This document provides assembly instructions for a final drive in 29 steps. It lists required tools and parts. Key steps include: installing bearings and seals; determining bearing preload using shims; assembling carrier assemblies with planetary gears; and installing ring gears, covers, and bolts. Proper cleaning, lubrication and torque specifications are noted throughout assembly.
Caterpillar cat 330 d excavator (prefix edx) service repair manual (edx00001 ...hhjsekmdmm
The document provides instructions for assembling the swing drive of an excavator. It describes 30 steps for installing bearings, gears, seals, and other components into the swing drive housing. Tools required include pliers, link brackets, a torque wrench, and sealant. Proper cleaning and lubrication of parts is emphasized. Weights of components are provided to note the number of people needed for installation.
Caterpillar cat 319 d l excavator (prefix zca) service repair manual (zca0000...fjkskedmme
This document provides assembly instructions for a final drive on an excavator model 319D L. It involves 37 steps including installing bearings, seals, gears, and other components into housings and covers. Precise measurements and torque specifications are required. Cleanliness is important throughout the process. The completed final drive and sprocket assembly weighs approximately 310 kg.
Caterpillar cat 323 f ln excavator (prefix yec) service repair manual (yec000...fjjskekdmme
This service repair manual provides instructions for assembling the final drive of a 323F LN Excavator. It outlines 37 steps requiring various tools to install bearings, seals, gears, pins, and other components in the proper order. Proper preloading of bearings is important. Gaskets and seals must be clean and lubricated before installation. Weights of individual components are provided to assist with assembly. Upon completion, the final drive is installed on the excavator.
Caterpillar cat 345 d l excavator (prefix byc) service repair manual (byc0000...hhfjksekmm
This document provides instructions for removing and installing various components of the rear gear group on a 345D L Excavator powered by a C13 engine, including:
1. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, gears, bushings, bearings, and covers.
2. Detailed installation instructions are also provided, including proper tooling, torque specifications, and ensuring correct dimensions and alignments of components.
3. Removal and installation of the flywheel and rear crankshaft seal are also described following similar procedures.
Caterpillar cat 325 d excavator (prefix kbe) service repair manual (kbe00001 ...hfjsekekmmd
The document provides instructions for repairing the final drive of excavator models 325D and 325D L. It involves 14 steps including cleaning parts, applying lubricants, installing seals and bearings, adjusting bearing preload, and assembling components like the carrier assembly, planetary gears, and ring gear. Proper torque values and alignment of pins are emphasized throughout the process to ensure correct assembly.
Caterpillar cat 345 c l hydraulic excavator (prefix pjw) service repair manua...hhfjksekmm
The document provides assembly instructions for a 345C excavator final drive system in 3 steps:
1. Adjust the bearing preload of the final drive by measuring dimensions and determining the correct shim thickness.
2. Assemble the carrier assemblies, which include installing planetary gears, bearings, shafts, and pins into housings.
3. Install the assembled carrier assemblies into the sprocket and ring gears in the correct order.
Caterpillar cat 385 c l excavator (prefix sbe) service repair manual (sbe0000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 385C L Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the housing cover, carrier assemblies, planetary gear assemblies, ring gear, and motor housing. Precautions are given to ensure cleanliness during disassembly and assembly. The parts are to be reinstalled in their original locations and orientation marks should be made for alignment. Proper lifting devices and techniques are specified due to the heavy weights of some components.
This document provides instructions for disassembling and assembling the final drive of a 318D2 excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then describes 28 steps to reassemble the final drive, including preloading the bearings, installing seals and pins, and reassembling the carrier assembly components. Cleanliness is emphasized throughout to prevent dirt from entering internal mechanisms during disassembly and assembly.
Caterpillar cat 330 d excavator (prefix edx) service repair manual (edx00001 ...hhjsekmdmm
The document provides instructions for assembling the swing drive of an excavator. It describes 30 steps for installing bearings, gears, seals, and other components into the swing drive housing. Tools required include pliers, link brackets, a torque wrench, and sealant. Proper cleaning and lubrication of parts is emphasized. Weights of components are provided to note the number of people needed for installation.
Caterpillar cat 319 d l excavator (prefix zca) service repair manual (zca0000...fjkskedmme
This document provides assembly instructions for a final drive on an excavator model 319D L. It involves 37 steps including installing bearings, seals, gears, and other components into housings and covers. Precise measurements and torque specifications are required. Cleanliness is important throughout the process. The completed final drive and sprocket assembly weighs approximately 310 kg.
Caterpillar cat 323 f ln excavator (prefix yec) service repair manual (yec000...fjjskekdmme
This service repair manual provides instructions for assembling the final drive of a 323F LN Excavator. It outlines 37 steps requiring various tools to install bearings, seals, gears, pins, and other components in the proper order. Proper preloading of bearings is important. Gaskets and seals must be clean and lubricated before installation. Weights of individual components are provided to assist with assembly. Upon completion, the final drive is installed on the excavator.
Caterpillar cat 345 d l excavator (prefix byc) service repair manual (byc0000...hhfjksekmm
This document provides instructions for removing and installing various components of the rear gear group on a 345D L Excavator powered by a C13 engine, including:
1. The procedures include removing the electric starting motor, flywheel, rear crankshaft seal, gears, bushings, bearings, and covers.
2. Detailed installation instructions are also provided, including proper tooling, torque specifications, and ensuring correct dimensions and alignments of components.
