herbs Plus How to Use Them in Cooking, Crafts, Companion Planting and More; by Miranda Smith http://www.librarything.com/work/217099 http://books.google.com/books?id=Zxxm0awYC3QC http://www.worldcat.or/oclc/34722846 bookfinder.com addall.com booksprice.com SWAP your Books with Other People http://www.scribd.com/doc/81071919 http://www.calameo.com/books/00115999712e89ac6bda5
  • 14.
    ~ ORGANIC GARDENING TECHNOLOGIES INCREASINGPlant Yields by over 400 PERCENT http://www.scribd.com/doc/75160339 http://www.calameo.com/books/0010511867e619fa5b018 Remineralize your Soil ~ Healthy Soil, Healthy Plants, Healthy People http://remineralize.org Soil Regeneration with Volcanic Rock Dust http://calameo.com/books/00062163120384c54b373 http://scribd.com/doc/30402511 Volcanic Rock Dust added to soil can double plant or lawn growth. Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by Marc Remillard librarything.com/11197572 books.google.com/PZHObwAACAAJ worldcat.org/oclc/744677817 A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra Truax ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com http://vermico.com SoilSoup Compost Tea ~ Healthy Soil, Healthy Plants, Healthy People http://soilsoup.com SoilSoup Compost Tea is an excellent soil builder and organic fertilizer. Soil Soup is very easy to handle and use. Growing Solutions ~ Healthy Soil, Healthy Plants, Healthy People http://www.growingsolutions.com Zing Bokashi: Recycling Organic Waste with Effective Microorganisms (EM) http://www.zingbokashi.co.nz An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural, Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism http://www.librarything.com/work/5162954 http://books.google.com/books?id=drOMQQAACAAJ http://www.worldcat.org/oclc/54830842 bookfinder.com addall.com booksprice.com
  • 15.
    ~ ORGANIC GARDENING andEco Gardening ~ Healthy Soil, Healthy Plants, Healthy People Advanced Aeroponics; by Chad Peterson ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com 20 Best Small Gardens: Innovative Designs for every Site and Situation ; by Tim Newbury http://www.librarything.com/work/2326033 http://books.google.com/books?id=2i2qQgAACAAJ http://www.worldcat.org/oclc/41925845 bookfinder.com addall.com booksprice.com 101 Ideas for Veg from Small Spaces: Delicious Crops from Tiny Plots; by Jane Moore http://www.librarything.com/work/8553786 http://books.google.com/books?id=VcYUOgAACAAJ http://www.worldcat.org/oclc/288986247 bookfinder.com addall.com booksprice.com 101 Organic Gardening Tips; by Sheri Ann Richerson http://www.librarything.com/work/13168242 http://books.google.com/books?id=UDI-YgEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com 300 of the Most Asked Questions About Organic Gardening; by Charles Gerras; Rodale Organic Gardening Magazine http://www.librarything.com/work/2720602 http://books.google.com/books?id=94VFAQAAIAAJ http://www.worldcat.org/oclc/532445 bookfinder.com addall.com booksprice.com 365 Down-To-Earth Gardening Hints and Tips; by Susan McClure http://books.google.com/books?id=EvJL7JsrCq8C http://www.worldcat.org/oclc/40443946 1,001 Old-Time Garden Tips: Timeless Bits of Wisdom on How to Grow Everything Organically, from the Good Old Days When Everyone Did; by Roger Yepsen http://www.librarything.com/work/368884 http://books.google.com/books?id=UzQHAAAACAAJ http://www.worldcat.org/oclc/53912298 bookfinder.com addall.com booksprice.com
  • 16.
    ~ A Beginners Guideto Organic Vegetable Gardening: Introduction to Composting, Worm Farming, No Dig Raised and Wicking Gardens Plus More; by Mel Jeffreys http://www.librarything.com/work/13508623 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com A Brief Guide to Organic Gardening; by Irish Seed Savers Association http://www.irishseedsavers.ie http://www.google.com http://www.bing.com A Child's Organic Garden: Grow Your Own Delicious Nutritious Foods, Australia; by Lee Fryer http://www.librarything.com/work/3612052 http://books.google.com/books?id=QFPfAQAACAAJ http://www.worldcat.org/oclc/20295655 bookfinder.com addall.com booksprice.com A Guide to Organic Gardening in Australia; by Michael J. Roads http://books.google.com/books?id=ZNGaAQAACAAJ http://www.worldcat.org/oclc/27616780 A Patch of Eden: America's Inner-City Gardeners; by H. Patricia Hynes http://www.librarything.com/work/173800 http://books.google.com/books?id=QqBHAAAAMAAJ http://www.worldcat.org/oclc/34410093 bookfinder.com addall.com booksprice.com A Treatise on the Management of Peach and Nectarine Trees: Either in Forcing-Houses, or on Hot and Common Walls. Containing an Effectual and Easy Process for Preventing Them from Being Infected with Any Species of Insects; by Thomas Kyle http://books.google.com/books?id=kTREAAAAYAAJ http://www.worldcat.org/oclc/642622210 http://www.echobooks.org A Year on the Garden Path: A 52-Week Organic Gardening Guide; by Carolyn Herriot http://www.librarything.com/work/5305327 http://books.google.com/books?id=5y9VYgEACAAJ http://www.worldcat.org/oclc/60318976
  • 17.
    ~ Adobe and RammedEarth Buildings: Design and Construction; by Paul G. McHenry http://www.librarything.com/work/984947 http://books.google.com/books?id=q4GU71IMn3kC http://www.worldcat.org/oclc/9645321 bookfinder.com addall.com booksprice.com Advanced Organic Gardening (Rodale's Grow-It Guides); by Anna Carr http://www.librarything.com/work/2314163 http://books.google.com/books?id=nhrSAAAACAAJ http://www.worldcat.org/oclc/7925730 bookfinder.com addall.com booksprice.com Advancing Biological Farming: Practicing Mineralized, Balanced Agriculture to Improve Soils and Crops; by Gary F. Zimmer http://www.librarything.com/work/11126192 http://books.google.com/books?id=nifUZwEACAAJ http://www.worldcat.org/oclc/710981889 Agriculture in the City: A Key to Sustainability in Havana, Cuba; by Maria Caridad Cruz http://www.librarything.com/work/2562094 http://books.google.com/books?id=qySx0yq9Jd4C http://www.worldcat.org/oclc/53356977 bookfinder.com addall.com booksprice.com Agricultural Options of the Poor: A Handbook for Those Who Serve Them; by Timothy N. Motts http://www.echobooks.org http://www.google.com http://www.bing.com All-Time Best Gardening Secrets; by the Editors of Organic Gardening Magazine http://www.librarything.com/work/1608013 http://books.google.com/books?id=jpFHYAAACAAJ http://www.worldcat.org/oclc/23728857 bookfinder.com addall.com booksprice.com Allergy-Free Gardening: The Revolutionary Guide to Healthy Landscaping; by Thomas Leo Ogren http://www.librarything.com/work/881332 http://books.google.com/books?id=UnAlAQAAMAAJ http://www.worldcat.org/oclc/43919603 bookfinder.com addall.com booksprice.com
  • 18.
    ~ Allotment Gardening: AnOrganic Guide For Beginners; by Susan Berger, the Organic Centre, Ireland http://www.librarything.com/work/1387210 http://books.google.com/books?id=gtlYoks42I4C http://www.worldcat.org/oclc/58456384 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Alternatives to Peat; by Pauline Pears http://books.google.com/books?id=O6KaXwAACAAJ http://www.worldcat.org/oclc/316533298 http://www.worldcat.org/oclc/223261303 Amaranth to Zai Holes: Ideas for Growing Food Under Difficult Conditions; by Laura S. Meitzner http://www.librarything.com/work/4512527 http://books.google.com/books?id=__RHAAAAYAAJ http://www.worldcat.org/oclc/36561933 bookfinder.com addall.com booksprice.com An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural, Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism http://www.librarything.com/work/5162954 http://books.google.com/books?id=drOMQQAACAAJ http://www.worldcat.org/oclc/54830842 bookfinder.com addall.com booksprice.com Any Size, Anywhere Edible Gardening: The No Yard, No Time, No Problem Way to Grow Your Own Food; by William Moss http://books.google.com/books?id=G2D8TmIR_agC http://www.worldcat.org/oclc/738347398 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Anything Grows: Ingenious Ways To Grow More Food In Front Yards, Backyards, Side Yards, In The Suburbs, In The City, On Rooftops, Even Parking Lots; by Sheryl London http://www.librarything.com/work/1112076 http://books.google.com/books?id=je44AQAAIAAJ http://www.worldcat.org/oclc/10208434 bookfinder.com addall.com booksprice.com
  • 19.
    ~ Apartment Gardening: Plants,Projects, and Recipes for Growing Food in Your Urban Home; by Amy Pennington librarything.com/11367320 books.google.com/UNa9bwAACAAJ worldcat.org/oclc/759838812 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Aquaponic Gardening: A Step-By-Step Guide to Raising Vegetables; by Sylvia Bernstein http://www.librarything.com/work/11672554 http://books.google.com/books?isbn=1550924893 http://www.worldcat.org/oclc/709681564 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Asphalt to Ecosystems: Design Ideas for Schoolyard Transformation; by Sharon Gamson Danks http://www.librarything.com/work/9587254 http://books.google.com/books?id=GzhxmxBsn5oC http://www.worldcat.org/oclc/216936727 bookfinder.com addall.com booksprice.com Attracting Native Pollinators: The Xerces Society Guide Protecting North America's Bees and Butterflies http://www.librarything.com/work/10501685 http://books.google.com/books?id=iTwPEDL3nvMC http://www.worldcat.org/oclc/535495615 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Australia and New Zealand Guide to Compost Gardening: A Guide to Gardening Without Digging: by David Hornblow http://www.librarything.com/work/8412440 http://books.google.com/books?id=QyanAQAACAAJ http://www.worldcat.org/oclc/6910861 bookfinder.com addall.com booksprice.com Backyard Farming: Growing Your Own Fresh Vegetables, Fruits, and Herbs in a Small Space; by Lee Foster http://www.librarything.com/work/8602055 http://books.google.com/books?id=ZINjAAAACAAJ http://www.worldcat.org/oclc/7307268 bookfinder.com addall.com booksprice.com Back to Eden; by Jethro Kloss - he was curing cancer in the 1930's librarything.com/86035 books.google.com/blIQgUVUy_8C worldcat.org/28157353 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 20.
    ~ Backyard Organic Gardeningin Australia; by Brenda Little http://www.librarything.com/work/1004810 http://books.google.com/books?id=KpGlYgEACAAJ http://www.worldcat.org/oclc/221117836 bookfinder.com addall.com booksprice.com Backyard Bounty: The Complete Guide to Year-Round Organic Gardening in the Pacific Northwest; by Linda A Gilkeson http://www.librarything.com/work/11026821 http://books.google.com/books?id=xSOTCeV_m4gC http://www.worldcat.org/oclc/669755016 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com Balcony Gardening : Growing Herbs and Vegetables in a Small Urban Space; by Jeff Haase http://books.google.com/books?id=DrJ-lwEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Basic Book of Cloche and Frame Gardening; by W E Shewell-Cooper http://books.google.com/books?id=YYmbAAAACAAJ http://www.worldcat.org/oclc/4578165 Basic Book of Natural Gardening; by Wilfred Edward Shewell-Cooper http://www.librarything.com/work/13211130 http://books.google.com/books?id=oqTpRwAACAAJ http://www.worldcat.org/oclc/6358555 bookfinder.com addall.com booksprice.com Basic Vegetable Gardening: Small-Scale Vegetable Production in Tropical Climates; by E.D. Adams http://www.google.com http://www.bing.com Best Ideas for Organic Vegetable Growing; by Glenn F. Johns http://www.librarything.com/work/368890 http://books.google.com/books?id=p_V-ntrP768C http://www.worldcat.org/oclc/54881 bookfinder.com addall.com booksprice.com
  • 21.
    ~ Best Methods forGrowing Fruits and Berries; by Rodale Organic Gardening Magazine http://www.librarything.com/work/1608026 http://books.google.com/books?id=SFwrlAEACAAJ http://www.worldcat.org/oclc/6403713 bookfinder.com addall.com booksprice.com Better Vegetable Gardens the Chinese Way: Peter Chan's Raised-Bed System; by Peter Chan http://www.librarything.com/work/1361317 http://books.google.com/books?id=TVsjAQAAMAAJ Bible Plants for American Gardens; by Eleanor Anthony King http://www.librarything.com/work/482448 http://books.google.com/books?id=M1FfDLxT_DoC http://www.worldcat.org/oclc/1186027 bookfinder.com addall.com booksprice.com Big Ideas for Northwest Small Gardens; by Marty Wingate http://www.librarything.com/work/907983 http://books.google.com/books?id=66yNsFIpGNoC http://www.worldcat.org/oclc/50252055 bookfinder.com addall.com booksprice.com Biodynamics for the Home Garden, New Zealand; by Peter Proctor http://www.librarything.com/work/9783978 http://books.google.com/books?id=NQtlLwEACAAJ http://www.worldcat.org/oclc/819421004 bookfinder.com addall.com booksprice.com Biofertilizers for Sustainable Agriculture; by Arun K. Sharma http://books.google.com/books?id=d7WOAAAACAAJ http://www.worldcat.org/oclc/50390257 Biological Transmutations; by C. Louis Kervran http://www.librarything.com/work/3248374 http://books.google.com/books?id=FFoGAAAACAAJ http://www.worldcat.org/oclc/560595 bookfinder.com addall.com booksprice.com Bioshelter Market Garden: A Permaculture Farm; by Darrell Frey librarything.com/10703491 books.google.com/Vx8enVBW5jwC worldcat.org/oclc/601130383 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 22.
    ~ Botanica's Organic Gardening:The Healthy Way to Live and Grow; by Judyth McLeond. http://www.librarything.com/work/157977 http://books.google.com/books?id=5N1yjCNM8fIC http://www.worldcat.org/oclc/50730815 bookfinder.com addall.com booksprice.com Breaking Through Concrete: Building an Urban Farm Revival; by David Hanson http://www.librarything.com/work/12241103 http://books.google.com/books?id=pW1r0u95OLEC http://www.worldcat.org/oclc/712114151 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Building and Using Cold Frames; by Charles Siegchrist http://www.librarything.com/work/44477 http://books.google.com/books?id=_YZgFQ4fwSUC http://www.worldcat.org/oclc/6993581 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Building Soils Naturally: Innovative Methods for Organic Gardeners; by Phil Nauta http://books.google.com/books?id=aJdtMAEACAAJ http://www.worldcat.org/oclc/807332486 Building With Cob: A Step-by-step Guide; by Adam Weismann http://www.librarything.com/work/1103587 http://books.google.com/books?id=ri45AQAAIAAJ http://www.worldcat.org/oclc/66901843 ~ Kindle book allbookstores.com bing.com bookfinder.com Bush-Fruits: A Horticultural Monograph of Raspberries, Blackberries, Dewberries, Currants, Gooseberries, and Other Shrub-Like Fruits; by Fred W. Card http://books.google.com/books?id=NHP3f3W2hH0C http://www.worldcat.org/oclc/3547720 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Charles Dowding's Vegetable Course; by Charles Dowding http://www.librarything.com/work/12309906 http://books.google.com/books?id=IPeNZwEACAAJ http://www.worldcat.org/oclc/762989736 bookfinder.com addall.com booksprice.com
  • 23.
    ~ Chico's Organic Gardeningand Natural Living; by Frank Bucaro http://www.librarything.com/work/9228498 http://books.google.com/books?id=G9axOAAACAAJ http://www.worldcat.org/oclc/235155 bookfinder.com addall.com booksprice.com City Bountiful: A Century of Community Gardening in America; by Laura J. Lawson http://www.librarything.com/work/1327706 http://books.google.com/books?id=lgopAQAAMAAJ http://www.worldcat.org/oclc/58728578 bookfinder.com addall.com booksprice.com City People's Book of Raising Food; by Helga Olkowski http://www.librarything.com/work/3501360 http://books.google.com/books?id=t04WPwAACAAJ http://www.worldcat.org/oclc/1177811 bookfinder.com addall.com booksprice.com City Permaculture, Volume 1: Sustainable Living in Small Spaces; by Earth Garden Publication http://www.google.com http://www.bing.com City Permaculture, Volume 2; by Earth Garden Publication http://www.google.com http://www.bing.com Clay Soil Gardening - Australasian Edition; by Michael Carr ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Cold-Climate Gardening; by Lewis Hill http://www.librarything.com/work/800344 http://books.google.com/books?id=YYac91iUGr8C http://www.worldcat.org/oclc/14413823 bookfinder.com addall.com booksprice.com Comfrey: Fodder, Food and Remedy, United Kingdom; by Lawrence Donegan Hills http://www.librarything.com/work/6954118 http://books.google.com/books?id=VfQ4AQAAIAAJ http://www.worldcat.org/oclc/2212835 bookfinder.com addall.com booksprice.com
  • 24.
    ~ Comfrey Report: TheStory of the World's Fastest Protein Builder and Herbal Healer; by Lawrence D. Hills http://www.librarything.com/work/2404463 http://books.google.com/books?id=BGc4RAAACAAJ http://www.worldcat.org/oclc/2507087 bookfinder.com addall.com booksprice.com Commonsense Gardening in Australia: Organic Growing for All Gardeners ; by Panorama Books http://www.librarything.com/work/4948078 http://books.google.com/books?id=MtkAuAAACAAJ http://www.worldcat.org/oclc/27624021 bookfinder.com addall.com booksprice.com Common Sense Organic Gardening; by Warner Fremont Bower http://www.librarything.com/work/232881 http://www.worldcat.org/oclc/796985 Community Gardening, New Zealand; by Stephen Trinder http://books.google.com/books?id=WYrpLQAACAAJ http://www.worldcat.org/oclc/156371596 Complete Organic Gardening: A Comprehensive Guide to Better Gardening and Increased Self Sufficiency; by Jonathan Sturm http://www.librarything.com/work/6278906 http://books.google.com/books?id=pFsAAQAACAAJ http://www.worldcat.org/oclc/28473558 bookfinder.com addall.com booksprice.com Compost and Mulch Gardening; by Rodale Organic Gardening Magazine http://www.librarything.com/work/9660918 http://books.google.com/books?id=0lrWAAAAMAAJ http://www.worldcat.org/oclc/17358150 bookfinder.com addall.com booksprice.com Compost Gardening: A New Time-Saving System for More Flavorful Vegetables, Bountiful Blooms, and the Richest Soil You've Ever Seen; by by Wilfred Edward Shewell-Cooper http://www.librarything.com/work/1410958 http://books.google.com/books?id=oHJlNQAACAAJ http://www.worldcat.org/oclc/1046147 bookfinder.com addall.com booksprice.com
  • 25.
    ~ Compost, Vermicompost, andCompost Tea; by Grace Gershuny http://www.librarything.com/work/9379681 http://books.google.com/books?id=Xub8aChfFsIC http://www.worldcat.org/oclc/676727212 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Composting: The Ultimate Organic Guide to Recycling Your Garden, Australia; by Tim Marshall http://www.librarything.com/work/7930606 http://books.google.com/books?id=lGpz4mFf6-QC http://www.worldcat.org/oclc/252764840 bookfinder.com addall.com booksprice.com Composting for Manure Management; by The Staff of BioCycle http://books.google.com/books?id=U44dAQAAMAAJ http://www.worldcat.org/oclc/41095726 Composting Inside And Out: The Comprehensive Guide To Reusing Trash, Saving Money And Enjoying The Benefits Of Organic Gardening; by Stephanie Davies http://www.librarything.com/work/10782998 http://books.google.com/books?id=ITTfPbwXyNkC http://www.worldcat.org/oclc/661181266 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Country Wisdom and Know-How: Everything You Need To Know to Live Off the Land; by Storey Publishing http://www.librarything.com/work/635434 http://books.google.com/books?id=x1wezh3aP34C http://www.worldcat.org/oclc/56513771 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Contour Farming with Living Barriers; by World Neighbors http://books.google.com/books?id=5sXdlAEACAAJ http://www.worldcat.org/oclc/43935008 http://www.echobooks.org Converting to Organic Farming; by Nicolas Lampkin http://books.google.com/books?id=CPZHAAAAYAAJ http://www.worldcat.org/oclc/23362983
  • 26.
    ~ Converting to OrganicFarming; by David Younie http://books.google.com/books?id=1844MwEACAAJ http://www.worldcat.org/oclc/80681198 Converting to Organic Farming; by Hartmut Vogtmann http://www.worldcat.org/oclc/23362983 Creative Sustainable Gardening for the Twenty-First Century, New Zealand; by Diana Anthony http://www.worldcat.org/oclc/154751351 Creative Vegetable Gardening; by Joy Larkcom http://www.librarything.com/work/748050 http://books.google.com/books?id=lrk9PgAACAAJ http://www.worldcat.org/oclc/180478256 bookfinder.com addall.com booksprice.com Crop Rotation and Cover Cropping: Soil Resiliency and Health on the Organic Farm; by Seth Kroeck http://www.librarything.com/work/11138600 http://books.google.com/books?id=vp5xYRVkIzAC http://www.worldcat.org/oclc/676727214 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Cultivating Community: Principles and Practices for Community Gardening as a Community- Building Tool; by Karen Payne http://www.librarything.com/work/10004068 http://books.google.com/books?id=1ELkGwAACAAJ http://www.worldcat.org/oclc/49777298 bookfinder.com addall.com booksprice.com Desert Gardening for Beginners: How to Grow Vegetables, Flowers and Herbs in an Arid Climate; by Cathy Cromell http://www.librarything.com/work/613055 http://books.google.com/books?id=zrINAAAACAAJ http://www.worldcat.org/oclc/42697618 bookfinder.com addall.com booksprice.com
  • 27.
    ~ Desert Gardening: Fruitsand Vegetables; by George Brookbank http://www.librarything.com/work/1093624 http://books.google.com/books?id=Fmzr1uGU4jkC http://www.worldcat.org/oclc/23047472 bookfinder.com addall.com booksprice.com Desert Harvest: A Guide to Vegetable Gardening in Arid Lands; by Jane Nyhuis http://www.librarything.com/work/1961242 http://books.google.com/books?id=AVdYpwAACAAJ http://www.worldcat.org/oclc/9026622 bookfinder.com addall.com booksprice.com Digging Deeper: Integrating Youth Gardens into Schools and Communities, A Comprehensive Guide; by Joseph Kiefer http://www.librarything.com/work/4964212 http://books.google.com/books?id=Hu_ZAAAACAAJ http://www.worldcat.org/oclc/41174314 bookfinder.com addall.com booksprice.com Don't Throw It, Grow It: 68 Windowsill Plants From Kitchen Scraps; by Millicent Selsam http://www.librarything.com/work/5003825 http://books.google.com/books?id=71kCTjFilNMC http://www.worldcat.org/oclc/192050048 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com Down to Earth: The Absolute Beginner's Guide to Growing Organic Vegetables, New Zealand ; by David Prosser http://www.librarything.com/work/12135436 http://books.google.com/books?id=g9K1PQAACAAJ http://www.worldcat.org/oclc/154667091 bookfinder.com addall.com booksprice.com Dr. Shewell-Cooper's Basic Book of Fruit Growing, United Kingdom; by Wilfred Edward Shewell- Cooper http://books.google.com/books?id=3G2ZPAAACAAJ http://www.worldcat.org/oclc/6377385
  • 28.
    ~ Drip Irrigation forEvery Landscape and All Climates: Helping Your Garden Flourish, While Conserving Water; by Robert Kourik http://www.librarything.com/work/2069850 http://books.google.com/books?id=pj5_AAAACAAJ http://www.worldcat.org/oclc/26704282 bookfinder.com addall.com booksprice.com Earthbag Building: The Tools, Tricks and Techniques; by Kaki Hunter http://www.librarything.com/work/1677450 http://books.google.com/books?id=5TLCbGmcGLUC http://www.worldcat.org/oclc/56752089 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Easy Garden Projects to Make, Build, and Grow: 200 Do-It-Yourself Ideas to Help You Grow Your Best Garden Ever, by Barbara Pleasant http://www.librarything.com/work/3830618 http://books.google.com/books?id=y9GpDTUwG4kC http://www.worldcat.org/oclc/62782168 bookfinder.com addall.com booksprice.com Easy Organic Gardening and Moon Planting; Lyn Bagnall http://www.librarything.com/work/1467113 http://books.google.com/books?id=ZTgmRxGxb-0C http://www.worldcat.org/oclc/224492192 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Eat More Dirt: Diverting and Instructive Tips for Growing and Tending an Organic Garden; by Ellen Sandbeck http://www.librarything.com/work/785915 http://books.google.com/books?id=9L-bI_M_WskC http://www.worldcat.org/oclc/50339883 bookfinder.com addall.com booksprice.com Eat the Weeds; by Ben Charles Harris http://www.librarything.com/work/307825 http://books.google.com/books?id=tB1FAAAAYAAJ http://www.worldcat.org/oclc/4426 bookfinder.com addall.com booksprice.com
  • 29.
    ~ Eat Your Garden:Organic Gardening for Home and Schools; Leonie Shanahan http://books.google.com/books?id=VwGJSQAACAAJ http://www.worldcat.org/oclc/643584711 ECHO Appropriate Technologies Book; by ECHO http://www.echobooks.org Eco-Farm, An Acres U.S.A. Primer: The definitive guide to managing farm and ranch soil fertility, crops, fertilizers, weeds and insects while avoiding dangerous chemicals; by Jr. Charles Walters librarything.com/326739 books.google.com/hKodAQAAMAAJ worldcat.org/oclc/35908160 Ecological Gardening: Your Path to a Healthy Garden; by Marjorie Harris http://www.librarything.com/work/1320836 http://books.google.com/books?id=T0jLCKrsV8AC http://www.worldcat.org/oclc/22510551 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Edible Flower Garden; by Rosalind Creasy http://www.librarything.com/work/326878 http://books.google.com/books?id=AwGJVW948mwC http://www.worldcat.org/oclc/39713714 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Edible Flowers Hydroponic Kit; by Institue of Simplified Hydroponics carbon.org google.com bing.com yahoo.com Edible Forest Gardens; by Dave Jacke http://www.librarything.com/work/10192426 http://books.google.com/books?id=s_vwAAAAMAAJ http://www.worldcat.org/oclc/57344039 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Edible Landscaping in the Desert Southwest: Wheelbarrow to Plate; by Catherine Crowley http://books.google.com/books?id=uDio8-sC2wMC http://www.worldcat.org/oclc/63205838 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com
  • 30.
    ~ Encyclopedia of OrganicGardening; by Pauline Pears, UK Garden Organic, Henry Doubleday Research Assoc. http://www.librarything.com/work/3203058 http://books.google.com/books?id=WywrPQAACAAJ http://www.worldcat.org/oclc/47062668 bookfinder.com addall.com booksprice.com Enhanced Composting for Cold-Climate Biodegradation of Organic Contaminated in Soil; by James D. Berg http://books.google.com/books?id=9H9sHAAACAAJ http://www.worldcat.org/oclc/26528976 bookfinder.com addall.com booksprice.com Essiac: A Native Herbal Cancer Remedy; by Cynthia B. Olsen http://www.librarything.com/work/1378787 http://books.google.com/books?id=XdaoKpyNqjwC http://www.worldcat.org/oclc/39508255 ~ Kindle book bookfinder.com addall.com booksprice.com Extreme Gardening: How To Grow Organic In The Hostile Deserts; by David Owens http://www.librarything.com/work/1734788 http://books.google.com/books?id=G2ANAAAACAAJ http://www.worldcat.org/oclc/45401379 ~ Kindle book bookfinder.com addall.com booksprice.com Fall and Winter Gardening: 25 Organic Vegetables to Plant and Grow for Late Season Food; by R.J. Ruppenthal http://www.librarything.com/work/12863754 http://books.google.com/books?id=cBO7MQEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Fall and Winter Vegetable Gardening in the Pacific Northwest; by Oregon State University http://books.google.com/books?id=plp1NwAACAAJ http://www.worldcat.org/oclc/49659478 Farm City: The Education of an Urban Farmer; by Novella Carpenter librarything.com/11480723 books.google.com/KqUVJLLDJbQC worldcat.org/oclc/276819186 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 31.
    ~ Farmers of FortyCenturies: Organic Farming in China, Korea, and Japan; by F. H. King http://www.librarything.com/work/307828 http://books.google.com/books?id=5IFxU_UP1l0C http://www.worldcat.org/oclc/2204645 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Farming God's Way, Trainer's Reference Guide; by Grant W. Dryden http://www.echobooks.org http://www.google.com http://www.bing.com Feed Me Right: Nutritional Know-How and Body Science; by Dee Pigneguy http://www.librarything.com/work/9863792 http://books.google.com/books?id=KLCjPQAACAAJ http://www.worldcat.org/oclc/156664877 bookfinder.com addall.com booksprice.com Feed Me Right Teacher's Resource: Nutritional Know-How and Body Science; by Dee Pigneguy http://www.worldcat.org/oclc/212408333 http://www.google.com http://www.bing.com Fertility without Fertilizers: A Basic Approach to Organic Garden; by Lawrence D. Hills http://www.librarything.com/work/8806700 http://books.google.com/books?id=4_4JAQAAMAAJ http://www.worldcat.org/oclc/3183370 bookfinder.com addall.com booksprice.com Fletcher Sims' Compost; by Charles Walters http://www.librarything.com/work/8170309 http://books.google.com/books?id=wo0UAQAAMAAJ http://www.worldcat.org/oclc/31294906 bookfinder.com addall.com booksprice.com Food, Not Lawns: How to Turn Your Yard into a Garden And Your Neighborhood into a Community; by Heather Coburn Flores http://librarything.com/work/1658215 http://books.google.com/books?id=M_DtwznYASwC http://www.worldcat.org/oclc/68693667 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 32.
    ~ Food From DrylandGardens: An Ecological, Nutritional, and Social Approach to Small-Scale Household Food Production; by David Arthur Cleveland http://www.librarything.com/work/2225653 http://books.google.com/books?id=1a8QAQAAMAAJ http://www.worldcat.org/oclc/23950386 bookfinder.com addall.com booksprice.com Food Growing without Poisons; by Meta Strandberg http://www.librarything.com/work/6298211 http://books.google.com/books?id=kMqCAAAACAAJ http://www.worldcat.org/oclc/5188246 bookfinder.com addall.com booksprice.com Foods Jesus Ate and How to Grow Them; by Allan A. Swenson http://www.librarything.com/work/7847224 http://books.google.com/books?id=Nx1GPwGTqz0C http://www.worldcat.org/oclc/180851958 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Four-Season Harvest: Organic Vegetables from Your Home Garden All Year Long; by Eliot Coleman http://books.google.com/books?id=QMHdDgkRjDkC http://www.worldcat.org/oclc/40856843 http://www.librarything.com/work/11571806 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Fresh Food from Small Gardens, United Kingdom; by Brian George Furner http://books.google.com/books?id=fq3aAAAACAAJ http://www.worldcat.org/oclc/99789 Fresh Food from Small Spaces; by R.J. Ruppenthal librarything.com/6347778 books.google.com/OPQXAfANf08 worldcat.org/oclc/225871288 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Fresh Start Kit for Simple Hydroponics; by Institue of Simplified Hydroponics carbon.org google.com bing.com yahoo.com Fruit and Vegetables for Scotland: What to Grow and How to Grow It; by Kenneth Cox http://www.librarything.com/work/12646142 http://books.google.com/books?id=iyWUtgAACAAJ http://www.worldcat.org/oclc/806457656 bookfinder.com addall.com booksprice.com
  • 33.
    ~ Fruits and VegetablesUnder Glass; Apples, Apricots, Cherries, Figs, Grapes, Melons, Peaches and Nectarines, Pears, Pineapples, Plums, Strawberries; by William Turner http://www.librarything.com/work/10024680 http://books.google.com/books?id=E8_UygAACAAJ http://www.worldcat.org/oclc/811981519 http://www.echobooks.org ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Fruit for Australian Gardens: A Practical Guide to Growing Fruit at Home, Organic Methods Included; by Paul Baxter http://www.librarything.com/work/3635276 http://books.google.com/books?id=Ls4bAAAACAAJ http://www.worldcat.org/oclc/220877251 bookfinder.com addall.com booksprice.com Fruits of Warm Climates; by Julia Frances Morton http://www.librarything.com/work/2012189 http://books.google.com/books?id=pCgmAQAAMAAJ http://www.worldcat.org/oclc/16947184 bookfinder.com addall.com booksprice.com Fruit Trees in Small Spaces: Abundant Harvests from Your Own Backyard ; by Colby Eierman http://www.librarything.com/work/12084193 http://books.google.com/books?id=GbPHdcCktHYC http://www.worldcat.org/oclc/712124012 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gaia's Garden: A Guide To Home-Scale Permaculture; by Toby Hemenway http://www.librarything.com/work/7674490 http://books.google.com/books?id=gxW0MGXha6cC http://www.worldcat.org/oclc/262883159 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Garden Anywhere: How to Grow Gorgeous Container Gardens, Herb Gardens, Kitchen Gardens ; by Alys Fowler http://www.librarything.com/work/8196682 http://books.google.com/books?id=JYD9OQAACAAJ http://www.worldcat.org/oclc/262430097 bookfinder.com addall.com booksprice.com
  • 34.
    ~ Garden My Heart:Organic Strategies for Backyard Sustainability; by Cecil Bothwell http://www.librarything.com/work/8479871 http://books.google.com/books?id=alAtXrP8EAcC http://www.worldcat.org/oclc/252079992 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Garden Wisdom and Know-How: Everything You Need to Know to Plant, Grow, and Harvest; by Editors of Rodale Books http://www.librarything.com/work/9524818 http://books.google.com/books?id=0vDd6X4pnY0C http://www.worldcat.org/oclc/495597866 bookfinder.com addall.com booksprice.com Gardening Answers (Storey Country Wisdom Bulletin, Vol. A-49); by Storey Publishing http://www.librarything.com/work/3253617 http://books.google.com/books?id=reAlzkJrLvwC http://www.worldcat.org/oclc/42693801 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening by the Foot: Mini Grow-Boxes for Maxi Yields; by Jacob R. Mittleider http://www.librarything.com/work/2882555 http://books.google.com/books?id=GNFNewAACAAJ http://www.worldcat.org/oclc/7774519 bookfinder.com addall.com booksprice.com Gardening Down-Under: A Guide to Healthier Soils and Plants; by Kevin Handreck http://www.librarything.com/work/2105270 http://books.google.com/books?id=NFdY04HS9oEC http://www.worldcat.org/oclc/695998454 bookfinder.com addall.com booksprice.com Gardening for Health and Nutrition; by John Philbrick http://www.librarything.com/work/3533219 http://books.google.com/books?id=86Y6qCo8-tAC http://www.worldcat.org/oclc/157328 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening for Planet Earth, New Zealand; by Dee Pigneguy http://www.librarything.com/work/9783950 http://books.google.com/books?id=I-zjQgAACAAJ http://www.worldcat.org/oclc/457182888 bookfinder.com addall.com booksprice.com
  • 35.
    ~ Gardening for theFaint of Heart; by Robin Wheeler, Canadian Organic Growers http://www.librarything.com/work/94245 http://books.google.com/books?id=M5zEPQAACAAJ http://www.worldcat.org/oclc/45265081 bookfinder.com addall.com booksprice.com Gardening in Clay Soil; by Sara Pitzer http://www.librarything.com/work/1479640 http://books.google.com/books?id=HbODYMQNELIC http://www.worldcat.org/oclc/32665494 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening Naturally: Getting The Most from Your Organic Garden, Australia ; by Ann Reilly http://www.librarything.com/work/11827602 http://books.google.com/books?id=U2PsiASpd7IC http://www.worldcat.org/oclc/154700776 bookfinder.com addall.com booksprice.com Gardening the Organic Way: A Central Minnesota Truck Gardener Offers Ideas and Observations ; by David J. Schonberg http://www.google.com http://www.bing.com Gardening Under Cover: A Northwest Guide to Solar Greenhouses, Cold Frames, and Cloches ; by William Head http://www.librarything.com/work/326757 http://books.google.com/books?id=CQhleOXhivgC http://www.worldcat.org/oclc/20171991 bookfinder.com addall.com booksprice.com Gardening When It Counts: Growing Food in Hard Times; by Steve Solomon http://www.librarything.com/work/1114565 http://books.google.com/books?id=lbohaJCxFnAC http://www.worldcat.org/oclc/62535644 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening with Cloches, United Kingdom; by Louis N Flawn http://books.google.com/books?id=aFtCAAAAYAAJ http://www.worldcat.org/oclc/3012403
  • 36.
    ~ Gardening with Earthworms:A Manual for New Zealanders; by John Stemmer http://books.google.com/books?id=xbHtXwAACAAJ http://www.worldcat.org/oclc/156005711 Gardening with Green Manures; by Pauline M. Pears http://books.google.com/books?id=vtYfMgAACAAJ http://www.worldcat.org/oclc/152375742 Gardening With SPROUTS: A How-to Guide to Understanding Organic Gardening and Design; by Daniel A Atlas http://books.google.com/books?id=jgRMWNzvU3gC http://www.worldcat.org/oclc/388032342 Gardening without Peat: The Friends of the Earth Guide to Peat Alternatives ; by Graham Howell http://books.google.com/books?id=ID8cAAAACAAJ http://www.worldcat.org/oclc/24751168 Gardening Without Chemicals: Grow Untreated Natural Vegetables And Fresh Garden Produce All Year Round In Your Own Organic Garden Using These Homemade Recipes For Organic Fertilizer And Natural Pesticides; by Henry Q. Wilson ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Gardener to Gardener: 1,001 Greatest Gardening Tips Ever, the Best Hints and Techniques from the Pages of Organic Magazine http://www.librarything.com/work/326755 http://books.google.com/books?id=kpoicRF6CrAC http://www.worldcat.org/oclc/50292740 bookfinder.com addall.com booksprice.com Gaviotas: A Village to Reinvent the World; by Alan Weisman http://www.librarything.com/work/353643 http://books.google.com/books?id=vWR_LQys4hsC http://www.worldcat.org/oclc/37955739 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 37.
    ~ Getting the Mostfrom Your Garden: Using Advanced Intensive Gardening Techniques; by Dan Wallace, Rodale Organic Gardening Magazine http://www.librarything.com/work/837826 http://books.google.com/books?id=rsP2AAAACAAJ http://www.worldcat.org/oclc/6085860 bookfinder.com addall.com booksprice.com Getting Started in Permaculture: 50 Practical Projects to Build and Design Productive Gardens ; by Ross Mars http://www.librarything.com/work/1479240 http://books.google.com/books?id=0WUUHVpMSoEC http://www.worldcat.org/oclc/191856838 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Golden Gate Gardening: The Complete Guide to Year-Round Food Gardening in the San Francisco Bay Area and Coastal California; by Pam Peirce http://www.librarything.com/work/305892 http://books.google.com/books?id=TFv2PwAACAAJ http://www.worldcat.org/oclc/38168316 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Great Garden Gadgets: Make-It-Yourself Gizmos and Projects; by Fern Marshall Bradley http://www.librarything.com/work/639109 http://books.google.com/books?id=0875969984 http://www.worldcat.org/oclc/45890319 bookfinder.com addall.com booksprice.com Green Harvest: A History of Organic Farming and Gardening in Australia; by Rebecca Jones http://books.google.com/books?id=fXlumxpqbeUC http://www.worldcat.org/oclc/714770262 Greenhouses, Cloches and Frames; by Peter McHoy http://books.google.com/books?id=aV0lAQAAMAAJ http://www.worldcat.org/oclc/10608452 Greenhouse Gardener's Companion; by Shane Smith http://www.librarything.com/work/308369 http://books.google.com/books?id=Onv60-c6iEIC http://www.worldcat.org/oclc/42592887 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 38.
    ~ Greening of theRevolution: Cuba's Experiment with Organic Agriculture; by Peter Rossett http://www.librarything.com/work/1156025 http://books.google.ca/books?id=JP9gAAAAMAAJ http://www.worldcat.org/oclc/31388107 bookfinder.com addall.com booksprice.com Grow Anything Anywhere with the Garden Doctor; by Jacob R. Mittleider http://www.librarything.com/work/11463866 http://books.google.com/books?id=5w9HAAAAYAAJ http://www.worldcat.org/oclc/22310155 bookfinder.com addall.com booksprice.com Grow Fruit Naturally: A Hands-On Guide to Luscious, Homegrown Fruit; by Lee Reich http://www.librarything.com/work/12549835 http://books.google.com/books?id=sQCIb5cMAHgC http://www.worldcat.org/oclc/742508603 bookfinder.com addall.com booksprice.com Grow Great Grub: Organic Food from Small Spaces; by Gayla Trail http://www.librarything.com/work/9007003 http://books.google.com/books?id=qXpkPgAACAAJ http://www.worldcat.org/oclc/419799997 bookfinder.com addall.com booksprice.com Grow It, Eat it: Simple Gardening Projects and Delicious Recipes; by Royal Horticultural Society http://www.librarything.com/work/8471989 http://books.google.com/books?id=kWQZfEXECj4C http://www.worldcat.org/oclc/190777430 bookfinder.com addall.com booksprice.com Grow Organic: Fruit and Vegetables Fresh from Your Garden; by Nick Hamilton http://www.librarything.com/work/9259684 http://books.google.com/books?id=q7PhFBPagggC http://www.worldcat.org/oclc/244652353 bookfinder.com addall.com booksprice.com Grow Organic: A Simple Guide to Nova Scotia Vegetable Gardening; by Elizabeth Peirce http://www.librarything.com/work/10050034 http://books.google.com/books?id=p7QZQwAACAAJ http://www.worldcat.org/oclc/489949713 bookfinder.com addall.com booksprice.com
  • 39.
    ~ Grow Organic, CookOrganic: Natural Food From Garden to Table, with Over 1700 Photographs; by Ysanne Spevack http://www.librarything.com/work/5252443 http://books.google.com/books?id=HONoAAAACAAJ http://www.worldcat.org/oclc/731265846 bookfinder.com addall.com booksprice.com Grow Organic, Eat Organic: A Practical Activity Book for Beginners; by Lone Morton http://www.librarything.com/work/6981315 http://books.google.com/books?id=6GzTAAAACAAJ http://www.worldcat.org/oclc/50747132 bookfinder.com addall.com booksprice.com Grow Organic, Eat Organic: Creative Activities; by Susan Martineau http://www.google.com http://www.bing.com bookfinder.com addall.com booksprice.com Grow Your Food for Free (well almost); by Dave Hamilton http://www.librarything.com/work/11138599 http://books.google.com/books?id=6j23cQAACAAJ http://www.worldcat.org/oclc/701113495 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Grow Your Own: Be an Organic Farmer, Grow Vegetables in Your Back Garden, United Kingdom; Thompson Yardley http://books.google.com/books?id=4k9CAQAACAAJ http://www.worldcat.org/oclc/819661088 Grow Your Own Pizza: Gardening Plans and Recipes for Kids; by Constance Hardesty http://www.librarything.com/work/2336285 http://books.google.com/books?id=FrreSip51z8C http://www.worldcat.org/oclc/42619631 bookfinder.com addall.com booksprice.com Grow Your Own Vegetables; by Joy Larkcom http://www.librarything.com/work/748047 http://books.google.com/books?id=Z1YzE5QU7gEC http://www.worldcat.org/oclc/51914602 bookfinder.com addall.com booksprice.com
  • 40.
    ~ Growing a GardenCity: How Farmers, First Graders, Counselors, Troubled Teens, Foodies, a Homeless Shelter Chef, Single Mothers, and More Are Transforming Themselves and Their Neighborhoods Through the Intersection of Local Agriculture and Community - and How You Can, Too; by Jeremy N. Smith http://www.librarything.com/work/10163107 http://books.google.com/books?id=6qleEZuwdCAC http://www.worldcat.org/oclc/593629391 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Growing Communities: How to Build Community Through Community Gardening ; by Jeanette Abi- Nader http://www.librarything.com/work/9435547 http://books.google.com/books?id=wLolAAAACAAJ http://www.worldcat.org/oclc/51738829 bookfinder.com addall.com booksprice.com Growing Community: Starting and Nurturing Community Gardens ; by Claire Nettle http://www.librarything.com/work/11937751 http://books.google.com/books?id=4o69Qp3y1f0C http://www.worldcat.org/oclc/556524850 bookfinder.com addall.com booksprice.com Growing Food in Solar Greenhouses: A Month-By-Month Guide to Raising Vegetables, Fruit, and Herbs Under Glass; by Delores Wolfe http://www.librarything.com/work/4898291 http://books.google.com/books?id=mE54MwEACAAJ http://www.worldcat.org/oclc/7554710 bookfinder.com addall.com booksprice.com Growing Food in the High Desert Country; by Julie Behrend Weinberg http://www.librarything.com/work/2023815 http://books.google.com/books?id=hbFVCgkPR4kC http://www.worldcat.org/oclc/11624150 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Growing Food in the Southwest Mountains: A Permaculture Approach to Home Gardening Above 6,500 Feet in Arizona, New Mexico, Southern Colorado and Southern Utah; by Lisa Rayner http://www.librarything.com/work/3451496 http://books.google.com/books?id=4G33NlnnC24C http://www.worldcat.org/oclc/51049019 bookfinder.com addall.com booksprice.com
  • 41.
    ~ Growing Food Organically:The Key to Healthy Soil for Pest-Free Gardening and Farming; by John B. Harris http://www.librarything.com/work/2072626 http://books.google.com/books?id=nV3vAAAACAAJ http://www.worldcat.org/oclc/28497526 bookfinder.com addall.com booksprice.com Growing Fruit and Herbs Organically: Step by Step to Growing Success (Australian Self-Sufficiency Guides) by Liz Sinnamon http://www.librarything.com/work/1307648 http://books.google.com/books?id=tJ3VPAAACAAJ http://www.worldcat.org/oclc/32008702 bookfinder.com addall.com booksprice.com Growing Fruit and Vegetables on a Bed System the Organic Way; by Pauline Pears http://www.librarything.com/work/3794249 http://www.worldcat.org/oclc/53961948 Growing Fruits and Vegetables Organically: The Complete Guide to a Great-Tasting, More Bountiful, Problem-Free Harvest; by Jean M. A. Nick http://www.librarything.com/work/554644 http://books.google.com/books?id=CANIAAAAYAAJ http://www.worldcat.org/oclc/28962115 bookfinder.com addall.com booksprice.com Growing Gardeners: The Fun and Science of Organic Gardening, New Zealand ; by Dee Pigneguy http://www.librarything.com/work/11633552 http://books.google.com/books?id=KFqOOwAACAAJ http://www.worldcat.org/oclc/244797522 bookfinder.com addall.com booksprice.com Growing Greenhouse Crops on Straw Bales; by A Loughton http://books.google.com/books?id=_EnHSgAACAAJ http://www.worldcat.orgoclc/67679459 Growing Gourmet and Medicinal Mushrooms; by Paul Stamets http://www.librarything.com/work/494919 http://books.google.com/books?id=M9Mz99pAdXMC http://www.worldcat.org/oclc/30657098 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 42.
    ~ Growing Great Garlic:The Definitive Guide for Organic Gardeners and Small Farmers ; by Ron L. Engeland http://www.librarything.com/work/176627 http://books.google.com/books?id=hh6qNCngPyQC http://www.worldcat.org/oclc/26064602 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Growing Green: Animal-Free Organic Techniques; by Jenny Hall http://www.librarything.com/work/3807896 http://books.google.com/books?id=vi4aRQAACAAJ http://www.worldcat.org/oclc/86105554 bookfinder.com addall.com booksprice.com Growing Organic: Green Tips for the New Zealand Gardener; by Philippa Jamieson http://www.worldcat.org/oclc/229447967 Growing Rich, Tasty Veggies in Harmony with Nature; by Jeff Van Hautte http://www.librarything.com/work/8722855 Growing Together: School Garden Tips and Healthy Recipes; by the Organic Centre, Ireland http://www.google.com http://www.theorganiccentre.ie http://www.bing.com Growing Under Glass: Without Using Chemicals; by Sue Stickland http://www.librarything.com/work/13250800 http://books.google.com/books?id=JzsCAAAACAAJ http://www.worldcat.org/oclc/52993042 bookfinder.com addall.com booksprice.com Growing Under Glass: Your Guide to Greenhouse Gardening Success; by Hilery Hixon http://www.librarything.com/work/8665091 http://books.google.com/books?id=DF_OWunf4HcC http://www.worldcat.org/oclc/430234632 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 43.
    ~ Growing Under Glass(Royal Horticultural Society Encyclopedia of Practical Gardening) ; by Kenneth A. Beckett http://www.librarything.com/work/1653322 http://books.google.com/books?id=kcMqGwAACAAJ http://www.worldcat.org/oclc/26549983 bookfinder.com addall.com booksprice.com Growing Unusual Vegetables: Weird And Wonderful Vegetables And How to Grow Them; by Simon Hickmott http://www.librarything.com/work/857014 http://books.google.com/books?id=USssAAAACAAJ Growing Vegetables in South Africa - electronic book; by Darlene Roelofsen http://www.gardeninginsouthafrica.co.za https://www.google.com http://www.yahoo.com Growing Vegetables Indoors: How to Supply Your Own Organic Food Year Round ; by Steve Meyerowitz ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Growing Vegetables West of the Cascades: The Complete Guide to Organic Gardening ; by Steve Solomon http://www.librarything.com/work/160861 http://books.google.com/books?id=uc4-2jATIrEC http://www.worldcat.org/oclc/19263031 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Guide to Canadian Vegetable Gardening; by Douglas Green http://www.librarything.com/work/8408997 http://books.google.com/books?id=QSBkPgAACAAJ http://www.worldcat.org/oclc/303026232 bookfinder.com addall.com booksprice.com Hawaiian Organic Growing Guide: Hawaii's How-To-Grow-It Gardening Guidebook for the Tropics and Subtropics; by Shunyam Nirav http://www.librarything.com/work/3813024 http://books.google.com/books?id=sSpIAAAAYAAJ http://www.worldcat.org/oclc/27663562 bookfinder.com addall.com booksprice.com
  • 44.
    ~ Healthy Soil: AGuide to Organic Gardening; by Soil Association of New Zealand http://books.google.com/books?id=FgS_PAAACAAJ http://www.worldcat.org/oclc/153729624 Heirloom Vegetable Gardening: A Master Gardener's Guide; by William Woys Weaver librarything.com/376857 books.google.com/pqrTGwAACAAJ worldcat.org/oclc/34887017 Herbal Remedies of the Lumbee Indians; by Arvis Locklear Boughman http://www.librarything.com/work/10349629 http://books.google.com/books?id=skjgx5jD4WUC http://www.worldcat.org/oclc/53224826 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Here's Health Guide to Gardening without Chemicals: A Step-By-Step Guide to Growing Vegetable and Soft Fruit the Organic Way; by Jack Temple http://books.google.com/books?id=1aVSJgAACAAJ http://www.worldcat.org/oclc/14360336 Herbs for Australian Gardens: A Practical Guide to Growing and Using Organic Herbs; by Penny Woodward http://www.librarything.com/work/6944418 http://books.google.com/books?id=vJdXPgAACAAJ http://www.worldcat.org/oclc/271516862 bookfinder.com addall.com booksprice.com Herbs for Texas; by John Howard Garrett http://www.librarything.com/work/703801 http://books.google.com/books?id=4pAv0O5HWOQC http://www.worldcat.org/oclc/43552593 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com High Altitude Planting: A Practical Guide to Landscaping, Gardening, and Planting Above 6,000 Feet; by Ann Barrett http://www.librarything.com/work/2966410 http://books.google.com/books?id=0aZWVvgYfPUC http://www.worldcat.org/oclc/45446214 bookfinder.com addall.com booksprice.com
  • 45.
    ~ Hobby Hydroponics; byHoward M. Resh http://www.librarything.com/work/2793250 http://books.google.com/books?id=_Ufzy0QqVHoC http://www.worldcat.org/oclc/51586636 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Home Hydroponic Gardens - CD book; by Peggy Bradley carbon.org google.com bing.com yahoo.com books.google.com/books?id=lIHrNQAACAAJ worldcat.org/oclc/223014089 Home Solar Gardening: Solar Greenhouses For Your House, Backyard or Apartment; by John H. Pierce http://www.librarything.com/work/1479431 http://books.google.com/books?id=LVCkAAAACAAJ http://www.worldcat.org/oclc/25095722 bookfinder.com addall.com booksprice.com Home Vegetable Gardening - Gardening Indoors and Under Glass; by Frederick Frye Rockwell http://books.google.com/books?id=By_SAAAAMAAJ ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Homegrown: Community Agriculture and a Better Tomorrow; by Patrick Johnson http://books.google.com/books?id=y-2LMQEACAAJ ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com How to Build a Small A-Frame Greenhouse with PVC Pipe and Plastic Sheeting for Less than $50; by Taylor Birch http://www.librarything.com/work/12764498 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How to Build, Maintain, and Use a Compost System: Secrets and Techniques You Need to Know to Grow the Best Vegetables; by Kelly Smith http://books.google.com/books?id=hAQ60w2soC4C http://www.worldcat.org/oclc/316834169 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com How to Easily Grow Organic Superfoods at Home Without a Garden; by Nate Lemmon ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 46.
    ~ How to FarmYour Backyard the Mulch-Organic Way; by Max Alth http://www.librarything.com/work/2209737 http://books.google.com/books?id=qcQi0JqAh1oC http://www.worldcat.org/oclc/2189377 bookfinder.com addall.com booksprice.com How to Get Your Lawn and Garden Off Drugs: Pesticide-Free Gardening for a Healthier Environment; by Carole Rubin http://www.librarything.com/work/141714 http://books.google.com/books?id=L-VDAAAACAAJ http://www.worldcat.org/oclc/27980966 bookfinder.com addall.com booksprice.com How to Get Your Lawn Off Grass: A North American Guide to Turning Off the Water Tap and Going Native; by Carole Rubin http://www.librarything.com/work/5409479 http://books.google.com/books?id=7WjoPAAACAAJ http://www.worldcat.org/oclc/48579629 bookfinder.com addall.com booksprice.com How to Grow a School Garden: A Complete Guide for Parents and Teachers ; by Arden Bucklin- Sporer http://www.librarything.com/work/10253392 http://books.google.com/books?id=X4Q2LZMUcU4C http://www.worldcat.org/oclc/436623440 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com How to Grow Fresh Air: 50 House Plants that Purify Your Home or Office; by B. C. Wolverton http://www.librarything.com/work/3681 http://books.google.com/books?id=wtG61KIYpOEC http://www.worldcat.org/oclc/36634843 bookfinder.com addall.com booksprice.com How to Grow More Vegetables Than You Ever Thought Possible on Less Land Than You Can Imagine; by John Jeavons http://www.librarything.com/work/4331 http://books.google.com/books?id=1YdUYJN8X9cC http://www.worldcat.org/oclc/5083177 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 47.
    ~ How to GrowOrganic Vegetables, Fruit, Herbs and Flowers: The Complete Guide to Cultivating a Productive and Beautiful Garden the Natural Way, with 800 Step-By-Step Photographs; by Christine Lavelle http://www.librarything.com/work/5900225 http://books.google.com/books?id=zB-uPQAACAAJ http://www.worldcat.org/oclc/181927690 bookfinder.com addall.com booksprice.com How to Grow Perennial Vegetables: Low-Maintenance, Low-Impact Vegetable Gardening; by Martin Crawford http://www.librarything.com/work/12486841 http://books.google.com/books?id=OsgOywAACAAJ http://www.worldcat.org/oclc/766340582 bookfinder.com addall.com booksprice.com How to Grow Potatoes: Planting and Harvesting Organic Food From Your Patio, Rooftop, Balcony, or Backyard Garden; by R.J. Ruppenthal http://www.librarything.com/work/12679789 http://books.google.com/books?id=_D6DMAEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How to Grow Practically Everything; by Zia Allaway http://www.librarything.com/work/10270993 http://books.google.com/books?id=gmAuHkA7KjgC http://www.worldcat.org/oclc/244058227 bookfinder.com addall.com booksprice.com How To Grow Winter Vegetables; by Charles Dowding http://www.librarything.com/work/11138596 http://books.google.com/books?id=vHWncQAACAAJ http://www.worldcat.org/oclc/676727215 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How to Grow World Record Tomatoes: a Guinness World Record Holder, Reveals His All-Organic Secrets. His organic methods work with other crops; by Charles Wilber http://librarything.com/work/1752882 http://books.google.com/books?id=hQdIAAAAYAAJ http://worldcat.org/oclc/40948283 bookfinder.com addall.com booksprice.com
  • 48.
    ~ How to GrowYour Own Food: Creating and Maintaining an Organic Vegetable Garden, New Zealand; by Adrienne Grant http://books.google.com/books?id=Z2r9twAACAAJ http://www.worldcat.org/oclc/213363176 How To Grow Vegetables Indoors: A Guide To Small Space and Container Gardening to Grow Vegetables and Herbs at Home or In Your Apartment; by Andrew Macarthy ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Hydroponics and Microfarms - CD book; by Institue of Simplified Hydroponics carbon.org google.com bing.com yahoo.com I Garden - Urban Style; by Reggie Solomon http://www.librarything.com/work/10952073 http://books.google.com/books?id=v9vi7QjUQsUC ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com I'm Hungry, Let's Grow It: Organic Gardening and Recipes for Australian Families ; by Joanne Newell http://books.google.com/books?id=xkxqPgAACAAJ http://www.worldcat.org/oclc/299129156 In the Land of the Grasshopper Song; by Mary Ellicott Arnold http://www.librarything.com/work/902649 http://books.google.com/books?id=iDYw0erYnH0C http://www.worldcat.org/oclc/6143499 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Incredible Vegetables from Self-Watering Containers: Using Ed's Amazing POTS System; by Edward C. Smith http://www.librarything.com/work/1406838 http://books.google.com/books?id=pwz7sD5x8YgC http://www.worldcat.org/oclc/62302436 bookfinder.com addall.com booksprice.com Indigenous Fruit Trees in the Tropics: Domestication, Utilization and Commercialization; by Festus K. Akinnifesi http://books.google.com/books?id=wKHs1gLiYYkC http://www.worldcat.org/oclc/647686009
  • 49.
