This document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1) Removing the final drive assembly and marking parts for reinstallation.
2) Disassembling components like gears, bearings, and seals.
3) Cleaning all parts thoroughly before assembly to prevent dirt entry.
4) Assembling components and pressing bearings using a press and spacer to apply proper load.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 329 d excavator (prefix yfw) service repair manual (yfw00001 ...fkjsekksmem
This document provides instructions for disassembling and assembling the final drive of a 329D or 329D L excavator. It lists 37 steps for disassembly, removing components like gears, shafts, bearings and seals. The assembly section outlines 15 steps, including pressing bearings into place, installing seals, and using shims to set the proper bearing preload when mounting the main housing onto the motor housing. Cleanliness is emphasized throughout as important for preventing contamination.
This document provides instructions for removing the rear power take-off (RPTO) from a C7.1 engine. It outlines 10 steps to remove gears, hubs, adapters and other components from the flywheel housing. These include removing bolts, gears, seals and sleeve bearings from housings, gears and adapters. Special tools and marks are recommended to ensure correct reinstallation. Cleaning and inspection of removed parts is also specified.
Caterpillar cat 325 c fm excavator (prefix g1l) service repair manual (g1l000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 325C FM excavator. The disassembly procedure involves 31 steps to remove all components of the final drive. The assembly procedure involves 18 steps including pressing bearings into housings, installing seals, and measuring clearances using specialized tools to ensure proper assembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 323 e l excavator (prefix tdw) service repair manual (tdw0000...fjskefkemms
This document provides assembly and disassembly instructions for a swing drive on excavator models 323E L, 323E LN, and 323E SA. It includes 21 steps for disassembly and 18 steps for assembly. Key steps include using retaining ring pliers and pullers to remove gears, carriers, shafts, and seals from the housing. Assembly involves pressing components back into place, applying threadlocker, and torquing bolts to specifications. The document provides detailed illustrations and lists required tools for each step.
The document provides assembly instructions for installing a swing gear and bearing on an excavator. It lists required tools and parts. The procedure involves cleaning the swing gear and bearing, applying lubricant and sealant, lifting it into position using links, and securing it with bolts torqued to specification. Inner and outer dust seals are installed in seal grooves before completing reassembly of the undercarriage frame.
Caterpillar cat 319 d l excavator (prefix rjp) service repair manual (rjp0000...fjkskedmme
The document provides instructions for disassembling and assembling a final drive on a 319D L and 319D LN excavator. The disassembly procedure involves removing 33 individual parts from the final drive including the cover, carrier assembly, ring gears, and main housing. The assembly procedure instructs installing 31 of the parts back into the final drive in reverse order and provides details on properly preloading the bearings and determining the correct shim thickness.
Caterpillar cat 349 f l excavator (prefix kea) service repair manual (kea0000...fjjskekdmme
The document provides instructions for disassembling and assembling the travel motor of a 349F L excavator. It describes 31 steps to disassemble the travel motor by removing components like plugs, springs, pistons, and bearings. It then describes 28 steps to reassemble the travel motor by reversing the disassembly steps and ensuring components like seals, pins, and bearings are properly installed using the specified tools and torques. Safety notices are included throughout to warn of potential injury from released springs or flying parts during disassembly and assembly.
Caterpillar cat 323 d ln excavator (prefix cyd) service repair manual (cyd000...fjjsekmsmmes
This document provides instructions for disassembling and assembling the final drive of 323D LN and 323D S excavators. It involves removing over 30 individual parts in 23 steps, including the carrier assembly, ring gears, main housing, and bearings. Cleanliness is important during disassembly and assembly. O-rings and seals should always be replaced. Parts should be lubricated before assembly and bearings are to be preloaded using a press to the correct thickness of shims.
Caterpillar cat 329 d excavator (prefix yfw) service repair manual (yfw00001 ...fkjsekksmem
This document provides instructions for disassembling and assembling the final drive of a 329D or 329D L excavator. It lists 37 steps for disassembly, removing components like gears, shafts, bearings and seals. The assembly section outlines 15 steps, including pressing bearings into place, installing seals, and using shims to set the proper bearing preload when mounting the main housing onto the motor housing. Cleanliness is emphasized throughout as important for preventing contamination.
This document provides instructions for removing the rear power take-off (RPTO) from a C7.1 engine. It outlines 10 steps to remove gears, hubs, adapters and other components from the flywheel housing. These include removing bolts, gears, seals and sleeve bearings from housings, gears and adapters. Special tools and marks are recommended to ensure correct reinstallation. Cleaning and inspection of removed parts is also specified.