3. Removal and installation of the flywheel and rear crankshaft seal are also described following similar procedures.
Caterpillar cat 325 d excavator (prefix kbe) service repair manual (kbe00001 ...hfjsekekmmd
The document provides instructions for repairing the final drive of excavator models 325D and 325D L. It involves 14 steps including cleaning parts, applying lubricants, installing seals and bearings, adjusting bearing preload, and assembling components like the carrier assembly, planetary gears, and ring gear. Proper torque values and alignment of pins are emphasized throughout the process to ensure correct assembly.
Caterpillar cat 345 c l hydraulic excavator (prefix pjw) service repair manua...hhfjksekmm
The document provides assembly instructions for a 345C excavator final drive system in 3 steps:
1. Adjust the bearing preload of the final drive by measuring dimensions and determining the correct shim thickness.
2. Assemble the carrier assemblies, which include installing planetary gears, bearings, shafts, and pins into housings.
3. Install the assembled carrier assemblies into the sprocket and ring gears in the correct order.
Caterpillar cat 385 c l excavator (prefix sbe) service repair manual (sbe0000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 385C L Excavator. It lists the required tools and gives step-by-step instructions to remove components such as the housing cover, carrier assemblies, planetary gear assemblies, ring gear, and motor housing. Precautions are given to ensure cleanliness during disassembly and assembly. The parts are to be reinstalled in their original locations and orientation marks should be made for alignment. Proper lifting devices and techniques are specified due to the heavy weights of some components.
This document provides instructions for disassembling and assembling the final drive of a 318D2 excavator. It lists the required tools and outlines 33 steps to disassemble the final drive components such as the cover, carrier assembly, ring gears, and housing. It then describes 28 steps to reassemble the final drive, including preloading the bearings, installing seals and pins, and reassembling the carrier assembly components. Cleanliness is emphasized throughout to prevent dirt from entering internal mechanisms during disassembly and assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
Caterpillar cat 140 k 2 motor grader (prefix szw) service repair manual (szw0...fusjefjskekmem
This document provides instructions for disassembling and assembling the final drive components of a 140K 2 Motor Grader. The disassembly process involves removing 24 separate components from the final drive housing. The assembly section outlines assembling the components in the reverse order and includes checking clearances with tools. Proper lubrication and heating of bearings is required during assembly.
Caterpillar cat 315 d l excavator (prefix ncm) service repair manual (ncm0000...fjsekdmmeed
This document provides instructions for disassembling and assembling a 315D L excavator final drive. The disassembly process involves removing 33 parts from the final drive assembly including the cover, carrier assembly, ring gears, and housing components. The assembly process describes installing 33 parts back into the final drive in reverse order and includes steps for preloading the bearings and determining the correct shim thickness. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
This document provides instructions for assembling a torque converter for a 730 Articulated Truck. It lists 43 steps to assemble the various components of the torque converter in the correct order. Safety precautions are provided at the beginning regarding lifting heavy components and containing fluids. Diagrams illustrate each step. The summary ends by stating to connect the assembled torque converter housing to the planetary transmission.
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix mdg) service...fjjsjeskkekem
This document provides assembly instructions for a final drive on a D11T track-type tractor. It lists 37 steps and required tools to assemble the final drive components which include installing bearings and seals using specialized tools, torquing bolts to specified values, and checking clearances with feeler gauges. Pictures accompany each step to illustrate the assembly process.
Caterpillar cat 325 d l excavator (prefix dbh) service repair manual (dbh0000...hfjsekekmmd
The document provides instructions for disassembling a service repair manual for excavator models 325D and 325D L. It lists required tools and a multi-step process to disassemble the final drive. Key steps include removing the final drive cover, carrier assembly, ring gears, and other internal components. Cleanliness is important during disassembly to prevent dirt from entering mechanisms.
This document provides the disassembly and assembly procedures for the final drive of a 336 excavator model. It outlines 24 steps to disassemble the components which include removing gears, shafts, seals, and housings using various tools. The 21 steps for assembly include pressing bearings into place, measuring clearances, installing seals and O-rings, and torquing bolts to the specified values. Tools, part numbers, and weights of components are provided to aid in the process.
Caterpillar cat 374 f l excavator (prefix dnm) service repair manual (dnm0000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 374F L Excavator. The disassembly process involves removing over 30 individual parts from the final drive housing using various tools. The assembly process reverses the disassembly steps and provides details on installing new seals and determining the correct shim thickness between bearings and gears. Proper cleaning, application of sealants, and torque specifications are emphasized to correctly reassemble the final drive.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...jiaoyi82414369
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups using anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete the final drive assembly.
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups with anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete the final drive assembly.
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups using anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete assembly.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...yinranhe0814
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, carriers, housing, and other parts. The instructions describe cleaning parts, applying lubricants, and inserting components in the correct order and orientation.
3) Precise measurements and torque specifications are provided to ensure proper bearing preload and component securement. Installation of the assembled final drive and travel motors completes the process.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...aags15120808
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, housing, pins, rings, and shafts. The instructions describe cleaning parts, applying lubricants, and pressing, installing, and securing components in the correct positions and orientations.
3) Precise measurements and torque specifications are provided to ensure proper bearing preload and component fastening. Assembly of multiple planetary gear sets and carriers is described. The document ensures a thorough rebuild of the final drive.
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, housing, pins, rings, and shims. The instructions describe how to correctly install each part and ensure proper alignment and torque specifications are followed.
3) Proper cleaning and application of lubricants to mating surfaces is emphasized throughout the assembly process. Measurements are taken to determine the correct shim thickness to achieve the proper bearing preload.
