SlideShare a Scribd company logo
Congrès de l'ACP / CAP Congress
Dr. Sébastien Bianchin (TRIUMF / UBC)
Development of an Active Kaon Stopping
Target for the TREK-E36 Experiment at
J-PARC
29 Mai 2013 / May 29, 2013
S. Bianchin CAP Congress (May 27 - 31, 2013) 2
The TREK-E36 Experiment
The TREK-E36 Experiment at J-PARC is dedicated to the search for
lepton flavor universality violation in Γ(Ke2)/Γ(Kµ2)
Talk by Prof. M. Hasinoff R2-7-4 (Thurday, May 30)
Precise measurement of the decay width ratio: RK = Γ(Ke2) / Γ(Kµ2)
E36 Goal : δRK/RK = ± 0.2% (stat.) ± 0.15% (syst.) [0.25% total]
S. Bianchin CAP Congress (May 27 - 31, 2013)
Active Polarimeter
(JAPAN)
New Fiber Target
(CANADA)
GEM Dectectors
(USA)
CsI(Tl) readout (RUSSIA)
End View Side View
The TREK Experimental Apparatus
3
S. Bianchin CAP Congress (May 27 - 31, 2013)
18 Fibres (~6cm)
The TREK Scintillating Fiber Target
● 256 Fibers (3.2 x 3.2 x 200 mm3
)
● Tested (Nov. 2012), labelled and ready
to be assembled
● 1mm groove + green WLS fiber glued
● Assembly starts in May 2013 (K. Chang)
4
S. Bianchin CAP Congress (May 27 - 31, 2013) 4
18 Fibres (~6cm)
The TREK Scintillating Fiber Target
● 256 Fibers (3.2 x 3.2 x 200 mm3
)
● Tested (Nov. 2012), labelled and ready
to be assembled
● 1mm groove + green WLS fiber glued
● Assembly starts in May 2013 (K. Chang)
S. Bianchin CAP Congress (May 27 - 31, 2013)
Production of the TREK Fibers
5
1. A 1mm wide groove is cut along
the 20cm long scintillating fiber
S. Bianchin CAP Congress (May 27 - 31, 2013)
Production of the TREK Fibers
5
1. A 1mm wide groove is cut along
the 20cm long scintillating fiber
2. An optical glue is carefully
deposited inside the groove
S. Bianchin CAP Congress (May 27 - 31, 2013)
Production of the TREK Fibers
5
1. A 1mm wide groove is cut along
the 20cm long scintillating fiber
2. An optical glue is carefully
deposited inside the groove
3. A green WLS fiber is pushed
inside the groove and let to rest
for 24h so that the optical glue
hardens
S. Bianchin CAP Congress (May 27 - 31, 2013)
Production of the TREK Fibers
5
1. A 1mm wide groove is cut along
the 20cm long scintillating fiber
2. An optical glue is carefully
deposited inside the groove
3. A green WLS fiber is pushed
inside the groove and let to rest
for 24h so that the optical glue
hardens
4. A plastic coupler is glued at the
other end of the green WLS fiber
S. Bianchin CAP Congress (May 27 - 31, 2013)
Fibers are held together by stepped acrylic pieces and
1mm-thick Aluminium rings
7mm clearance to Aerogel Tube
Aerogel Tube : ID 79mm OD 85mm
Target Tube : ID 57mm OD 65mm
6
The TREK Scintillating Fiber Target
Side View
Acrylic pieces at both ends of the target
S. Bianchin CAP Congress (May 27 - 31, 2013)
● MPPCs (S10362-11-50C)
● 1 x 1 mm2
sensor
● 400 Pixels (50x50 µm2
)
● Gain: 7.5x105
● Better efficiency at low temperatures (0-5°C)
● ~450 MMPCs have been tested (Nov. 2012)
7
The MMPC Readout
S. Bianchin CAP Congress (May 27 - 31, 2013)
