This document provides installation instructions for a travel motor on a 330D FM excavator. It includes:
- Cleaning the mating surfaces of the travel motor and final drive.
- Using guide bolts and lifting devices to position the travel motor, then installing securing bolts.
- Connecting hose assemblies and tightening to the specified torque.
- Using guide bolts and two people to position the heavy cover, then installing and tightening cover bolts.
- Filling fluids and completing the installation. The document details 25 steps with illustrations to ensure proper assembly.
Caterpillar cat 330 d mh excavator (prefix pel) service repair manual (pel000...fjjskekdmme
This document provides installation instructions for a main hydraulic pump on a 330D excavator. It lists 54 steps to assemble various components of the pump such as pistons, bearings, gears, covers, and valves. Tools required include lever pullers, link brackets, and retaining ring pliers. Photos illustrate each step, and torque specifications are provided for fasteners. The overall process installs the pump, connects hoses and wiring, and mounts related components back onto the excavator.
Caterpillar cat 330 d l hydraulic excavator (prefix gge) service repair manua...jfdskekdmme
This document provides assembly instructions for excavator final drive models 330D L, 330D N, and 330D LN in 3 sentences:
The instructions list 59 steps and required tools to assemble the final drive components, including installing bearings and seals, assembling carrier assemblies, and testing the final seal. Cleanliness is important during assembly and O-rings, gaskets, and seals should always be replaced with new parts. Dimensions and torque specifications are provided to ensure proper assembly and installation of the final drive.
Caterpillar cat m318 d wheeled excavator (prefix w8p) service repair manual (...fdjjsekksemxs
This document provides instructions for removing and installing an idler gear on a Caterpillar C6.6 diesel engine. It describes:
1) The required tools and preparation steps, which include locking the camshaft and crankshaft, removing covers, and ensuring the valves are closed.
2) The removal procedure, which involves marking components, loosening rocker arms, and tilting the idler gear during removal.
3) The installation procedure, such as cleaning parts, aligning timing marks, and lubricating before sliding the hub into the idler gear. Precise timing of the camshaft and crankshaft is required.
Caterpillar cat 330 d l excavator (prefix jlp) service repair manual (jlp0000...hhjsekmdmm
This document provides disassembly instructions for a final drive on an excavator. It begins by having the technician mark the final drive for alignment and then remove the final drive and travel motor. Over 30 steps are then outlined to disassemble the various components of the final drive. This includes removing gears, carriers, shafts, seals and other parts using specialized tools. Cleanliness is emphasized throughout the process to prevent dirt from entering the mechanism.
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
Caterpillar cat m318 f wheeled excavator (prefix fb8) service repair manual (...ifkkdmdmdm
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of an M318F wheeled excavator. The disassembly procedure involves removing 23 components and subassemblies including the carrier housing, planetary gears, brake discs, and hub. The assembly procedure instructs installing these components in reverse order and provides torque specifications for critical fasteners. Tools required include retaining ring pliers, drivers, a spanner, pry bars, pullers, and torque multipliers.
Caterpillar cat 330 d excavator (prefix eah) service repair manual (eah00001 ...hhjsekmdmm
This document provides instructions for disassembling and assembling the swing drive of 330D and 330D L excavator models. The disassembly procedure involves removing 17 parts from the swing drive including the cover, carrier assemblies, gears, and housing. The assembly procedure describes installing these 17 parts in the reverse order and includes cleaning, lubricating, and setting components into place using various tools. Proper alignment and torque specifications are noted throughout.
This document provides instructions for removing a crankshaft from a Caterpillar 3116 engine. The steps include removing the cylinder head, crankshaft rear seal carrier, front gear group, and crankshaft main bearings. With the main bearings removed, the crankshaft can then be lifted out of the engine block. Proper cleaning and inspection of removed parts is emphasized.
Caterpillar cat 330 d mh excavator (prefix pel) service repair manual (pel000...fjjskekdmme
This document provides installation instructions for a main hydraulic pump on a 330D excavator. It lists 54 steps to assemble various components of the pump such as pistons, bearings, gears, covers, and valves. Tools required include lever pullers, link brackets, and retaining ring pliers. Photos illustrate each step, and torque specifications are provided for fasteners. The overall process installs the pump, connects hoses and wiring, and mounts related components back onto the excavator.
Caterpillar cat 330 d l hydraulic excavator (prefix gge) service repair manua...jfdskekdmme
This document provides assembly instructions for excavator final drive models 330D L, 330D N, and 330D LN in 3 sentences:
The instructions list 59 steps and required tools to assemble the final drive components, including installing bearings and seals, assembling carrier assemblies, and testing the final seal. Cleanliness is important during assembly and O-rings, gaskets, and seals should always be replaced with new parts. Dimensions and torque specifications are provided to ensure proper assembly and installation of the final drive.
