CCTV Inspection Report
This report was generated by MZR Plumbing.
Copyright © MZR 2007
Generated by MZR Plumbing & Drainage
Drainage defect codes
Defect codes to WRC standards
1: Occurrence’s without damage: for example, laterals joints etc.
NO DEFECTS WERE DETECTED.
2: Constructional deficiencies or occurrence’s with insignificant influence
to tightness, hydraulic or static pressure of pipe: i.e. wide joints, badly
torched intakes, minor deformation of plastic pipes, minor erosions etc.
REHABILITATION CAN BE SCHEDULED LONG-TERM.
3: Constructional deficiencies diminishing static, hydraulic and tightness:
i.e. open joints,
untorched intakes, cracks, minor drainage obstructions such as calcide
build ups, protruding laterals, minor damages to pipe wall, individual root
penetrations, corroded pipe walls etc.
REHABILITATION IS NECESSARY MEDIUM-TERM WITHIN 3 TO 5
YEARS.
4: Constructional damages with nonsufficient static safety, hydraulic or
tightness: i.e. axial/radial pipe bursts, pipe deformations, visually
noticeable infiltration/exfiltration, cavities in pipe-wall, severe protruding,
laterals severe root intrusion, severe corrosion of pipe wall etc.
REHABILITATION PROCEDURE IS URGENT AND HAS TO BE
COMPLETED WITHIN 1
TO 2 YEARS. NECESSITY FOR EMERCENCY OPERATIONS HAS TO
BE EXAMINED.
5: Pipe is already or will shortly be impermeable: i.e. collapsed pipe,
deeply rooted pipe or other drainage obstructions. Pipe loses water or
danger of backwater in basements etc.
REHABILITATION IS URGENT AND SHORT-TERM. IN ORDER TO
PREVENT FURTHER
DAMAGE, NECESSARY TEMPORARY SPOT REPAIR HAS TO BE
CONDUCTED ON EMERGENCY LEVEL.
MR PATEL B74 2HS- CCTV Survey Report : 03/05/16
MZR
MICHAEL BURROWS
25 FREASLEY ROAD
SHARD END
BIRMINGHAM
B34 7QA
0121 6631060
07967835427
info@mzrplumbing.com
Name :
Contact :
Location :
Town :
Region :
Postcode :
Tel :
Mobile :
Email :
Fax :
MR PATEL
MR PATEL
140A CHESTER ROAD
SUTTON COLDFIELD
BIRMINGHAM
B74 2HS
gold_chahal@hotmail.com
Name :
Contact :
Location :
Town :
Region :
Postcode :
Tel :
Mobile :
Email :
Fax :
MR PATEL
MR PATEL
140A CHESTER ROAD
SUTTON COLDFIELD
BIRMINGHAM
B74 2HS
gold_chahal@hotmail.com
Name :
Contact :
Location :
Town :
Region :
Postcode :
Tel :
Mobile :
Email :
Fax :
Client Information
Site Information
Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0
Total grades for project
Inspection Report
Page 1
From To Dia Material G1 - 2 G3 - 4 G5
00.00m - 18.70m 100 Vitrified Clay (i.e. all clayware) 0 0 0
Section: 1 Start: FM1 End: END Road: 140A CHESTER ROAD
Length: 18.7 Use: Foul Depth: 600 Place: SUTTON COLDFIELD
Graded defect count per section
This section shows the number of graded defects per individual survey. A grade 5 defect being serious and
indicating more urgent repair. Grade 3-4 defects are less serious and are less urgent concerning repair. Grade 1-
2 defects are relatively minor and could be monitored and/or repaired if thought necessary.
Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0
Total grades for project
Inspection Report
Page 2
Client: Location (Street Name): City/Town/Village Cust Job Ref. Surveyors Name: Date:
MR PATEL 140A CHESTER ROAD SUTTON COLDFIELD B74 2HS GARY 03/05/2016
Start Node Ref: FM1 Finish Node Ref: END Direction: D Height/Dia: 100
Start Node Depth: 600 Finish Node Depth: 0 Use: F Shape: C
Start Node Coordinate: Finish Node Coordinate: Material: VC Cleaned N
Drain Type Lining Type Lining Mat. Year Const. Weather Flow Cont. Length Remarks
A D N 18.7
Site: 140A CHESTER ROAD SUTTON COLDFIELD Section 1
Position Code Description CD Pic Grade
00.00m MH Start node type, manhole 0_0 0
04.44m REM General remark 0_1 0
04.44m LRF Line of drain/sewer deviates right [full] 0_2 0
18.70m SA Survey abandoned 0_99
99
0
Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0
Total grades for project
Inspection Report
Page 3
Descriptive Report with Remarks and Observation Images
Pos Code Description Image
00.00m MH Start node type, manhole
FM1 START OF SURVEY FROM FOUL
MANHOLE 1
Image Provided - Ref: 0_0
04.44m REM General remark
FM2 PUSHED THOUGH
Image Provided - Ref: 0_1
04.44m LRF Line of drain/sewer deviates right [full]
LINE OF DRAIN DEVIATES RIGHT FULL
Image Provided - Ref: 0_2
Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0
Total grades for project
Inspection Report
Page 4
Pos Code Description Image
18.70m SA Survey abandoned
END OF SURVEY OFF THE BOUNDARY
OF THE PROPERTY
Image Provided - Ref: 0_9999
Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0
Total grades for project
Inspection Report
Page 5
Public Sewer
Assumed Foul Water
Surface Water
Assumed Surface Water
Combined Water
Assumed Combined Water
Foul Water Gully
Storm Water Gully
WC
Soil/Vent Pipe
Rainwater Pipe
Rodding Eye
Foul Manhole
Foul Inspection Chamber
Storm Manhole
Storm Inspection Chamber
Interceptor
Soakaway
Road Gully
Tree
Hedge
Shrub
Property Boundary Line
Invert level :__________
Pipe size:_____________
Material:_____________
550mm
100mm
CLAY
Foul Water
Client: MR PATEL
Site Address:
Site Drainage Plan
(1:100 on A4)
This plan is diagrammatic only and
has been prepared to illustrate the
general position of the property in
relationship to drains and sewers
within its boundaries
140A CHESTER ROAD
BIRMINGHAM
B74 2HS
FM1
FM2
FRONT ELEVATION
140A

