This document provides the disassembly and assembly procedures for a travel motor in a 324D or 324D L excavator. The disassembly procedure involves 28 steps to remove components from the travel motor including the head, springs, plates, seals, pistons, bearings and housing cover. The assembly procedure reverses the disassembly steps and provides notes on cleaning, lubricating and installing components in their proper positions and orientations. Tools required for disassembly and assembly are also listed.
VAT Registration Outlined In UAE: Benefits and Requirementsuae taxgpt
Â
Vat Registration is a legal obligation for businesses meeting the threshold requirement, helping companies avoid fines and ramifications. Contact now!
https://viralsocialtrends.com/vat-registration-outlined-in-uae/
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
Â
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Attending a job Interview for B1 and B2 Englsih learnersErika906060
Â
It is a sample of an interview for a business english class for pre-intermediate and intermediate english students with emphasis on the speking ability.
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Â
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1‪(218) 203-5951‬
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Â
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Â
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
Â
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
Â
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
2. Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
1U-7506 Adapter 1
8T-4244 Nut 6
8T-4223 Hard Washer 6
- Threaded RodM12 x 1.75 by 250 mm (10 in) long 1
B
8T-0651 Bolt 1
8T-4167 Hard Washer 1
C 3E-3882 Eyebolt 1
D 1P-1859 Retaining Ring Pliers 1
E
1P-0510 Driver Gp 1
9S-9152 Bearing Puller Gp 1
F 1P-1861 Retaining Ring Pliers 1
Start By:
A. Remove the travel motor. Refer to Disassembly and Assembly, "Travel Motor - Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Dealer Service
Tool Catalog" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
3/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. 1. Thoroughly clean the outside of the travel motor prior to disassembly.
2. Fasten the travel motor in Tooling (A) in a vertical position. The weight of the travel motor
is approximately 60 kg (132 lb).
3. Put an alignment mark across the head and the body of the travel motor for assembly
purposes. The head must be reinstalled in the head's original position on the body of the
travel motor.
Illustration 1 g00887295
Note: During the removal of head (2) from the travel motor, be careful not to damage the
mating surfaces of the components.
Spring force can cause personal injury or death.
Do not repair until you have read the Operation and Maintenance
Manual.
4. Remove bolts (1) .
5. Remove head (2) from the body of the travel motor.
4/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Illustration 2 g00887302
6. Remove O-ring seal (3) , port plate (4) , and bearing (5) .
Illustration 3 g00887311
7. Remove O-ring seals (6) . Remove springs (7) .
Illustration 4 g00887331
5/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Illustration 5 g00890074
This is an example of the use of Tooling (B) .
8. Place a shop towel over brake piston (8) . Retain brake piston (8) with Tooling (B) . Apply
approximately 525 kPa (75 psi) of shop air pressure to brake release Port (Y) . Make sure
that the shop air pressure is free of water. Brake piston (8) will move up the piston guide,
and out of the piston guide. Remove brake piston (8) from the body of the travel motor.
Illustration 6 g00887336
9. Remove seal (9) and backup ring (10) from the brake piston.
10. Remove seal (11) and backup ring (12) from the brake piston.
6/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. Illustration 7 g00887355
11. Remove plates (13) and friction discs (14) .
Illustration 8 g00887401
Illustration 9 g00887405
12. Install Tooling (C) into shaft (15) . Use a prybar to remove the rotating assembly (16) from
the housing.
7/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. 13. Remove Tooling (C) from shaft (15) .
Illustration 10 g00887424
14. Remove shaft (15) from rotating assembly (16) .
Illustration 11 g00887426
15. Use Tooling (D) in order to remove retaining ring (17) from shaft (15) .
8/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Illustration 12 g00887445
16. Install shaft (15) into a suitable press. Remove bearing race (18) from the shaft.
Illustration 13 g00887463
17. Rotate shaft (15) . Install shaft (15) into a suitable press. Install Tooling (E) . Remove
bearing race (19) from shaft (15) .
Illustration 14 g00887501
18. Remove cam plate (20) from barrel assembly (21) .
9/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Illustration 15 g00887520
19. Remove piston assemblies and retainer plate (22) from barrel assembly (21) .
Note: Place marks on the pistons and the barrel assembly. The pistons must be returned to
the original position.