    ~ Indolent Kitchen Gardening:A Vegetable Growing and Cooking Guide For the Part-Time Canberra Gardener Using Minimum Effort and Organic Gardening Techniques; by Libby Smith http://www.librarything.com/work/85695 http://books.google.com/books?id=oHxqXwAACAAJ http://www.worldcat.org/oclc/27535584 bookfinder.com addall.com booksprice.com Indoor Vegetable Gardening: How to Grow Fresh Foods All Year Long; by Bob Henrichsen http://www.librarything.com/work/652907 http://books.google.com/books?id=MH9CAQAACAAJ http://www.worldcat.org/oclc/8762732 bookfinder.com addall.com booksprice.com Intercropping: An Application of Ecological Principles to Improve Nitrogen Use Efficiency in Organic Farming Systems; by Laurent Bedoussac http://www.worldcat.org/oclc/746131316 Introduction to Permaculture; by Bill Mollison http://scribd.com/doc/54165436 IPM for Gardeners: A Guide to Integrated Pest Management; by Raymond A. Cloyd http://www.librarything.com/work/1341845 http://books.google.com/books?id=6DE-PwAACAAJ http://www.worldcat.org/oclc/53369197 bookfinder.com addall.com booksprice.com Kids in the Garden: Growing Plants For Food and Fun; by Elizabeth McCorquodale http://www.librarything.com/work/10081625 http://books.google.com/books?id=z3qcQAAACAAJ http://www.worldcat.org/oclc/501399804 bookfinder.com addall.com booksprice.com Landscape You Can Eat; by Allan A. Swenson http://www.librarything.com/work/3225770 http://books.google.com/books?id=DzEjAQAAMAAJ http://www.worldcat.org/oclc/3204694 bookfinder.com addall.com booksprice.com
  • 50.
    ~ Landscaping with Fruit: Strawberry Ground Covers, Blueberry Hedges, Grape Arbors, and 39 Other Luscious Fruits to Make Your Yard an Edible Paradise; by Lee Reich http://www.librarything.com/work/7962908 http://books.google.com/books?id=bwxHIaLGnd0C http://www.worldcat.org/oclc/213301159 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Landscaping With Fruits and Vegetables; by Fred Hagy http://www.librarything.com/work/1141979 http://books.google.com/books?id=esMxPQAACAAJ http://www.worldcat.org/oclc/45172206 bookfinder.com addall.com booksprice.com Lasagna Gardening: A New Layering System for Bountiful Gardens: No Digging, No Tilling, No Weeding; by Patricia Lanza librarything.com/10115926 books.google.com/Zih2ggDzMSgC worldcat.org/oclc/39181782 http://lasagnagardeningbook.com Lasagna Gardening for Small Spaces: A Layering System for Big Results in Small Gardens and Containers; by Patricia Lanza http://www.librarything.com/work/9959884 http://books.google.com/books?id=CpeGvUvjcAkC http://www.worldcat.org/oclc/47930793 bookfinder.com addall.com booksprice.com Less Usual Vegetables: How to Grow and How to Cook Them, United Kingdom; by Brian George Furner http://www.librarything.com/work/5119441 http://books.google.com/books?id=EAtPAAAACAAJ http://www.worldcat.org/oclc/16281331 bookfinder.com addall.com booksprice.com Let Nature Do the Growing: The Fertilizer-Free Vegetable Garden, Japan; by Gajin Tokuno http://www.librarything.com/work/4309503 http://books.google.com/books?id=wK3oPAAACAAJ http://www.worldcat.org/oclc/15680771 bookfinder.com addall.com booksprice.com
  • 51.
    ~ Linnea's Windowsill Garden;by Christina Björk http://www.librarything.com/work/53830 http://books.google.com/books?id=oUjhAAAAMAAJ http://www.worldcat.org/oclc/16005183 bookfinder.com addall.com booksprice.com Little Veggie Patch: How to Grow Food in Small Spaces; by Fabian Capomolla http://www.librarything.com/work/11935089 http://books.google.com/books?id=AoiRZwEACAAJ http://www.worldcat.org/oclc/726150813 bookfinder.com addall.com booksprice.com Living More with Less; by Doris Janzen Longacre http://www.librarything.com/work/160053 http://books.google.com/books?id=u5k5SgAACAAJ http://www.worldcat.org/oclc/6378842 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Lucky Ducks: Companions in the Organic Garden, Australia; by Phoebe Thorndyke http://www.librarything.com/work/12701277 http://books.google.com/books?id=XwxEAAAACAAJ http://www.worldcat.org/oclc/155413934 bookfinder.com addall.com booksprice.com Made from Scratch: How to Start and Operate a Successful Organic Container Plant Business ; by Louise Placek http://www.librarything.com/work/8170276 http://books.google.com/books?id=hKgxAAAACAAJ http://www.worldcat.org/oclc/53922312 bookfinder.com addall.com booksprice.com Making Natural Milk Soap: Storey's Country Wisdom Bulletin A-199; by Casey Makela http://www.librarything.com/work/2314309 http://books.google.com/books?id=IY_1jrhjw_0C http://www.worldcat.org/oclc/41452745 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 52.
    ~ Making Peace withthe Land: God's Call to Reconcile with Creation; by Fred Bahnson http://www.librarything.com/work/12739868 http://books.google.com/books?id=3aWmfCxkpsIC http://www.worldcat.org/oclc/774021102 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com McGee & Stuckey's Bountiful Container: Create Container Gardens of Vegetables, Herbs, Fruits, and Edible Flowers; by Rose Marie Nichols McGee http://www.librarything.com/work/80468 http://books.google.com/books?id=bInlEEdea4gC http://www.worldcat.org/oclc/48013569 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Manual of Minor Vegetables; by James M. Stephens http://www.librarything.com/work/11511491 http://books.google.com/books?id=CmssGQAACAAJ http://www.worldcat.org/oclc/18884855 bookfinder.com addall.com booksprice.com Micro Eco-Farming: Prospering from Backyard to Small Acreage in Partnership with the Earth ; by Barbara Berst Adams librarything.com/592901 books.google.com/OW2oAAAACAAJ worldcat.org/oclc/54677648 MetroFarm: Growing for Profit In or Near the City; by Michael Olson librarything.com/131465 books.google.com/oOKBNgAACAAJ worldcat.org/oclc/30795120 Microgreens: A Guide to Growing Nutrient-Packed Greens; by Eric Franks http://www.librarything.com/work/8492027 http://books.google.com/books?id=KQVrD5q7oy4C http://www.worldcat.org/oclc/237325030 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Mini Farming: Self-Sufficiency on 1/4 Acre; by Brett L. Markham http://www.librarything.com/work/9724353 http://books.google.com/books?id=HfVygFIMI3sC http://www.worldcat.org/oclc/458582333 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 53.
    ~ Mulch It: APractical Guide to Using Mulch in the Garden and Landscape; by Stu Campbell http://www.librarything.com/work/1868359 http://books.google.com/books?id=2rywY0P6c4QC http://www.worldcat.org/oclc/44764178 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Muck and Magic: Start Your Own Natural Garden with Colorful, Simple Projects ; by Jo Readman http://www.librarything.com/work/7542338 http://books.google.com/books?id=oDXSAAAACAAJ http://www.worldcat.org/oclc/33382093 bookfinder.com addall.com booksprice.com Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Nature Farming and Microbial Applications; by Hiu-lian Xu http://www.librarything.com/work/9350031 http://books.google.com/books?id=GNbe4eClXicC http://www.worldcat.org/oclc/44468922 bookfinder.com addall.com booksprice.com New Kitchen Garden: Organic Gardening and Cooking with Herbs, Vegetables, and Fruit ; by Adam Caplin http://www.librarything.com/work/2356756 http://books.google.com/books?id=QQ2PAAAACAAJ http://www.worldcat.org/oclc/75713992 bookfinder.com addall.com booksprice.com New Zealand Guide to Compost Gardening: A Guide to Gardening Without Digging; by David Hornblow http://www.worldcat.org/oclc/154650512 No-Till Farming Systems with CD; by Tom Goddard http://www.echobooks.org http://books.google.com/books?id=gou1LwAACAAJ http://www.worldcat.org/oclc/225820611
  • 54.
    ~ No-Till Vegetable Productionat the Cal Poly Organic Farm; by Nathaniel Harkleroad; http://www.worldcat.org/oclc/697842329 Old-Fashioned Organic Gardening: Natural Wisdom from the Past for the Gardener of Today; by Nigel Colborn http://www.librarything.com/work/2687938 http://books.google.com/books?id=WgQCAAAACAAJ http://www.worldcat.org/oclc/50566914 bookfinder.com addall.com booksprice.com One Magic Square: The Easy, Organic Way to Grow Your Own Food on a 3-Foot Square; by Lolo Houbein http://www.librarything.com/work/8613957 http://books.google.com/books?id=V2xjXvDTr1QC http://www.worldcat.org/oclc/426814504 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Organic Avocado: Resource Guide, New Zealand; by Ewen Willis http://books.google.com/books?id=anD7PAAACAAJ http://www.worldcat.org/oclc/156741854 Organic Citrus: Resource Guide; by Allan Morton http://books.google.com/books?id=mB-0PAAACAAJ http://www.worldcat.org/oclc/156741849 Organic Coffee: Sustainable Development by Mayan Farmers; by Maria Elena Martinez-Torres http://www.librarything.com/work/5161140 http://books.google.com/books?id=pkvKhxwfVMIC http://www.worldcat.org/oclc/64335995 bookfinder.com addall.com booksprice.com Organic Container Gardening: Grow Pesticide-Free Fruits and Vegetables in Small Spaces; by Barbara Barker http://www.librarything.com/work/9503189 http://books.google.com/books?id=UthPXwAACAAJ http://www.worldcat.org/oclc/777003549 bookfinder.com addall.com booksprice.com
  • 55.
    ~ Organic Crops inPots: How to Grow Your Own Vegetables, Fruits, and Herbs ; by Deborah Schneebeli-Morrell http://www.librarything.com/work/8325893 http://books.google.com/books?id=4n5uPQAACAAJ http://www.worldcat.org/oclc/326877640 bookfinder.com addall.com booksprice.com Organic Farming; by Nicolas Lampkin http://www.librarything.com/work/1176589 http://books.google.com/books?id=mrz8PAAACAAJ http://www.worldcat.org/oclc/762067926 bookfinder.com addall.com booksprice.com Organic Farming: Crops, Fruits and Vegetables; by Jennifer Laffan http://books.google.com/books?id=6fXQuAAACAAJ http://www.worldcat.org/oclc/47039206 Organic Farming: Everything You Need to Know; by Peter V. Fossel http://www.librarything.com/work/7848924 http://books.google.com/books?id=ATWaaXyA1VEC http://www.worldcat.org/oclc/74568462 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Organic Farming: The Ecological Systems; by Charles Francis http://www.librarything.com/work/11337802 http://books.google.com/books?id=8HMfbQpNq60C http://www.worldcat.org/oclc/460638866 bookfinder.com addall.com booksprice.com Organic Farming, Pest Control and Remediation of Soil Pollutants; by Eric Lichtfouse http://books.google.com/books?id=66RV9Q1EtLcC http://www.worldcat.org/oclc/495478491 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Fertilizers, Including: Compost, Seaweed Fertiliser, Fish Emulsion, Organic Fertilizer, Cottonseed Meal, Uses of Compost, Fish Meal, Rockdust, Feather Meal, Fish Hydrolysate, Maxicrop, Effluent Spreading http://books.google.com/books?id=r3i5tgAACAAJ
  • 56.
    ~ Organic Fruit Productionand Viticulture; by Stella Cubison http://www.librarything.com/work/11344875 http://books.google.com/books?id=MTNRPgAACAAJ http://www.worldcat.org/oclc/302077577 bookfinder.com addall.com booksprice.com Organic Garden: Beginner's Guide; by Doctor Garden ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardener's Companion: Growing Vegetables in the West; by Jane Shellenberger http://www.librarything.com/work/11510538 http://books.google.com/books?id=ken5tgAACAAJ http://www.worldcat.org/oclc/709681309 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Organic Gardening, United Kingdom; by Geoff Hamilton http://www.librarything.com/work/880332 http://books.google.com/books?id=MOBHny71tF4C http://www.worldcat.org/oclc/617579941 bookfinder.com addall.com booksprice.com Organic Gardening; by Peter Bennett http://www.librarything.com/work/355051 http://books.google.com/books?id=BMs2AQAACAAJ http://www.worldcat.org/oclc/156781107 bookfinder.com addall.com booksprice.com Organic Gardening, New Zealand; by Moira Ryan http://www.librarything.com/work/9460520 http://books.google.com/books?id=cfOeAAAACAAJ http://www.worldcat.org/oclc/27616582 bookfinder.com addall.com booksprice.com Organic Gardening: A Comprehensive Guide to Chemical-Free Growing; by Crow Miller http://books.google.com/books?id=zvc4AQAAIAAJ http://www.worldcat.org/oclc/43780957 Organic Gardening: A Growers Handbook for New Zealanders; by Moira Ryan http://www.librarything.com/work/3693540 http://books.google.com/books?id=cvOeAAAACAAJ http://www.worldcat.org/oclc/35167812
  • 57.
    ~ Organic Gardening: AGuide, New Zealand; by Valerie Freeman http://books.google.com/books?id=QQ0MAgAACAAJ http://www.worldcat.org/oclc/155835590 Organic Gardening: A Practical Guide to Natural Gardens, from Planning and Planting to Harvesting and Maintenance; by Christine Lavelle http://www.librarything.com/work/11859576 http://books.google.com/books?id=CA7pQgAACAAJ http://www.worldcat.org/oclc/56837274 bookfinder.com addall.com booksprice.com Organic Gardening: An Integrated Approach; by Curtis J Overdahl, University of Minnesota http://books.google.com/books?id=9o0hPQAACAAJ http://www.worldcat.org/oclc/4524486 Organic Gardening: The Natural No-Dig Way; by Charles Dowding http://www.librarything.com/work/3214693 http://books.google.com/books?id=EM4LuwAACAAJ http://www.worldcat.org/oclc/76852976 bookfinder.com addall.com booksprice.com Organic Gardening: Your Guide to Growing Healthy Organic Produce; by Michelle Anderson http://books.google.com/books?id=PlnTkQEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening Beginner's Manual: Attracting Beneficial Insects and Animals ; by Lisa Van Til http://www.google.com http://www.bing.com ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening Beginner's Manual: Soil Mechanics and Amendment; by Lisa Van Til http://www.librarything.com/work/12790876 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening Beginner's Manual: The Ultimate Take-You-By-the-Hand Beginner's Gardening Manual for Creating and Managing Your Own Organic Garden; by Julie Turner http://www.librarything.com/work/12638853 http://books.google.com/books?id=D0ZkkwEACAAJ http://www.worldcat.org/oclc/825182238 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 58.
    ~ Organic Gardening's BestVegetables Guide; by Rodale Organic Gardening Magazine http://www.librarything.com/work/11707025 http://books.google.com/books?id=TVAjAQAAMAAJ http://www.worldcat.org/oclc/12284714 bookfinder.com addall.com booksprice.com Organic Gardening for Canada; by Laura Peters http://www.librarything.com/work/9743132 http://books.google.com/books?id=RVRzRAAACAAJ http://www.worldcat.org/oclc/499430338 bookfinder.com addall.com booksprice.com Organic Gardening For Dummies; by Ann Whitman http://www.librarything.com/work/427103 http://books.google.com/books?id=7MfmWEyF4dkC http://www.worldcat.org/oclc/316346746 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Organic Gardening for Dummies, United Kingdom Edition; by Sue Fisher http://books.google.com/books?id=Ne_IBOqWkOkC http://www.worldcat.org/oclc/751742038 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening for New Zealand Gardeners; by Judyth A. McLeod http://www.librarything.com/work/8186189 http://books.google.com/books?id=Ux6hPQAACAAJ http://www.worldcat.org/oclc/16145540 bookfinder.com addall.com booksprice.com Organic Gardening in Australia: The Complete Guide to Natural and Chemical-Free Gardening; by Jacqueline French http://www.librarything.com/work/1456190 http://books.google.com/books?id=TnmkAAAACAAJ http://www.worldcat.org/oclc/62537528 bookfinder.com addall.com booksprice.com Organic Gardening in Cold Climates; by Sandra Perrin http://www.librarything.com/work/407268 http://books.google.com/books?id=5iJIAAAAYAAJ http://www.worldcat.org/oclc/48544159 bookfinder.com addall.com booksprice.com
  • 59.
    ~ Organic Gardening inHawaii: With Methods and Principles Applicable to Mainland Gardens ; by Richard L. Stevens http://books.google.com/books?id=zyJsPQAACAAJ http://www.worldcat.org/oclc/8210588 Organic Gardening in Montana and the Northwest; by Sandra Perrin http://www.librarything.com/work/1921435 http://books.google.com/books?id=UtbBAAAACAAJ http://www.worldcat.org/oclc/8176706 bookfinder.com addall.com booksprice.com Organic gardening in New Zealand; by Richard Llewellyn Hudson http://books.google.com/books?id=E4zZAAAACAAJ http://www.worldcat.org/oclc/16145540 Organic Gardening in Tropical Climates; by Liz Sinnamon http://books.google.com/books?id=kduZAAAACAAJ http://www.worldcat.org/oclc/29887168 Organic Gardening in the American West: Raising Vegetables in a Short, Dry, Growing Season; by Robert F. Smith http://www.librarything.com/work/10182179 http://books.google.com/books?id=KXFpGHktWcwC http://www.worldcat.org/oclc/39464745 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening is Simple; by Jill Scott http://www.google.com http://www.bing.com Organic Gardening Magic: Grow Healthy Garden Fresh Food - Electronic Book; by Laura Fox http://www.organicgardeningmagic.com http://www.google.com http://www.bing.com Organic Gardening Techniques; by Nick Hamilton http://www.librarything.com/work/8669550 http://books.google.com/books?id=76vjvtZTJucC http://www.worldcat.org/oclc/195728461 bookfinder.com addall.com booksprice.com
  • 60.
    ~ Organic Gardening UnderGlass: Fruits, Vegetables, and Ornamentals in the Greenhouse; by George Abraham http://www.librarything.com/work/767869 http://books.google.com/books?id=-_6OAQAACAAJ http://www.worldcat.org/oclc/1876834 bookfinder.com addall.com booksprice.com Organic Gardening's All-time Best Gardening Secrets; by Rodale Organic Gardening Magazine http://www.librarything.com/work/1608013 http://books.google.com/books?id=jpFHYAAACAAJ http://www.worldcat.org/oclc/23728857 bookfinder.com addall.com booksprice.com Organic Gardening's Soil First Aid Manual; by Rodale Organic Gardening Magazine http://www.librarything.com/work/838309 http://books.google.com/books?id=sXuctwAACAAJ http://www.worldcat.org/oclc/12483374 bookfinder.com addall.com booksprice.com Organic Growing, New Zealand; by May Philip http://books.google.com/books?id=LsX0MgAACAAJ http://www.worldcat.org/oclc/154678397 Organic Growing 2, New Zealand; by May Philip http://books.google.com/books?id=Ss55MQAACAAJ http://www.worldcat.org/oclc/154135554 Organic Growing with Worms: A Handbook for a Better Environment; by David Murphy http://www.librarything.com/work/5240016 http://books.google.com/books?id=ytJYAAAACAAJ Organic Kitchen and Garden: Growing and Cooking Food the Natural Way, with Over 500 Growing Tips and 150 Step-by-step Recipes; by Ysanne Spevack http://www.librarything.com/work/843383 http://books.google.com/books?id=FY8AAAAACAAJ http://www.worldcat.org/oclc/53912079 bookfinder.com addall.com booksprice.com
  • 61.
    ~ Organic Kitchen Garden(Conran Octopus Gardening); by Juliet Roberts http://www.librarything.com/work/1141041 http://books.google.com/books?id=WaI_PgAACAAJ http://www.worldcat.org/oclc/264021925 bookfinder.com addall.com booksprice.com Organic Kitchen Gardening: A Guide to Growing Produce in Small Urban Areas ; by Barbara Segall http://www.librarything.com/work/1665655 http://books.google.com/books?id=DTBg5ERy-kQC http://www.worldcat.org/oclc/51929741 bookfinder.com addall.com booksprice.com Organic Methods of Pest and Disease Management; by K. Vijayalakshmi http://books.google.com/books?id=5rwkPAAACAAJ http://www.worldcat.org/oclc/271823772 Organic Methods for Vegetable Gardening in Florida; by Ginny Stibolt http://books.google.com/books?id=SBSLMAEACAAJ http://www.worldcat.org/oclc/806013180 Organic No Dig, No Weed Gardening: A Revolutionary Method For Easy Gardening; by Raymond P Poincelot librarything.com/4692899 books.google.com/jNR7AAAACAAJ worldcat.org/oclc/16756235 bookfinder.com addall.com booksprice.com Organic No-Till Farming - Advancing No-Till Agriculture: Crops, Soil, Equipment; by Jeff Moyer http://books.google.com/books?id=izRKXwAACAAJ http://www.worldcat.org/oclc/731720202 Organic Pastoral: Resource Guide, New Zealand; by Barbara Gillatt http://books.google.com/books?id=MzeRLQAACAAJ http://www.worldcat.org/oclc/156602722 Organic Strawberry Production Manual; by Steven T Koike http://books.google.com/books?id=HJ8biqTMpDAC http://www.worldcat.org/oclc/801973485
  • 62.
    ~ Organic Surface Cultivation:Its Theory and Practice, United Kingdom; by Newton Gerard Smith http://books.google.com/books?id=afNIAAAAIAAJ http://www.worldcat.org/oclc/613203247 Organic Tree Fruit Management; by Linda Edwards, Canadian Organic Growers - British Columbia http://www.worldcat.org/oclc/45818011 Organic Vegetable Gardening, Australia; by Annette McFarlane http://www.librarything.com/work/1116249 http://books.google.com/books?id=O1xUAQAACAAJ http://www.worldcat.org/oclc/156118755 bookfinder.com addall.com booksprice.com Organic Vegetable Gardening, New Zealand; by Xanthe White http://www.librarything.com/work/12784235 http://books.google.com/books?id=aOdlPgAACAAJ http://www.worldcat.org/oclc/423373713 bookfinder.com addall.com booksprice.com Organic Vegetable Gardening; by Subhashini Sridhar https://www.google.com http://www.bing.com Organic Vegetable Gardening (30 Varieties), New Zealand; by Ray Dwyer http://books.google.com/books?id=OE_pMQAACAAJ http://www.worldcat.org/oclc/154202499 Organic Vegetable Growing, United Kingdom; by Brian George Furner http://www.librarything.com/work/7183499 http://books.google.com/books?id=868jAAAACAAJ http://www.worldcat.org/oclc/1047290 bookfinder.com addall.com booksprice.com Organic Vegetable Growing: A Practical, Authoritative Guide to Producing Nutritious and Flavourful Vegetables from Your Garden; by Robert Milne http://www.worldcat.org/oclc/499092120 http://books.google.com/books?id=uXDXevCgtV0C ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 63.
    ~ Organic Vegetable Production:A Complete Guide; by Gareth Davies http://www.librarything.com/work/8587813 http://books.google.com/books?id=AoBnAAAACAAJ http://www.worldcat.org/oclc/61703020 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Organic Vegetable Production Manual; by Milton E. McGiffen http://books.google.com/books?id=AQ60lYTCFzwC http://www.worldcat.org/oclc/769436851 Organic Vegetable Production Manual; by Kasisi Agricultural Training Centre http://books.google.com/books?id=FmLMtwAACAAJ http://www.worldcat.org/oclc/289108180 Our Earth Our Cure: A Handbook of Natural Medicine for Today; by Raymond Dextreit http://www.librarything.com/work/1863257 http://books.google.com/books?id=KiUNAQAAMAAJ http://www.worldcat.org/oclc/15595537 bookfinder.com addall.com booksprice.com Our Future Reborn: EM Technology Changes The World; by Dr. Teruo Higa http://www.librarything.com/work/9217089 http://books.google.com/books?id=jjffSAAACAAJ http://www.worldcat.org/oclc/556259884 bookfinder.com addall.com booksprice.com Perennial Vegetables, Canada; by D. H. Dabbs http://books.google.com/books?id=sYE0PAAACAAJ http://www.worldcat.org/oclc/70511251 Perennial Vegetables: From Artichoke to Zuiki Taro, a Gardener's Guide to Over 100 Delicious, Easy-to-Grow Edibles; by Eric Toensmeier http://www.librarything.com/work/3300317 http://books.google.com/books?id=CyAAXbCiQDcC http://www.worldcat.org/oclc/77520604 bookfinder.com addall.com booksprice.com ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 64.
    ~ Permaculture: Garden Guidelinesand Seed Catalogue: Dryland Coastal Regions ; by Julie Firth http://books.google.com/books?id=SR6pAAAACAAJ http://www.worldcat.org/oclc/36131752 Permaculture and Organic Gardening; by Josh Byrne http://books.google.com/books?id=R9rBSgAACAAJ http://www.worldcat.org/oclc/225024051 Permaculture in a Nutshell; by Patrick Whitefield http://www.librarything.com/work/114614 http://books.google.com/books?id=ms6Vo5RdvI0C http://www.worldcat.org/oclc/30510467 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Pippa's Organic Kitchen Garden: A New Practical Guide to Growing your Own Fresh Fruit, Vegetables and Herbs; by Pippa Greenwood http://www.librarything.com/work/6882485 http://books.google.com/books?id=ph_zAAAACAAJ http://www.worldcat.org/oclc/41925645 bookfinder.com addall.com booksprice.com Planning Your Organic Herb Garden: From Pots on Patios to Larger Layouts, United Kingdom; by Sue Stickland http://www.librarything.com/work/4021326 http://books.google.com/books?id=tgFIAAAAYAAJ http://www.worldcat.org/oclc/30028771 bookfinder.com addall.com booksprice.com Plants for a Future: Edible and Useful Plants for a Healthier World; by Ken Fern http://www.librarything.com/work/238954 http://books.google.com/books?id=uXDXevCgtV0C http://www.worldcat.org/oclc/37824869 bookfinder.com addall.com booksprice.com Pot It, Grow It, Eat It: Home-Grown Produce from Pot to Pan by Kathryn Hawkins http://www.librarything.com/work/9827879 http://books.google.com/books?id=KymfQQAACAAJ http://www.worldcat.org/oclc/436618302 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 65.
    ~ Potato Growing theOrganic Way, United Kingdom; by Pauline M. Pears http://books.google.com/books?id=ea8NAQAACAAJ http://www.worldcat.org/oclc/810769177 Prospering as God's Sharecropper, Vegetable Gardening Made Easy, God Inspired Ways; by Wolfgang D. Sauer http://books.google.com/books?id=HEmjoFYm8PoC http://www.worldcat.org/oclc/57639878 Practical Organics for New Zealand Farmers; by Trisha Fisk http://www.librarything.com/work/8186191 http://books.google.com/books?id=vQGFAAAACAAJ http://www.worldcat.org/oclc/54778654 bookfinder.com addall.com booksprice.com Protected Cultivation: Construction, Requirements and Use of Greenhouses in Various Climates; by Ernst van Heurn, Agrodok, Agromisa Foundation http://www.echobooks.org http://books.google.com/books?id=dwbWz6lUa0kC Raised Bed Gardening the Organic Way; by Pauline M. Pears http://books.google.com/books?id=9horAAAACAAJ http://www.worldcat.org/oclc/12512846 Ruffles on My Longjohns; by Isabel K. Edwards http://www.librarything.com/work/3498929 http://books.google.com/books?id=-Qt6AAAAMAAJ http://www.worldcat.org/oclc/8112857 bookfinder.com addall.com booksprice.com Quick Ways to Better Soil: Steps to Ensure Your Gardening Success ; by Rodale Organic Gardening Magazine http://www.librarything.com/work/4518711 http://books.google.com/books?id=kCPAHAAACAAJ http://www.worldcat.org/oclc/47057114 bookfinder.com addall.com booksprice.com
  • 66.
    ~ Rodale's Book ofPractical Formulas: Easy-To-Make, Easy-To-Use, Recipes for Hundreds of Everyday Activities and Tasks; by Paula Dreifus Bakule http://www.librarything.com/work/190764 http://books.google.com/books?id=T3Nk4hYWADsC http://www.worldcat.org/oclc/23732512 bookfinder.com addall.com booksprice.com Rodale's Chemical-Free Yard and Garden: The Ultimate Authority on Successful Organic Gardening; by Anna Carr http://www.librarything.com/work/2187237 http://books.google.com/books?id=06wrwltOkuYC bookfinder.com addall.com booksprice.com google.com bing.com yahoo.com Rodale's Ultimate Encyclopedia of Organic Gardening: The Indispensable Green Resource for Every Gardener; by Fern Marshall Bradley http://www.librarything.com/work/7712271 http://books.google.com/books?id=xwqqNwAACAAJ http://www.worldcat.org/oclc/243544156 bookfinder.com addall.com booksprice.com Restoring the Soil: A Guide for Using Green Manure/Cover Crops to Improve the Food Security for Smallholder Farmer; by Roland Bunch http://books.google.com/books?id=fKuaMQEACAAJ http://www.worldcat.org/oclc/810526142 Salad Leaves for All Seasons: Organic Growing from Pot to Plot; by Charles Dowdin http://www.librarything.com/work/4240398 http://books.google.com/books?id=qQhVn9ZN5jUC http://www.worldcat.org/oclc/183149253 bookfinder.com addall.com booksprice.com Secrets to Great Soil; by Elizabeth P. Stell http://www.librarything.com/work/44650 http://books.google.com/books?id=DhgHh37org4C http://www.worldcat.org/oclc/37742336 bookfinder.com addall.com booksprice.com
  • 67.
    ~ Secrets of NativeAmerican Herbal Remedies: A Comprehensive Guide to the Native American Tradition of Using Herbs for Improving Health and Well-Being; by Anthony J. Cichoke http://www.librarything.com/work/224533 http://books.google.com/books?id=h3Xcj5lw4rIC http://www.worldcat.org/oclc/45556196 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Secrets to Successful Organic Gardening: Soils, Bugs, Sprays and Everything Else You Need to Know to Make Your Organic Garden Thrive; by Fi McMurray, New Zealand http://books.google.com/books?id=_SErYAAACAAJ http://www.worldcat.org/oclc/48032477 ~ Kindle book Self-Watering Containers: The Missing Manual by Bill Bradley ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Sepp Holzer: The Rebel Farmer; by Sepp Holzer http://www.librarything.com/work/9529944 http://books.google.com/books?id=LI26xo9QR7kC http://www.worldcat.org/oclc/60115859 bookfinder.com addall.com booksprice.com Sepp Holzer's Permaculture: A Practical Guide to Small-Scale, Integrative Farming and Gardening; by Sepp Holzer librarything.com/11138591 books.google.com/jNXK9kE-lOoC worldcat.org/oclc/694395083 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Setting Up and Running a School Garden: A Manual for Teachers and Communities ; by Food and Agriculture Organization of the United Nations http://books.google.com/books?id=syTbAAAAMAAJ http://www.worldcat.org/oclc/69172511 bookfinder.com addall.com booksprice.com http://www.google.com http://www.bing.com http://www.fao.org - HTML Version, PDF Version Shallow Bed Gardening: A Gardening Hint from ECHO; by ECHO http://www.google.com http://www.bing.com http://www.echobooks.org
  • 68.
    ~ Shameless Shortcuts: 1,027Tips and Techniques That Help You Save Time, Save Money, and Save Work Every Day; by Fern Marshall Bradley http://www.librarything.com/work/4798316 http://books.google.com/books?id=WwEUFTHZbA4C http://www.worldcat.org/oclc/60524293 bookfinder.com addall.com booksprice.com Simple Hydroponics Cookbook - CD book; by Institue of Simplified Hydroponics http://www.carbon.org google.com bing.com yahoo.com Simple Organic Kitchen and Garden: A Complete Guide to Growing and Cooking Perfect Natural Produce; by Ysanne Spevak http://www.librarything.com/work/843383 http://books.google.com/books?id=zIf7ygAACAAJ http://www.worldcat.org/oclc/757931825 bookfinder.com addall.com booksprice.com Small Plot, High Yield Gardening: How to Grow Like a Pro, Save Money, and Eat Well by Turning Your Back (or Front or Side) Yard Into An Organic Produce Garden; by Sal Gilbertie http://www.librarything.com/work/9331893 http://books.google.com/books?id=g02VD8jbKvMC http://www.worldcat.org/oclc/326542026 bookfinder.com addall.com booksprice.com Small Scale Irrigation: A Manual of Low-Cost Water Technolog; by Peter H. Stern http://books.google.com/books?id=fzNBAAAAYAAJ http://www.worldcat.org/oclc/5955664 Small Space, Big Harvest: Turn Your Small Garden Into A Vegetable Garden Naturally; by Duane G. Newcomb http://www.librarything.com/work/204736 http://books.google.com/books?id=iAtIAAAAYAAJ http://www.worldcat.org/oclc/26974793 bookfinder.com addall.com booksprice.com Soil Biology Primer; by Elaine R Ingham http://www.librarything.com/work/10366790 http://books.google.com/books?id=uoQflQEACAAJ http://www.worldcat.org/oclc/47066686 bookfinder.com addall.com booksprice.com Soil Food: 1372 Ways to Add Fertility to Your Soil; by Jackie French http://www.librarything.com/work/4695783 http://books.google.com/books?id=mWjDAQAACAAJ http://www.worldcat.org/oclc/35203273 bookfinder.com addall.com booksprice.com
  • 69.
    ~ Solar Gardening: GrowingVegetables Year-Round the American Intensive Way; by Leandre Poisson http://www.librarything.com/work/326851 http://books.google.com/books?id=YQnRrUvFPoIC http://www.worldcat.org/oclc/30624782 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Solar Growing Frame: Grows Fresh Vegetables Year Round Using Only Solar Energy; by Rodale Press http://www.librarything.com/work/11957510 http://books.google.com/books?id=otUnAQAAMAAJ http://www.worldcat.org/oclc/5751201 bookfinder.com addall.com booksprice.com Solar Heat-N-Grow Window: Combines a Window Greenhouse and Solar Air Heater in One Project ; by Roger A Moyer http://books.google.com/books?id=PMqUsuaSv1QC http://www.worldcat.org/oclc/8553355 Solviva: How to Grow $500,000 on One Acre, and Peace on Earth; by Anna Edey http://www.librarything.com/work/366689 http://books.google.com/books?id=QOoJAQAAMAAJ http://www.worldcat.org/oclc/39119150 bookfinder.com addall.com booksprice.com Sowing Seeds in the Desert: Natural Farming, Global Restoration, and Ultimate Food Security; by Masanobu Fukuoka http://www.librarything.com/work/12418163 http://books.google.com/books?id=k6hWTd2Baz8C http://www.worldcat.org/oclc/759171802 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Starter Vegetable Gardens: 24 No-Fail Plans for Small Organic Gardens; by Barbara Pleasant http://www.librarything.com/work/9524928 http://books.google.com/books?id=fCHKE--dKMEC http://www.worldcat.org/oclc/436623382 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 70.
    ~ Step by Stepto Organic Vegetable Growing; by Samuel Ogden http://www.librarything.com/work/118019 http://books.google.com/books?id=z8WrZCxwj-QC http://www.worldcat.org/oclc/141139 bookfinder.com addall.com booksprice.com Straight Ahead Organic: A Step By Step Guide to Growing Great Vegetables in a Less-Than-Perfect World; by Shepherd Ogden http://www.librarything.com/work/1130349 http://books.google.com/books?id=Vu84AQAAIAAJ http://www.worldcat.org/oclc/40408867 bookfinder.com addall.com booksprice.com Square Foot Gardening: A New Way to Garden in Less Space with Less Work; by Mel Bartholomew http://www.librarything.com/work/3213 http://books.google.com/books?id=GcGciVvDTAkC http://www.worldcat.org/oclc/6943565 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Straw Bale Gardens: The Breakthrough Method for Growing Vegetables Anywhere, Earlier and with No Weeding; by Joel Karsten http://www.librarything.com/work/9956274 http://books.google.com/books?id=M8GQMQEACAAJ http://www.worldcat.org/oclc/808421742 bookfinder.com addall.com booksprice.com Straw Bale Greenhouse http://scribd.com/doc/50250383 Successful Indoor Organic Vegetable Gardening Manual; by Anthony Higgin http://www.librarything.com/work/11672320 http://books.google.com/books?id=-EWfcQAACAAJ http://www.worldcat.org/oclc/706697067 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Successful Small-Scale Farming: An Organic Approach; by Karl Schwenke http://books.google.com/books?id=FDB1KTrEWv4C http://www.librarything.com/work/126871 http://www.worldcat.org/oclc/22766714 bookfinder.com addall.com booksprice.com
  • 71.
    ~ Successful Self-Watering Containers:Converting Your Favorite Container to a Self-Waterer; by Lorraine Ballato http://books.google.com/books?id=uQ12PgAACAAJ Sugar Snaps and Strawberries: Simple Solutions for Creating Your Own Small-Space Edible Garden; by Andrea Bellamy http://www.librarything.com/work/10780140 http://books.google.com/books?id=o409gk89VT4C http://www.worldcat.org/oclc/535495586 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Sustainable Agriculture in the Tropics: A Natural Farming System; by Keith O. Mikkelson http://books.google.com/books?id=VaUD09gyRUwC http://www.echobooks.org Talking Dirt: The Dirt Diva's Down-To-Earth Guide to Organic Gardening; by Annie Spiegelman http://www.librarything.com/work/9524952 http://books.google.com/books?id=AOKXOA9jxYoC http://www.worldcat.org/oclc/426803606 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Teaming with Microbes: The Organic Gardener's Guide to the Soil Food Web; by Wayne Lewis http://www.librarything.com/work/9475195 http://books.google.com/books?id=r3ZsL47QiVQC http://www.worldcat.org/oclc/495597869 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Terrific Garden Tonics: 345 Do-It-Yourself, Fix 'em Formulas for Maintaining a Lush Lawn and Gorgeous Garden; by Jerry Baker http://www.librarything.com/work/659670 http://books.google.com/books?id=F4_UAAAACAAJ http://www.worldcat.org/oclc/55475437 bookfinder.com addall.com booksprice.com
  • 72.
    ~ Texas Organic VegetableGardening : The Total Guide to Growing Vegetables, Fruits, Herbs, and Other Edible Plants the Natural Way; by John Howard Garrett http://www.librarything.com/work/392350 http://books.google.com/books?id=0wJIAAAAYAAJ http://www.worldcat.org/oclc/39545722 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Apartment Farmer: The Hassle-Free Way to Grow Vegetables Indoors, on Balconies, Patios, Roofs, and In Small Yards; by Duane G. Newcomb http://www.librarything.com/work/2348812 http://books.google.com/books?id=DTQjAQAAMAAJ http://www.worldcat.org/oclc/2146869 bookfinder.com addall.com booksprice.com The Australian Organic Gardener's Handbook; by Keith Smith http://www.librarything.com/work/1062708 http://books.google.com/books?id=Yqp2AAAACAAJ http://www.worldcat.org/oclc/29630260 bookfinder.com addall.com booksprice.com The Australian Organic Gardening Handbook; by Brenda Little http://www.librarything.com/work/4755601 http://books.google.com/books?id=Ve2JAAAACAAJ http://www.worldcat.org/oclc/155649090 bookfinder.com addall.com booksprice.com The Backyard Vegetable Factory: Super Yields from Small Spaces; by Duane G. Newcomb http://www.librarything.com/work/524835 http://books.google.com/books?id=UQNIAAAAYAAJ http://www.worldcat.org/oclc/17875035 bookfinder.com addall.com booksprice.com The Beautiful Food Garden: Creative Landscaping With Vegetables, Herbs, Fruits ; by Kate Rogers Gessert http://www.librarything.com/work/2178068 http://books.google.com/books?id=sEIjAQAAMAAJ http://www.worldcat.org/oclc/15198566 bookfinder.com addall.com booksprice.com
  • 73.
    ~ The Best ofOrganic Gardening: Over 50 Years of Organic Advice and Reader-Proven Techniques from America's Best-Loved Gardening Magazine; by Mike McGrath http://www.librarything.com/work/142168 http://books.google.com/books?id=VksIAAAACAAJ http://www.worldcat.org/oclc/32699254 bookfinder.com addall.com booksprice.com The Biodome Garden Book: The Only Greenhouse Design That Needs No Electrical Ventilation or Humidifying System; by Patricia Watters http://www.librarything.com/work/12561067 http://books.google.com/books?id=uXNIXwAACAAJ http://www.worldcat.org/oclc/767652177 bookfinder.com addall.com booksprice.com The Canadian Garden Primer: An Organic Approach; by Mark Cullen http://www.librarything.com/work/11677453 http://books.google.com/books?id=tPBDOQAACAAJ http://www.worldcat.org/oclc/426079221 bookfinder.com addall.com booksprice.com The Canadian Illustrated Guide to Green Gardening: All-New, All-Organic, Back to Basics Gardening; by Trevor Cole http://www.librarything.com/work/11472149 http://books.google.com/books?id=uGwsOAAACAAJ http://www.worldcat.org/oclc/416971501 The Cobber's Companion: How to Build Your Own Earthen Home; by Michael G. Smith http://www.librarything.com/work/606492 http://books.google.com/books?id=HeF5QgAACAAJ http://www.worldcat.org/oclc/40140530 bookfinder.com addall.com booksprice.com The Complete Technology Book On Bio-Fertilizer And Organic Farming; by Niir Board http://books.google.com/books?id=ID1u7mzd-nUC http://www.worldcat.org/oclc/174264194 The Complete Idiot's Guide to Small-Space Gardening; by Chris McLaughlin http://books.google.com/books?id=OHAKCzbecp0C http://www.worldcat.org/oclc/727703421 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 74.
    ~ The Complete Idiot'sGuide to Year-Round Gardening; by Delilah Smittle http://www.librarything.com/work/9764714 http://books.google.com/books?id=55MKiliSiYoC http://www.worldcat.org/oclc/426803239 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com The Compost Fruit Grower: Organic Fruit Growing, United Kingdom; by Wilfred Edward Shewell- Cooper http://www.librarything.com/work/13172100 http://books.google.com/books?id=oVg7AAAACAAJ http://www.worldcat.org/oclc/5322299 bookfinder.com addall.com booksprice.com The Desert Shall Blossom: A Comprehensive Guide to Vegetable Gardening in the Mountain West ; by David E. Whiting http://www.librarything.com/work/12079388 http://books.google.com/books?id=aWVH76wVNJgC http://www.worldcat.org/oclc/25122129 bookfinder.com addall.com booksprice.com The Dirt Cheap Green Thumb: 400 Thrifty Tips for Saving Money, Time, and Resources in and Around the Garden; by Rhonda Massingham Hart http://www.librarything.com/work/8912322 http://books.google.com/books?id=QyoCnQZwvgEC http://www.worldcat.org/oclc/768625607 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com The Earth Sheltered Solar Greenhouse Book; by Mike Oehler http://www.librarything.com/work/4507903 http://books.google.com/books?id=5iKwGAAACAAJ http://www.worldcat.org/oclc/184985256 bookfinder.com addall.com booksprice.com The Eave Trough Garden: A Gardening Hint from ECHO; by ECHO http://www.google.com http://www.bing.com http://www.echobooks.org The Ecological Approach to Backyard Farming (Integrated Pest Management); by Jeff Van Hautte http://www.librarything.com/work/8722861
  • 75.
    ~ The Edible Balcony:Growing Fresh Produce in Small Spaces; by Alex Mitchell http://www.librarything.com/work/11880083 http://books.google.com/books?id=9Znv-k_bwqsC http://www.worldcat.org/oclc/748331324 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Edible Balcony: How to Grow Fresh Food in a Small Space Plus 60 Inspiring Recipes; by Indira Naidoo http://www.librarything.com/work/12005362 http://books.google.com/books?id=z5eKZwEACAAJ http://www.worldcat.org/oclc/712025202 bookfinder.com addall.com booksprice.com The Edible City Resource Manual; by Richard Britz librarything.com/2389015 books.google.com/p_r6wNisWWQC worldcat.org/oclc/7555708 The Edible Container Garden: Growing Fresh Food in Small Spaces; by Michael Guerra http://www.librarything.com/work/517225 http://books.google.com/books?id=6X9YHFG15GkC http://www.worldcat.org/oclc/41967278 bookfinder.com addall.com booksprice.com The Edible Indoor Garden: A Complete Guide to Growing over 60 Vegetables, Fruits, and Herbs Indoors; by Peggy Ann Hardigree http://www.librarything.com/work/1637987 http://books.google.com/books?id=Po7upwAACAAJ http://www.worldcat.org/oclc/6707926 bookfinder.com addall.com booksprice.com The Elements of Organic Gardening; by the Prince of Wales http://www.librarything.com/work/3690504 http://books.google.com/books?id=LxmM_rZ4axgC http://books.google.com/books?id=_UTKtgAACAAJ http://www.worldcat.org/oclc/80180346 bookfinder.com addall.com booksprice.com The Enlivened Rock Powders; by Harvey Lisle http://www.librarything.com/work/596365 http://books.google.com/books?id=KfMGAAAACAAJ http://www.worldcat.org/oclc/33209424 bookfinder.com addall.com booksprice.com
  • 76.
    ~ The Essential UrbanFarmer; by Novella Carpenter librarything.com/11860723 books.google.com/IRCkqDLpcW4C worldcat.org/oclc/744291854 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Experts Book of Garden Hints: Over 1,500 Organic Tips and Techniques From 250 of America's Best Gardeners; by Fern Marshall Bradley http://www.librarything.com/work/72806 http://books.google.com/books?id=_ilIAAAAYAAJ http://www.worldcat.org/oclc/27338955 bookfinder.com addall.com booksprice.com The Food and Heat Producing Solar Greenhouse: Design, Construction, Operation; by Rick Fisher http://www.librarything.com/work/1956314 http://books.google.com/books?id=_ykhAQAAIAAJ http://www.worldcat.org/oclc/6170175 bookfinder.com addall.com booksprice.com The Food Mission: Sustainable Food Production: a Manual of Sustainable Methods of Plant Production Helpful in Meeting Food Needs Everywhere; by Don Sobkoviak http://www.librarything.com/work/12097279 http://books.google.com/books?id=9cnBAAAACAAJ http://www.worldcat.org/oclc/33315294 bookfinder.com addall.com booksprice.com The Garden Organic Guide to Growing Vegetables; by Pauline Pears http://www.librarything.com/work/10442667 http://books.google.com/books?id=NoVKPQAACAAJ http://www.worldcat.org/oclc/261177919 bookfinder.com addall.com booksprice.com The Garden Ville Method: Lessons in Nature; by Malcolm Beck http://www.librarything.com/work/86117 http://books.google.com/books?id=s2YnlAEACAAJ http://www.worldcat.org/oclc/29867781 bookfinder.com addall.com booksprice.com The Gardener's A-Z Guide to Growing Organic Food; by Tanya L. K. Denckla http://www.librarything.com/work/651194 http://books.google.com/books?id=4Y9tGKq-mwoC http://www.worldcat.org/oclc/51726870 bookfinder.com addall.com booksprice.com
  • 77.
    ~ The Gardening fromWhich: Guide to Gardening Without Chemicals, United Kingdom; by Alistair Ayres http://www.librarything.com/work/11768150 http://books.google.com/books?id=qPRGHAAACAAJ http://www.worldcat.org/oclc/59148657 bookfinder.com addall.com booksprice.com The Good Food Revolution: Growing Healthy Food, People, and Communities; by Will Allen librarything.com/11993624 books.google.com/nf55k2hlg-IC worldcat.org/oclc/757470632 calameo.com/00146760196286db0d170 calameo.com/0014676015b669d39046f calameo.com/0014676011706f76df387 calameo.com/0014676011ef888557ff8 http://www.growingpower.org ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Half-hour Allotment; by Lia Leendertz http://www.librarything.com/work/2548117 http://books.google.com/books?id=hsv0B0up2ugC http://www.worldcat.org/oclc/62891716 bookfinder.com addall.com booksprice.com The Holistic Orchard: Tree Fruits and Berries the Biological Way; by Michael Phillips http://www.librarything.com/work/11949597 http://books.google.com/books?id=zwHotVXtnfsC http://www.worldcat.org/oclc/719429796 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Ideal Soil: A Handbook for the New Agriculture; by Michael Astera http://www.librarything.com/work/10283710 http://books.google.com/books?id=amv2SAAACAAJ http://www.worldcat.org/oclc/696741259 bookfinder.com addall.com booksprice.com The Indoor Kitchen Garden: Vegetable Growing in Limited Space; by Joy O. I. Spoczynska http://www.librarything.com/work/1387335 http://books.google.com/books?id=WQNIAAAAYAAJ http://www.worldcat.org/oclc/18415887 bookfinder.com addall.com booksprice.com The Irish Gardener's Handbook: How to Grow Vegetables, Herbs, Fruit; by Michael Brenock http://www.librarything.com/work/9696229 http://www.worldcat.org/oclc/751785794
  • 78.
    ~ The Intelligent Gardener:Growing Nutrient Dense Food; by Steve Solomon http://www.librarything.com/work/12933706 http://books.google.com/books?id=SC6YjYyC8gEC http://www.worldcat.org/oclc/783153248 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Little Gardeners Guide: Gardening Know-How and Fun Activities For Young Greenthumbs; by Niki Horin http://www.librarything.com/work/12548763 http://books.google.com/books?id=qPs2YgEACAAJ http://www.worldcat.org/oclc/712021918 bookfinder.com addall.com booksprice.com The Living Garden: A Practical Guide To Gardening The Natural Way, United Kingdom; by Hamilton Geoff http://www.librarything.com/work/9300726 http://books.google.com/books?id=UEZOOQAACAAJ http://www.worldcat.org/oclc/28135487 bookfinder.com addall.com booksprice.com The Lost Crops of Africa; by National Academies of Science http://www.librarything.com/work/8962486 http://books.google.com/books?id=MqGLARzj-6sC http://www.worldcat.org/oclc/85851965 bookfinder.com addall.com booksprice.com The Lost Crops of the Incas: Little-Known Plants of the Andes with Promise for Worldwide Cultivation; by National Research Council http://www.librarything.com/work/819947 http://books.google.com/books?id=XMM4uR_sdHgC http://www.worldcat.org/oclc/20397360 bookfinder.com addall.com booksprice.com The Low Desert Herb Gardening Handbook; by Anne Fischer http://www.librarything.com/work/4125236 http://books.google.com/books?id=3V0eHQAACAAJ http://www.worldcat.org/oclc/38524358 bookfinder.com addall.com booksprice.com
  • 79.
    ~ The Lychee andLungan; by George Weidman Groff http://books.google.com/books?id=W8kqAAAAYAAJ http://www.worldcat.org/oclc/1601613 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com The Michigan Gardener's Companion: An Insider's Guide to Gardening in the Great Lakes State; by Rita C. Henehan http://www.librarything.com/work/5245461 http://books.google.com/books?id=rFozvuOHH0cC http://www.worldcat.org/oclc/175218268 bookfinder.com addall.com booksprice.com The Michigan Gardening Guide; by Jerry Minnich http://www.librarything.com/work/648284 http://books.google.com/books?id=4MKtIRwfw6UC http://www.worldcat.org/oclc/37854424 bookfinder.com addall.com booksprice.com The Miracle Tree: The Multiple Attributes of Moringa; by Church World Service http://www.librarything.com/work/11458407 http://books.google.com/books?id=V0bEOQAACAAJ http://www.worldcat.org/oclc/223572371 bookfinder.com addall.com booksprice.com The Natural Magic of Mulch: Organic Gardening Australian Style; by Michael J. Roads http://www.librarything.com/work/4948348 http://books.google.com/books?id=uEc_AAAACAAJ http://www.worldcat.org/oclc/24890703 bookfinder.com addall.com booksprice.com The New Hampshire Gardener's Companion: An Insider's Guide to Gardening in the Granite State; by Henry Homeyer http://www.librarything.com/work/2941107 http://books.google.com/books?id=v307KIjlyK0C http://www.worldcat.org/oclc/70864475 bookfinder.com addall.com booksprice.com The New Organic Grower: Master's Manual of Tools and Techniques for the Home and Market Gardener; by Francis Blake, Eliot Coleman http://www.librarything.com/work/114053 http://books.google.com/books?id=zmJVlBrLtO8C ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 80.
    ~ The Natural Gardener:A Complete Guide to Organic Gardening, Australia; by Jeff Hodges http://www.librarything.com/work/6206018 http://books.google.com/books?id=N6WJGwAACAAJ http://www.worldcat.org/oclc/38353338 bookfinder.com addall.com booksprice.com The New Seed Starter's Handbook; by Nancy Bubel http://www.librarything.com/work/524755 http://books.google.com/books?id=uXpJxgIUG4wC http://www.worldcat.org/oclc/16873192 bookfinder.com addall.com booksprice.com The NZ Fruit Garden: Growing Fruit and Nuts in New Zealand; by Sally Cameron http://books.google.com/books?id=9UFBQwAACAAJ http://www.worldcat.org/oclc/538967681 The New Zealand Organic Gardening Book; by Brenda Little http://books.google.com/books?id=OFOYAAAACAAJ The New Zealand Organic Gardening Year: A Month-By-Month Guide for Vegetables and Flowers; by Jonathan Spade http://www.librarything.com/work/8980050 http://books.google.com/books?id=YVP8PAAACAAJ http://www.worldcat.org/oclc/154642673 bookfinder.com addall.com booksprice.com The No-Work Garden Book; by Ruth Stout http://www.librarything.com/work/247464 http://books.google.com/books?id=E1ZxAAAACAAJ http://www.worldcat.org/oclc/156488 bookfinder.com addall.com booksprice.com The Old-Fashioned Fruit Garden: The Best Way to Grow, Preserve, and Bake with Small Fruit; by Jo Ann Gardner http://www.librarything.com/work/12918919 http://books.google.com/books?id=kk_r8FWIw9YC http://www.worldcat.org/oclc/779864671 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 81.
    ~ The Organic BackyardVineyard: A Step-by-Step Guide to Growing Your Own Grapes; by Tom Powers http://www.librarything.com/work/12705131 http://books.google.com/books?id=f236F59EkLUC http://www.worldcat.org/oclc/756377665 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Organic Companion: Gleanings from Canadian Organic Growers; by Canadian Organic Growers http://books.google.com/books?id=pvfttgAACAAJ http://www.worldcat.org/oclc/317351463 The Organic Farming Manual: A Comprehensive Guide to Starting and Running a Certified Organic Farm; by Anne Larkin Hansen http://www.librarything.com/work/9524925 http://books.google.com/books?id=B0XP2bmNkdwC ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Organic Farming Source Book; by Claude Alvares http://www.librarything.com/work/13423412 http://books.google.com/books?id=E-ATJQAACAAJ http://www.worldcat.org/oclc/50506626 bookfinder.com addall.com booksprice.com The Organic Gardener; by Catharine Osgood Foster http://www.librarything.com/work/1375482 http://books.google.com/books?id=qoRFAAAAYAAJ http://www.worldcat.org/oclc/210873 bookfinder.com addall.com booksprice.com The Organic Gardener: How to Create Flower, Vegetable, Herb and Fruit Gardens Using Completely Natural Techniques; by Christine Lavelle http://www.librarything.com/work/10355394 http://books.google.com/books?id=CA7pQgAACAAJ http://www.worldcat.org/oclc/56393006 bookfinder.com addall.com booksprice.com The Organic Gardener's Companion; by Organic Gardening and Farming Society of Tasmania http://www.librarything.com/work/8488228 http://books.google.com/books?id=pwCXGQAACAAJ http://www.worldcat.org/oclc/27504408 bookfinder.com addall.com booksprice.com
  • 82.
    ~ The Organic Gardener'sHome Reference: A Plant-By-Plant Guide to Growing Fresh, Healthy Food; by Tanya Denckla http://www.librarything.com/work/1791736 http://books.google.com/books?id=MtwOAQAAMAAJ http://www.worldcat.org/oclc/28221586 bookfinder.com addall.com booksprice.com The Organic Greenhouse and Conservatory; by Roy Lacey http://www.librarything.com/work/2633391 http://books.google.com/books/about/Organic_Greenhouse_Cons_n_e.html?id=WdtZHNHPnW8C http://www.worldcat.org/oclc/27896537 bookfinder.com addall.com booksprice.com The Organic Gardener, United Kingdom; by Montagu Don http://www.librarything.com/work/6731029 http://books.google.com/books?id=ak91PQAACAAJ http://www.worldcat.org/oclc/156753643 bookfinder.com addall.com booksprice.com The Organic Gardeners Handbook: An Expert’s Advice on The Art And Science of Organic Gardening; by Frank Tozer http://www.librarything.com/work/7816065 http://books.google.com/books?id=LTkjAQAAMAAJ http://www.worldcat.org/oclc/179824430 bookfinder.com addall.com booksprice.com The Organic Guide to Edible Gardens, Australia; by Jennifer Stackhouse http://www.librarything.com/work/13250241 http://books.google.com/books?id=UCEptwAACAAJ http://www.worldcat.org/oclc/758465359 bookfinder.com addall.com booksprice.com The Organic Herb Gardener; by Graham Clarke http://www.librarything.com/work/11635229 http://books.google.com/books?id=HSb7QwAACAAJ http://www.worldcat.org/oclc/548555850 bookfinder.com addall.com booksprice.com The Organic Method Primer; by Bargyla Rateaver http://www.acresusa.com http://www.librarything.com/work/950134 http://books.google.com/books?id=rYANAQAACAAJ http://www.worldcat.org/oclc/29660866 bookfinder.com addall.com booksprice.com
  • 83.
    ~ The Organic SaladGarden; by Joy Larkcom http://www.librarything.com/work/3028346 http://books.google.com/books?id=SsQ8XBJkGG8C http://www.worldcat.org/oclc/59549813 bookfinder.com addall.com booksprice.com The Organic Vegetable Garden: Improving the Soil - Naturally, Australia; by Mary Moody http://books.google.com/books?id=WWwxAAAACAAJ http://www.worldcat.org/oclc/27553380 The Organic Vegetable Gardener; by Yvonne Cuthbertson http://www.librarything.com/work/12507921 http://books.google.com/books?id=cm9AYgEACAAJ http://www.worldcat.org/oclc/727107975 bookfinder.com addall.com booksprice.com The Organic Tradition: An Anthology of Writings on Organic Farming 1900 - 1950; by Philip Conford books.google.com/x5sdAQAAMAAJ bookfinder.com addall.com booksprice.com The Permaculture Garden; by Graham Bell http://www.librarything.com/work/1113145 http://books.google.com/books?id=2Od_K7SYiYIC http://www.worldcat.org/oclc/30607872 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Permaculture Handbook: Garden Farming for Town and Country; by Peter Bane http://www.librarything.com/work/12029692 http://books.google.com/books?id=M5fZAnAEH7MC http://www.worldcat.org/oclc/784293137 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Permaculture Home Garden; by Linda Woodrow http://www.librarything.com/work/739311 http://books.google.com/books?id=P9VUAAAACAAJ http://www.worldcat.org/oclc/221992806 bookfinder.com addall.com booksprice.com The Permaculture Way: Practical Steps to Create a Self-Sustaining World; by Graham Bell http://www.librarything.com/work/330095 http://books.google.com/books?id=9sb-PG2osiAC http://www.worldcat.org/oclc/59987308 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 84.