Caterpillar cat 325 b l excavator (prefix 8rr) service repair manual (8rr0000...f98soeodidkdk
This document provides assembly instructions for the final drive of an excavator model 325B L. It describes:
1) Cleaning and preparing the final drive components and installing bearings in the main housing.
2) Determining the correct bearing preload and shim thickness to set the gear mesh.
3) Installing seals in the main housing and motor housing.
4) Assembling the carrier assemblies, installing gears, shafts, and retaining rings.
5) Positioning the main housing, gear, and ring gear on the motor housing and securing with bolts.
Caterpillar cat 325 b excavator (prefix 8rr) service repair manual (8rr00001 ...f98soeodidkdk
This document provides assembly instructions for the final drive of an excavator model 325B L. It describes:
1) Cleaning and preparing the components, installing bearings in the main housing, and determining the correct shim thickness for the gear.
2) Installing seals in the main housing and motor housing.
3) Assembling the carrier assembly by installing planetary gears, shafts, and pins.
4) Positioning the main housing, gear, and ring gear on the motor housing and securing them with bolts.
Caterpillar cat 325 b l excavator (prefix 8rr) service repair manual (8rr0000...fjsjjekdkme
This document provides assembly instructions for the final drive of an excavator model 325B L. It includes:
- A list of required tools and parts for assembly
- Detailed step-by-step instructions on installing bearings, seals, gears, carriers, and other components
- Procedures for determining correct bearing preload and shim thickness
- Instructions on installing retaining rings, pins, and seals in the proper orientation
The assembly process involves precisely fitting multiple gears, carriers, and housings to ensure proper alignment and engagement of all components. Measurements are taken and compared to specifications to verify correct assembly.
Caterpillar cat 325 b excavator (prefix 8rr) service repair manual (8rr00001 ...fjsjjekdkme
This document provides assembly instructions for the final drive of an excavator model 325B L. It includes:
- A list of required tools and parts for assembly
- Detailed step-by-step instructions for installing bearings, seals, gears, carriers, and other components
- Procedures for determining correct bearing preload and shim thickness
- Notes on cleaning, lubricating, and torque specifications
The goal is to correctly assemble all internal components of the final drive, including installing carriers, gears, seals and adjusting bearing preloads, to achieve proper operation. Proper cleaning and lubrication of parts is emphasized.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual (MCY00001...f8usiejdkmdd
1) The document provides assembly instructions for a 365C L excavator final drive. It describes 36 steps to assemble components like bearings, gears, seals, housings and covers.
2) Precise assembly requires determining the correct shim thickness to achieve proper bearing preload. Loctite and thread locking compounds are applied to bolts.
3) Various tools are used, including a transmission repair stand, hydraulic torque wrench, seal installer, and lifting devices to handle components weighing up to 817 kg. Cleaning and lubrication are important throughout the process.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual Instant D...yan77xunhao
This document provides assembly instructions for the final drive of a 365C L excavator. It lists the required tools and parts. The procedures describe how to assemble the main housing, motor housing, bearing cones, seals, coupling gear, planetary gears, carrier assembly, and ring gear. Precise measurements and torque specifications are provided to ensure proper bearing preload and component installation.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual (MCY00001...dujdkksdmm
1) The document provides assembly instructions for a 365C L excavator final drive. It describes 36 steps to assemble components like bearings, gears, seals, housings and covers.
2) Precise assembly requires determining the correct shim thickness to achieve proper bearing preload. Loctite and thread locking compounds are applied to bolts.
3) Various tools are used, including a transmission repair stand, hydraulic torque wrench, seal installer, and lifting devices to handle components weighing up to 817 kg. Cleaning and lubrication are also emphasized.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
Caterpillar cat 140 k 2 motor grader (prefix szw) service repair manual (szw0...fusjefjskekmem
This document provides instructions for disassembling and assembling the final drive components of a 140K 2 Motor Grader. The disassembly process involves removing 24 separate components from the final drive housing. The assembly section outlines assembling the components in the reverse order and includes checking clearances with tools. Proper lubrication and heating of bearings is required during assembly.
Caterpillar cat 315 d l excavator (prefix ncm) service repair manual (ncm0000...fjsekdmmeed
This document provides instructions for disassembling and assembling a 315D L excavator final drive. The disassembly process involves removing 33 parts from the final drive assembly including the cover, carrier assembly, ring gears, and housing components. The assembly process describes installing 33 parts back into the final drive in reverse order and includes steps for preloading the bearings and determining the correct shim thickness. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
This document provides instructions for assembling a torque converter for a 730 Articulated Truck. It lists 43 steps to assemble the various components of the torque converter in the correct order. Safety precautions are provided at the beginning regarding lifting heavy components and containing fluids. Diagrams illustrate each step. The summary ends by stating to connect the assembled torque converter housing to the planetary transmission.
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix mdg) service...fjjsjeskkekem
This document provides assembly instructions for a final drive on a D11T track-type tractor. It lists 37 steps and required tools to assemble the final drive components which include installing bearings and seals using specialized tools, torquing bolts to specified values, and checking clearances with feeler gauges. Pictures accompany each step to illustrate the assembly process.
Caterpillar cat 325 d l excavator (prefix dbh) service repair manual (dbh0000...hfjsekekmmd
The document provides instructions for disassembling a service repair manual for excavator models 325D and 325D L. It lists required tools and a multi-step process to disassemble the final drive. Key steps include removing the final drive cover, carrier assembly, ring gears, and other internal components. Cleanliness is important during disassembly to prevent dirt from entering mechanisms.
