This document provides instructions for removing and installing a governor and fuel injection control linkage on a Caterpillar 3116 engine. The removal procedure involves disconnecting linkages, removing clips and pins connecting components. Installation requires applying lubricant to seals, connecting linkages using pins and clips, and checking adjustments. Tools including pliers and pins are required.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 322B L EXCAVATOR 1YS
Configuration: 322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine
Disassembly and Assembly
446 and 446B Backhoe Loaders, Lexion 450 Combine, 3114 and 3116 Engines,
IT18F Integrated Toolcarrier, D6M Track-Type Tractor and 928F, 950F and 950G
Wheel Loaders
Media Number -SENR3611-18 Publication Date -01/05/2009 Date Updated -27/05/2009
i01928381
Governor - Remove
SMCS - 1264-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 136-4149 Governor Pliers(1)
1
(1)
This tool is part of the 128-8822 Fuel System and Governor Tool Group.
Start By:
a. Remove the fuel shutoff solenoid. Refer to Disassembly and Assembly, "Fuel Shutoff
Solenoid - Remove and Install".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
1/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00613041
1. Disconnect the governor control cable.
2. Remove oil tube assembly (1). Remove tube assembly (2) and tube assembly for fuel ratio
control (3), if equipped. Plug and cap all connections.
Illustration 2 g00613071
3. Remove clip (4).
2/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 3 g00655975
4. Use Tooling (A) to slide tube assembly (5) into the cylinder head.
Illustration 4 g00613149
5. Remove the clip and use Tooling (A) to remove the clevis pin (6).
Note: Clevis pin (6) must stay with the governor in order to be adjusted.
3/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 5 g00613563
6. Remove bolts (7) and the washers that hold the governor in position.
Illustration 6 g00673182
7. Remove the governor from the engine.
Illustration 7 g00673180
8. Remove O-ring seal (3) on the governor.
Illustration 8 g00672742
4/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 9. Remove the O-ring seal and tube assembly (5) from the cylinder head.
Illustration 9 g00672733
10. Remove O-ring seal (2) on the tube assembly (5).
Illustration 10 g00673178
11. Remove O-ring seal (1) from the cylinder head.
Note: For more information on the governor, refer to Service Manual, SENR6454, "3114, 3116, &
3126 Engine Governors". The Service Manual, SENR6454 requires the use of a 1U-7326
Governor Calibration Bench. For information on reusability of components in the governor, refer
to Guideline For Reusable Parts And Salvage Operations, SEBF8434, "3100 Governor Inspection
and General Information for Mechanical Governor Groups Used in 3114, 3116, and 3126 Engines
Equipped with Mechanical Unit Injectors (MUI)".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 25 13:17:06 UTC+0800 2019
5/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 322B L EXCAVATOR 1YS
Configuration: 322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine
Disassembly and Assembly
446 and 446B Backhoe Loaders, Lexion 450 Combine, 3114 and 3116 Engines,
IT18F Integrated Toolcarrier, D6M Track-Type Tractor and 928F, 950F and 950G
Wheel Loaders
Media Number -SENR3611-18 Publication Date -01/05/2009 Date Updated -27/05/2009
i01928419
Governor - Install
SMCS - 1264-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 136-4149 Governor Pliers(1)
1
B
128-8827 Pin(1)
1
1U-7523 Pin Pilot(1)
1
(1)
This tool is part of the 128-8822 Governor Tool Group.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: For more information on the governor, refer to Service Manual, SENR6454, "3114, 3116, &
3126 Engine Governors". The Service Manual, SENR6454 requires the use of a 1U-7326
Governor Calibration Bench. For information on reusability of components in the governor, refer
to Guideline For Reusable Parts And Salvage Operations, SEBF8434, "3100 Governor Inspection
and General Information for Mechanical Governor Groups Used in 3114, 3116, and 3126 Engines
Equipped with Mechanical Unit Injectors (MUI)".
1/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 1 g00673178
1. Apply lubricant to the new O-ring seal (1). Install new O-ring seal (1) in the cylinder head.
Illustration 2 g00672733
2. Apply lubricant to the new O-ring seal (2). Install new O-ring seal (2) on the tube assembly
(5).
Illustration 3 g00672742
3. Install the O-ring seal and tube assembly (5) in the cylinder head.
2/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 4 g00673180
4. Apply lubricant to the new O-ring seal (3). Install new O-ring seal (3) on the governor.
Illustration 5 g00673182
5. Place the governor in position on the engine.
Illustration 6 g00613563
6. Install the washers and bolts (7) that hold the governor in place.
3/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 7 g00672755
7. Install clevis pin (6) in Tooling (B).
Illustration 8 g00672752
8. Use Tooling (B) to install clevis pin (6) and the clip.
9. Check the fuel setting adjustment. Refer to Testing and Adjusting, SENR5118.
4/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 9 g00655975
10. Use Tooling (A) to slide tube assembly (5) into the governor.
Illustration 10 g00613071
11. Install clip (4).
Illustration 11 g00613041
12. Install oil tube assembly (1). Install tube assembly (2) and tube assembly for fuel ratio
control (3), if equipped. Plug and cap all connections.