    ~ The Postage StampGarden Book: How to Grow All the Food You Can Eat in Very Little Space ; by Duane Newcomb http://www.librarything.com/work/687383 http://books.google.com/books?id=JdM-twAACAAJ http://www.worldcat.org/oclc/1294524 bookfinder.com addall.com booksprice.com The Postage Stamp Kitchen Garden Book; by Duane G. Newcomb http://books.google.com/books?id=wwxIAAAAYAAJ http://www.worldcat.org/oclc/37878700 The Practical Australian Gardener: Seasonal Tasks Using Sensible Organic Methods ; by Peter Cundall http://www.librarything.com/work/355107 http://books.google.com/books?id=VAkaAAAACAAJ http://www.worldcat.org/oclc/223881977 bookfinder.com addall.com booksprice.com The Quarter-Acre Farm: How I Kept the Patio, Lost the Lawn, and Fed My Family for a Year; by Spring Warren librarything.com/10997398 books.google.com/hOs4988PX8kC worldcat.org/oclc/663102316 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Resilient Gardener: Food Production and Self-Reliance in Uncertain Times; by Marylyn Abbott http://www.librarything.com/work/10481246 http://books.google.com/books?id=Xf5Q4jo_mEEC http://www.worldcat.org/oclc/746302068 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Rhode Island Gardener's Companion: An Insider's Guide to Gardening in the Ocean State ; by Barbara Gee http://www.librarything.com/work/6399481 http://books.google.com/books?id=vLCS2Ek_BxAC http://www.worldcat.org/oclc/175218273 bookfinder.com addall.com booksprice.com The Secret Life of Compost; by Malcolm Beck http://www.librarything.com/work/186462 http://books.google.com/books?id=2_hHAAAAYAAJ http://www.worldcat.org/oclc/36379496 bookfinder.com addall.com booksprice.com
  • 85.
    ~ The Seed Savers'Handbook for Australia and New Zealand; by Michel Fanton http://www.librarything.com/work/1062702 http://books.google.com/books?id=U13vAQAACAAJ http://www.worldcat.org/oclc/28957043 bookfinder.com addall.com booksprice.com The Small Ecological Garden; by Sue Stickland http://www.librarything.com/work/4268793 http://books.google.com/books?id=S_iqAAAACAAJ http://www.worldcat.org/oclc/60115287 bookfinder.com addall.com booksprice.com The Small Food Garden: Growing Organic Fruit and Vegetables at Home, Australia; by Diana Anthony http://www.librarything.com/work/13250259 http://books.google.com/books?id=KiRcLwEACAAJ http://www.worldcat.org/oclc/794003152 bookfinder.com addall.com booksprice.com The Soul of Soil: A Soil-Building Guide for Master Gardeners and Farmers; by Joseph Smillie librarything.com/984997 books.google.com/z_sVgV-WqagC worldcat.org/oclc/41049496 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Speedy Vegetable Garden; by Lia Leendertz http://www.librarything.com/work/13359585 http://books.google.com/books?id=fuinuAAACAAJ http://www.worldcat.org/oclc/785870742 bookfinder.com addall.com booksprice.com The Sprouters Handbook; by Edward Cairney http://www.librarything.com/work/223142 http://books.google.com/books?id=NoyjZwEACAAJ http://www.worldcat.org/oclc/43806613 bookfinder.com addall.com booksprice.com The Sustainable Vegetable Garden: A Backyard Guide to and Higher Yields ; by John Jeavons http://www.librarything.com/work/441930 http://books.google.com/books?id=wN9v1jAwd6EC http://www.worldcat.org/oclc/40588583 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 86.
    ~ The Tui NZVegetable Garden: The Complete Guide to Growing Vegetables and Herbs in New Zealand; by Sally Cameron http://www.librarything.com/work/9322644 http://books.google.com/books?id=M8KZZwEACAAJ http://www.worldcat.org/oclc/421587839 bookfinder.com addall.com booksprice.com The Urban Christian: Effective Ministry in Today's Urban World; by Raymond J. Bakke http://www.librarything.com/work/348108 http://books.google.com/books?id=XQ-LMlswbicC http://www.worldcat.org/oclc/16980474 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Vegetable and Herb Expert; by D. G. Hessayon http://www.librarything.com/work/622014 http://books.google.com/books?id=vq8swHca-vQC http://www.worldcat.org/oclc/37204022 bookfinder.com addall.com booksprice.com The Vegetable Gardener's Bible: Discover Ed's High-Yield W-O-R-D System for All North American Gardening Regions; by Edward C. Smith http://www.librarything.com/work/174886 http://books.google.com/books?id=JYIMJ9hbYZsC http://www.worldcat.org/oclc/42690086 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Vegetable Gardener's Container Bible: How to Grow a Bounty of Food in Pots, Tubs, and Other Containers; by Edward C. Smith http://www.librarything.com/work/10966276 http://books.google.com/books?id=ptmFAh2zDJUC http://www.worldcat.org/oclc/681503215 bookfinder.com addall.com booksprice.com The Vegetable Gardener's Guide to Permaculture: Creating an Edible Ecosystem; by Christopher Shein http://www.librarything.com/work/13344315 http://books.google.com/books?id=6uGsuAAACAAJ http://www.worldcat.org/oclc/785870730 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 87.
    ~ The Vermont Gardener'sCompanion: An Insider's Guide to Gardening in the Green Mountain State ; by Henry Homeyer http://www.librarything.com/work/4286634 http://books.google.com/books?id=hp1LytmlwwoC http://www.worldcat.org/oclc/148971634 bookfinder.com addall.com booksprice.com The Winter Harvest Handbook: Year-Round Vegetable Production Using Deep-Organic Techniques and Unheated Greenhouses; by Eliot Coleman http://www.librarything.com/work/8075876 http://books.google.com/books?id=aAn2XI29yToC http://www.worldcat.org/oclc/262883165 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Water Efficient Garden: Includes Detailed Information on Greywater Irrigation ; by Wendy van Dok http://www.librarything.com/work/6143125 http://books.google.com/books?id=GWJoAAAACAAJ http://www.worldcat.org/oclc/52828879 bookfinder.com addall.com booksprice.com The Winter Harvest Handbook: Year Round Vegetable Production Using Deep Organic Techniques and Unheated Greenhouses http://www.librarything.com/work/8075876 http://books.google.com/books?id=aAn2XI29yToC http://www.worldcat.org/oclc/262883165 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Worm Book: The Complete Guide to Worms in Your Garden; by Loren Nancarrow http://www.librarything.com/work/653193 http://books.google.com/books?id=rmtZ91zbxLMC http://www.worldcat.org/oclc/38067650 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Year Round Organic School Garden: A Guide to Designing, Creating and Using an Organic School Garden; by Lucy Bell http://books.google.com/books?id=XDGVSQAACAAJ http://www.worldcat.org/oclc/465361174
  • 88.
    ~ The Year-Round VegetableGardener: How to Grow Your Own Food 365 Days a Year, No Matter Where You Live; by Niki Jabbour http://www.librarything.com/work/12029688 http://books.google.com/books?id=cr1A4wrB7KUC http://www.worldcat.org/oclc/704380998 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Year-Round Vegetable Gardener: The Complete Guide to Growing Vegetables at Anytime of the Year; by Anne Halpin http://www.librarything.com/work/9081513 http://books.google.com/books?id=C_dHAAAAYAAJ http://www.worldcat.org/oclc/24670767 bookfinder.com addall.com booksprice.com This Common Ground: Seasons on an Organic Farm; by Scott Chaskey http://www.librarything.com/work/703414 http://books.google.com/books?id=sBqieO2jcJAC http://www.worldcat.org/oclc/57201355 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Time Savers for Smart Gardeners; by Rodale Organic Gardening Magazine http://www.librarything.com/work/12418352 http://books.google.com/books?id=vjDgHAAACAAJ http://www.worldcat.org/oclc/25798897 bookfinder.com addall.com booksprice.com Tomatoes for Everyone: A Practical Guide to Growing Tomatoes, All Year Round ; by Allen Gilbert http://www.librarything.com/work/1410867 http://books.google.com/books?id=SbUAAAAACAAJ http://www.worldcat.org/oclc/38413641 bookfinder.com addall.com booksprice.com Tools for Organic Farming: A Manual of Appropriate Equipment and Treatments; by George McRobie http://www.librarything.com/work/11463490 http://books.google.com/books?id=UH0fAQAAMAAJ http://www.worldcat.org/oclc/21999495 bookfinder.com addall.com booksprice.com
  • 89.
    ~ Tropical Food Gardens:A Guide to Growing Fruit, Herbs and Vegetables in Tropical and Sub- tropical Climates; by Leonie Norrington http://www.librarything.com/work/3080043 http://books.google.com/books?id=snZFAQAAIAAJ http://www.worldcat.org/oclc/155720492 bookfinder.com addall.com booksprice.com Tropical Organic Gardening: Hawaiian Style; by Richard Stevens http://www.librarything.com/work/3648942 http://books.google.com/books?id=cr5xAAAACAAJ http://www.worldcat.org/oclc/48063233 bookfinder.com addall.com booksprice.com Trowel and Error: Over 700 Tips, Remedies and Shortcuts for the Gardener; by Sharon Lovejoy http://www.librarything.com/work/44590 http://books.google.com/books?id=hae65llQFoAC http://www.worldcat.org/oclc/50192230 bookfinder.com addall.com booksprice.com Uncommon Fruits for Every Garden; by Lee Reich http://www.librarything.com/work/1857569 http://books.google.com/books?id=DQKlPwAACAAJ http://www.worldcat.org/oclc/52838215 bookfinder.com addall.com booksprice.com Urban Agriculture: Growing Vegetables in Cities; by Jeroen Boland, Agrodok, Agromisa Foundation http://books.google.com/books?id=DmEcsbKRHYIC http://www.worldcat.org/oclc/56824504 http://www.echobooks.org http://www.google.com http://www.bing.com Urban Farm Handbook: City Slicker Resources for Growing, Raising, Sourcing, Trading, and Preparing What You Eat; by Annette Cottrell librarything.com/11738731 books.google.com/g2VCN2W1HNEC worldcat.org/oclc/727705064 Urban Farming: Sustainable City Living in Your Backyard, in Your Community, and in the World ; by Thomas Fox librarything.com/11280180 books.google.com/RTZjQwAACAAJ worldcat.org/oclc/503073342 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 90.
    ~ Urban Gardening: HowTo Grow Food In Any City Apartment Or Yard No Matter How Small (Growing Indoors, On Rooftop , Small Yards, Balcony Gardens, Planting In Containers, Aeroponic Gardening Systems); by Will Cook http://www.librarything.com/work/13279986 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Urban Gardening For Dummies; by the National Gardening Association http://books.google.com/books?id=y7wyFyE2gFgC http://www.worldcat.org/oclc/816160435 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Urban Kitchen Garden: Grow and Cook Your Own Food in the City; by Tom Moggach http://www.librarything.com/work/12933705 http://books.google.com/books?id=FicBywAACAAJ http://www.worldcat.org/oclc/755072865 bookfinder.com addall.com booksprice.com Valuable Vegetables: Growing for Pleasure and Profit, United Kingdom; by Mandy Pullen http://www.librarything.com/work/4902844 http://books.google.com/books?id=AnnYAAAACAAJ Veg Patch (River Cottage Handbook 4); by Mark Diacono http://www.librarything.com/work/8063484 http://books.google.com/books?id=yDbVNwAACAAJ http://www.worldcat.org/oclc/335739160 bookfinder.com addall.com booksprice.com Veganic Gardening: The Alternative System for Healthier Crops, United Kingdom; by Kenneth Dalziel O'Brien http://books.google.com/books?id=2sBaAQAACAAJ http://www.worldcat.org/oclc/13425106 Vegetable Affinities, Composting of Sawdust and Safe Pesticides, New Zealand; by George MacM Fuller http://books.google.com/books?id=dVKStgAACAAJ http://www.worldcat.org/oclc/224334134
  • 91.
    ~ Vegetables: Rodale OrganicGardening Basics; by Rodale Organic Gardening Magazine http://www.librarything.com/work/7670922 http://books.google.com/books?id=2YHRLNuv4pAC http://www.worldcat.org/oclc/42476802 bookfinder.com addall.com booksprice.com Vegetables and Fruit in Pots: Simple Steps to Success; by Dorling Kindersley http://books.google.com/books?id=YlR7ygAACAAJ http://www.worldcat.org/oclc/755072238 http://www.librarything.com/work/8325893 bookfinder.com addall.com booksprice.com Vegetables for the Irish Garden; by Klaus Laitenberger http://www.librarything.com/work/11861236 http://books.google.com/books?id=0eM9YgEACAAJ http://www.worldcat.org/oclc/750674646 bookfinder.com addall.com booksprice.com Vegetable Gardening for Ontario; by Laura Peters http://www.librarything.com/work/11781467 http://books.google.com/books?id=MNVQYgEACAAJ http://www.worldcat.org/oclc/676689892 bookfinder.com addall.com booksprice.com Vegetables in Patches and Pots: A Child's Guide to Organic Vegetable Gardening; by Lorelie Miller Mintz http://www.librarything.com/work/8703969 http://books.google.com/books?id=BQgfAgAACAAJ http://www.worldcat.org/oclc/2525276 bookfinder.com addall.com booksprice.com Vegetables of Canada; by Derek B. Munro http://www.librarything.com/work/6267728 http://books.google.com/books?id=z_yezcnaUHQC http://www.worldcat.org/oclc/44961565 bookfinder.com addall.com booksprice.com Vermiculture and Organic Farming; by Sathe Tukaram Vithatran http://www.librarything.com/work/13118363 http://books.google.com/books?id=lW5fB0sUDK0C http://www.worldcat.org/oclc/427638359 bookfinder.com addall.com booksprice.com
  • 92.
    ~ VERTICAL Gardening Vertical Vegetablesand Fruit: Creative Gardening Techniques for Growing Up in Small Spaces; by Rhonda Massingham Hart http://www.librarything.com/work/12112878 http://books.google.com/books?id=ZS6DHy0naNsC http://www.worldcat.org/oclc/704381000 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Vertical Gardening: Grow Up, Not Out, for More Vegetables and Flowers in Much Less Space; by Derek Fell http://www.librarything.com/work/11193216 http://books.google.com/books?id=auqpcQAACAAJ http://www.worldcat.org/oclc/659769914 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Garden Up: Smart Vertical Gardening for Small and Large Spaces; by Susan Morrison http://librarything.com/work/10878183 http://books.google.com/books?id=MX5eAZDG-PQC http://www.worldcat.org/oclc/648923671 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening Vertically: 24 Ideas for Creating Your Own Green Walls; by Noemie Vialard http://www.librarything.com/work/12333863 http://books.google.com/books?id=ViQlKQEACAAJ http://www.worldcat.org/oclc/732601932 bookfinder.com addall.com booksprice.com Vertical Gardening: Climbing Plants, Hanging Plants, Trellises, Wall Plantings, Terraces, Steep Banks, Window Boxes; by Caroline Boisset http://www.librarything.com/work/819922 http://books.google.com/books?id=lq6LQgAACAAJ http://www.worldcat.org/oclc/17551617 bookfinder.com addall.com booksprice.com
  • 93.
    ~ Vertical Garden: FromNature to the City; by Patrick Blanc http://www.librarything.com/work/5955910 http://books.google.com/books?id=GRiV6E_xn8gC http://www.worldcat.org/oclc/214934450 bookfinder.com addall.com booksprice.com Vertical Gardens: Bringing the City to Life; by Anna Lambertini http://www.librarything.com/work/4917724 http://books.google.com/books?id=MPA4AQAAIAAJ http://www.worldcat.org/oclc/165407838 Vertical Garden: Construction And Analysis Of A Portable Vertical Plantscape; by Janani Kannan http://books.google.com/books?id=iF9QAAAAYAAJ http://www.worldcat.org/oclc/692998938 Wading Pool Garden: A Gardening Hint from ECHO; by ECHO http://www.google.com http://www.bing.com http://www.echobooks.org Wally's Down to Earth Gardening Guide, New Zealand; by Wally Richards http://www.librarything.com/work/5802523 http://books.google.com/books?id=AJuiAwAACAAJ http://www.worldcat.org/oclc/156765404 bookfinder.com addall.com booksprice.com Wally's Gardening and Health, New Zealand; by Wally Richards http://books.google.com/books?id=jQUhQwAACAAJ http://www.worldcat.org/oclc/463639315 Water For Every Farm: Yeomans Keyline Plan; by P. A. Yeomans http://www.librarything.com/work/2191599 http://books.google.com/books?id=cFebQQAACAAJ http://www.worldcat.org/oclc/27598545 ~ Kindle book bookfinder.com addall.com booksprice.com
  • 94.
    ~ Water-Wise Vegetables: Forthe Maritime Northwest Gardener; by Steve Solomon http://www.librarything.com/work/1284437 http://books.google.com/books?id=WloAAAAACAAJ http://www.worldcat.org/oclc/27221876 bookfinder.com addall.com booksprice.com What Every Gardener Should Know About Earthworms; by Henry Hopp http://www.librarything.com/work/5011585 http://books.google.com/books?id=GrX12L3vfmgC http://www.worldcat.org/oclc/777949 bookfinder.com addall.com booksprice.com ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Why Garden Organically: Organic Gardening for Beginners; by Jane Jame ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Wide Row Planting: The Productive Miracle; by Dick Raymond http://www.librarything.com/work/2701853 http://books.google.com/books?id=Rz1PClzlqeYC http://www.worldcat.org/oclc/6063325 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Wild Farming; by Lambert M. Surhone http://books.google.com/books?id=9QccygAACAAJ
  • 95.
    ~ Windowsill Herb Garden;by John Prenis http://www.librarything.com/work/303604 http://books.google.com/books?id=-x3LqlKQ7aYC http://www.worldcat.org/oclc/22276933 bookfinder.com addall.com booksprice.com Winter Gardening in the Maritime Northwest: Cool Season Crops for the Year-Round Gardener; by Binda Colebrook http://www.librarything.com/work/326916 http://books.google.com/books?id=6ovX1mZory0C http://www.worldcat.org/oclc/19395171 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Working with Nature: Shifting Paradigms; by Heide Hermary http://www.librarything.com/work/9241529 http://books.google.com/books?id=SCaSMwEACAAJ http://www.worldcat.org/oclc/159897732 bookfinder.com addall.com booksprice.com Year-Around Harvest: Winter Gardening on the Coast; by Linda Gilkeson http://www.librarything.com/work/6042046 http://books.google.com/books?id=ApGZlAEACAAJ http://www.worldcat.org/oclc/701014927 bookfinder.com addall.com booksprice.com
  • 96.
    ~ Year Round Vegetables,Fruits and Flowers For Metro Houston, A Natural Organic Approach Using Ecology; by Bob Randall http://www.librarything.com/work/7864051 http://books.google.com/books?id=-dPSPAAACAAJ http://www.worldcat.org/oclc/40836180 bookfinder.com addall.com booksprice.com Your Organic Allotment; by Pauline Pears http://www.librarything.com/work/5665458 http://books.google.com/books?id=iAarAAAACAAJ http://www.worldcat.org/oclc/77797432 bookfinder.com addall.com booksprice.com Yates Green Guide to Gardening: A No Fuss Guide to Organic Gardening, Austrialia; by Allen Gilbert http://www.librarything.com/work/1093366 http://books.google.com/books?id=KRctGwAACAAJ http://www.worldcat.org/oclc/27492084 bookfinder.com addall.com booksprice.com You Can Build a Chicken Tractor: Step-by-Step Instructions for Beginners; by Sue Merriam http://www.librarything.com/work/8999243 http://books.google.com/books?id=X2GOQQAACAAJ http://www.worldcat.org/oclc/458488182 bookfinder.com addall.com booksprice.com Your Farm in the City: An Urban-Dweller's Guide to Growing Food and Raising Animals; by Lisa Taylor librarything.com/10874790 books.google.com/3OrIhF8XJ80C worldcat.org/oclc/664666698 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com
  • 97.
    ~ SEAWEED Gardening Fertility fromthe Ocean Deep: Nature's Perfect Nutrient Blend for the Farm; by Charles Walters http://www.librarything.com/work/8911935 http://books.google.com/books?id=IOPyAQAACAAJ http://www.worldcat.org/oclc/58994165 bookfinder.com addall.com booksprice.com Food Power from the Sea: The Seaweed Story; by Lee Fryer http://www.librarything.com/work/5150765 http://books.google.com/books?id=ews3AAAACAAJ http://www.worldcat.org/oclc/2525278 bookfinder.com addall.com booksprice.com Sea Energy Agriculture: Nature's Ideal Trace Element Blend for Farm, Livestock, Humans; by by Maynard Murray http://www.librarything.com/work/4623809 http://books.google.com/books?id=NpgFAAAACAAJ http://www.worldcat.org/oclc/52379170 bookfinder.com addall.com booksprice.com Seaweed: A User's Guide; by Sonia Surey-Gent http://www.librarything.com/work/5325764 http://books.google.com/books?id=xlEVAQAAIAAJ http://www.worldcat.org/oclc/16088902 bookfinder.com addall.com booksprice.com Seaweed and Plant Growth; by T. L. Senn http://www.librarything.com/work/8104499 http://books.google.com/books?id=bOVFAAAAYAAJ http://www.worldcat.org/oclc/17170597 bookfinder.com addall.com booksprice.com Seaweed in Agriculture and Horticulture; by William Anthony Stephenson http://www.librarything.com/work/10269006 http://books.google.com/books?id=HZQXAQAAIAAJ http://www.worldcat.org/oclc/3242474 bookfinder.com addall.com booksprice.com
  • 98.
    ~ Fertile Soil fromthe Sea: The Effective Use of Seaweed in the Garden; by Curtis Stuart Laughlin http://books.google.com/books?id=IxIzGwAACAAJ http://www.worldcat.org/oclc/27178068 Effect of Seaweed Extract on Yield and Maturity of Onions; by David John McGeary http://books.google.com/books?id=YzSCAAAACAAJ http://www.worldcat.org/oclc/27531327 DVD: Permaculture Design Certificate Course; DVD Collection with Bill Mollison and Geoff Lawton http://www.permaculture-design-courses.com http://www.yahoo.com http://www.google.com http://www.bing.com Aquaponics Journal backyardaquaponics.com aquaponicsjournal.com Aquaponics UK and Australia ukaquaponics.org aquaponics.org.uk aquaponics.net.au diyaquaponics.com Aquaponics Systems and GREEN ROOFS MANUALS http://en.calameo.com/books/00135160793af637917ef http://www.scribd.com/doc/45480026 Aquaponic Gardening: A Step-By-Step Guide to Raising Vegetables; by Sylvia Bernstein librarything.com/11672554 books.google.com/iiT7GbUoauUC worldcat.org/oclc/709681564 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Aquaponic Food Product: Raising fish and plants for food and profit ; by Rebecca L. Nelson librarything.com/11556695 books.google.com/da1fPgAACAAJ aquaponics.com.au ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Small Scale Aquaculture: A Hobbyist's Guide for Growing Fish in Recirculating Systems, Greenhouses, Cages And Flowing Water; by Steven D. Van Gorder librarything.com/1891250 books.google.com/ON2wAAAACAAJ worldcat.org/oclc/50995488
  • 99.
    ~ FOR MORE INFORMATION,please contact local gardeners and farmers who specialize in: Organic gardening, Permaculture gardening, Biodynamic gardening, Japanese Kyusei Nature gardening - Shizen Nouhou, Biointensive gardening, Heirloom gardening-Heritage Seeds, Lasagna gardening, Square Foot gardening, Vertical gardening, Wall and Fence gardening, Roof Top and Balcony gardening, Indoor gardening with LED Grow Lights and www.Solatube.com, Micro Greens gardening, Windowsill gardening, Container gardening, African Keyhole gardening, Organic Aquaponics gardening, African Bag Gardens, No Dig gardening, Agroforestry gardening, Biochar gardening, Aeroponic gardening, Seaweed gardening, Israeli Greenhouses Technology for Hot Climates, Organic Hydroponics gardening , Gardening Therapy, Native Plant gardening, Rain Gardens, Xeriscape gardening , Rainwater Harvesting, Greywater gardening. Water Wise gardening and Drought gardening. Gardening is micro-climate specific. This means that Local Organic Gardeners might know of gardening techniques and resources which are helpful for the location you live in. Keep researching, reading, refining your gardening methods and experimenting with different growing techniques. Organic Gardening technology is changing and improving all the time. Also, as the climate changes, you may need to learn other gardening techniques for various climates. For More Resources Please Contact: Local Harvest http://localharvest.org HOW to GROW FRESH AIR How to Grow Fresh Air: 50 House Plants that Purify Your Home or Office; by B. C. Wolverton http://www.librarything.com/work/3681 http://books.google.com/books?id=DLuFPwAACAAJ http://www.worldcat.org/oclc/36634843 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Eco-friendly houseplants: 50 indoor plants that purify air in homes and offices ; by B. C. Wolverton http://books.google.com/books?id=VbOuQgAACAAJ http://www.worldcat.org/oclc/37703853 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com
  • 100.
    ~ Houseplants, Indoor AirPollutants, and Allergic Reactions; by B. C. Wolverton http://books.google.com/books?id=YFe1HAAACAAJ http://www.worldcat.org/oclc/80973510 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Interior Landscape Plants for Indoor Air Pollution Abatement; by B. C. Wolverton http://books.google.com/books?id=xgMaMwEACAAJ http://www.worldcat.org/oclc/22655402 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Interior Plants and Their Role in Indoor Air Quality: An Overview; by B. C. Wolverton http://books.google.com/books?id=ZxsPHQAACAAJ http://www.worldcat.org/oclc/31915258 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Plants: Why You Can't Live Without Them; by B. C. Wolverton http://www.librarything.com/work/10942269 http://www.worldcat.org/oclc/659760995 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com 50 Verrassende Kamerplanten - Dutch; by B. C. Wolverton http://books.google.com/books?id=FE87twAACAAJ http://www.worldcat.org/oclc/68692945 http://www.wolvertonenvironmental.com Amiche piante: 50 piante per purificare l'aria in casa e in ufficio - Italian; by B. C. Wolverton http://books.google.com/books?id=nbIOAQAACAAJ http://www.worldcat.org/oclc/797753386 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com
  • 101.
    ~ ORGANIC PEST CONTROLand WEED CONTROL, IPM, and BIOLOGICAL CONTROLS 1001 All Natural Secrets to Pest Control; by Myles H. Bader http://www.librarything.com/work/8355873 http://books.google.com/books?id=P4A_twAACAAJ http://www.worldcat.org/oclc/429908577 bookfinder.com addall.com booksprice.com 100% Natural Organic Pest Control for Home and Garden; by Tom Roberts http://www.librarything.com/work/2196724 http://books.google.com/books?id=BQBNAAAAYAAJ http://www.worldcat.org/oclc/38042977 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Alternatives to Insecticides For Managing Vegetable Insects; by Kimberly A Stoner http://books.google.com/books?id=gugnAQAAMAAJ http://www.worldcat.org/oclc/42641805 An Ecological and Societal Approach to Biological Control; by Jørgen Eilenberg http://www.librarything.com/work/8842491 http://books.google.com/books?id=u0SD6MZ2QcoC http://www.worldcat.org/oclc/65466731 bookfinder.com addall.com booksprice.com Aphids: How to Control Aphids Naturally; by D. R. Cook ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Backyard Bugs: A Guide to Pest Control in the Home and Garden, New Zealand; by Ronald Bruce Chapman http://www.librarything.com/work/6045594 http://books.google.com/books?id=OSAYAAAACAAJ http://www.worldcat.org/oclc/154726063 bookfinder.com addall.com booksprice.com Banish Slugs Naturally (Green Essentials - Organic Guides); by Jeremy Stratton http://www.librarything.com/work/8527295 http://books.google.com/books?id=AC8zAAAACAAJ http://www.worldcat.org/oclc/502389932 bookfinder.com addall.com booksprice.com
  • 102.
    ~ Basic Gardening WithoutPoisons for Australia and New Zealand; by Jo-An Warren http://www.librarything.com/work/4175022 http://books.google.com/books?id=aJPRygAACAAJ http://www.worldcat.org/oclc/27621773 bookfinder.com addall.com booksprice.com Best Ideas For Organic Vegetable Growing; by Rodale Organic Gardening Magazine http://www.librarything.com/work/368890 http://books.google.com/books?id=p_V-ntrP768C http://www.worldcat.org/oclc/54881 bookfinder.com addall.com booksprice.com Biodiversity and Pest Management in Agroecosystems; by Miguel A. Altieri http://books.google.com/books?id=gQI0PCnnbI8C http://www.worldcat.org/oclc/26128714 Biological and Biotechnological Control of Insect Pests; by Jack E. Rechcigl http://www.librarything.com/work/7098194 http://books.google.com/books?id=9tJe6eBdOFAC http://www.worldcat.org/oclc/41347093 bookfinder.com addall.com booksprice.com Biological Control; by Roy Van Driesche http://books.google.com/books?id=tcazZ-shA_QC http://www.worldcat.org/oclc/32819777 Biological Control: Measures of Success; by Geoff Gurr http://books.google.com/books?id=HvzB_xMfxCsC http://www.worldcat.org/oclc/44550625 Biological Control by Augmentation of Natural Enemies: Insect and Mite Control with Parasites and Predators; by R L Ridgway http://www.librarything.com/work/5834186 http://books.google.com/books?id=t0YgAQAAMAAJ http://www.worldcat.org/oclc/3273984 bookfinder.com addall.com booksprice.com Biological Control by Natural Enemies; by Paul DeBach http://www.librarything.com/work/1955523 http://books.google.com/books?id=K6dOAAAAIAAJ http://www.worldcat.org/oclc/914654 bookfinder.com addall.com booksprice.com
  • 103.
    ~ Biological Control inIPM Systems in Africa; by Peter Neuenschwander http://books.google.com/books?id=o-OWjhAymCwC http://www.worldcat.org/oclc/4802909825 Biological Control in Plant Protection; by Neil Helyer http://books.google.com/books?id=eOE9PAAACAAJ http://www.worldcat.org/oclc/34083052 Biological Control of Insect Pests of Cabbage and Other Crucifers; by Susan E. Rice Mahr http://www.librarything.com/work/9258145 http://books.google.com/books?id=EuUmAQAAMAAJ http://www.worldcat.org/oclc/30531107 Biological Control of Insects and Mites: An Introduction to Beneficial Natural Enemies and Their Use in Pest Management; by Daniel L. Mahr http://www.librarything.com/work/9275381 http://books.google.com/books?id=xyNNMAAACAAJ http://www.worldcat.org/oclc/30574145 bookfinder.com addall.com booksprice.com Biological Control of Invasive Plants in the United States; by Eric M. Coombs http://www.librarything.com/work/4342897 http://books.google.com/books?id=-uzwAAAAMAAJ http://www.worldcat.org/oclc/54479883 bookfinder.com addall.com booksprice.com Biological Control of Mosquitoes; by Harold C. Chapman, http://www.librarything.com/work/11121642 http://books.google.com/books?id=Lq1aAAAAYAAJ http://www.worldcat.org/oclc/12667282 bookfinder.com addall.com booksprice.com Biological Control of Tropical Weeds Using Arthropods; by R Muniappan http://www.librarything.com/work/8543434 http://books.google.com/books?id=RYNBMAEACAAJ http://www.worldcat.org/oclc/233543954 bookfinder.com addall.com booksprice.com
  • 104.
    ~ Biological Control ofWeeds: Proceedings of the VIII International Symposium on Biological Control of Weeds; by Ernest S. Delfosse http://books.google.com/books?id=5tUnAQAAMAAJ http://www.worldcat.org/oclc/36787209 Biological Control of Weeds: Proceedings of the IX International Symposium on Biological Control of Weeds; by V C Moran http://books.google.com/books?id=exvbAAAAMAAJ http://www.worldcat.org/oclc/36758595 Biological Control of Weeds: Proceedings of the XII International Symposium on Biological Control of Weeds; by M. H. Julien http://books.google.com/books?id=c_cCwli1NQcC http://www.worldcat.org/oclc/798091773 Biological Control of Weeds: Theory and Practical Application; by Mic Julien http://books.google.com/books?id=9BRIAAAAYAAJ http://www.worldcat.org/oclc/39078715 Biological Control Programmes in Canada, 1981-2000; by Peter G. Mason http://books.google.com/books?id=tDHWhOEhTckC http://www.worldcat.org/oclc/46678324 Biological Methods in Crop Pest Control; by George Ordish http://www.librarything.com/work/5838710 http://books.google.com/books?id=ex1DAAAAYAAJ http://www.worldcat.org/oclc/642322059 Biological Pest Control; by Tukaram Vithalrao Sathe http://books.google.com/books?id=LBT40I_-ixYC http://www.worldcat.org/oclc/51795975 Biological Pest Control, including: Bird, Bacillus Thuringiensis, Predation, Companion Planting, Disease Resistance In Fruit And Vegetables, Biocide, Parasitoid, Pyrethrum, Beetle Bank, Scoliidae, Pyrethrin, Fire Ant, Integrated Pest Management, Tansy; by Hephaestus Books http://books.google.com/books?id=OGmQSQAACAAJ
  • 105.
    ~ Bug, Slugs, andOther Thugs: Controlling Garden Pests Organically; by Rhonda Massingham Hart http://www.librarything.com/work/1160552 http://books.google.com/books?id=JM4nAQAAMAAJ http://www.worldcat.org/oclc/23139837 bookfinder.com addall.com booksprice.com Bug: The Ultimate Gardener’s Guide to Organic Pest Control, Australia; by Tim Marshall http://www.librarything.com/work/9478218 http://books.google.com/books?id=k44HQgAACAAJ http://www.worldcat.org/oclc/427785925 bookfinder.com addall.com booksprice.com Bug Off: How to Protect Your Plants the Organic Way; by Rodale Organic Gardening Magazine http://www.librarything.com/work/5193596 http://books.google.com/books?id=988EPQAACAAJ http://www.worldcat.org/oclc/43981311 bookfinder.com addall.com booksprice.com Chinese Herbal Pest Control Technology; by Chen Kang Zhu Bian http://www.google.com http://www.bing.com http://www.amazon.com bookfinder.com addall.com booksprice.com Citrus: A Guide to Organic Management, Propagation, Pruning, Pest Control and Harvesting ; by Allen Gilbert http://books.google.com/books?id=6zkLGQAACAAJ http://www.worldcat.org/oclc/174084148 Citrus Pests and Their Natural Enemies: Integrated Pest Management in Australia; by Dan Smith http://books.google.com/books?id=dhBqAAAACAAJ http://www.worldcat.org/oclc/38213617 Club the Bugs and Scare the Critters; by Myles H. Bader http://www.librarything.com/work/5152612 http://books.google.com/books?id=_rOWGQAACAAJ http://www.worldcat.org/oclc/53952310 bookfinder.com addall.com booksprice.com Color Handbook of Biological Control in Plant Protection; by Neil Helyer http://www.librarything.com/work/2077415 http://books.google.com/books?id=NwpNAAAAYAAJ http://www.worldcat.org/oclc/52733389 bookfinder.com addall.com booksprice.com
  • 106.
    ~ Common Sense PestControl: Least Toxic Solutions for Your Home, Garden, Pets and Community; by William Olkowski http://www.librarything.com/work/819968 http://books.google.com/books?id=jwmFQgAACAAJ http://www.worldcat.org/oclc/800037527 bookfinder.com addall.com booksprice.com Concepts in Integrated Pest Management; by Robert F. Norris http://www.librarything.com/work/967656 http://books.google.com/books?id=yAUpAQAAMAAJ http://www.worldcat.org/oclc/49699355 bookfinder.com addall.com booksprice.com Control of Pests and Weeds by Natural Enemies: An Introduction to Biological Control; by Roy van Driesche http://www.librarything.com/work/7991872 http://books.google.com/books?id=0sLTMbNswecC http://www.worldcat.org/oclc/173367808 bookfinder.com addall.com booksprice.com Control Pests (Green Essentials - Organic Guides); by Richard Jones http://books.google.com/books?id=Z-o3PQAACAAJ http://www.worldcat.org/oclc/502390208 Control Slugs without Poison; by Marilyn Pokorney ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Controlling Garden Weeds: Storey's Country Wisdom Bulletin A-171; by Barbara Pleasant http://www.librarything.com/work/2435712 http://books.google.com/books?id=0bovHiolTAEC http://www.worldcat.org/oclc/36621885 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Controlling Pests and Diseases (Rodale's Successful Organic Gardening); by Patricia S. Michalak http://www.librarything.com/work/2673683 http://books.google.com/books?id=z3ICAAAACAAJ http://www.worldcat.org/oclc/28665641 bookfinder.com addall.com booksprice.com
  • 107.
    ~ Controlling Pests andDiseases the Organic Way; by Jane Courtier http://www.librarything.com/work/12964884 http://books.google.com/books?id=g7drHAAACAAJ http://www.worldcat.org/oclc/28115599 bookfinder.com addall.com booksprice.com Controlling Vegetable Pests; by Pam Peirce http://www.librarything.com/work/1436736 http://books.google.com/books?id=Yw9IAAAAYAAJ http://www.worldcat.org/oclc/25009778 bookfinder.com addall.com booksprice.com Controlling Weeds (Rodale's Successful Organic Gardening); by Erin Hynes http://www.librarything.com/work/1577455 http://books.google.com/books?id=0ta3OQAACAAJ http://www.worldcat.org/oclc/31969014 bookfinder.com addall.com booksprice.com Controlling Weeds: without Using Chemicals; by Joanna Readman http://books.google.com/books?id=uqHLNQAACAAJ http://www.worldcat.org/oclc/43718575 Dead Daisies Make Me Crazy: Garden Solutions without Chemical Pollution; by Loren Nancarrow http://www.librarything.com/work/1234288 http://books.google.com/books?id=4P7S0jLrdDUC http://www.worldcat.org/oclc/43060651 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 108.
    ~ Dead Snails LeaveNo Trails: Natural Pest Control for Home and Garden; by Loren Nancarrow http://www.librarything.com/work/71467 http://books.google.com/books?id=RaWkPHkawM0C http://www.worldcat.org/oclc/34356066 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Dear Dirt Doctor: Questions Answered the Natural Way; by Howard Garrett http://www.librarything.com/work/703825 http://books.google.com/books?id=Uc_DLeNeNqkC http://www.worldcat.org/oclc/51544218 bookfinder.com addall.com booksprice.com Deer Proofing Your Yard and Garden; by Rhonda Massingham Hart http://www.librarything.com/work/1283124 http://books.google.com/books?id=vG7RZC8qHhwC http://www.worldcat.org/oclc/36930671 bookfinder.com addall.com booksprice.com Disease Control in Crops: Biological and Environmentally-Friendly Approaches; by Dale Walters http://www.librarything.com/work/8428875 http://books.google.com/books?id=sbJ4iMaf9GYC http://www.worldcat.org/oclc/288986018 bookfinder.com addall.com booksprice.com Ecologically Based Pest Management: New Solutions for a New Century; by Committee on Pest and Pathogen Control http://www.librarything.com/work/8803086 http://books.google.com/books?id=tbCHiHgq7MIC http://www.worldcat.org/oclc/754030952 bookfinder.com addall.com booksprice.com Ecological Engineering for Pest Management: Advances in Habitat Manipulation for Arthropods ; by Geoff Gur http://www.librarything.com/work/6736185 http://books.google.com/books?id=o00PxzH-X58C http://www.worldcat.org/oclc/803728363 bookfinder.com addall.com booksprice.com Ecological Management of Agricultural Weeds; by Matt Liebman http://www.librarything.com/work/8829805 http://books.google.com/books?id=MjBuqk8-t2sC http://www.worldcat.org/oclc/56416032 bookfinder.com addall.com booksprice.com
  • 109.
    ~ Ecological Weed Managementfor Organic Farming Systems; by Derek Law http://www.worldcat.org/oclc/76787660 Emerging Technologies for Integrated Pest Management: Concepts, Research, and Implementation ; by George G. Kennedy http://www.librarything.com/work/2912579 http://books.google.com/books?id=K31FAQAAIAAJ http://www.worldcat.org/oclc/44562808 bookfinder.com addall.com booksprice.com Enhancing Biological Control: Habitat Management to Promote Natural Enemies of Agricultural Pests; by Charles Hammond Pickett http://www.librarything.com/work/10563267 http://books.google.com/books?id=fPi6eHMqdgMC http://www.worldcat.org/oclc/34046524 bookfinder.com addall.com booksprice.com Environment Friendly Antiviral Agents for Plants; by Baoan Song http://books.google.com/books?id=HKUEdP_LJy4C http://www.worldcat.org/oclc/701719301 Environmentally Friendly Pest Control; by Robert H. Stauffer http://books.google.com/books?id=TI9IoVTVtyIC http://www.worldcat.org/oclc/49727015 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Environmentally Safe Approaches to Crop Disease Control; by Nancy A Rechcigl http://books.google.com/books?id=hew4AQAAIAAJ http://www.worldcat.org/oclc/36158715 Field Vegetable Production: Using Cover Crops for Integrated Weed Management; by Bonnie R Ball Coelho http://books.google.com/books?id=Dl1UMwEACAAJ http://www.worldcat.org/oclc/729352736 Fruit and Vegetable Clinic; by Pippa Greenwood http://www.librarything.com/work/11967419 http://books.google.com/books?id=lEbwGwAACAAJ http://www.worldcat.org/oclc/28734288 bookfinder.com addall.com booksprice.com
  • 110.
    ~ Fruit Pest andDisease Control the Organic Way; by Lawrence D. Hills http://books.google.com/books?id=H5qPAAAACAAJ http://www.worldcat.org/oclc/12512849 Gardener to Gardener Almanac and Pest-Control Primer: A Month-By-Month Guide and Journal for Planning, Planting, and Tending Your Organic Garden; by Vicki Mattern, Rodale Organic Gardening Magazine http://www.librarything.com/work/536884 http://books.google.com/books?id=3lolAQAAMAAJ http://www.worldcat.org/oclc/44083925 bookfinder.com addall.com booksprice.com Gardening for a Greener Planet: A Chemical-free Approach; by Jonathan Erickson http://www.librarything.com/work/11459365 http://books.google.com/books?id=zSlIAAAAYAAJ http://www.worldcat.org/oclc/24468352 bookfinder.com addall.com booksprice.com Garden Success without Poison Sprays; by Jerome Irving Rodale http://books.google.com/books?id=M5U_AAAAYAAJ http://www.worldcat.org/oclc/7902477 bookfinder.com addall.com booksprice.com google.com bing.com yahoo.com Gardening with Good Bugs; by Erin W. Hodgson http://www.librarything.com/work/11468858 http://books.google.com/books?id=091nPQAACAAJ http://www.worldcat.org/oclc/154744370 bookfinder.com addall.com booksprice.com General Concepts in Integrated Pest and Disease Management ; by A Ciancio http://www.librarything.com/work/8081237 http://books.google.com/books?id=EORpe3TF5A4C http://www.worldcat.org/oclc/144228545 bookfinder.com addall.com booksprice.com Getting the Bugs Out of Organic Gardening; by Barbara B. McKillip http://www.librarything.com/work/2209937 http://books.google.com/books?id=_-dFAAAAYAAJ http://www.worldcat.org/oclc/613782 bookfinder.com addall.com booksprice.com
  • 111.
    ~ Good Bug, BadBug: Who's Who, What They Do, and How to Manage Them Organically; by Jessica Walliser http://www.librarything.com/work/5775897 http://books.google.com/books?id=N22qcQAACAAJ http://www.worldcat.org/oclc/184826566 bookfinder.com addall.com booksprice.com Great Garden Fix-Its: Organic Remedies for Everything from Aphids to Weeds; by Christine Bucks http://www.librarything.com/work/5157934 http://books.google.com/books?id=pCYLAAAACAAJ http://www.worldcat.org/oclc/45879681 bookfinder.com addall.com booksprice.com Great Garden Formulas: The Ultimate Book of Mix-It-Yourself Concoctions for Your Garden; by Joan Benjamin, Rodale Books http://www.librarything.com/work/1236213 http://books.google.com/books?id=e0YEAAAACAAJ http://www.worldcat.org/oclc/38410048 bookfinder.com addall.com booksprice.com Green, Healthy and Thrifty Gardening Helpful Hints: A Practical Guidebook of 1001 Wholesome Living Solutions to Make Life Easier and Save Money with Safe and Natural Non-Toxic Tips; by Tui Rose http://books.google.com/books?id=iRTi83i1yyUC http://www.worldcat.org/oclc/794300971 Grow Your Own Organic Fruit And Vegetables: A Complete Guide, United Kingdom; by John Fedor http://books.google.com/books?id=7XZxKUP2Bg8C http://www.worldcat.org/oclc/461271084 Grow Your Own Organic Fruit and Vegetables: An Easy-to-follow Directory Of Vegetables, Fruit And Herbs, United Kingdom; by Christine Lavelle http://www.librarything.com/work/1215045 http://books.google.com/books?id=nI6FAAAACAAJ http://www.worldcat.org/oclc/57485512 bookfinder.com addall.com booksprice.com
  • 112.
    ~ Growing Healthy VegetableCrops: Working with Nature to Control Diseases and Pests Organically; by Brian Caldwell http://www.librarything.com/work/11138598 http://books.google.com/books?id=PsSSQS-u2-MC http://www.worldcat.org/oclc/676727210 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Hand Book of Biological Control in Horticultural Crops; by P. Parvatha Reddy http://books.google.com/books?id=eGFqMwEACAAJ http://www.worldcat.org/oclc/779808414 Handbook of Biological Control: Principles and Applications of Biological Control ; by T. W. Fishe http://www.librarything.com/work/23912 http://books.google.com/books?id=u2X-rfgU0ewC http://www.worldcat.org/oclc/42418644 bookfinder.com addall.com booksprice.com Handbook of Sustainable Weed Management; by Harminder Pal Singh http://www.librarything.com/work/9021671 http://books.google.com/books?id=Az-qoHPCnvYC http://www.worldcat.org/oclc/57202209 bookfinder.com addall.com booksprice.com Here's Health Guide to Gardening Without Chemicals: A Step-By-Step Guide to Growing Vegetable and Soft Fruit the Organic Way, United Kingdom; by Jack Temple http://books.google.com/books?id=pyxWAAAACAAJ http://www.worldcat.org/oclc/14360336 Home Remedies for Pest Control; by Eric Vinje http://www.google.com http://www.bing.com Homes That Heal; by Athena Thompson http://www.librarything.com/work/2175564 http://books.google.com/books?id=qs9ev0aso0IC http://www.worldcat.org/oclc/56632426 bookfinder.com addall.com booksprice.com
  • 113.
    ~ House and GardenPests: How to Organically Control Common Invasive Species ; by James Kavanagh http://www.worldcat.org/oclc/176926607 How Green is Your Garden: A Guide to Choosing Environmentally Safe Products, United Kingdom; by Nick Branwell http://www.librarything.com/work/8628264 http://books.google.com/books?id=SSJIAAAAYAAJ http://www.worldcat.org/oclc/21164034 bookfinder.com addall.com booksprice.com How to Get Your Lawn and Garden Off Drugs: A Basic Guide to Pesticide-Free Gardening in North America; by Carole Rubin http://www.librarything.com/work/141714 http://books.google.com/books?id=__2tbwAACAAJ http://www.worldcat.org/oclc/51630649 bookfinder.com addall.com booksprice.com Indian Insect Predators in Biological Control; by K. Sahayaraj http://books.google.com/books?id=WCr4rV27J6sC http://www.worldcat.org/oclc/57796692 Insects and Gardens: in Pursuit of a Garden Ecology; by Eric Grissell http://www.librarything.com/work/407258 http://www.worldcat.org/oclc/46866205 Insect, Disease and Weed I.D. Guide: Find-It-Fast Organic Solutions for Your Garden (Rodale Organic Gardening Book); by Jill Jesiolowski Cebenko http://www.librarything.com/work/2710886 http://books.google.com/books?id=x_CjYwMzD4wC bookfinder.com addall.com booksprice.com google.com bing.com yahoo.com Insect Pest Control in Colorado Organic Vegetable Gardens; by Whitney Cranshaw http://books.google.com/books?id=chjIHAAACAAJ http://www.worldcat.org/oclc/768865247 Insects Predators and Pest Management; by T.V. Sathe http://books.google.com/books?id=xoy1KFnAne0C http://www.worldcat.org/oclc/469320112
  • 114.
    ~ Integrated Disease andPest Control in Irish Mushroom Tunnels; by Liam Staunton http://books.google.com/books?id=stzvGwAACAAJ http://www.worldcat.org/oclc/59461896 IPM for Gardeners: A Guide to Integrated Pest Management; by Raymond A. Cloyd http://www.librarything.com/work/1341845 http://books.google.com/books?id=6DE-PwAACAAJ http://www.worldcat.org/oclc/53369197 bookfinder.com addall.com booksprice.com Intergrated Farm Management III: Practical guides to Dryland Farming; by World Neighbours http://www.echobooks.org http://books.google.com/books?id=KTmCGwAACAAJ http://www.google.com http://www.bing.com Integrated Pest and Disease Management; by Rajeev K. Upadhyay http://books.google.com/books?id=9CUD07Fcp_kC Integrated Pest and Disease Management for Australian Summerfruit; by Shane Hetherington http://www.worldcat.org/oclc/174039504 Integrated Pest and Disease Management in Greenhouse Crops; by Ramon Albajes http://www.librarything.com/work/5223301 http://books.google.com/books?id=BINB9u06MsEC http://www.worldcat.org/oclc/70738858 bookfinder.com addall.com booksprice.com Integrated Pest and Disease Management in Strawberries; by N Shanmuganathan http://books.google.com/books?id=aMiDAAAACAAJ http://www.worldcat.org/oclc/38333828 Integrated Pest Management; by D. Dent http://books.google.com/books?id=BNVLxXDBVr8C http://www.worldcat.org/oclc/33062390
  • 115.
    ~ Integrated Pest Management:Concepts, Tactics, Strategies and Case Studies; by Edward B Radcliffe http://www.librarything.com/work/8282229 http://books.google.com/books?id=P_5kF31fs9wC http://www.worldcat.org/oclc/261342078 bookfinder.com addall.com booksprice.com Integrated Pest Management: Innovation-Development Process; by Rajinder Peshin http://books.google.com/books?id=xjhr2M1H_9IC http://www.worldcat.org/oclc/494709604 Integrated Pest Management for Cole Crops and Lettuce; by University of California http://www.librarything.com/work/4798246 http://books.google.com/books?id=m-jurKUqSscC http://www.worldcat.org/oclc/13643352 bookfinder.com addall.com booksprice.com Integrated Pest Management for Developing Countries: A Systemic Overview; by Chigozie Jesse Uneke http://books.google.com/books?id=dqLnb-GA--4C http://www.worldcat.org/oclc/82472718 Integrated Pest Management For Greenhouse Tomatoes; by N.A. Martin, New Zealand Institute for Crop http://books.google.com/books?id=JEpOMwEACAAJ http://www.worldcat.org/oclc/31807682 Integrated Pest Management for Potatoes in the Western United States; by Larry L. Strand http://books.google.com/books?id=NDxpniwC1MwC http://www.worldcat.org/oclc/15106781 Integrated Pest Management for Stone Fruits; by Larry L. Strand http://www.librarything.com/work/4998778 http://books.google.com/books?id=Qb9F4jnuXiEC http://www.worldcat.org/oclc/43001117 bookfinder.com addall.com booksprice.com Integrated Pest Management for Strawberries; by Larry L. Strand http://books.google.com/books?id=2ertGXmmwDwC http://www.worldcat.org/oclc/30301088
  • 116.
    ~ Integrated Pest ManagementFor Strawberries in the Northeastern United States: A Manual For Growers and Scouts; by Daniel R Cooley http://books.google.com/books?id=DLirHAAACAAJ http://www.worldcat.org/oclc/36970821 Integrated Pest Management for Tomatoes; by Larry R. Strand http://www.librarything.com/work/4988490 http://books.google.com/books?id=sf651bq4q0kC http://www.worldcat.org/oclc/39107898 bookfinder.com addall.com booksprice.com Integrated Pest Management in Rice-Vegetable Cropping Systems; by Madeline B. Quiamco http://books.google.com/books?id=WAVIAAAAYAAJ http://www.worldcat.org/oclc/99894081 Integrated Pest Management in Vegetable Production: A Guide for Extension Workers in West Africa; by B. James http://books.google.com/books?id=gb3Tp0Wb-DsC Integrated Management of Insect Pests of Pome and Stone Fruits ; by Brian A. Croft http://books.google.com/books?id=VN46WN3PXSQC http://www.worldcat.org/oclc/8688382 Integrated Weed Management, Cover Crop, Mulch and Rotation Management in Vegetable Production Systems; by Craig Henderson http://books.google.com/books?id=-g0hAAAACAAJ http://www.worldcat.org/oclc/223023305 Invisible Gardener's Natural Cockroach Control ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Invisible Gardener's Natural Pest Control; by Invisible Gardener ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 117.
    ~ Jerry Baker's BugOff: 2,193 Super Secrets for Battling Bad Bugs, Outfoxing Crafty Critters, Evicting Voracious Varmints and Much More; by Jerry Baker http://www.librarything.com/work/2506577 http://books.google.com/books?id=UeDHKeYd0KcC http://www.worldcat.org/oclc/55957158 bookfinder.com addall.com booksprice.com Kill Pest Problems without Killing Yourself: 12 Techniques For Organic Pest Control in Your Garden; by Emily Josephine ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Killing without Poison: Natural and Effective Ways to Eliminate Garden Pests; by D A Eash http://books.google.com/books?id=yvC4SgAACAAJ http://www.worldcat.org/oclc/707932788 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Least Toxic Pest Management: Greenhouses and Indoor Plants; by Bio Integral Resource Center http://books.google.com/books?id=Egh8GwAACAAJ http://www.worldcat.org/oclc/29240901 Managing Pests and Diseases: A Handbook for New Zealand Gardeners; by Rob Lucas http://www.librarything.com/work/5161603 http://books.google.com/books?id=vuZ2AAAACAAJ http://www.worldcat.org/oclc/156769112 bookfinder.com addall.com booksprice.com Microbial Control of Weeds; by David O. TeBeest http://books.google.com/books?id=TfHwAAAAMAAJ http://www.worldcat.org/oclc/21116639 Mushroom Pest and Disease Control: A Color Handbook; by John T Fletche http://books.google.com/books?id=LiIZhzUYYX8C http://www.worldcat.org/oclc/13793072 Natural Ant Control; by Invisible Gardener ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 118.
    ~ Natural Control ofGarden Pests; by Jackie French http://www.librarything.com/work/3540418 http://books.google.com/books?id=qnAOAQAACAAJ http://www.worldcat.org/oclc/62538775 bookfinder.com addall.com booksprice.com Natural Disease Control: A Common Sense Approach to Plant First Aid; by Beth Hanson, Brooklyn Botanic Garden http://www.librarything.com/work/5346708 http://books.google.com/books?id=KZKeXjVbGX0C http://www.worldcat.org/oclc/44848714 bookfinder.com addall.com booksprice.com Natural Enemies: An Introduction to Biological Control; by Ann E. Hajek http://www.librarything.com/work/3579154 http://books.google.com/books?id=6zNey_Cdl3UC http://www.worldcat.org/oclc/52455193 bookfinder.com addall.com booksprice.com Natural Enemies Handbook: The Illustrated Guide to Biological Pest Control ; by Mary Louise Flint http://www.librarything.com/work/3765024 http://books.google.com/books?id=FBJvpMqcV9UC http://www.worldcat.org/oclc/39933890 bookfinder.com addall.com booksprice.com Natural Enemies in Your Garden: A Homeowner's Guide to Biological Control ; by Jana Chin-Ting Lee http://www.librarything.com/work/9436306 http://books.google.com/books?id=z-2SgAACAAJ http://www.worldcat.org/oclc/52823917 bookfinder.com addall.com booksprice.com Natural Flea and Tick Control; by Andy Lopez http://www.librarything.com/work/12177395 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Natural Fruit Tree Care; by Andy Lopez ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 119.
    ~ Natural Insect Control:The Ecological Gardener's Guide to Foiling Pests; by Warren Schultz; Brooklyn Botanic Garden http://www.librarything.com/work/819659 http://books.google.com/books?id=DsJsQZ70zSsC http://www.worldcat.org/oclc/30837148 bookfinder.com addall.com booksprice.com Natural Mosquito Control; by Invisible Gardener ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Natural Pest Control, Don't Panic, It's Organic: Alternatives to Chemicals for the Home and Garden; by Andrew Lopez http://www.librarything.com/work/2522262 http://books.google.com/books?id=KecGAAAACAAJ http://www.worldcat.org/oclc/36184524 bookfinder.com addall.com booksprice.com Natural Pesticides from the Neem Tree and Other Tropical Plants; by H. and Ascher Schmutterer http://www.librarything.com/work/11106136 http://books.google.com/books?id=it0EO7D2RssC http://www.worldcat.org/oclc/12687465 bookfinder.com addall.com booksprice.com Natural Solutions to Things That Bug You; by Myles Bader http://www.librarything.com/work/13201492 http://books.google.com/books?id=lhpaNQEACAAJ http://www.worldcat.org/oclc/813250170 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Neem: A Treatise; by K. K. Singh http://books.google.com/books?id=PyYRUCoIDk4C http://www.worldcat.org/oclc/315479400 Neem: A Tree for Solving Global Problems; by National Research Council http://www.librarything.com/work/3503203 http://books.google.com/books?id=reJEGbb3YooC http://www.worldcat.org/oclc/42328520 bookfinder.com addall.com booksprice.com
  • 120.
    ~ Neem: A User'sGuide; by Subhashini Sridhar http://www.librarything.com/work/4551754 http://books.google.com/books?id=PAHKPgAACAAJ http://www.worldcat.org/oclc/255007491 bookfinder.com addall.com booksprice.com Neem Pesticides in Rice: Potential and Limitations; by Guan Soon Lim http://books.google.com/books?id=1T0QlaY8J http://www.worldcat.org/oclc/31062520 Neem Tree in Agriculture: Its Uses in Low-Input Pest Management; by Edwin van Latum http://books.google.com/books?id=i5OkHAAACAAJ http://www.worldcat.org/oclc/64293143 Non Chemical Methods of Pest Control; by K. Vijayalakshmi http://www.librarything.com/work/7944826 http://books.google.com/books?id=UA48GQAACAAJ http://www.worldcat.org/oclc/295033730 bookfinder.com addall.com booksprice.com Non Chemical Weed Management: Principles, Concepts and Technology; by Mahesh K. Upadhyaya http://www.librarything.com/work/10166394 http://books.google.com/books?id=CyBJuCcFNsQC http://www.worldcat.org/oclc/123079235 bookfinder.com addall.com booksprice.com Organic Control of Common Weeds, Australia; by Jackie French http://www.librarything.com/work/85731 http://books.google.com/books?id=rQWoNgAACAAJ http://www.worldcat.org/oclc/29008460 bookfinder.com addall.com booksprice.com Organic Control of Household Pests, Australia; by Jackie French http://www.librarything.com/work/2603956 http://books.google.com/books?id=fetaAAAACAAJ http://www.worldcat.org/oclc/27628514 bookfinder.com addall.com booksprice.com Organic Crop Production: Weed Management, Canada; by Kerry Foster http://books.google.com/books?id=VTWjMQEACAAJ http://www.worldcat.org/oclc/56302003
  • 121.