More Related Content

Similar to CCTV SURVEY B74 2HS

IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...
IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...
IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...IRJET Journal
 
Piping sample report
Piping sample reportPiping sample report
Piping sample reportram111eg
 
Att. 2. POF_specs_2009-M (part of scope of work P23).pdf
Att. 2. POF_specs_2009-M (part of scope of work P23).pdfAtt. 2. POF_specs_2009-M (part of scope of work P23).pdf
Att. 2. POF_specs_2009-M (part of scope of work P23).pdfAbdelrhman K.
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodpaulus konda
 
Design Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection RobotDesign Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection RobotSuchit Moon
 
combinepdf (24).pdf
combinepdf (24).pdfcombinepdf (24).pdf
combinepdf (24).pdfmannyladera
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC Building
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC BuildingIRJET- Case Study on Diagnosis and Repair of Failuers in RCC Building
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC BuildingIRJET Journal
 
Almousa Hospital Al Hasa Transfer Slab.pptx
Almousa Hospital Al Hasa Transfer Slab.pptxAlmousa Hospital Al Hasa Transfer Slab.pptx
Almousa Hospital Al Hasa Transfer Slab.pptxMuhammadUsman396532
 
Weld Defects
Weld DefectsWeld Defects
Weld Defectsadminn2
 
QES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfQES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfIvanHerrera897380
 
Fyp 1 progress report 2 half cell measurement for reinforce steel concrete ...
Fyp 1 progress report 2   half cell measurement for reinforce steel concrete ...Fyp 1 progress report 2   half cell measurement for reinforce steel concrete ...
Fyp 1 progress report 2 half cell measurement for reinforce steel concrete ...Dr Abdul Aziz Mohamed
 
23-WIS5 Visual Inspections 2006 Addition
23-WIS5 Visual Inspections 2006 Addition23-WIS5 Visual Inspections 2006 Addition
23-WIS5 Visual Inspections 2006 AdditionKamal Ahmed
 
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILER
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILERBOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILER
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILERIRJET Journal
 
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...IRJET Journal
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET Journal
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptxmebremezgebe
 
MAI CONDENSATE POT CATALOG
MAI CONDENSATE POT CATALOGMAI CONDENSATE POT CATALOG
MAI CONDENSATE POT CATALOGDhawal Doshi
 

Similar to CCTV SURVEY B74 2HS (20)

IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...
IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...
IRJET - Case Study of Structural Rehabilitation of Multi Storey Residential B...
 
