CoffeeScript: The Good Parts 
The good and not so good parts of CoffeeScript in comparison to JavaScript 
@azat_co 
1
Watch the video with slide 
synchronization on InfoQ.com! 
http://www.infoq.com/presentations 
/coffeescript-lessons 
InfoQ.com: News & Community Site 
• 750,000 unique visitors/month 
• Published in 4 languages (English, Chinese, Japanese and Brazilian 
Portuguese) 
• Post content from our QCon conferences 
• News 15-20 / week 
• Articles 3-4 / week 
• Presentations (videos) 12-15 / week 
• Interviews 2-3 / week 
• Books 1 / month
Presented at QCon New York 
www.qconnewyork.com 
Purpose of QCon 
- to empower software development by facilitating the spread of 
knowledge and innovation 
Strategy 
- practitioner-driven conference designed for YOU: influencers of 
change and innovation in your teams 
- speakers and topics driving the evolution and innovation 
- connecting and catalyzing the influencers and innovators 
Highlights 
- attended by more than 12,000 delegates since 2007 
- held in 9 cities worldwide
webapplog.com 
About The Presenter 
@azat_co 
Azat Mardan 
• Worked in the US government, startups 
and corporations 
• Wrote six books on JavaScript and 
Node.js (the latest is Practical Node.js 
by Apress) 
• Certified yoga teacher and paleo lifestyle 
enthusiast 
2
webapplog.com 
Fun story: “CoffeeScript is a solution without a problem” 
I used to make fun of CoffeeScript, before falling in love with 
it. 
@azat_co 
3
webapplog.com 
@azat_co 
Who likes /uses 
CoffeeScript already? 
4
webapplog.com 
@azat_co 
Please be open-minded 
5
webapplog.com 
Blub Paradox 
@azat_co 
6 
! 
Blub paradox: devs are satisfied with whatever language 
they happen to use, because it dictates the way they think 
about programs. 
http://en.wikipedia.org/wiki/ 
Paul_Graham_(computer_programmer)#Blub
webapplog.com 
CoffeeScript’s Bad Rep 
Most of the people who say bad things about CoffeeScript 
have never built with it anything relatively large-scale and 
production-ready. 
@azat_co 
7
webapplog.com 
CoffeeScript at DocuSign 
DocuSign stack: CoffeeScript+Node.js+Backbone.js+Grunt 
Observation: front-end developers, after only a few weeks of 
CoffeeScript, didn’t want to go back to regular JavaScript! 
@azat_co 
8
webapplog.com 
“CoffeeScript is a little language that compiles 
into JavaScript.” — coffeescript.org 
@azat_co 
9
webapplog.com 
TOC for v1.7.1 
Maybe CoffeeScript is not so small 
anymore? 
@azat_co 
10
webapplog.com 
@azat_co 
JavaScript 
11
webapplog.com 
Native JavaScript Issues 
• == vs === 
• Functional inheritance vs pseudo-classical 
• Global variable leakage (missing var) 
• Many others 
@azat_co 
12
webapplog.com 
CoffeeScript: The Good Parts (some of them) 
• Syntax: curly braces, parentheses and semicolons 
• Function declaration: -> and => 
• Scoping: automatic var 
• Iterators / comprehensions: replacement of for loops 
• Class declaration: class operand 
@azat_co 
13
webapplog.com 
Syntax 
• No semicolons, i.e., they are banned 
• Logical blocks can omit curly braces 
• Function calls can omit parentheses 
@azat_co 
14
webapplog.com 
Why Semicolons are Bad? (*IMHO) 
• Extra time&work to put them 
• If missed, inconsistent but working code 
• Redundant/not-needed (expect in two cases) 
• Semicolon Insertion (ASI) 
@azat_co 
15
webapplog.com 
Logical Blocks (optional curly braces) 
@azat_co 
kids = 
brother: 
name: "Max" 
age: 11 
sister: 
name: "Ida" 
age: 9 
16
webapplog.com 
Function calls 
console.log object.class 
! 
$('.account').attr class: ‘active’ 
! 
