This document provides assembly instructions for an axle housing on a 432F backhoe loader. It outlines 29 steps to assemble components like bearing cups, brake cylinders, pins, seals, and covers. Precise measurements and torque specifications are given for proper installation. Cleanliness is stressed as important to prevent contaminant-related wear.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fujsefkxswksemm
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brake discs, seals and pins. Special tools are required and cleanliness is important. Measurements are taken and shims selected to achieve proper torque specifications. Springs and cylinders are installed last.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fjskefksemer
This document provides assembly instructions for an axle housing on a 432F backhoe loader. It lists required tools and outlines 31 steps for installing and adjusting various components like bearings, brakes, differentials, seals and fasteners. Proper cleaning and torque specifications are emphasized. Diagrams illustrate each step and safety notices warn of potential injury from improper assembly of spring-loaded parts.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...udfjsjkkksme
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brakes, differentials, seals and pins. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims are used to achieve proper torque specifications. Springs and seals must be installed correctly to prevent injury.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...ujfdjjskkemme
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brakes, differentials, seals and pins. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims are used to achieve proper torque specifications. Springs and pins are installed, applying grease and thread lock as needed.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fujsefkksemm
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, seals, brakes and differentials. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims selected to achieve proper torque specifications. Springs and pins are installed and nuts are staked to complete the assembly.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER model. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions with illustrations for assembling the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Proper compression of springs and installation of seals, bearings, gears and other parts is described.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fujsefkxswksemm
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brake discs, seals and pins. Special tools are required and cleanliness is important. Measurements are taken and shims selected to achieve proper torque specifications. Springs and cylinders are installed last.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fjskefksemer
This document provides assembly instructions for an axle housing on a 432F backhoe loader. It lists required tools and outlines 31 steps for installing and adjusting various components like bearings, brakes, differentials, seals and fasteners. Proper cleaning and torque specifications are emphasized. Diagrams illustrate each step and safety notices warn of potential injury from improper assembly of spring-loaded parts.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...udfjsjkkksme
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brakes, differentials, seals and pins. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims are used to achieve proper torque specifications. Springs and seals must be installed correctly to prevent injury.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...ujfdjjskkemme
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, brakes, differentials, seals and pins. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims are used to achieve proper torque specifications. Springs and pins are installed, applying grease and thread lock as needed.
Caterpillar cat 432 f backhoe loader (prefix pxr) service repair manual (pxr0...fujsefkksemm
This document provides assembly instructions for the axle housing of a 432F backhoe loader. It outlines 34 steps to assemble components like bearings, seals, brakes and differentials. Special tools are required and cleanliness is important during assembly. Measurements are taken and shims selected to achieve proper torque specifications. Springs and pins are installed and nuts are staked to complete the assembly.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER model. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions with illustrations for assembling the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Proper compression of springs and installation of seals, bearings, gears and other parts is described.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft. Safety notes are included to warn of potential injury from improper assembly of spring-loaded parts.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper order and include safety warnings for parts under spring load.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper order and include safety warnings for parts under spring load.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER model. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions with illustrations for assembling the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Proper compression of springs and installation of seals, bearings, gears and other parts is described.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper sequence and orientation. Safety warnings are also provided where parts are under spring load.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and applying thread lock compound and loctite to bolts.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and use of thread locking compound.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and use of thread locking compound.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
Caterpillar Cat 345B Series II Excavator (Prefix CCC) Service Repair Manual I...yan77xunhao
The document provides instructions for removing and installing the rocker shaft, pushrods, cylinder head, and related components on a 345B Series II Excavator with a 3176C engine. The removal procedure involves disconnecting sensors, tubes, and wiring before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning mating surfaces, installing new gaskets and seals, and using guide bolts to position the cylinder head before reconnecting components.
More Related Content
Similar to Caterpillar Cat 432F BACKHOE LOADER (Prefix PXR) Service Repair Manual Instant Download.pdf
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft. Safety notes are included to warn of potential injury from improper assembly of spring-loaded parts.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper order and include safety warnings for parts under spring load.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper order and include safety warnings for parts under spring load.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER model. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions with illustrations for assembling the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Proper compression of springs and installation of seals, bearings, gears and other parts is described.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It describes assembling the major components of the transmission, including the reverse shaft, input shaft, countershaft, and output shaft (rear). Detailed steps and illustrations are provided for installing various parts like gears, bearings, seals, springs, and retaining rings onto each shaft in the proper order. Cleanliness and applying a film of transmission oil to parts before assembly is emphasized.
