1) The document provides step-by-step instructions for disassembling and assembling the final drive of a 315C excavator.
2) Disassembly includes removing 21 components from the final drive housing. Assembly is the reverse of disassembly and requires determining the proper shim thickness to set the rolling torque.
3) Special tools are required and components must be cleaned and lubricated before assembly to ensure proper operation of the final drive.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...tuzhiyou2
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...jse7039222
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...lituo39419496
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, plates, gears, shafts, seals and bearings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...tuzhiyou2
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...jse7039222
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly. Cleanliness is important during assembly to prevent contamination.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. The disassembly process involves removing 21 components from the final drive assembly using various tools. The assembly process describes installing the components in reverse order and determining the proper shim thickness to set the rolling torque. Precise measurements and stake marks are required to ensure correct assembly.
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next it describes removing individual components from the final drive including covers, gears, shafts, seals and housings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001...lituo39419496
This document provides instructions for disassembling and assembling the final drive of a 315C excavator. It begins with removing the final drive assembly from the excavator. Next, it describes removing individual components from the final drive including covers, plates, gears, shafts, seals and bearings. The assembly section provides instructions for installing these components in reverse order and includes steps for determining the proper shim thickness to set the rolling torque. The summary is provided in 3 sentences or less.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...rishang96299
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 330C L Excavator (Prefix KDD) Service Repair Manual (KDD00001...dujkdksmdmdm
1) The document provides step-by-step instructions for disassembling and assembling the travel motor of a 330C L excavator.
2) It lists 28 steps for disassembly, including removing the head, brake piston, plates and discs, seals, and other components.
3) It then lists 28 steps for assembly, placing the components back in reverse order and noting proper installation of seals, springs, and other parts.
This document provides instructions for removing and installing a front cover on a 330F excavator engine. The key steps are:
1. Remove the crankshaft pulley, fan if equipped, and front seal from the front cover.
2. Remove bolts from the front cover and housing, and remove the front cover and gasket.
3. Clean the front cover, housing, and install a new gasket. Use guide studs to position the front cover and hand tighten bolts.
4. Align the front cover and tighten the bolts. Install a new front seal and reinstall any removed components.
This document provides instructions for disassembling and assembling a final drive for 330F and 330F LN excavators. The disassembly procedure involves using various tools to remove 37 individual parts from the final drive assembly, including gears, shafts, housings, seals and bearings. The assembly procedure consists of 30 steps to reinstall the parts in reverse order, noting the proper application of sealants and adjustment of bearing preload using shims. Precise alignment and cleanliness of parts is emphasized throughout.
Caterpillar Cat 330D2 L Excavator (Prefix FEX) Service Repair Manual (FEX0000...dujkdksmdmdm
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps: 1) marking the final drive parts for reassembly; 2) removing the final drive cover and internal parts like gears, washers, seals and shafts; 3) disassembling the carrier assembly and planetary gears; 4) removing the ring gear and separating the motor and sprocket housings; and 5) taking out the coupling gear and shims. Cleanliness is important to prevent dirt ingress, and tools are needed to remove securing pins, rings, bolts and separate connected parts. Weights of individual parts are also provided.
Caterpillar Cat 330D2 L Excavator (Prefix EBP) Service Repair Manual (EBP0000...dujkdksmdmdm
The document provides disassembly instructions for a 330D2 and 330D2 L excavator travel motor in 28 steps. It begins by having the technician thoroughly clean and secure the travel motor vertically before disassembling. The steps then carefully describe removing components like the head, brake piston, plates, seals, bearings, and more. Pictures accompany each step to illustrate the proper procedure. Safety notices are included to handle fluids and springs carefully.
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves removing 37 individual parts in a specific sequence using various tools. The assembly process reverses the disassembly steps and provides additional details on setting the bearing preload and installing seals correctly.
The document provides instructions for disassembling an excavator travel motor. It is a 27 step process that includes removing the motor head, brake piston, barrel assembly, cam plate, and other internal components. Special tools are required to properly support and disassemble the motor. Technicians are advised to take care to contain fluids and properly dispose of them.
