1) The document provides step-by-step instructions for disassembling and assembling the final drive of a 315C excavator.
2) Disassembly includes removing 21 components from the final drive housing. Assembly is the reverse of disassembly and requires determining the proper shim thickness to set the rolling torque.
3) Special tools are required and components must be cleaned and lubricated before assembly to ensure proper operation of the reassembled final drive.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...tuzhiyou2
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...jse7039222
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...lituo39419496
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, plates, gears, shafts, seals and bearings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...tuzhiyou2
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...jse7039222
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...lituo39419496
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, plates, gears, shafts, seals and bearings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
JCB 2DX Backhoe Loader Service Repair Manual Instant Download.pdfrishang96299
This service manual provides instructions for servicing the backhoe loader model 2DX. It contains 15 sections covering various systems of the machine including the engine, fuel system, cooling system, brakes, steering, hydraulics, and electrical systems. The excerpt focuses on servicing instructions for the engine, including safety procedures, technical specifications, operating instructions, and steps to drain and fill oil, clean parts, check oil levels, and remove and install engine components.
This document provides instructions for removing and reassembling the final drives on an excavator model 330B. The summary is:
1. The final drive must be disassembled by removing components like the ring gear, carrier assemblies, planetary gears, and seals.
2. To reassemble, components must be cleaned and seals/bearings installed before refitting parts like the carrier assemblies, ring gear, and sprocket in their original positions.
3. Precise measurements and torque specifications must be followed to set bearing preload and install retaining rings and bolts correctly.
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. A new cylinder head gasket is installed when reinstalling the cylinder head. Precautions are given to contain fluids and keep parts clean from contaminants.
Caterpillar Cat 325B L Excavator (Prefix 5BS) Service Repair Manual Instant D...rishang96299
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. When installing, the mating surfaces are cleaned and a new cylinder head gasket is used. Torque values and cleaning contaminants are emphasized.
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals and other internal parts. Precautions are included to properly handle springs and ensure correct positioning of parts during assembly.
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and note proper alignment of parts, use of lubrication and tools.
Caterpillar Cat 324E L Excavator (Prefix TLF) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and provides step-by-step instructions and illustrations for removing and installing each component of the travel motor. The components include the head, port plate, bearings, brake piston, seals, plates, discs, shaft, races, cam plate, piston assemblies, seals, cover, and more. Precautions are provided regarding spring force and proper placement of parts.
Caterpillar Cat 324E L Excavator (Prefix LDG) Service Repair Manual Instant D...rishang96299
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and include lubricating mating surfaces.
Caterpillar Cat 324E L Excavator (Prefix KTE) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
Caterpillar Cat 324E L Excavator (Prefix JCZ) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process is described in 27 steps and involves removing components like the motor head, brake piston, rotating assembly, seals, and bearings. The assembly process reverses the disassembly steps and includes lubricating components and ensuring proper alignment of parts. Tools required include retaining ring pliers, drivers, pullers, and press equipment. Cautions are provided about spring loading and containing fluids during repair work.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process involves removing 28 components from the travel motor including the head, brake piston, plates, springs and seals. The assembly process reverses the disassembly steps and includes lubricating components and ensuring proper alignment of parts like the cam plate keys and piston marks. Special tools are required for tasks like removing races and seals.
This document provides the disassembly and assembly procedures for a 324D LN excavator travel motor. It includes 28 steps for disassembly that remove components like the motor head, seals, plates, discs, bearings, and housing pieces. The 28 steps for assembly install these same components in reverse order and include notes about cleaning, applying lubricant, and ensuring proper positioning of parts. Tools required are also listed.
More Related Content
Similar to Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual Instant Download.pdf
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Similar to Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual Instant Download.pdf (8)
JCB 2DX Backhoe Loader Service Repair Manual Instant Download.pdfrishang96299
This service manual provides instructions for servicing the backhoe loader model 2DX. It contains 15 sections covering various systems of the machine including the engine, fuel system, cooling system, brakes, steering, hydraulics, and electrical systems. The excerpt focuses on servicing instructions for the engine, including safety procedures, technical specifications, operating instructions, and steps to drain and fill oil, clean parts, check oil levels, and remove and install engine components.
This document provides instructions for removing and reassembling the final drives on an excavator model 330B. The summary is:
1. The final drive must be disassembled by removing components like the ring gear, carrier assemblies, planetary gears, and seals.