This document provides the disassembly and assembly procedures for the final drive of a 336 excavator model. It outlines 24 steps to disassemble the components which include removing gears, shafts, seals, and housings using various tools. The 21 steps for assembly include pressing bearings into place, measuring clearances, installing seals and O-rings, and torquing bolts to the specified values. Tools, part numbers, and weights of components are provided to aid in the process.
Caterpillar cat 374 f l excavator (prefix dnm) service repair manual (dnm0000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 374F L Excavator. The disassembly process involves removing over 30 individual parts from the final drive housing using various tools. The assembly process reverses the disassembly steps and provides details on installing new seals and determining the correct shim thickness between bearings and gears. Proper cleaning, application of sealants, and torque specifications are emphasized to correctly reassemble the final drive.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...jiaoyi82414369
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups using anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete the final drive assembly.
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups with anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete the final drive assembly.
This document provides assembly instructions for a final drive on an excavator. It includes:
1. Cleaning all parts and installing bearing cones, pins, and cups using anti-seize compound.
2. Measuring bearing preload and determining the correct shim thickness.
3. Installing duo-cone seals and assembling the main housing, motor housing, coupling gear, and ring gear.
4. Assembling the carrier assembly with planetary gears, shafts, thrust washers and pins.
5. Positioning the carrier assembly and installing remaining components to complete assembly.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...yinranhe0814
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, carriers, housing, and other parts. The instructions describe cleaning parts, applying lubricants, and inserting components in the correct order and orientation.
3) Precise measurements and torque specifications are provided to ensure proper bearing preload and component securement. Installation of the assembled final drive and travel motors completes the process.
Caterpillar Cat 365B L MH EXCAVATOR (Prefix CTY) Service Repair Manual (CTY00...aags15120808
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, housing, pins, rings, and shafts. The instructions describe cleaning parts, applying lubricants, and pressing, installing, and securing components in the correct positions and orientations.
3) Precise measurements and torque specifications are provided to ensure proper bearing preload and component fastening. Assembly of multiple planetary gear sets and carriers is described. The document ensures a thorough rebuild of the final drive.
1) The document provides assembly instructions for the final drive of an excavator model 365B. It lists required tools and parts and provides detailed steps and illustrations for assembling the various components of the final drive.
2) The components include bearings, seals, gears, housing, pins, rings, and shims. The instructions describe how to correctly install each part and ensure proper alignment and torque specifications are followed.
3) Proper cleaning and application of lubricants to mating surfaces is emphasized throughout the assembly process. Measurements are taken to determine the correct shim thickness to achieve the proper bearing preload.
Caterpillar cat 325 b l excavator (prefix 8rr) service repair manual (8rr0000...f98soeodidkdk
This document provides assembly instructions for the final drive of an excavator model 325B L. It describes:
1) Cleaning and preparing the final drive components and installing bearings in the main housing.
2) Determining the correct bearing preload and shim thickness to set the gear mesh.
3) Installing seals in the main housing and motor housing.
4) Assembling the carrier assemblies, installing gears, shafts, and retaining rings.
5) Positioning the main housing, gear, and ring gear on the motor housing and securing with bolts.
Caterpillar cat 325 b excavator (prefix 8rr) service repair manual (8rr00001 ...f98soeodidkdk
This document provides assembly instructions for the final drive of an excavator model 325B L. It describes:
1) Cleaning and preparing the components, installing bearings in the main housing, and determining the correct shim thickness for the gear.
2) Installing seals in the main housing and motor housing.
3) Assembling the carrier assembly by installing planetary gears, shafts, and pins.
4) Positioning the main housing, gear, and ring gear on the motor housing and securing them with bolts.
Caterpillar cat 325 b l excavator (prefix 8rr) service repair manual (8rr0000...fjsjjekdkme
This document provides assembly instructions for the final drive of an excavator model 325B L. It includes:
- A list of required tools and parts for assembly
- Detailed step-by-step instructions on installing bearings, seals, gears, carriers, and other components
- Procedures for determining correct bearing preload and shim thickness
- Instructions on installing retaining rings, pins, and seals in the proper orientation
The assembly process involves precisely fitting multiple gears, carriers, and housings to ensure proper alignment and engagement of all components. Measurements are taken and compared to specifications to verify correct assembly.
Caterpillar cat 325 b excavator (prefix 8rr) service repair manual (8rr00001 ...fjsjjekdkme
This document provides assembly instructions for the final drive of an excavator model 325B L. It includes:
- A list of required tools and parts for assembly
- Detailed step-by-step instructions for installing bearings, seals, gears, carriers, and other components
- Procedures for determining correct bearing preload and shim thickness
- Notes on cleaning, lubricating, and torque specifications
The goal is to correctly assemble all internal components of the final drive, including installing carriers, gears, seals and adjusting bearing preloads, to achieve proper operation. Proper cleaning and lubrication of parts is emphasized.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual (MCY00001...f8usiejdkmdd
1) The document provides assembly instructions for a 365C L excavator final drive. It describes 36 steps to assemble components like bearings, gears, seals, housings and covers.
2) Precise assembly requires determining the correct shim thickness to achieve proper bearing preload. Loctite and thread locking compounds are applied to bolts.
3) Various tools are used, including a transmission repair stand, hydraulic torque wrench, seal installer, and lifting devices to handle components weighing up to 817 kg. Cleaning and lubrication are important throughout the process.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual Instant D...yan77xunhao
This document provides assembly instructions for the final drive of a 365C L excavator. It lists the required tools and parts. The procedures describe how to assemble the main housing, motor housing, bearing cones, seals, coupling gear, planetary gears, carrier assembly, and ring gear. Precise measurements and torque specifications are provided to ensure proper bearing preload and component installation.