Illustration 16 g00887558
20. Remove ball (23) and springs (24) .
10/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. Illustration 17 g00887578
21. Remove bearing (25) .
22. Remove keys (26) and locating pins (not shown) from the body of the travel motor.
Illustration 18 g00887589
23. Rotate the housing. Use Tooling (F) in order to remove retaining ring (27) .
24. Remove seal (28) .
Illustration 19 g00887619
25. Remove bolts (29) and cover (30) .
11/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. Illustration 20 g00887729
26. Remove seal (31) and backup ring (32) .
Illustration 21 g00887754
27. Remove piston actuator (33) and seal (34) .
Illustration 22 g00887762
28. Remove O-ring seal (35) from the housing of the travel motor.
12/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 324D EXCAVATOR JZR
Configuration: 324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03124523
Travel Motor - Assemble
SMCS - 4351-016
S/N - A3R1-UP
S/N - AZP1-UP
S/N - BFC1-UP
S/N - BTK1-UP
S/N - BYS1-UP
S/N - CYW1-UP
S/N - CZF1-UP
S/N - DBH1-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC1-UP
S/N - GBR1-UP
S/N - GPB1-UP
S/N - GPK1-UP
S/N - J8D1-UP
1/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. S/N - WDK1-UP
S/N - WLT1-UP
S/N - XDB1-UP
S/N - YFW1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
1U-7506 Adapter 1
8T-4244 Nut 6
8T-4223 Hard Washer 6
- Threaded Rod M12 x 1.75 X 250 mm (10 in) long 1
C 3E-3882 Eyebolt 1
D 1P-1859 Retaining Ring Pliers 1
E
1P-0510 Driver Gp 1
9S-9152 Bearing Puller Gp 1
F 1P-1861 Retaining Ring Pliers 1
G 9S-3263 Thread Lock Compound -
Note: Replace all O-ring seals and gaskets. Apply a light film of"10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause trouble later. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement. All disassembly and all assembly procedures
must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts
covered and protected at all times.
3/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Illustration 1 g00887762
1. Install O-ring seal (35) onto the housing of the travel motor.
Illustration 2 g00887754
2. Install seal (34) and piston actuator (33) .
Illustration 3 g00887729
3. Install backup ring (32) and seal (31) .
4/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Illustration 4 g00887619
4. Install cover (30) and bolts (29) . Tighten bolts (29) to a torque of 28 ± 7 N·m (21 ± 5 lb ft).
Illustration 5 g00887589
5. Apply Tooling (G) to the mating surface of seal (28) . Use Tooling (E) in order to install
seal (28) .
6. Use Tooling (F) in order to install retaining ring (27) .
5/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Illustration 6 g00887578
7. Rotate the housing.
8. Install keys (26) and locating pins (not shown) into the body of the travel motor.
9. Install bearing (25) .
Illustration 7 g00887558
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
10. Install springs (24) into the barrel. Install ball (23) onto springs (24) .
6/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. Illustration 8 g00887520
11. Install piston assemblies and retainer plate (22) into barrel assembly (21) .
Note: Take note of the mark on the piston assembly and the barrel assembly. The pistons
must be returned to the same position.
Illustration 9 g00887501
12. Install cam plate (20) onto barrel assembly (21) .
7/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Illustration 10 g00888697
13. Install shaft (15) into a suitable press. Install bearing race (19) onto shaft (15) .
Illustration 11 g00887426
14. Rotate shaft (15) in the suitable press. Use Tooling (D) to install retaining ring (17) onto
shaft (15) .
Illustration 12 g00888710
15. Install bearing race (18) onto shaft (15) .
Note: Bearing race (18) must contact retaining ring (17) .
8/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Illustration 13 g00887405
16. Install Tooling (C) into shaft (15) . Install shaft (15) into rotating assembly (16) .
17. Place the pump housing into Tooling (A) .
Illustration 14 g00887401
18. Use Tooling (C) in order to install rotating assembly (16) into the housing.
Illustration 15 g00887501
9/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Illustration 16 g00887578
19. The notches in cam plate (20) must align with keys (26) . The keys are located in the bottom
of the housing of the travel motor.
Illustration 17 g00887355
20. Install plates (13) and friction discs (14) into the housing.
Note: Install the plates and the discs alternately.
10/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
23. Illustration 18 g00887336
21. Install backup ring (12) and seal (11) onto the brake piston.
22. Install backup ring (10) and seal (9) onto the brake piston.
Illustration 19 g00888967
23. Rotate brake piston (8) .
24. Install brake piston (8) into the housing.
Note: Brake piston (8) must be level upon installation. The brake piston must be level in
order to prevent damage to the O-ring seals.
11/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
24. Illustration 20 g00887311
25. Install springs (7) and O-ring seals (6) .
Illustration 21 g00887302
26. Install O-ring seal (3) , port plate (4) , and bearing (5) .
Illustration 22 g00887295
27. Install head (2) onto the body of the travel motor.
12/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
25. Note: During the installation of head (2) onto the travel motor, be careful not to damage the
mating surfaces of the components.
28. Install bolts (1) . Tighten bolts (1) to a torque of 240 ± 40 N·m (177 ± 30 lb ft).
End By: Install the travel motor. Refer to Disassembly and Assembly, "Travel Motor - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Aug 2 09:53:19 UTC+0800 2020
13/13
324D & 324D L Excavators JZR00001-UP (MACHINE) POWERED BY C7 Engin...
2020/8/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...