This document provides assembly instructions for the transmission of a 434E BACKHOE LOADER. It lists the required tools and notes on cleanliness and lubrication. It then provides step-by-step instructions to assemble the various transmission components, including the reverse shaft, input shaft, countershaft, and output shaft (rear). The instructions include installing bearings, gears, springs, seals and other parts in the proper sequence and orientation. Safety warnings are also provided where parts are under spring load.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and applying thread lock compound and loctite to bolts.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and use of thread locking compound.
The document provides installation instructions for a transmission and parking brake on a 434E backhoe loader. It details 25 steps for installing the transmission using various tools, connecting hoses and harnesses, and filling the transmission with oil. It then details 14 steps for removing the parking brake and 11 steps for reinstalling it, noting the proper orientation of parts and use of thread locking compound.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
The document provides instructions for installing the transmission on a 434E backhoe loader. It describes:
1) Using a hydraulic jack to lift and position the transmission assembly.
2) Installing mounting brackets, bolts, and hoses to secure the transmission in place.
3) Connecting electrical harnesses, solenoids, and hydraulic lines to complete the installation.
Similar to Caterpillar Cat 432F BACKHOE LOADER (Prefix PXR) Service Repair Manual Instant Download.pdf (16)
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
Caterpillar Cat 345B Series II Excavator (Prefix CCC) Service Repair Manual I...yan77xunhao
The document provides instructions for removing and installing the rocker shaft, pushrods, cylinder head, and related components on a 345B Series II Excavator with a 3176C engine. The removal procedure involves disconnecting sensors, tubes, and wiring before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning mating surfaces, installing new gaskets and seals, and using guide bolts to position the cylinder head before reconnecting components.
This document provides instructions for removing the cylinder head from a Caterpillar 3054C engine. The steps include:
1. Draining the coolant and engine oil from the engine oil cooler.
2. Removing the air filter hose.
3. Removing any attached components to the cylinder head like the valve cover, rocker arms, pushrods, etc.
4. Removing the cylinder head bolts and removing the cylinder head.
The document provides instructions for disassembling and assembling components of the control valve for an excavator model 385B. It describes 25 steps to disassemble parts like actuators, manifolds, solenoids, valves, seals and more. The assembly section outlines 14 steps and provides warnings to properly install spring-loaded parts to prevent injury. Precautions are noted to clean parts and check for wear before reassembly.
Caterpillar Cat 385C and 385C L Excavator (Prefix JCM) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 385C excavator. It lists 34 steps for disassembly, removing components like housing covers, gears, shafts and seals. It notes the importance of cleanliness. For assembly, it lists 1 step to reassemble the final drive on a repair stand and cribbing, referring to other assembly instructions. Tools, torque specs and notes on lubrication and seals are provided. The goal is to disassemble, clean, inspect for wear, replace worn parts, and reassemble the final drive while maintaining cleanliness.
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. It describes:
1) Removing over 30 components of the final drive including gears, shafts, housings and seals using various tools.
2) Cleaning and inspecting parts prior to assembly.
3) Assembling the components in reverse order, applying lubricants to bearings and sealing surfaces.
4) Using tools and procedures to properly set bearing preload when installing the main housing.
Caterpillar Cat 385B and 385B L Excavator (Prefix FDL) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of an excavator model 385B.
The disassembly procedure involves removing 27 parts in a specific sequence, including removing the ring gear, carrier assemblies, gears, shafts and seals. The assembly procedure instructs installing 31 parts in reverse order, and describes determining the correct shim thickness between the bearing cone and coupling gear to achieve proper bearing preload. Special tools are required for several steps.
Caterpillar Cat 374F L Excavator (Prefix AP4) Service Repair Manual Instant D...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 374F L Excavator. It lists the required tools and parts. The disassembly process involves removing components like the final drive cover, ring gear, carrier assemblies, gears, shafts and housings. The assembly process specifies cleaning parts, applying sealant, installing bearings and seals, and adjusting bearing preload using shims. Precautions are given for using hydraulic cylinders and puller studs during the assembly process.
This document provides instructions for disassembling and assembling the governor and fuel injection pump housing of a 3306 vehicular engine. It describes removing over 30 individual parts in 12 steps to disassemble the governor. It then describes assembling the governor in 35 steps, noting to clean and oil all parts before assembly.
