The document provides instructions for disassembling a final drive on an excavator. It lists required tools and a multi-step process involving removing bolts, gears, carriers, shafts, seals, and other components. Cleanliness is important to prevent dirt from entering during disassembly. Parts must be marked for proper reinstallation. Weights of removed parts are provided.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
2. Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 154-6181 Forcing Screw 1
D 138-7574 Link Bracket 2
E
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
F 1U-8846 Gasket Sealant 1
Start By:
a. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and
final drive sprocket is approximately 312 kg (688 lb).
3/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. 3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. The weight of cover (2) is approximately 32 kg (70 lb). Remove cover
(2).
Illustration 3 g00708091
5. Remove thrust plate (3) from cover (2).
6. Remove plugs (4) from cover (2).
4/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 4 g00708235
7. Remove O-ring seals (5) from both plugs (4) that were in the cover.
Illustration 5 g00708092
8. Remove spacer (6) from carrier assembly (7).
9. Remove sun gear (8) from carrier assembly (7).
10. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of
carrier assembly (7) is approximately 14 kg (30 lb).
Illustration 6 g01304883
11. Disassemble carrier assembly (7), as follows.
a. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
5/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 7 g00708144
b. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.
c. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.
Illustration 8 g00708218
d. Remove thrust washers (11) and planetary gear (13) from the carrier assembly.
e. Remove bearing (12) from planetary gear (13).
12. Repeat Steps 11.a through 11.e in order to remove the remaining planetary gears from the
carrier assembly.
6/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g00708162
13. Remove sun gear (14) from carrier assembly (15).
Illustration 10 g00708325
14. Remove spacer (16).
Illustration 11 g00708184
Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to
install the lifting slings.
15. Fasten a suitable lifting device to ring gears (17), as shown. Remove the ring gears from
main housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
7/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 12 g00708360
16. Use a screwdriver or a chisel in order to separate the two ring gears (17).
Note: The two ring gears are held together with Tooling (F). It may be necessary to heat the
ring gears in order to soften the sealant. Do not heat over 135 °C (275 °F) for more than
thirty minutes.
Illustration 13 g00708172
17. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15).
18. Fasten a suitable lifting device to the shackle.
19. Slowly lift carrier assembly (15) from the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Disassemble carrier assembly (15), as follows.
Illustration 14 g00708175
a. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
8/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 15 g00708370
Illustration 16 g00708220
b. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.
c. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.
d. Remove thrust washers (21) and planetary gear (23) from the carrier assembly.
e. Remove bearings (22) from planetary gear (23).
21. Repeat Steps 20.a through 20.e in order to remove the remaining planetary gears from the
carrier.
9/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 17 g00708186
22. Remove O-ring seal (24) from main housing (18).
Illustration 18 g00708187
23. Remove bolts (25) from gear (26).
Illustration 19 g00708202
24. Use Tooling (C) in order to remove gear (26) from main housing (18).
Note: The motor housing will separate from the main housing (18) once gear (26) is
removed. Make sure that the motor housing is supported.
10/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 20 g00708211
25. Remove shims (27) from the main housing.
Illustration 21 g00708212
26. Fasten Tooling (D) and a suitable lifting device to main housing (18), as shown.
27. Use a hammer and a punch in order to separate main housing (18) and the final drive
sprocket from the motor housing (28). The combined weight of main housing (18) and the
final drive sprocket is approximately 82 kg (180 lb).
Illustration 22 g00708214
28. Remove Duo-Cone seal (29) from motor housing (28).
29. Remove alignment pins (30).
11/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 23 g00708215
Illustration 24 g00708216
30. Remove Duo-Cone seal (31) from main housing (18).
31. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.
32. If necessary, remove the final drive sprocket from the main housing.
33. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Jul 12 07:05:21 UTC+0800 2020
12/12
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 324D L EXCAVATOR JJG
Configuration: 324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i02783051
Final Drive - Disassemble
SMCS - 4050-015
S/N - A3R1-1021
S/N - AZP1-UP
S/N - DBH1-UP
S/N - EJC1-643
S/N - GBR1-UP
S/N - GPB1-801
S/N - JJG1-813
S/N - KBE1-UP
S/N - LAB1-415
S/N - LAL1-250
S/N - MCL1-201
S/N - NAC1-250
S/N - PAL1-UP
S/N - PKE1-814
S/N - SCR1-774
S/N - SYM1-617
1/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. S/N - T2D1-322
S/N - T2S1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 194-3878 Spanner Socket 1
E 138-7574 Link Bracket 2
F
5F-7366 Forcing Screw 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
G
1U-7600 Slide Hammer Puller Gp 1
8T-0266 Bolt 1
Start By:
a. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
Note: Some of the images that are in this procedure do not show the sprocket assembly that
is attached to the final drive housing. If necessary, the weights that are given include the
weight of the sprocket assembly.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the part's original locations.