13. Install the governor control cable.
End By:
a. Install the fuel shutoff solenoid. Refer to Disassembly and Assembly, "Fuel Shutoff
Solenoid - Remove and Install".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 25 13:18:02 UTC+0800 2019
5/5322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 322B L EXCAVATOR 1YS
Configuration: 322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine
Disassembly and Assembly
446 and 446B Backhoe Loaders, Lexion 450 Combine, 3114 and 3116 Engines,
IT18F Integrated Toolcarrier, D6M Track-Type Tractor and 928F, 950F and 950G
Wheel Loaders
Media Number -SENR3611-18 Publication Date -01/05/2009 Date Updated -27/05/2009
i01928445
Fuel Injection Control Linkage - Remove
SMCS - 1298-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 136-4149 Governor Pliers 1
Start By:
a. Remove the rocker shaft and the pushrods. Refer to Disassembly and Assembly, "Rocker
Shaft and Pushrod - Remove".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/3322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 1 g00613071
1. Remove clip (4). Clip (4) is located between the governor and the cylinder head.
Illustration 2 g00655975
2. Use Tooling (A) to slide tube assembly (5) into the cylinder head.
Illustration 3 g00613149
2/3322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. 3. Remove the clip and use Tooling (A) to remove the clevis pin (6). Clevis pin (6) connects
the governor to the control lever of the fuel injection control linkage.
Note: Clevis pin (6) must stay with the governor in order to be adjusted.
Illustration 4 g00630566
4. Remove bolts (1) and remove fuel injection control linkage (2). Control lever (3) connects
the fuel injection control linkage (2) to the governor.
Note: For information on the inspection procedure for control lever (3), refer to Special
Instruction, REHS0601, "Inspection and Modification of the 102-7459 Fuel Injection
Control Linkage and the 4P-9048 Fuel Injection Control Linkage".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 25 13:18:58 UTC+0800 2019
3/3322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 322B L EXCAVATOR 1YS
Configuration: 322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine
Disassembly and Assembly
446 and 446B Backhoe Loaders, Lexion 450 Combine, 3114 and 3116 Engines, IT18F
Integrated Toolcarrier, D6M Track-Type Tractor and 928F, 950F and 950G Wheel Loaders
Media Number -SENR3611-18 Publication Date -01/05/2009 Date Updated -27/05/2009
i01928573
Fuel Injection Control Linkage - Install
SMCS - 1298-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 136-4149 Governor Pliers(1)
1
B
128-8827 Pin(1)
1
1U-7523 Pin Pilot(1)
1
C 1U-6675 Spring Compressor(1)
6
D 128-8822 Fuel System and Governor Tool Gp 1
(1)
This tool is part of the 128-8822 Governor Tool Group.
1/4322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 1 g00661331
Note: For information on the inspection procedure for control lever (3), refer to Special Instruction,
REHS0601, "Inspection and Modification of the 102-7459 Fuel Injection Control Linkage and the 4P
-9048 Fuel Injection Control Linkage".
1. Loosen setscrews (4) on each bracket.
2. Install fuel control linkage (2) and install bolts (1). Use the following sequence in order to tighten the
bolts.
3. Tighten bracket (A) and (D) to a torque of 12 ± 3 N·m (106 ± 27 lb in).
4. Tighten brackets (B) and (C) to a torque of 12 ± 3 N·m (106 ± 27 lb in).
5. Position brackets (B) and (C) in order to allow free rotation of the fuel control rod.
6. Use a 2.5 mm (0.10 inch) wrench to tighten setscrews (4). Tighten the setscrews to a torque of
3.5 ± 0.2 N·m (31 ± 2 lb in). Do not overtighten the setscrews. Ensure that the control rod rotates
freely.
7. The control rod should rotate freely when a force of 4.4 N (1 lb) or less is applied to control lever
(3).
Illustration 2 g00750163
8. Rotate the unit injectors in order to engage the injector rack bar (5) with the fuel injection control
linkage (2).
Note: If the unit injectors are not installed, refer to the Disassembly and Assembly, "Unit Injector -
Install".
2/4322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. 9. Install Tooling (C) on the unit injectors and compress the springs.
Note: For the procedure to install Tooling (C), refer to Tool Operating Manual, NEHS0610, "Using
the 128-8822 Tool Group on 3114, 3116, and 3126 Engines with Mechanical Unit Injectors (MUI)".
Illustration 3 g00672755
10. Install clevis pin (6) in Tooling (B). Clevis pin (6) attaches the control lever (3) to the governor.
Illustration 4 g00672752
11. Use Tooling (B) to install clevis pin (6) and the clip.
12. Use Tooling (D) to set the unit injector synchronization.
Note: For the procedure to use Tooling (D), refer to Tool Operating Manual, NEHS0610, "Using the
128-8822 Tool Group on 3114, 3116, and 3126 Engines with Mechanical Unit Injectors (MUI)".
13. Remove Tooling (C) from the unit injectors.
3/4322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
19. Illustration 5 g00655975
14. Use Tooling (A) to slide tube assembly (5) into the governor.
Illustration 6 g00613071
15. Install clip (4).
End By:
a. Install the rocker arm assemblies and the pushrods. Refer to Disassembly and Assembly, "Rocker
Shaft and Pushrod - Install".
Copyright 1993 - 2019 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Oct 25 13:19:54 UTC+0800 2019
4/4322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 322B L EXCAVATOR 1YS
Configuration: 322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine
Disassembly and Assembly
446 and 446B Backhoe Loaders, Lexion 450 Combine, 3114 and 3116 Engines,
IT18F Integrated Toolcarrier, D6M Track-Type Tractor and 928F, 950F and 950G
Wheel Loaders
Media Number -SENR3611-18 Publication Date -01/05/2009 Date Updated -27/05/2009
i05919358
Unit Injector - Remove
SMCS - 1290-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 5P-0302 Bar 1
Start By:
A. Remove the rocker shaft and the pushrods. Refer to Disassembly and Assembly, "Rocker
Shaft and Pushrod - Remove".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
1/3322B L Excavator 1YS00001-UP (MACHINE) POWERED BY 3116 Engine(SEBP25...
2019/10/25https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...