The document provides instructions for disassembling a final drive component in 3 steps:
1. Remove the final drive assembly and disassemble it by removing the cover, gears, carrier assembly, planetary gears, and ring gear.
2. Disassemble the planetary carrier by removing the shafts, washers, bearings and gears.
3. Remove the ring gear from the sprocket housing, then disassemble the motor housing by removing bolts, shims and a coupling gear.
Caterpillar Cat 330D L Excavator (Prefix R2D) Service Repair Manual (R2D00001...dujkdksmdmdm
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a Caterpillar 330D L excavator with a C9 engine. The summary is:
The rear gear group removal procedure involves using tools to remove retaining bolts, bushings, adapters, bearings, gears and covers. Installation requires matching dimensions and orientations when pressing in new bearings and reinstalling components.
To remove the flywheel, bolts are first removed 180 degrees apart using a guide stud before lifting the flywheel off. Installation involves heating and pressing in a ring gear, lifting the flywheel into place using guide studs, and torquing bolts to the specified value
Caterpillar Cat 330D L Excavator (Prefix LRM) Service Repair Manual (LRM00001...dujkdksmdmdm
The document provides instructions for removing and installing the final drive and travel motor assembly on an excavator. Key steps include:
1. Removing hydraulic hoses and fittings, separating the track, and using a lever puller and vacuum pump to remove the assembly.
2. Lifting the assembly free using lifting brackets and bolts, and removing mounting bolts and seals.
3. Reinstalling seals and components in reverse order, and refilling the hydraulic system. Proper cleaning, safety procedures, and use of anti-seize compound are emphasized.
Caterpillar Cat 330D L Excavator (Prefix JLP) Service Repair Manual (JLP00001...dujkdksmdmdm
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. The steps include removing covers, gears, shafts, seals, and other components. Special tools are required for tasks like removing retaining rings and carrier assemblies. Safety notes are included to clean parts before disassembly and have additional assistance when removing heavy components weighing over 30kg. The detailed process takes the final drive completely apart down to individual planetary gears and shafts.
Caterpillar Cat 330D L Excavator (Prefix EDX) Service Repair Manual (EDX00001...dujkdksmdmdm
The document provides instructions for assembling and installing the swing drive of an excavator. It describes 30 steps for assembling the internal components of the swing drive, including installing bearings, gears, seals, and housing components. It then describes 6 steps for installing the entire assembled swing drive into the excavator frame, including attaching lifting brackets, applying sealant, tightening bolts to the specified torque, and filling it with oil. The overall process installs and secures the fully assembled swing drive subsystem into the excavator.
Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001...dujkdksmdmdm
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive including removing covers, gears, carriers, shafts, seals and housings. Special tools are required including link brackets and forcing bolts to remove components due to their weight, with some parts weighing up to 550kg. Detailed illustrations accompany each step to show how to disassemble the various components.
More Related Content
Similar to Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001 and up).pdf
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual Instant D...kubei069369925
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...fuusejkddmmd3e
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 27 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring pressure.
Caterpillar cat 315 c excavator (prefix cft) service repair manual (cft00001 ...dkdmidkkdk
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
Caterpillar Cat 315C L Excavator (Prefix CFT) Service Repair Manual (CFT00001...dujkdksmdmdm
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It lists 28 steps for disassembly, which include removing bolts, valves, seals, bearings, pistons, and other components. It then lists 25 steps for reassembly in reverse order, noting to clean parts thoroughly, replace all seals and gaskets, and apply a light film of oil before assembling components. Precautions are provided for parts under spring force.
This document provides instructions for disassembling and assembling the travel motor on 315C and 315C L Excavator models. The disassembly process involves 27 steps to remove components like the traction control valve, travel motor, piston motor, brake pack, pistons, and bearings. The assembly process reverses the disassembly with 23 steps and cautions to clean parts, replace seals and gaskets, apply lubricant, and heat/cool components for proper installation. Proper tooling and following all steps is important to prevent damage during disassembly and assembly.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 315C. It describes 27 steps to disassemble the motor by removing components like bolts, seals, bearings, pistons, springs and plates. It then describes 26 steps for reassembling the motor by installing these components in the reverse order. Precautions are provided to mark parts, clean them, apply lubricants and take care when removing or installing parts with spring forces.