This document provides instructions for removing and installing various engine components on a Caterpillar 3054C engine, including:
- Lifter group
- Camshaft
- Camshaft bearings
- Engine oil pan
- Piston cooling jets
The instructions include lists of required tools, step-by-step procedures, torque specifications, and cautions to keep parts clean and properly support components.
The document provides instructions for removing and disassembling the transmission of a 428D Backhoe Loader. It describes 19 steps to disassemble the transmission into its major components which include removing valve groups, filters, shafts, seals and gaskets. Special tools are required and cleanliness is important when disassembling the transmission.
The document provides instructions for removing the bank valve from a 420E Backhoe Loader. It is a 19 step process that involves draining fluids, removing floor plates, disconnecting hoses and wiring, and using lifting equipment to remove the heavy bank valve unit. The bank valve is then disassembled into its individual valve components for inspection or replacement.
The document provides instructions for installing a swing frame on a 420E backhoe loader. It outlines 20 steps for the installation, which include lowering bearing temperatures, placing bars through frames, installing pins and bolts, connecting hoses and harnesses, and positioning cylinders. Tools required include levers, drivers, and lifting devices. Safety precautions are provided for working on pressurized hydraulic systems.
The document provides instructions to disassemble an axle housing, axle shaft, and wheel flange from a 420E backhoe loader. It outlines 9 steps to remove components including the axle shaft, retaining rings, locking plates, seals, bearings and bushings. Tools required include a spanner wrench, retaining ring pliers, and a combination puller. The purpose is to disassemble these components for repair or replacement.
The document provides instructions for removing and installing components related to the steering and final drive system of a Caterpillar 420E backhoe loader, including:
- Removing and installing the front tire and rim.
- Removing and installing the tie rod and steering cylinder.
- Removing the final drive planetary by draining oil and removing mounting screws.
- Disassembling the final drive planetary by using retaining ring pliers to remove the retaining ring.
The document provides instructions for removing and installing the lift cylinder and lift arms on a Caterpillar 420E backhoe loader. It includes:
- A list of required tools for each job.
- Step-by-step procedures to release hydraulic pressure, remove hoses and pins, and use tools to detach the lift cylinder and lift arms.
- Notes on cleaning parts and inspecting for wear before reassembly.
- An installation procedure that reverses the removal steps and includes torquing specifications.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
2. Shutdown SIS
Previous Screen
Product: BACKHOE LOADER
Model: 432F BACKHOE LOADER PXR
Configuration: 432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 Engine
Disassembly and Assembly
416F, 420F, 422F, 428F, 430F, 432F, 434F and 444F Backhoe Loaders Power Train
Media Number -UENR2303-02 Publication Date -01/04/2013 Date Updated -15/04/2013
i07189711
Axle Housing (Service Brakes, Differential and Bevel Gear) -
Assemble
SMCS - 3256-016; 3258-016; 3260-016; 4251-016
S/N - FBN1-UP
S/N - FLY1-UP
S/N - LBH1-UP
S/N - LDH1-UP
S/N - LJJ1-UP
S/N - LNR1-UP
S/N - LRH1-UP
S/N - PXR1-UP
S/N - RAK1-UP
S/N - SEJ1-UP
S/N - SJW1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 202-7965 Spanner Wrench 1
1/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. C 235-2784 Adjusting Tool Gp 1
E 1P-0520 Driver Gp 1
F 235-2790 False Pinion 1
G 235-2792 False Differential 1
H 6V-2012 Depth Micrometer 1
J 154-9731 Thread Lock Compound -
K 069-4707 Sealant 1
L
8T-5096 Dial Indicator Gp 1
207-0478 Socket Assembly 1
207-0485 Adjustment Tool 1
207-0481 Adjustment Tool 1
M 129-1938 Grease Cartridge -
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning
fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be
deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or
damaged, use new parts for replacement. Dirt and other contaminants can damage the precision
component. Perform assembly procedures on a clean work surface. Keep components covered and
protected at all times.
Note: Check the O-ring seals and the seals for wear or for damage. Replace the components, if
necessary.
2/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 1 g01641381
1. Lower the temperature of bearing cups (67). Use Tooling (E) to install bearing cups (67)
into the center housing.
Illustration 2 g01649194
2. Install bearing cones (50) and (48). Install Tooling (F).
3/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 3 g01649293
3. Align the location marks that were made during the removal procedure. Position brake
cylinder assembly (11) and temporarily install bolts (17). Repeat for the opposite side.
Illustration 4 g01649294
4. Install Tooling (G) into the center housing. Make sure that Tooling (G) is inserted into both
brake cylinders.