Caterpillar Cat 365C L Excavator (Prefix MCY) Service Repair Manual (MCY00001...dujdkksdmm
1) The document provides assembly instructions for a 365C L excavator final drive. It describes 36 steps to assemble components like bearings, gears, seals, housings and covers.
2) Precise assembly requires determining the correct shim thickness to achieve proper bearing preload. Loctite and thread locking compounds are applied to bolts.
3) Various tools are used, including a transmission repair stand, hydraulic torque wrench, seal installer, and lifting devices to handle components weighing up to 817 kg. Cleaning and lubrication are also emphasized.
Similar to Caterpillar cat 365 b l mh excavator (prefix cty) service repair manual (cty00001 and up) (13)
Caterpillar cat 385 b l excavator (prefix cls) service repair manual (cls0000...fjjskekmsemm
The document provides assembly instructions for control valves on 385B and 385B L excavators. It involves 25 steps to assemble components like spools, seals, plugs, resolver valves, differential relief valves, and covers. Special tools may be required and parts need to be checked for wear before assembly. Springs and other components must be assembled carefully according to the instructions to avoid injury. Torque specifications are provided for tightening certain parts.
Caterpillar cat 385 b l excavator (prefix bly) service repair manual (bly0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of 385B and 385B L Excavators.
The disassembly procedure involves removing 27 parts from the final drive housing using various tools. This includes removing gears, shafts, washers, bearings and seals.
The assembly procedure instructs to thoroughly clean all parts, apply anti-seize compound, and install parts in reverse order of disassembly. Special steps are provided to determine the correct bearing preload using shims and applying hydraulic pressure.
Caterpillar cat 385 b l excavator (prefix bkf) service repair manual (bkf0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. It describes:
1) Removing over 30 components of the final drive including gears, shafts, housings and seals using various tools.
2) Cleaning and inspecting parts prior to reassembly.
3) Reassembling the components in reverse order, applying lubricants and determining proper bearing preload using a hydraulic press and micrometer measurements.
Caterpillar cat 385 b excavator (prefix rcd) service repair manual (rcd00001 ...fjjskekmsemm
The document provides instructions for disassembling and assembling various components of an excavator control valve, including:
1. Disassembling the proportional valve by removing bolts, nuts, and cartridge components.
2. Assembling the attachment, bucket, and boom control valve by installing O-rings, plugs, resolver valves, springs, and actuator groups.
3. Assembling the right travel, left travel, and stick control valve by installing spools, plugs, resolver valves, O-rings, and covers.
Caterpillar cat 385 b excavator (prefix mya) service repair manual (mya00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling components of the control valve for an excavator model 385B. It describes 25 steps to disassemble parts like actuators, manifolds, solenoids, valves, seals and gaskets. Corresponding assembly steps are also provided, with notes to check components for wear and reduce temperature before inserting some parts. The goal is to properly disassemble and reassemble the control valve while preventing contamination.
Caterpillar cat 385 b excavator (prefix fdl) service repair manual (fdl00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. The disassembly process involves removing 27 parts from the final drive housing using various tools. The assembly process specifies applying anti-seize compound to bearing surfaces and installing parts in reverse order using lifting devices and a pressure tool to set the bearing preload. Proper cleaning and inspection of O-rings is also noted.
Caterpillar cat 385 b excavator (prefix cls) service repair manual (cls00001 ...fjjskekmsemm
The document provides assembly instructions for control valves for attachment, bucket, boom, right travel, left travel, and stick functions on 385B and 385B L excavators. It involves installing seals, spools, resolver valves, solenoids, pistons, actuators, and covers. Proper torque values are specified and safety precautions are provided due to parts being under spring load.
Caterpillar cat 385 b excavator (prefix bly) service repair manual (bly00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of 385B and 385B L Excavators.
The disassembly procedure involves removing 27 parts from the final drive housing using various tools. This includes removing gears, shafts, washers, bearings and seals.
The assembly procedure instructs to thoroughly clean all parts, apply anti-seize compound, and install parts in reverse order of disassembly. It provides details on installing bearings and determining the correct number of shims using a hydraulic press and micrometer measurements.
Caterpillar cat 385 b excavator (prefix bkx) service repair manual (bkx00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. It includes:
1) A list of required tools for the job.
2) Detailed step-by-step instructions for removing over 30 components of the final drive, including gears, shafts, housings, and seals.
3) Procedures for installing new bearings and determining the proper bearing preload during assembly.
Caterpillar cat 385 b excavator (prefix bkf) service repair manual (bkf00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling a final drive on 385B and 385B L excavators. The disassembly process involves removing 27 components from the final drive housing using various tools. The assembly process reverses the disassembly steps and includes pressing bearings into place, determining the correct shim thickness, and installing seals. Precise alignment of parts and cleanliness are emphasized throughout.
Caterpillar cat 374 f l excavator (prefix ebf) service repair manual (ebf0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive on a 374F excavator. It lists the required tools and parts. The disassembly process involves removing components like the final drive cover, ring gear, carrier assemblies, planetary gears and shafts. The assembly process reverses this, applying anti-seize compound and installing components like bearing cups, pins and housings in the correct order. Safety precautions are provided for using hydraulic cylinders and puller studs during assembly.