$(‘button’).css 
color: red 
“font-size”: “16px” 
@azat_co 
17
webapplog.com 
Function Declaration 
• Skinny arrow (->) saves time typing “function” over and 
over again 
• Fat arrow (=>), i.e., no need to use “var that = this” or “var 
self = this” 
@azat_co 
18
webapplog.com 
Function Declaration Elegance 
CoffeeScript: JavaScript: 
a = (x,y) -> console.log x+y 
@azat_co 
var a; 
! 
a = function(x, y) { 
return console.log(x + y); 
}; 
! 
a(10, -5); 
19
webapplog.com 
Function Declaration: Skinny Arrow 
CoffeeScript: JavaScript: 
console.log @ 
$('div').click ()-> 
console.log @ console.log(this); 
@azat_co 
$('div').click(function() { 
return console.log(this); 
}); 
Prints “window” and DOM elements i.e., 
“this” changes and @ changes too 
20
webapplog.com 
Function Declaration: Fat Arrow 
CoffeeScript: JavaScript: 
console.log @ 
$('div').click ()=> 
console.log @ 
@azat_co 
var _this = this; 
! 
console.log(this); 
! 
$('div').click(function() { 
return console.log(_this); 
}); 
Prints “window” both times (i.e., the outer scope) 
21
webapplog.com 
Scoping 
• Manual “var” is banned 
• Variables declared in the scope in which they are 
encountered first (i.e., the order in which variables used 
determines their scope). 
@azat_co 
22
webapplog.com 
Why auto vars are good? Missed “var” Example. 
CoffeeScript: JavaScript: 
var a = function (c) { 
b = 10; 
return b + c; 
} 
console.log(a(0)); 
! 
b is window.b — bad! 
@azat_co 
var a = function(c) { 
var b = 10; 
return b + c; 
}; 
console.log(a(0)); 
! 
b is a private attribute — 
what we wanted! 
23
webapplog.com 
Scoping: Example I 
CoffeeScript: JavaScript: 
b = 1 
a = -> 
b = -1 
! 
a() 
console.log b 
@azat_co 
var a, b; 
b = 1; 
a = function() { 
return b = -1; 
}; 
a(); 
console.log(b); 
24
webapplog.com 
Scoping: Example II 
CoffeeScript: JavaScript: 
a = -> 
b = -1 
b = 1 
a() 
console.log b 
@azat_co 
var a, b; 
a = function() { 
var b; 
return b = -1; 
}; 
b = 1; 
a(); 
console.log(b); 
25
webapplog.com 
Iterators / Comprehensions (for loops) 
Awesome time savers! Good for arrays and objects: 
! 
for item, index in arrayObject 
iterator(item) 
! 
for key, value of object 
iterator(item) 
! 
! 
! 
! 
! 
@azat_co 
26
webapplog.com 
Iterating over an Array 
CoffeeScript: JavaScript: 
for item, index in arrayObject 
iterator(item) 
@azat_co 
var index, item, _i, _len; 
! 
for (index = _i = 0, 
_len = arrayObject.length; 
_i < _len; 
index = ++_i) { 
item = arrayObject[index]; 
iterator(item); 
} 
27
webapplog.com 
Iterating over an Object 
CoffeeScript: JavaScript: 
for key, value of object 
iterator(value) 
@azat_co 
var key, value; 
! 
for (key in object) { 
value = object[key]; 
iterator(value); 
} 
28
webapplog.com 
Iterators / Comprehensions (for loops) II 
Many options: 
! 
iterator (item) for item in arrayObject 
! 
iterator item for item in arrayObject 
! 
iterator item for item in arrayObject when item > 0 
! 
! 
! 
! 
! 
! 
@azat_co 
29
webapplog.com 
Class Declaration 
• In JavaScript classes are absent at all! 
• CoffeeScript eloquently implements Pseudo-classical 
inheritance pattern: “new” and capitalized name (“new 
Animal”, “new Vehicle”, etc.) 
• Pseudo-classical is hard and cumbersome without CS 
• CoffeeScript “constructor” method and “super” call 
@azat_co 
30
webapplog.com 
Class Example 
CoffeeScript: 
class Vehicle 
constructor: (@name) -> 
move: (meters) -> 
console.log @name + " moved #{meters} miles.” 
! 
camry = new Vehicle "Camry" 
camry.move(50) 
Output: Camry moved 50 miles. 
@azat_co 
31
webapplog.com 
Class Example 
JavaScript: 
var Vehicle, camry; 
! 
Vehicle = (function() { 
function Vehicle(name) { 
this.name = name; 
} 
! 
Vehicle.prototype.move = function(meters) { 
return console.log(this.name + (" moved " + meters + " miles.")); 
}; 
! 
return Vehicle; 
! 
})(); 
! 
camry = new Vehicle("Camry"); 
! 
camry.move(50); 
2x: 6 vs 12 lines of code! 