2/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The weight of the final drive assembly is
approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from the cover. Fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. Remove the cover. The weight of the cover is approximately 32 kg
(70 lb).
Illustration 3 g00879362
3/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. 5. Remove bolts (3). Remove gear (5). Check plate (6). Replace plate (6) if wear is shown.
Remove plugs (4) from cover (2).
Illustration 4 g00879365
6. Remove O-ring seal (7) from plugs (4).
Illustration 5 g00780428
7. Remove gear (8). Remove spacer (9).
Illustration 6 g00780432
4/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 8. Remove retaining ring (10) with Tooling (C). Remove washer (11). Remove gear (12).
Remove bearing assembly (13). Remove second washer (11).
9. Repeat Step 8 for the remaining two gear assemblies.
Illustration 7 g00781401
10. Remove retaining ring (14).
Illustration 8 g00781407
11. Remove carrier assembly (15).
5/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 9 g01389593
12. Use a suitable press in order to remove the shafts from carrier assembly (15).
Illustration 10 g00781412
13. Remove gear (16). Remove spacer (17).
Illustration 11 g00781466
6/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. 14. Remove retaining ring (18).
15. Remove carrier assembly (19).
Illustration 12 g00879368
16. Disassemble carrier assembly (19), as follows.
a. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Illustration 13 g00781476
b. Remove planetary shaft (21).
c. Remove spring pin (20) from planetary shaft (21) with a hammer and a punch.
7/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 14 g00781516
d. Remove thrust washers (22) and planetary gear (24) from the carrier assembly.
e. Remove bearing (23) from planetary gear (24).
17. Repeat Steps 16.a through 16.e for the other two planetary.
Illustration 15 g00781529
18. Remove gear (25). Remove spacer (26).
Illustration 16 g00781559
19. Remove carrier assembly (27).
20. Use two people to remove carrier assembly (27). The weight of the carrier assembly is
approximately 38 kg (85 lb).
21. Disassemble carrier assembly (27), as follows.
8/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 17 g00781719
a. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
Illustration 18 g00781601
b. Remove planetary shaft (28).
c. Remove spring pin (29) from planetary shaft (28) with a hammer and a punch.
Illustration 19 g00781607
d. Remove thrust washers (30) and planetary gear (32) from the carrier assembly.
e. Remove two bearings (31) from the planetary gear.
9/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 22. Repeat Steps 21.a through 21.e for the other two planetary gears.
Illustration 20 g00781730
23. Use two people to remove gear (33). The weight of gear is approximately 41 kg (90 lb).
Illustration 21 g00781807
24. Remove O-ring seal (34).
Illustration 22 g01147650
25. Remove bolts (35A) and plates (35B).
10/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 23 g01147651
26. Use Tooling (G) to remove dowel (37) from stopper plate (35).
Illustration 24 g01147759
27. Secure Tooling (D) to stopper plate (35). Use Tooling (D) to remove stopper plate (35).
Illustration 25 g01147930
28. Use Tooling (E) and a suitable lifting device to remove housing (36). The weight of housing
(36) is approximately 100 kg (220 lb).
11/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 26 g01147951
29. Remove Duo-Cone seal (39A) from housing (38).
Illustration 27 g01147975
Illustration 28 g01147934
30. Remove Duo-Cone seal (39B) from housing (36).
31. Use Tooling (F) in order to remove bearings (40) and (41) from housing (36).
32. If necessary, remove the final drive sprocket from the sprocket housing. Refer to
Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
12/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engi...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 324D L EXCAVATOR JJG
Configuration: 324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03508206
Final Drive - Disassemble
SMCS - 4050-015
S/N - A3R1022-UP
S/N - BFC1-UP
S/N - BYS1-UP
S/N - CYW1-UP
S/N - CZF1-UP
S/N - DBH380-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC644-UP
S/N - GPB802-UP
S/N - J8D1-UP
S/N - J9D1-UP
S/N - JAT1-UP
S/N - JHJ1-UP
S/N - JJG814-UP
1/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
Start By:
a. Start by removing the final drive. Refer to Disassembly and Assembly, "Final Drive -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A). The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1).
3/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
Illustration 3 g00892888
5. Remove bolts (3) and gear (4). Check plate (6). Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2).
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5).
4/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
29. Illustration 5 g00892930
7. Remove gear (8) and spacer (9).
Illustration 6 g00892965
8. Use Tooling (C) to remove retaining ring (10). Remove washer (11) and gear (12). Remove
bearing assembly (13) and washer (14).
9. Repeat Step 8 for the other two gear assemblies.
Illustration 7 g00892968
10. Remove retaining ring (15).
5/13
324D L Hydraulic Excavator JJG00001-UP (MACHINE) POWERED BY C-7 Engine...
2020/7/12
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...