2. To reassemble, components must be cleaned and seals/bearings installed before refitting parts like the carrier assemblies, ring gear, and sprocket in their original positions.
3. Precise measurements and torque specifications must be followed to set bearing preload and install retaining rings and bolts correctly.
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. A new cylinder head gasket is installed when reinstalling the cylinder head. Precautions are given to contain fluids and keep parts clean from contaminants.
Caterpillar Cat 325B L Excavator (Prefix 5BS) Service Repair Manual Instant D...rishang96299
This document provides instructions for removing and installing a cylinder head on a 325B L excavator powered by a 3116 engine. The removal procedure involves removing several other components first, like the fuel filter base and injectors. To remove the cylinder head, lifting devices are attached and bolts holding it to the cylinder block are removed. When installing, the mating surfaces are cleaned and a new cylinder head gasket is used. Torque values and cleaning contaminants are emphasized.
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals and other internal parts. Precautions are included to properly handle springs and ensure correct positioning of parts during assembly.
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and note proper alignment of parts, use of lubrication and tools.
Caterpillar Cat 324E L Excavator (Prefix TLF) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and provides step-by-step instructions and illustrations for removing and installing each component of the travel motor. The components include the head, port plate, bearings, brake piston, seals, plates, discs, shaft, races, cam plate, piston assemblies, seals, cover, and more. Precautions are provided regarding spring force and proper placement of parts.
Caterpillar Cat 324E L Excavator (Prefix LDG) Service Repair Manual Instant D...rishang96299
1. The document provides step-by-step instructions for disassembling and assembling the travel motor of a 324E LN excavator.
2. It details 27 steps to disassemble components like the head, brake piston, rotating assembly, and seals.
3. The 28 steps for assembly instruct to reinstall these components in reverse order and include lubricating mating surfaces.
Caterpillar Cat 324E L Excavator (Prefix KTE) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
Caterpillar Cat 324E L Excavator (Prefix JCZ) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process is described in 27 steps and involves removing components like the motor head, brake piston, rotating assembly, seals, and bearings. The assembly process reverses the disassembly steps and includes lubricating components and ensuring proper alignment of parts. Tools required include retaining ring pliers, drivers, pullers, and press equipment. Cautions are provided about spring loading and containing fluids during repair work.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process includes removing 28 components from the travel motor housing including the head, brake piston, plates, springs, seals and bearings. The assembly section outlines 28 steps to reinstall these components in reverse order using various tools. Special care must be taken when working with pressurized components or parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 324E and 324E L excavator models. The disassembly process involves removing 28 components from the travel motor including the head, brake piston, plates, springs and seals. The assembly process reverses the disassembly steps and includes lubricating components and ensuring proper alignment of parts like the cam plate keys and piston marks. Special tools are required for tasks like removing races and seals.
This document provides the disassembly and assembly procedures for a 324D LN excavator travel motor. It includes 28 steps for disassembly that remove components like the motor head, seals, plates, discs, bearings, and housing pieces. The 28 steps for assembly install these same components in reverse order and include notes about cleaning, applying lubricant, and ensuring proper positioning of parts. Tools required are also listed.
The document provides instructions for disassembling the final drive of an excavator. Key steps include:
1. Marking the final drive for alignment and securing it to a repair stand.
2. Removing bolts and lifting devices to extract the cover and internal gears and shafts.
3. Using retaining ring pliers and presses to separate additional components like carriers.
4. Hammering out pins to dismantle planetary gear sets from within the carriers.
This document provides the disassembly and assembly procedures for a travel motor on excavator models 324D L and 324D LN. The disassembly procedure is outlined in 28 steps and includes removing components like the head, seals, springs, plates, and bearings. The assembly procedure reverses the disassembly steps in 15 illustrated steps and provides notes on cleaning, applying thread lock compound and lubricant, and ensuring parts are returned to their original positions.
Caterpillar Cat 324D L Excavator (Prefix TRH) Service Repair Manual Instant D...rishang96299
This document provides the disassembly and assembly procedures for a 324D LN excavator travel motor. It includes 28 steps for disassembly that remove components like the motor head, seals, plates, discs, bearings, and housing pieces. The 28 steps for assembly install these same components in reverse order and include notes about cleaning, applying lubricant, and ensuring proper positioning of parts. Tools required are also listed.