Caterpillar cat m318 d wheeled excavator (prefix w8p) service repair manual (...fdjjsekksemxs
This document provides instructions for removing and installing an idler gear on a Caterpillar C6.6 diesel engine. It describes:
1) The required tools and preparation steps, which include locking the camshaft and crankshaft, removing covers, and ensuring the valves are closed.
2) The removal procedure, which involves marking components, loosening rocker arms, and tilting the idler gear during removal.
3) The installation procedure, such as cleaning parts, aligning timing marks, and lubricating before sliding the hub into the idler gear. Precise timing of the camshaft and crankshaft is required.
Caterpillar cat 330 d l excavator (prefix jlp) service repair manual (jlp0000...hhjsekmdmm
This document provides disassembly instructions for a final drive on an excavator. It begins by having the technician mark the final drive for alignment and then remove the final drive and travel motor. Over 30 steps are then outlined to disassemble the various components of the final drive. This includes removing gears, carriers, shafts, seals and other parts using specialized tools. Cleanliness is emphasized throughout the process to prevent dirt from entering the mechanism.
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
Caterpillar cat m318 f wheeled excavator (prefix fb8) service repair manual (...ifkkdmdmdm
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of an M318F wheeled excavator. The disassembly procedure involves removing 23 components and subassemblies including the carrier housing, planetary gears, brake discs, and hub. The assembly procedure instructs installing these components in reverse order and provides torque specifications for critical fasteners. Tools required include retaining ring pliers, drivers, a spanner, pry bars, pullers, and torque multipliers.
Caterpillar cat 330 d excavator (prefix eah) service repair manual (eah00001 ...hhjsekmdmm
This document provides instructions for disassembling and assembling the swing drive of 330D and 330D L excavator models. The disassembly procedure involves removing 17 parts from the swing drive including the cover, carrier assemblies, gears, and housing. The assembly procedure describes installing these 17 parts in the reverse order and includes cleaning, lubricating, and setting components into place using various tools. Proper alignment and torque specifications are noted throughout.
This document provides instructions for removing a crankshaft from a Caterpillar 3116 engine. The steps include removing the cylinder head, crankshaft rear seal carrier, front gear group, and crankshaft main bearings. With the main bearings removed, the crankshaft can then be lifted out of the engine block. Proper cleaning and inspection of removed parts is emphasized.
Caterpillar cat m318 c wheeled excavator (prefix bcz) service repair manual (...udfjjdjkkmds
This document provides instructions for separating the upper frame and undercarriage frame on an M318C wheeled excavator. It lists the required tools which include electric hydraulic pumps, cylinders, stands, pins, tubes, collars, saddles, links and guide bolts. The procedure involves using the listed tools and hydraulic jacks to lift and support the frames while removing connecting components. Proper containment of fluids is noted as important during the separation process.
Caterpillar cat m318 d wheeled excavator (prefix d8w) service repair manual (...fujsjefjwerkskemm
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 separate parts including carrier housings, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 parts in reverse order and includes steps to measure clearances and end play to ensure proper assembly. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque multipliers.
Caterpillar cat m318 c mh wheeled excavator (prefix beb) service repair manua...udjjjskekdmdm
This document provides instructions for disassembling and assembling the swing drive of an excavator model M318C MH. It lists 28 steps for disassembly, removing components like the swing brake assembly, discs, pins, gears, and bearings. It then lists 29 steps for reassembly, providing details on cleaning parts, applying lubricant, and setting proper torque specifications when reinstalling components like the pinion, nuts, rings, and seals. Precautions are given to relieve spring tension safely and set bearing preload correctly during assembly.
Caterpillar cat m318 c wheeled excavator (prefix bcz) service repair manual (...udfjjdjkkmds
This document provides instructions for disassembling and assembling the front axle components of an M318C Wheeled Excavator, including:
1. Removing components like the carrier housing, planetary gears, brake discs, and hub assembly which involve using various tools and lifting devices.
2. Disassembling internal components of the carrier like retaining rings, bearings, and seals.
3. Cleaning all parts before assembly and heating/cooling some components to aid installation.
4. Reassembling the components in reverse order, applying grease and torquing fasteners to specifications. Proper cleanliness and procedure is emphasized for the precision components.
Caterpillar cat m318 c wheeled excavator (prefix h2d) service repair manual (...udfjjdjkkmds
The document provides instructions for disassembling and assembling the travel motor of an M318C Wheeled Excavator. It lists 48 steps for disassembly, involving removing housing components, valves, seals, springs, pins, and other internal parts. It then lists 26 steps for reassembly, putting the components back in reverse order, ensuring proper installation of seals, springs, and other precision parts. Tools required include retaining ring pliers, a slide hammer puller, bearing puller, and link brackets for lifting components. Cleanliness is emphasized to prevent dirt contamination of internal parts.