    ~ Organic Farming, PestControl and Remediation of Soil Pollutants; by Eric Lichtfouse http://books.google.com/books?id=66RV9Q1EtLcC http://www.worldcat.org/oclc/495478491 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Farming; Garden Pests, How to Fight Them and Maintain A Healthy Garden ; by Elena Pochegaeva http://books.google.com/books?id=4lHINAEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Fertilisation, Soil Quality and Human Health; by Eric Lichtfouse http://www.librarything.com/work/12299574 http://books.google.com/books?id=LSxv16xvdmkC http://www.worldcat.org/oclc/793521334 bookfinder.com addall.com booksprice.com Organic Food: Why You Should Care; by Centre for Indian Knowledge Systems http://www.google.com http://www.bing.com http://uk.yahoo.com bookfinder.com addall.com booksprice.com Organic Garden Pests: Learn All the Simple Techniques For Organic Pest Control in Your Garden ; by Doctor Garden ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening Beginner's Manual: Nature-Friendly Pest Control; by Lisa Van Til http://www.google.com http://www.bing.com ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Gardening Harvest Book; by Rodale Organic Gardening Magazine http://www.librarything.com/work/366648 http://books.google.com/books?id=GDFOAQAAIAAJ http://www.worldcat.org/oclc/26688929 bookfinder.com addall.com booksprice.com Organic Gardening without Poisons; by Hamilton A. Tyler http://www.librarything.com/work/2396125 http://books.google.com/books?id=5qEdAQAAMAAJ http://www.worldcat.org/oclc/115658 bookfinder.com addall.com booksprice.com
  • 122.
    ~ Organic Management forthe Professional: The Natural Way for Landscape Architects and Contractors, Commercial Growers, Golf Course Managers, Park Administrators, Turf Managers, and Other Stew; by Howard Garrett http://www.librarything.com/work/12661085 http://books.google.com/books?id=qfm3JyefEIMC http://www.worldcat.org/oclc/757935842 bookfinder.com addall.com booksprice.com Organic Methods of Pest and Disease Management; by K. Vijayalakshmi http://books.google.com/books?id=5rwkPAAACAAJ http://www.worldcat.org/oclc/271823772 Organic No Dig, No Weed Gardening: A Revolutionary Method For Easy Gardening; by Raymond P Poincelot librarything.com/4692899 books.google.com/jNR7AAAACAAJ worldcat.org/oclc/16756235 bookfinder.com addall.com booksprice.com Organic Pest and Disease Control: How to Grow a Healthy, Problem-Free Garden; by Barbara Ellis http://www.librarything.com/work/4630091 http://books.google.com/books?id=KhksOlkC028C http://www.worldcat.org/oclc/34564792 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Pest Control Using Essential Oils; by Susan Fairbairn ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Organic Pest Control: Control Pests in Your Organic Garden; by Bill Vincent http://books.google.com/books?id=eD2NMAEACAAJ Organic Plant Protection: A Comprehensive Reference on Controlling Insects and Diseases in the Garden, Orchard and Yard without Using Chemicals; by Roger B. Yepsen http://www.librarything.com/work/326820 http://books.google.com/books?id=Gd8nAQAAMAAJ Organic Soil-Fertility and Weed Management; by Steve Gilman http://www.librarything.com/work/11138592 http://books.google.com/books?id=ty2LTvx4EuIC http://www.worldcat.org/oclc/676727213 bookfinder.com addall.com booksprice.com
  • 123.
    ~ Organic Weed Management:A Project of the Northeast Organic Farming Association of Massachusetts (Hands-On Organics); by Steve Gilman http://www.librarything.com/work/3770411 http://www.worldcat.org/oclc/51460417 Panty Hose, Hot Peppers, Tea Bags, and More for the Garden: 1001 Ingenious Ways to Use Common Household Items to Control Weeds, Beat Pests ; by Yankee Magazine http://www.librarything.com/work/4052024 http://books.google.com/books?id=_XMGMstgtm8C http://www.worldcat.org/oclc/58604552 bookfinder.com addall.com booksprice.com Pest and Disease Management for Organic Farmers, Growers and Smallholders; by Gareth Davies http://www.librarything.com/work/11858090 http://books.google.com/books?id=_-SNRAAACAAJ http://www.worldcat.org/oclc/540161749 bookfinder.com addall.com booksprice.com Pest Repellent Plants: Organic Solutions to Garden and Household Pests; by Penny Woodward http://www.librarything.com/work/3635277 http://books.google.com/books?id=1J5_ygAACAAJ http://www.worldcat.org/oclc/222194492 bookfinder.com addall.com booksprice.com Pesticides and Breast Cancer: A WAKE UP CALL; by Dr Meriel Watts http://books.google.com/books?id=JF6NNQAACAAJ http://www.worldcat.org/oclc/229447336 Pests: How to Control Them on Fruit and Vegetables (Organic Handbook); by Pauline Pears http://www.librarything.com/work/1740543 http://books.google.com/books?id=9QJaAAAACAAJ http://www.worldcat.org/oclc/222135311 bookfinder.com addall.com booksprice.com Pests of the Garden and Small Farm: A Grower's Guide to Using Less Pesticide ; by Mary Louise Flint http://www.librarything.com/work/1518615 http://books.google.com/books?id=yJYyL9CC82sC http://www.worldcat.org/oclc/41158879 bookfinder.com addall.com booksprice.com
  • 124.
    ~ Pests of theWest: Prevention and Control for Today's Garden and Small Farm; by Whitney Cranshaw http://www.librarything.com/work/6879738 http://books.google.com/books?id=OBkEO6eiavgC http://www.worldcat.org/oclc/39313628 bookfinder.com addall.com booksprice.com Pests (Gaia Organic Basics); by Charlie Ryrie http://www.librarything.com/work/1953515 http://books.google.com/books?id=lY0SHAAACAAJ http://www.worldcat.org/oclc/45580410 bookfinder.com addall.com booksprice.com Pests: Organic Gardening Basics, Volume 7; by Rodale Books http://www.librarything.com/work/11013731 http://books.google.com/books?id=4ZAMAAAACAAJ http://www.worldcat.org/oclc/44090397 bookfinder.com addall.com booksprice.com Pests of the Garden and Small Farm: A Grower's Guide to Using Less Pesticide ; by Mary Louise Flint http://www.librarything.com/work/1518615 http://books.google.com/books?id=yJYyL9CC82sC http://www.worldcat.org/oclc/41158879 bookfinder.com addall.com booksprice.com Plant Disease Management for Organic Crops; by M. Gaskell http://books.google.com/books?id=ObbrqQfF124C Plant Protection in Organic Arable and Vegetable Crops: A Grower's Resource; by David A.J. Teulon http://books.google.com/books?id=O5MkAAAACAAJ http://www.worldcat.org/oclc/68695859 Protect Your Garden: Eco-Friendly Solutions for Healthy Plants; by Ed Rosenthal http://books.google.com/books?id=m7U8ywAACAAJ http://www.worldcat.org/oclc/823387429
  • 125.
    ~ Q and A:Hundreds of Can-Do Answers to a Gardener's Toughest Questions; by Rodale Organic Gardening Magazine http://www.librarything.com/work/1753376 http://books.google.com/books?id=fUogTwPNHVkC http://www.worldcat.org/oclc/18559357 bookfinder.com addall.com booksprice.com Robin Stewart’s Chemical Free Pest Control: Hundreds of Practical and Inexpensive Ways to Control Pests without Chemicals; by Robin Stewart http://www.librarything.com/work/7986349 http://books.google.com/books?id=4GwYoJUTEgwC http://www.worldcat.org/oclc/155724391 bookfinder.com addall.com booksprice.com Rodale's Color Handbook of Garden Insects; by Anna Carr http://www.librarything.com/work/748260 http://books.google.com/books?id=8yjeNQAACAAJ http://www.worldcat.org/oclc/4776728 bookfinder.com addall.com booksprice.com Rodale's Complete Garden Problem Solver: Instant Answers to the Most Common Gardening Questions; by Cheryl Long http://www.librarything.com/work/1734793 http://books.google.com/books?id=QQs7AQAAIAAJ http://www.worldcat.org/oclc/36647787 bookfinder.com addall.com booksprice.com Rodale's Vegetable Garden Problem Solver: The Best and Latest Advice For Beating Pests, Diseases, and Weeds and Staying A Step Ahead of Trouble in the Garden; by Fern Marshall Bradley http://www.librarything.com/work/2516852 http://books.google.com/books?id=WKhVKocYN6wC http://www.worldcat.org/oclc/70836655 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Scat Pest-Proofing Your Garden: Storey's Country Wisdom Bulletin A-15; by Ruth Harley http://www.librarything.com/work/5813308 http://books.google.com/books?id=VuKvF1-V9pkC http://www.worldcat.org/oclc/6063322 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 126.
    ~ Shepherd's Purse: OrganicPest Control Handbook; by Tom Robert http://www.librarything.com/work/7646604 http://books.google.com/books?id=gugnAQAAMAAJ http://www.worldcat.org/oclc/26211339 bookfinder.com addall.com booksprice.com Simple Green Pest and Disease Control: Bob's Basics; by Bob Flowerdew http://www.librarything.com/work/12593861 http://books.google.com/books?id=l9Vp3Zuf_IoC http://www.worldcat.org/oclc/755704765 bookfinder.com addall.com booksprice.com Slug Bread and Beheaded Thistles: Amusing and Useful Techniques for Nontoxic Housekeeping and Gardening; by Ellen Sandbeck http://www.librarything.com/work/287619 http://books.google.com/books?id=W6TImqN5HpwC http://www.worldcat.org/oclc/42733789 bookfinder.com addall.com booksprice.com Smith and Hawken Hands-On Gardener: The Organic Management of Pests; by Elizabeth Miller http://books.google.com/books/about/Pests.html?id=uF5L1VOp9D8C http://www.worldcat.org/oclc/43118270 Spray Oils Beyond 2000: Sustainable Pest and Disease Management; by Roger Broadley http://books.google.com/books?id=3pnGgZNXyY0C Start With the Soil: The Organic Gardener's Guide to Improving Soil for Higher Yields, More Beautiful Flowers, and a Healthy, Easy-Care Garden; by Grace Gershuny http://www.librarything.com/work/1208561 Successful Organic Pest Control: Environmentally Friendly Ways to Deal with Unwanted Garden Pests and Disease; by Trevor G. Forsythe http://www.librarything.com/work/1206338 http://books.google.com/books?id=Yd5MAAAAYAAJ http://www.worldcat.org/oclc/21299286 bookfinder.com addall.com booksprice.com Sustainable Weed Management in Organic Herb and Vegetable Production; by Paul Erik Kristiansen http://books.google.com/books?id=oGoONAAACAAJ http://www.worldcat.org/oclc/224266578
  • 127.
    ~ Techniques For ReducingPesticide Use: Economic and Environmental Benefits; by David Pimentel http://books.google.com/books?id=nxDxAAAAMAAJ http://www.worldcat.org/oclc/35029593 The All Natural Vegetable Garden Art and Science; by Donald A McAndrew http://books.google.com/books?id=7EGxRwlhJDYC The Biological Control of Insects; by Hugh Nicol http://www.librarything.com/work/13325957 http://books.google.com/books?id=WB1DAAAAYAAJ The Bug Book: Harmless Insect Controls; by Helen Philbrick http://www.librarything.com/work/1352963 http://books.google.com/books?id=He46AQAAIAAJ http://www.worldcat.org/oclc/1068202 bookfinder.com addall.com booksprice.com The Conscientious Gardener: Cultivating a Garden Ethic; by Sarah Hayden Reichard http://www.librarything.com/work/10721197 http://books.google.com/books?id=9d55ibqCVDsC http://www.worldcat.org/oclc/606760526 bookfinder.com addall.com booksprice.com The Encyclopedia of Natural Insect and Disease Control: The Most Comprehensive Guide to Protecting Plants, Vegetables, Fruit, Flowers, Trees and Law; by Roger B. Yepsen http://www.librarything.com/work/1122940 http://books.google.com/books?id=zbgSAQAAMAAJ http://www.worldcat.org/oclc/10230091 bookfinder.com addall.com booksprice.com The Gardener's Bug Book: Earth-Safe Insect Control; by Barbara Pleasant http://www.librarything.com/work/2214306 http://books.google.com/books?id=DaUHYivaCbcC http://www.worldcat.org/oclc/45732471 bookfinder.com addall.com booksprice.com The Gardener's Guide to Common-Sense Pest Control: Least-Toxic Solutions for Your Home, Garden, Pets and Community; by William Olkowski http://www.librarything.com/work/819968 http://books.google.com/books?id=b3yYwDUNQiUC http://www.worldcat.org/oclc/800037527 bookfinder.com addall.com booksprice.com
  • 128.
    ~ The Gardener's WeedBook: Earth-Safe Controls; by Barbara Pleasant http://www.librarything.com/work/692483 http://books.google.com/books?id=BecPkE9B6HkC http://www.worldcat.org/oclc/45732510 bookfinder.com addall.com booksprice.com The Good Bug Book: Beneficial Organisms Commercially Available in Australia and New Zealand for Biological Pest Control; by Richard Llewellyn http://www.librarything.com/work/4271733 http://books.google.com/books?id=qH7uAAAACAAJ http://www.worldcat.org/oclc/50571301 bookfinder.com addall.com booksprice.com The Green Methods Manual: The Original Bio-Control Primer; by Michael S Cherim http://books.google.com/books?id=feYnAQAAMAAJ http://www.worldcat.org/oclc/39261583 The Little Book of Garden Heroes (Centre for Alternative Technology); by Allan Shepherd http://www.librarything.com/work/931293 http://books.google.com/books?id=RUAsmglNtYsC http://www.worldcat.org/oclc/63199671 bookfinder.com addall.com booksprice.com The Little Book of Slugs (Centre for Alternative Technology); by Allan Shepherd http://www.librarything.com/work/4453840 http://books.google.com/books?id=1ISrFXqhN1AC http://www.worldcat.org/oclc/51806352 bookfinder.com addall.com booksprice.com The Neem Tree: An Inhibitor of Insect Feeding and Growth; by Henry Gilbert http://books.google.com/books?id=KwI9HDeRoJQC http://www.worldcat.org/oclc/20484822 The Neem Tree: Sources of Unique Natural Products for Integrated Pest Management; by the Neem Tree: Sources of Unique Natural Products for Integrated Pest Management google.com bing.com bookfinder.com addall.com booksprice.com The Natural Formula Book for Home and Yard; by Dan Wallace http://www.librarything.com/work/338892 http://books.google.com/books?id=ZSdyAAAACAAJ http://www.worldcat.org/oclc/8347525 bookfinder.com addall.com booksprice.com
  • 129.
    ~ The Non-Toxic FarmingHandbook; by Philip A. Wheeler http://books.google.com/books?id=paodAQAAMAAJ http://www.worldcat.org/oclc/40684103 The Organic Gardener's Handbook of Natural Insect and Disease Control: A Complete Problem- Solving Guide to Keeping Your Garden and Yard Healthy without Chemicals ; by Barbara W. Ellis http://www.librarything.com/work/23950 http://books.google.com/books?id=v5We-H9B4kcC http://www.worldcat.org/oclc/25246554 bookfinder.com addall.com booksprice.com The Organic Gardener's Handbook of Natural Pest and Disease Control: A Complete Guide to Maintaining a Healthy Garden and Yard the Earth-Friendly Way; by Fern Marshall Bradley http://www.librarything.com/work/9393502 http://books.google.com/books?id=GcWQQKJX1xEC http://www.worldcat.org/oclc/419860680 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Organic Way to Plant Protection; by Jerome Irving Rodale http://www.librarything.com/work/2071635 http://books.google.com/books?id=3I4ZTwEACAAJ http://www.worldcat.org/oclc/155703462 bookfinder.com addall.com booksprice.com The Organic Way to Plant Protection; by Glenn F. Johns http://books.google.com/books?id=-QopAQAAMAAJ http://www.librarything.com/work/461586 http://www.worldcat.org/oclc/10623779 bookfinder.com addall.com booksprice.com The Pesticide Detox: Towards a More Sustainable Agriculture; by Jules Pretty http://www.librarything.com/work/5224392 http://books.google.com/books?id=8p1WNFEA7P4C http://www.worldcat.org/oclc/56807177 bookfinder.com addall.com booksprice.com The Veggie Gardener's Answer Book: Solutions to Every Problem You'll Ever Face Answers to Every Question You'll Ever Ask; by Barbara W. Ellis http://www.librarything.com/work/5235368 http://books.google.com/books?id=IvlGCGPtCfMC http://www.worldcat.org/oclc/183179542 bookfinder.com addall.com booksprice.com
  • 130.
    ~ The War onBugs; by Will Allen http://www.librarything.com/work/5059747 http://books.google.com/books?id=TnP_g4U49tUC http://www.worldcat.org/oclc/153580282 bookfinder.com addall.com booksprice.com West Coast Gardening: Natural Insect, Weed and Disease Control; by Linda A. Gilkeson http://www.librarything.com/work/8688486 http://books.google.com/books?id=ZqjEAAAACAAJ http://www.worldcat.org/oclc/70231319 bookfinder.com addall.com booksprice.com Tiny Game Hunting: Environmentally Healthy Ways to Trap and Kill the Pests in Your House and Garden; by Hilary Dole Klein http://www.librarything.com/work/81492 http://books.google.com/books?id=MTRTagwnBP4C http://www.worldcat.org/oclc/51825651 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Urban Gardening: A Hong Kong Gardener's Journal; by Arthur Van Langenberg http://www.librarything.com/work/4487918 http://books.google.com/books?id=WJu8J-EuNJAC http://www.worldcat.org/oclc/63508263 bookfinder.com addall.com booksprice.com UnderGround Pests Controls (Natural Pest Control); by Invisible Gardener ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Vegetable Pest and Disease Control the Organic Way; by Lawrence Donegan Hills http://www.librarything.com/work/1736571 http://books.google.com/books?id=JsyYAQAACAAJ http://www.worldcat.org/oclc/12512845 bookfinder.com addall.com booksprice.com Weed: The Ultimate Gardener's Guide to Organic Weed Control, Australia; by Tim Marshall http://www.librarything.com/work/10238767 http://books.google.com/books?id=334fWKO-TXAC http://www.worldcat.org/oclc/472597796 bookfinder.com addall.com booksprice.com
  • 131.
    ~ Weed Management forOrganic Farmers, Growers and Smallholders: A Complete Guide; by Gareth Davies http://books.google.com/books?id=tLAOPQAACAAJ http://www.worldcat.org/oclc/271803309 Weed Management in Organic Small Grains; by Susan Tallman http://books.google.com/books?id=10y2kwEACAAJ http://www.worldcat.org/oclc/820786272 Weed Management in Organic Vegetable Production: A Practical Review of Applied Research; by Jed Colquhoun, University of Wisconsin http://books.google.com/books?id=at5RMAAACAAJ http://www.worldcat.org/oclc/213391541 Weeding without Chemicals; by Bob Flowerdew http://books.google.com/books?id=A7hCFd557OEC http://www.worldcat.org/oclc/755704767 Weedless Gardening; by Lee Reic http://www.librarything.com/work/2940169 http://books.google.com/books?id=tYBfUtb2eCUC http://www.worldcat.org/oclc/44548931 bookfinder.com addall.com booksprice.com Weeds: Control without Poisons; by Charles Walters http://www.librarything.com/work/131478 http://books.google.com/books?id=4MUnAQAAMAAJ http://www.worldcat.org/oclc/42860793 bookfinder.com addall.com booksprice.com
  • 132.
    ~ Weeds: How toControl and Love Them (The Organic Handbook 5); by Jo Readman http://www.librarything.com/work/3834288 http://books.google.com/books?id=6Z0BAAAACAAJ http://www.worldcat.org/oclc/29147748 bookfinder.com addall.com booksprice.com Weeds and What They Tell; by Ehrenfried E. Pfeiffer http://www.librarything.com/work/1679617 http://books.google.com/books?id=iXsKQwAACAAJ http://www.worldcat.org/oclc/44566838 bookfinder.com addall.com booksprice.com West Coast Gardening: Natural Insect, Weed and Disease Control; by Linda A. Gilkeson http://www.librarything.com/work/8688486 http://books.google.com/books?id=ZqjEAAAACAAJ http://www.worldcat.org/oclc/70231319 bookfinder.com addall.com booksprice.com What's Wrong with My Plant? (And How Do I Fix It?): A Visual Guide to Easy Diagnosis and Organic Remedies; by David Deardorff http://www.librarything.com/work/9147994 http://books.google.com/books?id=6Xh35zXiNWYC http://www.worldcat.org/oclc/311779871 bookfinder.com addall.com booksprice.com What's Wrong with My Vegetable Garden: 100% Organic Solutions for All Your Vegetables, from Artichokes to Zucchini; by David Deardorff http://www.librarything.com/work/11949817 http://books.google.com/books?id=y2MMF72yhJ0C http://www.worldcat.org/oclc/704381005 bookfinder.com addall.com booksprice.com Wildlife in the Garden: How to Live in Harmony with Deer, Raccoons, Rabbits, Crows, and Other Pesky Creatures; by Gene Logsdon http://www.librarything.com/work/984989 http://books.google.com/books?id=qhhDbYzYnEIC http://www.worldcat.org/oclc/9154635 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 133.
    ~ HEIRLOOM GARDENING Heirloom Vegetables,Heritage Fruits, Antique Roses Gardening with Heirloom Seeds: Tried-and-True Flowers, Fruits, and Vegetables for a New Generation; by Lynn Coulter http://www.librarything.com/work/1857555 http://books.google.com/books?id=1uya8RqUs8kC http://www.worldcat.org/oclc/62281621 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Heirloom Vegetable Gardening: A Master Gardener's Guide; by William Woys Weaver http://www.librarything.com/work/376857 http://books.google.com/books?id=pqrTGwAACAAJ http://www.worldcat.org/oclc/34887017 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Edible Heirloom Garden; by Rosalind Creasy http://www.librarything.com/work/1141998 http://books.google.com/books?id=-OkJAQAAMAAJ ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Heirloom Vegetables: A Home Gardener's Guide to Finding and Growing Vegetables from the Past ; by Sue Stickland http://www.librarything.com/work/141693 http://books.google.com/books?id=dwZIAAAAYAAJ http://www.worldcat.org/oclc/37310883 bookfinder.com addall.com booksprice.com The Edible Flower Garden; by Rosalind Creasy http://www.librarything.com/work/326878 http://books.google.com/books?id=AwGJVW948mwC http://www.worldcat.org/oclc/39713714 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 134.
    >{-}< 75 Exciting VegetablesFor Your Garden; by Jack E. Staub http://www.librarything.com/work/1358809 http://books.google.com/books?id=ZfSmSmC0WhMC http://www.worldcat.org/oclc/56559168 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com 75 Remarkable Fruits For Your Garden; by Jack E. Staub http://www.librarything.com/work/5343647 http://books.google.com/books?id=4NTKoIy2TcYC http://www.worldcat.org/oclc/173218785 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com 100 Heirloom Tomatoes for the American Garden; by Carolyn J. Male, http://www.librarything.com/work/748212 http://books.google.com/books?id=y4y_Fz2QLkIC http://www.worldcat.org/oclc/40805462 bookfinder.com addall.com booksprice.com 100 Old Roses for the American Garden; by Clair G. Martin http://www.librarything.com/work/289850 http://books.google.com/books?id=6jWGAvyBsvcC http://www.worldcat.org/oclc/42690032 bookfinder.com addall.com booksprice.com A Basic Middle Eastern Desert Survival Guide of Common Wild Foods ; by Linda Runyon http://www.worldcat.org/oclc/48810358 A Celebration of Heirloom Vegetables: Growing and Cooking Old-Time Varieties; by Roger B. Yepsen http://www.librarything.com/work/176053 http://books.google.com/books?id=bi4NAQAAMAAJ http://www.worldcat.org/oclc/38936671 bookfinder.com addall.com booksprice.com A Guide to Pruning Heritage Roses; by Angela Adams http://books.google.com/books?id=KJ7MPAAACAAJ http://www.worldcat.org/oclc/222080253
  • 135.
    ~ A Heritage ofRoses; by Hazel Le Rougetel http://www.librarything.com/work/679750 http://books.google.com/books?id=VxdIAAAAYAAJ http://www.worldcat.org/oclc/18464606 bookfinder.com addall.com booksprice.com A Potted History of Vegetables: A Kitchen Cornucopia: by Lorraine Harrison http://www.librarything.com/work/11945250 http://books.google.com/books?id=RGNjzgAACAAJ http://www.worldcat.org/oclc/666237642 bookfinder.com addall.com booksprice.com A Taste of The Unexpected: How to Grow your own Remarkable Fruit, Vegetables, Nuts, Herbs, Spices and Flowers; by Mark Diacono http://www.librarything.com/work/10484142 http://books.google.com/books?id=bWb3RQAACAAJ http://www.worldcat.org/oclc/624417648 bookfinder.com addall.com booksprice.com A Taste of The Unexpected; by Annette Swanberg http://www.worldcat.org/oclc/47444480 Aboriginal Plant Use in Canada's Northwest Boreal Forest ; by Robin J. Marles http://www.librarything.com/work/7675875 http://books.google.com/books?id=XPbaAAAAMAAJ http://www.worldcat.org/oclc/43280421 bookfinder.com addall.com booksprice.com African Indigenous Vegetables in Urban Agriculture; by Charlie M Shackleton http://books.google.com/books?id=h2Rbq1YZO60C http://www.worldcat.org/oclc/471807899 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Agrobiodiversity Conservation and Use in Asia, Pacific and Oceania Region; by L.S. Sebastian http://books.google.com/books?id=uMmTtwAACAAJ http://www.worldcat.org/oclc/773322663 All About Tomatoes: And Potatoes, Peppers and Other Relatives, Australia ; by Clive Blazey http://books.google.com/books?id=Bmv7tgAACAAJ http://www.worldcat.org/oclc/755283225
  • 136.
    ~ Antique and HeirloomFlowers, Fruit and Vegetables: A Catalogue; by by National Trust of Australia http://books.google.com/books?id=1r_FtgAACAAJ http://www.worldcat.org/oclc/39442891 Antique Roses For The South; by William C. Welch http://www.librarything.com/work/403730 http://books.google.com/books?id=LCj5OqTO2mEC http://www.worldcat.org/oclc/21374140 bookfinder.com addall.com booksprice.com Asian Vegetable Research and Development Center; by Tim Griggs http://books.google.com/books?id=_vRHAAAAYAAJ http://www.worldcat.org/oclc/35295653 Asian Vegetables: A Guide to Growing Fruit, Vegetables and Spices from the Indian Subcontinent; by Sally Cunningham http://www.librarything.com/work/11138654 http://books.google.com/books?id=c-NpPgAACAAJ http://www.worldcat.org/oclc/506235366 bookfinder.com addall.com booksprice.com Attracting Native Pollinators: The Xerces Society Guide Protecting North America's Bees and Butterflies http://www.librarything.com/work/10501685 http://books.google.com/books?id=iTwPEDL3nvMC http://www.worldcat.org/oclc/535495615 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Banana Diversity in the Middle East; by Bioversity International http://books.google.com/books?id=F31GfnmBk0wC Bio-Dynamic Gardening; by John Soper http://www.librarything.com/work/1624111 http://books.google.com/books?id=B20OAAAACAAJ http://www.worldcat.org/oclc/35830019 bookfinder.com addall.com booksprice.com Biodynamics: New Directions for Farming and Gardening in New Zealand; by Herbert H Koepf http://books.google.com/books?id=ApA_AAAAYAAJ http://www.worldcat.org/oclc/24210770
  • 137.
    ~ Biodynamics in theHome Garden; by Peter Proctor http://www.librarything.com/work/9783978 http://books.google.com/books?id=NQtlLwEACAAJ http://www.worldcat.org/oclc/823861985 bookfinder.com addall.com booksprice.com Bio-dynamics in the Home Garden; by Ruth Eastman http://books.google.com/books?id=-89-QwAACAAJ http://www.worldcat.org/oclc/387498 Blue Corn and Square Tomatoes: Unusual Facts About Common Vegetables ; by Rebecca Rupp http://www.librarything.com/work/3338949 http://books.google.com/books?id=D_VHAAAAYAAJ http://www.worldcat.org/oclc/15589106 bookfinder.com addall.com booksprice.com Brother Crow, Sister Corn: Traditional American Indian Gardening; by Carol Buchanan http://www.librarything.com/work/3725181 http://books.google.com/books?id=gZ51AAAAMAAJ http://www.worldcat.org/oclc/35096005 bookfinder.com addall.com booksprice.com Breed Your Own Vegetable Varieties: The Gardener's and Farmer's Guide to Plant Breeding and Seed Saving; by Carol Deppe http://www.librarything.com/work/837820 http://books.google.com/books?id=sNgMAAAACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Breeding of Neglected and Under-Utilized Crops, Spices, and Herbs; by Sergio Ochatt http://books.google.com/books?id=uaRFAQAAIAAJ http://www.worldcat.org/oclc/646769365 Breeding Tropical and Subtropical Fruits; by P.K. Ray http://books.google.com/books?id=0l2JnsONxlAC http://www.worldcat.org/oclc/50130185 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 138.
    ~ Buffalo Bird Woman'sGarden: Agriculture of the Hidatsa Indians; by Gilbert Wilson http://www.librarything.com/work/262327 http://books.google.com/books?id=8r6-kcHIUDsC http://www.worldcat.org/oclc/16352461 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Building and Using Our Sun-Heated Greenhouse: Grow Vegetables All Year-Round; by Helen Nearing http://www.librarything.com/work/1005535 http://books.google.com/books?id=p2XGQgAACAAJ http://www.worldcat.org/oclc/3292675 bookfinder.com addall.com booksprice.com Building with Earth: A Guide to Flexible-Form Earthbag Construction; by Paulina Wojciechowska http://www.librarything.com/work/1411647 http://books.google.com/books?id=0TZSAAAAMAAJ http://www.worldcat.org/oclc/46683761 bookfinder.com addall.com booksprice.com Building Soils For Better Crops: Organic Matter Management; by Fred Magdoff http://www.librarything.com/work/5971806 http://books.google.com/books?id=DN84AQAAIAAJ http://www.worldcat.org/oclc/823514452 bookfinder.com addall.com booksprice.com Blue Potatoes, Orange Tomatoes; by Rosalind Creasy http://www.librarything.com/work/1315279 http://books.google.com/books?id=7XxMZGnOVXUC http://www.worldcat.org/oclc/27149446 bookfinder.com addall.com booksprice.com Build It Better Yourself; by Rodale Organic Gardening Magazine http://www.librarything.com/work/190040 http://books.google.com/books?id=aSZSAAAAMAAJ http://www.worldcat.org/oclc/2633091 bookfinder.com addall.com booksprice.com Build Your Own Earth Oven: A Low-Cost Wood-Fired Mud Oven; Simple Sourdough Bread; Perfect Loaves; by Kiko Denzer http://www.librarything.com/work/121460 http://books.google.com/books?isbn=096798467X http://www.worldcat.org/oclc/126880248 bookfinder.com addall.com booksprice.com
  • 139.
    ~ Building With Cob:A Step-by-step Guide; by Adam Weismann http://www.librarything.com/work/1103587 http://books.google.com/books?id=ri45AQAAIAAJ http://www.worldcat.org/oclc/66901843 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Canadian Home Gardening the Year 'round; by Alden Blair Cutting http://www.librarything.com/work/6809412 http://books.google.com/books?id=BgjBlwEACAAJ http://www.worldcat.org/oclc/38915212 bookfinder.com addall.com booksprice.com Cities Feeding People: An Examination of Urban Agriculture in East Africa; by Axumite G. Egziabher http://www.librarything.com/work/1084095 http://books.google.com/books?id=-XPvJxgWYZUC http://www.worldcat.org/oclc/52916140 bookfinder.com addall.com booksprice.com Cities Farming for the Future: Urban Agriculture for Green and Productive Cities; by René Van Veenhuizen http://www.librarything.com/work/12948771 http://books.google.com/books?id=n0QQqbw9MRoC http://www.worldcat.org/oclc/175314013 bookfinder.com addall.com booksprice.com Classic Roses: An Illustrated Encyclopaedia and Grower's Manual of Old Roses, Shrub Roses and Climbers; by Peter Beales http://www.librarything.com/work/96808 http://books.google.com/books?id=txgwOKbMhmsC http://www.worldcat.org/oclc/12263001 bookfinder.com addall.com booksprice.com Collection, Evaluation and Breeding of African Edible Vegetables; by Samuel Mendlinger http://books.google.com/books?id=0JLvHAAACAAJ http://www.worldcat.org/oclc/29947151 Common Sense Gardens: How to Plan and Plant Them; by Cornelius V. V. Sewell http://books.google.com/books?id=sF5GAAAAYAAJ http://www.worldcat.org/oclc/8287709 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com
  • 140.
    ~ Conservation And UtilizationOf Sweet Potato Genetic Diversity In Asia; by V. Ramanatha Rao http://books.google.com/books?id=yJ6SOTpGnw0C Conservation of Plant Genetic Resources: Grassroots Efforts in North America; by Kevin Dahl http://books.google.com/books?id=Sa8fAQAAIAAJ http://www.worldcat.org/oclc/27994607 Conserving Plant Genetic Diversity in Protected Areas; by José María Iriondo http://www.librarything.com/work/6273760 http://books.google.com/books?id=tQVdFVnLPyUC http://www.worldcat.org/oclc/226881602 bookfinder.com addall.com booksprice.com Continuous Productive Urban Landscapes: Designing Urban Agriculture for Sustainable Cities; by Andre Viljoen http://www.librarything.com/work/5221352 http://books.google.com/books?id=SWuDgEfUqzIC http://www.worldcat.org/oclc/60533269 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Cool Season Gardening: Extend the Harvest, Plan Ahead, and Grow Vegetables Year Round ; by Bill Thorness http://books.google.com/books?id=PNa-MQEACAAJ http://www.worldcat.org/oclc/813301110 Cornucopia II: A Source Book of Edible Plants; by Stephen Facciola http://www.librarything.com/work/384442 http://books.google.com/books?id=XzolAQAAMAAJ http://www.worldcat.org/oclc/40692996 bookfinder.com addall.com booksprice.com Crops in Pots: 50 Great Container Projects Using Vegetables, Fruit and Herbs; by Bob Purnell http://www.librarything.com/work/3155841 http://books.google.com/books?id=dzSyAAAACAAJ http://www.worldcat.org/oclc/171529907 bookfinder.com addall.com booksprice.com
  • 141.
    ~ Crops in Pots:Growing Vegetables, Fruits and Herbs in Pots, Containers and Baskets; by Rachelle Strauss http://www.librarything.com/work/12736847 http://books.google.com/books?id=J_WZuAAACAAJ http://www.worldcat.org/oclc/743473266 bookfinder.com addall.com booksprice.com Crop Wild Relatives; by Bioversity International http://books.google.com/books?id=yqUUmqcYef0C Crop Wild Relatives: A Manual of in Situ Conservation; by Danny Hunter http://www.librarything.com/work/11220363 http://books.google.com/books?id=O4KJP40SBN4C http://www.worldcat.org/oclc/642351938 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Descriptors for Mango (Mangifera indica L.); by Bioversity International http://books.google.com/books?id=YW6TyOeAftYC http://www.worldcat.org/oclc/20878851 Desert Problems and Desertification in Central Asia; by Agadzhan Gel'dyevich Babaev http://books.google.com/books?id=ilTuAAAAMAAJ http://www.worldcat.org/oclc/40881651 Designing and Maintaining Your Edible Landscape Naturally; by Robert Kourik http://www.librarything.com/work/176424 http://books.google.com/books?id=rF3-RzZ0psoC http://www.worldcat.org/oclc/14258849 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Dig On for Victory: Mr Middleton's All-Year-Round Gardening Guide From 1945; by C. H. Middleton http://www.librarything.com/work/9546895 http://books.google.com/books?id=dhlKPgAACAAJ http://www.worldcat.org/oclc/551661241 bookfinder.com addall.com booksprice.com
  • 142.
    ~ Don't Eat ThisBook: Fast Food and the Supersizing of America; by Morgan Spurlock http://www.librarything.com/work/18410 http://books.google.com/books?id=LLLuAAAAMAAJ http://www.worldcat.org/oclc/57694996 bookfinder.com addall.com booksprice.com Down to Earth Gardening, United Kingdom; by Lawrence D. Hills http://www.librarything.com/work/2418646 http://books.google.com/books?id=dEkaOQAACAAJ http://www.worldcat.org/oclc/955935 bookfinder.com addall.com booksprice.com Eat Your Roses: Pansies, Lavender, and 49 Other Delicious Edible Flowers; by Denise Schreiber http://www.librarything.com/work/12486309 http://books.google.com/books?id=1QdgSwAACAAJ http://www.worldcat.org/oclc/650215987 bookfinder.com addall.com booksprice.com Edible: An Illustrated Guide to the World's Food Plants; by National Geographic http://www.librarything.com/work/7248157 http://books.google.com/books?id=HORIzBx17DYC http://www.worldcat.org/oclc/212855174 bookfinder.com addall.com booksprice.com Edible and Useful Plants of Texas and the Southwest: A Practical Guide; by Delena Tull http://www.librarything.com/work/1828350 http://books.google.com/books?id=pnnHgcasN-cC http://www.worldcat.org/oclc/39739735 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Edible Estates: Attack on the Front Lawn; by Fritz Haeg http://www.librarything.com/work/4811709 http://books.google.com/books?id=rvM4AQAAIAAJ http://www.worldcat.org/oclc/170057672 bookfinder.com addall.com booksprice.com Edible Flower Garden: From Garden to Kitchen : Choosing, Growing and Cooking Edible Flowers ; by Kathy Brown http://www.librarything.com/work/314753 http://books.google.com/books?id=96rpNwAACAAJ http://www.worldcat.org/oclc/41611171 bookfinder.com addall.com booksprice.com
  • 143.
    ~ Edible Heirlooms: HeritageVegetables for the Maritme Garden; by Bill Thorness http://www.librarything.com/work/10078345 http://books.google.com/books?id=xCobUshBhpoC http://www.worldcat.org/oclc/316035485 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Edible Medicinal and Non-medicinal Plants: Fruits, Volume 3; T. K. Lim http://www.librarything.com/work/12522682 http://books.google.com/books?id=32rWbxUtjeMC http://www.worldcat.org/oclc/777214147 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Edible Plants and Animals: Unusual Foods from Aardvark to Zamia; by A. D. Livingston http://www.librarything.com/work/2245452 http://books.google.com/books?id=BUuSQgAACAAJ http://www.worldcat.org/oclc/27035871 bookfinder.com addall.com booksprice.com Edible Wild Plants of Vietnam: The Bountiful Garden; by Yoshitaka Tanaka http://www.librarything.com/work/6254592 http://books.google.com/books?id=3TddBAAACAAJ http://www.worldcat.org/oclc/85840629 bookfinder.com addall.com booksprice.com Epicure with Hoe: A Gardening Guide to Heirloom Vegetables; by William W. Weaver http://www.worldcat.org/oclc/664376826 Experiments and Observations on Aboriginal Wild Plant Food Utilization in Eastern North America ; by Patrick J Munson; http://books.google.com/books?id=nG8aAQAAIAAJ http://www.worldcat.org/oclc/11249200 Extend Your Garden Season: Row Covers and Mulches; by Fred Stetson http://www.librarything.com/work/1655048 http://books.google.com/books?id=o39si0G_bDkC http://www.worldcat.org/oclc/34029357 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 144.
    ~ Farming in theCity: An Annotated Bibliography of Urban andf Peri-Urban Agriculture in Uganda; by Sarah N. Kimeze http://books.google.com/books?id=FSloIuxaTgIC Feeding Plants the Organic Way; by Jim Hay http://www.librarything.com/work/3175052 http://books.google.com/books?id=sYhFGwAACAAJ http://www.worldcat.org/oclc/24647752 bookfinder.com addall.com booksprice.com Feeding Plants the Organic Way: The Life Story of Britain's Best Known Organic Gardener by Lawrence D. Hills http://www.librarything.com/work/5682765 http://books.google.com/books?id=sAdIAAAAYAAJ http://www.worldcat.org/oclc/20414756 bookfinder.com addall.com booksprice.com Figs, Dates, Laurel, and Myrrh: Plants of the Bible and the Quran; by Lytton John Musselman http://www.librarything.com/work/5159174 http://books.google.com/books?id=bVUXUygxSDMC http://www.worldcat.org/oclc/124538759 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Five Borough Farm: Seeding the Future of Urban Agriculture in New York City by Nevin Cohen http://www.librarything.com/work/12845552 http://books.google.com/books?id=m7eIMAEACAAJ http://www.worldcat.org/oclc/808671055 bookfinder.com addall.com booksprice.com Food in China: A Cultural and Historical Inquiry; by Frederick J. Simoons http://www.librarything.com/work/384515 http://books.google.com/books?id=Fo087ZxohA4C http://www.worldcat.org/oclc/20392910 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Food Plants of the Sonoran Desert; by Wendy C Hodgson http://www.librarything.com/work/1969053 http://books.google.com/books?id=_cq3v-RH5nMC http://www.worldcat.org/oclc/43569323 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 145.
    ~ For Hunger-Proof Cities:Sustainable Urban Food Systems; by Mustafa Koc http://www.librarything.com/work/4558450 http://books.google.com/books?id=yr9D2-ZK4AwC http://www.worldcat.org/oclc/52110558 bookfinder.com addall.com booksprice.com Forest Gardening: Rediscovering Nature and Community in a Post-industrial Age; by Robert A. de J. Hart http://www.librarything.com/work/491105 http://books.google.com/books?id=vyVsAAAACAAJ http://www.worldcat.org/oclc/34933167 bookfinder.com addall.com booksprice.com Forgotten Fruit. The English Orchard and Fruit Garden; by Francesca Greenoak http://www.librarything.com/work/1707600 http://books.google.com/books?id=o3MjAQAAMAAJ http://www.worldcat.org/oclc/10753259 bookfinder.com addall.com booksprice.com Forgotten Fruits: The Stories Behind Britain's Traditional Fruit and Vegetables: A Guide to Britain's Traditional Fruit and Vegetables from Orange Jelly Gooseberries and Dan's Mistake Turnips ; by Christopher Stocks http://www.librarything.com/work/6000509 http://books.google.com/books?id=BqXHEkczrjMC http://www.worldcat.org/oclc/191891319 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com From the Ground Up: How Ireland is Growing Its Own: by Fionnuala Fallon http://books.google.com/books?id=rhBNLwEACAAJ http://www.worldcat.org/oclc/781501003 From Grass to Gardens: How to Reap Bounty from a Small Yard; by Janet Lembke http://www.librarything.com/work/3994542 http://books.google.com/books?id=an6TnsAzW9wC http://www.worldcat.org/oclc/61704762 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 146.
    ~ Fruit and ItsCultivation; The Cultivation of All Kinds of Hardy Fruits in Garden and Orchard ; by Thomas William Sanders http://www.librarything.com/work/9862736 http://books.google.com/books?id=5JKduAAACAAJ http://www.worldcat.org/oclc/3021006 bookfinder.com addall.com booksprice.com Fruits And Vegetables: IARC Handbook of Cancer Prevention; by IARC http://www.librarything.com/work/8566127 http://books.google.com/books?id=RiKjvAzzwFYC http://www.worldcat.org/oclc/55228997 bookfinder.com addall.com booksprice.com Fruit and Vegetables for Scotland: What to Grow and How to Grow It; by Kenneth Cox http://www.librarything.com/work/12646142 http://books.google.com/books?id=iyWUtgAACAAJ http://www.worldcat.org/oclc/806457656 bookfinder.com addall.com booksprice.com Fruit and Vegetable Juice Therapy; by N. N. Saha http://www.librarything.com/work/2868132 http://books.google.com/books?id=C3oaSEWJaNwC http://www.worldcat.org/oclc/469651828 bookfinder.com addall.com booksprice.com Fruit and Vegetable Juice Therapy: Curative and Healing Powers of Fruit and Vegetables in Ensuring a Healthy Body and Glowing Skin; by Syed Aziz Ahmad http://books.google.com/books?id=L7w-QuPX3rAC http://www.worldcat.org/oclc/59345018 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Fruits and Vegetables in Ancient India; by Priya Vrat Sharma http://www.librarything.com/work/6678169 http://books.google.com/books?id=lhkumfD4TbIC http://www.worldcat.org/oclc/6377881 bookfinder.com addall.com booksprice.com Fruits and Vegetables in Brazil: A Special Report; by K J Kadow http://books.google.com/books?id=XPu8lwEACAAJ http://www.worldcat.org/oclc/6293533
  • 147.
    ~ Fruits of Queensland;by Albert H. Benson http://books.google.com/books?id=pMdBAAAAIAAJ http://www.worldcat.org/oclc/263027274 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Garden Mulches and Compost; by Duane Hatch http://books.google.com/books?id=Pc7EGwAACAAJ http://www.worldcat.org/oclc/10854138 Garden Seed Inventory: Inventory Of Seed Catalogs Listing All Non-Hybrid Vegetable Seeds, Available in the United States and Canada; by Kent Whealy http://www.librarything.com/work/1004841 http://books.google.com/books?id=ZYlFAQAAIAAJ http://www.worldcat.org/oclc/18117099 bookfinder.com addall.com booksprice.com Gardening: Naturally; by D. X. Fenten http://www.librarything.com/work/12234407 http://books.google.com/books?id=r8vfpcnFpUoC http://www.worldcat.org/oclc/538910 bookfinder.com addall.com booksprice.com Gardening Guide: All the Year Round Flowers, Fruit, Vegetables; by Cecil Henry Middleton http://www.librarything.com/work/5424521 http://books.google.com/books?id=oCklpwAACAAJ http://www.worldcat.org/oclc/30255590 bookfinder.com addall.com booksprice.com Gardening in School All Year Round: An Annual Programme of Gardening Activities Suitable for Primary School; by Clare Revera http://books.google.com/books?id=Aow-YgEACAAJ http://www.worldcat.org/oclc/696740429 Gardening on Pavement, Tables, and Hard Surfaces: by George Schenk http://www.librarything.com/work/2260721 http://books.google.com/books?id=cMEWV-ima-MC http://www.worldcat.org/oclc/51967398 bookfinder.com addall.com booksprice.com
  • 148.
    ~ Gardening with Compost;by Frederic Charles King http://www.librarything.com/work/5355240 http://books.google.com/books?id=tmA9PQAACAAJ http://www.worldcat.org/oclc/4878042 bookfinder.com addall.com booksprice.com Gardening with Composts, Mulches, and Row Covers; by by N S Mansour http://books.google.com/books?id=6GFLOAAACAAJ http://www.worldcat.org/oclc/15145090 Gardening with Conscience: The Organic-Intensive Method; by Marny Smith http://www.librarything.com/work/2971154 http://books.google.com/books?id=yuYTAAAACAAJ http://www.worldcat.org/oclc/7280839 bookfinder.com addall.com booksprice.com Gardening With Heirloom Plants; by David Stuart http://www.librarything.com/work/1857555 http://books.google.com/books?id=bOEKAAAACAAJ http://www.worldcat.org/oclc/37220757 bookfinder.com addall.com booksprice.com Gardening with Heirloom Seeds: Tried-and-True Flowers, Fruits, and Vegetables for a New Generation; by Lynn Coulter http://www.librarything.com/work/1857555 http://books.google.com/books?id=ktF6PfQcDcYC http://www.worldcat.org/oclc/62281621 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Gardening with Old Roses; by John Scarman http://www.librarything.com/work/403852 http://books.google.com/books?id=N4tCAAAACAAJ http://www.worldcat.org/oclc/41465587 bookfinder.com addall.com booksprice.com Garlic Healing Powers; by Bernard Jensen http://www.librarything.com/work/10452504 http://books.google.com/books?id=VkdvPQAACAAJ http://www.worldcat.org/oclc/30737968 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 149.
    ~ Gathering: Memoir ofa Seed Saver; by Diane Ott Whealy http://www.librarything.com/work/11603514 http://books.google.com/books?id=_ygdKQEACAAJ http://www.worldcat.org/oclc/719429780 bookfinder.com addall.com booksprice.com Gene Logsdon's Practical Skills: A Revival of Forgotten Crafts, Techniques, and Traditions; by Gene Logsdon http://www.librarything.com/work/121468 http://books.google.com/books?id=HtZKAAAACAAJ http://www.worldcat.org/oclc/12022124 bookfinder.com addall.com booksprice.com Genetic Resources and Utilization of Underutilized Crops in Southern and Eastern Africa ; by Kenneth R. M. Anthony http://books.google.com/books?id=tRzrAAAACAAJ http://www.worldcat.org/oclc/42424013 Getting Food From Water: A Guide to Backyard Aquaculture; by Gene Logsdon http://www.librarything.com/work/916666 http://books.google.com/books?id=P78vAAAAYAAJ http://www.worldcat.org/oclc/4036797 bookfinder.com addall.com booksprice.com Good Housekeeping's Unusual Vegetables: How to Grow, how to Cook; by Good Housekeeping http://www.librarything.com/work/3435289 http://books.google.com/books?id=R1TVMgEACAAJ http://www.worldcat.org/oclc/40829280 bookfinder.com addall.com booksprice.com Greening the Garden: A Guide to Sustainable Growing; by Dan Jason http://www.librarything.com/work/1646110 http://books.google.com/books?id=qQE5AQAAIAAJ http://www.worldcat.org/oclc/26807478 bookfinder.com addall.com booksprice.com Greening of the Revolution: Cuba's Experiment with Organic Agriculture; by Peter Rossett http://www.librarything.com/work/1156025 http://books.google.com/books?id=JP9gAAAAMAAJ
  • 150.
    ~ Grow Fruits andVegetables the Way They Used to Taste; by John Festus Adams http://www.librarything.com/work/3720768 http://books.google.com/books?id=2f9HAAAAYAAJ http://www.worldcat.org/oclc/17871706 bookfinder.com addall.com booksprice.com Grow Organic: Over 250 Tips and Ideas for Growing Flowers, Veggies, Lawns and More ; by Doug Oster http://www.librarything.com/work/2882100 http://books.google.com/books?id=YANEAAAACAAJ http://www.worldcat.org/oclc/122256399 bookfinder.com addall.com booksprice.com Grow Your Own Fruit and Veg: Teach Yourself; by Michael Thurlow http://www.librarything.com/work/11512911 http://books.google.com/books?id=D4K2ssHLuD8C http://www.worldcat.org/oclc/649802943 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Grow Your Own Fruit and Veg in Plot, Pots or Growbags: The A-Z Guide to Growing and Cooking Farm-fresh Food; by Steve Ott http://www.librarything.com/work/8240710 http://books.google.com/books?id=JE9yNwAACAAJ http://www.worldcat.org/oclc/244653116 bookfinder.com addall.com booksprice.com Grow Your Own Fruit and Vegetables, United Kingdom; by Lawrence D. Hills http://www.librarything.com/work/2677282 http://books.google.com/books?id=g0M3RWDO0q0C http://www.worldcat.org/oclc/1805959 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Grow Your Vegetables: For Your Nutritional and Financial Health; by Rod Stone ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Growing Diversity: Genetic Resources and Local Food Security; by David Cooper http://www.librarything.com/work/507525 http://books.google.com/books?id=gaMfAQAAIAAJ http://www.worldcat.org/oclc/29475405 bookfinder.com addall.com booksprice.com
  • 151.
    ~ Growing Food forHealth and Pleasure: A Comprehensive Guide to Practical Organic Gardening; by Harold Hart http://www.librarything.com/work/6303297 http://books.google.com/books?id=9vS9OQAACAAJ http://www.worldcat.org/oclc/257662 bookfinder.com addall.com booksprice.com Growing Old Fashioned Roses: In Australia and New Zealand; by Trevor Nottle http://www.librarything.com/work/3070548 http://books.google.com/books?id=Lhy5GQAACAAJ http://www.worldcat.org/oclc/27607900 bookfinder.com addall.com booksprice.com Growing Uncommon Fruits and Vegetables in Australia; by Keith Smith http://www.librarything.com/work/2559916 http://books.google.com/books?isbn=1864363541 http://www.worldcat.org/oclc/768488040 bookfinder.com addall.com booksprice.com Growing Unusual Vegetables; by Alan Wilbur http://books.google.com/books?id=C4sqOQAACAAJ http://www.worldcat.org/oclc/7395531 Growing Unusual Vegetables; by Ralph Whitlock http://books.google.com/books?id=aggkNAAACAAJ http://www.worldcat.org/oclc/16436555 Growing Unusual Vegetables: Weird and Wonderful Vegetables and How to Grow Them; by Simon Hickmott http://www.librarything.com/work/857014 http://books.google.com/books?id=USssAAAACAAJ http://www.worldcat.org/oclc/56197407 bookfinder.com addall.com booksprice.com Growing Your Own Heirloom Vegetables: Bringing Carbon Dioxide Down to Earth ; by Clive Blazey http://www.librarything.com/work/8166834 http://books.google.com/books?id=JEktOQAACAAJ http://www.worldcat.org/oclc/255966637 bookfinder.com addall.com booksprice.com
  • 152.
    ~ Guide to IndianHerbs; by Raymond Stark http://www.librarything.com/work/3095345 http://books.google.com/books?id=zvY6AQAAIAAJ http://www.worldcat.org/oclc/8629696 bookfinder.com addall.com booksprice.com Handy Farm Devices: And How to Make Them; by Rolfe Cobleigh http://www.librarything.com/work/99433 http://books.google.com/books?id=N2w2lwEACAAJ http://www.worldcat.org/oclc/33010298 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Health Benefits and Healing Power of Fruits and Vegetables: Inflammation, Anti-aging, High Blood Pressure and Much More; by Jack LaGrande ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Herbal Harvest: Commercial Organic Production of Quality Dried Herbs; by Greg Whitten http://www.librarything.com/work/2049495 http://books.google.com/books?id=DCkjAQAAMAAJ http://www.worldcat.org/oclc/55687840 bookfinder.com addall.com booksprice.com Heritage and Dwarf Fruit Trees for Urban Backyards and Small Orchards; by Peter Allen http://www.google.com http://www.bing.com Heirloom Beans: Great Recipes for Dips and Spreads, Soups and Stews, Salads and Salsas, and Much More from Rancho Gordo; by Steve Sando http://www.librarything.com/work/6151381 http://books.google.com/books?id=x4qDu_odrX8C http://www.worldcat.org/oclc/212410193 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Heirloom Country Gardens: Timeless Treasures for Today's Gardeners; by Sarah Wolfgang Heffner, Rodale Organic Gardening Magazine http://www.librarything.com/work/392323 http://books.google.com/books?id=rGAlAQAAMAAJ http://www.worldcat.org/oclc/41835124 bookfinder.com addall.com booksprice.com
  • 153.
    ~ Heirloom Fruits andVegetables; by Toby Musgrave http://www.librarything.com/work/12678782 http://books.google.com/books?id=EITkygAACAAJ http://www.worldcat.org/oclc/767564464 bookfinder.com addall.com booksprice.com Heirloom Flavor: Yesterday's Best-Tasting Vegetables, Fruits, and Herbs for Today's Cook; by Doreen G. Howard http://books.google.com/books?id=kEXuuSFzj2kC http://www.worldcat.org/oclc/648923688 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Heirloom Gardens: Simple Secrets for Old-Fashioned Flowers and Vegetables; by Mimi Luebbermann, http://www.librarything.com/work/678683 http://books.google.com/books?id=mQhIAAAAYAAJ http://www.worldcat.org/oclc/35638091 bookfinder.com addall.com booksprice.com Heirloom Gardening in the South: Yesterday's Plants for Today's Gardens; by William C. Welch http://www.librarything.com/work/11463888 http://books.google.com/books?id=_6nQ681qy-4C http://www.worldcat.org/oclc/649419454 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Heirloom Herbs: Using Old Fashioned Herbs in Gardens, Recipes and Decorations ; by Mary Forsell, http://www.librarything.com/work/109040 http://books.google.com/books?id=YQ1IAAAAYAAJ http://www.worldcat.org/oclc/21409492 bookfinder.com addall.com booksprice.com Heirloom Roses: A Passion for Roses; by Rayford Clayton Reddell http://www.librarything.com/work/1355722 http://books.google.com/books?id=5ek4AQAAIAAJ http://www.worldcat.org/oclc/39181655 bookfinder.com addall.com booksprice.com Heirloom Seeds and Their Keepers: Marginality and Memory in the Conservation of Biological Diversity; by Virginia Dimasuay Nazarea http://www.librarything.com/work/5983186 http://books.google.com/books?id=j3IxSgc4cOsC http://www.worldcat.org/oclc/56967130 bookfinder.com addall.com booksprice.com
  • 154.
    ~ Heirloom Vegetables: AHome Gardener's Guide to Finding and Growing Vegetables from the Past; by Sue Stickland http://www.librarything.com/work/141693 http://books.google.com/books?id=dwZIAAAAYAAJ http://www.worldcat.org/oclc/37310883 bookfinder.com addall.com booksprice.com Heritage Apples: A New Sensation; by Susan Lundy http://books.google.com/books?id=iDjOK5EVDqkC http://www.worldcat.org/oclc/819846451 Heritage Fruits and Vegetables; by Toby Musgrave http://www.librarything.com/work/12678782 http://books.google.com/books?isbn=0500516138 http://www.worldcat.org/oclc/819846451 bookfinder.com addall.com booksprice.com Heritage Gardening: With an Illustrated Directory of Heirloom Flowers, Fruit and Vegetables ; by Judyth A. McLeod http://www.librarything.com/work/11845034 http://books.google.com/books?id=aKZWAgAACAAJ http://www.worldcat.org/oclc/38351815 bookfinder.com addall.com booksprice.com Heritage Roses in Australia; by International Heritage Rose Conference http://books.google.com/books?id=vjZaAAAACAAJ http://www.worldcat.org/oclc/220384734 Heritage Vegetables: The Gardener's Guide to Cultivating Diversity; by Sue Strickland http://www.librarything.com/work/363583 http://books.google.com/books?id=TgZIAAAAYAAJ High-Yield Gardening: How to Get More from Your Garden Space and More from Your Gardening Season by Marjorie B. Hunt http://books.google.com/books?id=HwNIAAAAYAAJ http://www.worldcat.org/oclc/12751397
  • 155.