Caterpillar cat 325 c fm excavator (prefix g1l) service repair manual (g1l000...fjkskedmme
This document provides instructions for disassembling and assembling the final drive of a 325C FM excavator. The disassembly procedure involves 31 steps to remove all components of the final drive. The assembly procedure involves 18 steps including pressing bearings into housings, installing seals, and measuring clearances using specialized tools to ensure proper assembly. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar cat 323 e l excavator (prefix tdw) service repair manual (tdw0000...fjskefkemms
This document provides assembly and disassembly instructions for a swing drive on excavator models 323E L, 323E LN, and 323E SA. It includes 21 steps for disassembly and 18 steps for assembly. Key steps include using retaining ring pliers and pullers to remove gears, carriers, shafts, and seals from the housing. Assembly involves pressing components back into place, applying threadlocker, and torquing bolts to specifications. The document provides detailed illustrations and lists required tools for each step.
The document provides assembly instructions for installing a swing gear and bearing on an excavator. It lists required tools and parts. The procedure involves cleaning the swing gear and bearing, applying lubricant and sealant, lifting it into position using links, and securing it with bolts torqued to specification. Inner and outer dust seals are installed in seal grooves before completing reassembly of the undercarriage frame.
Caterpillar cat 319 d l excavator (prefix rjp) service repair manual (rjp0000...fjkskedmme
The document provides instructions for disassembling and assembling a final drive on a 319D L and 319D LN excavator. The disassembly procedure involves removing 33 individual parts from the final drive including the cover, carrier assembly, ring gears, and main housing. The assembly procedure instructs installing 31 of the parts back into the final drive in reverse order and provides details on properly preloading the bearings and determining the correct shim thickness.
Caterpillar cat 349 f l excavator (prefix kea) service repair manual (kea0000...fjjskekdmme
The document provides instructions for disassembling and assembling the travel motor of a 349F L excavator. It describes 31 steps to disassemble the travel motor by removing components like plugs, springs, pistons, and bearings. It then describes 28 steps to reassemble the travel motor by reversing the disassembly steps and ensuring components like seals, pins, and bearings are properly installed using the specified tools and torques. Safety notices are included throughout to warn of potential injury from released springs or flying parts during disassembly and assembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Caterpillar cat 345 c l excavator (prefix wde) service repair manual (wde0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing 28 parts in 28 steps, including removing the final drive cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure involves installing 29 parts in 29 steps in the reverse order, adjusting bearing preload using shims, and applying anti-seize compound and thread lock to ensure proper assembly. Tools such as retaining ring pliers, eyebolts, and a transmission stand are required.
Caterpillar cat 345 c l excavator (prefix spc) service repair manual (spc0000...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with disassembly steps including removing the head, pins, plates, seals, brake piston, separator plates, disks, and rotating group. It then details removing components from the rotating group like the shaft assembly, bearings, and piston assemblies. The assembly section provides steps to reinstall these components in reverse order and includes precautions like cleaning, applying lubricant, and ensuring proper orientation of parts.
More Related Content
Similar to Caterpillar cat 325 d l excavator (prefix pke) service repair manual (pke00001 and up)
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Similar to Caterpillar cat 325 d l excavator (prefix pke) service repair manual (pke00001 and up) (20)
Caterpillar cat 345 c l excavator (prefix wde) service repair manual (wde0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing 28 parts in 28 steps, including removing the final drive cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure involves installing 29 parts in 29 steps in the reverse order, adjusting bearing preload using shims, and applying anti-seize compound and thread lock to ensure proper assembly. Tools such as retaining ring pliers, eyebolts, and a transmission stand are required.
Caterpillar cat 345 c l excavator (prefix spc) service repair manual (spc0000...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with disassembly steps including removing the head, pins, plates, seals, brake piston, separator plates, disks, and rotating group. It then details removing components from the rotating group like the shaft assembly, bearings, and piston assemblies. The assembly section provides steps to reinstall these components in reverse order and includes precautions like cleaning, applying lubricant, and ensuring proper orientation of parts.
Caterpillar cat 345 c l excavator (prefix scn) service repair manual (scn0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C L excavator. The disassembly process involves removing over 20 individual parts from the final drive including the cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly section outlines installing new seals, pressing in bearing cups, adjusting shims to set proper bearing preload, and reinstalling all parts in reverse order. Precise positioning of stamped identification marks on gears is required for correct reassembly.