Caterpillar cat 390 f excavator (prefix feh) service repair manual (feh00001 ...fjkskedmme
The document provides instructions for disassembling and assembling the travel motor of a 390F excavator. It describes 40 steps to disassemble the various components of the travel motor including removing the head, relief valves, spools, pistons, plates, seals and bearings. It then describes 36 steps for reassembling the components in reverse order, making sure to align marks and reinstall parts in their original locations. Precautions are provided regarding spring loaded components.
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...cdsaas
The document provides instructions for disassembling the piston pump (swing) of an M315C wheeled excavator. It describes removing 22 individual parts from the pump housing including the servo valve, charge pump, gears, head, port plate, relief valves, spool, and adjustment screw. Cleanliness is important when disassembling to prevent dirt from entering the internal mechanisms. Personal injury precautions are also noted regarding hydraulic pressure and spring force.
Caterpillar cat m315 c wheeled excavator (prefix bdm) service repair manual (...cdsaas
This document provides instructions for disassembling and assembling the main hydraulic pump of a M315C wheeled excavator. It lists 42 steps to disassemble the pump by removing components like valves, springs, seals, pistons, and bearings. It then lists the assembly steps in reverse order, noting to clean parts and apply new thread lock before reinstalling components. Precautions are provided to mark parts for orientation and contain fluids during maintenance.
Caterpillar cat 330 d2 l excavator (prefix xdr) service repair manual (xdr000...cdsaas
The document provides instructions for installing and removing an engine oil pump, water pump, and water temperature regulator on a Caterpillar 330D2 excavator. The oil pump installation involves cleaning components, installing various parts in sequence using specific tools and torques. The water pump removal requires draining coolant and removing hoses and bolts. Its installation aligns parts using guide studs and torques bolts in a given order. Removing the temperature regulator involves draining coolant and disconnecting hoses.
Caterpillar cat 330 d2 l excavator (prefix hsp) service repair manual (hsp000...cdsaas
The document provides instructions for disassembling a 330D2 excavator travel motor. It is a 27 step process that includes removing the head, brake piston, barrel assembly, cam plate, shaft assembly, and other internal components. Special tools are required and components must be marked for proper reassembly in the correct positions. Safety precautions are outlined to contain fluids and handle components carefully.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...cdsaas
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
Caterpillar cat 330 d2 l excavator (prefix fex) service repair manual (fex000...cdsaas
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps including removing the final drive cover, carrier assembly, planetary gears, ring gears, and other components. Various tools are required including link brackets, eyebolts, retaining ring pliers, and a transmission repair stand to support components of significant weight during disassembly. Cleanliness is emphasized to prevent dirt from entering internal mechanisms.
Caterpillar cat 330 d2 l excavator (prefix ex7) service repair manual (ex7000...cdsaas
The document provides step-by-step instructions for disassembling and assembling a travel motor. It lists 28 steps for disassembly, removing components like the head, port plate, bearings, brake piston, plates, and seals. It then lists 16 steps for assembly, replacing components in reverse order and noting specifics like lubrication, alignment marks, and press fittings. Precise installation of keys and cam plates is emphasized to prevent damage.
Caterpillar cat 330 d2 l excavator (prefix ebp) service repair manual (ebp000...cdsaas
The document provides instructions for disassembling an excavator travel motor. It begins by having the technician remove the travel motor from the excavator. The disassembly procedure then consists of 27 steps to dismantle the various components of the travel motor, including removing the head, brake piston, barrel assembly, cam plate, and other internal parts. Precautions are provided to properly contain fluids and mark components for reassembly. Required tools are also listed.
Caterpillar cat 330 d2 l excavator (prefix dtg) service repair manual (dtg000...cdsaas
The document provides instructions for disassembling a 330D2 excavator travel motor. It lists 27 steps to completely disassemble the travel motor, removing components like the motor head, brake piston, barrel assembly, cam plate, and shaft assembly. Tools required for the disassembly include an adapter, bolts, washers, eyebolt, retaining ring pliers, bearing puller, and shop air. Safety precautions are noted, such as containing fluids and avoiding damage to component surfaces.
The document provides instructions for installing and removing an engine oil pump, water pump, and water temperature regulator on a Caterpillar 330D2 excavator. The oil pump installation involves cleaning components, installing various parts in sequence using specific tools and torques. The water pump removal requires draining coolant and removing hoses and bolts. Its installation aligns parts using guide studs and torques bolts in a given order. Removing the temperature regulator involves draining coolant and disconnecting hoses.