Caterpillar cat 374 f excavator (prefix ebf) service repair manual (ebf00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive on a 374F excavator. It lists the required tools and parts. The disassembly process involves removing components like the final drive cover, ring gear, carrier assemblies, planetary gears and shafts. The assembly process reverses this, applying anti-seize compound and installing components like bearing cups, pins and housings in the correct order. Safety precautions are provided for using hydraulic cylinders and puller studs during assembly.
Caterpillar cat 374 d l excavator (prefix pas) service repair manual (pas0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 374D L Excavator. The disassembly process involves removing over 30 individual parts in a specific sequence, including gears, shafts, housings and seals. Photos illustrate each step. Assembly requires applying threadlock to fasteners and bearings, and using shims to set the proper bearing preload when reinstalling the main housing. Proper cleaning and inspection of all parts is emphasized before reassembly.
Caterpillar cat 365 c l excavator (prefix mem) service repair manual (mem0000...fjjskekmsemm
This document provides disassembly and assembly instructions for the final drive on a 365C excavator. It describes how to disassemble the various components of the final drive including removing the ring gear, carrier assemblies, gears, shafts and seals. It then describes the assembly process and includes details on cleaning, applying threadlock, installing bearings and seals, and determining the correct shim thickness. The overall document provides a detailed multi-step process for taking apart and rebuilding the final drive assembly.
Caterpillar cat 365 c l excavator (prefix mcs) service repair manual (mcs0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 365C excavator. It outlines 33 steps to disassemble the final drive by removing components like the ring gear, carrier assemblies, gears, shafts and seals. It then outlines 11 steps to reassemble the final drive, which includes determining the correct shim thickness between components and installing seals using specialized tools. The purpose is to provide maintenance technicians with a procedure to fully disassemble and reassemble the final drive.
Caterpillar cat 365 c l excavator (prefix elc) service repair manual (elc0000...fjjskekmsemm
This document provides instructions for disassembling and assembling the travel motor of a 365C excavator. The disassembly process involves 29 steps to remove components like springs, plates, pistons, seals, and bearings. The assembly process reverses the disassembly with 31 steps, including verifying clearances with feeler gauges and heating components before installation. Tools include retaining ring pliers, link brackets, and threaded rods for lifting heavy parts. Personal protective equipment is recommended due to spring-loaded components.
Caterpillar cat 365 c excavator (prefix mem) service repair manual (mem00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive on a 365C excavator. It lists over 30 steps for disassembly, which include removing the final drive cover, carrier assemblies, gears, shafts, seals and bearings. For assembly, it lists 8 steps such as cleaning parts, installing bearings, seals and housing components, and determining the correct number of shims using a micrometer to measure gear dimensions. The overall document provides detailed technical instructions for taking apart and rebuilding the final drive transmission on this excavator model.
Caterpillar cat 365 c excavator (prefix mcs) service repair manual (mcs00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the final drive of a 365C excavator. It describes in detail how to remove over 30 individual parts, including gears, shafts, housings and seals. Reassembly is outlined in similar detail, with requirements to clean parts thoroughly, apply locking compounds, and properly set bearing preloads using shims. Proper tools are listed to facilitate disassembly and assembly.
Caterpillar cat 365 c excavator (prefix elc) service repair manual (elc00001 ...fjjskekmsemm
This document provides instructions for disassembling and assembling the travel motor of a 365C excavator. The disassembly process involves 29 steps to remove components like springs, plates, pistons, seals, and bearings. The assembly process reverses the disassembly with 31 steps, including verifying clearances with feeler gauges and heating components before installation. Tools required include retaining ring pliers, link brackets, and threaded rods for lifting. Personal safety warnings are provided throughout.
Caterpillar cat 365 b mh excavator (prefix cty) service repair manual (cty000...fjjskekmsemm
1) The document provides assembly instructions for a final drive on an excavator. It details cleaning parts, applying anti-seize compound, installing bearings and seals, and adjusting bearing preload using shims.
2) Carrier assemblies are assembled by installing bearings, thrust washers, and planetary gears, then securing with spring pins.
3) Carrier assemblies are installed in the ring gear and main housing, and components are secured with bolts torqued to specification.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR CTY
Configuration: 365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i02789460
Final Drive - Assemble
SMCS - 4050-016
Assembly procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7575 Link Bracket 5
C 140-7642 Duo-Cone Seal Installer As 1
F 1P-1859 Retaining Ring Pliers 1
G 138-7576 Link Bracket 2
H 5P-3931 Anti-Seize Compound 1
J 9S-3263 Thread Lock Compound 1
K 1U-8846 Gasket Sealant 1
1. Make sure that all parts of the final drive are thoroughly clean and free of dirt and debris
prior to assembly.
Note: Check the condition of all the O-ring seals that are used in the final drive. If any of
the seals are worn or damaged, use new parts for replacement.
2. Reassemble the final drive on Tooling (A) .
1/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00599211
3. Apply Tooling (H) to the surfaces that contact the bearing cones. Install the bearing cone
with a press. Raise the temperature of bearing (50) and install bearing (50) .
4. Apply Tooling (H) to the surfaces that contact pins (49) . Install pins (49) .
Illustration 2 g00599224
5. Apply Tooling (H) to the surfaces that contact bearing cups (48) and (47) . Install bearing
cups (48) and (47) .
2/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 3 g00596986
6. Install bearing (45) and the bearing cone.
Illustration 4 g01035739
7. Attach Tooling (B) and a suitable lifting device to main housing (39) . Install the main
housing on motor housing (44) , as shown.
8. Use the following procedure to determine the bearing preload and the correct number of
shims.