Caterpillar cat 345 c l excavator (prefix s5m) service repair manual (s5m0000...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C L excavator. The disassembly procedure involves removing over 20 components of the final drive including the cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure instructs to clean all parts, apply anti-seize compound, install bearing cups and cones, and adjust the bearing preload using shims to achieve the proper load. Precise positioning of identification marks is required to reinstall parts in their original locations.
Caterpillar cat 345 c hydraulic excavator (prefix tdg) service repair manual ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It lists 31 steps for disassembly, removing components like the head, plates, seals, pistons, and housing pieces. It then lists 13 steps for assembly, replacing components in reverse order and noting to clean all parts, apply lubricant, and measure clearances during assembly to ensure proper operation. Tools required are listed for both disassembly and assembly.
Caterpillar cat 345 c excavator (prefix wde) service repair manual (wde00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of a 345C excavator. The disassembly procedure involves removing 28 parts in 28 steps, including removing the final drive cover, ring gear, carrier assemblies, planetary gears, and sprocket housing. The assembly procedure involves installing 29 parts in 29 steps in the reverse order, adjusting bearing preload using shims, and applying anti-seize compound and thread lock to ensure proper assembly. Tools such as retaining ring pliers, eyebolts, and a transmission stand are required.
Caterpillar cat 345 c excavator (prefix spc) service repair manual (spc00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with disassembly steps including removing the head, pins, plates, seals, brake piston, separator plates, disks, and rotating group components. Assembly steps are then listed in reverse order and include installing seals, spacers, piston assemblies, springs and other components back into the travel motor housing. Precautions are given such as cleaning parts and applying lubricant before assembly.
Caterpillar cat 345 c excavator (prefix dhp) service repair manual (dhp00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling a travel motor. It begins with removing external components like the displacement change valve and head. Internal components like the brake piston, disks, and rotating group are then removed. Individual parts in the rotating group like the piston assemblies and barrel are also taken apart. Precise identification and reinstallation of parts is emphasized. The assembly section provides instructions for reinstalling components in reverse order and ensuring proper placement and torque of parts.
Caterpillar cat 345 b series ii excavator (prefix dcw) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing the cylinder head on a 345B Series II Excavator with a 3176 engine. The removal procedure involves disconnecting sensors, tubes, wiring harnesses, and fuel filters before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning surfaces, installing new gaskets and seals, tightening bolts in a specific sequence, and reconnecting all components in reverse order. Tools required include wrenches, taps, and a strap wrench.
Caterpillar cat 345 b series ii excavator (prefix ccc) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing the cylinder head on a 345B Series II Excavator with a 3176C engine. The removal process involves disconnecting various sensors and tubes, removing bolts, and lifting the cylinder head off. The installation involves cleaning surfaces, installing new gaskets and seals, lifting the cylinder head into place, and torquing the head bolts to the specified sequence and values. Proper cleaning, lubrication, and torque procedures are emphasized to ensure correct installation.
Caterpillar cat 345 b series ii excavator (prefix ald) service repair manual ...fjsekdmmeed
This document provides instructions for removing and installing a lifter group on a 3176C engine. The removal process involves taking out bolts and separating the lifter assembly into sections to remove individual components like brackets, lifters and injector lifters. The installation is the reverse of removal, requiring cleaning of parts and reinstallation in the proper order and orientation. Precautions are provided to contain fluids and dispose of them according to regulations.
Caterpillar cat 345 b l excavator (prefix 9cw) service repair manual (9cw0000...fjsekdmmeed
This document provides instructions for removing and installing a cylinder head on a Caterpillar 345B L excavator engine. It details removing components like the valve mechanism cover, rocker shaft, and pushrods. It then explains how to remove the cylinder head by disconnecting sensors and tubes, and removing bolts. Reinstallation involves cleaning surfaces, installing new gaskets and seals, tightening bolts in a specific sequence, and reconnecting all removed components and hoses. Tools required are also listed.
Caterpillar cat 345 b l excavator (prefix 8rw) service repair manual (8rw0000...fjsekdmmeed
The document provides instructions for removing and installing a cylinder head and lifter group on a Caterpillar 345B L EXCAVATOR engine. It describes disconnecting various engine components and sensors, removing bolts and gaskets, and lifting the cylinder head off the engine block. It then details cleaning surfaces, installing new gaskets and seals, bolting the head back onto the block, and reconnecting all components in reverse order. Proper torque specifications are provided for all fasteners.