The document provides instructions for disassembling a 330D2 excavator travel motor. The 27 step procedure includes removing the head, brake piston, barrel assembly, cam plate, shaft assembly, seals and other components. Special tools are required and technicians are advised to take care to not damage components and contain fluids.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps including removing the final drive cover, carrier assembly, planetary gears, ring gears, and other components. Various specialized tools are required to disassemble parts and subassemblies. Cleanliness is important to prevent dirt from entering during disassembly.
The document provides step-by-step instructions for disassembling and assembling a travel motor. It lists 28 steps for disassembly, removing components like the head, port plate, bearings, brake piston, plates, and seals. It then lists 16 steps for assembly, replacing components in reverse order and noting specifics like lubrication, alignment marks, and press fittings. Precise installation of keys and cam plates is emphasized to prevent damage.
The document provides instructions for disassembling an excavator travel motor. It begins by having the technician remove the travel motor from the excavator. The disassembly procedure then consists of 27 steps to dismantle the various components of the travel motor, including removing the head, brake piston, barrel assembly, cam plate, and other internal parts. Precautions are provided to properly contain fluids and mark components for reassembly. Required tools are also listed.
The document provides instructions for disassembling a 330D2 excavator travel motor. It lists 27 steps to completely disassemble the travel motor, removing components like the motor head, brake piston, barrel assembly, cam plate, and shaft assembly. Tools required for the disassembly include an adapter, bolts, washers, eyebolt, retaining ring pliers, bearing puller, and shop air. Safety precautions are noted, such as containing fluids and avoiding damage to component surfaces.
Caterpillar cat m318 c wheeled excavator (prefix bcz) service repair manual (...udfjjdjkkmds
This document provides instructions for separating the upper frame and undercarriage frame on an M318C wheeled excavator. It lists the required tools which include electric hydraulic pumps, cylinders, stands, pins, tubes, collars, saddles, links and guide bolts. The procedure involves using the listed tools and hydraulic jacks to lift and support the frames while removing connecting components. Proper containment of fluids is noted as important during the separation process.
Caterpillar cat m318 d wheeled excavator (prefix d8w) service repair manual (...fujsjefjwerkskemm
This document provides instructions for disassembling and assembling the final drive carriers, hubs, and brakes of a M318D wheeled excavator. The disassembly procedure involves removing 23 separate parts including carrier housings, planetary gears, thrust washers, retaining rings, and brake discs. The assembly procedure instructs installing these 23 parts in reverse order and includes steps to measure clearances and end play to ensure proper assembly. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque multipliers.
Caterpillar cat m318 c mh wheeled excavator (prefix beb) service repair manua...udjjjskekdmdm
This document provides instructions for disassembling and assembling the swing drive of an excavator model M318C MH. It lists 28 steps for disassembly, removing components like the swing brake assembly, discs, pins, gears, and bearings. It then lists 29 steps for reassembly, providing details on cleaning parts, applying lubricant, and setting proper torque specifications when reinstalling components like the pinion, nuts, rings, and seals. Precautions are given to relieve spring tension safely and set bearing preload correctly during assembly.
Caterpillar cat m318 c wheeled excavator (prefix bcz) service repair manual (...udfjjdjkkmds
This document provides instructions for disassembling and assembling the front axle components of an M318C Wheeled Excavator, including:
1. Removing components like the carrier housing, planetary gears, brake discs, and hub assembly which involve using various tools and lifting devices.
2. Disassembling internal components of the carrier like retaining rings, bearings, and seals.
3. Cleaning all parts before assembly and heating/cooling some components to aid installation.
4. Reassembling the components in reverse order, applying grease and torquing fasteners to specifications. Proper cleanliness and procedure is emphasized for the precision components.
Caterpillar cat m318 c wheeled excavator (prefix h2d) service repair manual (...udfjjdjkkmds
The document provides instructions for disassembling and assembling the travel motor of an M318C Wheeled Excavator. It lists 48 steps for disassembly, involving removing housing components, valves, seals, springs, pins, and other internal parts. It then lists 26 steps for reassembly, putting the components back in reverse order, ensuring proper installation of seals, springs, and other precision parts. Tools required include retaining ring pliers, a slide hammer puller, bearing puller, and link brackets for lifting components. Cleanliness is emphasized to prevent dirt contamination of internal parts.
Caterpillar cat 390 f excavator (prefix feh) service repair manual (feh00001 ...fjkskedmme
The document provides instructions for disassembling and assembling the travel motor of a 390F excavator. It describes 40 steps to disassemble the various components of the travel motor including removing the head, relief valves, spools, pistons, plates, seals and bearings. It then describes 36 steps for reassembling the components in reverse order, making sure to align marks and reinstall parts in their original locations. Precautions are provided regarding spring loaded components.