Caterpillar Cat 324D L Excavator (Prefix SYM) Service Repair Manual Instant D...rishang96299
This document provides disassembly instructions for the final drive of an excavator model 324D L and 324D LN. The 31 step procedure includes removing the final drive housing, cover, gears, carriers, shafts, seals and other components. Special tools are listed that are required, and safety notes about cleanliness and part markings for reassembly are provided. Detailed illustrations accompany each step to show how to disassemble the various parts of the final drive.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix JJG) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling a final drive on an excavator. It lists required tools and a multi-step process involving removing bolts, gears, carriers, shafts, seals, and other components. Cleanliness is important to prevent dirt from entering during disassembly. Parts must be reinstalled in their original locations later. Various components like covers, gears and carriers are removed using lifting devices due to their significant weights ranging from 30-312 kg.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01960779
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
B 1U-7600 Slide Hammer 1
C 138-7575 Link Brackets 3
D 154-6181 Forcing Screw 2
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive- Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
1/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Dispose of all fluids according to local regulations and mandates.
NOTICE
Failure to properly assemble parts or failure to follow established
procedures can lead to damage of the parts and assembly.
To avoid damage to parts, always identify and mark the parts so that
they can be installed in the same location. Ensure that gear surfaces
align. Never force parts during assembly.
Illustration 1 g00777501
1. Install the final drive assembly on Tooling (A) .
Illustration 2 g01018685
2/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 2. Remove bolts (1). Remove plugs (2) and the O-ring seals from cover (3). Remove cover
(3) .
Illustration 3 g00777515
3. Use Tooling (B) in order to remove plate (4) .
Illustration 4 g00777542
4. Remove carrier assembly (5) from the main housing. The weight of the carrier assembly is
approximately16 kg (35 lb).
3/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 5 g00777548
5. Remove spacer (6) .
Illustration 6 g00777570
6. Use a suitable punch and a hammer to install spring pin (7) into planetary shaft (8) .
Illustration 7 g01021689
4/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 7. Remove planetary shaft (8). Remove spring pin (7). Remove thrust washers (9). Remove
planetary gear (11) and bearing (10) .
8. Repeat Steps 6 and 7 in order to remove the other two planetary gears from the carrier.
Illustration 8 g00777624
9. Remove gear (12) .
Illustration 9 g00777626
10. Remove gear (13). Remove spacer (14) .
5/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g00777631
11. Use Tooling (C) and a suitable lifting device in order to remove carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 11 g01021690
12. Use a suitable punch and a hammer to install spring pin (16) into planetary shaft (17) .
Illustration 12 g01021692
6/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 13. Remove spring pin (16) from planetary shaft (17). Remove thrust washers (18), bearings
(19) and gear (20) from the carrier assembly.
Illustration 13 g01018688
14. Remove bolts (21) .
Illustration 14 g00778413
15. Use Tooling (D) in order to push gear (22) from the upper housing.
7/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00778461
16. Remove gear (22). Four dowel pins (23) will stay with the gear.
Illustration 16 g00778471
17. Use a suitable press in order to remove dowel pins (23) .
Illustration 17 g01018689
18. Remove shim (24) and washer (25) .
8/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g01018690
19. Separate housing (26) from housing (27) .
Illustration 19 g01018692
20. Remove Duo-cone seal gp (28) from housing (27) .
9/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 20 g01018693
21. Remove Duo-cone seal gp (29) and bearings (30) from housing (26) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:26:14 UTC+0800 2020
10/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961218
Final Drive - Assemble
SMCS - 4050-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
C 138-7575 Link Brackets 3
D 126-3994 Seal Installer 1
E
1U-9895 Crossblock 1
5F-7369 Leg 2
5P-4808 Cap 2
3H-0465 Plate 4
1B-4207 Nut 2
F 6V-2012 Depth Micrometer 1
G 169-0503 Installation Kit 1
Note: Replace all O-ring seals and gaskets. Apply a light film of"10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 1 g01021697
1. Place housing (27) on Tooling (A) .
2. Use Tooling (G) in order to clean the Duo-cone seal gp prior to installation. Use Tooling
(D) in order to install Duo-cone seal gp (28) into housing (27) .
Illustration 2 g01018693
3. Install bearings (30) into housing (26). Use Tooling (D) in order to install Duo-cone seal gp
(29) into housing (26).
2/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 3 g01018690
4. Install Tooling (C) to housing (26). Use Tooling (C) and a suitable lifting device in order to
install housing (26) onto housing (27) .