    ~ Home Food Systems:Rodale's Catalog of Methods and Tools for Producing, Processing, and Preserving Naturally Good Foods; by Roger B. Yepsen http://www.librarything.com/work/1642031 http://books.google.com/books?id=T7KHPwAACAAJ http://www.worldcat.org/oclc/6602735 bookfinder.com addall.com booksprice.com Home Power; by Rodale Organic Gardening Magazine http://www.librarything.com/work/7483922 http://books.google.com/books?id=D6qrHAAACAAJ http://www.worldcat.org/oclc/184759826 bookfinder.com addall.com booksprice.com Homepower http://www.homepower.com Homeschoolers, Hippies, and Heirloom Tomatoes; by Philip Ward Newton http://books.google.com/books?isbn=1935909401 http://www.worldcat.org/oclc/806323060 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Homesweet Homegrown: How to Grow, Make and Store Food Your Own Food, No Matter Where You Live; by Jennifer Biggs http://www.librarything.com/work/12670275 http://books.google.com/books?id=zjQQywAACAAJ http://www.worldcat.org/oclc/781500741 bookfinder.com addall.com booksprice.com How to Buy Solar Heating Without Getting Burnt; by Malcolm Wells http://www.librarything.com/work/899506 http://books.google.com/books?id=7cxSAAAAMAAJ http://www.worldcat.org/oclc/781500741 bookfinder.com addall.com booksprice.com How to Farm your Backyard the Mulch-Organic Way; by Max Alth http://books.google.com/books?id=qcQi0JqAh1oC http://www.worldcat.org/oclc/2189377 How to Grow Beans and Peas: Planting and Growing Organic Green Beans, Sugar Snap Peas, and Heirloom Dry Beans and Peas; by R.J. Ruppenthal http://www.librarything.com/work/13554588 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 156.
    ~ How to GrowFood in Your Polytunnel: All Year Round; by Mark Gatter http://www.librarything.com/work/11138597 http://books.google.com/books?id=aVBNSAAACAAJ http://www.worldcat.org/oclc/610835244 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How To Grow Sexy Tomatoes Upside Down, And Get A Bumper Crop; Brian Morris ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How to Grow Vegetables and Fruits by the Organic Method; by Rodale Organic Gardening Magazine http://www.librarything.com/work/997045 http://books.google.com/books?id=DPRHAAAAYAAJ http://www.worldcat.org/oclc/171305 bookfinder.com addall.com booksprice.com How to Grow Vegetables Organically; by Jeff Cox http://www.librarything.com/work/634076 http://books.google.com/books?id=_yBDAAAACAAJ http://www.worldcat.org/oclc/16803517 bookfinder.com addall.com booksprice.com How to Save Your Own Seeds: A Handbook for Home Seed Production; by Diane Joubert, Seeds of Diversity Canada http://www.librarything.com/work/5713984 http://books.google.com/books?id=xNxJAAAAYAAJ http://www.worldcat.org/oclc/22705502 bookfinder.com addall.com booksprice.com Howard Garrett's Texas Organic Gardening; by Howard Garrett http://www.librarything.com/work/3909479 http://books.google.com/books?id=pBkHAAAACAAJ http://www.worldcat.org/oclc/25788833 bookfinder.com addall.com booksprice.com In Search of Lost Roses; by Thomas Christopher http://www.librarything.com/work/290178 http://books.google.com/books?id=MtBgyNQiF80C http://www.worldcat.org/oclc/19778377 bookfinder.com addall.com booksprice.com
  • 157.
    ~ Indigenous Fruit Treesin the Tropics: Domestication, Utilization and Commercialization; by Festus K Akinnifesi http://books.google.com/books?id=wKHs1gLiYYkC http://www.worldcat.org/oclc/647686009 Innovative Methods for Propagating Potatoes; by International Potato Center http://books.google.com/books?id=YkTQNlWB7QoC http://www.worldcat.org/oclc/13556929 Intensive Gardening Round the Year; by Paul Doscher http://www.librarything.com/work/2642565 http://books.google.com/books?id=pzgjAQAAMAAJ http://www.worldcat.org/oclc/6735397 bookfinder.com addall.com booksprice.com IPM for Schools: A How-to Manual; by Sheila Daar http://books.google.com/books?id=RwYRHAAACAAJ http://www.worldcat.org/oclc/425255912 It Started in Eden: How the Plant Hunters and the Plants They Found Changed the Course of History; by Bertha Sanford Dodge http://www.librarything.com/work/5938371 http://books.google.com/books?id=mh5tAAAAMAAJ http://www.worldcat.org/oclc/5008248 bookfinder.com addall.com booksprice.com Jim Johnson's Heirloom Vegetable Guide; by Jim Johnson http://books.google.com/books?id=ab8LtwAACAAJ http://www.worldcat.org/oclc/6572162 Juice Fasting and Detoxification: Use the Healing Power of Fresh Juice to Feel Young and Look Great; by Steve Meyerowitz http://www.librarything.com/work/313425 http://books.google.com/books?id=yrO-YuI33SsC http://www.worldcat.org/oclc/41821606 bookfinder.com addall.com booksprice.com
  • 158.
    ~ Kids' Container Gardening:Year-Round Projects for Inside and Out; by Cindy Krezel http://www.librarything.com/work/1625136 http://books.google.com/books?id=kQIaQgAACAAJ http://www.worldcat.org/oclc/57549488 bookfinder.com addall.com booksprice.com Lawn Beauty: The Organic Way; by Glenn F. Johns http://www.librarything.com/work/12097063 http://books.google.com/books?id=fnQlAQAAMAAJ http://www.worldcat.org/oclc/125988 bookfinder.com addall.com booksprice.com Lawn Food Cook Book: Groceries in the Backyard; by Linda Runyon http://www.librarything.com/work/3712089 http://books.google.com/books?id=lSJPRAAACAAJ http://www.worldcat.org/oclc/13582289 bookfinder.com addall.com booksprice.com Let's Get Growing: A Dirt-Under-The-Nails Primer to Raising Vegetables, Fruits and Flowers Organically; by Crow Miller http://www.librarything.com/work/230832 http://books.google.com/books?id=kN_nNAAACAAJ http://www.worldcat.org/oclc/31517800 bookfinder.com addall.com booksprice.com Lost Crops of Africa, Volume I: Grains http://www.librarything.com/work/5845213 http://books.google.com/books?id=87ou6aEaze8C http://www.worldcat.org/oclc/439351797 bookfinder.com addall.com booksprice.com Lost Crops of Africa, Volume II: Vegetables http://www.librarything.com/work/6772813 http://books.google.com/books?id=e-UjAQAAMAAJ http://www.worldcat.org/oclc/85851965 bookfinder.com addall.com booksprice.com Lost Crops of Africa, Volume III: Fruits; by National Research Council http://www.librarything.com/work/7788674 http://books.google.com/books?id=MqGLARzj-6sC http://www.worldcat.org/oclc/798306541 bookfinder.com addall.com booksprice.com
  • 159.
    ~ Lost Crops ofthe Incas: Little-known Plants of the Andes With Promise for Worldwide Cultivation ; by National Research Council http://www.librarything.com/work/819947 http://books.google.com/books?id=iT0rAAAAYAAJ http://www.worldcat.org/oclc/20397360 bookfinder.com addall.com booksprice.com Maintaining Your Dwarf Fruit Orchard; by Lawrence Southwick, Storey Publishing http://books.google.com/books?id=O0cr0jMYos0C ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Making Vegetables (Volume 1): Germinating Heirloom Seeds and Growing a Sustainable Garden the Organic Way; by Shoshanna Easling http://books.google.com/books?id=ZZiiuAAACAAJ http://www.worldcat.org/oclc/811739619 Melons, An Heirloom Gallery for the Passionate Grower: With Practical Advice on Growing, Pollinating, Picking, and Preparing; by Amy Goldman http://www.librarything.com/work/711917 http://books.google.com/books?id=xqG22Ah3Hx4C http://www.worldcat.org/oclc/48706948 bookfinder.com addall.com booksprice.com Month-by-month Guide to Organic Gardening: The Green Gardener's Calendar, United Kingdom; by Lawrence D. Hills http://www.librarything.com/work/3434652 http://books.google.com/books?id=BAJhHwAACAAJ http://www.worldcat.org/oclc/59174997 bookfinder.com addall.com booksprice.com Native American Ethnobotany: A Database Of Foods, Drugs, Dyes And Fibers Of Native American Peoples, Derived From Plants; by Daniel E Moerman http://www.librarything.com/work/12880811 http://books.google.com/books?id=UXaQat5icHUC http://www.worldcat.org/oclc/38002531 bookfinder.com addall.com booksprice.com
  • 160.
    ~ Native American Gardening:Buffalobird-Woman's Guide To Traditional Methods; by Gilbert L. Wilson http://books.google.com/books?id=lQMFMDGvoccC http://www.worldcat.org/oclc/57564915 Native American Gardening: Stories, Projects, and Recipes for Families ; by Michael J. Caduto http://www.librarything.com/work/1445555 http://books.google.com/books?id=4TNTbLYvufgC http://www.worldcat.org/oclc/33665323 bookfinder.com addall.com booksprice.com Native Harvest: Authentic Southwestern Gardening; by Kevin Dahl http://www.librarything.com/work/3110507 http://books.google.com/books?id=1583690603 http://www.worldcat.org/oclc/57577355 bookfinder.com addall.com booksprice.com Natural Gardening Handbook: Mulching and Composting, How To Use Organic Fertilizers, Pest Control Without Synthetics, Soil Testing Laboratories: by Robert A. Wearne http://www.librarything.com/work/11270407 http://books.google.com/books?id=SXRoPQAACAAJ http://www.worldcat.org/oclc/38324909 bookfinder.com addall.com booksprice.com New Ideas in Organic Gardening; by Rodale Organic Gardening Magazine http://www.librarything.com/work/2758526 http://books.google.com/books?id=FYzblwEACAAJ http://www.worldcat.org/oclc/7074624 bookfinder.com addall.com booksprice.com Newspaper, Pennies, Cardboard, and Eggs--For Growing a Better Garden: More than 400 New, Fun, and Ingenious Ideas to Keep Your Garden Growing Great All Season Long ; by Roger Yepsen http://www.librarything.com/work/4687168 http://books.google.com/books?id=h3fvGwAACAAJ http://www.worldcat.org/oclc/85692923 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 161.
    ~ New Zealand Guideto Compost Gardening: A Guide to Gardening Without Digging ; by David Hornblow http://www.librarything.com/work/10555384 http://books.google.com/books?id=QyanAQAACAAJ http://www.worldcat.org/oclc/154650512 bookfinder.com addall.com booksprice.com Nourishing Traditions: The Cookbook That Challenges Politically Correct Nutrition and the Diet Dictocrats; by Sally Fallon http://www.librarything.com/work/33864 http://books.google.com/books?id=89GTrR95aIoC http://www.worldcat.org/oclc/49603939 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Old-Fashioned and David Austin Roses; by Barbara Lea Taylor http://www.librarything.com/work/290316 http://books.google.com/books?id=s24xr3dcY6YC http://www.worldcat.org/oclc/53131811 bookfinder.com addall.com booksprice.com Old Fashioned Roses: Their Care and Cultivation; by Amanda Beales http://www.librarything.com/work/1562204 http://books.google.com/books?id=OR85OAAACAAJ http://www.worldcat.org/oclc/20691869 bookfinder.com addall.com booksprice.com Old Roses; by Ethelyn Emery Keays http://www.librarything.com/work/2095267 http://books.google.com/books?id=VVVEAAAAYAAJ http://www.worldcat.org/oclc/1726937 bookfinder.com addall.com booksprice.com Old Roses (Gardens by Design); by Graham Murphy http://www.librarything.com/work/2771300 http://books.google.com/books?id=nYw77SS8HfQC http://www.worldcat.org/oclc/52057129 bookfinder.com addall.com booksprice.com Old Roses: An Illustrated Guide to Varieties, Cultivation and Care, with Step-By-Step Instructions; by Andrew Mikolajski http://www.librarything.com/work/2774399 http://books.google.com/books?id=F5W2lr9du9AC http://www.worldcat.org/oclc/37257666 bookfinder.com addall.com booksprice.com
  • 162.
    ~ Old Roses: TheMaster List; by Brent C. Dickerson http://www.librarything.com/work/2858546 http://books.google.com/books?id=N_m9IAAACAAJ http://www.worldcat.org/oclc/228657825 bookfinder.com addall.com booksprice.com Old Roses and English Roses; by David Austin http://www.librarything.com/work/85575 http://books.google.com/books?id=xMMeQwAACAAJ http://www.worldcat.org/oclc/805472444 bookfinder.com addall.com booksprice.com Old Southern Apples: A Comprehensive History and Description of Varieties for Collectors, Growers, and Fruit Enthusiasts; by Creighton Lee Calhoun, Jr. http://www.librarything.com/work/4210220 http://books.google.com/books?id=XCFYuLbMuZQC http://www.worldcat.org/oclc/31647065 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Old Ways Rediscovered: Valuable Recipes and Information Collected by Three Generations of an American Family; by Clarence Meyer http://www.librarything.com/work/2827063 http://books.google.com/books?id=Fg4hAAAACAAJ http://www.worldcat.org/oclc/18015151 bookfinder.com addall.com booksprice.com Organic Avocado: Resource Guide; http://books.google.com/books?id=anD7PAAACAAJ http://www.worldcat.org/oclc/156741854 Organic Citrus: Resource Guide http://books.google.com/books?id=mB-0PAAACAAJ http://www.worldcat.org/oclc/156741849 Organic Fertilizing Secret of Garden Experts; by Rodale Organic Gardening Magazine http://www.librarything.com/work/10808299 http://books.google.com/books?id=P7EXYAAACAAJ http://www.worldcat.org/oclc/18997575 bookfinder.com addall.com booksprice.com
  • 163.
    ~ Organic Gardening; byCharles W. Basham http://books.google.com/books?id=OlF1lwEACAAJ http://www.worldcat.org/oclc/6772986 Organic Gardening; by Lawrence Donegan Hills http://www.librarything.com/work/658600 http://books.google.com/books?id=As1wQgAACAAJ http://www.worldcat.org/oclc/3772079 bookfinder.com addall.com booksprice.com Organic Gardening: How to Grow Healthy Vegetables,fruits,and Flowers Using Nature's Own Methods; by Organic Gardening Magazine http://www.librarything.com/work/6745681 http://books.google.com/books?id=yuxJAAAAYAAJ http://www.worldcat.org/oclc/561284 bookfinder.com addall.com booksprice.com Organic Gardening - LP: Learn New Gardening Techniques To Give You And Your Family Healthy Fruit, Vegetables, Herbs And Plants; by Patsy Powell http://www.google.com http://www.bing.com bookfinder.com addall.com booksprice.com Organic Gardening and Farming; by Joseph A Cocannouer http://www.librarything.com/work/2813829 http://books.google.com/books?id=DkMtAQAAMAAJ http://www.worldcat.org/oclc/768090461 bookfinder.com addall.com booksprice.com Organic Gardening and Farming: Using Natural Compost to Achieve a Fertile Soil; by George Joseph Binding http://books.google.com/books?id=ufemOAAACAAJ http://www.worldcat.org/oclc/16433071 Organic Gardening Down South: Deep South Gardening the Organic Way; by Nellie Neal http://www.librarything.com/work/6629703 http://books.google.com/books?id=EijAOgAACAAJ http://www.worldcat.org/oclc/245588033 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 164.
    ~ Organic Gardening forCity Dwellers; by Walter Harter http://www.librarything.com/work/3605472 http://books.google.com/books?id=gyulGwAACAAJ http://www.worldcat.org/oclc/629164 bookfinder.com addall.com booksprice.com Organic Gardening for Health and Nutrition: An Introduction to the Method of Bio-dynamic Gardening Inaugurated by Rudolf Steiner http://www.librarything.com/work/2924530 http://books.google.com/books?id=86Y6qCo8-tAC http://www.worldcat.org/oclc/550329 bookfinder.com addall.com booksprice.com Organic Gardening in Australia: The Complete Guide to Natural and Chemical-Free Gardening; by Pauline Pears http://www.librarything.com/work/1456190 http://books.google.com/books?id=TnmkAAAACAAJ http://www.worldcat.org/oclc/62537528 bookfinder.com addall.com booksprice.com Organic Gardening for Kids; by Elizabeth J. Scholl http://www.librarything.com/work/8369060 http://books.google.com/books?isbn=1584158158 http://www.worldcat.org/oclc/302188955 bookfinder.com addall.com booksprice.com Organic Orcharding: A Grove of Trees to Live In; by Gene Logsdon http://www.librarything.com/work/1005577 http://books.google.com/books?id=N_A4AQAAIAAJ http://www.worldcat.org/oclc/7572475 bookfinder.com addall.com booksprice.com Organic Summerfruit: Resource Guide http://www.worldcat.org/oclc/156741857 Oriental Vegetables: The Complete Guide for the Gardening Cook; by Joy Larkcom http://www.librarything.com/work/819973 http://books.google.com/books?id=Reqk636tqWAC http://www.worldcat.org/oclc/23286099 bookfinder.com addall.com booksprice.com
  • 165.
    ~ Our Heritage ofOld Roses; by Judyth A. McLeod http://www.librarything.com/work/3430454 http://books.google.com/books?id=gZE_AAAAYAAJ http://www.worldcat.org/oclc/18569608 bookfinder.com addall.com booksprice.com Passionate Gardening: Good Advice for Challenging Climates; by Lauren Springer http://books.google.com/books?id=p0qDdFXBP-YC http://www.librarything.com/work/177018 http://www.worldcat.org/oclc/42580378 bookfinder.com addall.com booksprice.com Patio Produce: How to Cultivate a Lot of Home-grown Vegetables from the Smallest Possible Space; by Paul Peacock http://www.librarything.com/work/9820106 http://books.google.com/books?id=QL11PAAACAAJ http://www.worldcat.org/oclc/666975438 bookfinder.com addall.com booksprice.com Patio Rooftop and Balcony Gardening; by Violet W. Stevenson http://books.google.com/books?id=aMI_AAAAYAAJ http://www.worldcat.org/oclc/2753543 Pay Dirt: Farming and Gardening with Composts; by Rodale Organic Gardening Magazine http://www.librarything.com/work/1889982 http://books.google.com/books?id=ZhyNuQAACAAJ http://www.worldcat.org/oclc/3441125 bookfinder.com addall.com booksprice.com Planning the Organic Vegetable Garden: For Healthy Crops Throughout the Year; by Dick Kitto http://www.librarything.com/work/1284115 http://books.google.com/books?id=PwNIAAAAYAAJ http://www.worldcat.org/oclc/28854313 bookfinder.com addall.com booksprice.com Plant Hunters In The Andes; by Thomas Harper Goodspeed http://www.librarything.com/work/385738 http://books.google.com/books?id=W_k2OoJIsSYC http://www.worldcat.org/oclc/487689 bookfinder.com addall.com booksprice.com
  • 166.
    ~ Plant Hunting, Volume1; by Ernest H. Wilson http://www.librarything.com/work/9414707 http://books.google.com/books?id=H_IIAAAACAAJ http://www.worldcat.org/oclc/792106871 bookfinder.com addall.com booksprice.com Plant Hunting, Volume 2; by Ernest H. Wilson http://www.librarything.com/work/9414722 http://books.google.com/books?id=Svj0PAAACAAJ http://www.worldcat.org/oclc/791733587 bookfinder.com addall.com booksprice.com Plant Hunting in China: A History of Botanical Exploration in China and the Tibetan Marches; by Euan Hillhouse Methven Cox http://www.librarything.com/work/2261689 http://books.google.com/books?id=_AYQAQAAMAAJ http://www.worldcat.org/oclc/1892343 bookfinder.com addall.com booksprice.com Plant Hunting on the Edge of the World: Travels of a Naturalist in Assam and Upper Burma http://www.librarything.com/work/1741975 http://books.google.com/books?id=HQBHAAAAYAAJ http://www.worldcat.org/oclc/2508235 bookfinder.com addall.com booksprice.com Plants and People of Nepal; by Narayan P. Manandha http://www.librarything.com/work/2248639 http://books.google.com/books?id=klAFeYz4YdYC http://www.worldcat.org/oclc/47136567 bookfinder.com addall.com booksprice.com Plant Genetic Resources Conservation and Use in China; by Weidong Gao http://books.google.com/books?id=-uSQL5cE_7EC http://www.worldcat.org/oclc/54531182 Potatoes on Rooftops: Farming in the City; by Hadley Dyer http://www.librarything.com/work/13294003 http://books.google.com/books?id=hg6xuAAACAAJ http://www.worldcat.org/oclc/780360587 bookfinder.com addall.com booksprice.com
  • 167.
    ~ Potted Plant OrganicCare; by Jody Main http://books.google.com/books?id=jwHjPQAACAAJ http://www.worldcat.org/oclc/5494162 Practical Organic Gardening; by Ben Easey http://www.librarything.com/work/2151831 http://books.google.com/books?id=EKiWPwAACAAJ http://www.worldcat.org/oclc/2597501 bookfinder.com addall.com booksprice.com Practical Organic Gardening; by David Palliser http://www.librarything.com/work/11601590 http://www.worldcat.org/oclc/28926555 Promoting the Conservation and Use of Underutilized and Neglected Crops http://books.google.com/books?id=zZWylgEACAAJ http://www.worldcat.org/oclc/183241733 Producing Your Own Power: How to Make Nature's Energy Sources Work for You ; by Carol Hupping Stoner http://www.librarything.com/work/898813 http://books.google.com/books?id=k6QDlwEACAAJ http://www.worldcat.org/oclc/934750 bookfinder.com addall.com booksprice.com Purple Citrus and Sweet Perfume: Cuisine of the Eastern Mediterranean ; by Silvena Rowe http://www.librarything.com/work/9859257 http://books.google.com/books?id=o8-Q-QgKvH0C http://www.worldcat.org/oclc/670475456 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Quaker Plant Hunters: From North America's Early Frontier to the South Pacific; by David Sox http://www.librarything.com/work/5706424 http://books.google.com/books?id=7P8fAQAAIAAJ http://www.worldcat.org/oclc/55222778 bookfinder.com addall.com booksprice.com
  • 168.
    ~ Rapid Tomato Ripeningfor Nurseryman and Amateur. With Notes on Possible Application to Other Fruit; by Lawrence D. Hills http://books.google.com/books?id=2DMQMwEACAAJ http://www.worldcat.org/oclc/8015039 Recovering Our Ancestors' Gardens: Indigenous Recipes And Guide to Diet And Fitness; by Devon Abbott Mihesuah http://www.librarything.com/work/3146467 http://books.google.com/books?id=OKoiCm09p6sC http://www.worldcat.org/oclc/62147981 bookfinder.com addall.com booksprice.com Redwoods and Roses: The Gardening Heritage of California and the Old West ; by Maureen Gilmer http://www.librarything.com/work/7525672 http://books.google.com/books?id=bsI-TTBhJ-8C http://www.worldcat.org/oclc/32822463 bookfinder.com addall.com booksprice.com RHS Grow Your Own Crops in Pots: with 30 Step-by-Step Projects Using Vegetables, Fruit and Herbs; by Kay Maguire http://books.google.com/books?id=ZqZxMAEACAAJ ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Rodale's Encyclopedia of Indoor Gardening; by Anne Moyer Halpin http://www.librarything.com/work/1240753 http://books.google.com/books?isbn=0878573194 http://www.worldcat.org/oclc/6421388 bookfinder.com addall.com booksprice.com Rodale's Illustrated Encyclopedia of Herbs; by Claire Kowalchik http://www.librarything.com/work/44867 http://books.google.com/books?id=htGD3Y7WNxwC http://www.worldcat.org/oclc/16128781 bookfinder.com addall.com booksprice.com Rodale's Illustrated Encyclopedia of Organic Gardening; by Anna Kruger http://www.librarything.com/work/1335949 http://books.google.com/books?id=kcHZAAAACAAJ http://www.worldcat.org/oclc/49936222 bookfinder.com addall.com booksprice.com
  • 169.
    ~ Roots: The DefinitiveCompendium with more than 225 Recipes; by Diane Morgan http://www.librarything.com/work/12965169 http://books.google.com/books?id=EvaYfje1TCIC http://www.worldcat.org/oclc/783157666 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Roots, Shoots, Buckets and Boots: Gardening Together With Children; by Sharon Lovejoy http://www.librarything.com/work/32322 http://books.google.com/books?id=gQ6bCIOo7xUC http://www.worldcat.org/oclc/40856801 bookfinder.com addall.com booksprice.com Russian Comfrey: A Hundred Tons an Acre of Stock Feed or Compost for Farm, Garden or Small- holding; by Lawrence D. Hills http://www.librarything.com/work/9779309 http://books.google.com/books?id=RbdrQgAACAAJ http://www.worldcat.org/oclc/630857 bookfinder.com addall.com booksprice.com Save Your Own Seed, United Kingdom; by Lawrence Donegan Hills http://www.librarything.com/work/10627157 http://books.google.com/books?id=toauMwEACAAJ http://www.worldcat.org/oclc/16431723 bookfinder.com addall.com booksprice.com Secrets of Master Gardeners; by Rodale Organic Gardening Magazine http://www.librarything.com/work/2685007 http://books.google.com/books?id=k2gjAQAAMAAJ http://www.worldcat.org/oclc/10208123 bookfinder.com addall.com booksprice.com Seed Production for the Australian Home Vegetable Gardener; by Allen Barry http://www.librarything.com/work/4683126 http://books.google.com/books?id=jpsgAQAACAAJ http://www.worldcat.org/oclc/27611231 bookfinder.com addall.com booksprice.com Seed Saving Techniques of the National Colonial Farm; by Mary Ann Klein http://books.google.com/books?id=dhRIAAAAYAAJ http://www.worldcat.org/oclc/13029646
  • 170.
    ~ Seeds: The DefinitiveGuide To Growing, History, And Lore; by H. Peter Loewer http://www.librarything.com/work/1933582 http://books.google.com/books?id=Yorr0tXFx2IC http://www.worldcat.org/oclc/33007755 bookfinder.com addall.com booksprice.com Seeds Blüm: Heirloom Seeds and Other Garden Gems, 1989-90; by Jan Blüm http://books.google.com/books?id=mFUEHAAACAAJ http://www.worldcat.org/oclc/41769983 Sonoran Desert Food Plants: Edible Uses for the Desert's Wild Bounty; by Charles W. Kane http://www.librarything.com/work/12390574 http://books.google.com/books?id=DpgqKQEACAAJ http://www.worldcat.org/oclc/721825958 bookfinder.com addall.com booksprice.com South Indian Fruits and Their Culture; by Kullal Chickappu Naik http://books.google.com/books?id=WhpBAAAAYAAJ http://www.worldcat.org/oclc/151839 Sowing Seeds for Change: Sustainable Agriculture, Biodiversity and Food Security; by Unitarian Service Committee of Canada http://books.google.com/books?id=ZsD3MgAACAAJ http://www.worldcat.org/oclc/181786488 Small Green Roofs: Low-Tech Options for Homeowners; by Nigel Dunnett http://www.librarything.com/work/11164186 http://books.google.com/books?id=ENYxgGk_5DMC http://www.worldcat.org/oclc/666223954 bookfinder.com addall.com booksprice.com Small Is Bountiful: Grow Your Own Vegetables and Fruit in Small Spaces; by Liz Dobbs http://www.librarything.com/work/12500919 http://books.google.com/books?id=-4xNtQAACAAJ http://www.worldcat.org/oclc/762992186 bookfinder.com addall.com booksprice.com
  • 171.
    ~ Small-Space Gardening: HowTo Successfully Grow Flowers And Fruits In Containers And Pots; by H. Peter Loewer http://www.librarything.com/work/177197 http://books.google.com/books?id=F2F8vBXKNn4C http://www.worldcat.org/oclc/51258326 bookfinder.com addall.com booksprice.com Small-Space Container Gardens: Transform Your Balcony, Porch, or Patio with Fruits, Flowers, Foliage, and Herbs; by Fern Richardson http://www.librarything.com/work/12036792 http://books.google.com/books?id=JfWtESZLP4EC http://www.worldcat.org/oclc/704380959 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Soil Fertility, Renewal & Preservation. Bio-dynamic Farming and Gardening; by Ehrenfried Pfeiffer http://www.librarything.com/work/9469391 http://books.google.com/books?id=zKsIMwEACAAJ http://www.worldcat.org/oclc/12449048 bookfinder.com addall.com booksprice.com Sprouts The Miracle Food: The Complete Guide to Sprouting; by Steve Meyerowitz http://www.librarything.com/work/1036396 http://www.bookfinder.com http://books.google.com/books?id=dkzs8HHDDtsC http://www.worldcat.org/oclc/42694430 Step by Step Organic Vegetable Gardening: The Gardening Classic Revised; by Shepherd Ogden http://www.librarything.com/work/118018 http://www.bookfinder.com http://books.google.com/books?id=REeAu6rjifQC http://www.worldcat.org/oclc/25914761 bookfinder.com addall.com booksprice.com Sunshine to Dollars: Capturing Free Solar Energy at Little Or No Cost; by Steven E. Harris http://www.librarything.com/work/2495217 http://books.google.com/books?id=_4UWMwAACAAJ http://www.worldcat.org/oclc/692637668 bookfinder.com addall.com booksprice.com Super Nutrition Gardening: How to Grow Your Own Powercharged Foods; by Dr. William S. Peavy http://www.librarything.com/work/509355 http://books.google.com/books?id=YSHVGuHLBkQC http://www.worldcat.org/oclc/26303775 bookfinder.com addall.com booksprice.com
  • 172.
    ~ Survival Gardening; byJohn A. Freeman http://www.librarything.com/work/755306 http://books.google.com/books?id=6q8QAQAAMAAJ http://www.worldcat.org/oclc/10244668 bookfinder.com addall.com booksprice.com Suppliers of organic, non-GE, or heirloom vegetable seed; by Katherine L Adam http://books.google.com/books?id=zeVXHQAACAAJ http://www.worldcat.org/oclc/46956657 Survival Acre: 50 Nationwide Wild Foods and Medicines; by Linda Runyon http://www.librarything.com/work/2924946 http://books.google.com/books?id=5YVcSnpt7Z4C http://www.worldcat.org/oclc/525219531 bookfinder.com addall.com booksprice.com Success with Organic Fruit; by Yvonne Cuthbertson http://www.librarything.com/work/3323832 http://books.google.com/books?id=vVcmAAAACAAJ http://www.worldcat.org/oclc/85839068 bookfinder.com addall.com booksprice.com Sustainable Agriculture and Resistance: Transforming Food Production in Cuba; by Fernando Funes http://www.librarything.com/work/1314816 http://books.google.com/books?id=U0FgAAAAMAAJ http://www.worldcat.org/oclc/48557628 bookfinder.com addall.com booksprice.com Sustainable Market Farming: Intensive Vegetable Production on a Few Acres; by Lynn Byczynski http://www.librarything.com/work/13371090 http://books.google.com/books?id=JlIwbBcglxEC http://www.worldcat.org/oclc/816764351 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Taylor's Pocket Guide to Old-Fashioned Roses; by Maggie Oster http://www.librarything.com/work/5162346 http://books.google.com/books?id=9HEjAQAAMAAJ http://www.worldcat.org/oclc/20998199 bookfinder.com addall.com booksprice.com
  • 173.
    ~ Taylor's Guide toHeirloom Vegetables: A Complete Guide to the Best Historic and Ethnic Varieties; by Benjamin A Watson http://www.librarything.com/work/258380 http://books.google.com/books?id=wTYcr8mgXbcC http://www.worldcat.org/oclc/32891387 bookfinder.com addall.com booksprice.com Texas Fruit and Vegetable Gardening: Plant, Grow, and Eat the Best Edibles for Texas Gardens ; by Greg Grant http://books.google.com/books?id=LdR9QPutjHgC http://www.worldcat.org/oclc/711045857 The A-Z of Vegetable Gardening in South Africa: Everthing You Need to Know for Successful Vegetable Gardening; by Jack Hadfield http://www.librarything.com/work/9182990 http://books.google.com/books?id=k9VPtbNk2asC http://www.worldcat.org/oclc/14966726 bookfinder.com addall.com booksprice.com The All Natural Vegetable Garden Art and Science; by Donald A. McAndrew http://books.google.com/books?id=7EGxRwlhJDYC The Alternative Kitchen Garden: An A-Z; by Emma Cooper http://www.librarything.com/work/9954969 http://books.google.com/books?id=_MBl1madZfgC http://www.worldcat.org/oclc/613439133 bookfinder.com addall.com booksprice.com The Apple Grower: Guide for the Organic Orchardist; by Michael Phillips http://www.librarything.com/work/1376088 http://books.google.com/books?id=G0Faik1mSp0C http://www.worldcat.org/oclc/38731995 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Arrows Cookbook: Cooking and Gardening from Maine's Most Beautiful Farmhouse Restaurant; by Clark Frasier, http://www.librarything.com/work/114040 http://books.google.com/books?id=1WDmacEqXPoC http://www.worldcat.org/oclc/51607604 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 174.
    ~ The Australian VegetableGarden: What's New is Old; by Clive Blazey http://www.librarything.com/work/181491 http://books.google.com/books?id=yT89twAACAAJ http://www.worldcat.org/oclc/222605336 bookfinder.com addall.com booksprice.com The Art of Natural Farming and Gardening; by Ralph Engelken http://www.librarything.com/work/9665299 http://books.google.com/books?id=3_k4AQAAIAAJ http://www.worldcat.org/oclc/8462536 bookfinder.com addall.com booksprice.com The Art of Promoting The Growth of The Cucumber And Melon: In A Series of Directions for The Best Means To Be Adopted In Bringing Them To A Complete State of Perfection ; by Thomas Watkins http://books.google.com/books?id=W88GAAAAQAAJ http://www.worldcat.org/oclc/747739218 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Australian Vegetable Gardening Encyclopedia; by Brenda Little http://www.librarything.com/work/3248458 http://books.google.com/books?id=QRm2AAAACAAJ http://www.worldcat.org/oclc/27547543 bookfinder.com addall.com booksprice.com The Backyard Berry Book: A Hands-On Guide to Growing Berries, Brambles, and Vine Fruit in the Home Garden; by Stella Otto http://www.librarything.com/work/67303 http://books.google.com/books?id=XaIQAQAAMAAJ http://www.worldcat.org/oclc/32324896 bookfinder.com addall.com booksprice.com The Basic Book of Organic Gardening; Rodale Organic Gardening Magazine http://www.librarything.com/work/433000 http://books.google.com/books?id=I76gHAAACAAJ http://www.worldcat.org/oclc/117865 bookfinder.com addall.com booksprice.com The Basic Book of Organically Grown Foods; by M. C. Goldman http://www.librarything.com/work/7481557 http://books.google.com/books?id=FuAMRAAACAAJ http://www.worldcat.org/oclc/570540 bookfinder.com addall.com booksprice.com
  • 175.
    ~ The Beginner's Guideto Growing Heirloom Vegetables: The 100 Easiest-to-Grow, Tastiest-to-Eat Vegetables for Your Garden; by Marie Iannotti http://www.librarything.com/work/12027023 http://books.google.com/books?id=VqRG_6KQewwC http://www.worldcat.org/oclc/704380983 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Bio-Gardener's Bible; by Lee Fryer http://www.librarything.com/work/2625846 http://books.google.com/books?id=iJlFAAAAYAAJ http://www.worldcat.org/oclc/8628421 bookfinder.com addall.com booksprice.com The Bountiful Solar Greenhouse: A Guide to Year-Round Food Production; by Shane Smith http://www.librarything.com/work/2426151 http://books.google.com/books?id=p3OQHQAACAAJ http://www.worldcat.org/oclc/8520492 bookfinder.com addall.com booksprice.com The Broccoli Sprouts Breakthrough: The New Miracle Food for Cancer Prevention; by Deborah Mitchell http://www.librarything.com/work/4760673 http://books.google.com/books?id=VtpdHAAACAAJ http://www.worldcat.org/oclc/39889843 bookfinder.com addall.com booksprice.com The City People's Book of Raising Food; by Helga Olkowski http://www.librarything.com/work/3501360 http://books.google.com/books?id=z8WrZCxwj-QC http://www.worldcat.org/oclc/1177811 bookfinder.com addall.com booksprice.com The Complete Book of Fruit Growing in Australia: Over 200 Temperate and Subtropical Fruits, Nuts and Berries to Grow in Gardens, Farms Or Orchards; by Louis Glowinski http://www.librarything.com/work/181512 http://books.google.com/books?id=z0D1PgAACAAJ http://www.worldcat.org/oclc/222049322 bookfinder.com addall.com booksprice.com
  • 176.
    ~ The Complete Bookof Garlic: A Guide for Gardeners, Growers, and Serious Cooks ; by Ted Jordan Meredith http://www.librarything.com/work/5672975 http://books.google.com/books?id=Hsf-43XvEnkC http://www.worldcat.org/oclc/172521653 bookfinder.com addall.com booksprice.com The Complete Book of Potatoes: What Every Grower and Gardener Needs to Know; by Hielke De Jong http://www.librarything.com/work/11128468 http://books.google.com/books?id=H0oIth3qOnMC http://www.worldcat.org/oclc/656556669 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Complete Chilli Pepper Book: A Gardener's Guide to Choosing, Growing, Preserving, and Cooking; by Dave DeWitt http://www.librarything.com/work/9045114 http://books.google.com/books?id=90M5Tw0530gC http://www.worldcat.org/oclc/310224857 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Complete Compost Gardening Guide: Banner Batches, Grow Heaps, Comforter Compost, and Other Amazing Techniques for Saving Time and Money, and Producing the Most Flavorful, Nutritous Vegetables Ever; by Barbara Pleasant http://www.librarything.com/work/5022973 http://books.google.com/books?id=lV5QKHxICbgC http://www.worldcat.org/oclc/171113154 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Complete Guide to Saving Seeds: 322 Vegetables, Herbs, Fruits, Flowers, Trees, and Shrub ; by Robert E. Gough http://www.librarything.com/work/11050047 http://books.google.com/books?id=EuQ4eWtUGlwC http://www.worldcat.org/oclc/681503214 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Complete Handbook of Solar Air Heating Systems; by Steve Kornher http://www.librarything.com/work/1956010 http://books.google.com/books?id=ltUhPQAACAAJ http://www.worldcat.org/oclc/9619424 bookfinder.com addall.com booksprice.com
  • 177.
    ~ The Complete Idiot'sGuide to Heirloom Vegetables; by Chris McLaughlin http://www.librarything.com/work/10957629 http://books.google.com/books?id=r3IaTHvsFQEC http://www.worldcat.org/oclc/555647743 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Compleat Squash: A Passionate Grower's Guide to Pumpkins, Squashes, and Gourds ; by Amy Goldman http://www.librarything.com/work/1604533 http://books.google.com/books?id=yzPyDsVBmGcC http://www.worldcat.org/oclc/55595969 bookfinder.com addall.com booksprice.com The Edible Flower Garden; by Rosalind Creasy http://www.librarything.com/work/326878 http://books.google.com/books?id=AwGJVW948mwC http://www.worldcat.org/oclc/39713714 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Edible Heirloom Garden; by Rosalind Creasy http://www.librarything.com/work/1141998 http://books.google.com/books?id=-OkJAQAAMAAJ http://www.worldcat.org/oclc/39748087 bookfinder.com addall.com booksprice.com The Edible Mexican Garden; by Rosalind Creasy http://www.librarything.com/work/1141988 http://books.google.com/books?id=hAgHAAAACAAJ http://www.worldcat.org/oclc/42603342 bookfinder.com addall.com booksprice.com The Encyclopaedia of Antique Roses, Volume 4; by Robert E. Edberg http://books.google.com/books?id=oI78ewEACAAJ http://www.worldcat.org/oclc/62696925 The Everything Small-Space Gardening Book; by Catherine Abbott http://www.librarything.com/work/12342322 http://books.google.com/books?id=uaafcoXyWvgC http://www.worldcat.org/oclc/731912727 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 178.
    ~ The Field andGarden Vegetables of America; by Fearing Burr http://www.librarything.com/work/1927023 http://books.google.com/books?id=iosMAAAAYAAJ http://www.worldcat.org/oclc/11110977 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Findhorn Garden Story; by The Findhorn Community http://www.librarything.com/work/6109522 http://books.google.com/books?id=Uv4jetYoAvMC http://www.worldcat.org/oclc/182735547 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Founding Gardeners: How the Revolutionary Generation created an American Eden ; by Andrea Wulf http://www.librarything.com/work/10919003 http://books.google.com/books?id=0LvbOyzZFocC http://www.worldcat.org/oclc/694616489 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Fruits and Fruit Trees of Monticello; by Peter J. Hatch http://www.librarything.com/work/1375508 http://books.google.com/books?id=lDHz7htpBTUC http://www.worldcat.org/oclc/36499097 bookfinder.com addall.com booksprice.com The Gourmet Gardener: Growing Choice Fruits and Vegetables With Spectacular Results; by Annie E. Proulx http://www.librarything.com/work/2749360 http://books.google.com/books?id=KukqX3npryMC http://www.worldcat.org/oclc/15645025 bookfinder.com addall.com booksprice.com The Great Exotic Fruit Book: A Handbook of Tropical and Subtropical Fruits, With Recipes ; by by Norman Van Aken http://www.librarything.com/work/772029 http://books.google.com/books?id=41JIi52wYP0C http://www.worldcat.org/oclc/31867506 bookfinder.com addall.com booksprice.com
  • 179.
    ~ The Guide toAntique Roses; by Antique Rose Emporium http://www.librarything.com/work/10771704 http://books.google.com/books?id=NCyaMwAACAAJ http://www.worldcat.org/oclc/182540828 bookfinder.com addall.com booksprice.com The Handbook for Fruit Explorers; by Ram Fishman http://www.librarything.com/work/366720 http://books.google.com/books?id=RVMjAQAAMAAJ http://www.worldcat.org/oclc/14719291 bookfinder.com addall.com booksprice.com The Heirloom Gardener: Collecting and growing old and rare varieties of vegetables and fruits ; by Carolyn Jabs http://www.librarything.com/work/486969 http://books.google.com/books?id=PoIgPwAACAAJ http://www.worldcat.org/oclc/9441927 bookfinder.com addall.com booksprice.com The Heirloom Life Gardener: The Baker Creek Way of Growing Your Own Food Easily and Naturally; by Jere And Emilee Gettle http://www.librarything.com/work/11593525 http://books.google.com/books?id=2BBlyrmxUBoC http://www.worldcat.org/oclc/703206541 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Heirloom Tomato: From Garden to Table: Recipes, Portraits, and History of the World's Most Beautiful Fruit; by Amy Goldman http://www.librarything.com/work/5971485 http://books.google.com/books?id=ZPK5PgAACAAJ http://www.worldcat.org/oclc/180751483 bookfinder.com addall.com booksprice.com The Heirloom Vegetable Garden: Gardening in the 19th Century; by Roger A Kline http://www.librarything.com/work/8419039 http://books.google.com/books?id=SEqIAAAACAAJ http://www.worldcat.org/oclc/8614087 bookfinder.com addall.com booksprice.com
  • 180.
    ~ The History andSurvival of Traditional Heirloom Vegetable Varieties and Strategies for the Conservation of Crop Biodiversity in the Southern Appalachian Mountains of Western North Carolina; by James Robert Veteto http://books.google.com/books?id=IvqYNwAACAAJ http://www.worldcat.org/oclc/64173401 The Juice Lady's Guide to Juicing for Health: Unleashing the Healing Power of Whole Fruits and Vegetables; by Cherie Calbom http://www.librarything.com/work/746461 http://books.google.com/books?id=edLAjKSWvWQC http://www.worldcat.org/oclc/59345018 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Healing Powers of Fruits And Vegetables; by Bernard Jensen http://books.google.com/books?id=2_JWpOI-4jcC http://www.worldcat.org/oclc/427638780 The Healing Power of Chlorophyll from Plant Life; by Bernard Jensen http://www.librarything.com/work/2082071 http://books.google.com/books?id=T6HolwEACAAJ http://www.worldcat.org/oclc/31819287 bookfinder.com addall.com booksprice.com The Healing Power of Fruits Vegetables and Herbs; by Doctor John Heinerman http://www.librarything.com/work/1004911 http://books.google.com/books?id=4UqQYgEACAAJ http://www.worldcat.org/oclc/663975325 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Healing Power of Juicing; by Doctor John Heinerman ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Gardner's Guide to Better Soil; by Gene Logsdon http://www.librarything.com/work/1697092 http://books.google.com/books?id=lr0dAQAAMAAJ http://www.worldcat.org/oclc/1733769 bookfinder.com addall.com booksprice.com
  • 181.
    ~ The Grape Grower:A Guide to Organic Viticulture; by Lon J. Rombough http://www.librarything.com/work/372432 http://books.google.com/books?id=RlcIZ2HbUvYC http://www.worldcat.org/oclc/49351733 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Great Vegetable Plot: Delicious Varieties to Grow and Eat; by Sarah Raven http://www.librarything.com/work/2860467 http://books.google.com/books?id=s2-LajPCjG8C http://www.worldcat.org/oclc/85839031 bookfinder.com addall.com booksprice.com The Green Gardener: Sustainable Gardening in Your Own Backyard; by Cundall Byrne http://www.librarything.com/work/4272825 http://books.google.com/books?id=jRfWAAAACAAJ http://www.worldcat.org/oclc/156660891 bookfinder.com addall.com booksprice.com The Holistic Orchard: Tree Fruits and Berries the Biological Way; by Michael Phillips http://www.librarything.com/work/11949597 http://books.google.com/books?id=zwHotVXtnfsC http://www.worldcat.org/oclc/719429796 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Issues of Organic Foods and Organic Gardening; by Adams E. Blakely http://www.google.com http://www.bing.com The Kitchen Gardener's Guide; by Donald J. Berg http://www.librarything.com/work/819853 http://books.google.com/books?id=Rw1IAAAAYAAJ http://www.worldcat.org/oclc/16349405 bookfinder.com addall.com booksprice.com The Little Book of Old Roses; by Hazel Le Rougetel http://www.librarything.com/work/1527206 http://books.google.com/books?id=UPhHAAAAYAAJ http://www.worldcat.org/oclc/25914678 bookfinder.com addall.com booksprice.com
  • 182.
    ~ The Last GreatPlant Hunt: The Story of Kew’s Millenium Seed Bank by Carolyn Fry http://www.librarything.com/work/12301674 http://books.google.com/books?id=to0GRQAACAAJ http://www.worldcat.org/oclc/587209618 bookfinder.com addall.com booksprice.com The MacMillan Book of Organic Gardening; by Marie Luise Kreuter http://www.librarything.com/work/1306533 http://books.google.com/books?id=4utFAAAAYAAJ http://www.worldcat.org/oclc/11971269 bookfinder.com addall.com booksprice.com The Magic of Findhorn; by Paul Hawken http://www.librarything.com/work/136955 http://books.google.com/books?id=a_s9d85m2jAC http://www.worldcat.org/oclc/1217386 bookfinder.com addall.com booksprice.com The Maritime Northwest Garden Guide: Planning Calendar for Year-round Organic Gardening; by Carl W. Elliott http://www.librarything.com/work/326799 http://books.google.com/books?id=Zo3FMQAACAAJ http://www.worldcat.org/oclc/39671810 bookfinder.com addall.com booksprice.com The Mexican Kitchen Garden; by John Meeker http://www.librarything.com/work/4894087 http://books.google.com/books?id=hAgHAAAACAAJ http://www.worldcat.org/oclc/37310846 bookfinder.com addall.com booksprice.com The Middle East Garden Traditions, Unity, and Diversity: Questions, Methods and Resources in a Multicultural Perspective http://www.librarything.com/work/8200503 http://books.google.com/books?id=U-NDmuj9I8cC http://www.worldcat.org/oclc/85830776 bookfinder.com addall.com booksprice.com The Natural Gardener; by Roger Grounds http://books.google.com/books?id=8RM2AAAAMAAJ http://www.worldcat.org/oclc/2213136
  • 183.
    ~ The New ZealandCompost Book; by David A. Taylor http://www.librarything.com/work/12141317 http://books.google.com/books?id=DsehPQAACAAJ http://www.worldcat.org/oclc/154631290 bookfinder.com addall.com booksprice.com The Organic Garden Book; by Geoff Hamilton http://www.librarything.com/work/338265 http://books.google.com/books?id=V9FFAAAAYAAJ http://www.worldcat.org/oclc/617579941 bookfinder.com addall.com booksprice.com The Organic Home Garden: How to Grow Fruits and Vegetables Naturally; by Patrick Lima http://www.librarything.com/work/572230 http://books.google.com/books?id=k-zelpmUSHcC http://www.worldcat.org/oclc/54498090 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Organic Gardener's Complete Guide to Vegetables and Fruits; by Rodale Organic Gardening Magazine http://www.librarything.com/work/7488528 http://books.google.com/books?id=ITkjAQAAMAAJ http://www.worldcat.org/oclc/7922881 bookfinder.com addall.com booksprice.com The Organic Method Primer Update, A Practical Explanation: The How and Why for the Beginner and the Experience; by Bargyla Rateaver http://www.librarything.com/work/950134 http://books.google.com/books?id=rYANAQAACAAJ http://www.worldcat.org/oclc/29660866 bookfinder.com addall.com booksprice.com The Organic Vegetable Garden: Improving the Soil Naturally; by Mary Moody http://www.librarything.com/work/2569597 http://books.google.com/books?id=WWwxAAAACAAJ http://www.worldcat.org/oclc/27553380 bookfinder.com addall.com booksprice.com The Organic Way to Mulching; by Robert Rodale http://www.librarything.com/work/1184465 http://books.google.com/books?id=5JsdAQAAMAAJ http://www.worldcat.org/oclc/238315 bookfinder.com addall.com booksprice.com
  • 184.
    ~ The Ornamental KitchenGarden; by Janet W. MacDonald http://www.librarything.com/work/1590603 http://books.google.com/books?id=JRBIAAAAYAAJ http://www.worldcat.org/oclc/32859065 bookfinder.com addall.com booksprice.com The Pepper Garden: From the Sweetest Bell to the Hottest Habanero; by Dave DeWitt http://www.librarything.com/work/257612 http://books.google.com/books?id=mjKwHAAACAAJ http://www.worldcat.org/oclc/28710727 bookfinder.com addall.com booksprice.com The Perfect Plot: Starting an Allotment from Scratch; by Kim Sayer http://books.google.com/books?id=ME8HywAACAAJ http://www.worldcat.org/oclc/766340083 The Plant Hunters: The Adventures of the World's Greatest Botanical Explorers; by Carolyn Fry http://www.librarything.com/work/8542919 http://books.google.com/books?id=rRmDtwAACAAJ http://www.worldcat.org/oclc/276647746 bookfinder.com addall.com booksprice.com The Plant Hunters: Two Hundred Years of Adventure and Discovery Around the World ; by Toby Musgrave http://www.librarything.com/work/630189 http://books.google.com/books?id=JO-jQgAACAAJ http://www.worldcat.org/oclc/40250278 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Plant Hunters: True Stories of Their Daring Adventures to the Far Corners of the Earth ; by Anita Silvey http://www.librarything.com/work/11743215 http://books.google.com/books?id=ak8lKQEACAAJ http://www.worldcat.org/oclc/707626602 bookfinder.com addall.com booksprice.com The Plant Hunters or Adventures Among the Himalaya Mountainsthe Plant Hunters Or Adventures Among the Himalaya Mountains; by Mayne Reid http://www.librarything.com/work/7037061 http://books.google.com/books?id=Ra0BAAAAQAAJ http://www.worldcat.org/oclc/47292299 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 185.
    ~ The Plant Hunter'sGarden: The New Explorers and Their Discoveries; by Bobby J. Ward http://www.librarything.com/work/2761601 http://books.google.com/books?id=FQIIHEHu1EQC http://www.worldcat.org/oclc/54881927 bookfinder.com addall.com booksprice.com The Polytunnel Book: Fruit and Vegetables All Year Round; by Joyce Russell http://www.librarything.com/work/11432199 http://books.google.com/books?id=j-f9Xi0Q7QkC http://www.worldcat.org/oclc/656451029 bookfinder.com addall.com booksprice.com The Playground Potting Shed: A Foolproof Guide to Gardening with Children ; by Dominic Murphy http://www.librarything.com/work/12922250 http://books.google.com/books?id=tHUFHwAACAAJ http://www.worldcat.org/oclc/477270934 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Rancho Gordo Heirloom Bean Grower's Guide: Steve Sando's 50 Favorite Varieties; by Steve Sando http://www.librarything.com/work/11448571 http://books.google.com/books?id=kN-TGgPPPykC http://www.worldcat.org/oclc/666223958 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Rodale Herb Book: How to Use, Grow, and Buy Nature's Miracle Plants; by William H. Hylton http://www.librarything.com/work/465044 http://books.google.com/books?id=bykhAQAAIAAJ http://www.worldcat.org/oclc/865983 bookfinder.com addall.com booksprice.com The Seeds of Kokopelli: A Manual for the Production of Seeds in the Family Garden, a Directory of Heritage Seeds; by Dominique Guillet http://books.google.com/books?id=q9LvHAAACAAJ http://www.worldcat.org/oclc/61214528 The Seed Underground: A Growing Revolution to Save Food; by Janisse Ray http://www.librarything.com/work/12583401 http://books.google.com/books?id=TKLJxZPdyyQC http://www.worldcat.org/oclc/759171799 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 186.
    ~ The Self-Sufficiency Bible:Window Boxes to Smallholdings - Hundreds of Ways to Become Self- Sufficient; by Simon Dawson http://www.librarything.com/work/12309935 http://books.google.com/books?id=J4_LQgAACAAJ http://www.worldcat.org/oclc/805397174 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Socio-Economic Causes and Consequences of Desertification in Central Asia; by Roy Behnke http://www.librarything.com/work/8740971 http://books.google.com/books?id=dEM0J1Iyhy0C http://www.worldcat.org/oclc/272298646 bookfinder.com addall.com booksprice.com The Ten-Minute Gardener's Fruit-Growing Diary; by Val Bourne http://www.librarything.com/work/11834016 http://books.google.com/books?id=Ziz9cYpzFQ4C http://www.worldcat.org/oclc/751788965 bookfinder.com addall.com booksprice.com The Ten-Minute Gardener's Vegetable-Growing Diary; by Val Bourne http://www.librarything.com/work/11834015 http://books.google.com/books?id=h_SriF7MoUwC http://www.worldcat.org/oclc/751788970 bookfinder.com addall.com booksprice.com The Terrace Gardener's Handbook: Raising Plants on a Balcony, Terrace, Rooftop, Penthouse or Patio; by Linda Yang http://www.librarything.com/work/1691339 http://books.google.com/books?id=zQhIAAAAYAAJ http://www.worldcat.org/oclc/1054140 bookfinder.com addall.com booksprice.com The Underground Gardener: A Low Cost Way to Year-Round Gardening Under Glass; by Jack Kramer http://www.librarything.com/work/8050041 http://books.google.com/books?id=WmElAQAAMAAJ http://www.worldcat.org/oclc/2035186 bookfinder.com addall.com booksprice.com The Vegetable Finder, United Kingdom; by Lawrence Donegan Hills http://www.librarything.com/work/2418689 http://books.google.com/books?id=F1-eAQAACAAJ http://www.worldcat.org/oclc/3765910 bookfinder.com addall.com booksprice.com
  • 187.
    ~ The Wilderness Garden:Beyond Organic Gardening, Australia; by Jackie French http://www.librarything.com/work/1089170 http://books.google.com/books?id=LTQ-GQAACAAJ http://www.worldcat.org/oclc/225185954 bookfinder.com addall.com booksprice.com Two Acre Eden; by Gene Logsdon http://www.librarything.com/work/984987 http://books.google.com/books?id=_409NwAACAAJ http://www.worldcat.org/oclc/195733 bookfinder.com addall.com booksprice.com The Year-Round Vegetable Gardener: How to Grow Your Own Food 365 Days a Year, No Matter Where You Live; by Niki Jabbour http://www.librarything.com/work/12029688 http://books.google.com/books?id=cr1A4wrB7KUC http://www.worldcat.org/oclc/704380998 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Year-Round Vegetable Gardener: The Complete Guide to Growing Vegetables and Herbs Any Time of the Year; by Anne Moyer Halpin http://www.librarything.com/work/9081513 http://books.google.com/books?id=C_dHAAAAYAAJ http://www.worldcat.org/oclc/24670767 bookfinder.com addall.com booksprice.com The Year-Round Harvest: A Seasonal Guide to Growing, Eating, and Preserving the Fruits and Vegetables of Your Labor; by Catherine Abbott http://books.google.com/books?id=yKjGtrh30V4C http://www.worldcat.org/oclc/774595111 Tibetan Medicinal Plants; by Christa Kletter http://www.librarything.com/work/6179434 http://books.google.com/books?id=ODrIXj-48RsC http://www.worldcat.org/oclc/44270438 bookfinder.com addall.com booksprice.com Top 100 Exotic Food Plants; by Ernest Small http://www.librarything.com/work/8657363 http://books.google.com/books?id=1umZcQAACAAJ http://www.worldcat.org/oclc/659750596 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 188.
    ~ Transition Farms: Storyof 18 Farms Changing the Face of Farming in Australia; by Bev Buckley http://books.google.com/books?id=rz70pwAACAAJ Uncommon Fruits and Vegetables: A Commonsense Guide; by Elizabeth Schneider http://www.librarything.com/work/23782 http://books.google.com/books?id=8z052AtUOiUC http://www.worldcat.org/oclc/13003343 bookfinder.com addall.com booksprice.com Uncommon Fruits for Every Garden; by Lee Reich http://www.librarything.com/work/1857569 http://books.google.com/books?id=DQKlPwAACAAJ http://www.worldcat.org/oclc/52838215 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Uncommon Fruits Worthy of Attention: A Gardener's Guide; by Lee Reich http://www.librarything.com/work/114064 http://books.google.com/books?id=yiwjAQAAMAAJ http://www.worldcat.org/oclc/22278502 bookfinder.com addall.com booksprice.com Uncommon Vegetables and Fruits: How to Grow and How to Cook; by Eleanour Sinclair Rohde http://www.librarything.com/work/2213263 http://books.google.com/books?id=uabtMgEACAAJ http://www.worldcat.org/oclc/6402615 bookfinder.com addall.com booksprice.com Underutilized and Underexploited Horticultural Crops, Volume 4; by K.V. Peter http://books.google.com/books?id=lPo-7-zmrZcC http://www.worldcat.org/oclc/191029038 Underutilized and Underexploited Horticultural Crops, Volume 5; by K.V. Peter http://books.google.com/books?id=5VF1tgAACAAJ Underutilized Crops: Canna, Flax, Cassava, Cannabis, Amaranth, Typha, Teff, Guar, Turnip, Breadfruit, Sorghum, Plantain, Kudzu, Sorrel; by LLC http://books.google.com/books?id=VwOOSQAACAAJ
  • 189.
