SITE IMAGES
SITE/LOCATION SATELITE IMAGE :
PROPOSED SITE
SITE PLAN
PARKING PLAN
INFRASTUCTURE:
 WATER SUPPLY : MUNICIPAL SUPPLY AND BORE WELL
 DRAINAGE : ROOF RUN OFF TO RECHARGING PIT STP TREATED WATER TO FLUSHING PURPOSE AND SURFACE RUNOFF TO
MUNICIPALTY DRAIN.
 SEWERAGE : STP OF CAPACITY 45KLD WILL BE PROVIDED.
 GARBAGE DISPOSAL: SOLID WASTE WILL BE SEGREGATED TO BIODEGRADALE AND NON BIO DEGRADABLE. BIO DEGRADABLE WILL
COMPOSTED AND NON BIO DEGRADABLE WILL DISPOSED
TO BMC
 FIRE TENDER VEHICLE : FOR FIRE TENDER VEHECLE MOVEMENT HARD PAVED 6M WIDE PATH HAVE BEEN LEFT .
 PARKING : REQUIRED PARKING =1630.99 SQM.(30% BUA)
COVERD PARKING= 412.08 SQM.
OPEN PARKING(OPEN PARKING-(1, 2, 3 ,4) =1251.38SQM.
TOTAL PARKING AREA= 1663.46 SQM.
•
• RAIN WATER HARVESTING PIT : 6 NOS OF RAIN WATER HARVESTING PIT PROVIDED.
• GREEN BUILDING PROVISIONS: GREEN BUILDING MEASURES HAVE BEEN TAKEN TO ACHIVE IGBC RATING.
NOC’S OBTAINED :
 NO OBJECTION CERTIFICATE FOR GROUND WATER ABSTRACTION
 CONSENT ORDER FROM STATE POLLUTION CONTROL BOARD
 FIRE SAFETY RECOMMENDATION
CONCLUSION:
•THE BUILDING PARAMETERS ARE SCRUTINIZED AS PER ODA (P&BS) RULES 2020 AS WELL AS DECISION OF THE AUTHORITY. THE PROPOSAL
CONFIRMS TO THE NORMS OF BUILDING REGULATIONS.
• HENCE THE BUILDING HEIGHT IS 14.63 M. HAS BEEN PLACED BEFORE DP AND BP COMMITTEE.
THANK YOU

COLLEGE _HOSTEL BUILING_XXXXXXXXXXX.pptx

  • 2.
  • 3.
  • 7.
  • 8.
  • 14.
    INFRASTUCTURE:  WATER SUPPLY: MUNICIPAL SUPPLY AND BORE WELL  DRAINAGE : ROOF RUN OFF TO RECHARGING PIT STP TREATED WATER TO FLUSHING PURPOSE AND SURFACE RUNOFF TO MUNICIPALTY DRAIN.  SEWERAGE : STP OF CAPACITY 45KLD WILL BE PROVIDED.  GARBAGE DISPOSAL: SOLID WASTE WILL BE SEGREGATED TO BIODEGRADALE AND NON BIO DEGRADABLE. BIO DEGRADABLE WILL COMPOSTED AND NON BIO DEGRADABLE WILL DISPOSED TO BMC  FIRE TENDER VEHICLE : FOR FIRE TENDER VEHECLE MOVEMENT HARD PAVED 6M WIDE PATH HAVE BEEN LEFT .  PARKING : REQUIRED PARKING =1630.99 SQM.(30% BUA) COVERD PARKING= 412.08 SQM. OPEN PARKING(OPEN PARKING-(1, 2, 3 ,4) =1251.38SQM. TOTAL PARKING AREA= 1663.46 SQM. • • RAIN WATER HARVESTING PIT : 6 NOS OF RAIN WATER HARVESTING PIT PROVIDED. • GREEN BUILDING PROVISIONS: GREEN BUILDING MEASURES HAVE BEEN TAKEN TO ACHIVE IGBC RATING.
  • 15.
    NOC’S OBTAINED : NO OBJECTION CERTIFICATE FOR GROUND WATER ABSTRACTION  CONSENT ORDER FROM STATE POLLUTION CONTROL BOARD  FIRE SAFETY RECOMMENDATION
  • 16.
    CONCLUSION: •THE BUILDING PARAMETERSARE SCRUTINIZED AS PER ODA (P&BS) RULES 2020 AS WELL AS DECISION OF THE AUTHORITY. THE PROPOSAL CONFIRMS TO THE NORMS OF BUILDING REGULATIONS. • HENCE THE BUILDING HEIGHT IS 14.63 M. HAS BEEN PLACED BEFORE DP AND BP COMMITTEE.
  • 17.