@azat_co 
32
webapplog.com 
Other CoffeeScript Goodies 
• Splats (e.g., “options…”) 
• Conditions (if, isnt, not, and, or, unless) 
• Arrays and their slicing (arr = [1..10], slicedArr = arr[2..4]) 
@azat_co 
33
webapplog.com 
CoffeeScript: The Good Parts Summary 
• Syntax: curly braces, parentheses and semicolons 
• Function Declaration: -> and => 
• Scoping: automatic var 
• Iterators / Comprehensions: replacement of for loops 
• Class Declaration: class operand 
@azat_co 
34
webapplog.com 
CoffeeScript: Not So Good Parts 
• Learning: 1-2 day, free online ebooks 
• Compilation: extra build step (use Grunt or similar) 
• Parentheses: optional and cause misinterpretation 
• Debugging: use source-maps 
@azat_co 
35
webapplog.com 
CoffeeScript of My Dreams 
https://github.com/michaelficarra/coffee-of-my-dreams 
@azat_co
webapplog.com 
How to Get Started 
$ npm install -g coffee-script 
$ coffee 
>… 
@azat_co 
37
webapplog.com 
Companies that use CoffeeScript 
@azat_co 
38 
• GitHub 
• Dropbox 
• DocuSign 
• Airbnb (mobile) 
• HotelTonight 
• Basecamp (mobile)
webapplog.com 
Further Reading 
CoffeeScript FUNdamentals: The Better JavaScript 
http://bit.ly/1nD4dE3 
@azat_co 
39
webapplog.com 
CoffeeScript Ebooks 
• The Little Book on CoffeeScript (free onine) 
• CoffeeScript Cookbook (free online) 
• Smooth CoffeeScript (free online) 
• CoffeeScript Ristretto (free online) 
@azat_co 
40
webapplog.com 
Future / Alternatives 
@azat_co 
41 
• Dart (early stage) 
• TypeScript: MicroSoft project 
• ECMAScript 6: be careful with old browsers, use shims, 
fully available after June 2015 
• Sweet.js: macros!
webapplog.com 
Conclusions 
@azat_co 
42 
• Good for enterprise and large team, because it’s easer to 
have common style, e.g., https://github.com/styleguide/ 
javascript 
• Good for developers new to JavaScript and those 
coming from OOP languages (Java, Ruby) 
• Cross-browser / old browser support 
• More productive and happier developers (after learning) 
• Tested, robust, and available now 
• Awesome with Backbone.js and Underscore.js
webapplog.com 
Session Summary 
• Native JavaScript Issues 
• CoffeeScript: The Good Parts 
• How to Get Started 
• Future / Alternatives 
• Conclusions 
@azat_co 
43
webapplog.com 
Discussion and Q&A Time 
@azat_co 
Questions, thoughts and experiences? 
44
Watch the video with slide synchronization on 
InfoQ.com! 
http://www.infoq.com/presentations/coffeescript 
-lessons

CoffeeScript: The Good Parts

  • 1.
    webapplog.com CoffeeScript: TheGood Parts The good and not so good parts of CoffeeScript in comparison to JavaScript @azat_co 1
  • 2.
    Watch the videowith slide synchronization on InfoQ.com! http://www.infoq.com/presentations /coffeescript-lessons InfoQ.com: News & Community Site • 750,000 unique visitors/month • Published in 4 languages (English, Chinese, Japanese and Brazilian Portuguese) • Post content from our QCon conferences • News 15-20 / week • Articles 3-4 / week • Presentations (videos) 12-15 / week • Interviews 2-3 / week • Books 1 / month
  • 3.
    Presented at QConNew York www.qconnewyork.com Purpose of QCon - to empower software development by facilitating the spread of knowledge and innovation Strategy - practitioner-driven conference designed for YOU: influencers of change and innovation in your teams - speakers and topics driving the evolution and innovation - connecting and catalyzing the influencers and innovators Highlights - attended by more than 12,000 delegates since 2007 - held in 9 cities worldwide
  • 4.
    webapplog.com About ThePresenter @azat_co Azat Mardan • Worked in the US government, startups and corporations • Wrote six books on JavaScript and Node.js (the latest is Practical Node.js by Apress) • Certified yoga teacher and paleo lifestyle enthusiast 2
  • 5.
    webapplog.com Fun story:“CoffeeScript is a solution without a problem” I used to make fun of CoffeeScript, before falling in love with it. @azat_co 3
  • 6.
    webapplog.com @azat_co Wholikes /uses CoffeeScript already? 4
  • 7.