The Complete Setup (Concept)
8
Target OUT
Target IN
Temporary Support
S. Bianchin CAP Congress (May 27 - 31, 2013) 8
The Complete Setup (Concept)
Target IN
S. Bianchin CAP Congress (May 27 - 31, 2013)
The TREK Dark Box
Made of G10 (light tight)
568mm
568mm
The green WLS fibers are installed through a
slot in the Dark Box upstream plate
9
S. Bianchin CAP Congress (May 27 - 31, 2013)
The EASIROC Board
● 32-channel I/O
● DSP / FPGA
● ADC (HG and LG)
● Multi Hit TDC (LE and TE)
8x 32 channel (or 4 x 64) EASIROC boards are needed to read out
the 256 channels (full target)
Designed and made in Japan
Tested at TRIUMF
A new 64 channel EASIROC board
is currently being designed and
should be ready for tests in 2014 !
10
S. Bianchin CAP Congress (May 27 - 31, 2013)
Beam Tests & Preliminary Results
Tests performed at TRIUMF (Nov. 2012)
11
S. Bianchin CAP Congress (May 27 - 31, 2013)
Beam Tests & Preliminary Results
Tests performed at TRIUMF (Nov. 2012)
11
S. Bianchin CAP Congress (May 27 - 31, 2013)
A Look Inside de Box
32 (8x4) Fiber Bundle (~24x12mm2
)
Hit in perpendicular AND parallel directions
12
S. Bianchin CAP Congress (May 27 - 31, 2013)
A Look Inside de Box
32 green WLS fibers coupled to
32 MPPCs
13
S. Bianchin CAP Congress (May 27 - 31, 2013)
Preliminary Results : ADC Spectra
14
EASIROCBoard
#1
EASIROCBoard#2
Missing Channels (#14 & #28)
S. Bianchin CAP Congress (May 27 - 31, 2013)
Temperature dependence of ADC Gain
15
S. Bianchin CAP Congress (May 27 - 31, 2013)
Temperature dependence of ADC Gain
15
S. Bianchin CAP Congress (May 27 - 31, 2013)
Temperature dependence of ADC Gain
15
S. Bianchin CAP Congress (May 27 - 31, 2013)
Temperature dependence of ADC Gain
16
courtesy of F. Retière
∆x = -22.95T + 362.6
S. Bianchin CAP Congress (May 27 - 31, 2013) 17
1 pe ~12.5 pe
Dark Curent Analysis
Average Energy Deposit through 3mm of plastic 0.6 MeV
~21 pe/MeV
ped
1 pe
2 pe
MPPC noise spectrum showing
the photo-electron separation
3 pe
Energy spectrum for penetrating cosmic
rays passing through 1 bar
S. Bianchin CAP Congress (May 27 - 31, 2013)
Preliminary Results : Particle Tracking
beam
beam
EASIROCBoard#1EASIROCBoard#1
18
S. Bianchin CAP Congress (May 27 - 31, 2013)
Preliminary Results : Particle Tracking
19
beam
beam
EASIROCBoard#2EASIROCBoard#2
S. Bianchin CAP Congress (May 27 - 31, 2013)
beam
beam
EASIROCBoard#2EASIROCBoard#2
Preliminary Results : Particle Tracking
19
S. Bianchin CAP Congress (May 27 - 31, 2013)
Tracking Algorithm
We built a set of
20 “perfect” tracks in
a 64 fiber bundle
and
tested our tracking
algorithm
Prelim
inary
20
S. Bianchin CAP Congress (May 27 - 31, 2013)
Tracking Algorithm
Prelim
inary
We are now working on a better version of our tracking algorithm capable of finding
the particle tracks for MC simulated events and later on for real data collected during
our beam tests
21
courtesy of D. Gill
S. Bianchin CAP Congress (May 27 - 31, 2013)
The TREK Collaboration
22