Similar to Caterpillar Cat 315C L Excavator (Prefix CFB) Service Repair Manual (CFB00001 and up).pdf (8)
Caterpillar Cat 330C L Excavator (Prefix KDD) Service Repair Manual (KDD00001...dujkdksmdmdm
1) The document provides step-by-step instructions for disassembling and assembling the travel motor of a 330C L excavator.
2) It lists 28 steps for disassembly, including removing the head, brake piston, plates and discs, seals, and other components.
3) It then lists 28 steps for assembly, placing the components back in reverse order and noting proper installation of seals, springs, and other parts.
This document provides instructions for removing and installing a front cover on a 330F excavator engine. The key steps are:
1. Remove the crankshaft pulley, fan if equipped, and front seal from the front cover.
2. Remove bolts from the front cover and housing, and remove the front cover and gasket.
3. Clean the front cover, housing, and install a new gasket. Use guide studs to position the front cover and hand tighten bolts.
4. Align the front cover and tighten the bolts. Install a new front seal and reinstall any removed components.
This document provides instructions for disassembling and assembling a final drive for 330F and 330F LN excavators. The disassembly procedure involves using various tools to remove 37 individual parts from the final drive assembly, including gears, shafts, housings, seals and bearings. The assembly procedure consists of 30 steps to reinstall the parts in reverse order, noting the proper application of sealants and adjustment of bearing preload using shims. Precise alignment and cleanliness of parts is emphasized throughout.
Caterpillar Cat 330D2 L Excavator (Prefix FEX) Service Repair Manual (FEX0000...dujkdksmdmdm
The document provides instructions for disassembling a 330D2 excavator final drive. It involves 33 steps: 1) marking the final drive parts for reassembly; 2) removing the final drive cover and internal parts like gears, washers, seals and shafts; 3) disassembling the carrier assembly and planetary gears; 4) removing the ring gear and separating the motor and sprocket housings; and 5) taking out the coupling gear and shims. Cleanliness is important to prevent dirt ingress, and tools are needed to remove securing pins, rings, bolts and separate connected parts. Weights of individual parts are also provided.
Caterpillar Cat 330D2 L Excavator (Prefix EBP) Service Repair Manual (EBP0000...dujkdksmdmdm
The document provides disassembly instructions for a 330D2 and 330D2 L excavator travel motor in 28 steps. It begins by having the technician thoroughly clean and secure the travel motor vertically before disassembling. The steps then carefully describe removing components like the head, brake piston, plates, seals, bearings, and more. Pictures accompany each step to illustrate the proper procedure. Safety notices are included to handle fluids and springs carefully.
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves removing 37 individual parts in a specific sequence using various tools. The assembly process reverses the disassembly steps and provides additional details on setting the bearing preload and installing seals correctly.
The document provides instructions for disassembling an excavator travel motor. It is a 27 step process that includes removing the motor head, brake piston, barrel assembly, cam plate, and other internal components. Special tools are required to properly support and disassemble the motor. Technicians are advised to take care to contain fluids and properly dispose of them.
The document provides instructions for disassembling a final drive component in 3 steps:
1. Remove the final drive assembly and disassemble it by removing the cover, gears, carrier assembly, planetary gears, and ring gear.
2. Disassemble the planetary carrier by removing the shafts, washers, bearings and gears.
3. Remove the ring gear from the sprocket housing, then disassemble the motor housing by removing bolts, shims and a coupling gear.
Caterpillar Cat 330D L Excavator (Prefix R2D) Service Repair Manual (R2D00001...dujkdksmdmdm
This document provides instructions for removing and installing various components of the rear gear group and flywheel on a Caterpillar 330D L excavator with a C9 engine. The summary is:
The rear gear group removal procedure involves using tools to remove retaining bolts, bushings, adapters, bearings, gears and covers. Installation requires matching dimensions and orientations when pressing in new bearings and reinstalling components.