  • 8.
    webapplog.com Blub Paradox @azat_co 6 ! Blub paradox: devs are satisfied with whatever language they happen to use, because it dictates the way they think about programs. http://en.wikipedia.org/wiki/ Paul_Graham_(computer_programmer)#Blub
  • 9.
    webapplog.com CoffeeScript’s BadRep Most of the people who say bad things about CoffeeScript have never built with it anything relatively large-scale and production-ready. @azat_co 7
  • 10.
    webapplog.com CoffeeScript atDocuSign DocuSign stack: CoffeeScript+Node.js+Backbone.js+Grunt Observation: front-end developers, after only a few weeks of CoffeeScript, didn’t want to go back to regular JavaScript! @azat_co 8
  • 11.
    webapplog.com “CoffeeScript isa little language that compiles into JavaScript.” — coffeescript.org @azat_co 9
  • 12.
    webapplog.com TOC forv1.7.1 Maybe CoffeeScript is not so small anymore? @azat_co 10
  • 13.
  • 14.
    webapplog.com Native JavaScriptIssues • == vs === • Functional inheritance vs pseudo-classical • Global variable leakage (missing var) • Many others @azat_co 12
  • 15.
    webapplog.com CoffeeScript: TheGood Parts (some of them) • Syntax: curly braces, parentheses and semicolons • Function declaration: -> and => • Scoping: automatic var • Iterators / comprehensions: replacement of for loops • Class declaration: class operand @azat_co 13
  • 16.
    webapplog.com Syntax •No semicolons, i.e., they are banned • Logical blocks can omit curly braces • Function calls can omit parentheses @azat_co 14
  • 17.
    webapplog.com Why Semicolonsare Bad? (*IMHO) • Extra time&work to put them • If missed, inconsistent but working code • Redundant/not-needed (expect in two cases) • Semicolon Insertion (ASI) @azat_co 15
  • 18.
    webapplog.com Logical Blocks(optional curly braces) @azat_co kids = brother: name: "Max" age: 11 sister: name: "Ida" age: 9 16
  • 19.
    webapplog.com Function calls console.log object.class ! $('.account').attr class: ‘active’ ! $(‘button’).css color: red “font-size”: “16px” @azat_co 17
  • 20.
    webapplog.com Function Declaration • Skinny arrow (->) saves time typing “function” over and over again • Fat arrow (=>), i.e., no need to use “var that = this” or “var self = this” @azat_co 18
  • 21.
    webapplog.com Function DeclarationElegance CoffeeScript: JavaScript: a = (x,y) -> console.log x+y @azat_co var a; ! a = function(x, y) { return console.log(x + y); }; ! a(10, -5); 19
  • 22.
    webapplog.com Function Declaration:Skinny Arrow CoffeeScript: JavaScript: console.log @ $('div').click ()-> console.log @ console.log(this); @azat_co $('div').click(function() { return console.log(this); }); Prints “window” and DOM elements i.e., “this” changes and @ changes too 20
  • 23.
    webapplog.com Function Declaration:Fat Arrow CoffeeScript: JavaScript: console.log @ $('div').click ()=> console.log @ @azat_co var _this = this; ! console.log(this); ! $('div').click(function() { return console.log(_this); }); Prints “window” both times (i.e., the outer scope) 21
  • 24.
    webapplog.com Scoping •Manual “var” is banned • Variables declared in the scope in which they are encountered first (i.e., the order in which variables used determines their scope). @azat_co 22
  • 25.
    webapplog.com Why autovars are good? Missed “var” Example. CoffeeScript: JavaScript: var a = function (c) { b = 10; return b + c; } console.log(a(0)); ! b is window.b — bad! @azat_co var a = function(c) { var b = 10; return b + c; }; console.log(a(0)); ! b is a private attribute — what we wanted! 23
  • 26.
    webapplog.com Scoping: ExampleI CoffeeScript: JavaScript: b = 1 a = -> b = -1 ! a() console.log b @azat_co var a, b; b = 1; a = function() { return b = -1; }; a(); console.log(b); 24
  • 27.
    webapplog.com Scoping: ExampleII CoffeeScript: JavaScript: a = -> b = -1 b = 1 a() console.log b @azat_co var a, b; a = function() { var b; return b = -1; }; b = 1; a(); console.log(b); 25
  • 28.
    webapplog.com Iterators /Comprehensions (for loops) Awesome time savers! Good for arrays and objects: ! for item, index in arrayObject iterator(item) ! for key, value of object iterator(item) ! ! ! ! ! @azat_co 26
  • 29.