More Related Content

Similar to Cap bianchin

The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)
Sebastien Bianchin
 
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
Engr. Md. Nur-A-Alam
 
Transparent electronics
Transparent electronicsTransparent electronics
Transparent electronics
AKSHAY K
 
Transparent electronics
Transparent electronicsTransparent electronics
Transparent electronics
AKSHAY K
 
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
ijiert bestjournal
 
Lf3420252035
Lf3420252035Lf3420252035
Lf3420252035
IJERA Editor
 
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
IRJET Journal
 
Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...
IAEME Publication
 
Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...
IAEME Publication
 
LAM_TOMMY_PRESENTATION_FIN
LAM_TOMMY_PRESENTATION_FINLAM_TOMMY_PRESENTATION_FIN
LAM_TOMMY_PRESENTATION_FIN
Tommy Lam
 
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
IJARTES
 
Graphene Project Report
Graphene Project ReportGraphene Project Report
Graphene Project Report
vishal anand
 
Green electronics: a technology for a sustainable future.
Green electronics: a technology for a sustainable future.Green electronics: a technology for a sustainable future.
Green electronics: a technology for a sustainable future.
Sociedade Brasileira de Pesquisa em Materiais
 
Energy storage phosphors @ Phosphor Global Summit 2019
Energy storage phosphors @ Phosphor Global Summit 2019Energy storage phosphors @ Phosphor Global Summit 2019
Energy storage phosphors @ Phosphor Global Summit 2019
Philippe Smet
 
Fórum Brasil-Coreia - Yongil kim
Fórum Brasil-Coreia - Yongil kimFórum Brasil-Coreia - Yongil kim
Fórum Brasil-Coreia - Yongil kim
brasilcoreia
 
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
IRJET Journal
 
LCA building energy performance (frames)
LCA building energy performance (frames)LCA building energy performance (frames)
LCA building energy performance (frames)
Aldo Treville
 
Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)
Sebastien Bianchin
 
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
IRJET Journal
 
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting CavitiesFrom Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
Anirban Krishna Bhattacharyya
 

Similar to Cap bianchin (20)

The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)
 
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
Nondestructive Approach to Evaluate Defects in Elements of Agricultural Machi...
 
Transparent electronics
Transparent electronicsTransparent electronics
Transparent electronics
 
Transparent electronics
Transparent electronicsTransparent electronics
Transparent electronics
 
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
PROCESS PARAMETERS OPTIMIZATION IN EDM FOR AISI D3 STEEL BY GREY RELATIONAL A...
 
Lf3420252035
Lf3420252035Lf3420252035
Lf3420252035
 
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
Development of an End Platen to Integrate Fibre Bragg Grating Sensing Arrays ...
 
Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...
 
Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...Analytical solution of 2d poisson’s equation using separation of variable met...
Analytical solution of 2d poisson’s equation using separation of variable met...
 
LAM_TOMMY_PRESENTATION_FIN
LAM_TOMMY_PRESENTATION_FINLAM_TOMMY_PRESENTATION_FIN
LAM_TOMMY_PRESENTATION_FIN
 
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
Surface Traping in Silicon Nanowire Dual material engineered Cylindrical gate...
 
Graphene Project Report
Graphene Project ReportGraphene Project Report
Graphene Project Report
 
Green electronics: a technology for a sustainable future.
Green electronics: a technology for a sustainable future.Green electronics: a technology for a sustainable future.
Green electronics: a technology for a sustainable future.
 
Energy storage phosphors @ Phosphor Global Summit 2019
Energy storage phosphors @ Phosphor Global Summit 2019Energy storage phosphors @ Phosphor Global Summit 2019
Energy storage phosphors @ Phosphor Global Summit 2019
 
Fórum Brasil-Coreia - Yongil kim
Fórum Brasil-Coreia - Yongil kimFórum Brasil-Coreia - Yongil kim
Fórum Brasil-Coreia - Yongil kim
 
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
Detection of Cracks in Single Crystalline Silicon Wafers using Impact Test an...
 
LCA building energy performance (frames)
LCA building energy performance (frames)LCA building energy performance (frames)
LCA building energy performance (frames)
 
Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)
 
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
Structural and Optical Properties of Electron Beam Evaporated ITO and Ni: ITO...
 