Caterpillar cat 345 b excavator (prefix ayr) service repair manual (ayr00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the final drive of an excavator model 345B. It describes removing components such as the travel motor, final drive, ring gear, and carrier assemblies. Detailed steps are provided to disassemble each assembly into individual parts. The assembly section instructs cleaning and inspecting parts, applying anti-seize compound, and installing components in reverse order using lifting tools and following markings made during disassembly. Proper bearing preload is set by measuring clearance with shims.
Caterpillar cat 345 b excavator (prefix amn) service repair manual (amn00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 345B. It lists 31 steps to disassemble parts like the head, plates, seals, pistons, and housing. It then lists 27 steps to reassemble these parts in reverse order, making sure to clean parts and apply lubricant. Proper installation of seals, washers, and keys is emphasized.
Caterpillar cat 345 b excavator (prefix amj) service repair manual (amj00001 ...fjsekdmmeed
This document provides assembly instructions for installing a travel motor on a 345B Excavator. It outlines 33 steps to assemble parts like seals, pistons, plates, and shafts inside the travel motor housing. It then describes 4 steps to install the assembled travel motor onto the final drive, including cleaning surfaces, replacing an O-ring seal, and using lifting tools to maneuver the motor into position. Proper torque specifications are given for tightening fasteners.
Caterpillar cat 345 b excavator (prefix amd) service repair manual (amd00001 ...fjsekdmmeed
This document provides assembly instructions for a travel motor on a 345B Excavator. It outlines 33 steps to assemble internal components like pistons, seals, plates and housing pieces. Measurement checks are included to ensure correct assembly. The instructions also cover installing the assembled travel motor by cleaning mating surfaces, replacing an O-ring seal, and using lifting tools to slide the motor into position in the final drive housing.
Caterpillar cat 345 b excavator (prefix 8kw) service repair manual (8kw00001 ...fjsekdmmeed
This document provides instructions for removing and installing a cylinder head on a 345B excavator engine. It includes 14 steps to remove the head, such as removing sensors, tubes, and bolts. The 20 step installation procedure describes cleaning surfaces, installing gaskets and seals, tightening bolts in a specific sequence, and reconnecting related components like sensors and tubes. Special tools are listed for tasks like removing the fuel filter. Cautions are provided about containing fluids and keeping parts clean to prevent damage and wear.
Caterpillar cat 345 b excavator (prefix 6mw) service repair manual (6mw00001 ...fjsekdmmeed
The document provides instructions for disassembling and assembling the travel motor of an excavator model 345B. It lists the required tools and parts. The disassembly instructions include removing components like the brake cover, brake assembly, springs, gears, and barrel assembly. The assembly instructions list installing components like bushings, bearings, seals and rings in reverse order of disassembly. Safety notices are provided to keep parts clean and prevent hydraulic system contamination.
Caterpillar cat 340 f excavator (prefix sgh) service repair manual (sgh00001 ...fjsekdmmeed
This document provides instructions for disassembling and assembling the swing drive of a 340F Excavator. The disassembly procedure involves removing 27 parts from the swing drive including the cover, sun gear, carrier assembly, planetary gears, ring gear, and pinion shaft. The assembly procedure instructs installing lip seals and bearings on the cage and pinion shaft and pressing the cage into the swing drive housing.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
2. Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
Start By:
a. Start by removing the final drive. Refer to Disassembly and Assembly, "Final Drive -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A). The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1).
3/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
Illustration 3 g00892888
5. Remove bolts (3) and gear (4). Check plate (6). Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2).
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5).
4/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 5 g00892930
7. Remove gear (8) and spacer (9).
Illustration 6 g00892965
8. Use Tooling (C) to remove retaining ring (10). Remove washer (11) and gear (12). Remove
bearing assembly (13) and washer (14).
9. Repeat Step 8 for the other two gear assemblies.
Illustration 7 g00892968
10. Remove retaining ring (15).
5/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 8 g00892975
11. Remove carrier assembly (16).
Illustration 9 g01389804
12. Use a suitable press to remove the shafts from carrier assembly (16).
Illustration 10 g00892977
6/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 13. Remove gear (17) and spacer (18).
Illustration 11 g00892997
14. Use Tooling (D) and a suitable lifting device to remove planetary carrier (19). The weight of
planetary carrier (19) is approximately 48 kg (105 lb).