Piping sample report
Piping sample reportPiping sample report
Piping sample report
 
Att. 2. POF_specs_2009-M (part of scope of work P23).pdf
Att. 2. POF_specs_2009-M (part of scope of work P23).pdfAtt. 2. POF_specs_2009-M (part of scope of work P23).pdf
Att. 2. POF_specs_2009-M (part of scope of work P23).pdf
 
Pipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT methodPipeline integrity assessment with LRUT method
Pipeline integrity assessment with LRUT method
 
Design Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection RobotDesign Of Fibrication And Pipe Inspection Robot
Design Of Fibrication And Pipe Inspection Robot
 
combinepdf (24).pdf
combinepdf (24).pdfcombinepdf (24).pdf
combinepdf (24).pdf
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC Building
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC BuildingIRJET- Case Study on Diagnosis and Repair of Failuers in RCC Building
IRJET- Case Study on Diagnosis and Repair of Failuers in RCC Building
 
Almousa Hospital Al Hasa Transfer Slab.pptx
Almousa Hospital Al Hasa Transfer Slab.pptxAlmousa Hospital Al Hasa Transfer Slab.pptx
Almousa Hospital Al Hasa Transfer Slab.pptx
 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
 
QES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdfQES___________datasheet_____Crimping.pdf
QES___________datasheet_____Crimping.pdf
 
Fyp 1 progress report 2 half cell measurement for reinforce steel concrete ...
Fyp 1 progress report 2   half cell measurement for reinforce steel concrete ...Fyp 1 progress report 2   half cell measurement for reinforce steel concrete ...
Fyp 1 progress report 2 half cell measurement for reinforce steel concrete ...
 
23-WIS5 Visual Inspections 2006 Addition
23-WIS5 Visual Inspections 2006 Addition23-WIS5 Visual Inspections 2006 Addition
23-WIS5 Visual Inspections 2006 Addition
 
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILER
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILERBOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILER
BOILER TUBE FAILURE ANALYSIS IN 210MW POWER PLANT STEAM BOILER
 
Haresh Steel Centre
Haresh Steel CentreHaresh Steel Centre
Haresh Steel Centre
 
Building Dilapidations International Sample Report with Gauge
Building Dilapidations International Sample Report with GaugeBuilding Dilapidations International Sample Report with Gauge
Building Dilapidations International Sample Report with Gauge
 
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...
IRJET- A Review Paper on the Production Line of an Aluminum Alloy Wheel Manuf...
 
IRJET-Email Tracking System
IRJET-Email Tracking SystemIRJET-Email Tracking System
IRJET-Email Tracking System
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
 