4/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 5 g01649295
5/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 6 g01555354
5. Use Tooling (H) to measure Distance (A). Distance (B) equals 145 mm (5.709 inch).
Distance (C) equals 50 mm (1.968 inch). Use the following formula to calculate
Measurement (X): A mm + C mm - B mm = X mm. Record Measurement (X).
Illustration 7 g01649313
6/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 6. Measurement (V) is stamped on the head of pinion shaft (46). Use the following formula to
calculate Measurement (S): X mm - V mm = S mm.
7. Among the available shims, choose the shim with the thickness of Measurement (S). The
shim will be installed in Step 9.
Illustration 8 g01649314
8. Remove Tooling (G). Remove brake cylinder assemblies (11). Remove the nut and the
washer from Tooling (F) and remove Tooling (F). Remove bearing cones (48) and (50).
7/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 9 g01649474
9. Install the shim from Step 7 onto pinion shaft (46). Install the shim with the chamfer against
the gear. Raise the temperature of bearing cone (50) and install bearing cone (50) onto
pinion shaft (46).
8/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 10 g01649476
10. Install washers (49) and a new collapsible spacer (47) onto pinion shaft (46).
Illustration 11 g01649479
11. Install pinion shaft (46) into the center housing. Raise the temperature of bearing cone (48)
and install bearing cone (48) onto pinion shaft (46).
9/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 12 g01638835
12. Install lip seal (45) into the center housing.
Illustration 13 g01641791
13. Install brake disc (42), O-ring seal (43), washer (44), and nut (41).
10/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 14 g01649481
14. Use Tooling (C) to hold brake disc (42). Tighten nut (41). Continue to tighten nut (41) to
achieve a rotating torque of 4.126 to 4.460 N·m (36.518 to 39.474 lb in).
Illustration 15 g01638818
11/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. 15. Install thrust washer (37) and side gear (38). Install spider (36), gears (35), and thrust
washers (34).
Illustration 16 g01637983
16. Install planetary shafts (33). Install locking pins (31). Install side gear (32) and thrust
washer (30). Install cover (29).
Illustration 17 g01637981
17. Install pins (27), the seals, and collar (28).
12/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 18 g01637979
18. Install bevel gear (25) onto the differential. Apply Tooling (J) to the threads of bolts (24).
Install bolts (24) and tighten bolts (24) to a torque of 180 N·m (133 lb ft).
Illustration 19 g01641544
19. Raise the temperature of bearing cones (23) and (26). Install bearing cones (23) and (26).
13/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 20 g01639081
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
20. Install fork (58) into the center housing. Install retaining ring (57) onto rod (55). Install rod
(55) into fork (58).
21. Install washer (56) and spring (54) onto rod (55).
22. Install O-ring seal (53) onto cover (52). Install cover (52) and bolts (51). Tighten bolts (51)
to a torque of 20 to 24 N·m (15 to 18 lb ft).
23. Install spring (59), bushing (60), and retaining ring (61) onto rod (55).
24. Install O-ring seals (62) onto piston (63). Install piston (63) into cover (65).
14/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 25. Install O-ring seal (64) onto cover (65). Install cover (65) and bolts (66). Tighten bolts (66)
to a torque of 20 to 24 N·m (15 to 18 lb ft).
Illustration 21 g01641550
26. Apply a thin coat of Tooling (M) onto O-ring seals (5). Install O-ring seals (5) onto brake
piston (6). Repeat this step for the opposite side.
15/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 22 g01641551
27. Install brake piston (6) into brake cylinder assembly (11). Make sure that the holes on brake
piston (6) align with the holes in brake cylinder assembly (11). Make sure that brake piston
(7) is installed all the way to the bottom of brake cylinder assembly (11). If necessary, tap
brake piston (6) with a suitable rubber mallet to install brake cylinder assembly (11)
completely to the bottom. Repeat this step for the opposite side.
Illustration 23 g01641574
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
28. Install bolts (16), retainers (15), springs (14), springs (13), and bushings (12), as an
assembly. Install bolts (10), washers (9), bushings (8), and spacers (7). Tighten bolts (10) to
a torque of 10 N·m (89 lb in). Tighten the bolts for springs (16) to a torque of 10 N·m
(89 lb in). Repeat this step for the opposite side.
16/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 24 g01641778
29. Position brake cylinder assembly (11) on a flat surface. Use Tooling (E) to install bearing
cup (21). Repeat this step for the opposite side.
Illustration 25 g01641782
30. Use Tooling (A) to install spanner nut (22) into brake cylinder assembly (11). Repeat this
step for the opposite side.