    ~ Underutilized Vegetable Crops;by A K Pandey http://books.google.com/books?id=ABTZygAACAAJ http://www.worldcat.org/oclc/309702056 Underutilized Vegetable and Spice Crops; by S K Sanwal http://books.google.com/books?id=ehFePgAACAAJ http://www.worldcat.org/oclc/291122159 Unusual Vegetables; by Erma Harvey James http://books.google.com/books?id=rCONQAAACAAJ http://www.worldcat.org/oclc/11523291 Unusual Vegetables: Something New for This Year's Garden; by Anne Moyer Halpin http://www.librarything.com/work/563424 http://books.google.com/books?id=wjIWAQAACAAJ http://www.worldcat.org/oclc/3627752 bookfinder.com addall.com booksprice.com Unusual Vegetables, Herbs And Other Edible Plants; by Alan J Hartley http://books.google.com/books?id=1-OHp50kX1IC Urban Agriculture: Growing Healthy, Sustainable Places; by Kimberly Hodgson http://www.librarything.com/work/11293017 http://books.google.com/books?id=ZhBFYgEACAAJ http://www.worldcat.org/oclc/687694235 bookfinder.com addall.com booksprice.com Urban Harvest; by International Potato Center http://books.google.com/books?id=fVxP2r9IYH0C Using the Biodynamic Compost Preparations and Sprays in Garden, Orchard, and Farm; by Ehrenfried Pfeiffer http://www.librarything.com/work/8921160 http://books.google.com/books?id=OjbbXP21WwsC http://www.worldcat.org/oclc/26499900 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 190.
    ~ Varieties Of VegetableCrops In India; by Hazra P. Banerjee http://books.google.com/books?id=Vl86YgEACAAJ http://www.worldcat.org/oclc/664653125 Vegetable Crops in India; by T. K. Bose http://books.google.com/books?id=sHk_AAAAYAAJ http://www.worldcat.org/oclc/13621876 Vegetable Crops of India; by K. S. Yawalkar http://books.google.com/books?id=kCtBAAAAYAAJ http://www.worldcat.org/oclc/2825467 Vegetable, Fruit and Herb Growing in Small Spaces; by John Harrison http://books.google.com/books?id=AZv_gPfUwNMC ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Vegetable Gardening in Malaya; by John Noel Milsum http://books.google.com/books?id=USFBAAAAYAAJ http://www.worldcat.org/oclc/27835957 Vegetable Gardening the Colonial Williamsburg Way: 18th-Century Methods for Today's Organic Gardeners; by Wesley Greene http://www.librarything.com/work/12148424 http://books.google.com/books?id=KFQMt1Ww6osC http://www.worldcat.org/oclc/740628585 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Vegetable Genetic Resources in Ghana; by FAO http://www.worldcat.org/oclc/197864712 Vegetable Growing in New South Wales; by A. J. Pinn http://books.google.com/books?id=C8dBAAAAIAAJ http://www.worldcat.org/oclc/220054630 Vegetable Pigeonpea: A Promising Crop for India http://books.google.com/books?id=I964XwAACAAJ http://www.worldcat.org/oclc/17965175
  • 191.
    ~ Vegetable Seeds: APictorial Field Guide; by Terry A. Woodger http://books.google.com/books?id=CzCu60l2BV0C http://www.worldcat.org/oclc/747385660 Vegetables: For the Irish Garden; by Klaus Laitenberger http://www.librarything.com/work/11861236 http://books.google.com/books?id=0eM9YgEACAAJ http://www.worldcat.org/oclc/750674646 Vegetables All The Year Round; by Harry George Witham Fogg http://books.google.com/books?id=sSxBAAAAYAAJ http://www.worldcat.org/oclc/7404259 Vegetables and Fruits: A Guide to Heirloom Varieties and Community-Based Stewardship; by National Agricultural Library http://books.google.com/books?id=twAUAAAAYAAJ http://www.worldcat.org/oclc/40474000 Vegetables in a Small Garden: Simple Steps to Success; Dorling Kindersley http://www.librarything.com/work/5103221# http://books.google.com/books?id=rUbjQgAACAAJ http://www.worldcat.org/oclc/213379759 bookfinder.com addall.com booksprice.com Vegetables in Patches and Pots: A Child's Guide to Organic Vegetable Gardening ; by Lorelie Miller Mintz http://www.librarything.com/work/8703969 http://books.google.com/books?id=BQgfAgAACAAJ http://www.worldcat.org/oclc/2525276 bookfinder.com addall.com booksprice.com Vegetables Naturally: An Organic Gardening Guide; by Harry George Witham Fogg http://www.librarything.com/work/2025622 http://books.google.com/books?id=CtioAAAACAAJ http://www.worldcat.org/oclc/2727154 bookfinder.com addall.com booksprice.com
  • 192.
    ~ Vegetables Naturally: OrganicGrowing for Small Gardens; by Jim Hay http://books.google.com/books?id=eFRNNwAACAAJ http://www.worldcat.org/oclc/11671050 Vegetables of Canada; by Derek B. Munro http://www.librarything.com/work/6267728 http://books.google.com/books?id=z_yezcnaUHQC http://www.worldcat.org/oclc/44961565 bookfinder.com addall.com booksprice.com What Makes Heirloom Plants So Great: Old-Fashioned Treasures to Grow, Eat, and Admire; by Judy Barrett http://www.librarything.com/work/11496142 http://books.google.com/books?id=0oOj1KMYgegC http://www.worldcat.org/oclc/610466231 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Wild Crop Relatives: Genomic and Breeding Resources: Legume Crops and Forages ; by Chittaranjan Kole http://www.librarything.com/work/11472286 http://books.google.com/books?id=kAJ_mUrdpWMC http://www.worldcat.org/oclc/710150948 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Wild Foods of the Sonoran Desert; by Kevin Dahl http://www.librarything.com/work/1691333 http://books.google.com/books?id=Br5QAQAAIAAJ http://www.worldcat.org/oclc/34190785 bookfinder.com addall.com booksprice.com World Hunger: Twelve Myths; by Frances Moore Lappe http://www.librarything.com/work/504026 http://books.google.com/books?id=CxbxAAAAMAAJ http://www.worldcat.org/oclc/14372267 bookfinder.com addall.com booksprice.com Yates Green Guide to Gardening: A No Fuss Guide to Organic Gardening; by Allen Gilbert http://www.librarything.com/work/1093366 http://books.google.com/books?id=KRctGwAACAAJ http://www.worldcat.org/oclc/27492084 bookfinder.com addall.com booksprice.com
  • 193.
    ~ Year-Around Harvest: WinterGardening on the Coast; by Linda A. Gilkeson http://books.google.com/books?id=dgsnlwEACAAJ http://www.worldcat.org/oclc/701014927 Yesterday's Ways, Tomorrow's Treasures: Heirloom Plants And Memory Banking ; by by Virginia D Nazarea http://www.librarything.com/work/714614 http://books.google.com/books?id=UYddAAAACAAJ http://www.worldcat.org/oclc/55629997 bookfinder.com addall.com booksprice.com GARDENING with NATIVE PLANTS and FLOWERS NATIVE PLANT SOCIETIES: Providing Native Plant Information for their Area North American Native Plant Society http://www.nanps.org Native Plant Conservation Campaign http://www.plantsocieties.org New England Wild Flower Society http://www.newfs.org Alabama Wildflower Society - Native Plant Society http://www.alwildflowers.org/ Alaska Native Plant Society http://aknps.org Arizona Native Plant Society http://www.aznps.com Arkansas Native Plant Society http://anps.org California Native Plant Society http://www.cnps.org
  • 194.
    ~ Colorado Native PlantSociety http://www.conps.org Connecticut Botanical Society http://ct-botanical-society.org Delaware Native Plant Society http://www.delawarenativeplants.org Florida Native Plant Society http://www.fnps.org Georgia Native Plant Society http://www.gnps.org Hawaiian Native Plant Society http://www.hear.org/nhps Idaho Native Plant Societ http://www.idahonativeplants.org Illinois Native Plant Society http://www.ill-inps.org Iowa Native Plant Society http://www.public.iastate.edu/~herbarium/inps/index.php Iowa Prairie Network http://www.iowaprairienetwork.org Kansas Native Plant Society http://www.kansasnativeplantsociety.org Kauai Native Plant Society http://www.kauainativeplantsociety.org Kentucky Native Plant Society http://www.knps.org Lady Bird Johnson Wildflower Center http://www.wildflower.org Louisiana Native Plant Society http://www.lnps.org
  • 195.
    ~ Maryland Native PlantSociety http://mdflora.org Michigan Botanical Club http://www.michbotclub.org Midwest Native Plant Society http://www.midwestnativeplants.org/ Minnesota Native Plant Society http://www.mnnps.org Minnesota Wildflowers http://www.minnesotawildflowers.info Mississippi Native Plant Society http://www.mississippinativeplantsociety.org Missouri Native Plant Society http://www.missourinativeplantsociety.org Missouri Prairie Foundation http://www.moprairie.org Montana Native Plant Society http://www.mtnativeplants.org Nevada Native Plant Society http://www.nvnps.org New Jersey Native Plant Society http://www.npsnj.org New Mexico Native Plant Society http://www.npsnm.org New York Flora Association http://www.nyflora.org North Carolina Native Plant Society http://www.ncwildflower.org
  • 196.
    ~ Ohio Northeast NativePlant Society http://nativeplantsocietyneohio.org Ohio Prairie Association http://www.ohioprairie.org Oklahoma Native Plant Society http://www.oknativeplants.org Oregon Native Plant Society http://www.npsoregon.org Pennsylvania Native Plant Society http://www.pawildflower.org Rhode Island Wild Plant Society http://www.riwps.org/nativeplantnurseries.htm South Carolina Native Plant Society http://scnps.org Tennessee Native Plant Society http://www.tnps.org Texas Native Plant Society http://www.npsot.org Texas Native Prairies Association http://www.texasprairie.org/ Utah Native Plant Society http://www.unps.org Virginia Native Plant Society http://www.vnps.org Washington Native Plant Society http://www.wnps.org West Virginia Native Plant Society http://www.wvnps.org Wyoming Native Plant Society http://www.wynps.org
  • 197.
    ~ AL - BlancheDean Wildflower Society http://alabamawildflower.org AL - Huntsville Wildflower Society http://huntsville.org.alwildflowers.org AL - Shoals Wildflower Society http://shoalswildflower.blogspot.com CA - Bristlecone Native Plant Society http://bristleconecnps.org CA - Channel Islands Native Plant Society http://www.cnpsci.org CA - Dorothy King Young Native Plant Society http://www.dkycnps.org CA - East Bay Native Plant Society http://www.ebcnps.org CA - El Dorado Native Plant Society http://www.eldoradocnps.org CA - Los Angeles-Santa Monica Mountains Native Plant Society http://lasmmcnps.org CA - Milo Baker Native Plant Society http://www.cnpsmb.org CA - Mojave Desert Native Plant Society http://www.mojavecnps.org CA - Monterey Bay Native Plant Society http://montereybay.cnps.org CA - Mount Lassen Native Plant Society http://mountlassen.cnps.org CA - Napa Valley Native Plant Society http://www.napavalleycnps.org CA - North Coast Native Plant Society http://northcoastcnps.org
  • 198.
    ~ CA - NorthSan Joaquin ValleyNative Plant Society http://nsj.cnps.org CA - Orange County Native Plant Society http://www.occnps.org CA - Redbud Native Plant Society http://www.redbud-cnps.org CA - Riverside-San Bernardino Native Plant Society http://www.enceliacnps.org CA - Sacramento Valley Native Plant Society http://www.sacvalleycnps.org CA - San Diego Native Plant Society http://www.cnpssd.org/ CA - San Gabriel Mountains Native Plant Society http://www.cnps-sgm.org CA - San Luis Obispo Native Plant Society http://www.cnps-slo.org CA - Sanhedrin Native Plant Society http://www.cnps-sanhedrin.org CA - Santa Clara Valley Native Plant Society http://www.cnps-scv.org CA - Santa Cruz County Native Plant Society http://www.cnps-scv.org CA - Sequoia Native Plant Society http://www.cnps-sequoia.org CA - Shasta Native Plant Society http://www.shastacnps.org CA - Sierra Foothills Native Plant Society http://www.sierrafoothillscnps.org CA - South Coast Native Plant Society http://www.sccnps.org
  • 199.
    ~ CA - WillisLinn Jepson Native Plant Society http://cnpsjepson.dreamhosters.com CA - Yerba Buena Native Plant Society http://www.cnps-yerbabuena.org FL - Magnolia Native Plant Society http://magnolia.fnpschapters.org FL - Nature Coast Native Plant Society http://naturecoast.fnpschapters.org FL - Sea Oats Native Plant Society http://seaoats.fnpschapters.org IL - Grand Prairie Friends http://grandprairiefriends.org LA - Folsom Native Plant Society http://folsomnps.org MO - Hawthorn Chapter of the Missouri Native Plant Society http://columbianativeplants.org MO - Southeast Chapter of Missouri Native Plant Society http://www.semonps.org NY - Finger Lakes Native Plant Society http://flnps.org OH - Cincinnati Wildflower Preservation Society http://cincywildflower.org PA - Delaware Valley Fern and Wildflower Society http://www.dvfws.org SC - Southern Appalachian Botanical Society http://www.sabs.appstate.edu VA - Blue Ridge Wildflower Society http://brwfs.org VA - John Clayton Native Plant Society http://www.claytonvnps.org
  • 200.
    ~ VA - PocahontasNative Plant Society http://pocahontaschapter-vnps.org VA - Potowmack Native Plant Society http://www.vnps-pot.org WI - North Woods Native Plant Society http://www.northwoodsnativeplantsociety.org WV - Eastern Panhandle Native Plant Society http://www.epnps.org British Columbia Native Plant Society http://www.npsbc.org Nova Scotia Wild Flower Society http://www.nswildflora.ca Saskatchewan Native Plant Society http://www.npss.sk.ca ORGANIC GARDENING TECHNOLOGIES INCREASING Plant Yields by over 400 PERCENT http://www.scribd.com/doc/75160339 http://www.calameo.com/books/0010511867e619fa5b018
  • 201.
    ~ Worms Eat My Garbage WASTE NOT, WANT NOT Organic Composting with Earthworms and Recycling book: Worms Eat My Garbage; by Mary Appelhof librarything.com/129657 books.google.com/Z-FjPwAACAAJ worldcat.org/oclc/9210284 http://wormbooks.com http://www.wormwoman.com http://wormdigest.org http://vermico.com http://www.happydranch.com http://www.rainbowworms.com http://worms.com http://unclejimswormfarm.com http://www.nyworms.com Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by Marc Remillard http://www.librarything.com/work/11197572 http://books.google.com/books?id=PZHObwAACAAJ http://www.worldcat.org/oclc/744677817 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra Truax ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com http://vermico.com SoilSoup Compost Tea ~ Healthy Soil, Healthy Plants, Healthy People http://soilsoup.com SoilSoup Compost Tea is an excellent soil builder and organic fertilizer. Soil Soup is very easy to handle and use. Growing Solutions ~ Healthy Soil, Healthy Plants, Healthy People http://www.growingsolutions.com Zing Bokashi: Recycling Organic Waste with Effective Microorganisms (EM) http://www.zingbokashi.co.nz
  • 202.
    ~ Remineralize your Soil~ Healthy Soil, Healthy Plants, Healthy People http://remineralize.org Soil Regeneration with Volcanic Rock Dust http://calameo.com/books/00062163120384c54b373 http://scribd.com/doc/30402511 Volcanic Rock Dust added to soil can double plant or lawn growth. What Every Gardener Should Know About Earthworms, Bulletin A-21; by Henry Hopp http://www.librarything.com/work/5011585 http://books.google.com/books?id=GrX12L3vfmgC http://www.worldcat.org/oclc/777949 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Recycle with Earthworms; by Shelley C. Grossman http://www.librarything.com/work/11924887 http://books.google.com/books?id=635wPQAACAAJ http://www.worldcat.org/oclc/38889546 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Let an Earthworm be Your Garbage Man: All about Earthworms, for Garbage Disposal and Soil Fertility http://www.librarything.com/work/13102639 http://books.google.com/books?id=-vJgAQAACAAJ http://www.worldcat.org/oclc/1429548 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Harnessing the Earthworm; a Practical Inquiry Into Soil-Building, Soil-Conditioning and Plant Nutrition Through the Action of Earthworms; by Thomas Jason Barrett http://www.librarything.com/work/941755 http://books.google.com/books?id=ZZssrk1M5zUC http://www.worldcat.org/oclc/2505704 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com As the Worm Turns: New and Easy Methods for Raising Earthworms; by Roy Fewell http://www.librarything.com/work/3752722 http://books.google.com/books?id=-aTbPQAACAAJ http://www.worldcat.org/oclc/43960994 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com
  • 203.
    ~ Worms Eat OurGarbage: Classroom Activities for a Better Environment; by Mary Appelhof http://www.librarything.com/work/4048089 http://books.google.com/books?id=vI-ihPW04c8C http://www.worldcat.org/oclc/28532138 allbookstores.com bing.com bookfinder.com The Worm Cafe: Mid-scale Vermicomposting of Lunchroom Wastes; by Binet Payne http://www.librarything.com/work/1124844 http://books.google.com/books?id=IsUKAAAACAAJ http://www.worldcat.org/oclc/41343935 allbookstores.com bing.com bookfinder.com The Worm Book For Beginners: A Vermiculture Starter or How To Be A Backyard Worm Farmer And Make The Best Natural Compost From Worms; by Frank Randall http://www.librarything.com/work/12326569 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Commercial Vermiculture: How to Build a Thriving Business in Redworms ; by Peter Bogdanov http://www.librarything.com/work/8602513 http://books.google.com/books?id=3SrcAAAACAAJ http://www.worldcat.org/oclc/38410758 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com A-Worming We Did Go; by Ruth Myers http://books.google.com/books?id=Mx8MuwAACAAJ http://www.worldcat.org/oclc/2385483 allbookstores.com bing.com bookfinder.com A Guide to Worm Composting: Help Nature to Help You, New Zealand; http://books.google.com/books?id=ofJuYgEACAAJ http://www.worldcat.org/oclc/154272498 allbookstores.com bing.com bookfinder.com A Manual on Compost and Other Organic Manures; by R. Krishna Murthy http://books.google.com/books?id=vWVCAAAAYAAJ http://www.worldcat.org/oclc/4331209 allbookstores.com bing.com bookfinder.com An Ecological Treatment System for the Re-Use of Bio-Digested Food Waste; by Hui Lin http://books.google.com/books?id=lpWnuAAACAAJ http://www.worldcat.org/oclc/671765100 allbookstores.com bing.com bookfinder.com
  • 204.
    ~ Application of Vermicompostfor Crop Cultivation in Semi Arid Soil: Significance of Organic Farming; by Rajeev Kumar Niranjan http://books.google.com/books?id=4Q2spwAACAAJ allbookstores.com bing.com As the Worm Turns; by Brian Rosenberger http://www.librarything.com/work/10913183 http://books.google.com/books?id=DMeqcQAACAAJ http://www.worldcat.org/oclc/733731575 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com As the Worm Turns: New and Easy Methods for Raising Earthworms; by Roy Fewell http://www.librarything.com/work/3752722 http://books.google.com/books?id=-aTbPQAACAAJ http://www.worldcat.org/oclc/43960994 allbookstores.com bing.com bookfinder.com Basic Guide to Worm Composting; by Gillian Elcock google.com allbookstores.com bing.com yahoo.com bookfinder.com addall.com Best Practice Guideline to Managing On-Site Vermiculture Technologies; by Amanda Ferris http://books.google.com/books?id=mYrqAQAACAAJ http://www.worldcat.org/oclc/223347135 allbookstores.com bing.com bookfinder.com Beyond Compost: A VermiChester Guide to Converting Organic Waste Beyond Compost Using Worms in a Medium-Scale Composting System; by Tom Wilkinson http://www.librarything.com/work/8739373 http://books.google.com/books?id=c4nbQQAACAAJ http://www.worldcat.org/oclc/449905490 allbookstores.com bing.com bookfinder.com Biowastes' Into Value Addition By Semi-Scientific Vermitechnology: Mitigation Of GHGs By Abatement Of Organic Pollution; by Sunitha N. Seenappa http://books.google.com/books?id=sGuqMQEACAAJ Charles Darwins Plough Tool for Vermitechnology; by Madhab Chandra Dash http://books.google.com/books?id=tn95tgAACAAJ
  • 205.
    ~ Compendium on SolidWaste Management By Vermicomposting; by Municipal Environmental Research Laboratory http://books.google.com/books?id=qAdSAAAAMAAJ http://www.worldcat.org/oclc/7158379 allbookstores.com bing.com bookfinder.com Compost, by Gosh: An Adventure with Vermicompostingp; by Michelle Eva Portman http://www.librarything.com/work/838602 http://books.google.com/books?id=ILYJAAAACAAJ http://www.worldcat.org/oclc/52223212 allbookstores.com bing.com bookfinder.com Compost, Vermicompost and Compost Tea: Feeding the Soil on the Organic Farm; by Grace Gershuny http://www.librarything.com/work/9379681 http://books.google.com/books?id=Xub8aChfFsIC http://www.worldcat.org/oclc/676727212 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Composting: Worm Recycling; by King County, WA http://books.google.com/books?id=h01vuAAACAAJ http://www.worldcat.org/oclc/56367025 allbookstores.com bing.com bookfinder.com Composting Made Easy: A Guide for Schools, Composting, Mulching and Wormeries; by John Laffin http://books.google.com/books?id=8D0CtwAACAAJ http://www.worldcat.org/oclc/38384250 allbookstores.com bing.com bookfinder.com Composting with Worms: Why Waste Your Waste, United Kingdom; by G. Pilkington http://www.librarything.com/work/3963878 http://books.google.com/books?id=szGwPAAACAAJ http://www.worldcat.org/oclc/604935405 allbookstores.com bing.com bookfinder.com Dear Charlie: A Collection Of Correspondence Between The Late Charlie Morgan, The World's Most Renowned Wormologist, And Worm Farmers Around The World ; by Charlie Morgan http://wormbooks.com google.com bing.com yahoo.com bookfinder.com allbookstores.com booksprice.com
  • 206.
    ~ Deep Burrowing EarthwormsBoost Pasture; by Mark Seeliger http://books.google.com/books?id=4XGKAAAACAAJ http://www.worldcat.org/oclc/43413338 allbookstores.com bing.com bookfinder.com Diversity And Abundance Of Earthworms As Indicators Of Soil Pollution; by Addisu Mergia http://books.google.com/books?id=-GUJTwEACAAJ google.com bing.com yahoo.com Domestic Wastewater Treatment By Constructed Wetland And Vermifilter: Wastewater Engineering ; by Navin Pise http://books.google.com/books?id=uGr1ugAACAAJ google.com bing.com yahoo.com Don't Rubbish Green Waste: Mulch, Compost, Worm Farms; by Peter Rutherford, Chatswood, New South Wales, Australia http://books.google.com/books?id=NqhrAAAACAAJ http://www.worldcat.org/oclc/38758799 allbookstores.com bing.com bookfinder.com Earthworms: Their Ecology And Relationships With Soils And Land Use; by Kenneth Ernest Lee http://books.google.com/books?id=C4bwAAAAMAAJ http://www.worldcat.org/oclc/13069479 allbookstores.com bing.com bookfinder.com Earthworm Breeding For Profit : Practical Production And Marketing Of Earthworms in Australia and New Zealand; by David Lambert http://books.google.com/books?id=yWgyAgAACAAJ http://www.worldcat.org/oclc/35283653 allbookstores.com bing.com bookfinder.com Earthworm Buyer's Guide and Directory: Directory of Earthworm Hatcheries in the U. S. A. and Canada; by Patrick H. Shields http://wormbooks.com http://books.google.com/books?id=8xgSAAAACAAJ google.com bing.com yahoo.com Earthworm Culture for the Gardener: Poultryman and Fisherman; by Elpam gardens, Burlington, Ontario http://books.google.com/books?id=qWCwHAAACAAJ http://www.worldcat.org/oclc/62965506 allbookstores.com bing.com bookfinder.com
  • 207.
    ~ Earthworm Ecology; byClive A. Edwards http://www.librarything.com/work/1226709 http://books.google.com/books?id=7mHvxY-1BKsC http://www.worldcat.org/oclc/38243637 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Earthworm Ecology and Environment; by Satyendra M. Singh http://books.google.com/books?id=8tZfsCu2eQkC http://www.worldcat.org/oclc/317588499 allbookstores.com bing.com bookfinder.com Earthworm Ecology and Application of Vermicompost Technology for Sugarcane production; by K Sreenivasulu Reddy http://books.google.com/books?id=nWHoZwEACAAJ http://www.worldcat.org/oclc/703917448 allbookstores.com bing.com bookfinder.com Earthworm Feeds and Feeding; by Charlie Morgan http://www.librarything.com/work/4849362 http://books.google.com/books?id=yOc7uwAACAAJ http://www.worldcat.org/oclc/6473662 allbookstores.com bing.com bookfinder.com Earthworm Management In Tropical Agroecosystems; by Patrick Lavelle http://books.google.com/books?id=VX5FAQAAIAAJ http://www.worldcat.org/oclc/40675052 allbookstores.com bing.com bookfinder.com Earthworm Resources And Vermiculture, India; by J M Julka http://books.google.com/books?id=9u1JAAAAYAAJ http://www.worldcat.org/oclc/41650058 allbookstores.com bing.com bookfinder.com Earthworm Response To Soil Management Practices In Vineyards; by Katie A Webster http://books.google.com/books?id=9-zoSAAACAAJ http://www.worldcat.org/oclc/503244349 allbookstores.com bing.com bookfinder.com Earthworm Selling and Shipping Guide; by Charlie Morgan http://books.google.com/books?id=8ukmAAAACAAJ http://www.worldcat.org/oclc/4769721 allbookstores.com bing.com bookfinder.com
  • 208.
    ~ Earthworm Vermicompost: ASustainable Alternative to Chemical Fertilizers for Organic Farming ; by Rajiv K. Sinha http://books.google.com/books?id=NQ6gcQAACAAJ http://www.worldcat.org/oclc/663102403 allbookstores.com bing.com bookfinder.com Earthworms: Improving Soil for Agriculture, Proceedings of a Conference Held at TAFE College ; by Philip James Haines http://books.google.com/books?id=NwFrYgEACAAJ http://www.worldcat.org/oclc/27595221 allbookstores.com bing.com bookfinder.com Earthworms: Technology Information To Enable The Development Of Earthworm Production, a report for the Rural Industries Research and Development Corporation ; by Robyn A Dynes http://www.worldcat.org/oclc/224036092 allbookstores.com bing.com bookfinder.com Earthworms, The Soil Managers: Their Role in Restoration and Improvement of Soil Fertility; by Rajiv K. Sinha http://books.google.com/books?id=wIMgkgAACAAJ http://www.worldcat.org/oclc/673417997 allbookstores.com bing.com bookfinder.com Earthworms, The Waste Managers: Their Role in Sustainable Waste Management Converting Waste into Resource While Reducing Greenhouse Gases; by Rajiv K. Sinha http://books.google.com/books?id=VUafcQAACAAJ http://www.worldcat.org/oclc/663102404 allbookstores.com bing.com bookfinder.com Earthworms: Their Intensive Propagation and Use in Biological Soil-building; by Thomas J. Barrett http://www.librarything.com/work/8595954 http://books.google.com/books?id=grNBAAAAIAAJ http://www.worldcat.org/oclc/1826279 allbookstores.com bing.com bookfinder.com Earthworms: Underground Farmers; by Patricia Laube http://www.librarything.com/work/310494 http://books.google.com/books?id=8fTfbpIN6ToC http://www.worldcat.org/oclc/31174079 allbookstores.com bing.com bookfinder.com Earthworms for Ecology and Profit, Volume 1; by Ronald E. Gaddie http://www.librarything.com/work/8806683 http://books.google.com/books?id=j2r6SAAACAAJ http://www.worldcat.org/oclc/3787427 allbookstores.com bing.com bookfinder.com
  • 209.
    ~ Earthworms for Ecologyand Profit, Volume 2; by Ronald E. Gaddie http://books.google.com/books?id=PxVHAAAAYAAJ http://www.worldcat.org/oclc/732742442 allbookstores.com bing.com bookfinder.com Earthworms For Gardeners And Fishermen; by Kevin Handreck http://www.librarything.com/work/2217922 http://books.google.com/books?id=0b_qAAAACAAJ http://www.worldcat.org/oclc/28209451 allbookstores.com bing.com bookfinder.com Earthworms for Monitoring Metal Contamination; by Barbara Plytycz http://books.google.com/books?id=35ApAQAAMAAJ http://www.worldcat.org/oclc/662458795 allbookstores.com bing.com bookfinder.com Earthworms for Solid Waste Management; by Satyendra M. Singh http://books.google.com/books?id=Bl648_wspRwC http://www.worldcat.org/oclc/630057584 allbookstores.com bing.com bookfinder.com Earthworms in Australia: A Blueprint for a Better Environment; by David Murphy http://www.librarything.com/work/354871 http://books.google.com/books?id=h3MQAAAACAAJ http://www.worldcat.org/oclc/29252871 allbookstores.com bing.com bookfinder.com Earthworms in New Zealand; by Amy Brown http://www.worldcat.org/oclc/154692781 allbookstores.com bing.com bookfinder.com Earthworms in Waste And Environmental Management; by Clive Arthur Edwards http://books.google.com/books?id=UD_xAAAAMAAJ http://www.worldcat.org/oclc/19496912 allbookstores.com bing.com bookfinder.com Earthworms Life Cycle, Compost and Therapy; by Kasi Parthasarathi http://books.google.com/books?id=pfKucQAACAAJ google.com bing.com yahoo.com Effects of Application of Vermicompost and FYM on Release of Nutrients and Their Uptake by Maize in Different Textured Soils; by N K Patil http://books.google.com/books?id=-IoUMwEACAAJ http://www.worldcat.org/oclc/778037247 allbookstores.com bing.com bookfinder.com
  • 210.
    ~ Effect of ApplicationOf Vermicompost On The Availability And Uptake Of Micronurients by sunflower in medium black calcareous and non-calcareous soils; by S S Damshett http://www.worldcat.org/oclc/781251648 allbookstores.com bing.com bookfinder.com Effects of Compost, Legume Cover Cropping And Vermicompost Extract Foliar Applications On Nutrition and Yield of Washington Navel Oranges; by William Payton Carling http://www.worldcat.org/oclc/817718944 allbookstores.com bing.com bookfinder.com Effect of Nutrient And Microbially Rich Vermicompost On Pomegrante: Soil Microbiology Nutrient Management and Fruit Production; by Bishwanath Nandi http://books.google.com/books?id=HdlCLgEACAAJ google.com bing.com yahoo.com Effect of NPK and Vermicompost in Tomato; by Narender Pal http://books.google.com/books?id=P--vYgEACAAJ http://www.worldcat.org/oclc/652231475 allbookstores.com bing.com bookfinder.com Effect of Vermicompost and Pressmud on Soil Fertility, Plant Nutrition, Yield and Quality of Onion ; by P. Sreedevi http://books.google.com/books?id=olflZwEACAAJ http://www.worldcat.org/oclc/703926231 allbookstores.com bing.com bookfinder.com Environmental Biotechnologies for Bioremediation of Contaiminated Lands and Soil by Microbes, Plants and Earthworms; by Rajiv K. Sinha http://books.google.com/books?id=66UoAQAAMAAJ http://www.worldcat.org/oclc/505420620 allbookstores.com bing.com bookfinder.com Feasibility of Low Cost Vermicompost Production in Accra, Ghana; by Nana-Osei K. Mainoo http://books.google.com/books?id=4ykSAk0AMSkC http://www.worldcat.org/oclc/704029257 allbookstores.com bing.com bookfinder.com Fletcher Sims Compost; by Fletcher Sims http://www.librarything.com/work/8170309 http://books.google.com/books?id=wo0UAQAAMAAJ http://www.worldcat.org/oclc/31294906 allbookstores.com bing.com bookfinder.com
  • 211.
    ~ Gardening with Worms:A Manual for New Zealanders; by John Stemmer http://books.google.com/books?id=xbHtXwAACAAJ http://www.worldcat.org/oclc/156005711 allbookstores.com bing.com bookfinder.com Green Home Recycling: 16 Ways to Compost and Worm Farm, Landcare for Every Household; by Allan Windust http://books.google.com/books?id=A6QlAQAACAAJ http://www.worldcat.org/oclc/222706413 allbookstores.com bing.com bookfinder.com Green Tips: Vermicomposting; by Ontario Ministry of the Environment google.com bing.com yahoo.com ~ Nook book allbookstores.com allbookstores.com bing.com bookfinder.com Hand Book of Biofertilizers and Vermiculture; by Engineers India Research Institute http://books.google.com/books?id=fX6mA1jE72oC http://www.worldcat.org/oclc/295034947 allbookstores.com bing.com bookfinder.com Hand Book of Organic Farming and Organic Foods with Vermi-composting and Neem Products; by by Engineers India Research Institute http://books.google.com/books?id=T354WbwT7ZIC http://www.worldcat.org/oclc/295034946 allbookstores.com bing.com bookfinder.com Harnessing the Earthworm; a Practical Inquiry Into Soil-Building, Soil-Conditioning and Plant Nutrition Through the Action of Earthworms; by Thomas Jason Barrett http://www.librarything.com/work/941755 http://books.google.com/books?id=ZZssrk1M5zUC http://www.worldcat.org/oclc/2505704 allbookstores.com bing.com bookfinder.com How to Raise, Store and Sell Nightcrawlers: (Lumbricus Terrestris) Or Northern Native; by Charlie Morgan http://books.google.com/books?id=VnQVPwAACAAJ http://www.worldcat.org/oclc/10768827 allbookstores.com bing.com bookfinder.com How To Start A Worm Farm: Worm Farming And Using Worms For Composting ; by Robin Harris http://books.google.com/books?id=9FyMMAEACAAJ google.com bing.com yahoo.com
  • 212.
    ~ Improving Sanitization andFertiliser Value of Dairy Manure and Waste Paper Mixtures Enriched with Rock Phosphate Through Combined Thermophilic Composting and Vermicomposting ; by Lushian Tapiwa Mupondi http://books.google.com/books?id=ePhzMwEACAAJ http://www.worldcat.org/oclc/796918596 allbookstores.com bing.com bookfinder.com In Their Own Words: Interviews with Vermiculture Experts; by Peter Bogdanovich http://www.librarything.com/work/11957519 http://books.google.com/books?id=5uCTAAAACAAJ http://www.worldcat.org/oclc/45487223 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Laverme's Handbook of Indoor Worm Composting; by Ellen Sandbeck http://books.google.com/books?id=aGNmGwAACAAJ http://www.worldcat.org/oclc/48024159 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Le Compost de vers de terre; by Jack Temple - French http://books.google.com/books?id=t5zfOwAACAAJ http://www.worldcat.org/oclc/462433116 allbookstores.com bing.com bookfinder.com Let an Earthworm be Your Garbage Man: All about Earthworms, for Garbage Disposal and Soil Fertility http://www.librarything.com/work/13102639 http://books.google.com/books?id=-vJgAQAACAAJ http://www.worldcat.org/oclc/1429548 allbookstores.com bing.com bookfinder.com Lunch Munchers: An Education Kit for Primary Schools to Develop Worm Composting and Recycling Programs in New South Wales, Australia; by Tammy Small http://books.google.com/books?id=koasXwAACAAJ http://www.worldcat.org/oclc/320288613 allbookstores.com bing.com bookfinder.com Make a Worm Farm; by Jill McDougall http://www.librarything.com/work/9001373 http://books.google.com/books?id=YMdDs0l5AqYC http://www.worldcat.org/oclc/155445530 allbookstores.com bing.com bookfinder.com
  • 213.
    ~ Making a WormFarm, Springboard Level 16A; by Nicole Ward http://books.google.com/books?id=ljKxtJTI6PcC http://www.worldcat.org/oclc/324952072 allbookstores.com bing.com bookfinder.com Management of Water Hyacinth Biomass Along with Industrial Effluents: Mushroom Culturing And Vermicomposting; by Priyanka Anand http://books.google.com/books?id=WRiqZwEACAAJ google.com bing.com yahoo.com Manual of Therapeutic Medications and Pesticides for Worm Growers; by Charlie Morgan http://books.google.com/books?id=XsDqGwAACAAJ http://www.worldcat.org/oclc/8803512 allbookstores.com bing.com bookfinder.com Marty McGuire Digs Worms; by Kate Messner http://www.librarything.com/work/11618797 http://books.google.com/books?id=g5L-A0UdPH4C http://www.worldcat.org/oclc/732967751 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Mini Farming: Self-Sufficiency on 1/4 Acre; by Brett L. Markham http://www.librarything.com/work/9724353 http://books.google.com/books?id=HfVygFIMI3sC http://www.worldcat.org/oclc/458582333 allbookstores.com bing.com bookfinder.com Nature Farming and Microbial Applications; by Hiu-lian Xu http://www.librarything.com/work/9350031 http://books.google.com/books?id=GNbe4eClXicC http://www.worldcat.org/oclc/44468922 allbookstores.com bing.com bookfinder.com Organic farming and vermiculture; by Gaurav Singh http://books.google.com/books?id=kjt0QwAACAAJ http://www.worldcat.org/oclc/398315852 allbookstores.com bing.com bookfinder.com Organic Farming and Vermiculture; Linga Raj Patro http://books.google.com/books?id=W9-TkgEACAAJ http://www.worldcat.org/oclc/818319567 allbookstores.com bing.com bookfinder.com
  • 214.
    ~ Organic Growing withWorms: A Handbook for a Better Environment; by David Murphy http://www.librarything.com/work/5240016 http://books.google.com/books?id=ytJYAAAACAAJ http://www.worldcat.org/oclc/224612833 allbookstores.com bing.com bookfinder.com Pee Wee’s Great Adventure: A guide to Vermicomposting; by Larraine Roulston http://www.librarything.com/work/6262779 http://books.google.com/books?id=np8MPwAACAAJ http://www.worldcat.org/oclc/43283553 allbookstores.com bing.com bookfinder.com Pitting Friends Against Foes: Weed Management by Vermicomposting; by Astha Thakur http://books.google.com/books?id=pq_llwEACAAJ google.com bing.com yahoo.com Profitable Earth Worm Farming: A complete raising and marketing manual for those who want to raise their own bait, or those who want to raise bait for fun and profit; by Charlie Morgan http://www.librarything.com/work/8539906 http://books.google.com/books?id=4VLsQgAACAAJ http://www.worldcat.org/oclc/8710868 allbookstores.com bing.com bookfinder.com Raising the African Nightcrawler or Tropical Giant Worm: A Complete Production and Sales Manual; by Charlie Morgan http://www.librarything.com/work/8595978 http://books.google.com/books?id=cKlfNQAACAAJ http://www.worldcat.org/oclc/3343215 allbookstores.com bing.com bookfinder.com Raising Composting Earthworms for Fun and Profit; by Daniel C Merrill http://books.google.com/books?id=Yh26a_Th6scC http://www.worldcat.org/oclc/748328186 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Recycle With Earthworms: The Red Wiggler Connection; by Shelley C. Grossman http://www.librarything.com/work/9345776 http://books.google.com/books?id=635wPQAACAAJ http://www.worldcat.org/oclc/38889546 allbookstores.com bing.com bookfinder.com
  • 215.
    ~ Raising Fishworms withRabbits: A Profitable Combination; by Howard Lucky Mays http://www.librarything.com/work/1486785 http://books.google.com/books?id=5UiKPQAACAAJ http://www.worldcat.org/oclc/8734203 allbookstores.com bing.com bookfinder.com Recycling of Horse Manure by Vermicomposting; by Lai-yee Joyce Ng http://books.google.com/books?id=BzQAywAACAAJ http://www.worldcat.org/oclc/51348900 allbookstores.com bing.com bookfinder.com Red Worm Composting: Guide to Vermicomposting; by Bentley Christie google.com allbookstores.com bing.com bookfinder.com yahoo.com Reduction of Heavy Metals Sludge By Vermicomposting Technique: Treatment of the Industrial Sludge by Earthworms; by Shaymaa Ahmed Hamdi http://books.google.com/books?id=4xqlpwAACAAJ Revolution in a Bottle: How TerraCycle Is Redefining Green Business; by Tom Szaky http://www.librarything.com/work/8039516 http://books.google.com/books?id=aMItfTftcqYC http://www.worldcat.org/oclc/276138230 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Russian Worm Conference: Earthworms and Soil's Fertility Abstracts; by Green-PIK google.com allbookstores.com bing.com bookfinder.com yahoo.com Save The Planet: Start Your Own Worm Farm; by Gregory Vanden Berge ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Solid waste management with earthworms; by S A Abbasi http://books.google.com/books?id=UdOiAAAACAAJ http://www.worldcat.org/oclc/60691668 google.com bing.com yahoo.com
  • 216.
    ~ Start A WormFarm For A Green Home Garden: Make Natural Garden Fertilizer Following This Worm Farming Beginner's Guide With All The Basic Details; by Becca D. Nigel http://books.google.com/books?id=gAhCXwAACAAJ ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Starting a Worm Farm: Also Known as Vermicomposting Or Vermiculture; by M L Robinson http://books.google.com/books?id=30X7HAAACAAJ http://www.worldcat.org/oclc/46674850 allbookstores.com bing.com bookfinder.com The ABC's of the Earthworm Business; by Ruth Myers http://www.librarything.com/work/10164470 http://books.google.com/books?id=dMiQpwAACAAJ http://www.worldcat.org/oclc/10306006 allbookstores.com bing.com bookfinder.com The Australian Compost and Worm Book: A Practical Guide For Homes, Schools And Businesses; by Peter W. Rutherford http://www.librarything.com/work/1665718 http://books.google.com/books?id=VRBxHAAACAAJ http://www.worldcat.org/oclc/39131057 allbookstores.com bing.com bookfinder.com The Average Joe's Guide To Indoor Worm Composting; by Barbara Shaw http://www.librarything.com/work/12785238 ~ Kindle book bookfinder.com allbookstores.com addall.com booksprice.com The Best Place for Garbage: The Essential Guide To Recycling With Composting Worms; by Sandra Wiese http://books.google.com/books?id=K62suAAACAAJ http://www.worldcat.org/oclc/711102018 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Complete Guide to Working With Worms: Using the Gardener's Best Friend for Organic Gardening and Composting; by Wendy M. Vincent http://www.librarything.com/work/10080771 http://books.google.com/books?id=vlKbRNzhM1AC http://www.worldcat.org/oclc/768607157 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 217.
    ~ The Complete TechnologyBook On Vermiculture and Vermicompost; by Niir Board http://www.librarything.com/work/13117042 http://books.google.com/books?id=PwxPUGpRyQkC http://www.worldcat.org/oclc/174263493 allbookstores.com bing.com bookfinder.com The Earth Moved: On the Remarkable Achievements of Earthworms; by Amy Stewart http://www.librarything.com/work/118073 http://books.google.com/books?id=ETE8qhmc2SEC http://www.worldcat.org/oclc/52814414 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Earthworm Book: How to Raise and Use Earthworms for Your Farm and Garden ; by Jerry Minnich http://www.librarything.com/work/1821430 http://books.google.com/books?id=ngTxAAAAMAAJ http://www.worldcat.org/oclc/3311468 allbookstores.com bing.com bookfinder.com The Farmer's Earthworm Handbook: Managing Your Underground Money-Makers; by David Ernst http://www.librarything.com/work/5971800 http://books.google.com/books?id=hdMnAQAAMAAJ http://www.worldcat.org/oclc/33820604 allbookstores.com bing.com bookfinder.com The Good Worm on Compost; by Gold Coast City Council http://books.google.com/books?id=XpOyMwEACAAJ http://www.worldcat.org/oclc/794929036 allbookstores.com bing.com bookfinder.com The Nightcrawler Manual: A Complete Guide to the Collecting and Storing of the Nightcrawler; by Ray Edwards http://books.google.ca/books?id=ZNRjMwEACAAJ http://www.worldcat.org/oclc/22960548 allbookstores.com bing.com bookfinder.com The Production and Sale of Larger Red Worms; by George H. Holwager http://www.librarything.com/work/5153407 http://books.google.com/books?id=Dt9HAAAACAAJ http://www.worldcat.org/oclc/756886 allbookstores.com bing.com bookfinder.com
  • 218.
    ~ The Role ofEarthworms in Agriculture and Land Management; by Mike Temple-Smith http://books.google.com/books?id=_Yf7tgAACAAJ http://www.worldcat.org/oclc/38397782 allbookstores.com bing.com bookfinder.com The Worm Book: The Complete Guide to Gardening and Composting with Worms; by Loren Nancarrow http://www.librarything.com/work/653193 http://books.google.com/books?id=rmtZ91zbxLMC http://www.worldcat.org/oclc/38067650 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Worm Book For Beginners: A Vermiculture Starter or How To Be A Backyard Worm Farmer And Make The Best Natural Compost From Worms; by Frank Randall http://www.librarything.com/work/12326569 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com The Worm Cafe: Mid-scale Vermicomposting of Lunchroom Wastes; by Binet Payne http://www.librarything.com/work/1124844 http://books.google.com/books?id=IsUKAAAACAAJ http://www.worldcat.org/oclc/41343935 allbookstores.com bing.com bookfinder.com The Worm Farm: a Diary: Complete Story of Building and Operating a $20,000.00 Worm Business ; by Charlie Morgan http://books.google.com/books?id=X9y1GAAACAAJ http://www.worldcat.org/oclc/220271918 allbookstores.com bing.com bookfinder.com The Worm Guide: A Vermicomposting Guide for Teachers; by Tavia Pagan http://books.google.com/books?id=1IL4PAAACAAJ http://www.worldcat.org/oclc/49339696 allbookstores.com bing.com bookfinder.com The Worm Guide: A Vermicomposting Guide for Teachers; by California Integrated Waste Management Board http://www.librarything.com/work/11236245 http://www.worldcat.org/oclc/316871428 allbookstores.com bing.com bookfinder.com
  • 219.
    ~ Using Earthworms toMake Super Vermicompost, South Africa; by Charl Pienaar http://books.google.com/books?id=e7SWXwAACAAJ http://www.worldcat.org/oclc/467149455 allbookstores.com bing.com bookfinder.com Value Addition on Biogas Effluent Through Vermicomposting Using Earthworms google.com allbookstores.com bing.com bookfinder.com yahoo.com Vermi Composting Techniques; by Marcie Snyder ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Vermicompost: A Bio-Organic Fertilizer: Vermicompost: Rich Supplement for Your Home Gardening http://books.google.com/books?id=1reeZwEACAAJ Vermicompost Amended Pine Bark Substrate Improves Nursery Crop Production ; by Michelle S. McGinnis http://books.google.com/books?id=3ac980LCk8QC http://www.worldcat.org/oclc/183034860 allbookstores.com bing.com bookfinder.com Vermicompost and NPK on Wheat: Growth, Chemical Composition and Yield; by Mohammad Saiful Islam Bhuiyan http://books.google.com/books?id=GWmmMQEACAAJ Vermicomposting; by Ontario Environment http://www.worldcat.org/oclc/670416286 allbookstores.com bing.com bookfinder.com Vermicomposting: 1-2-3 Worm Composting Bin; by Recycling Council of Ontario http://books.google.com/books?id=9fMrHAAACAAJ http://www.worldcat.org/oclc/40153236 allbookstores.com bing.com bookfinder.com Vermicomposting: A Beginners Guide to making Organic Compost with a Home Made Worm Farm; by Jana Wilcox ~ Kindle book allbookstores.com google.com bing.com yahoo.com
  • 220.
    ~ Vermicomposting: A Boonfor Soil, Plant and Environment ; by Keshav Singh http://books.google.com/books?id=1reeZwEACAAJ Vermicomposting: A Teachers Guide for Composting with Worms; by Wisconsin. Dept. of Natural Resources http://books.google.com/books?id=EzHmGwAACAAJ http://www.worldcat.org/oclc/41477048 allbookstores.com bing.com bookfinder.com Vermicomposting: An Eco Approach Towards Pollution Management; Usha Damodharan; by Arun Karnwal http://books.google.com/books?id=cX91MAEACAAJ Vermicomposting: From Microbial and Earthworm Induced Effects in Bacterial Sanitation to the Chemistry of Biodegradation Under Batch Or Continuous Operation http://books.google.com/books?id=IbkBuyICJ9wC http://www.worldcat.org/oclc/665191603 allbookstores.com bing.com bookfinder.com Vermicomposting: Recycling Wastes Into Valuable Organic Fertilizer; by K P Nagavallemma http://books.google.com/books?id=d6pKAAAAYAAJ http://www.worldcat.org/oclc/57914891 allbookstores.com bing.com bookfinder.com Vermicomposting: Solid Waste Management and Crop Improvement: Home Gardening with Home Waste; by Nandita Mehta http://books.google.com/books?id=QaCcMQEACAAJ http://www.worldcat.org/oclc/823319973 allbookstores.com bing.com bookfinder.com Vermicomposting: Selected Articles; by Mary Appelhof http://books.google.com/books?id=YlIoAAAACAAJ http://www.worldcat.org/oclc/10374523 allbookstores.com bing.com bookfinder.com Vermicomposting and Vermiwash; by L L Somani http://www.worldcat.org/oclc/297212101 allbookstores.com bing.com bookfinder.com
  • 221.
    ~ Vermicomposting Brings BetterYields and Returns A Small Farmer Shows the Way; by AME Foundation http://www.google.com http://www.bing.com Vermicomposting for Sustainable Agriculture; by P K Gupta http://books.google.com/books?id=jUinAQAACAAJ http://www.worldcat.org/oclc/65174861 allbookstores.com bing.com bookfinder.com Vermicomposting for Sustainable Agriculture; by R K Pawar http://books.google.com/books?id=OGpiPgAACAAJ http://www.worldcat.org/oclc/277278415 allbookstores.com bing.com bookfinder.com Vermicomposting of Cow Slurry; by Paul Hand http://books.google.com/books?id=ILw5MwEACAAJ http://www.worldcat.org/oclc/704196282 allbookstores.com bing.com bookfinder.com Vermiculture and Organic Farming; by Sathe Tukaram Vithatran http://www.librarything.com/work/13118363 http://books.google.com/books?id=lW5fB0sUDK0C http://www.worldcat.org/oclc/427638359 allbookstores.com bing.com bookfinder.com Vermicomposting Horse Manure; by A B Card http://www.worldcat.org/oclc/123776008 allbookstores.com bing.com bookfinder.com Vermicomposting Toilets, An Alternative To Latrine Style Microbial Composting Toilets, Prove Far Superior In Mass Reduction, Pathogen Destruction, Compost Quality, And Operational Cost http://www.worldcat.org/oclc/4906909633 allbookstores.com bing.com bookfinder.com Vermiculture Revolution; by Rajiv K. Sinha http://books.google.com/books?id=K6q6cQAACAAJ http://www.worldcat.org/oclc/663773365 allbookstores.com bing.com bookfinder.com
  • 222.
    ~ Vermiculture Technology: Earthworms,Organic Wastes, and Environmental Management ; by Clive A. Edwards http://www.librarything.com/work/10973239 http://books.google.com/books?id=_JJ5Cw5BBxEC http://www.worldcat.org/oclc/645676613 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Vermitechnology; by M. Seetha Lekshmy http://www.google.com allbookstores.com bing.com bookfinder.com Vermitechnology: Permutations And Combinations Of Organic Waste; by Abdullah Adil Ansari http://books.google.com/books?id=LpD1ugAACAAJ Vermitechnology for Solid Waste Management; by V K Garg http://books.google.com/books?id=EmM5LgEACAAJ Vermitechnology, Vermiculture, Vermicompost and Earthworms; by Avnish Chauhan http://books.google.com/books?id=4oRkLwEACAAJ Verms and Vermitechnology; by Arvind Kumar http://books.google.com/books?id=ODwS49rFHeMC http://www.worldcat.org/oclc/297506435 allbookstores.com bing.com bookfinder.com Waste Recycling: Utilization of Coffee Grounds and Kitchen Waste in Vermicomposting; by Adi Ainurzaman Jamaludin http://books.google.com/books?id=PExBLgEACAAJ Wellington Vermicomposting Trials, 1995/96: Medium Scale Collection and Composting of Commercial Food Waste Using Tiger Worms in Outdoor Low Capital Cost Systems, New Zealand; by Dana R Peterson http://books.google.com/books?id=qYYPMgAACAAJ http://www.worldcat.org/oclc/153809023 allbookstores.com bing.com bookfinder.com
  • 223.
    ~ What Every GardenerShould Know About Earthworms, Bulletin A-21; by Henry Hopp http://www.librarything.com/work/5011585 http://books.google.com/books?id=GrX12L3vfmgC http://www.worldcat.org/oclc/777949 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com What is vermicomposting; by Illinois http://www.worldcat.org/oclc/57671629 allbookstores.com bing.com bookfinder.com Wine Country Worms DVD http://www.happydranch.com http://www.vermico.com http://www.sonomavalleyworms.com With Tails We Win; by Mary Crowe http://books.google.com/books?id=dTqltwAACAAJ http://www.worldcat.org/oclc/4557323 allbookstores.com bing.com bookfinder.com Workshop on the Role of Earthworms in the Stabilization of Organic Residues, Volume 1; by Mary Appelhof http://books.google.com/books?id=xUE-AQAAIAAJ http://www.worldcat.org/oclc/9151455 allbookstores.com bing.com bookfinder.com Workshop on the Role of Earthworms in the Stabilization of Organic Residues, Volume 2; by Mary Appelhof http://www.worldcat.org/oclc/257394731 allbookstores.com bing.com bookfinder.com Worm Composting; by Joshua D. Nelson http://books.google.com/books?id=E_fsOMYk0Z0C http://www.worldcat.org/oclc/39786612 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Worm Composting: A Practical Guide by Young Urban Farmers; by Christopher Wong ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 224.
    ~ Worm Composting: CompostingIdeas for use in Organic Gardening and Growing of Vegetables and Herbs; by Jack Pollard http://www.librarything.com/work/13551292 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Worm Composting: Let Worms Eat Your Garbage; by San Francisco League of Urban Gardeners http://books.google.com/books?id=NbHzPgAACAAJ http://www.worldcat.org/oclc/47728382 allbookstores.com bing.com bookfinder.com Worm Composting Bin; by Suzanne Smith Hirrel http://books.google.com/books?id=oBQhHQAACAAJ http://www.worldcat.org/oclc/029239848 allbookstores.com bing.com bookfinder.com Worm Composting: Woodworking Plans and Worm Bin Ideas for Use in Organic Gardening ; by Jack Pollard http://www.librarything.com/work/13552900 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Worm Farm Management: Practices, Principles, Procedures; by Eric Wilson http://www.librarything.com/work/599056 http://books.google.com/books?id=6DkPAAAACAAJ http://www.worldcat.org/oclc/42277941 allbookstores.com bing.com bookfinder.com Worm Farming: The Fun and Easy Way to Turn your Waste into Amazing Fertilizer; by Kay Summers ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Worm Farming by Kids for Kids; by Hannah ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Wormania: Teaching Guide; by Caton Gauthier http://www.librarything.com/work/12349310 http://www.worldcat.org/oclc/33927566 allbookstores.com bing.com bookfinder.com
  • 225.
    ~ Worming Your Wayto Better Compost; by New Hampshire Governor's Recycling Program http://books.google.com/books?id=Pv0IHQAACAAJ http://www.worldcat.org/oclc/32997723 allbookstores.com bing.com bookfinder.com Worms and Waste Management In California: A Question And Answer Factsheet On Vermiculture; by California Integrated Waste Management Board http://www.worldcat.org/oclc/34444065 allbookstores.com bing.com bookfinder.com Worms and Wormeries: Composting Your Kitchen Waste and More; by Mike Woolnough http://www.librarything.com/work/12354489 http://books.google.com/books?id=HaAZQwAACAAJ http://www.worldcat.org/oclc/495273629 allbookstores.com bing.com bookfinder.com Worms Downunder Downunder: For Farm, Garden, Schools, Profit and Recycling; by Allan Windust http://www.librarything.com/work/10169485 http://books.google.com/books?id=ksxdMQAACAAJ http://www.worldcat.org/oclc/38352918 allbookstores.com bing.com bookfinder.com Worms Garden for You; by Allan Windust http://books.google.com/books?id=NxOmAAAACAAJ http://www.worldcat.org/oclc/40871977 allbookstores.com bing.com bookfinder.com Worms the Mechanics of Organics; by Kellie Bollard http://books.google.com/books?id=itGZSQAACAAJ http://www.worldcat.org/oclc/693545699 allbookstores.com bing.com bookfinder.com Worms, Worms and Even More Worms: A Vermicomposting Guide for Teachers; by Anthony Eulo http://books.google.com/books?id=UEECAAAACAAJ http://www.worldcat.org/oclc/40865304 allbookstores.com bing.com bookfinder.com Worms, Worms, Worms, New Zealand; by Joy Allcock http://books.google.com/books?id=potkewAACAAJ http://www.worldcat.org/oclc/665171480 allbookstores.com bing.com bookfinder.com
  • 226.
    ~ GREY WATER RECYLING TheNew Create an Oasis with Greywater: Choosing, Building and Using Greywater Systems - Includes Branched Drains; by Art Ludwig http://www.librarything.com/work/2194973 http://books.google.com/books?id=VQNDAQAACAAJ http://www.worldcat.org/oclc/319646247 allbookstores.com bing.com bookfinder.com Branched Drain Greywater Systems: Reliable, Sanitary, Low Maintenance Distribution of Household Greywater to Downhill Plants Without Filtration Or Pumping; by Art Ludwig http://www.librarything.com/work/2194999 http://books.google.com/books?id=AJkNAAAACAAJ http://www.worldcat.org/oclc/46820337 allbookstores.com bing.com bookfinder.com Builder's Greywater Guide: Installation of Greywater Systems in New Construction and Remodeling ; by Art Ludwig http://www.librarything.com/work/2168145 http://books.google.com/books?id=PZS1QwAACAAJ http://www.worldcat.org/oclc/45833015 allbookstores.com bing.com bookfinder.com Create an Oasis With Greywater: Your Complete Guide to Choosing, Building and Using Greywater Systems; by Art Ludwig (2000) http://www.librarything.com/work/326733 http://books.google.com/books?id=y-kLAQAAMAAJ http://www.worldcat.org/oclc/76901413 allbookstores.com bing.com bookfinder.com Domestic Greywater: A Review of Alternatives for Its Treatment and Uses; by Martin M Karpiscak http://books.google.com/books?id=griKHAAACAAJ http://www.worldcat.org/oclc/71320428 allbookstores.com bing.com bookfinder.com Every Drop is Precious: Greywater as an Alternative Water Source, Australia; by Glenda Emmerson http://books.google.com/books?id=_Ty3twAACAAJ http://www.worldcat.org/oclc/222251354 allbookstores.com bing.com bookfinder.com Graywater Systems, Composting Toilets And Rainwater Collection Systems : A Resource List ; by Rocky Mountain Institute http://www.worldcat.org/oclc/40136853 allbookstores.com bing.com bookfinder.com
  • 227.