Illustration 4 g01018688
5. Install gear (22). Install bolts (21) in order to hold the two housings together. This is
necessary in order to transport the housings to the press.
Note: The following steps are necessary in order to determine the proper shim or shims
needed to set the rolling torque.
3/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 5 g01018688
a. Set the main housing assembly in a suitable press. Remove bolts (21). Remove gear
(22) .
Illustration 6 g01021714
b. Install Tooling (E). Use a suitable press in order to apply the load of 4000 kg (8818
lb). Rotate the housing in order to seat bearings (30). Reduce the load to 1000 ± 100
kg (2204 ± 220 lb).
4/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 7 g01018888
c. Maintain the load pressure of 1000 ± 100 kg (2204 ± 220 lb). Use Tool (F) in order to
obtain Measurement (A). Record the measurement.
Illustration 8 g00781842
d. Use Tooling (F) in order to obtain Measurement (B) on gear (22). Record the
measurement.
5/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 9 g00781847
Illustration 10 g01018689
e. Measure the thickness of washer (25). Record the measurement.
f. Install washer (25). Install the required shims. The shim thickness is determined by
subtracting Dimension (A) from Dimension (B) and subtractingDimension (C). This
thickness has a tolerance of ± 0.050 mm ( ± 0.0020 inch). If two shims are required,
install the thinner shim next to gear (22) .
6/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 11 g00782429
6. Install gear (22) and pins (23). Install bolts (21). Tighten bolts (21) to a torque of 270 ± 40
N·m (199 ± 30 lb ft).
Illustration 12 g01021692
7. Install bearings (19) and gear (20). Install thrust washers (18). Install planetary shaft (17)
and spring pin (16) .
Illustration 13 g01021690
7/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. 8. Use a suitable punch and a hammer in order to drive spring pin (16) into planetary shaft
(17) .
Illustration 14 g00782239
Stake marks on each side of spring pin (16)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
9. Use a suitable punch in order to peen planetary shaft (17) on each side of spring pin (16).
Each stake mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of
the spring pin.
10. Repeat Steps 7 through 9 in order to install the other two planetary gears into the carrier.
Illustration 15 g00777631
8/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 11. Use Tooling (C) and a suitable lifting device in order to install carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 16 g00777626
12. Install spacer (14). Install gear (13).
Illustration 17 g00777624
13. Install gear (12) .
9/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 18 g01021689
14. Install planetary gear (11) and bearing (10). Install thrust washers (9). Install planetary shaft
(8). Install spring pin (7) .
Illustration 19 g00782239
Stake marks on each side of spring pin (7)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
15. Use a suitable punch in order to peen shaft (8) on each side of spring pin (7). Each stake
mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of the spring
pin.
16. Repeat Steps 14 and 17 in order to install the other two planetary gears into the carrier.
10/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 20 g00777548
17. Install spacer (6) .
Illustration 21 g00777542
18. Install carrier assembly (5) into the main housing. The weight of carrier assembly (5) is
approximately 16 kg (35 lb).
Illustration 22 g00782448
11/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 19. Install plate (4) .
Illustration 23 g01018685
20. Install cover (3). Install bolts (1). Tighten bolts (1) to a torque of 105 ± 20 N·m (77 ± 15 lb
ft). Install plugs (2) and the O-ring seals. Tighten plugs (2) to a torque of 80 ± 10 N·m (59 ±
7 lb ft).
End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:27:10 UTC+0800 2020
12/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961382
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7574 Link Bracket 2
C 9S-3263 Thread Lock Compound 1
1. Make sure that the mating surfaces of the final drive and the undercarriage frame are
thoroughly clean and free of dirt and debris prior to assembly.
2. Check the condition of the O-ring seals that are used in the ends of the tube assemblies.
Check the condition of the O-ring seals that are used in the ends of the hose assemblies. If
the O-ring seals are worn or damaged, use new parts for replacement.
1/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
26. Illustration 1 g00486987
3. Fasten Tooling (A) and a suitable lifting device to final drive (7). Carefully, put the final
drive in position on the undercarriage frame.
Illustration 2 g00486988
4. Apply Tooling (C) on the threads of bolts (8). Install bolts (8) that hold the final drive to the
undercarriage frame. Tighten bolts (8) evenly.
5. Install plugs (9) in the forcing bolt holes.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
2/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...