17/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 26 g01641802
31. Apply Tooling (K) to the mating surfaces of the center housing and one brake cylinder
assembly (11). Align the location marks that were made during the removal procedure.
Position brake cylinder assembly (11) on the side that is opposite of the bevel gear, and onto
the center housing. Install bolts (17). Tighten bolts (17) to a torque of 79 ± 4 N·m
(58 ± 3 lb ft).
18/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 27 g01641803
32. Install the differential and bevel gear assembly (18) into the center housing.
Note: Ensure that collar (28) engages fork (58).
Illustration 28 g01641804
33. Apply Tooling (K) to the mating surfaces of the center housing and brake cylinder assembly
(11). Align the location marks that were made during the removal procedure. Position brake
cylinder assembly (11) onto the center housing and install bolts (17). Tighten bolts (17) to a
torque of 79 ± 4 N·m (58 ± 3 lb ft).
Illustration 29 g01650293
19/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 34. Oscillate the pinion shaft and use Tooling (A) to advance spanner nuts (22) until there is
slight backlash with no end play.
Illustration 30 g01641805
35. Install a dial type torque wrench onto pinion shaft (46). Measure the total rotating torque.
Use the following formula to calculate the total rotating torque (TRT): P equals the rotating
torque that was measured in Step 14. TRT = P + 0.519 N·m (4.593 lb in) to P + 0.778 N·m
(6.885 lb in)
36. If the total rotating torque (TRT) is less than the specified amount, tighten both spanner nuts
equally. If the total rotating torque (TRT) is greater than the specified amount, loosen both
spanner nuts equally. Be sure to always maintain slight backlash.
37. Use a suitable hammer and a punch to stake nut (32).
20/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 31 g01641806
Typical example
38. Mount Tooling (L) onto the center housing. Measure the backlash between the pinion and
the bevel gear. The proper backlash setting is 0.18 to 0.32 mm (0.007 to 0.013 inch).
21/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 32 g01449257
39. If the backlash is not within the specification, retract one spanner nut and advance the
opposite spanner nut equally. This will maintain the bearing preload. If the backlash is less
than the specified amount, move the bevel gear in Direction (A). If the backlash is greater
than the specified amount, move the bevel gear in Direction (B).
Illustration 33 g01641796
22/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 40. Install retainer (19) and bolt (20) into both brake cylinder assemblies (11). Tighten bolts
(20) to a torque of 13 N·m (10 lb ft). Repeat this step for the opposite side.
Illustration 34 g01641808
41. Apply Tooling (J) to the threads of bolts (40). Position brake assembly (39) and install bolts
(40).
Illustration 35 g01636808
Note: Make sure that you align the tear-shaped holes in brake discs (2) to provide proper
flow of oil for cooling, as shown.
42. Install dowels (3). Install brake hub (4) with brake discs (2) and plates (1) into the brake
cylinder assembly.
23/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. End By:
a. Install the axle housing. Refer to Disassembly and Assembly, "Axle Housing, Axle Shaft,
and Wheel Flange - Install".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Sep 27 21:01:18 UTC+0800 2019
24/24
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. S/N - RDF1-UP
S/N - RGS1-UP
S/N - SEJ1-UP
S/N - SJW1-UP
S/N - SKR1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 230-7923 Spanner Wrench 1
B 1P-1861 Retaining Ring Pliers 1
C 1P-0520 Driver Gp 1
Note: Cleanliness is an important factor. Before assembly, thoroughly clean all parts in cleaning
fluid. Allow the parts to air dry. Do not use wiping cloths or rags to dry parts. Lint may be
deposited on the parts which may cause trouble. Inspect all parts. If any parts are worn or
damaged, use new parts for replacement. Dirt and other contaminants can damage the precision
component. Perform assembly procedures on a clean work surface. Keep components covered and
protected at all times.
2/12
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 1 g01546055
Illustration 2 g01546098
1. Use Tooling (C) in order to install bushing (20) and seal (19). Install bushing (20) and seal
(19) to the depth of Dimension (A). Dimension (A) is measured from Surface (X) to seal
(19). Dimension (A) is equal to 9.0 mm (0.35 inch).
3/12
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
29. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
30. Illustration 3 g01545954
2. Raise the temperature of bearing cone (18). Install bearing cone (18). Install spacer (17).
4/12
432F Backhoe Loader Side Shift PXR00001-UP (MACHINE) POWERED BY C4.4 E...
2019/9/27
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...