    ~ Greywater and RainwaterSystems: Recommended UK Requirements; by S Mustow http://books.google.com/books?id=bJZnAAAACAAJ http://www.worldcat.org/oclc/43726768 allbookstores.com bing.com bookfinder.com Greywater Management in Low an And Middle-income Countries: Review of Different Treatment Systems for Households or Neighbourhoods; by Stefan Diener http://www.librarything.com/work/11556394 http://books.google.com/books?id=Nj0OtwAACAAJ Greywater Reuse for the Irrigation of Food Crops; by Sara Finley http://books.google.com/books?id=v1DjSAAACAAJ http://www.worldcat.org/oclc/429188579 allbookstores.com bing.com bookfinder.com Greywater Reuse In Rural Schools; by Nehru Marg http://www.worldcat.org/oclc/385258373 allbookstores.com bing.com bookfinder.com Greywater Treatment Within Semi-centralised Supply and Treatment Systems by the Example of the People's Republic of China; by Yue Chang http://books.google.com/books?id=oz3fZwEACAAJ http://www.worldcat.org/oclc/670416927 allbookstores.com bing.com bookfinder.com Greywater Use in the Middle East: Technical, Social, Economic and Policy Issues; by Stephen McIlwaine http://www.librarything.com/work/11357398 http://books.google.com/books?id=De0_BrweA1UC Introduction to Greywater Management, Australia; by Peter Ridderstolpe http://books.google.com/books?id=2vDpCV9-37wC http://www.worldcat.org/oclc/38387945 allbookstores.com bing.com bookfinder.com Laundry to Landscape Grey Water Systems: A Simple, Efficient, Economical, Easy-to-Use Greywater System; by Art Ludwig http://books.google.com/books?id=QdEwQwAACAAJ http://www.worldcat.org/oclc/556147645 allbookstores.com bing.com bookfinder.com
  • 228.
    ~ Making the Mostof the Water We Have: The Soft Path Approach to Water Management; by David B Brooks http://books.google.com/books?id=FBEsMk76kyIC http://www.worldcat.org/oclc/586098202 allbookstores.com bing.com bookfinder.com Manual of Grey Water Treatment Practice; John H. Timothy Winneberger http://books.google.com/books?id=nRFSAAAAMAAJ http://www.worldcat.org/oclc/2585925 allbookstores.com bing.com bookfinder.com Rainwater and Greywater Use in Buildings: Best Practice Guidance; by Daniel J. Leggett http://books.google.com/books?id=nXe5PAAACAAJ http://www.worldcat.org/oclc/48894192 allbookstores.com bing.com bookfinder.com Rainwater and Greywater Use in Buildings: Decision-Making for Water Conservation; by Daniel J. Leggett http://books.google.com/books?id=8vlRPQAACAAJ http://www.worldcat.org/oclc/48886913 allbookstores.com bing.com bookfinder.com Rainwater and Greywater in Buildings: Project Report and Case Studies; by D. Brewer http://www.librarything.com/work/12859611 http://books.google.com/books?id=Dz9dAAAACAAJ http://www.worldcat.org/oclc/48255587 allbookstores.com bing.com bookfinder.com Simulation of Domestic Water Re-use Systems: Greywater and Rainwater in Combination; by Andrew Martin Dixon http://books.google.com/books?id=ma9CHQAACAAJ http://www.worldcat.org/oclc/53551527 allbookstores.com bing.com bookfinder.com The Complete Guide to Water Storage: How to Use Gray Water and Rainwater Systems, Rain Barrels, Tanks, and Other Water Storage Techniques for Household and Emergency Use; by Julie Frye http://books.google.com/books?id=SINk832GJa4C http://www.worldcat.org/oclc/741710615 allbookstores.com bing.com bookfinder.com The Evaluation of a Domestic On-site System Incorporating a Composting Toilet and Greywater Reedbed; by Andrew George Edward http://books.google.com/books?id=YW3vNAAACAAJ http://www.worldcat.org/oclc/222730926 allbookstores.com bing.com bookfinder.com
  • 229.
    ~ Water For EveryFarm: Yeomans Keyline Plan; by P. A. Yeomans http://www.librarything.com/work/2191599 http://books.google.com/books?id=cFebQQAACAAJ http://www.worldcat.org/oclc/27598545 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Water Not Just down the Drain: a Guide to Reusing and Treating Your Household Water, Australia; by Stuart McQuire http://www.librarything.com/work/11165284 http://books.google.com/books?id=wIkXIgAACAAJ http://www.worldcat.org/oclc/225372999 allbookstores.com bing.com bookfinder.com FREE RAIN WATER HARVESTING MANUALS and Much More http://www.scribd.com/doc/75160853 http://www.calameo.com/books/00105118622f34ba7dbe7 FREE WATER WISE Gardening, DROUGHT Gardening, XERISCAPE Gardening MANUALS, Books and Much More http://www.scribd.com/doc/105267038 http://calameo.com/books/001698854129dced31cc9 FREE RAIN GARDEN MANUALS, BROCHURES and INFORMATION SHEETS http://www.scribd.com/doc/75162927 http://www.calameo.com/books/00105118638b46251e05d FREE ROOF GARDENS - GREEN ROOFS MANUALS Links and Aquaponics Systems http://www.scribd.com/doc/45480026 http://calameo.com/books/00135160793af637917ef GREEN CHURCHES http://www.scribd.com/doc/75171088 http://calameo.com/books/0010511867f3f30cfdf12
  • 230.
    ~ REED BEDS WaterRecycling On-site Domestic Wastewater Treatment by Reed Bed and Sand Filter; by Mark Laurence Bayley http://books.google.com/books?id=stNBNQAACAAJ http://www.worldcat.org/oclc/223412885 allbookstores.com bing.com bookfinder.com Reed Beds: For the Treatment of Domestic Wastewater; by Nick Grant http://www.librarything.com/work/5575369 http://books.google.com/books?id=IYKCAAAACAAJ http://www.worldcat.org/oclc/59496097 allbookstores.com bing.com bookfinder.com Reedbeds for Greywater Treatment-Case Study in Santa Elena-Monteverde, Costa Rica, Central America; by Stewart Dallas http://www.worldcat.org/oclc/648856080 allbookstores.com bing.com bookfinder.com Sewage Solutions: Answering the Call of Nature; by Nick Grant http://www.librarything.com/work/1901790 http://books.google.com/books?id=AT6lOAAACAAJ http://www.worldcat.org/oclc/48232389 allbookstores.com bing.com bookfinder.com Sludge Management Using Reed Bed System Palestine Case Study; by Abdelmajid Nassar http://books.google.com/books?id=BYJTRwAACAAJ http://www.worldcat.org/oclc/500463298 allbookstores.com bing.com bookfinder.com The Performance of Two Reed Bed Greywater Treatment Systems in North Eastern New South Wales; by Meg Kezia Edmonds http://books.google.com/books?id=-mKKNAAACAAJ http://www.worldcat.org/oclc/223301040 allbookstores.com bing.com bookfinder.com Reedbed Management For Commercial And Wildlife Interests; by Carl Hawke http://books.google.com/books?id=lXbwAAAAMAAJ Small-Scale Constructed Wetland Treatment Systems; by Scott D. Wallace http://books.google.com/books?id=YVcOAQAACAAJ Sludge Management Using Reed Bed System Palestine Case Study; by Abdelmajid Nassar http://books.google.com/books?id=BYJTRwAACAAJ
  • 231.
    ~ COMPOSTING Animal MANURE AnEarth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural, Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism http://www.librarything.com/work/5162954 http://books.google.com/books?id=drOMQQAACAAJ http://www.worldcat.org/oclc/54830842 allbookstores.com bing.com bookfinder.com A Comparison of Composting Shavings-Based Horse Manure with Straw-based Horse Manure; by Matthew Robert James http://books.google.com/books?id=dCFWMwEACAAJ http://www.worldcat.org/oclc/795949716 allbookstores.com bing.com bookfinder.com A Comparison of Three Animal Manure Composts on the Growth of Potatoes; by Peter John Rich http://books.google.com/books?id=STxOMwEACAAJ http://www.worldcat.org/oclc/795967801 allbookstores.com bing.com bookfinder.com A Guide to Composting Horse Manure; by Jessica Paige https://www.google.com allbookstores.com bing.com bookfinder.com A Manual on Compost and Other Organic Manures; by R. Krishna Murthy http://books.google.com/books?id=vWVCAAAAYAAJ http://www.worldcat.org/oclc/4331209 allbookstores.com bing.com bookfinder.com An Assessment of the Effectiveness of Micro Aid Treatment in Solids Reduction and Composting of Beef Cattle Feedlot Manure; by Jim Fujikawa http://books.google.com/books?id=vAccHAAACAAJ http://www.worldcat.org/oclc/70376938 allbookstores.com bing.com bookfinder.com Characterizing The Process Of Composting Mink Manure; by Jennifer L Ferguson http://www.worldcat.org/oclc/228977263 allbookstores.com bing.com bookfinder.com
  • 232.
    ~ Cold Climate Composting:An Opportunity for Enhanced Manure Management; by Jeremy James Leonard http://books.google.com/books?id=jnGvGwAACAAJ http://www.worldcat.org/oclc/70492476 allbookstores.com bing.com bookfinder.com Comparative Study of Methods of Aeration for Composting Manure Slurries;; by Majid Sartaj http://www.worldcat.org/oclc/46508836 allbookstores.com bing.com bookfinder.com Composted Manures Offer Yield and Disease Resistance Benefits; by University of Wisconsin http://books.google.com/books?id=xJg0OAAACAAJ http://www.worldcat.org/oclc/47165846 allbookstores.com bing.com bookfinder.com Composted Swine Manure for Vegetable Crop Application; by Halina Maria Zaleski http://books.google.com/books?id=SadgNwAACAA http://www.worldcat.org/oclc/74200328 allbookstores.com bing.com bookfinder.com Composted Versus Stacked Cattle Manure on Ontario Farms; by George M Karanja http://www.worldcat.org/oclc/46534522 allbookstores.com bing.com bookfinder.com Composting: An Alternative for Livestock Manure Management; by Andrew Thomas Sandeen http://www.worldcat.org/oclc/57948653 allbookstores.com bing.com bookfinder.com Composting: The Safe Conversion of Village Refuse and Nightsoil into a Valuable Manure; by J W Scharff http://www.worldcat.org/oclc/642508781 allbookstores.com bing.com bookfinder.com Composting Animal Manures: A Guide to the Process and Management of Animal Compost; by Chris Augustin http://books.google.com/books?id=sRQBcgAACAAJ http://www.worldcat.org/oclc/642010770 allbookstores.com bing.com bookfinder.com Composting as a Manure Management Strategy for a Calf Farm in Northeast Wisconsin; by Paul C Robertson http://books.google.com/books?id=K01dOAAACAAJ http://www.worldcat.org/oclc/60652912 allbookstores.com bing.com bookfinder.com
  • 233.
    ~ Composting as aManure Management Alternative; by Francis J Larney http://books.google.com/books?id=GMsQtwAACAAJ http://www.worldcat.org/oclc/70594044 allbookstores.com bing.com bookfinder.com Composting Cage Layer Manure with Poulry Litter and The Use of Compost as A Source of Nitrogen for Ruminants; by A K M Aminul Haque http://www.worldcat.org/oclc/30531388 allbookstores.com bing.com bookfinder.com Composting Characteristics of Mixed Dairy Manure with Bulking Agent; by Hong, Ji Hyoung http://www.worldcat.org/oclc/677412605 allbookstores.com bing.com bookfinder.com Composting for Manure Management; by BioCycle http://books.google.com/books?id=U44dAQAAMAAJ Composting for Small Scale Livestock Operations, by University of Illinois Extension https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure; by Brent Walter Auvermann, Texas A&M http://www.worldcat.org/oclc/42291763 allbookstores.com bing.com bookfinder.com https://www.google.com Composting Horse Manure; by Brian Van Der Wege, Thal Equine https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure; by Kathy Corwin Doesken, Colorado State University https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure; by E A Ott http://www.worldcat.org/oclc/48269631 allbookstores.com bing.com bookfinder.com
  • 234.
    ~ Composting Horse Manure;by Gibbs Ferris, The Livestock and Land Program https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure; by Maryland Department of Agriculture https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure: A Field Guide for Recycling Equestrian Waste, by Cooperative Extension and County of San Diego https://www.google.com allbookstores.com bing.com bookfinder.com Composting Horse Manure in Dynamic Windrows; by A B Card http://www.worldcat.org/oclc/123775199 https://www.google.com allbookstores.com bing.com bookfinder.com Composting horse manure in static windrows, passively aerated windrow method; by A B Card http://www.worldcat.org/oclc/123899091 allbookstores.com bing.com bookfinder.com Composting liquid pig manure folder; by Ron Fleming http://www.worldcat.org/oclc/629033812 allbookstores.com bing.com bookfinder.com Composting Manure: Turn Horse Manure into Black Gold; by Environmental Equine ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Composting Manure and Other Organic Residues; Bahman Eghball http://books.google.com/books?id=8V3ctgAACAAJ http://www.worldcat.org/oclc/41268311 allbookstores.com bing.com bookfinder.com Composting Manure for Value-Added Products; by JG Press http://books.google.com/books?id=ymDUPQAACAAJ http://www.worldcat.org/oclc/49918878 allbookstores.com bing.com bookfinder.com
  • 235.
    ~ Composting of farmmanure; by Small Farm Energy Projec http://www.worldcat.org/oclc/25146410 allbookstores.com bing.com bookfinder.com Composting of High Moisture Dairy Manure Using Sawdust Or Mixed Paper as Amendments and Wood Chips as the Bulking Agent; by Md Shahjahan Mollah http://books.google.com/books?id=r9yQtgAACAAJ http://www.worldcat.org/oclc/156679489 allbookstores.com bing.com bookfinder.com Composting on Horse Farms; by H.M. Keener, Ohio State University https://www.google.com allbookstores.com bing.com bookfinder.com Composting Solid Manure; by Katherine E Buckley http://www.worldcat.org/oclc/629684903 allbookstores.com bing.com bookfinder.com Contour ripping and composted dairy manure for erosion control on Fort Hood Military Installation; by Lisa J Prcin http://www.worldcat.org/oclc/662322787 allbookstores.com bing.com bookfinder.com Composting System for Small Horse Farms; by Douglas W. Hamilton, Oklahoma Cooperative Extension Service http://www.worldcat.org/oclc/648264554 https://www.google.com allbookstores.com bing.com bookfinder.com Covering Tree Line with Black Poly Ethylene Sheets for Composting Fresh Animal Manures Reduces Weeds and Improves Tree Growth in Newly Established Orchards; by Barakat Abu Irmaileh; http://www.worldcat.org/oclc/825462839 allbookstores.com bing.com bookfinder.com Effect of Aeration and Turning on Decomposition and Odor Emission in Cattle Manure Composting; by Joko Nugroho Wahyu Karyadi http://www.worldcat.org/oclc/702866699 allbookstores.com bing.com bookfinder.com
  • 236.
    ~ Effect of AirFlow Rate on Cattle Manure Composting with Forced Aeration; by J.N.W.K. Karyadi http://www.worldcat.org/oclc/692264521 allbookstores.com bing.com bookfinder.com Effects of Bioadditive With Yeast and Zeolite on The Performance and Odor Emission From Poultry Manure Composting Process; by Zhiping Wen http://www.worldcat.org/oclc/607131125 allbookstores.com bing.com bookfinder.com Effect Of Compost Manure Age On Root-Gall Nematode Disease And Yield Of African Yam Bean; by Agu, C M http://www.worldcat.org/oclc/810505295 allbookstores.com bing.com bookfinder.com Evaluation of Enriched Farm Manure and Coir Compost for Nitrogen And Moisture Mangement in Rainfed Sorghum; by K Anabayan http://www.worldcat.org/oclc/698550768 allbookstores.com bing.com bookfinder.com Experimental Observations of Composting Dairy Manure Solids; by Stephen Earl Ferns http://books.google.com/books?id=Yl3RNwAACAAJ http://www.worldcat.org/oclc/19643033 allbookstores.com bing.com bookfinder.com Fertilization with Fresh and Composted Chicken Manure: Effect on Soil Fertility and Mixed Hay Quality; by Julia Mary Cooper http://books.google.com/books?id=kEXmNAEACAAJ http://www.worldcat.org/oclc/228946018 allbookstores.com bing.com bookfinder.com Fertilizer Pellets Made from Composted Livestock Manure; by Masayuki Hara http://books.google.com/books?id=N3pAygAACAAJ http://www.worldcat.org/oclc/760010797 allbookstores.com bing.com bookfinder.com Fletcher Sims Compost; by Fletcher Sims http://www.librarything.com/work/8170309 http://books.google.com/books?id=wo0UAQAAMAAJ http://www.worldcat.org/oclc/31294906 allbookstores.com bing.com bookfinder.com High Rapid Composting of Dairy Cattle Manure with Crop and Forest Residues; by J. H. Hong https://www.google.com allbookstores.com bing.com bookfinder.com
  • 237.
    ~ Horse Manure Managementand Composting; by Betsy Wieland http://books.google.com/books?id=QLREQwAACAAJ http://www.worldcat.org/oclc/430839604 How to Compost and Use Horse Manure, by Horses for Clean Water, University of Illinois Extension https://www.google.com http://www.bing.com How to Compost and Use Horse Manure; by Skagit Conservation District https://www.google.com http://www.bing.com How to Compost Manure; by Jack Pollard ~ Kindle book allbookstores.com http://howtocompostmanure.com bing.com Identification of Techniques to Produce Poultry Manure and Compost-tea and Their Benefits in Vegetable Production; by Steven David http://books.google.com/books?id=PCwHtwAACAAJ http://www.worldcat.org/oclc/62542108 allbookstores.com bing.com bookfinder.com Improving Sanitization and Fertiliser Value of Dairy Manure and Waste Paper Mixtures Enriched with Rock Phosphate Through Combined Thermophilic Composting and Vermicomposting; by Lushian Tapiwa Mupondi http://books.google.com/books?id=ePhzMwEACAAJ http://www.worldcat.org/oclc/796918596 allbookstores.com bing.com bookfinder.com Innovations in Composting Pig Manure; by Dale Philip Rudrum http://books.google.com/books?id=OG4SAAAACAAJ http://www.worldcat.org/oclc/70109230 allbookstores.com bing.com bookfinder.com Intensive Vegetable Production Using Composted Animal Manures; by Abigail Abbot Maynard http://books.google.com/books?id=jD6wMQEACAAJ http://www.worldcat.org/oclc/25820384 allbookstores.com bing.com bookfinder.com
  • 238.
    ~ Large Scale Vermicomposting- Worm Power https://www.google.com allbookstores.com bing.com bookfinder.com Large-Scale Vermicomposting of Dairy Manure https://www.google.com allbookstores.com bing.com bookfinder.com Learn How to Make and Use Compost Manure in Farming; by Pius B Ngeze http://books.google.com/books?id=f4UvtwAACAAJ http://www.worldcat.org/oclc/48632909 allbookstores.com bing.com bookfinder.com Liquid Fertilizer from Organic Waste Using Anaerobic Process; by Ripan Kumar Saha http://books.google.com/books?id=wacqOAAACAAJ http://www.worldcat.org/oclc/50436225 allbookstores.com bing.com bookfinder.com Liquid Organic Fertilizer: An Approach Towards Organic Vegetable Production; Gopal Deore http://books.google.com/books?id=IwOdpwAACAAJ Manures and Compost; by A J MacLean http://www.librarything.com/work/9002114 http://books.google.com/books?id=6oi0MwEACAAJ http://www.worldcat.org/oclc/15693323 allbookstores.com bing.com bookfinder.com Manure and Composted Manure Application for Corn Production; by Dave Venhaus http://www.worldcat.org/oclc/57146012 allbookstores.com bing.com bookfinder.com Manure Composting as a Pathogen Reduction Strategy; by Hugh Douglas Martin http://books.google.com/books?id=9xaaNwAACAAJ http://www.worldcat.org/oclc/227507239 allbookstores.com bing.com bookfinder.com Manure Composting Converts Raw Organic Waste into a Dark, Soil-Enriching Product; by South Carolina Conservation http://www.worldcat.org/oclc/39634842 allbookstores.com bing.com bookfinder.com
  • 239.
    ~ Manure Composting Manual;by Alberta Agriculture http://books.google.com/books?id=vBb4GgAACAAJ http://www.worldcat.org/oclc/57021570 MARVEL Composting Technology: A System to Compost Liquid Swine Manure; by Ron Fleming http://books.google.com/books?id=pob-cQAACAAJ http://www.worldcat.org/oclc/629773355 Manual of On-Farm Vermicomposting - All Things Organic https://www.google.com allbookstores.com bing.com bookfinder.com Manual of On-Farm Vermicomposting and Vermiculture - Organic Agriculture Centre of Canada https://www.google.com allbookstores.com bing.com bookfinder.com Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com On-Farm Composting: A Method for Converting Manure into Soil-Building Humus While Saving Time, Money and Fuel; by Land Stewardship Project http://www.worldcat.org/oclc/23765590 On-Farm Composting of Horse Manure and Its Use As A Fertilizer for Common Forages in North Florida; by Sarah Courtney Dilling http://www.worldcat.org/oclc/664030741 On-farm Manure Management Through Composting by Nova Scotia http://books.google.com/books?id=EYhENwAACAAJ http://www.worldcat.org/oclc/229200805 On-farm Manure Composting Techniques: Understanding Nitrogen and Carbon Conservation; by Richard St Jean http://books.google.com/books?id=G0mDHAAACAAJ http://www.worldcat.org/oclc/45527906
  • 240.
    ~ Organic Fertilizers: WhichOnes and How to Use Them; by Rodale Organic Gardening Magazine http://www.librarything.com/work/843239 http://books.google.com/books?id=CGLdAAAACAAJ http://www.worldcat.org/oclc/673074 bookfinder.com addall.com booksprice.com Organic Fertilizing, Secret of Garden Experts; by Rodale Organic Gardening Magazine http://www.librarything.com/work/10808299 http://books.google.com/books?id=P7EXYAAACAAJ http://www.worldcat.org/oclc/18997575 bookfinder.com addall.com booksprice.com Pig Manure Vermicompost as a Component of a Horticultural Bedding Plant Medium https://www.google.com http://www.bing.com Poultry Manure and Composted Yard Trimmings for Organic Vegetable Production in Delta, B.C.; by Katrina Nolan http://www.worldcat.org/oclc/606269762 Preliminary Design of a Co Composting System for Dairy Manure and Food Wastes; by David Profusek http://books.google.com/books?id=RvtHAAAAYAAJ http://www.worldcat.org/oclc/688656001 Preventive Control of Ammonia and Odor Emissions During the Active Phase of Poultry Manure Composting; by Zhang, Wenxiu http://www.worldcat.org/oclc/680290299 Static Pile Passive Aeration Composting of Poultry Manure Slurry; by Weiguo Zhan http://www.worldcat.org/oclc/35941805 Studies on the Fermentation of Compost Manure; by G B Masefield http://www.worldcat.org/oclc/270954740 http://books.google.com/books?id=1iTdPgAACAAJ
  • 241.
    ~ Successive Rapid ReductiveDehalogenation and Mineralization of Pentachlorophenol by the Indigenous Microflora of Farmyard Manure Compost; by Jaspers, Charles http://www.worldcat.org/oclc/803471704 The Composting of Farmyard Manure with Mineral Additives and Under Forced Aeration, and the Utilization of Fym and Fym Compost in Crop Production; by Pierre R Ott http://www.worldcat.org/oclc/256321581 The Development and Testing of a Dairy Manure Composting Operation; by James Craig Simmons http://books.google.com/books?id=GSE9OAAACAA http://www.worldcat.org/oclc/42705843 The Development of a Manure Composting System for West Virginia Dairy Producers; by James Simmons http://books.google.com/books?id=i5c0AwEACAAJ http://www.worldcat.org/oclc/43272070 The Composting of Poultry Manure with Two Paper Waste Materials; by T S J Budd http://books.google.com/books?id=D5f4cQAACAAJ http://www.worldcat.org/oclc/643389302 The effect of sheep-manure vermicompost on quantitative and qualitative properties of cucumber grown in the greenhouse https://www.google.com http://www.bing.com The Use of Composted Dairy Cow Manure as a Peat Moss Substitute in a Greenhouse Growing Substrate; by Wesley Dean Bannister http://books.google.com/books?id=X_77tgAACAAJ http://www.worldcat.org/oclc/318355456 The Use of Dairy Manure Compost for Sustainable Maize Production; by Vania Cabus De Toledo http://www.worldcat.org/oclc/53653943
  • 242.
    ~ The Use ofHartpury College Composted Horse Manure as Medium for Tomato Production; by Caphas Chisangowerota http://www.worldcat.org/oclc/795967684 The Use of Spent Mushroom Compost as an Organic Manure; by John Anthony Duggan http://books.google.com/books?id=x6jUSAAACAAJ http://www.worldcat.org/oclc/605203133 Under-Cage Drying and Windrow Composting of Manure; by William C Fairbank http://www.worldcat.org/oclc/16789029 Use of wood ash and composted manure as an alternative to limestone and fertilizer; by Jaote Makau Wawatu http://www.worldcat.org/oclc/163586549 Vermicomposting Horse Manure; by .B. Card, Colorado State University, Equine Extension https://www.google.com http://www.bing.com Windrow Management Methods for Composting Straw Amended Dairy Manure; by Michael C Kenny http://www.worldcat.org/oclc/44916229 Vermicomposting of Cow Slurry; by Paul Hand http://books.google.com/books?id=ILw5MwEACAAJ http://www.worldcat.org/oclc/704196282
  • 243.
    ~ COMPOSTING WATERLESS TOILETS TheComposting Toilet System Book: A Practical Guide to Choosing, Planning and Maintaining Composting Toilet Systems, a Water-Saving, Pollution-Preven; by David Del Porto http://www.librarything.com/work/606354 http://books.google.com/books?id=HRWKkgEACAAJ http://www.worldcat.org/oclc/44413552 bookfinder.com addall.com booksprice.com Appraisal of the Pilot Trials of Compost Toilets on Kiritimati Island ; by AusAID http://books.google.com/books?id=UoxrcgAACAAJ http://www.worldcat.org/oclc/640510854 Aerobic Thermophilic Composting of Piggery Solid Wastes; by Surya Prakash Pandey http://books.google.com/books?id=lKa9MgAACAAJ http://www.worldcat.org/oclc/155517687 Cheap Tricks for North Country Compost Toilets, Wastewater Recycling and Methane Digesters ; by Zandy Clark http://books.google.com/books?id=GJzgHAAACAAJ http://www.worldcat.org/oclc/41706925 Compost Toilets:A Guide for Owner-Builders; by Ida Daniels, National Center for Appropriate Technology http://books.google.com/books?id=Ef3fZwEACAAJ http://www.worldcat.org/oclc/6604184 Compost Toilets: A Practical DIY Guide: by Dave Darby http://books.google.com/books?id=p9xPLwEACAAJ http://www.worldcat.org/oclc/812342721 bookfinder.com addall.com booksprice.com Compost Toilets: An Option for Human Waste Disposal at Remote Sites; by Paul Donald Chapman http://books.google.com/books?id=rykUMgAACAAJ http://www.worldcat.org/oclc/152376261
  • 244.
    ~ Compost Toilets asan Alternative to the Honeybucket in a Rural Alaska Native Village ; by Simone Magyari Sebalo http://books.google.com/books?id=K7NNQwAACAAJ http://www.worldcat.org/oclc/436237016 Composting Toilet: Septic Tank, Composting, Sewage Treatment, Sewer, Latrine, Pit Toilet, Arborloo, Tree Bog, Chemical Toilet, Clivus Multrum, Ecological Sanitation, Humanure, Incinerating Toilet; by Frederic P. Miller http://books.google.com/books?id=lOwtQwAACAAJ Composting Toilet from Alley Scraps; by Allen Killian-Moore http://www.librarything.com/work/11827113 http://books.google.com/books?id=XexkMwEACAAJ http://www.worldcat.org/oclc/794452328 bookfinder.com addall.com booksprice.com Composting Toilets: A Critical Guide to Their Application and Operation in Canada; by Canada. Water Pollution Control Directorate http://books.google.com/books?id=D8iPXwAACAAJ http://www.worldcat.org/oclc/320852518 Composting Toilets and Greywater Disposal: Building Your Own; by Zandy Clark http://books.google.com/books?id=r_CBHAAACAAJ http://www.worldcat.org/oclc/41823653 bookfinder.com addall.com booksprice.com Composting Toilets Search; by Small Flows Clearinghouse http://books.google.com/books?id=indMkgAACAAJ http://www.worldcat.org/oclc/41815854 Composting Toilet System: Plans and Instruction Manual; by James D. Beard http://books.google.com/books?id=YZgGaAEACAAJ http://www.worldcat.org/oclc/707489613 Design Examples of Waterless Composting Toilets; by Derrick Depledge http://books.google.com/books?id=QbGdNQAACAAJ http://www.worldcat.org/oclc/223787240
  • 245.
    ~ Do-It-Yourself: Composting Toilets;by Charlotte Adelaide http://books.google.com/books?id=pratZwEACAAJ http://www.worldcat.org/oclc/799057658 bookfinder.com addall.com booksprice.com Double-Vault Composting Toilets: A State-of-the-art Review; by Witold Rybczynski http://books.google.com/books?id=leNMNAAACAAJ http://www.worldcat.org/oclc/220181279 An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural, Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism http://www.librarything.com/work/5162954 http://books.google.com/books?id=drOMQQAACAAJ http://www.worldcat.org/oclc/54830842 bookfinder.com addall.com booksprice.com Fletcher Sims' Compost; by Charles Walters http://www.librarything.com/work/8170309 http://books.google.com/books?id=wo0UAQAAMAAJ http://www.worldcat.org/oclc/31294906 bookfinder.com addall.com booksprice.com Future Fertility: Transforming Human Waste in to Human Wealth ; by John Beeby http://www.librarything.com/work/4546863 http://books.google.com/books?id=XexkMwEACAAJ http://www.worldcat.org/oclc/35304581 bookfinder.com addall.com booksprice.com Goodbye to the Flush Toilet: Water-Saving Alternatives to Cesspools, Septic Tanks, and Sewers; by Carol Hupping Stoner librarything.com/work/5011494 http://books.google.com/books?id=gjM5AQAAIAAJ http://www.worldcat.org/oclc/154090382 bookfinder.com addall.com booksprice.com How to Build a Compost Toilet; by Dan Martin ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com How to Build a Compost Toilet and Save a Piece of the Earth: A Guide for the Homeowner/builde ; by Ron Davis http://books.google.com/books?id=J29yHAAACAAJ http://www.worldcat.org/oclc/19875690
  • 246.
    ~ Lifting the Lid:An Ecological Approach to Toilet Systems; by Peter Harper http://www.librarything.com/work/2828721 http://books.google.com/books?id=W5eEJQ7ezFkC http://www.worldcat.org/oclc/44059281 bookfinder.com addall.com booksprice.com Mycelium Running: How Mushrooms Can Help Save the World; by Paul Stamets librarything.com/494921 books.google.com/qtsTH7ekvVYC worldcat.org/oclc/60603170 On-site Domestic-Wastewater Treatment Units, Part 2: Waterless composting toilets ; by Standards Australia http://books.google.com/books?id=BhLZQgAACAAJ http://www.worldcat.org/oclc/232969281 Recycling Human Waste: Composting Toilets as a Remedial Action in Hamilton Harbour ; by Wendy Wynia http://books.google.com/books?id=3_wUtwAACAAJ http://www.worldcat.org/oclc/761892733 Skycrapper: An Above-Ground Aerobic and Solar-Assisted Composting Toilet http://www.worldcat.org/oclc/4433333604 bookfinder.com addall.com booksprice.com Solar Energy Utilization in Composting Toilets; by Max L. Kroschel http://books.google.com/books?id=Y8x7ugAACAAJ http://www.worldcat.org/oclc/9056048 Solar Evaporation of Liquid Effluent from Composting Toilets in Cool Temperate Climates ; by David Paul Holman http://books.google.com/books?id=Xg9wNAAACAAJ http://www.worldcat.org/oclc/225063895 The Application of Solar Technologies to Composting Toilets in Cold Remote Locations ; by Matthew Thomas Dickson http://books.google.com/books?id=oLOttgAACAAJ http://www.worldcat.org/oclc/224957757
  • 247.
    ~ The Composting ToiletSystem, Or, The Waterless Toilet; by Ian E. Howarth http://books.google.com/books?id=mRWltgAACAAJ http://www.worldcat.org/oclc/154090382 The Humanure Handbook: A Guide to Composting Human Manure; by Joseph C. Jenkins http://www.librarything.com/work/560303 http://books.google.com/books?id=pIArAAAAYAAJ http://www.worldcat.org/oclc/794452328 bookfinder.com addall.com booksprice.com The Last Taboo: Opening the Door on the Global Sanitation Crisis; by Maggie Black http://www.librarything.com/work/5045343 http://books.google.com/books?id=TV0YWguY3nEC http://www.worldcat.org/oclc/677426915 bookfinder.com addall.com booksprice.com The Raw Guide To Construction Of Composting Toilets And Natural Greywater Systems; by Raw Press http://books.google.com/books?id=tfc7AAAACAAJ http://www.worldcat.org/oclc/225949468 The Toilet Paper: A Dry Composting Toilet Design-Build Venture in Yunnan, China; by Deborah Go http://www.worldcat.org/oclc/755811183 http://www.google.com http://www.bing.com The Toilet Papers: Recycling Waste and Conserving Water; by Sim Van der Ryn http://www.librarything.com/work/606534 http://books.google.com/books?id=h5YJu6wFYmMC http://www.worldcat.org/oclc/32236516 bookfinder.com addall.com booksprice.com Toilets That Make Compost: Low-Cost, Sanitary Toilets That Produce Valuable Compost for Crops in an African Context; by Peter Morgan http://www.librarything.com/work/5341119 http://books.google.com/books?id=CGzYBM2G2EwC http://www.worldcat.org/oclc/228374257 bookfinder.com addall.com booksprice.com The Waterless Toilet: Is it for You (Garden Way Bulletin); by Ron Poitras http://www.librarything.com/work/10182207 http://books.google.com/books?id=9sKSGAAACAAJ http://www.worldcat.org/oclc/5882212 bookfinder.com addall.com booksprice.com
  • 248.
    ~ Toilets That MakeCompost: Low-Cost, Sanitary Toilets That Produce Valuable Compost for Crops in an African Context; by Peter Morgan http://www.librarything.com/work/5341119 http://books.google.com/books?id=CGzYBM2G2EwC http://www.worldcat.org/oclc/228374257 bookfinder.com addall.com booksprice.com Using Human Waste Safely for Livelihoods, Food Production and Health: Information Kit on the Third Edition of the Guidelines for the Safe Use of Wastewater, Excreta and Greywater in Agriculture and Aquaculture; by World Health Organization http://www.librarything.com/work/11663724 Water Conservation: Shower, Composting Toilet, Reclaimed Water, Greywater, Water Purification, Evaporation, Surface Runoff, Pan Evaporation, Surface Irrigation, Irrigation, Drip Irrigation; by Lambert M. Surhone http://www.librarything.com/work/9993288 http://books.google.com/books?id=SM35QwAACAAJ Wastewater Irrigation and Health: Assessing and Mitigating Risk in Low-Income Countries; by Pay Drechsel http://books.google.com/books?id=eteKb8lnef4C http://www.worldcat.org/oclc/593329239 bookfinder.com addall.com booksprice.com WHO Guidelines for the Safe Use of Wastewater, Excreta And Greywater; by World Health Organization http://www.librarything.com/work/8566179 bookfinder.com addall.com booksprice.com http://books.google.com/books?id=uJJ3UIPGtFIC Liquid Gold: The Lore and Logic of Using Urine to Grow Plants; by Carol Steinfeld http://www.librarything.com/work/2168127 http://books.google.com/books?id=a_HqYKTMXxAC http://www.worldcat.org/oclc/137295284 bookfinder.com addall.com booksprice.com Holy Shit: Managing Manure To Save Mankind; by Gene Logsdon librarything.com/work/10365968 http://www.librarything.com/work/10365968 http://books.google.com/books?id=a_HqYKTMXxAC http://www.worldcat.org/oclc/610835212 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 249.
    ~ Growing Clean Water GrowingClean Water: Nature's Solution to Water Pollution; by B. C. Wolverton http://books.google.com/books?id=HnJOAAAAYAAJ http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Aquatic Plants for Ph Adjustment and Removal of Toxic Chemicals and Dissolved Minerals from Water Supplies; by B. C. Wolverton http://books.google.com/books?id=5eTpGwAACAAJ http://www.wolvertonenvironmental.com Aquatic Plants for Removal of Mevinphos from the Aquatic Environment; by B. C. Wolverton http://books.google.com/books?id=HDMJAQAAMAAJ http://www.wolvertonenvironmental.com Aquatic Plant Microbial Filters for Treating Septic Tank Effluent; by B. C. Wolverton http://books.google.com/books?id=z8lCNAAACAAJ http://www.worldcat.org/oclc/32531696 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Application of Vascular Aquatic Plants for Pollution Removal, Energy and Food Production in a Biological System; by B. C. Wolverton http://books.google.com/books?id=TwrTtgAACAAJ http://www.wolvertonenvironmental.com Artificial Marshes for Wastewater Treatment; by B. C. Wolverton http://books.google.com/books?id=BSpEtwAACAAJ http://www.worldcat.org/oclc/24120869 http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com Basic Engineering Criteria and Cost Estimations for Hybrid Microbial Filter-reed (Phragmites Communis) Wastewater Treatment Concept; by B. C. Wolverton http://books.google.com/books?id=JSoXHQAACAAJ http://www.wolvertonenvironmental.com
  • 250.
    ~ Bio-conversion of WaterHyacinths Into Methane Gas, Part 1; by B. C. Wolverton http://books.google.com/books?id=XPIatwAACAAJ http://www.wolvertonenvironmental.com Higher Plants for Recycling Human Waste Into Food, Potable Water and Revitalized Air in a Closed Life Support System; by B. C. Wolverton http://books.google.com/books?id=_loJMwEACAAJ http://www.wolvertonenvironmental.com Natural systems for wastewater treatment and water reuse for space and earthly applications ; by B. C. Wolverton http://books.google.com/books?id=Mw5ZAAAAYAAJ http://www.wolvertonenvironmental.com The Role of Plants and Microorganisms in Assuring a Future Supply of Clean Air and Water ; by B. C. Wolverton http://books.google.com/books?id=0LbgAAAAMAAJ http://www.wolvertonenvironmental.com Water Hyacinths and Alligator Weeds for Final Filtration Or Sewage; by B. C. Wolverton http://books.google.com/books?id=ZJKftgAACAAJ http://www.wolvertonenvironmental.com Water Hyacinths and Alligator Weeds for Removal of Lead and Mercury from Polluted Waters; by B. C. Wolverton http://books.google.com/books?id=lBq7tgAACAAJ http://www.wolvertonenvironmental.com
  • 251.
    ~ Water Hyacinths andAlligator Weeds for Removal of Silver, Cobalt and Strontium from Polluted Waters; by B. C. Wolverton http://books.google.com/books?id=OBemtgAACAAJ http://www.wolvertonenvironmental.com Water Hyacinths for Removal of Cadmium and Nickel from Polluted Waters; by B. C. Wolverton http://books.google.com/books?id=LnOJtgAACAAJ http://www.wolvertonenvironmental.com Water Hyacinths for Removal of Phenols from Polluted Waters; by B. C. Wolverton http://books.google.com/books?id=N49ytgAACAAJ http://www.wolvertonenvironmental.com Water Hyacinthis for Upgranding Sewage Lagoons to Meet Advanced Wastewater Treatment Standards, Part 1; by B. C. Wolverton http://books.google.com/books?id=3Uq1XwAACAAJ http://www.wolvertonenvironmental.com Water Hyacinths for Upgrading Sewage Lagoons to Meet Advanced Wastewater Treatment Standards, Part 2; by B. C. Wolverton http://books.google.com/books?id=bCQcYAAACAAJ http://www.wolvertonenvironmental.com Water Hyacinth Sorption Rates of Lead, Mercury and Cadmium; by B. C. Wolverton http://books.google.com/books?id=wkp1twAACAAJ http://www.wolvertonenvironmental.com
  • 252.
    ~ Wetlands for WastewaterTreatment, Pollution Control and Sustainable Water Supplies A Handbook of Constructed Wetlands: Domestic wastewater; by Luise Davis http://books.google.com/books?id=ExxJPgAACAAJ http://www.worldcat.org/oclc/35624329 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com A Pilot Constructed Treatment Wetland for Pulp and Paper Mill Wastewater, Kenya ; by Margaret Akinyi Abira http://books.google.com/books?id=-P4xSv7j9S0C http://www.worldcat.org/oclc/217265016 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Abstracts: Constructed Wetlands for Water Quality Improvement - an International Symposium; by Wetlands Laboratory http://books.google.com/books?id=hK9cGwAACAAJ http://www.worldcat.org/oclc/25454441 An Earth Saving Revolution (Volume 2) EM: Amazing Applications to Agricultural, Environmental, and Medical Problems; by Dr. Teruo Higa ~ EM = Effective Microorganism http://www.librarything.com/work/5162954 http://books.google.com/books?id=drOMQQAACAAJ http://www.worldcat.org/oclc/54830842 bookfinder.com addall.com booksprice.com Biocontrol of Heavy Metals Polluted Wastewater: Recovery of wastewater via microbial genetic systems; by Khalifa Abd http://books.google.com/books?id=2nhHYgEACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Biological Treatment of Wastewater: Use of Suspended and Attach Growth Bioreactors for Wastewater Reclamation; by Bushra Zaman http://books.google.com/books?id=ZTWyuAAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Biological Treatment of Dairy Industry Wastewater: Study of Kinetic coefficients for dairy industry wastewater; by Ambreen Lateef http://books.google.com/books?id=lEgJlAEACAAJ
  • 253.
    ~ Biological Wastewater Treatmentin Warm Climate Regions; by Marcos Von Sperling http://books.google.com/books?id=Pi4fMNY-hJYC http://www.worldcat.org/oclc/62306180 Bioremediation, including: Phytoremediation, Constructed Wetland, Applied Ecology, Restoration Ecology, Mycoremediation, Mycofiltration, Tree Bog; by Hephaestus Books http://books.google.com/books?id=ypietgAACAAJ Bioremediation of Contamined Soils; by Donald Lee Wise http://books.google.com/books?id=kJ_IULMoN68C http://www.worldcat.org/oclc/44172880 Bioremediation Process for Decolourisation of Textile Wastewater: Microbial Consortium for Textile Wastewater Decolourisation; by Khadijah Omar http://books.google.com/books?id=2T37ugAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Carbon Dynamics in Natural Vs. Constructed Wetland Systems: Implications for Wastewater Treatment; by Eliska Rejmankova http://books.google.com/books?id=hztBHQAACAAJ http://www.worldcat.org/oclc/40547236 Constructed and Natural Wetlands for Pollution Control: developed from "V international INTECOL wetlands conference; by Chris C. Tanner http://books.google.com/books?id=JftsHAAACAAJ http://www.worldcat.org/oclc/66868690 Constructed Wetland for Domestic Wastewater Treatment: A Case Study in Addis Ababa, Ethiopia; by Birhanu Genet http://books.google.com/books?id=iGLUygAACAAJ http://www.worldcat.org/oclc/809695017 bookfinder.com addall.com booksprice.com Constructed Wetland System for Water Quality Improvement of Irrigation Wastewater; by J. Chris Hoag http://books.google.com/books?id=Bbe_SgAACAAJ http://www.worldcat.org/oclc/49644956 Constructed Wetlands: A Promising Wastewater Treatment System for Small Localities: Experiences from Latin America; by Martin Gauss http://www.librarything.com/work/12251194 http://www.worldcat.org/oclc/429047675
  • 254.
    ~ Constructed Wetlands DomesticWastewater, Volume 2; by EPA http://books.google.com/books?id=w0qsNAEACAAJ Constructed Wetlands for Ground Water Quality Improvement; by Ryan C. Molsee http://books.google.com/books?id=x5Q9OAAACAAJ http://www.worldcat.org/oclc/51091714 Constructed Wetlands for High Strength Wastewater Treatment and Nutrient Removal; by Rajendra Kurup http://books.google.com/books?id=ko3VNwAACAAJ http://www.worldcat.org/oclc/475008068 Constructed Wetlands for Hydrocarbon Removal; by Paul Emeka Eke http://books.google.com/books?id=MLN7QwAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Constructed Wetlands for Livestock Wastewater Management ; by Payne Engineering http://www.librarything.com/work/10339043 http://books.google.com/books?id=9SNxGwAACAAJ bookfinder.com addall.com booksprice.com Constructed Wetlands for On-Site Septic Treatment: A Guide to Selecting Aquatic Plants for Low- Maintenance Micro-Wetlands; by USDA http://www.google.com http://www.bing.com ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Constructed Wetlands for Pollution Control; by R H Kadlec allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Constructed Wetlands for Pollution Control: Processes, Performance, Design and Operation ; by Jan Vymazal http://books.google.com/books?id=cQt0QgAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com
  • 255.
    ~ Constructed Wetland forthe Treatment of Brewery Wastewater: Performance evaluation ; by Kenatu Angassa http://books.google.com/books?id=uym_uAAACAAJ Constructed Wetlands for the Treatment of Landfill Leachates; by George Mulamoottil http://www.librarything.com/work/6550683 http://books.google.com/books?id=hMYYZmcQdlIC http://www.worldcat.org/oclc/39033560 bookfinder.com addall.com booksprice.com Constructed Wetland for Wastewater Treatment and Resource Recovery; by L. Poh-Eng http://books.google.com/books?id=uo5vNAAACAAJ http://www.worldcat.org/oclc/475525436 Constructed Wetlands for Wastewater Treatment in Cold Climates; by Ülo Mander http://books.google.com/books?id=LQ9SAAAAMAAJ http://www.worldcat.org/oclc/48628996 bookfinder.com addall.com booksprice.com Constructed Wetlands for Water Quality Improvement; by Gerald A. Moshiri http://www.librarything.com/work/6015208 http://books.google.com/books?id=_PQJ7wGG_2cC http://www.worldcat.org/oclc/27226472 Constructed Wetlands in the Sustainable Landscape; by Craig S. Campbell http://www.librarything.com/work/1324972 http://books.google.com/books?id=CNNml_0IfKoC Constructed Wetlands for Wastewater Treatment: Municipal, Industrial, and Agricultural ; by Donald A. Hammer http://www.librarything.com/work/3496698 http://books.google.com/books?id=BCdPHXm677kC Dye Treatment with Fungi: Azo Dye Decolorization by Phanerochaete Chrysosporium; by Yesim Erler Kubilay http://books.google.com/books?id=1KNWPgAACAAJ
  • 256.
    ~ Emerging Compounds Removalfrom Wastewater: Natural and Solar Based Treatments ; by Giusy Lofrano http://books.google.com/books?id=QscF-Kfr6-EC Enhancements of Nutrient Removal Performance in Constructed Wetlands for Domestic Wastewater Treatment; by Carlos A. Arias http://books.google.com/books?id=uj_PSAAACAAJ http://www.worldcat.org/oclc/475443151 Evaluation of the Subsurface Vegetated Bed Form of Constructed Wetlands for Domestic Wastewater Treatment; by Jie Huang http://books.google.com/books?id=ginftgAACAAJ http://www.worldcat.org/oclc/34176461 Evaluation of the Performance of Constructed Wetlands Treating Domestic Wastewater in the Waikato Region, New Zealand; by James Peter Sarkis Sukias http://books.google.com/books?id=kW26MgAACAAJ http://www.worldcat.org/oclc/156741057 Heat Recovery from Wastewater The Case Study of Amsterdam: Energy in the Urban Water Cycle ; by Sergio Nauffal Monsalve http://books.google.com/books?id=fiX6ugAACAAJ Heavy Metals Removal from Swine Wastewater Using Constructed Wetlands with Horizontal Sub- Surface Flow; by Jorge A Cortes-Esquivel http://www.worldcat.org/oclc/4903923389 Landscape Ecological Applications in Man-Influenced Areas: Linking Man and Nature System; by Sŏn-gi Hong http://books.google.com/books?id=gWWgqQv2YIAC http://www.worldcat.org/oclc/187915804 Leachate Treatment In Constructed Wetlands; by Aeslina Abdul Kadir http://books.google.com/books?id=y6WJSQAACAAJ
  • 257.
    ~ Manual: Constructed WetlandsTreatment of Municipal Wastewaters ; by EPA http://books.google.com/books?id=nXpVdmJI_NIC http://www.worldcat.org/oclc/45605155 Microbial Decolorization and Degradation of Azo dyes: An approach to Biotreatment of Textile and dye manufacturing Industries wastewaters; by Manjinder Singh http://books.google.com/books?id=6NJXYgEACAAJ Microbial Decolourization of Cane-molasses Based Distillery Effluent: Microbial Decolourization of Distillery Effluent for its application in Wasteland Reclamation; by Deepak Pant http://books.google.com/books?id=ftEtQwAACAAJ Microbial Fuelcell: Power from Wastewater in Cost Effective Manner: A New Approach of Wastewater Treatment with Power Generation in a Cost Effective Manner; by Saumya Mary Mathew http://books.google.com/books?id=SmE2LgEACAAJ Natural and Constructed Wetlands: Nutrients, Metals and Management ; by Jan Vymazal http://books.google.com/books?id=nyBFAQAAIAAJ http://www.worldcat.org/oclc/60375192 Performance and Feasibility of Constructed Wetlands for the Treatment of Domestic Wastewater in Nepal; by D. R. Adhikari http://books.google.com/books?id=t0s-cgAACAAJ http://www.worldcat.org/oclc/637047629 Performance of Up Flow Fixed Film Fixed Bed Reactor System: Performance at various pH using Vegetable Oil Refinery Wastewater; by Narendra Shinkar http://books.google.com/books?id=rZGsuAAACAAJ Performance of Various Tree Species as Irrigated by Urban Wastewater: Raising of forest trees using urban Wastewate; by Muhammad Ayyoub Tanvir http://books.google.com/books?id=LeKkcQAACAAJ http://www.worldcat.org/oclc/724431618
  • 258.
    ~ Physical, Chemical, andMicrobial Analysis of Domestic Wastewater Treated by Small Constructed Wetlands Designed for Individual Households; by Keith R Hench http://books.google.com/books?id=2XhENwAACAAJ http://www.worlcat.org/oclc/39931722 Phytoremediation Potential of Plants in Tannery Wastewater Treatment ; by Tadesse Alemu http://books.google.com/books?id=VECFkQEACAAJ Phytotreatment for Wastewater: Strategies and Practices for High Concentrations of Organic Matter ; by Sarwoko Mangkoedihardjo http://books.google.com/books?id=VXFOYgEACAAJ Planting Wetlands and Dams: A Practical Guide; by Nick Romanowski http://books.google.com/books?id=bO21HSBBcX0C http://www.worldcat.org/oclc/609408538 Pollutant Removal from Domestic Wastewater Using Constructed Wetlands (reed Beds); by Peter Cottingham http://books.google.com/books?id=wWq6ugAACAAJ http://www.worldcat.org/oclc/221738418 Possibilities for Recycling Domestic Wastewater with Vertical Flow Constructed Wetlands ; by R Shrestha http://books.google.com/books?id=QDFJcgAACAAJ http://www.worldcat.org/oclc/637056724 Removal of Heavy Metals In Constructed Wetlands For Treatment Of Domestic Wastewater in Flanders, Belgium; by Els Lesage http://www.worldcat.org/oclc/730356000 River Hebert Marsh: Constructed Wetlands for Wildlife and Tertiary Treatment of Domestic Wastewater; by Ducks Unlimited http://books.google.com/books?id=YVqlNwAACAAJ http://www.worldcat.org/oclc/228951639
  • 259.
    ~ Sanitation Ventures TechnologyLandscaping Report: New Concepts in On-Site Sanitation based on Bioadditives and Pit Design http://www.google.com http://www.bing.com Small-Scale Constructed Wetland Treatment Systems: Feasibility, Design Criteria; by Scott D. Wallace http://books.google.com/books?id=YVcOAQAACAAJ http://www.worldcat.org/oclc/156772669 Subsurface Flow Constructed Wetlands For WasteWater Treatment: A Technology Assessment ; by Sherwood C. Reed http://books.google.com/books?id=P21GAAAAYAAJ http://www.worldcat.org/oclc/56338655 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Sustainable Wastewater Management in Developing Countries; by Carsten Hollander Laugese http://books.google.com/books?id=p4YJWoa_t9kC http://www.worldcat.org/oclc/432442097 The Constructed Wetlands Manual: Volume 1; by New South Wales, Australia http://www.librarything.com/work/10902198 http://www.worldcat.org/oclc/40500618 The Constructed Wetlands Manual: Volume 2; by New South Wales, Australia http://www.librarything.com/work/10902242 http://books.google.com/books?id=j_yatwAACAAJ http://www.worldcat.org/oclc/223631664 bookfinder.com addall.com booksprice.com The Use of Constructed Wetlands as an Alternative Form of On-site Wastewater Treatment in a Temperate Climate; by Sam Bayley http://books.google.com/books?id=ETqQNAAACAAJ http://www.worldcat.org/oclc/224941117 The Use of Constructed Wetlands for Treatment of Domestic Wastewater in Senegal, West Africa; by Michael E. Babcock http://books.google.com/books?id=1MX3NwAACAAJ http://www.worldcat.org/oclc/56638440
  • 260.
    ~ The Use ofConstructed Wetlands for Wastewater Treatment; by Sim Cheng Hua http://books.google.com/books?id=fyLRAAAACAAJ http://www.worldcat.org/oclc/85517476 Treatment Efficiency of Constructed Wetlands for Domestic Wastewater Treatment in Giessen, Germany and Its Possibility to Construct it in Indonesia; by Denny Kurniadie http://books.google.com/books?id=Ze2uAQAACAAJ http://www.worldcat.org/oclc/48457807 Treatment of Dairy Wastewater by Aerobic Biodegradetion and Coagulation: Natural Remedy by Harush http://books.google.com/books?id=0CDgQ6AEwAA Use of Constructed Wetlands for Protection of Water Quality in Water Supply Reservoirs ; by Woody Frossard http://books.google.com/books?id=sgLOX1W0OJ4C http://www.worldcat.org/oclc/36159866 Vertical Flow Constructed Wetlands for the Treatment of Inorganic Industrial Wastewater ; by Sergio S. Domingos http://books.google.com/books?id=NTR3MwEACAAJ http://www.worldcat.org/oclc/793315404 Walter Giger; by Jesse Russell http://books.google.com/books?id=qBi9MQEACAAJ Wastewater Irrigation and Health: Assessing and Mitigating Risk in Low-income Countries; by Akissa Bahri http://books.google.com/books?id=TuYSEX4dwGEC http://www.worldcat.org/oclc/668138381 Wastewater Treatment by Natural and Artificial Marshes; by Frederic L Spangler http://books.google.com/books?id=8SoYAQAAIAAJ http://www.worldcat.org/oclc/2920272
  • 261.
    ~ Wastewater Treatment bya Natural Wetland: The Nakivubo Swamp, Uganda ; by Frank Kansiime http://books.google.com/books?id=i5IVXoP-geYC http://www.worldcat.org/oclc/42275919 Wastewater Treatment in Constructed Wetlands with Horizontal Sub-Surface Flow; by Jan Vymazal http://books.google.com/books?id=IfqerCqRvg8C http://www.worldcat.org/oclc/272298648 Wastewater Use in Irrigated Agriculture: Confronting the Livelihood and Environmental Realities ; by C. A. Scott http://www.librarything.com/work/5749121 http://books.google.com/books?id=Z3RiPwAACAAJ http://www.worldcat.org/oclc/668138381 bookfinder.com addall.com booksprice.com Water and Nutrient Management in Natural and Constructed Wetlands; by Jan Vymazal http://books.google.com/books?id=bgTZ-DQZ7CEC http://www.worldcat.org/oclc/669985678 Water Hyacinth Treatment of Industrial Wastewater: A Case Study of Reclamation ; by Mahendra Pratap Choudhary http://books.google.com/books?id=NyWquAAACAAJ http://www.worldcat.org/oclc/707105286 Wetlands for Tropical Applications: Wastewater Treatment by Constructed Wetlands ; by Norio Tanaka http://books.google.com/books?id=Vel-tREZnF0C http://www.worldcat.org/oclc/369140693 Wetland Macrophytes Purify Water; by Sukumar Ghosh http://books.google.com/books?id=bumilQEACAAJ
  • 262.
    ~ Spanish Language Books 25años de agricultura orgánica: una experiencia en el archipiélago de Chiloé; by Estudios Agrarios Ancud http://books.google.com/books?id=-OE4AQAAIAAJ http://www.worldcat.org/oclc/23366868 Abonos, lombricultura y compostaje; by Doris Liliana Osorio Díaz http://books.google.com/books?id=u4WdZwEACAAJ http://www.worldcat.org/oclc/777895366 Abonos, lombricultura y compostaje: metodos, sistemas, preparados, aplicacion; by Felipe Durán Ramírez http://books.google.com/books?id=cLyLZwEACAAJ http://www.worldcat.org/oclc/689995238 Agricultura ecológica: Manual y guía didáctica; by Javier Flórez Serrano http://books.google.com/books?id=GxYfKYV_9awC http://www.worldcat.org/oclc/804227322 Agricultura ecológica para jóvenes: aventuras de dos escolares en su primer verano en el campo; by Irmgard Heck http://www.librarything.com/work/6641315 http://books.google.com/books?id=Hi95AAAACAAJ http://www.worldcat.org/oclc/435081856 bookfinder.com addall.com booksprice.com ; by http://www.worldcat.org/oclc/169947645 Agricultura Organica; Asociación Cubana de Agricultura Orgánica http://books.google.com/books?id=lu4NAQAAIAAJ
  • 263.
    ~ Agricultura orgánica: experienciasde cultivo ecológico en la Argentina; by Guillermo Schnitman http://books.google.com/books?id=GcpgAAAAMAAJ http://www.worldcat.org/oclc/28254823 Agricultura orgánica: memoria sobre el Simposio Centroamericano; by Jaime E. García http://books.google.com/books?id=LqYfAQAAIAAJ http://www.worldcat.org/oclc/36069507 Agricultura orgánica: proyecto piloto de zonas de reserva campesina; by IICA Biblioteca Venezuela http://books.google.com/books?id=M8UqAAAAYAAJ Agricultura Organica, Ambiente y Seguridad Alimentaria; by Nadia El-Hage http://books.google.com/books?id=HlQhvUKrhxMC http://www.worldcat.org/oclc/503172436 bookfinder.com addall.com booksprice.com Agricultura Organica en Costa Rica; by Jaime Garcia http://www.librarything.com/work/1212008 http://www.worldcat.org/oclc/40945696 Agricultura Organica en la Amazinía Ecuatoriana: Abonos Orgánicos y Faces Lunares; by Beatriz Fischersworring http://www.librarything.com/work/11652897 Agricultura Organica Practica: Tecnologias Sostenibles Y Regeneradoras Del Medio Ambiente; by Antonio Rosas Roa allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Agricultura Orgánica, Ambiente Y Seguridad Alimentaria; by Nadia El-Hage Scialabba http://books.google.com/books?id=HlQhvUKrhxMC http://www.worldcat.org/oclc/503172436 Agricultura orgánica de México: datos básicos; by Manuel Angel Gómez Cruz http://books.google.com/books?id=lv1gAAAAMAAJ
  • 264.