Illustration 5 g00603328
a. Use a depth micrometer in order to measure the step length of the coupling gear (42) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this dimension (X) .
b. Use a suitable press and a spacer in order to apply a load of 10000 kg (22046 lb) on
the bearings.
c. Rotate the main housing in order to seat the bearing.
d. Reduce the load on the bearings to 3700 ± 370 kg (8157 ± 815 lb).
3/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00603604
e. Maintain the load on the bearings. Use a depth micrometer and measure the distance
between the top face of motor housing and the bearing cone, as shown. Take this
measurement in several locations around the bearing. Compute the average of the
measured dimensions and record the number. Call this dimension (Y) .
f. Determine the correct thickness of the shim pack that will be installed between the
bearing cone and the coupling gear. The shim pack thickness is equal to dimension
(Y) minus dimension (X) . Tolerance for the shim pack is 0.1 mm (0.003 inch).
Note: If two shims are required, install the thinner shim next to the coupling gear
when the coupling gear is installed.
9. Attach Tooling (B) and a suitable lifting device in order to remove the main housing from
the motor housing.
Note: Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, apply clean SAE 30 oil on the contact surfaces of the metal seals.
Illustration 7 g00600071
4/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 10. Use Tooling (C) to install Duo-Cone seal (46) in the main housing.
Illustration 8 g00600087
11. Use Tooling (C) to install Duo-Cone seal (51) in the motor housing.
Note: Make sure that the Duo-Cone seals are not scratched or damaged during the assembly
of the main housing or during the assembly of the motor housing. After installation of the
main housing on the motor housing, there will be a small gap between the components. The
gap is caused by the Duo-Cone seals. The gap will be eliminated during installation of the
gear.
Illustration 9 g00596986
12. Install bearing (45) and the bearing cone.
5/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g01035739
13. Attach Tooling (B) and a suitable lifting device to main housing (39) . Position main
housing (39) on motor housing (44) . Make sure that the Duo-Cone seals are not scratched
or damaged during installation.
Illustration 11 g00596927
14. Place shims (43) in the correct position on the motor housing. If two shims were required,
put the thinner shim in contact with coupling gear (42) . Make sure that all of the holes in
the components are in alignment with each other.
6/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 12 g00596901
15. Put coupling gear (42) in the original position on the motor housing.
16. Apply Tooling (J) on the threads of bolts (41) . Install the bolts to secure coupling gear (42)
in place. Tighten bolts (41) evenly and tighten the bolts in diagonally opposite pairs.
Tighten bolts to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).
Illustration 13 g00596864
17. Install O-ring seal (40) in the main housing.
Illustration 14 g01035734
18. Thoroughly clean the mating surface of main housing (39) that contacts ring gear (38) .
Apply a bead of Tooling (K) on the mating surface of ring gear (38) . Use Tooling (B) and a
suitable lifting device. Place the ring gear in position on the main housing. Make sure that
the alignment mark on the main housing and the ring gear line up with each other. It may be
necessary to use a soft faced hammer to seat the ring gear on the main housing.
19. Assemble carrier assembly (29) , as follows:
7/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00596823
Illustration 16 g00603856
a. Apply clean SAE 30 oil on bearings (34) and (36) . Install bearings (34) and (36) in
planetary gear (35) .
b. Install thrust washers (33) and (37) on each side of the planetary gear.
c. Install the planetary gear and thrust washers in carrier assembly (29) .
d. Install planetary shaft (30) in carrier (29) and through planetary gear assembly (32) .
Make sure that the spring pin hole in the planetary shaft is in alignment with the
spring pin hole in the carrier.
8/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 17 g00513451
e. Install spring pin (31) in the carrier and into the planetary shaft. Make sure that the
spring pin hole in the planetary shaft is in alignment with the spring pin hole in the
carrier.
f. Orient the split in the spring pin (31) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 19.a through 19.f in order to install the remaining planetary gears in
carrier (29) .
Illustration 18 g01035740
20. Attach Tooling (B) and a suitable lifting device to carrier assembly (29) . Put the carrier
assembly in position in the ring gear. It may be necessary to move the carrier assembly back
and forth during installation in order to ensure that all gears engage properly.
9/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 19 g00603929
21. Install spacer (28) on carrier assembly (29) .
22. Assemble carrier assembly (21) , as follows:
Illustration 20 g00596485
a. Apply clean SAE 30 oil on bearing (23) . Install bearing (23) in planetary gear (24) .
b. Install thrust washers (22) and (25) on each side of the planetary gear.
c. Install the thrust washers and the planetary gear in the carrier assembly (21) .
10/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 21 g00596446
d. Install planetary shaft (20) in carrier (21) and through planetary gear assembly (24) .
Make sure that the spring pin hole in the carrier is in alignment with the spring pin
hole in the planetary shaft.
Illustration 22 g00596442
e. Make sure that the spring pin (19) in the planetary shaft is in alignment with the
spring pin hole in the carrier.
11/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 23 g00513451
f. Orient the split in the spring pin (19) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 22.a through 22.f in order to install the remaining two planetary gears in
carrier (18) .
Illustration 24 g01035731
23. Attach Tooling (B) and a suitable lifting device to carrier assembly (18) . Position carrier
assembly (18) in ring gear (38) . Move carrier assembly (18) back and forth during the
installation in order to ensure that all gears engage properly.
12/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 25 g00596342
24. Install spacer (17) .
25. Assemble carrier assembly (8) , as follows:
Illustration 26 g00596337
a. Install washers (16) and gear (15) . Use suitable Tooling to install ring (14) .
Illustration 27 g00596273
13/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. b. Install bearings (12) and spacer (13) .