To remove the flywheel, bolts are first removed 180 degrees apart using a guide stud before lifting the flywheel off. Installation involves heating and pressing in a ring gear, lifting the flywheel into place using guide studs, and torquing bolts to the specified value
Caterpillar Cat 330D L Excavator (Prefix LRM) Service Repair Manual (LRM00001...dujkdksmdmdm
The document provides instructions for removing and installing the final drive and travel motor assembly on an excavator. Key steps include:
1. Removing hydraulic hoses and fittings, separating the track, and using a lever puller and vacuum pump to remove the assembly.
2. Lifting the assembly free using lifting brackets and bolts, and removing mounting bolts and seals.
3. Reinstalling seals and components in reverse order, and refilling the hydraulic system. Proper cleaning, safety procedures, and use of anti-seize compound are emphasized.
Caterpillar Cat 330D L Excavator (Prefix JLP) Service Repair Manual (JLP00001...dujkdksmdmdm
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. The steps include removing covers, gears, shafts, seals, and other components. Special tools are required for tasks like removing retaining rings and carrier assemblies. Safety notes are included to clean parts before disassembly and have additional assistance when removing heavy components weighing over 30kg. The detailed process takes the final drive completely apart down to individual planetary gears and shafts.
Caterpillar Cat 330D L Excavator (Prefix EDX) Service Repair Manual (EDX00001...dujkdksmdmdm
The document provides instructions for assembling and installing the swing drive of an excavator. It describes 30 steps for assembling the internal components of the swing drive, including installing bearings, gears, seals, and housing components. It then describes 6 steps for installing the entire assembled swing drive into the excavator frame, including attaching lifting brackets, applying sealant, tightening bolts to the specified torque, and filling it with oil. The overall process installs and secures the fully assembled swing drive subsystem into the excavator.
Caterpillar Cat 330D L Excavator (Prefix ERN) Service Repair Manual (ERN00001...dujkdksmdmdm
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive including removing covers, gears, carriers, shafts, seals and housings. Special tools are required including link brackets and forcing bolts to remove components due to their weight, with some parts weighing up to 550kg. Detailed illustrations accompany each step to show how to disassemble the various components.
Caterpillar Cat 330D L Excavator (Prefix GBC) Service Repair Manual (GBC00001...dujkdksmdmdm
This document provides instructions for removing and installing components in the cylinder head of a Caterpillar C9 engine, including the rocker arm shaft, cylinder head, lifter group, and camshaft. The procedures describe draining coolant, removing mounting bolts and connections, and lifting components out of the engine. Torque specifications and the proper sequence for installing mounting bolts are also included.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key components that are disassembled include the drive housing, three planetary gear assemblies, carrier assemblies, ring gear, and other internal gears, shafts, seals and bearings. Special tools are required for pressing, pulling, and removing components. Proper lifting devices and safety precautions are noted due to the heavy weights of components ranging from 32 to 550 kg.
The document provides disassembly instructions for a final drive on an excavator model 330D L. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing gears, carriers, shafts, seals and housings using various tools like link brackets, forcing bolts, and presses. Cleanliness is important to prevent dirt from entering during reassembly.
This document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. Key steps include removing the final drive cover, gears, carrier assemblies, planetary gear assemblies, and ring gear. Proper safety equipment and lifting devices are required due to the heavy weights involved, such as the 550 kg weight of the entire final drive assembly. Cleanliness is important to prevent dirt from entering during disassembly.
This document provides instructions for removing and installing a camshaft on a Caterpillar C9 engine. It outlines the required tools and steps to take the camshaft out of the cylinder block, including removing other components like the rocker arm shaft and front cover first. It then describes how to install the camshaft, making sure to lubricate the lobes and journals and rotate the camshaft to prevent binding. Proper alignment of timing marks is also emphasized when installing the camshaft.