    ~ ; by http://books.google.com/books?id=W6YfAQAAIAAJ http://www.worldcat.org/oclc/77415383 Agricultura organica en pequeña escala: huerto doméstico y huerta comunitaria; by http://books.google.com/books?id=oWe4PgAACAAJ http://www.worldcat.org/oclc/236142247 Agricultura orgánica práctica: Tecnologías sostenibles y regeneradoras del medio ambiente; by Antonio Rosas Roa http://www.worldcat.org/oclc/777060491 http://books.google.com/books?id=p7WhZwEACAAJ Agricultura Urbana y Suburbana en Cuba; by Carlos Alberto Hernández Medina http://books.google.com/books?id=AKORtgAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Agroindustria rural: recursos técnicos y alimentación; by François Boucher http://books.google.com/books?id=jyAOAQAAIAAJ http://www.worldcat.org/oclc/39114615 Agrosistemas Sostenibles y Ecologicos: La Reconversion Agropecuaria; by Ramon Fuentes Colmeiro http://books.google.com/books?id=oHtVPwP1vpsC http://www.worldcat.org/oclc/166868154 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Alternativas: tecnología, recursos, energía, construcción, habitat, alimentación, sanidad, agricultura; by Colegio de Arquitéctos Técnicos de Navarra http://books.google.com/books?id=Q88MAQAAIAAJ http://www.worldcat.org/oclc/6250798 Alternativas de uso del bromuro de metilo en la produccion de semilla de papa de calidad; by Division de Manejo Integrado de Cultivos http://books.google.com/books?id=ekfD7Ab7DREC
  • 265.
    ~ Alternativas Para ElDesarrollo de Una Agricultura Sostenida; by CATIE http://books.google.com/books?id=epgOAQAAIAAJ http://www.worldcat.org/oclc/805599316 Aprender sirviendo: un paradigma de formación integral universitaria; by Diana Pacheco Pinzón http://books.google.com/books?id=ietnHAAACAAJ http://www.worldcat.org/oclc/56097770 Apuntes para el desarrollo comunitario: manual de hidroponia popular urbana; by Alaldía de Medellín http://www.librarything.com/work/12499384 http://books.google.com/books?id=UDziMgEACAAJ Bases de Datos y Sistemas de Informacion Disponibles en el IICA; by IICA http://books.google.com/books?id=rSwOAQAAIAAJ http://www.worldcat.org/oclc/633132100 Biojardinería: Manual Práctico de Horticultura y Jardinería Ecológica; by Francisco Barranco Espinar http://books.google.com/books?id=1VXdPQAACAAJ http://www.worldcat.org/oclc/49319053 Buenas prácticas para el desarrollo de la cadena productiva de la papa: experiencias con el proyecto INCOPA en el Perú; by Gladys Triveno http://books.google.com/books?id=67sotGFKdHwC http://www.worldcat.org/oclc/780330551 Cartilha tecnologica de hidroponia; by A. Bliska Junior http://books.google.com/books?id=bCRVygAACAAJ http://www.worldcat.org/oclc/709851213 Cómo Hacer Cría de Lombrices; by Eduardo C. Foncini http://books.google.com/books?id=jAtEPQAACAAJ http://www.worldcat.org/oclc/149529577
  • 266.
    ~ Compostaje; by JoaquínMoreno Casco http://books.google.com/books?id=APuzwas6rrcC http://www.worldcat.org/oclc/645289619 bookfinder.com addall.com booksprice.com Conceptos básicos de gestión ambiental y desarrollo sustentable; by Arturo Sánchez Gándara http://books.google.com/books?id=L8v8CRDFm-oC Conservación del medio ambiente peruano; by José Félix Aparcana Pisconte http://books.google.com/books?id=FDN_AAAAMAAJ http://www.worldcat.org/oclc/50198906 Construcción de un invernadero para el cultivo de forraje verde hidropónico en Quintanavides http://books.google.com/books?id=XfP8cQAACAAJ http://www.worldcat.org/oclc/628421338 Control de Plagas y Malezas por Enemigos Naturales; by Roy Van Driesche http://www.worldcat.org/oclc/205944702 Conversion de pulpa y mucilago del cafe en vermicomposta mediante el uso de la lombriz Eisenia foetida; http://books.google.com/books?id=QcmpISns5UMC Creación de alternativas en México; by Lucía Alvarez Enríquez http://books.google.com/books?id=ndRowM32mhcC http://www.worldcat.org/oclc/760456138 Cria Casera De Lombrices: Manual Practico Para Su Aprovechamiento Ecologico; by Jose Gabetta http://books.google.com/books?id=2vMHPQAACAAJ http://www.worldcat.org/oclc/62293537 bookfinder.com addall.com booksprice.com Cria de Lombrices: su empresa de lombricultura; by José Luis Barbado http://books.google.com/books?id=fccwMYM4CWEC http://www.worldcat.org/oclc/166290273
  • 267.
    ~ Crianza Y Manejode Lombrices de Tierra Con Fines Agricolas; by CATIE http://books.google.com/books?id=occOAQAAIAAJ Cultivo de alface pela técnica de hidroponia: NFT; by Pedro Roberto Furlani http://books.google.com/books?id=jGuKHAAACAAJ http://www.worldcat.org/oclc/52368560 Cultivo de Champiñones; by María Laura Martínez http://books.google.com/books?id=Hyr4mf9u62gC http://www.worldcat.org/oclc/149529638 Cultivo de Hortalizas; by Vicente Giaconi M. http://books.google.com/books?id=-K9xgvfdGGYC http://www.worldcat.org/oclc/30600919 Cultivo de hortalizas en la Amazonía colombiana; by César H. Marulanda http://books.google.com/books?id=DUdjAAAAMAAJ http://www.worldcat.org/oclc/10437673 Cultivo de jitomate en hidroponia e invernadero; by Ezequiel Velasco Hernández http://books.google.com/books?isbn=9680201953 http://www.worldcat.org/oclc/651398195 Cultivo hidropônico de plantas; by Pedro Roberto Furlani http://books.google.com/books?id=6tL2GwAACAAJ http://www.worldcat.org/oclc/53851683 Cultivo sem solo; hidroponia; by P.D. Castellane http://books.google.com/books?id=PAnHjwEACAAJ Cultivos hidropónicos: Nuevas técnicas de producción; by Howard M. Resh http://books.google.com/books?id=O74no8Jcz8IC http://www.worldcat.org/oclc/52491540 Cultivos hidrop nicos en invernadero:gu a t cnica de sus principios y manejo; by Juan Antonio Del Castillo Garc a http://books.google.com/books?id=7lIrMwEACAAJ http://www.worldcat.org/oclc/804674137
  • 268.
    ~ Cultivos sin tierra:la hidroponía popular, una opción para superación de la pobreza; by Jorge Zapp http://books.google.com/books?id=Psj4ZwEACAAJ http://www.worldcat.org/oclc/710016306 Curso Básica de Hidroponía; by Jorge H. Bosques Vargas http://books.google.com/books?id=HxOucQAACAAJ ; by Beatriz Borda G http://www.worldcat.org/oclc/318454904 Curso nacional de lombricultura; by Fundacion para la Integracion e Investigacion Pecuaria http://www.worldcat.org/oclc/777744209 De la Necesidad Al Servicio; by Compromiso Fundacion, Granica http://books.google.com/books?id=lg9AB4xfsMoC http://www.worldcat.org/oclc/44560951 Dónde encontrar las bases de una agricultura alternativa; by Paul Coeytaux http://books.google.com/books?id=jDpgAAAAMAAJ http://www.worldcat.org/oclc/31163992 El compost com a substrat alternatiu en viverisme i hidroponia; by J. M. Vergara, M. Colombàs http://books.google.com/books?id=ZwMFcgAACAAJ http://www.worldcat.org/oclc/433706649 El Compostaje Proyectado a La Lombricultura; by Emilio Mirabelli http://books.google.com/books?id=jAZOQwAACAAJ http://www.worldcat.org/oclc/469107705 bookfinder.com addall.com booksprice.com El cuidado orgánico de las plantas: cómo controlar las plagas en el jardín y la huerta sin insecticidas; by Ernesto Flores http://books.google.com/books?id=FnFAAAACAAJ http://www.worldcat.org/oclc/31327832
  • 269.
    ~ El desarrollo localen el Ecuador: historia, actores y métodosd; by Galo Ramón Valarezo http://books.google.com/books?id=HJgwp0K240UC El Huerto biológico: cómo cultivar todo tipo de hortalizas sin productos químicos ni tratamientos tóxicos; by Claude Aubert http://www.librarything.com/work/9042646 http://books.google.com/books?id=MywjPwAACAAJ El huerto casero: manual de agricultura orgánica; by Nelson Álvarez Febles http://books.google.com/books?id=NH5ASQAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com El huerto ecologico del convento; by Crista Weinrich http://books.google.com/books?id=aNCCPgAACAAJ El Huerto Escolar Ecológico; by Montse Escutia http://books.google.com/books?id=jDF_j8Nz_6EC El Huerto Familiar Ecologico: la gran guía práctica del cultivo natural; by Mariano Bueno http://www.librarything.com/work/2249892 http://books.google.com/books?id=H1p1AAAACAAJ http://www.worldcat.org/oclc/46925668 bookfinder.com addall.com booksprice.com El jardin biologico rapido y facil; by Wolfgang Hensel http://books.google.com/books?id=kN_4VjhbbscC http://www.worldcat.org/oclc/723362588 bookfinder.com addall.com booksprice.com El Jardin Organico; by Bob Flowerdew http://books.google.com/books?id=JAquAAAACAAJ http://www.worldcat.org/oclc/539423342 bookfinder.com addall.com booksprice.com
  • 270.
    ~ ; by Richard Bird http://books.google.com/books?id=1x-hAAAACAAJ http://www.worldcat.org/oclc/38155199 bookfinder.com addall.com booksprice.com ; by Pedro González Guerrero http://books.google.com/books?id=ThyRXwAACAAJ El Rebost de la ciutat: manual de permacultura urbana; by Jordi Romero Lengua http://www.librarything.com/work/12373610 http://books.google.com/books?id=gpanXwAACAAJ http://www.worldcat.org/oclc/807345667 El sonido de la unida; by CATIE http://books.google.com/books?id=VdcOAQAAIAAJ Estudio y adecuacion a las condiciones de nuestro medio de la hidroponia como tecnica para el cultivo de hortalizas; by Gustavo Goez Morales, http://books.google.com/books?id=IyrGMgEACAAJ http://www.worldcat.org/oclc/778164172 Evaluación de tres soluciones nutritivas y tres sustratos en el cultivo de tomate (Lycopersicon esculentum Mill) en hidroponia; by Luis Javier Torres Barragán http://books.google.com/books?id=T9XnZwEACAAJ http://www.worldcat.org/oclc/689596741 Evaluacion economica de un sistema de vermicomposta para la industria cafetalera de Puerto Rico; by Milton F. Estupinan http://books.google.com/books?id=TdVTH3QzpJUC Estado de la agricultura orgánica en Nicaragua: propuesta del movimiento orgánico para su fomento y desarrollo; by IICA http://books.google.com/books?id=LeFUcCB_ltoC
  • 271.
    ~ Explotaciones alternativas: Salmonicultura,zoro azul, lombricultura; by M. Teresa Benito Hernández http://books.google.com/books?id=7ThnAAAACAAJ Falta Petroleo: perspectives on the emergence of a more ecological farming and food system in post- crisis Cuba; by Julia Emma Wright http://books.google.com/books?id=W2TRkQEACAAJ http://www.worldcat.org/oclc/61041656 Floricultura Y Medio Ambiente: Producción de Flores Sin Bromura de Metilo; by Marta Pizano de Márquez http://books.google.com/books?id=u2juv09M_OwC http://www.worldcat.org/oclc/162127135 Guía de los cultivos protegidos de hortalizas en zona tropical húmeda; by Christian Langlais http://books.google.com/books?id=UoN0kej0PVwC http://www.worldcat.org/oclc/470052090 Guía para compostaje y manejo de suelos; by Elkin Bongcam V squez http://books.google.com/books?id=BUDmjTQxKhQC http://www.worldcat.org/oclc/56590474 Guía para la cría, manejo y aprovechamiento sostenible de algunas especies animales promisorias y otras domésticas; by Jaime L. De la Ossa Velásquez http://books.google.com/books?id=ezpvt2lA788C http://www.worldcat.org/oclc/55989215 Hidrocultivos al alcance de todos: los principios fundamentales de la hidroponia bajo invernadero; by by Sergio Enrique Giraldo R http://www.worldcat.org/oclc/778032391 Hidroponia: su empresa de cultivos en agua; by José Luis Barbado http://www.librarything.com/work/5845557 http://books.google.com/books?id=aa4A0GakMRsC http://www.worldcat.org/oclc/65223814
  • 272.
    ~ Hidroponia: cultivo deplantas sin tierra; by G. O. Huterwal http://www.librarything.com/work/9720927 http://books.google.com/books?id=6Up4pwAACAAJ http://www.worldcat.org/oclc/22937736 Hidropon a: cultivo sin tierra: elementos b sicos para desarrollar la t cnica simple de cultivar plantas sin tierra en peque os espacios; by Laura Alpízar Antillón http://books.google.com/books?id=xvuGzvNxR9UC http://www.worldcat.org/oclc/228298661 Hidropon a: una gu a esencial para el cultivo en agua de frutas, hortalizas y plantas florales; by Martha Alvarez http://books.google.com/books?id=kh-auAAACAAJ http://www.worldcat.org/oclc/778704105 Hidroponia; by UNICAMP http://books.google.com/books?id=yLVXygAACAAJ http://www.worldcat.org/oclc/709851589 Hidroponia: cómo cultivar sin tierra; by James Sholto Douglas http://books.google.com/books?id=v5WKAAAACAAJ http://www.worldcat.org/oclc/48962585 Hidroponia: como cultivar tomates em sistema NFT (tecnica do fluxo laminar de nutrientes); by C. A. G. de Moraes http://books.google.com/books?id=o4TJZwEACAAJ http://www.worldcat.org/oclc/709530510 Hidroponia: como instalar e manejar o plantio de hortali as dispensando o uso do solo: alface, agri o, rucula, rabanete, chicoria, almeir o; by Robson de Barros Alberoni http://books.google.com/books?id=hCXvE53h924C http://www.worldcat.org/oclc/817614192 Hidroponia: cultivo de plantas sin tierra: aplicaciones de la hidroponia, sistemas de cultivo, la soluci n nutritiva, cuidados culturales; by Ulises Durany Carol http://books.google.com/books?id=VOBzbwAACAAJ http://www.worldcat.org/oclc/37477308
  • 273.
    ~ Hidroponía: cultivos sintierra; by Angel Ignacio Godoy http://books.google.com/books?id=2qUfAQAAIAAJ http://www.worldcat.org/oclc/49516232 Hidroponia: cultivo sin tierra; by Juan Grass de la Fuente http://books.google.com/books?id=BDHRtgAACAAJ http://www.worldcat.org/oclc/34879727 Hidroponía: cultivo de plantas sin tierra; by G. O. Huterwal http://books.google.com/books?isbn=9502400763 http://www.worldcat.org/oclc/22937736 Hidroponia: guia pratico; by S. Ueda http://books.google.com/books?id=7-uWXwAACAAJ http://www.worldcat.org/oclc/708384743 Hidroponia: produção alternativa de hortaliças folhosas; by Claudir Padova http://books.google.com/books?id=3dx7kgEACAAJ http://www.worldcat.org/oclc/819734747 Hidroponía: una esperanza para Latinoamérica; by Rodríguez Delfín http://books.google.com/books?id=mHv0cQAACAAJ Hidroponía básica; by Rodolfo Pezzani Ramaciotti http://books.google.com/books?id=EBsFtwAACAAJ http://www.worldcat.org/oclc/55245914 Hidroponia basica: El Cultivo Facil Y Rentable De Plantas Sin Tierra; by Gloria Samperio Ruiz http://www.librarything.com/work/8493358 http://books.google.com/books?id=weZNPgAACAAJ http://www.worldcat.org/oclc/38839564 Hidroponia comercial; by Gloria Samperio Ruiz http://books.google.com/books?id=1CAwAAAACAAJ http://www.worldcat.org/oclc/43702262
  • 274.
    ~ Hidroponía comercial: unabuena opción en agronegocios; by Alfredo Rodríguez Delfín http://books.google.com/books?id=ffP8cQAACAAJ http://www.worldcat.org/oclc/628658000 Hidropon a comercial fresas ; by Karen Palomino Velsquez http://www.worldcat.org/oclc/790514287 Hidroponía comercial (tomates y lechugas); by Karen Palomino Velsquez http://books.google.com/books?isbn=6034007550 http://www.worldcat.org/oclc/790700569 Hidroponia Como Cultivar Sin Tierra; by James Sholto http://books.google.com/books?isbn=9500230704 http://www.worldcat.org/oclc/48962585 Hidroponia em substratos: a hidroponia ao alcance de todos; by Raul Vergueiro Martins http://books.google.com/books?id=2LD7kQEACAAJ http://www.worldcat.org/oclc/817882122 Hidroponía familiar: guía técnica; by César H. Marulanda http://books.google.com/books?id=EodjHAAACAAJ http://www.worldcat.org/oclc/49319863 Hidroponía familiar en Colombia desde el eje cafetero: cultivo de esperanzas con rendimientos de paz; by César H. Marulanda Tabares http://books.google.com/books?id=_MY1twAACAAJ http://www.worldcat.org/oclc/318273876 Hidroponia orgânica e bioponia: a hidroponia orgânica ao seu alcance; by Raul Vergueiro Martins http://books.google.com/books?id=K46RkQEACAAJ http://www.worldcat.org/oclc/817882144 Hidroponia facil: Para jovenes (y no tan jovenes); by Gloria Samperio http://books.google.com/books?id=qU2APgAACAAJ http://www.worldcat.org/oclc/260339729 Hidroponia Para Dummies; by Gloria Samperio http://books.google.com/books?id=JOS8MgEACAAJ http://www.worldcat.org/oclc/812068839
  • 275.
    ~ Hidroponia paso apaso: cultivo sin tierra; by Cristian Sánchez Reyes http://books.google.com/books?isbn=9972977064 http://www.worldcat.org/oclc/681759316 Hierbas aromaticas para el jardin y la cocina. Jardin practico; by Renate Hudak http://books.google.com/books?id=L9_7TeqR1hUC http://www.worldcat.org/oclc/351320469 bookfinder.com addall.com booksprice.com Horticultur: Aeroponía, Cultivo de Tejidos Vegetales, Injerto, Agricultura de Conservación, Micropropagación, Horticultura Orgánica http://books.google.com/books?id=BvWWZwEACAAJ Huerta casera: manual de hidroponía popular; by EUNED http://books.google.com/books?id=wpZJ9qwfwKAC Huerta Jardin organica: Una Guia Esencial Para El Diseno Y El Cultivo De Una Huerta Ornamental Con Tecnicas Ecoologicas http://books.google.com/books?id=Q_N_AAAACAAJ http://www.worldcat.org/oclc/148667342 bookfinder.com addall.com booksprice.com ; by Alda Rodríguez http://books.google.com/books?id=aoUmAwEACAAJ http://www.worldcat.org/oclc/742679357 ; by Pippa Greenwood http://books.google.com/books?id=Q0rMAAAACAAJ http://www.worldcat.org/oclc/54443680 ; by rre http://books.google.com/books?id=E20nAQAACAAJ http://www.worldcat.org/oclc/63280975
  • 276.
    ~ ; by Pilar Moreno http://books.google.com/books?id=vsaVGQAACAAJ http://www.worldcat.org/oclc/166377930 bookfinder.com addall.com booksprice.com Huerta Organica: Guia Esencial Para la Planificacion, El Cultivo Y El Mantenimiento de Especies Horticolas Con Tecnicas Ecologicas; by Maria Gabriela Escriva http://books.google.com/books?id=N6LXPAAACAAJ http://www.worldcat.org/oclc/71832914 bookfinder.com addall.com booksprice.com ; by Edith Stojanov http://books.google.com/books?id=dm8HAAAACAAJ http://www.worldcat.org/oclc/54346642 ; by Sandra Quintans http://books.google.com/books?id=S_W0tgAACAAJ http://www.worldcat.org/oclc/253425051 Huerta Orgánica Casera; by Mirtha Jewtuszyk allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Huerta Orgánica en Macetas: Guia esencial para el cultivo de hortalizas y hierbas aromaticas en balcones, terrazas o patios; by Maria Gabriela Escriva http://books.google.com/books?id=L5_QQs4j7PcC http://www.worldcat.org/oclc/56033900 Huerta Organica Rentable; by Jewtuszyk-Sackewitz books.google.com/books?id=9mi0GAAACAAJ bookfinder.com addall.com booksprice.com Identificacao, em hidroponia, de genotipos de girassol (Helianthus annuus, L.) tolerantes ao aluminio; by N.C. Astafeief http://books.google.com/books?id=xrkoygAACAAJ http://www.worldcat.org/oclc/708515256
  • 277.
    ~ ; by Unicef http://books.google.com/books?id=-pOWMwEACAAJ http://www.worldcat.org/oclc/803164534 Instrucoes para o cultivo de hortalicas de folhas pela tecnica de hidroponia - NFT; by P. R. Furlani http://books.google.com/books?id=tFolQwAACAAJ http://www.worldcat.org/oclc/427853180 Introdução ao cultivo hidropônico de plantas; by Herminia Emilia Prieto Martinez http://books.google.com/books?id=nPpwBAAACAAJ http://www.worldcat.org/oclc/817766640 Introduccion: A La Permacultura; by Bill Mollison http://www.librarything.com/work/5911731 http://books.google.com/books?id=fL47PwAACAAJ Introducción a la Olericultura; by EUNED http://books.google.com/books?id=vBS_GwIrE1MC Invernadero para el cultivo de gerbera en Burgos; by Mar a Pino Mara n http://books.google.com/books?id=HMzwcQAACAAJ http://www.worldcat.org/oclc/628431149 Jardín y huerto biológicos: manual práctico para el cultivo biológico de hortalizas, frutas y flores; by Marie-Luise Kreuter http://www.librarything.com/work/12239055 http://books.google.com/books?id=Rml9AAAACAAJ http://www.worldcat.org/oclc/45782447 http://books.google.com/books?id=WUDk-S25hyMC http://www.worldcat.org/oclc/753701262 Jardines Hidropónicos Domésticos - Hidroponia Simplificada; by Cesar Marulanda carbon.org google.com bing.com yahoo.com bookfinder.com addall.com
  • 278.
    ~ La Agricultura Organica:Limitaciones y Potencialidades para el Desarrollo de Sistemas de Produccion Andinos; by IICA Biblioteca Venezuela http://books.google.com/books?id=sIsgAQAAIAAJ L 'Agricultura ecològica a la Comunitat Valenciana: per un menjar sa i segur; by Universitat Jaume http://books.google.com/books?id=2PG_zhyjDYcC http://www.worldcat.org/oclc/432893731 La Agricultura Orgánica: Una Alternativa para la Economía Campesina de la Globalización; by Felipe Torres Torres http://books.google.com/books?id=4m9gK5E9q1QC http://www.worldcat.org/oclc/38369840 ; by Gui http://books.google.com/books?id=WIRFAQAAIAAJ http://www.worldcat.org/oclc/221695257 contexto guatemalteco; by http://books.google.com/books?id=qbpgAAAAMAAJ http://www.worldcat.org/oclc/034433445 La Agricultura Orgánica en Costa Rica; by Jaime E. García http://books.google.com/books?id=YoloBbw-zRsC http://www.worldcat.org/oclc/40945696 La agricultura orgánica y el desarrollo sostenible en los países del Convenio Andrés Bello; by ITACAB http://books.google.com/books?id=UbxgAAAAMAAJ http://www.worldcat.org/oclc/43499980 La Esperanzita: hacia una agricultura orgánica en el trópico húmedo; by Manuel Fandiño http://books.google.com/books?id=5yZIAAAAYAAJ http://www.worldcat.org/oclc/51599003
  • 279.
    ~ La huerta hidroponicapopular: manual tecnico del curso audiovisual; by Cesar Marulanda http://books.google.com/books?id=cPLJMgEACAAJ http://www.worldcat.org/oclc/778032394 La huerta organica; by Terre des Hommes http://www.librarything.com/work/11988554 http://www.worldcat.org/oclc/34678188 La Huerta en la Escuela; by Miriam Kaufman http://books.google.com/books?id=Ws9dOF2D2cgC http://www.worldcat.org/oclc/434256075 La huerta organica familiar; by Alda Rodríguez http://books.google.com/books?id=GfKGuAAACAAJ http://www.worldcat.org/oclc/34678188 bookfinder.com addall.com booksprice.com La Lombricultura Y Sus Fundamentos; by Rufino Rivero Hernández http://books.google.com/books?id=Jo6-AAAACAAJ http://www.worldcat.org/oclc/434791022 bookfinder.com addall.com booksprice.com La Materia orgánica en los agrosistemas: aproximación al conocimiento de la dinámica, la gestión y la reutilización de la materia orgánica en los agrosistemas; by Juana Labrador Moreno http://books.google.com/books?id=EbmLHLY3qssC http://www.worldcat.org/oclc/41339921 La ruta andina: turismo y desarrollo sostenible en Perú y Bolivia; by Jorge Gómez Rendón http://books.google.com/books?id=gTCE_v7g24UC http://www.worldcat.org/oclc/213299411 La solución nutritiva universal de Steiner: una solución balanceada para cultivos en hidroponia; by Eduardo Rodríguez Guzmán http://books.google.com/books?id=5zTBYgEACAAJ http://www.worldcat.org/oclc/651360398
  • 280.
    ~ Lombrices de tierracon valor comercial: biología y técnicas de cultivo; by Carlos Aragonés http://books.google.com/books?id=xkFMHsqQqVYC http://www.worldcat.org/oclc/52177103 Lombricultura; by Centro de Estudios Agropecuarios http://books.google.com/books?id=O-EVAAAACAAJ http://www.worldcat.org/oclc/777880061 Lombricultura; by http://www.worldcat.org/oclc/780170766 Lombricultura; by Juan B. Lobera Lössel http://books.google.com/books?id=mPduNQAACAAJ http://www.worldcat.org/oclc/806373093 Lombricultura; by Mabel Abiatte http://books.google.com/books?id=N2MCAAAACAAJ allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Lombricultura: cultivo y utilizacion de la lombriz de tierra; by Secretaria de Agricultura del Quindio http://books.google.com/books?id=SVRJMwEACAAJ http://www.worldcat.org/oclc/777753269 Lombricultura: conceptos básicos; biotecnología para transformar los desechos orgánicos en humus; by Guerrero B., Juan http://www.worldcat.org/oclc/773117735 Lombricultura: conocer y cuidar las lombrices para obtener abono orgánico; by Martha Reines Alvarez http://books.google.com/books?id=iz_MYgEACAAJ http://www.worldcat.org/oclc/651367407
  • 281.
    ~ Lombricultura: desarrollo sostenible;by Editorial Universitaria http://www.worldcat.org/oclc/752453484 Lombricultura: otra fuente promisoria de explotacion comercial: la aternativa ecologica para el futuro; by Luz Elena Acosta M http://www.worldcat.org/oclc/778034501 Lombricultura: Teoria Y Practica ; by Miguel Schuldt http://books.google.com/books?id=gRU078M8nZYC http://www.worldcat.org/oclc/803241517 bookfinder.com addall.com booksprice.com ; by Miguel Ángel Cacciamani http://books.google.com/books?id=jTWSAAAACAAJ http://www.worldcat.org/oclc/123894257 bookfinder.com addall.com booksprice.com ; by http://books.google.com/books?id=Uag-twAACAAJ http://www.worldcat.org/oclc/756591929 ; by Universidad de Guadalajara http://books.google.com/books?id=HBzeYgEACAAJ http://www.worldcat.org/oclc/651322128 Lombricultura: una actividad ecológica y rentable; by Miguel Ángel Cacciamani http://books.google.com/books?id=jTWSAAAACAAJ http://www.worldcat.org/oclc/123894257 bookfinder.com addall.com booksprice.com Lombricultura Para Pequeños Emprendedores; by Fabián Rodríguez http://books.google.com/books?id=F00Ky06O2qwC Lombricultura Rentable: Manual Teorico-practico Para La Cria Comercial De Lombri; by Jose Gabetta http://books.google.com/books?id=yOY0AAAACAAJ http://www.worldcat.org/oclc/62392230 bookfinder.com addall.com booksprice.com
  • 282.
    ~ Lombricultura Y AbonosOrganicos; by IICA Biblioteca Venezuela http://books.google.com/books?id=vJ8qAAAAYAAJ Lombricultura y agricultura sustentable; by http://books.google.com/books?id=3n9bAwAACAAJ http://www.worldcat.org/oclc/76045936 Manual de Lombricultura; by Hector Quiroz http://books.google.com/books?id=UGjtMgEACAAJ http://www.worldcat.org/oclc/777831659 ; by Carlo Ferruzzi http://books.google.com/books?id=Bxa3OwAACAAJ http://www.worldcat.org/oclc/630609035 bookfinder.com addall.com booksprice.com Manual De Lombricultura. Crianza De La Lombriz Roja Californiana Eisenia Foetida; by Rodrigo Vásquez Romero allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Manual cría de la lombriz de tierra: una alternativa ecológica y rentable; by Mary Ruth García Conde http://books.google.com/books?id=uHlB89_Y_P0C http://www.worldcat.org/oclc/70669485 Más Allá del Compost: Una Guía de VermiChester para Convertir Orgánicos Residuos Más Allá del Compost Con las Lombrices en Una Mediana Escala Compostaje Sistema; by Tomas Wilkinson http://books.google.com/books?id=bfgFywAACAAJ http://www.worldcat.org/oclc/824470505 Memorias del Seminario de Lombricultura y Uso del Estiercol Porcino en la Produccion de Humus; by http://books.google.com/books?id=2SctNQEACAAJ http://www.worldcat.org/oclc/777744202
  • 283.
    ~ Manual abecedario ecológico:la más completa guía de términos ambientales; by Néstor Julio Fraume http://books.google.com/books?id=rrGMx_DpbfAC http://www.worldcat.org/oclc/777597464 Manual de prácticas agroecológicas de los Andes ecuatorianos; by Zhofre Aguirre http://books.google.com/books?id=O2i6qooj_PYC http://www.worldcat.org/oclc/37680788 Manual de Reciclaje Compostaje y Lombricompostaje; by Fabricio Capistran http://www.librarything.com/work/8215085 http://books.google.com/books?id=33m9AAAACAAJ http://www.worldcat.org/oclc/51611434 bookfinder.com addall.com booksprice.com Manual práctico de hidroponía; by Rodríguez Delfín http://books.google.com/books?isbn=8459110834 http://www.worldcat.org/oclc/817727797 ; by http://www.worldcat.org/oclc/804604470 Manual práctico del huerto ecológico; by Mariano Bueno Bosch http://books.google.com/books?id=aOSmcQAACAAJ http://www.worldcat.org/oclc/733965263 Manual tecnologico: hidroponia; by A. Bliska Junior http://books.google.com/books?id=ugQQtwAACAAJ http://www.worldcat.org/oclc/45777558 Micro Huertas Familiares - CD book; by Cesar Marulanda carbon.org google.com bing.com yahoo.com bookfinder.com addall.com Minna-de Tamesu Mimizu Conposuto Manyuaru: Gakkou, Chiiki-de Manabu Risaikuru; by Binet Payne http://www.google.com http://www.bing.com
  • 284.
    ~ Mujeres, tecnólogas invisibles:experiencias desde América Latina; by Carlos Frías Coronado http://books.google.com/books?id=XycGi-WGIkAC http://www.worldcat.org/oclc/38855280 Nuestra forma de hacer las cosas Experiencias campesinas: agricultura orgánica, recursos loca; by Pedro Figueroa B allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Permacultura: una guía para principiantes; by Graham Burnett http://books.google.com/books?id=5puoPQAACAAJ http://www.worldcat.org/oclc/433472941 bookfinder.com addall.com booksprice.com Permacultura per tutti. Oltre l'agricoltura biologica, per curare la Terra e guarire il pianeta; Patrick Whitefield http://books.google.com/books?id=U4OXtgAACAAJ http://www.worldcat.org/oclc/793322719 Permacultura: Principi e percorsi oltre la sostenibilità by David Holmgren http://www.librarything.com/work/12465756 http://books.google.com/books?id=Gwq3QQAACAAJ Permacultura: una guía para principiantes; by Graham Burnett http://books.google.com/books?id=5puoPQAACAAJ http://www.worldcat.org/oclc/433472941 bookfinder.com addall.com booksprice.com Permacultura en Salgueiron Masso; by Antonio Palma Rico ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Plantas Amigas de Interior; by B. C. Wolverton http://books.google.com/books?id=HFckAgAACAAJ http://www.wolvertonenvironmental.com bookfinder.com addall.com booksprice.com
  • 285.
    ~ Práctica elemental dehuerta orgánica; by Hemisferio Sur http://books.google.com/books?id=Yn9nAAAACAAJ Potencial de ; by http://books.google.com/books?id=QbCjZwEACAAJ http://www.worldcat.org/oclc/36890009 Prefactibilidad comparativa de un sistema de valorización de residuos sólidos urbanos biodegradables: compostaje versus lombricultura; by Conrado Ernesto Canales Schulin-Zeuthen http://books.google.com/books?id=5kT-MQAACAAJ http://www.worldcat.org/oclc/154331561 Primera Jornada Nacional de Lombricultura; by Universidad de Santiago de Chile http://books.google.com/books?id=hh24tgAACAAJ http://www.worldcat.org/oclc/182538019 Principales Avances en Investigacion Y Desarrollo Tecnologico Por Sistemas de Prodccion Agricola; by Corpoica http://books.google.com/books?id=6tzUDwLYA_kC http://www.worldcat.org/oclc/777765558 Princípios de hidroponia; by Carrijo. O. A. http://books.google.com/books?id=CDfQZwEACAAJ http://www.worldcat.org/oclc/709099426 Priorizando Areas Para la Conservacion de Suelos en la Microcuenca la Encanada http://books.google.com/books?id=8CQNxjulBcoC Produção de batata-semente pré-básica em canteiros, vasos e hidroponia; by Ricardo Monteiro Corrêa http://books.google.com/books?id=o4f3HAAACAAJ http://www.worldcat.org/oclc/61244492
  • 286.
    ~ Produccion de AbonosOrganicos de Buena Calidad; by Corpoica http://books.google.com/books?id=O7u8_I1rrnAC Producción de jitomate en hidroponia bajo invernadero: manual de manejo; by Antonio Domínguez Deheza http://books.google.com/books?id=vs_aAAAACAAJ http://www.worldcat.org/oclc/62365677 Produccion de Lombriz Roja Californiana Con Bovinaza; by Corpoica http://books.google.com/books?id=hsmV_w4VVP8C Recirculación de soluciones nutritivas en cultivo de tomate en hidroponía en San Sebastián (Guipúzcoa); by María Elena Blázquez Sanz http://books.google.com/books?id=8S4jcgAACAAJ http://www.worldcat.org/oclc/637593291 Producción del avestruz: aspectos clave; by Carlos Buxadé Carbó http://books.google.com/books?id=MoHuSfib4h0C http://books.google.com/books?id=LeFUcCB_ltoC http://www.worldcat.org/oclc/55205030 Simposio Centroamericano sobre Agricultura Orgánica; by Jaime E. García http://books.google.com/books?id=G8xgAAAAMAAJ http://www.worldcat.org/oclc/33948466 Seminario Taller El Tratamiento Anaerobico de los Residuos del Cafe: Una Alternativa Energitica Para la Disminucion del Impacto Ambiental en el Sector; by CATIE http://books.google.com/books?id=--YNAQAAIAAJ Soluciones nutritivas en hidroponía: formulación y preparación; by Alfredo Rodríguez Delfín http://books.google.com/books?isbn=630008017X
  • 287.
    ~ Sostenibilidad y MedioAmbiente: Políticas, Estrategias y Caminos de Acción; by Antonio Villa L. http://books.google.com/books?id=w_94NpmZDqcC http://www.worldcat.org/oclc/41538924 Sostenibilidad y desarrollo: el valor agregado de la agricultura orgánica; by Liven Martínez http://www.google.com http://www.bing.com Soluções Sustentáveis - Permacultura Urbana by Lucia Legan http://www.librarything.com/work/8460851 Taller De Abonos Organicos; by CATIE http://books.google.com/books?id=HtUOAQAAIAAJ Técnicas Agrícolas: Aeroponía, Hidroponía, Rotación de Cultivos, Ecoquema, Siembra Directa, Ensilado, Trilla, Bancal, Pool de Siembra; by Fuente: Wikipedia http://books.google.com/books?id=9TCbZwEACAAJ Técnicas agrarias: Cunicultura Lombricultura; by Centro de Cultura por Correspondencia http://books.google.com/books?id=NuI7QwAACAAJ Tecnología de Suelos: Estudio de Casos; by Asunción Usón Murillo http://books.google.com/books?id=b2h1gY9dPuoC http://www.worldcat.org/oclc/733969014 ; by Ricard Viladomiu Marnet http://www.worldcat.org/oclc/807514710 Tecnologías alternativas para el desarrollo urbano; by Alvaro Portillo http://books.google.com/books?id=77ZFAAAAYAAJ http://www.worldcat.org/oclc/21567853 Temas de agricultura organica. Lombricultura; by Centro de Estudios para la Democracia Uruguaya http://books.google.com/books?id=i3w1HQAACAAJ http://www.worldcat.org/oclc/36320183
  • 288.
    ~ Tikapapa. Vinculando consumidoresurbanos y pequeños productores andinos con la biodiversidad de la papa; by Centro Internacional de la Papa http://books.google.com/books?id=8-rQxFbg1WwC http://www.worldcat.org/oclc/712865187 Tomate: produção em campo, em casa-de-vegetação e em hidroponia; by Marco Antônio Rezende Alvarenga http://books.google.com/books?isbn=8587692208 http://www.worldcat.org/oclc/709890231 Tratado de cultivo sin suelo; by Miguel Urrestarazu; by Miguel Urrestarazu http://books.google.com/books?isbn=8484761398 http://www.worldcat.org/oclc/55509848 Utilización de compost en los sistemas de cultivo hortícola; by Peter J. Stofella http://books.google.com/books?id=qiVQOERQSOIC http://www.worldcat.org/oclc/57548400 ; by Montavon http://books.google.com/books?id=2EaQtwAACAAJ http://www.worldcat.org/oclc/84686989 Vamos a hacer un huerto: manual práctico para el huerto escolar ecológico; by Jesús María Cantero http://books.google.com/books?id=_nKRygAACAAJ http://www.worldcat.org/oclc/431623934 bookfinder.com addall.com booksprice.com
  • 289.
    ~ Remineralize your Soil~ Healthy Soil, Healthy Plants, Healthy People http://remineralize.org Soil Regeneration with Volcanic Rock Dust http://calameo.com/books/00062163120384c54b373 http://scribd.com/doc/30402511 Volcanic Rock Dust added to soil can double plant or lawn growth. Compost Tea Making: For Organic Healthier Vegetables, Flowers, Orchards, Vineyards, Lawns; by Marc Remillard librarything.com/11197572 books.google.com/PZHObwAACAAJ worldcat.org/oclc/744677817 A Worm Tea Primer: how to make and use worm tea for a vibrant organic garden; by Cassandra Truax ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com http://vermico.com SoilSoup Compost Tea ~ Healthy Soil, Healthy Plants, Healthy People http://soilsoup.com SoilSoup Compost Tea is an excellent soil builder and organic fertilizer. Soil Soup is very easy to handle and use. Growing Solutions ~ Healthy Soil, Healthy Plants, Healthy People http://www.growingsolutions.com Keep Our Country Strong Like a Rock Please Support your LOCAL Organic FAMILY Farmers http://localharvest.org
  • 290.
    ~ Healthy Soil, Healthy Plants, Healthy People eat LOCAL FRESH ORGANIC Food localharvest.org http://greenpeople.org http://eatwellguide.org http://biodynamics.com http://greenamerica.org http://localsustainability.net http://sustainabletable.org http://startnow.org http://harvestontario.com http://tilth.org GOOD FOOD is GOOD MEDICINE Let food be thy medicine; by the Great Physician Hippocrates, from Ancient Greece Your Health (Wholeness) is your Wealth. You can not be of much service to God and to Others, if you are not healthy. Do you Eat to Live, or do you Live to Eat; by Mohandas K. Gandhi Vegetarian Health Recipes for Super Energy and Long Life; by Paul C. Bragg librarything.com/10453101 books.google.com/xHR2MQAACAAJ worldcat.org/oclc/259194344 http://www.scribd.com/doc/122845795 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com
  • 291.
    ~ Healthy Heart: KeepYour Cardiovascular System Healthy and Fit at any Age by Patricia Bragg http://www.librarything.com/work/5143835 http://books.google.com/books?id=4Hu8zxU35y8C http://www.worldcat.org/oclc/54054103 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Eat Fat Look Thin: A Safe and Natural Way to Lose Weight Permanently; by Bruce Fife librarything.com/2179732 books.google.com/rFF30fhh7SoC worldcat.org/oclc/50291097 Raw Kids : Transitioning Children To A Raw Food Diet; by Cheryl Stoycoff librarything.com/work/3459281 books.google.com/DLJWPQAACAAJ worldcat.org/oclc/48399326 raweugene.homestead.com/resources.html rawbc.org Disease-Proof Your Child: Feeding Kids Right; by Joel Fuhrman librarything.com/1445760 books.google.com/-W_LYnBFIY8C worldcat.org/oclc/57452540 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Copy Kids Eat Fruits and Vegetables - Director: Malona Badelt dvd: worldcat.org/oclc/796662340 amazon.com google.com bing.com yahoo.com MIRACLE in WISCONSIN – a different kind of school lunch feingold.org/PF/wisconsin1.html foodrevolution.org/askjohn/43.htm http://advancedhealthplan.com/miracleschool.html Feeding Your Allergic Child: Happy Food for Healthy Kids; by Elisa Meyer calameo.com/000621631d8dc30d0b504 books.google.com/rhQesLhrDMEC worldcat.org/oclc/35651131 Build Powerful Nerve Force: It Controls Your Life, Keep It Healthy; by Patricia Bragg librarything.com/7071960 books.google.com/dm2NQ5OQL_4C worldcat.org/oclc/54051952 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com A healthy body is a guest chamber for the soul, A sick body is a Prison ~ Francis Bacon
  • 292.
    ~ Why be Sick? GarbageIn, Garbage Out Junk Food In, Fat Sick People Dying Out calameo.com/000621631d8dc30d0b504 DIET DRINK POISON http://calameo.com/books/000621631c357ae38ec3c The Stevia Organic Sweetener Story and the Burning of Stevia Books by the FDA scribd.com/doc/108619027 calameo.com/books/0017253189620d6a1a4cb Why Can't My Child Behave: Why Can't She Cope, Why Can't He Learn; by Jane Hersey librarything.com/6297660 books.google.com/3dDvQgAACAAJ worldcat.org/oclc/34765077 Little Sugar Addicts: End the Mood Swings, Meltdowns, Tantrums, and Low Self-Esteem in Your Child Today; by Kathleen DesMaisons librarything.com/work/950397 books.google.com/QmWLCShPhd0C worldcat.org/oclc/54001427 Born With a Junk Food Deficiency: How Flaks, Quacks, and Hacks Pimp the Public Health; by Martha Rosenberg librarything.com/12367474 books.google.com/wW_ApwAACAAJ worldcat.org/oclc/764387194 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Victory Over ADHD: A Holistic Approach for Helping Children with Attention Deficit Hyper- activity Disorder; by Deborah Merlin librarything.com/work/5263917 books.google.com/zylPPgAACAAJ worldcat.org/oclc/244062818 http://victoryoveradhd.com http://feingold.org Healing ADD: The Breakthrough Program That Allows You to See and Heal the 6 Types of ADD, by Doctor Daniel G. Amen, M.D. librarything.com/174213 books.google.com/cdNpm0rtpaAC worldcat.org/oclc/45100517 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Coconut Oil Cures Alzheimer and Other Diseases scribd.com/doc/122169282 calameo.com/books/00203825869b8b318cce3 librarything.com/work/12181672 books.google.com/IeawZwEACAAJ worldcat.org/oclc/738374964 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Coconut Oil Miracle; by Bruce Fife librarything.com/1140258 books.google.com/tSGmnBeRpLkC worldcat.org/oclc/54905936 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com
  • 293.
    ~ Drugging Our Children:How Profiteers Are Pushing Antipsychotics on Our Youngest, and What We Can Do to Stop It; by Sharna Olfman http://books.google.com/books?id=LYvOnrx-wfYC http://www.worldcat.org/oclc/745980498 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Feed Your Kids Right: Dr. Smith's Program for Your Child's Total Health; by Lendon H. Smith librarything.com/work/551514 books.google.com/q2aPdv1y8-UC worldcat.org/oclc/4493409 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com Detecting Your Hidden Allergies: Foods You Eat Everyday Can Cause Asthma, Sinus, Headaches, Fatigue, Nervousness, Digestive Problems, Arthritis and Many Other Disorders; by William G Crook librarything.com/work/2410176 books.google.com/books?id=w3UrPQAACAAJ http://www.worldcat.org/oclc/19068905 bookfinder.com addall.com booksprice.com Food Allergy Relief: The Joys of Being Food-Allergy Free, the Natural Way; by James Braly librarything.com/work/5317883 books.google.com/books?id=P7_akdEOJOAC http://www.worldcat.org/oclc/44268078 bookfinder.com addall.com booksprice.com Dr. Braly's Food Allergy and Nutrition Revolution: Change Your Food , Change Your Life, Featuring the Top 10 Research Breakthroughs; by James Braly librarything.com/work/2709970 books.google.com/books?id=upaYVKLIosUC http://www.worldcat.org/oclc/44965038 bookfinder.com addall.com booksprice.com Disease-Proof Your Child: Feeding Kids Right; by Joel Fuhrman librarything.com/1445760 books.google.com/-W_LYnBFIY8C worldcat.org/oclc/57452540 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Healing Power of Nature Foods; by Susan Smith Jones librarything.com/5850867 books.google.com/raxZgkAhOw0C worldcat.org/oclc/173239121 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Let's Get Well; by Adelle Davis librarything.com/153373 books.google.com/0CDoQ6AEwAA worldcat.org/oclc/271938 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Nutrition and Your Mind: The Psychochemical Response; by George Watson librarything.com/work/2933656 books.google.com/books?id=CJMjAAAACAAJ http://www.worldcat.org/oclc/277194 bookfinder.com addall.com booksprice.com
  • 294.
    ~ Change Your Brain,Change Your Life: The Breakthrough Program for Conquering Anxiety, Depression, Obsessiveness, Anger, and Impulsiveness; by Daniel G. Amen, M.D. librarything.com/302455 books.google.com/qB9vnlTv6Z4C worldcat.org/oclc/40943377 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Natural Baby Care; by Colleen K. Dodt librarything.com/637409 books.google.com/zngeIWEPqsIC worldcat.org/oclc/44954019 Apple Cider Vinegar: Control Weight, Banish Obesity and Diabetes; by Paul C. Bragg librarything.com/771911 books.google.com/GWMlSwAACAAJ worldcat.org/oclc/16445073 The Miracle of MSM: The Natural Solution for Pain; by Stanley W. Jacob librarything.com/1229935 books.google.com/QXXnCgcoDIAC worldcat.org/oclc/40200470 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Yeast Connection: A Medical Breakthrough; by William G Crook librarything.com/work/26945 books.google.com/wPCb1rjN2Q8C worldcat.org/oclc/13796406 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com The Food Factor in Disease; by Francis Washington Everard Hare, M. D. http://books.google.com/books?id=zgA1AQAAMAAJ http://www.worldcat.org/oclc/1620178 How to Heal the Sick; by Charles Hunter librarything.com/953145 books.google.com/TmxrPAAACAAJ worldcat.org/oclc/8010289 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Chemical Cuisine: Do You Really Know What You're Eating; by Gloria Gilbere librarything.com/12421182 worldcat.org/oclc/48523377 ~ Kindle book bookfinder.com addall.com booksprice.com Excitotoxins: The Taste That Kills; by Russell L Blaylock librarything.com/854055 books.google.com/gav_LL7olqQC worldcat.org/oclc/36060015 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Toxic Sludge is Good For You: Lies, Damn Lies and the Public Relations Industry; by John Stauber scribd.com/doc/106751750 librarything.com/5514 worldcat.org/oclc/32665064 Are Your Children and Grandchildren Eating Food Fertilized with Toxic Sewage Sludge scribd.com/106751638 scribd.com/106751750 scribd.com/106751911 Fateful Harvest: The True Story of a Small Town, a Global Industry, and a Toxic Secret; by Duff Wilson http://librarything.com/work/569636 http://safefoodandfertilizer.org ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 295.
    ~ The Unhealthy Truth:One Mother's Shocking Investigation into the Dangers of America's Food Supply; by Rachel Kranz librarything.com/10215853 books.google.com/Lrtuyrh8h2gC worldcat.org/oclc/462880202 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Guess What Came to Dinner: Parasites and Your Health; by Ann Louise Gittleman librarything.com/work/2395722 books.google.com/CgA8AjjGwD0C worldcat.org/oclc/45668924 bookfinder.com addall.com booksprice.com Pesticide Alert: A Guide to Pesticides in Fruits and Vegetables; by Lawrie Mott librarything.com/work/7535180 books.google.com/books?id=X5NKAAAAYAAJ http://www.worldcat.org/oclc/17106638 bookfinder.com addall.com booksprice.com Empty Harvest: Understanding the Link Between Our Food, Our Immunity and Our Planet; by Bernard Jensen librarything.com/1237077 books.google.com/Fp7eN8Ghg60C worldcat.org/oclc/20454798 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Stuffed and Starved: The Hidden Battle For The World Food System; by Raj Patel librarything.com/3657642 books.google.com/oAeFUSm5bAEC worldcat.org/oclc/182529373 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com dvd: Super Size Me; director: Morgan Spurlock http://worldcat.org/oclc/5658213 google.com bing.com yahoo.com dvd: Fast Food Nation; director: Richard Linklater http://worldcat.org/oclc/77539187 google.com bing.com yahoo.com dvd:King Corn; director: Aaron Woolf http://worldcat.org/oclc/213373700 google.com bing.com yahoo.com Beyond Antibiotics: Strategies for Living in a World of Emerging Infections and Antibiotic- Resistant Bacteria; by Michael A. Schmidt librarything.com/8585344 books.google.com/dvSYdNLxNgMC worldcat.org/oclc/227929988 bookfinder.com addall.com booksprice.com The Bible Cure; by Reginald B. Cherry, M.D. librarything.com/work/355159 books.google.com/books?id=nXaH6FtiZFoC worldcat.org/oclc/38898046 bookfinder.com addall.com booksprice.com Praying God's Word: Biblically Based Prayers and Faith Confessions; by Hazel Hill librarything.com/2845289 books.google.com/a5P9ewEACAAJ worldcat.org/oclc/27036064 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com
  • 296.
    ~ An Integrative Approachto Healing Chronic Illness: Revealing the Root Causes of Modern Disease; by Richard Brightheart http://books.google.com/books?id=lly0IAAACAAJ http://www.worldcat.org/oclc/778566973 allbookstores.com bing.com bookfinder.com The Probiotics Revolution: The Definitive Guide to Safe, Natural Health Solutions Using Probiotic and Prebiotic Foods and Supplements; by Sarah Wernick librarything.com/7569726 books.google.com/GSrjqYV2uVsC worldcat.org/oclc/137221392 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Probiotics - Protection Against Infection: Using Nature's Tiny Warriors To Stem Infection and Fight Disease; by Casey Adams librarything.com/10335947 books.google.com/KhppPgAACAAJ worldcat.org/oclc/727198870 ~ Kindle book ~ Nook book bookfinder.com addall.com booksprice.com The Complete Book of Enzyme Therapy: A Complete and Up-to-Date Reference to Effective Remedies; by Anthony J. Cichoke librarything.com/1118293 books.google.com/gJy5neC07YsC worldcat.org/oclc/39007146 Enzyme Nutrition; by Doctor Edward Howell librarything.com/1827688 books.google.com/h9EgG8O7GgIC worldcat.org/oclc/12103275 allbookstores.com google.com bookfinder.com booksprice.com bing.com yahoo.com Resetting the Clock: Five Anti-Aging Hormones That Improve and Extend Life; by Elmer Cranton librarything.com/work/6602028 books.google.com/books?id=bzVZ2aKBkysC http://www.worldcat.org/oclc/34788336 bookfinder.com addall.com booksprice.com Nurtured by Love: The Classic Approach to Talent Education; by Shinichi Suzuki librarything.com/work/557451 books.google.com/-Qvd7Wsmb48C worldcat.org/oclc/61038074 ~ Kindle book allbookstores.com bing.com bookfinder.com yahoo.com Game: Harvest Time ~ CO-OPERATIVE Games; by Family Pastimes http://familypastimes.com Go for Kids; by Milton N Bradley librarything.com/work/1567424 books.google.com/books?id=1tt_AAAACAAJ http://worldcat.org/oclc/48923942 bookfinder.com addall.com booksprice.com Chess is Child's Play: Teaching Techniques That Work; by Laura Sherman librarything.com/work/12340948 books.google.com/books?id=vsIMywAACAAJ http://www.worldcat.org/oclc/759173209 bookfinder.com addall.com booksprice.com 65 Promises from God for Your Child: Powerful Prayers for Supernatural Results; by Mike Shreve books.google.com/books?id=CCCHy5PdQe0C ~ Kindle book ~ Nook book allbookstores.com
  • 297.
    ~ ORGANIC GARDENING TECHNOLOGIES INCREASINGPlant Yields by over 400 PERCENT http://www.scribd.com/doc/75160339 http://www.calameo.com/books/0010511867e619fa5b018 Boost your Garden Yields with Companion Planting Technologies http://www.scribd.com/doc/124719796 http://calameo.com/books/0021353034dd0a1c03d43 CITY FARMING, BACKYARD FARMING, and URBAN FARMING http://www.scribd.com/doc/96622044 http://en.calameo.com/books/001467601ef8c64105f4c FREE RAIN WATER HARVESTING MANUALS and Much More http://www.scribd.com/doc/75160853 http://www.calameo.com/books/00105118622f34ba7dbe7 FREE RAIN GARDEN MANUALS, BROCHURES and INFORMATION SHEETS http://www.scribd.com/doc/75162927 http://www.calameo.com/books/00105118638b46251e05d FREE WATER WISE Gardening, DROUGHT Gardening, XERISCAPE Gardening MANUALS, Books and Much More http://www.scribd.com/doc/105267038 http://en.calameo.com/books/001698854129dced31cc9 FREE ROOF GARDENS - GREEN ROOFS MANUALS Links and Aquaponics Systems http://www.scribd.com/doc/75160952 http://www.calameo.com/books/0010511860c2e578571b1
  • 298.
    ~ Straight VEGETABLE OILCars, Trucks, Electric Generators, Water Pumps-Irrigation Straight Vegetable Oil Links to Books, Manuals, Articles and Much More http://www.scribd.com/doc/93406879 http://www.calameo.com/books/00139810833f44e83a7d4 SOLAR ENERGY TRAINING and Development Projects solarenergy.org homepower.com norcalsolar.org ises.org dgs.de protermosolar.com energy.sourceguides.com Dean's Coffee Beans Eco Development Projects - Organic and Fair Trade deansbeans.com books.google.com/IqXuk9mURjUC Growing Power - Training People for Creating Community Food Systems by Will Allen http://www.growingpower.org librarything.com/11993624 books.google.com/nf55k2hlg-IC worldcat.org/oclc/757470632 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Unlocking the Secrets of Living Your Dreams ~ Chicken Soup for the Soul ; by Mark Victor Hansen http://librarything.com/work/7580935 http://books.google.com/books?id=TuESYqr9mQIC http://worldcat.org/oclc/52854787 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com You Can If You Think You Can; by Norman Vincent Peale http://librarything.com/work/125895 http://books.google.com/books?id=xpzYyyN2XkUC http://www.worldcat.org/oclc/730748 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Coach Wooden's Pyramid of Success: Building Blocks For a Better Life; by John Wooden http://librarything.com/work/303206 http://books.google.com/books?id=tu23SID_8WwC http://www.worldcat.org/oclc/57366457 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Every day help someone who can never reciprocate. This is my obligation. ~ John Wooden's PHILOSOPHY, The great UCLA basketball coach calameo.com/books/00127522718a6e0fef72d scribd.com/doc/87058897
  • 299.
    ~ FREE GARDEN THERAPYMANUALS: HELPING the DISABLED scribd.com/doc/64621010 calameo.com/books/000877896a16a5245c71a Free Garden Posters http://www.scribd.com/doc/124386408 How to Heal the Sick; by Charles Hunter librarything.com/953145 books.google.com/TmxrPAAACAAJ worldcat.org/oclc/8010289 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com Super Power Breathing: For Super Energy, High Health and Longevity; by Patricia Bragg librarything.com/9216551 books.google.com/l0LxOy_M-5YC worldcat.org/oclc/41437619 ~ Nook book allbookstores.com bing.com bookfinder.com yahoo.com George Muller: Man of Faith and Miracles; by Basil Miller librarything.com/1547177 books.google.com/QKweK4HIxX4C worldcat.org/oclc/21343056 bookfinder.com addall.com booksprice.com google.com bing.com yahoo.com Experiencing The Great I Am: 40 Faith-building Stories From Contemporary Christians; by Bryant Heflin librarything.com/work/4540159 books.google.com/Wb8k-IQve48C worldcat.org/oclc/58546923 Always Enough: Gods Miraculous Provision among the Poorest Children on Earth; by Heidi Baker librarything.com/737793 books.google.com/RefRPAAACAAJ worldcat.org/oclc/52341800 ~ Kindle book ~ Nook book allbookstores.com bing.com bookfinder.com
  • 300.
    ~ We need YourHelp. Please Plant a Row for the Hungry. Thank YOU! Please use search engines to find "Plant A Row For The Hungry" locations, people, Food Banks and churches near you. Thank you. http://www.google.com http://www.scribd.com/doc/106198571 calameo.com/00127522718a6e0fef72d http://www.scribd.com/doc/75163916 http://www.yahoo.com http://www.bing.com Dig for Victory Faith Like Potatoes; by Angus Buchan http://www.librarything.com/work/2886793 http://books.google.com/books?id=LUN2Ci003esC http://www.worldcat.org/oclc/314188733 http://shalomtrust.co.za bookfinder.com addall.com booksprice.com