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting CavitiesFrom Macroscopic to Microscopic Dynamics of Superconducting Cavities
From Macroscopic to Microscopic Dynamics of Superconducting Cavities
 

Cap bianchin

  • 1. Congrès de l'ACP / CAP Congress Dr. Sébastien Bianchin (TRIUMF / UBC) Development of an Active Kaon Stopping Target for the TREK-E36 Experiment at J-PARC 29 Mai 2013 / May 29, 2013
  • 2. S. Bianchin CAP Congress (May 27 - 31, 2013) 2 The TREK-E36 Experiment The TREK-E36 Experiment at J-PARC is dedicated to the search for lepton flavor universality violation in Γ(Ke2)/Γ(Kµ2) Talk by Prof. M. Hasinoff R2-7-4 (Thurday, May 30) Precise measurement of the decay width ratio: RK = Γ(Ke2) / Γ(Kµ2) E36 Goal : δRK/RK = ± 0.2% (stat.) ± 0.15% (syst.) [0.25% total]
  • 3. S. Bianchin CAP Congress (May 27 - 31, 2013) Active Polarimeter (JAPAN) New Fiber Target (CANADA) GEM Dectectors (USA) CsI(Tl) readout (RUSSIA) End View Side View The TREK Experimental Apparatus 3
  • 4. S. Bianchin CAP Congress (May 27 - 31, 2013) 18 Fibres (~6cm) The TREK Scintillating Fiber Target ● 256 Fibers (3.2 x 3.2 x 200 mm3 ) ● Tested (Nov. 2012), labelled and ready to be assembled ● 1mm groove + green WLS fiber glued ● Assembly starts in May 2013 (K. Chang) 4
  • 5. S. Bianchin CAP Congress (May 27 - 31, 2013) 4 18 Fibres (~6cm) The TREK Scintillating Fiber Target ● 256 Fibers (3.2 x 3.2 x 200 mm3 ) ● Tested (Nov. 2012), labelled and ready to be assembled ● 1mm groove + green WLS fiber glued ● Assembly starts in May 2013 (K. Chang)
  • 6. S. Bianchin CAP Congress (May 27 - 31, 2013) Production of the TREK Fibers 5 1. A 1mm wide groove is cut along the 20cm long scintillating fiber
  • 7. S. Bianchin CAP Congress (May 27 - 31, 2013) Production of the TREK Fibers 5 1. A 1mm wide groove is cut along the 20cm long scintillating fiber 2. An optical glue is carefully deposited inside the groove
  • 8. S. Bianchin CAP Congress (May 27 - 31, 2013) Production of the TREK Fibers 5 1. A 1mm wide groove is cut along the 20cm long scintillating fiber 2. An optical glue is carefully deposited inside the groove 3. A green WLS fiber is pushed inside the groove and let to rest for 24h so that the optical glue hardens
  • 9. S. Bianchin CAP Congress (May 27 - 31, 2013) Production of the TREK Fibers 5 1. A 1mm wide groove is cut along the 20cm long scintillating fiber 2. An optical glue is carefully deposited inside the groove 3. A green WLS fiber is pushed inside the groove and let to rest for 24h so that the optical glue hardens 4. A plastic coupler is glued at the other end of the green WLS fiber
  • 10. S. Bianchin CAP Congress (May 27 - 31, 2013) Fibers are held together by stepped acrylic pieces and 1mm-thick Aluminium rings 7mm clearance to Aerogel Tube Aerogel Tube : ID 79mm OD 85mm Target Tube : ID 57mm OD 65mm 6 The TREK Scintillating Fiber Target Side View Acrylic pieces at both ends of the target
  • 11. S. Bianchin CAP Congress (May 27 - 31, 2013) ● MPPCs (S10362-11-50C) ● 1 x 1 mm2 sensor ● 400 Pixels (50x50 µm2 ) ● Gain: 7.5x105 ● Better efficiency at low temperatures (0-5°C) ● ~450 MMPCs have been tested (Nov. 2012) 7 The MMPC Readout