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...cdsaas
The document provides instructions for disassembling the piston pump (swing) of an M315C wheeled excavator. It describes removing 22 individual parts from the pump housing including the servo valve, charge pump, gears, head, port plate, relief valves, spool, and adjustment screw. Cleanliness is important when disassembling to prevent dirt from entering the internal mechanisms. Personal injury precautions are also noted regarding hydraulic pressure and spring force.
Caterpillar cat m315 c wheeled excavator (prefix bdm) service repair manual (...cdsaas
This document provides instructions for disassembling and assembling the main hydraulic pump of a M315C wheeled excavator. It lists 42 steps to disassemble the pump by removing components like valves, springs, seals, pistons, and bearings. It then lists the assembly steps in reverse order, noting to clean parts and apply new thread lock before reinstalling components. Precautions are provided to mark parts for orientation and contain fluids during maintenance.
Caterpillar cat 330 d2 l excavator (prefix xdr) service repair manual (xdr000...cdsaas
The document provides instructions for installing and removing an engine oil pump, water pump, and water temperature regulator on a Caterpillar 330D2 excavator. The oil pump installation involves cleaning components, installing various parts in sequence using specific tools and torques. The water pump removal requires draining coolant and removing hoses and bolts. Its installation aligns parts using guide studs and torques bolts in a given order. Removing the temperature regulator involves draining coolant and disconnecting hoses.
Caterpillar cat 330 d2 l excavator (prefix hsp) service repair manual (hsp000...cdsaas
The document provides instructions for disassembling a 330D2 excavator travel motor. It is a 27 step process that includes removing the head, brake piston, barrel assembly, cam plate, shaft assembly, and other internal components. Special tools are required and components must be marked for proper reassembly in the correct positions. Safety precautions are outlined to contain fluids and handle components carefully.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...cdsaas
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
Caterpillar cat 330 d2 l excavator (prefix fex) service repair manual (fex000...cdsaas
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps including removing the final drive cover, carrier assembly, planetary gears, ring gears, and other components. Various tools are required including link brackets, eyebolts, retaining ring pliers, and a transmission repair stand to support components of significant weight during disassembly. Cleanliness is emphasized to prevent dirt from entering internal mechanisms.
Caterpillar cat 330 d2 l excavator (prefix ex7) service repair manual (ex7000...cdsaas
The document provides step-by-step instructions for disassembling and assembling a travel motor. It lists 28 steps for disassembly, removing components like the head, port plate, bearings, brake piston, plates, and seals. It then lists 16 steps for assembly, replacing components in reverse order and noting specifics like lubrication, alignment marks, and press fittings. Precise installation of keys and cam plates is emphasized to prevent damage.
Caterpillar cat 330 d2 l excavator (prefix ebp) service repair manual (ebp000...cdsaas
The document provides instructions for disassembling an excavator travel motor. It begins by having the technician remove the travel motor from the excavator. The disassembly procedure then consists of 27 steps to dismantle the various components of the travel motor, including removing the head, brake piston, barrel assembly, cam plate, and other internal parts. Precautions are provided to properly contain fluids and mark components for reassembly. Required tools are also listed.
Caterpillar cat 330 d2 l excavator (prefix dtg) service repair manual (dtg000...cdsaas
The document provides instructions for disassembling a 330D2 excavator travel motor. It lists 27 steps to completely disassemble the travel motor, removing components like the motor head, brake piston, barrel assembly, cam plate, and shaft assembly. Tools required for the disassembly include an adapter, bolts, washers, eyebolt, retaining ring pliers, bearing puller, and shop air. Safety precautions are noted, such as containing fluids and avoiding damage to component surfaces.
The document provides instructions for installing and removing an engine oil pump, water pump, and water temperature regulator on a Caterpillar 330D2 excavator. The oil pump installation involves cleaning components, installing various parts in sequence using specific tools and torques. The water pump removal requires draining coolant and removing hoses and bolts. Its installation aligns parts using guide studs and torques bolts in a given order. Removing the temperature regulator involves draining coolant and disconnecting hoses.
The document provides instructions for disassembling a 330D2 excavator travel motor. The 27 step procedure includes removing the head, brake piston, barrel assembly, cam plate, shaft assembly, seals and other components. Special tools are required and technicians are advised to take care to not damage components and contain fluids.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves 37 steps to remove all components of the final drive. Key steps include removing the final drive cover, gears, carrier assembly, planetary gears, and sprocket housing. The assembly process has 35 steps and involves installing components in reverse order while applying anti-seize compound and ensuring proper bearing preload using shims.
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps including removing the final drive cover, carrier assembly, planetary gears, ring gears, and other components. Various specialized tools are required to disassemble parts and subassemblies. Cleanliness is important to prevent dirt from entering during disassembly.