    webapplog.com Iterating overan Array CoffeeScript: JavaScript: for item, index in arrayObject iterator(item) @azat_co var index, item, _i, _len; ! for (index = _i = 0, _len = arrayObject.length; _i < _len; index = ++_i) { item = arrayObject[index]; iterator(item); } 27
  • 30.
    webapplog.com Iterating overan Object CoffeeScript: JavaScript: for key, value of object iterator(value) @azat_co var key, value; ! for (key in object) { value = object[key]; iterator(value); } 28
  • 31.
    webapplog.com Iterators /Comprehensions (for loops) II Many options: ! iterator (item) for item in arrayObject ! iterator item for item in arrayObject ! iterator item for item in arrayObject when item > 0 ! ! ! ! ! ! @azat_co 29
  • 32.
    webapplog.com Class Declaration • In JavaScript classes are absent at all! • CoffeeScript eloquently implements Pseudo-classical inheritance pattern: “new” and capitalized name (“new Animal”, “new Vehicle”, etc.) • Pseudo-classical is hard and cumbersome without CS • CoffeeScript “constructor” method and “super” call @azat_co 30
  • 33.
    webapplog.com Class Example CoffeeScript: class Vehicle constructor: (@name) -> move: (meters) -> console.log @name + " moved #{meters} miles.” ! camry = new Vehicle "Camry" camry.move(50) Output: Camry moved 50 miles. @azat_co 31
  • 34.
    webapplog.com Class Example JavaScript: var Vehicle, camry; ! Vehicle = (function() { function Vehicle(name) { this.name = name; } ! Vehicle.prototype.move = function(meters) { return console.log(this.name + (" moved " + meters + " miles.")); }; ! return Vehicle; ! })(); ! camry = new Vehicle("Camry"); ! camry.move(50); 2x: 6 vs 12 lines of code! @azat_co 32
  • 35.
    webapplog.com Other CoffeeScriptGoodies • Splats (e.g., “options…”) • Conditions (if, isnt, not, and, or, unless) • Arrays and their slicing (arr = [1..10], slicedArr = arr[2..4]) @azat_co 33
  • 36.
    webapplog.com CoffeeScript: TheGood Parts Summary • Syntax: curly braces, parentheses and semicolons • Function Declaration: -> and => • Scoping: automatic var • Iterators / Comprehensions: replacement of for loops • Class Declaration: class operand @azat_co 34
  • 37.
    webapplog.com CoffeeScript: NotSo Good Parts • Learning: 1-2 day, free online ebooks • Compilation: extra build step (use Grunt or similar) • Parentheses: optional and cause misinterpretation • Debugging: use source-maps @azat_co 35
  • 38.
    webapplog.com CoffeeScript ofMy Dreams https://github.com/michaelficarra/coffee-of-my-dreams @azat_co
  • 39.
    webapplog.com How toGet Started $ npm install -g coffee-script $ coffee >… @azat_co 37
  • 40.
    webapplog.com Companies thatuse CoffeeScript @azat_co 38 • GitHub • Dropbox • DocuSign • Airbnb (mobile) • HotelTonight • Basecamp (mobile)
  • 41.
    webapplog.com Further Reading CoffeeScript FUNdamentals: The Better JavaScript http://bit.ly/1nD4dE3 @azat_co 39
  • 42.
    webapplog.com CoffeeScript Ebooks • The Little Book on CoffeeScript (free onine) • CoffeeScript Cookbook (free online) • Smooth CoffeeScript (free online) • CoffeeScript Ristretto (free online) @azat_co 40
  • 43.
    webapplog.com Future /Alternatives @azat_co 41 • Dart (early stage) • TypeScript: MicroSoft project • ECMAScript 6: be careful with old browsers, use shims, fully available after June 2015 • Sweet.js: macros!
  • 44.
    webapplog.com Conclusions @azat_co 42 • Good for enterprise and large team, because it’s easer to have common style, e.g., https://github.com/styleguide/ javascript • Good for developers new to JavaScript and those coming from OOP languages (Java, Ruby) • Cross-browser / old browser support • More productive and happier developers (after learning) • Tested, robust, and available now • Awesome with Backbone.js and Underscore.js
  • 45.
    webapplog.com Session Summary • Native JavaScript Issues • CoffeeScript: The Good Parts • How to Get Started • Future / Alternatives • Conclusions @azat_co 43
  • 46.
    webapplog.com Discussion andQ&A Time @azat_co Questions, thoughts and experiences? 44
  • 47.
    Watch the videowith slide synchronization on InfoQ.com! http://www.infoq.com/presentations/coffeescript -lessons