MAI CONDENSATE POT CATALOG
MAI CONDENSATE POT CATALOGMAI CONDENSATE POT CATALOG
MAI CONDENSATE POT CATALOG
 

CCTV SURVEY B74 2HS

  • 1. CCTV Inspection Report This report was generated by MZR Plumbing. Copyright © MZR 2007
  • 2. Generated by MZR Plumbing & Drainage Drainage defect codes Defect codes to WRC standards 1: Occurrence’s without damage: for example, laterals joints etc. NO DEFECTS WERE DETECTED. 2: Constructional deficiencies or occurrence’s with insignificant influence to tightness, hydraulic or static pressure of pipe: i.e. wide joints, badly torched intakes, minor deformation of plastic pipes, minor erosions etc. REHABILITATION CAN BE SCHEDULED LONG-TERM. 3: Constructional deficiencies diminishing static, hydraulic and tightness: i.e. open joints, untorched intakes, cracks, minor drainage obstructions such as calcide build ups, protruding laterals, minor damages to pipe wall, individual root penetrations, corroded pipe walls etc. REHABILITATION IS NECESSARY MEDIUM-TERM WITHIN 3 TO 5 YEARS. 4: Constructional damages with nonsufficient static safety, hydraulic or tightness: i.e. axial/radial pipe bursts, pipe deformations, visually noticeable infiltration/exfiltration, cavities in pipe-wall, severe protruding, laterals severe root intrusion, severe corrosion of pipe wall etc. REHABILITATION PROCEDURE IS URGENT AND HAS TO BE COMPLETED WITHIN 1 TO 2 YEARS. NECESSITY FOR EMERCENCY OPERATIONS HAS TO BE EXAMINED. 5: Pipe is already or will shortly be impermeable: i.e. collapsed pipe, deeply rooted pipe or other drainage obstructions. Pipe loses water or danger of backwater in basements etc. REHABILITATION IS URGENT AND SHORT-TERM. IN ORDER TO PREVENT FURTHER DAMAGE, NECESSARY TEMPORARY SPOT REPAIR HAS TO BE CONDUCTED ON EMERGENCY LEVEL.
  • 3. MR PATEL B74 2HS- CCTV Survey Report : 03/05/16 MZR MICHAEL BURROWS 25 FREASLEY ROAD SHARD END BIRMINGHAM B34 7QA 0121 6631060 07967835427 info@mzrplumbing.com Name : Contact : Location : Town : Region : Postcode : Tel : Mobile : Email : Fax : MR PATEL MR PATEL 140A CHESTER ROAD SUTTON COLDFIELD BIRMINGHAM B74 2HS gold_chahal@hotmail.com Name : Contact : Location : Town : Region : Postcode : Tel : Mobile : Email : Fax : MR PATEL MR PATEL 140A CHESTER ROAD SUTTON COLDFIELD BIRMINGHAM B74 2HS gold_chahal@hotmail.com Name : Contact : Location : Town : Region : Postcode : Tel : Mobile : Email : Fax : Client Information Site Information Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0 Total grades for project Inspection Report Page 1
  • 4. From To Dia Material G1 - 2 G3 - 4 G5 00.00m - 18.70m 100 Vitrified Clay (i.e. all clayware) 0 0 0 Section: 1 Start: FM1 End: END Road: 140A CHESTER ROAD Length: 18.7 Use: Foul Depth: 600 Place: SUTTON COLDFIELD Graded defect count per section This section shows the number of graded defects per individual survey. A grade 5 defect being serious and indicating more urgent repair. Grade 3-4 defects are less serious and are less urgent concerning repair. Grade 1- 2 defects are relatively minor and could be monitored and/or repaired if thought necessary. Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0 Total grades for project Inspection Report Page 2
  • 5. Client: Location (Street Name): City/Town/Village Cust Job Ref. Surveyors Name: Date: MR PATEL 140A CHESTER ROAD SUTTON COLDFIELD B74 2HS GARY 03/05/2016 Start Node Ref: FM1 Finish Node Ref: END Direction: D Height/Dia: 100 Start Node Depth: 600 Finish Node Depth: 0 Use: F Shape: C Start Node Coordinate: Finish Node Coordinate: Material: VC Cleaned N Drain Type Lining Type Lining Mat. Year Const. Weather Flow Cont. Length Remarks A D N 18.7 Site: 140A CHESTER ROAD SUTTON COLDFIELD Section 1 Position Code Description CD Pic Grade 00.00m MH Start node type, manhole 0_0 0 04.44m REM General remark 0_1 0 04.44m LRF Line of drain/sewer deviates right [full] 0_2 0 18.70m SA Survey abandoned 0_99 99 0 Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0 Total grades for project Inspection Report Page 3
  • 6. Descriptive Report with Remarks and Observation Images Pos Code Description Image 00.00m MH Start node type, manhole FM1 START OF SURVEY FROM FOUL MANHOLE 1 Image Provided - Ref: 0_0 04.44m REM General remark FM2 PUSHED THOUGH Image Provided - Ref: 0_1 04.44m LRF Line of drain/sewer deviates right [full] LINE OF DRAIN DEVIATES RIGHT FULL Image Provided - Ref: 0_2 Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0 Total grades for project Inspection Report Page 4
  • 7. Pos Code Description Image 18.70m SA Survey abandoned END OF SURVEY OFF THE BOUNDARY OF THE PROPERTY Image Provided - Ref: 0_9999 Grade 1 Defects Grade 2 Defects Grade 3 Defects Grade 4 Defects Grade 5 Defects0 0 0 0 0 Total grades for project Inspection Report Page 5
  • 8. Public Sewer Assumed Foul Water Surface Water Assumed Surface Water Combined Water Assumed Combined Water Foul Water Gully Storm Water Gully WC Soil/Vent Pipe Rainwater Pipe Rodding Eye Foul Manhole Foul Inspection Chamber Storm Manhole Storm Inspection Chamber Interceptor Soakaway Road Gully Tree Hedge Shrub Property Boundary Line Invert level :__________ Pipe size:_____________ Material:_____________ 550mm 100mm CLAY Foul Water Client: MR PATEL Site Address: Site Drainage Plan (1:100 on A4) This plan is diagrammatic only and has been prepared to illustrate the general position of the property in relationship to drains and sewers within its boundaries 140A CHESTER ROAD BIRMINGHAM B74 2HS FM1 FM2 FRONT ELEVATION 140A