  • 12. S. Bianchin CAP Congress (May 27 - 31, 2013) The Complete Setup (Concept) 8 Target OUT Target IN Temporary Support
  • 13. S. Bianchin CAP Congress (May 27 - 31, 2013) 8 The Complete Setup (Concept) Target IN
  • 14. S. Bianchin CAP Congress (May 27 - 31, 2013) The TREK Dark Box Made of G10 (light tight) 568mm 568mm The green WLS fibers are installed through a slot in the Dark Box upstream plate 9
  • 15. S. Bianchin CAP Congress (May 27 - 31, 2013) The EASIROC Board ● 32-channel I/O ● DSP / FPGA ● ADC (HG and LG) ● Multi Hit TDC (LE and TE) 8x 32 channel (or 4 x 64) EASIROC boards are needed to read out the 256 channels (full target) Designed and made in Japan Tested at TRIUMF A new 64 channel EASIROC board is currently being designed and should be ready for tests in 2014 ! 10
  • 16. S. Bianchin CAP Congress (May 27 - 31, 2013) Beam Tests & Preliminary Results Tests performed at TRIUMF (Nov. 2012) 11
  • 17. S. Bianchin CAP Congress (May 27 - 31, 2013) Beam Tests & Preliminary Results Tests performed at TRIUMF (Nov. 2012) 11
  • 18. S. Bianchin CAP Congress (May 27 - 31, 2013) A Look Inside de Box 32 (8x4) Fiber Bundle (~24x12mm2 ) Hit in perpendicular AND parallel directions 12
  • 19. S. Bianchin CAP Congress (May 27 - 31, 2013) A Look Inside de Box 32 green WLS fibers coupled to 32 MPPCs 13
  • 20. S. Bianchin CAP Congress (May 27 - 31, 2013) Preliminary Results : ADC Spectra 14 EASIROCBoard #1 EASIROCBoard#2 Missing Channels (#14 & #28)
  • 21. S. Bianchin CAP Congress (May 27 - 31, 2013) Temperature dependence of ADC Gain 15
  • 22. S. Bianchin CAP Congress (May 27 - 31, 2013) Temperature dependence of ADC Gain 15
  • 23. S. Bianchin CAP Congress (May 27 - 31, 2013) Temperature dependence of ADC Gain 15
  • 24. S. Bianchin CAP Congress (May 27 - 31, 2013) Temperature dependence of ADC Gain 16 courtesy of F. Retière ∆x = -22.95T + 362.6
  • 25. S. Bianchin CAP Congress (May 27 - 31, 2013) 17 1 pe ~12.5 pe Dark Curent Analysis Average Energy Deposit through 3mm of plastic 0.6 MeV ~21 pe/MeV ped 1 pe 2 pe MPPC noise spectrum showing the photo-electron separation 3 pe Energy spectrum for penetrating cosmic rays passing through 1 bar
  • 26. S. Bianchin CAP Congress (May 27 - 31, 2013) Preliminary Results : Particle Tracking beam beam EASIROCBoard#1EASIROCBoard#1 18
  • 27. S. Bianchin CAP Congress (May 27 - 31, 2013) Preliminary Results : Particle Tracking 19 beam beam EASIROCBoard#2EASIROCBoard#2
  • 28. S. Bianchin CAP Congress (May 27 - 31, 2013) beam beam EASIROCBoard#2EASIROCBoard#2 Preliminary Results : Particle Tracking 19
  • 29. S. Bianchin CAP Congress (May 27 - 31, 2013) Tracking Algorithm We built a set of 20 “perfect” tracks in a 64 fiber bundle and tested our tracking algorithm Prelim inary 20
  • 30. S. Bianchin CAP Congress (May 27 - 31, 2013) Tracking Algorithm Prelim inary We are now working on a better version of our tracking algorithm capable of finding the particle tracks for MC simulated events and later on for real data collected during our beam tests 21 courtesy of D. Gill
  • 31. S. Bianchin CAP Congress (May 27 - 31, 2013) The TREK Collaboration 22