The document provides step-by-step instructions for disassembling and assembling a travel motor. It lists 28 steps for disassembly, removing components like the head, port plate, bearings, brake piston, plates, and seals. It then lists 16 steps for assembly, replacing components in reverse order and noting specifics like lubrication, alignment marks, and press fittings. Precise installation of keys and cam plates is emphasized to prevent damage.
The document provides instructions for disassembling an excavator travel motor. It begins by having the technician remove the travel motor from the excavator. The disassembly procedure then consists of 27 steps to dismantle the various components of the travel motor, including removing the head, brake piston, barrel assembly, cam plate, and other internal parts. Precautions are provided to properly contain fluids and mark components for reassembly. Required tools are also listed.
The document provides instructions for disassembling a 330D2 excavator travel motor. It lists 27 steps to completely disassemble the travel motor, removing components like the motor head, brake piston, barrel assembly, cam plate, and shaft assembly. Tools required for the disassembly include an adapter, bolts, washers, eyebolt, retaining ring pliers, bearing puller, and shop air. Safety precautions are noted, such as containing fluids and avoiding damage to component surfaces.
Caterpillar cat 330 d l mobile hydraulic excavator (prefix h3d) service repai...cdsaas
This document provides instructions for removing and installing rear gear group components on a 330D L excavator powered by a C9 engine. The removal process involves using tools to remove retaining bolts and gears. Bearings are removed from adapters using tools as well. Clearances must be checked when installing new bearings. The installation process specifies torques for bolts and using loctite on reused bolts. Dimensions must be matched for bearing installation.
Caterpillar cat 330 d l excavator (prefix thj) service repair manual (thj0000...cdsaas
The document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing gears, carriers, shafts, seals and housings using various tools like brackets, presses, and hammers/punches. Cleanliness is important to prevent dirt entry during disassembly.
Caterpillar cat 330 d l excavator (prefix r2d) service repair manual (r2d0000...cdsaas
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a Caterpillar 330D L excavator with a C9 engine. The summary is:
The rear gear group removal procedure involves using tools to remove retaining bolts, bushings, adapters, bearings, gears and covers. Cleanliness is important to prevent contamination. The installation procedure specifies matching angles and distances when pressing bearings in place and lubricating bolts during reinstallation.
The flywheel removal involves using guide studs and lifting equipment due to the flywheel's weight. Removal of the ring gear may require a hammer and punch. Installation specifies heating the ring gear for pressing, applying thread
Caterpillar cat 330 d l excavator (prefix nbd) service repair manual (nbd0000...cdsaas
The document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing gears, shafts, seals, and housing components using various tools while noting weights of parts removed. Detailed illustrations are provided for each step. Cleanliness is important to prevent dirt entry during disassembly.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D FM EXCAVATOR L2K
Configuration: 330D Forest Swing Machine L2K00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D Forest Machine Machine Systems
Media Number -KENR5988-00 Publication Date -01/07/2007 Date Updated -03/07/2007
i05861332
Travel Motor - Assemble
SMCS - 4351-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1U-7563 Hex Wrench 1
C 6V-3821 Bolt 1
E 136-1452 Retaining Ring Pliers 1
F 1P-0510 Driver Group 1
G 149-4935 Measuring Tool 1
Note: Replace all O-ring seals and gaskets. Apply a light film of hydraulic oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, clean all parts in cleaning fluid. Allow
the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited
on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use
new parts for replacement.
Note: The assembly procedure begins with the head. The assembly procedure for the body
follows.
1/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. Illustration 1 g00841884
1. Use Tooling (A) in order to install shuttle valve (28) .
Illustration 2 g00841883
2. Install plug (27) .
Illustration 3 g00841878
3. Assemble spool (23) , spring (24) , seat (25) , and cap (26) .
2/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. Illustration 4 g00841875
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
4. Install valve assembly (22) .
5. Install the spool, the spring, the seat, and the cap on the other side of the head.
Illustration 5 g00841869
6. Assemble poppet (21) , spring (20) and valve assembly (19) .
3/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. Illustration 6 g00841860
7. Install valve assembly (18) .
8. Install the poppet, the spring, and the valve assembly on the other side of the head.
Illustration 7 g00841858
9. Assemble seat (17) , spring (16) , and cap (15) .
Illustration 8 g00841855
4/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
10. Install valve assembly (14) .
Illustration 9 g00841850
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
11. Install spool (13) , spacer (12) , and spring (11) .
12. Install cap (10) . Torque the cap to 250 N·m (185 lb ft).
5/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
7. Illustration 10 g00841845
13. Install piston (9) and plug (8) .
Illustration 11 g00841840
14. Install new O-ring seals (7) on both relief valves.
Illustration 12 g00841826
15. Install relief valves (6) . Torque each relief valve to 100 N·m (75 lb ft).
6/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
8. Illustration 13 g00841824
16. Install port plate (4) and pin (5) .
Note: Use grease in order to hold port plate (4) in position.