The document provides instructions for assembling and installing the swing drive of an excavator. It describes applying sealant and installing bearings, gears, housings, and other components in the proper order and orientation. Bolts are tightened to the specified torque using an impact wrench. The completed swing drive is then installed on the excavator frame and filled with oil.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01960779
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
B 1U-7600 Slide Hammer 1
C 138-7575 Link Brackets 3
D 154-6181 Forcing Screw 2
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive- Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
1/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Dispose of all fluids according to local regulations and mandates.
NOTICE
Failure to properly assemble parts or failure to follow established
procedures can lead to damage of the parts and assembly.
To avoid damage to parts, always identify and mark the parts so that
they can be installed in the same location. Ensure that gear surfaces
align. Never force parts during assembly.
Illustration 1 g00777501
1. Install the final drive assembly on Tooling (A) .
Illustration 2 g01018685
2/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 2. Remove bolts (1). Remove plugs (2) and the O-ring seals from cover (3). Remove cover
(3) .
Illustration 3 g00777515
3. Use Tooling (B) in order to remove plate (4) .
Illustration 4 g00777542
4. Remove carrier assembly (5) from the main housing. The weight of the carrier assembly is
approximately16 kg (35 lb).
3/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 5 g00777548
5. Remove spacer (6) .
Illustration 6 g00777570
6. Use a suitable punch and a hammer to install spring pin (7) into planetary shaft (8) .
Illustration 7 g01021689
4/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 7. Remove planetary shaft (8). Remove spring pin (7). Remove thrust washers (9). Remove
planetary gear (11) and bearing (10) .
8. Repeat Steps 6 and 7 in order to remove the other two planetary gears from the carrier.
Illustration 8 g00777624
9. Remove gear (12) .
Illustration 9 g00777626
10. Remove gear (13). Remove spacer (14) .
5/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g00777631
11. Use Tooling (C) and a suitable lifting device in order to remove carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 11 g01021690
12. Use a suitable punch and a hammer to install spring pin (16) into planetary shaft (17) .
Illustration 12 g01021692
6/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 13. Remove spring pin (16) from planetary shaft (17). Remove thrust washers (18), bearings
(19) and gear (20) from the carrier assembly.
Illustration 13 g01018688
14. Remove bolts (21) .
Illustration 14 g00778413
15. Use Tooling (D) in order to push gear (22) from the upper housing.
7/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00778461
16. Remove gear (22). Four dowel pins (23) will stay with the gear.
Illustration 16 g00778471
17. Use a suitable press in order to remove dowel pins (23) .
Illustration 17 g01018689
18. Remove shim (24) and washer (25) .
8/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g01018690
19. Separate housing (26) from housing (27) .
Illustration 19 g01018692
20. Remove Duo-cone seal gp (28) from housing (27) .
9/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 20 g01018693
21. Remove Duo-cone seal gp (29) and bearings (30) from housing (26) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:26:14 UTC+0800 2020
10/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961218
Final Drive - Assemble
SMCS - 4050-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
C 138-7575 Link Brackets 3
D 126-3994 Seal Installer 1
E
1U-9895 Crossblock 1
5F-7369 Leg 2
5P-4808 Cap 2
3H-0465 Plate 4
1B-4207 Nut 2
F 6V-2012 Depth Micrometer 1
G 169-0503 Installation Kit 1
Note: Replace all O-ring seals and gaskets. Apply a light film of"10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 1 g01021697
1. Place housing (27) on Tooling (A) .
2. Use Tooling (G) in order to clean the Duo-cone seal gp prior to installation. Use Tooling
(D) in order to install Duo-cone seal gp (28) into housing (27) .
Illustration 2 g01018693
3. Install bearings (30) into housing (26). Use Tooling (D) in order to install Duo-cone seal gp
(29) into housing (26).
2/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 3 g01018690
4. Install Tooling (C) to housing (26). Use Tooling (C) and a suitable lifting device in order to
install housing (26) onto housing (27) .
Illustration 4 g01018688
5. Install gear (22). Install bolts (21) in order to hold the two housings together. This is
necessary in order to transport the housings to the press.
Note: The following steps are necessary in order to determine the proper shim or shims
needed to set the rolling torque.