Illustration 28 g00596269
c. Install gears (11) .
Illustration 29 g00596242
d. Install washers (10) . Use Tooling (F) in order to install retaining ring (9) .
14/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 30 g00596082
26. Use two people to install carrier assembly (8) . The weight of the carrier assembly (8) is
approximately 24 kg (53 lb). Install sun gear (7) .
Illustration 31 g00596018
27. Install ring gear (6) into the cover. Tighten bolts (5) to a torque of 100 ± 20 N·m (74 ± 15 lb
ft). Install spacer (4) .
The weight of the cover is approximately 65 kg (143 lb).
Illustration 32 g00604398
28. Attach Tooling (G) and a suitable lifting device to cover (2) . Install bolts (3) and the
washers. Tighten bolts (3) to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).
15/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 33 g00596007
29. Install socket head bolts (1) .
End By: Install the final drives and the travel motors. Refer to Disassembly and Assembly, "Final
Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Nov 26 01:07:15 UTC+0800 2020
16/16
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR CTY
Configuration: 365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i01089053
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
(A)
132-8223 Power Pack 1
1U-6221 Hydraulic Torque Wrench Assembly 1
132-8154 3/4 inch Square Drive Link 1
Note: The procedure to install the right hand final drive and the procedure to install the left hand
final drive is identical. The procedure that follows is for one of the final drives.
1/3
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 1 g00595681
1. Attach two lifting straps and a hoist to final drive (1). The approximate weight of the final
drive is 812 kg (1790 lb). It may be necessary to adjust the lifting straps for correct balance
of the final drive. Position final drive (1) on the track roller frame, as shown.
Note: The weight of the final drive must be adjusted if any other components are being
installed with the final drive.
Illustration 2 g00594077
2/3
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 3 g00595694
Note: Make sure that mounting holes (a) for the travel motor are aligned, as shown. This is
necessary for the correct installation of the travel motor.
2. Use 9S-3263 Thread Lock Compound on bolts (2). Install the washers and bolts (2). Use
Tooling (A) to tighten bolts (2) to a torque of 1800 ± 200 N·m (1328 ± 148 lb ft).
End By:
a. Install the travel motor. Refer to Disassembly and Assembly, "Travel Motor - Install" in this
manual.
b. Install the final drive sprocket. Refer to Disassembly and Assembly, "Final Drive Sprocket -
Remove and Install" in this manual.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Nov 26 01:08:12 UTC+0800 2020
3/3
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR CTY
Configuration: 365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i01075995
Swivel - Remove
SMCS - 5060-011
Removal Procedure
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
At operating temperature the implement hydraulic oil tank is hot and
under pressure. Hot oil can cause burns.
To prevent possible injury, release the pressure in the implement
hydraulic system before hydraulic lines or components are disconnected
or removed.
1/4
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Table 1
Required Tools
Tool Part Number Part Description Qty
(A) 138-7573 Link Bracket 2
1. Release the hydraulic system pressure.
Reference: Refer to Disassembly and Assembly, "Hydraulic System Pressure Release".
2. Put identification marks on all hose assemblies and all tube assemblies. Mark the locations
that are connected to the swivel assembly for installation purposes.
Illustration 1 g00564081
3. Disconnect hose assembly (2) from the top of the swivel assembly (5). Disconnect two hose
assemblies (4) from the top of the swivel assembly (5) .
4. Disconnect four hose assemblies (3) from the swivel assembly (5) .
5. Remove two bolts and washers that hold support (1) in position. Remove the support from
the swivel assembly.
2/4
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 2 g00564141
6. Remove eight bolts (6) and washers from the retainer (7). Remove retainer (7) from the
swivel assembly.
Illustration 3 g00564022
7. Remove six bolts (9) and washers from the middle cover assembly (8). Remove middle
cover assembly (8).
8. Remove six bolts (10) and washers from cover assemblies (11). Remove cover assemblies
(11) .
Illustration 4 g00564155
9. Disconnect two hose assemblies (15) from the swivel assembly.
10. Disconnect two hose assemblies (12) from the swivel assembly. Remove fitting (13) in
order to create extra clearance for removing the swivel assembly from the undercarriage of
the machine.
11. Disconnect four hose assemblies (14) from the swivel assembly.
3/4
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 5 g00564467
12. Remove five bolts (16) and the washers that secure the swivel assembly to the undercarriage
of the machine.
Illustration 6 g00564469
13. Remove two bolts from the top of the swivel assembly and install Tooling (A). Fasten
lifting straps to the link brackets and remove the swivel assembly from the machine. The
weight of the swivel assembly is 124 kg (274 lb).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Nov 26 01:09:09 UTC+0800 2020
4/4
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR CTY
Configuration: 365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i01076491
Swivel - Disassemble
SMCS - 5060-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
(A) 1P-2420 Transmission Repair Stand 1
(B)
6V-3822 Bolt 2
1P-5546 Crossblock 1
5P-4168 Step Plate 1
5F-7366 Screw 1
Start By:
A. Remove the swivel. Refer to Disassembly and Assembly, "Swivel - Remove" in this
manual.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
1/3
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1. Thoroughly clean the outside of the swivel assembly prior to disassembly.
Illustration 1 g00600898
Illustration 2 g00600904
2. Fasten Tooling (A) to the swivel. The cover (2) for the swivel must face upward. The
weight of the swivel assembly is 124 kg (274 lb).
3. Remove six bolts (1) and cover (2) from the outside housing.
2/3
365B L Material Handler CTY00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/26
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...