Illustration 12 g00893019
15. Remove retaining ring (21). Lift planetary carrier (19) off sun gear (20).
Illustration 13 g00896860
16. Drive spring pin (23) into planetary shaft (22).
7/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 14 g00893043
17. Remove planetary shaft (22). Use a suitable punch to remove spring pin (23) from planetary
shaft (22).
Illustration 15 g00896863
18. Remove washers (24) and bearing (25) from planetary gear (26).
19. Repeat Steps 16 through 18 for the other two planetary gears.
Illustration 16 g01842853
20. Remove gear (27). Remove spacer (27A).
8/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 17 g01842974
21. Use two people to remove carrier assembly (28). The weight of carrier assembly (28) is
approximately 38 kg (85 lb).
Illustration 18 g01843140
22. Drive spring pin (30) into shaft (29).
Illustration 19 g00893658
23. Remove shaft (29). Use a suitable punch to remove spring pin (30) from shaft (29).
9/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 20 g00893674
24. Remove washers (31) and bearings (32) from planetary gear (33).
25. Repeat Steps 22 through 24 for the other three planetary gears.
Illustration 21 g01208300
26. Fasten Tooling (E) and a suitable lifting device to ring gear (34), as shown. Remove ring
gear (34) from sprocket housing (35). The weight of ring gear (34) is approximately 66 kg
(146 lb).
Illustration 22 g01208542
10/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. 27. Remove O-ring seal (36) from sprocket housing (35).
Illustration 23 g01208553
28. Remove bolts (37) from coupling gear (38).
Illustration 24 g01208572
29. Install suitable forcing bolts (39) in coupling gear (38). Tighten the forcing bolts evenly in
order to loosen coupling gear (38). Remove the coupling gear from the motor housing.
Illustration 25 g01208578
11/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 26 g01208625
30. Remove shims (40) from the motor housing.
Note: Inner cones and outer bearing cones (42) are a slip fit on the motor housing. While
you remove sprocket housing (35) from the motor housing, inner bearing cone (42) may
stay with the sprocket housing or the inner bearing cone may stay on the motor housing.
31. Fasten Tooling (F) and a suitable lifting device to sprocket housing (35). Separate the
sprocket housing from the motor housing. The weight of sprocket housing (35) is
approximately 109 kg (240 lb).
Illustration 27 g01208626
32. Remove the locating pins from the motor housing.
33. Remove Duo-Cone seal (41) from the motor housing.
34. If inner bearing cone (42) remained on the motor housing, then remove the inner bearing
cone.
12/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 28 g01208633
35. Remove Duo-Cone seal (43) from the sprocket housing.
36. If inner bearing cone (42) remained on the sprocket housing, then remove the inner bearing
cone.
37. Remove the bearing cups from the sprocket housing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Jun 19 10:58:39 UTC+0800 2020
13/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D EXCAVATOR PKE
Configuration: 325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03949150
Final Drive - Assemble
SMCS - 4050-016
S/N - A3R1-UP
S/N - AZP1-UP
S/N - BFC1-UP
S/N - BYS1-UP
S/N - CZF1-UP
S/N - DBH1-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC1-UP
S/N - GBR1-UP
S/N - GPB1-UP
S/N - GPK1-UP
S/N - JAT1-UP
S/N - JHJ1-UP
S/N - JJG1-UP
1/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
D 138-7574 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H 5P-3931 Anti-Seize Compound
F 1U-8846 Gasket Sealant
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counterbore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
3/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8818.5 lb) on
the bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2204.6 ± 220.5 lb).
e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y) .
4/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of the coupling gear (26) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this Dimension (X) .
g. The thickness of the shims is equal to (X - Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18) . Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
5/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28) .
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30) .
10. Install alignment pins (30) .
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26) .
6/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
7/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 10 g00708187
13. Install gear (26) .
14. Install bolts (25) in gear (26) . Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18) .
Illustration 12 g00708175
16. Assemble carrier assembly (15) , as follows.
8/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23) .
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
9/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15) . Fasten a 12.7 mm (0.50
inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b) .
22. Install ring gear (17a) on ring gear (17b) .
10/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17) , as shown. Install the ring gears to main
housing (18) . The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
11/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. 25. Install sun gear (14) in carrier assembly (15) .
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7) , as follows.
a. Install bearing (12) in planetary gear (13) .
b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
12/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7) .
30. Install spacer (6) in carrier assembly (7) .
13/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2) . Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2) .
34. Apply Tooling (F) to the mating surface of the ring gear.
14/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...