3/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 5 g01018688
a. Set the main housing assembly in a suitable press. Remove bolts (21). Remove gear
(22) .
Illustration 6 g01021714
b. Install Tooling (E). Use a suitable press in order to apply the load of 4000 kg (8818
lb). Rotate the housing in order to seat bearings (30). Reduce the load to 1000 ± 100
kg (2204 ± 220 lb).
4/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 7 g01018888
c. Maintain the load pressure of 1000 ± 100 kg (2204 ± 220 lb). Use Tool (F) in order to
obtain Measurement (A). Record the measurement.
Illustration 8 g00781842
d. Use Tooling (F) in order to obtain Measurement (B) on gear (22). Record the
measurement.
5/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 9 g00781847
Illustration 10 g01018689
e. Measure the thickness of washer (25). Record the measurement.
f. Install washer (25). Install the required shims. The shim thickness is determined by
subtracting Dimension (A) from Dimension (B) and subtractingDimension (C). This
thickness has a tolerance of ± 0.050 mm ( ± 0.0020 inch). If two shims are required,
install the thinner shim next to gear (22) .
6/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 11 g00782429
6. Install gear (22) and pins (23). Install bolts (21). Tighten bolts (21) to a torque of 270 ± 40
N·m (199 ± 30 lb ft).
Illustration 12 g01021692
7. Install bearings (19) and gear (20). Install thrust washers (18). Install planetary shaft (17)
and spring pin (16) .
Illustration 13 g01021690
7/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. 8. Use a suitable punch and a hammer in order to drive spring pin (16) into planetary shaft
(17) .
Illustration 14 g00782239
Stake marks on each side of spring pin (16)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
9. Use a suitable punch in order to peen planetary shaft (17) on each side of spring pin (16).
Each stake mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of
the spring pin.
10. Repeat Steps 7 through 9 in order to install the other two planetary gears into the carrier.
Illustration 15 g00777631
8/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 11. Use Tooling (C) and a suitable lifting device in order to install carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 16 g00777626
12. Install spacer (14). Install gear (13).
Illustration 17 g00777624
13. Install gear (12) .
9/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 18 g01021689
14. Install planetary gear (11) and bearing (10). Install thrust washers (9). Install planetary shaft
(8). Install spring pin (7) .
Illustration 19 g00782239
Stake marks on each side of spring pin (7)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
15. Use a suitable punch in order to peen shaft (8) on each side of spring pin (7). Each stake
mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of the spring
pin.
16. Repeat Steps 14 and 17 in order to install the other two planetary gears into the carrier.
10/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 20 g00777548
17. Install spacer (6) .
Illustration 21 g00777542
18. Install carrier assembly (5) into the main housing. The weight of carrier assembly (5) is
approximately 16 kg (35 lb).
Illustration 22 g00782448
11/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. 19. Install plate (4) .
Illustration 23 g01018685
20. Install cover (3). Install bolts (1). Tighten bolts (1) to a torque of 105 ± 20 N·m (77 ± 15 lb
ft). Install plugs (2) and the O-ring seals. Tighten plugs (2) to a torque of 80 ± 10 N·m (59 ±
7 lb ft).
End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:27:10 UTC+0800 2020
12/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961382
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7574 Link Bracket 2
C 9S-3263 Thread Lock Compound 1
1. Make sure that the mating surfaces of the final drive and the undercarriage frame are
thoroughly clean and free of dirt and debris prior to assembly.
2. Check the condition of the O-ring seals that are used in the ends of the tube assemblies.
Check the condition of the O-ring seals that are used in the ends of the hose assemblies. If
the O-ring seals are worn or damaged, use new parts for replacement.
1/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Illustration 1 g00486987
3. Fasten Tooling (A) and a suitable lifting device to final drive (7). Carefully, put the final
drive in position on the undercarriage frame.
Illustration 2 g00486988
4. Apply Tooling (C) on the threads of bolts (8). Install bolts (8) that hold the final drive to the
undercarriage frame. Tighten bolts (8) evenly.
5. Install plugs (9) in the forcing bolt holes.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
2/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...