Illustration 14 g00842015
17. Use Tooling (F) and a soft hammer in order to install seal (35) .
7/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 15 g01288684
Note: Raise the temperature of bearing (47) and bearing (49) . Lower the temperature of
shaft (46) .
18. Install bearing (48) onto shaft (46) .
Note: The preload for the bearings is adjusted at the factory. Install the bearings in sets.
Illustration 16 g01288688
19. Install shim (48) onto shaft (46) .
Illustration 17 g01288722
20. Install bearing (47) . Install shim (45) , and retaining ring (44) .
8/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 18 g00841932
21. Install center pin (41) , pistons (40) and retainer (39) . Install screws (38) .
22. The following steps are necessary in order to select the thickness of shim (43) . The
thickness of the shim determines the lift-off limitation.
Illustration 19 g01288723
a. Use Tooling (G) in order to determine the limit of separation.
Illustration 20 g00717767
9/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. b. Install the three balls into the plate.
Illustration 21 g01288724
c. Install spring (42) and Tooling (G) into the center pin hole in barrel (37) .
Illustration 22 g00841931
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
d. Install Tooling (C) into barrel (37) .
10/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Illustration 23 g00842029
e. Raise the housing to 80 °C (176 °F). Place the housing on suitable blocks.
Illustration 24 g00842031
f. Lower the rotary assembly into the housing. Install a new seal (29) .
Illustration 25 g00841889
g. Install shim (33) .
11/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. h. Use Tooling (E) in order to install retaining ring (34) .
Illustration 26 g00841898
Note: Use the recorded distance from the locknut to the end of the set screw for
installation purposes.
i. Install locknuts (31) and screws (32) .
Illustration 27 g00841816
j. Install head (3) on the housing. Turn the shaft and tighten bolts (2) at the same time.
k. Remove bolts (2) . Remove head (3) .
12/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. Illustration 28 g00842041
l. Remove Tooling (C) . Remove barrel (37) .
Illustration 29 g01288727
m. Remove Tooling (G) from barrel (37) .
Illustration 30 g01288731
13/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. n. Measure the thickness of Tooling (G) , Dimension (Z) . Subtract 0.3 ± 0.1 mm (.012
± .004 inch) from Dimension (Z) . Use a shim of this dimension in order to set the
correct lift off limitation.
Example (Z) = 5.00 mm (0.197 inch) - 0.3 ± 0.1 mm (.012 ± .004 inch) = 4.70 mm ±
0.10 (0.185 inch ± 0.004 inch).
Illustration 31 g00842044
o. Install shim (43) that was determined in Step 22.n into barrel (37) . Use a small
amount of grease in order to hold the shim in the barrel .
Illustration 32 g00842048
23. Install barrel (37) .
14/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
16. Illustration 33 g00841816
24. Install head (3) and bolts (2) . Tighten to a torque of 87 N·m (64.2 lb ft).
Illustration 34 g00841777
25. Install plug (1) .
End By: Install the travel motor. Refer to Disassembly and Assembly, "Travel Motor - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Aug 20 08:47:39 UTC+0800 2020
15/15(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
17. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D FM EXCAVATOR L2K
Configuration: 330D Forest Swing Machine L2K00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D Forest Machine Machine Systems
Media Number -KENR5988-00 Publication Date -01/07/2007 Date Updated -03/07/2007
i02752958
Travel Motor - Install
SMCS - 4351-012
Installation Procedure
Table 1
Required Tooling
Tool Part Number Part Description Qty
A 9U-6248 Guide Bolt 1
B 123-4370 Guide Bolt 1
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Dealer Service
Tool Catalog" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
1/3(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. Illustration 1 g01378258
1. Thoroughly clean the mating surfaces of the travel motor and the final drive.
2. Install Tooling (B) in the top hole in the final drive.
3. Attach a suitable lifting device to travel motor (6). The weight of travel motor (6) is
approximately 61 kg (135 lb).
4. Carefully position travel motor (6) on Tooling (B). Slide travel motor (6) into position on
the final drive.
5. Install bolt (8) in order to secure travel motor (6) to the final drive.
6. Remove Tooling (B) .
7. Install bolt (7). Remove the suitable lifting device.
Illustration 2 g01377743
2/3(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. 8. Install hose assembly (4). Tighten hose assembly (4) to a torque of 76 ± 4 N·m (56 ± 3 lb
ft).
9. Install hose assemblies (5) .
Illustration 3 g01377719
10. Install Tooling (A) into the bolt hole for cover (3) .
11. Use two people to position cover (3) on Tooling (A). The weight of cover (3) is
approximately 45 kg (100 lb). Slide cover (3) into position on the machine.
12. Install bolts (2). Tighten bolts (2 ) to a torque of 130 ± 10 N·m (96 ± 7 lb ft).
13. Remove Tooling (A). Install bolt (1). Tighten bolt (1) to a torque of 130 ± 10 N·m (96 ± 7
lb ft).
14. Fill the final drive with oil. Refer to Operation and Maintenance Manual, "Final Drive Oil -
Change".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Aug 20 08:48:42 UTC+0800 2020
3/3(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
20. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D FM EXCAVATOR L2K
Configuration: 330D Forest Swing Machine L2K00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D Forest Machine Machine Systems
Media Number -KENR5988-00 Publication Date -01/07/2007 Date Updated -03/07/2007
i02785246
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7576 Link Bracket 2
B 1P-1855 Retaining Ring Pliers 1
C 1P-1862 Retaining Ring Pliers 1
D 5P-5197 Retaining Ring Pliers 1
E 1P-2321 Puller Assembly(1)
1
F 1P-0520 Drive Group 1
G 2P-8312 Retaining Ring Pliers 1
H 138-7574 Link Bracket 3
J
1P-5546 Crossbar 1
5F-7366 Screw 1
1P-0523 Drive Plate 1
9S-8546 Seal Installer 1
6V-3532 Bolt 2
8T-3282 Washer 2
K 1U-8758 Retaining Ring Pliers 1
1/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. L
1P-0074 Slide Hammer Puller Gp 1
1P-0069 Head 1
2P-2312 Puller leg 3
M 1P-7407 Eyebolt 2
N 199-6557 Spanner socket 1
P 4C-8359 Eyebolt 2
Q 127-8458 Final Drive Bench Ar 1
QQ 127-8467 Reaction Plate(2)
R 127-8468 Reaction Bar As 1
S
3S-6224 Electric Hydraulic Pump 1
8T-0820 Pressure Gauge 1
3B-7722 Bushing 2
1P-2376 Coupler Assembly 2
1P-2377 Plug 2
8F-0024 Hose Assembly 2
T 154-6182 Forcing Bolt 2
(1)
Use 6C-7887 Leg on the two gears that are removed in Step 22.
(2)
Part of Tooling (Q)
Start By:
a. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
1. Thoroughly clean the outside of the final drive and travel motor prior to disassembly.
Illustration 1 g00659659
2. Remove bolts (2) that hold travel motor (1) to the final drive.
2/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. Illustration 2 g00659674
3. Fasten two suitable lifting straps and a suitable lifting device to travel motor (1). The weight
of travel motor (1) is approximately 54 kg (120 lb). Carefully remove travel motor (1) from
the final drive.
Illustration 3 g00676009
4. Remove O-ring seal (3) from the travel motor.
Illustration 4 g00659679
3/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Illustration 5 g00659682
5. Fasten Tooling (A) and a suitable lifting device to the final drive, and turn the final drive on
the side. The weight of the final drive is 500 kg (1100 lb).
6. Remove plug (4).
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
7. Drain the oil from the final drive into a suitable container for storage or disposal. Refer to
Operation and Maintenance Manual, "Capacities (Refill)" for the capacity. Refer to
Operation and Maintenance Manual, "Final Drive Oil - Change" for the proper procedure.
8. Reinstall plug (4).
4/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 6 g00659729
9. Position the final drive onto suitable blocking, as shown.
10. Remove the sprocket bolts (5) from final drive sprocket (6).
Illustration 7 g00659738
11. Use a suitable lifting device to remove final drive sprocket (6). If necessary, use a soft faced
hammer in order to unseat the sprocket.
12. The weight of the final drive sprocket is 91 kg (200 lb).
Illustration 8 g00659746
5/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
26. 13. Remove bolts (7) that hold cover (8) in place.
Illustration 9 g01391477
14. Use Tooling (T) to elevate cover (8). This will allow enough clearance for your fingers in
order to lift cover (8) off the final drive.
15. Remove cover (8).
16. If necessary, remove the spacer (Not Shown) from cover (8).
Illustration 10 g01391490
17. Remove carrier assembly (9).
18. Disassemble carrier assembly (9), as follows:
6/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
27. Illustration 11 g01391499
a. Use Tooling (B) to remove retaining ring (10).
Illustration 12 g01391503
b. Use a soft faced hammer in order to remove planetary gear assembly (11).
Note: Rotate the planetary gear assembly so that the gear assembly comes off
perpendicular to the carrier shaft.
c. Disassemble planetary gear assembly (11), as follows.
Illustration 13 g01391501
7/27(W)
w
2020/8/20
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...