Cost Comparative Statement between Conventional Mortar and  Build Fast



Build Fast ‐ Cost Analysis ( Light Weight Blocks)

A)  CONVENTIONAL METHOD                                                            B) GBP BUILD FAST

             Approximate calculation for per 100sq.ft wall of                                       Approximate calculation for per 100sq.ft wall of
       using Conventional method for AAC Block 150X600X200mm                                     using GBP ‐ Build Fast for AAC Block 150X600X200mm
                                                                 

    ITEM / BRASS (100 sq.ft.)        Qty.       Rates     Value in (INR)               ITEM / BRASS (100 sq.ft.)          Qty.       Rates        Value in (INR)

Blocks                                    60         65          3900.00           Blocks                                      63         65                4095.00
Cement Bags                              1.5        250           375.00           Build Fast Bags (15 KG)                  1.666        550                 916.30
Sand (Cft)                                15         45           675.00           Sand (Cft)                                   0                              0.00
Water (Ltrs)                            200        0.06            12.00           Water (Ltrs)                                 0                              0.00
Labour Messon                              1        300           300.00           Labour Messon                                1        300                 300.00
Helper                                     2        130           260.00           Helper                                       1        130                 130.00
In house material handelling                  lumpsum              20.00           In house material handelling                 0                              0.00
Wastage in sand & cement                      lumpsum              50.00           Wastage in sand & cement                     0                              0.00
Electricity                                 8         6            48.00           Electricity                                  0                              0.00
Housekeeping                                  lumpsum             100.00           Housekeeping                                 0                              0.00
Curing Labour                                 lumpsum             300.00           Curing Labour                                0                              0.00
Overheads                                     lumpsum             200.00           Overheads                                    0                              0.00

COST OF CONVENTIONAL METHOD                                      6240.00           COST OF GBP BUILD FAST                                                    5441.3
(‐) COST OF GBP BUILD FAST                                       5441.30
NET SAVINGS AMT PLUS ADDED BENEFITS                               798.70

                                                                                    UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST
*Statutory & Govt Taxes extra
                                                                                   1.  Eco Friendly                    7.  Excellent Bonding Strength
                                                                                   2.  Ready to Use                    8.  Water & Time Saving
                                                                                   3.  Self Curing                     9.  Excellent Pot Life
                                                                                   4.  Shrinkage Free                  10.  Non Hazardous
                                                                                   5.  Crack Resistance                11.  Zero Wastage
                                                                                   6.  Water & Fire Resistance         12.  Zero VOC




                                      Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
Cost Comparative Statement between Conventional Mortar and  Build Fast




Build Fast ‐ Cost Analysis ( Light Weight Blocks)

A)  CONVENTIONAL METHOD                                                            B) GBP BUILD FAST

             Approximate calculation for per 100sq.ft wall of                                       Approximate calculation for per 100sq.ft wall of
       using Conventional method for AAC Block 200X600X200mm                                     using GBP ‐ Build Fast for AAC Block 200X600X200mm



    ITEM / BRASS (100 sq.ft.)       Qty.       Rates     Value in (INR)                ITEM / BRASS (100 sq.ft.)          Qty.        Rates       Value in (INR)

Blocks                                  60          90           5400.00           Blocks                                        63       90                5670.00
Cement Bags                              2         250            500.00           Build Fast Bags (15 KG)                        2      550                1100.00
Sand (Cft)                              18          45            810.00           Sand (Cft)                                     0                            0.00
Water (Ltrs)                           200        0.06             12.00           Water (Ltrs)                                   0                            0.00
Labour Messon                            1         300            300.00           Labour Messon                                  1      300                 300.00
Helper                                   2         130            260.00           Helper                                         1      130                 130.00
In house material handelling                 lumpsum               20.00           In house material handelling                   0                            0.00
Wastage in sand & cement                     lumpsum               50.00           Wastage in sand & cement                       0                            0.00
Electricity                                8         6             48.00           Electricity                                    0                            0.00
Housekeeping                                 lumpsum              100.00           Housekeeping                                   0                            0.00
Curing Labour                                lumpsum              300.00           Curing Labour                                  0                            0.00
Overheads                                    lumpsum              200.00           Overheads                                      0                            0.00

COST OF CONVENTIONAL METHOD                                      8000.00           COST OF GBP BUILD FAST                                                      7200
(‐) COST OF GBP BUILD FAST                                       7200.00
NET SAVINGS AMT PLUS ADDED BENEFITS                               800.00            UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST

*Statutory & Govt Taxes extra                                                      1.  Eco Friendly                    7.  Excellent Bonding Strength
                                                                                   2.  Ready to Use                    8.  Water & Time Saving
                                                                                   3.  Self Curing                     9.  Excellent Pot Life
                                                                                   4.  Shrinkage Free                  10.  Non Hazardous
                                                                                   5.  Crack Resistance                11.  Zero Wastage
                                                                                   6.  Water & Fire Resistance         12.  Zero VOC




                                      Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
Cost Comparative Statement between Conventional Mortar and  Build Fast




Build Fast ‐ Cost Analysis ( Light Weight Blocks)

A)  CONVENTIONAL METHOD                                                            B) GBP BUILD FAST

             Approximate calculation for per 100sq.ft wall of                                       Approximate calculation for per 100sq.ft wall of
       using Conventional method for AAC Block 100X600X200mm                                     using GBP ‐ Build Fast for AAC Block 100X600X200mm



    ITEM / BRASS (100 sq.ft.)       Qty.       Rates     Value in (INR)                ITEM / BRASS (100 sq.ft.)          Qty.       Rates        Value in (INR)

Blocks                                  60        45.5           2730.00           Blocks                                      63        45.5               2866.50
Cement Bags                              1         250            250.00           Build Fast Bags (15 KG)                   1.42         550                781.00
Sand (Cft)                              12          45            540.00           Sand (Cft)                                   0                              0.00
Water (Ltrs)                           200        0.06             12.00           Water (Ltrs)                                 0                              0.00
Labour Messon                            1         300            300.00           Labour Messon                                1        300                 300.00
Helper                                   2         130            260.00           Helper                                       1        130                 130.00
In house material handelling                 lumpsum               20.00           In house material handelling                 0                              0.00
Wastage in sand & cement                     lumpsum               50.00           Wastage in sand & cement                     0                              0.00
Electricity                                8         6             48.00           Electricity                                  0                              0.00
Housekeeping                                 lumpsum              100.00           Housekeeping                                 0                              0.00
Curing Labour                                lumpsum              300.00           Curing Labour                                0                              0.00
Overheads                                    lumpsum              200.00           Overheads                                    0                              0.00

COST OF CONVENTIONAL METHOD                                      4810.00           COST OF GBP BUILD FAST                                                  4077.50
(‐) COST OF GBP BUILD FAST                                       4077.50
NET SAVINGS AMT PLUS ADDED BENEFITS                               732.50            UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST

*Statutory & Govt Taxes extra                                                      1.  Eco Friendly                    7.  Excellent Bonding Strength
                                                                                   2.  Ready to Use                    8.  Water & Time Saving
                                                                                   3.  Self Curing                     9.  Excellent Pot Life
                                                                                   4.  Shrinkage Free                  10.  Non Hazardous
                                                                                   5.  Crack Resistance                11.  Zero Wastage
                                                                                   6.  Water & Fire Resistance         12.  Zero VOC




                                      Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
Cost Comparative Statement between Conventional Mortar and  Build Fast




Build Fast ‐ Cost Analysis ( Concrete Blocks)

A)  CONVENTIONAL METHOD                                                             B) GBP BUILD FAST

            Approximate calculation for per 100sq.ft wall of                                        Approximate calculation for per 100sq.ft wall of
  using Conventional method for Concrete Blocks size 15' X7.5"X5.5"(w)                       using GBP ‐ Build Fast for Concrete Blcok Size 15' X7.5"X5.5" (w)



    ITEM / BRASS (100 sq.ft.)        Qty.       Rates     Value in (INR)                ITEM / BRASS (100 sq.ft.)          Qty.       Rates        Value in (INR)

Concrete Blocks                         100          40           4000.00           Concrete Blocks                            100         40                4000.00
Cement Bags (50 Kg)                       3         250            750.00           Build Fast Bags (15 KG)                     2.5       550                1375.00
Sand (Cft)                               20          45            900.00           Sand (Cft)                                    0                             0.00
Water (Ltrs)                            200        0.06             12.00           Water (Ltrs)                                  0                             0.00
Labour Messon                             1         450            450.00           Labour Messon                                 1       450                 450.00
Helper                                    2         180            360.00           Helper                                        1       180                 180.00
In house material handelling                  lumpsum               20.00           In house material handelling                  0                             0.00
Wastage in sand & cement                      lumpsum               50.00           Wastage in sand & cement                      0                             0.00
Electricity                                 8         6             48.00           Electricity                                   0                             0.00
Housekeeping                                  lumpsum              100.00           Housekeeping                                  0                             0.00
Curing Labour                                 lumpsum              300.00           Curing Labour                                 0                             0.00
Overheads                                     lumpsum              200.00           Overheads                                     0                             0.00

COST OF CONVENTIONAL METHOD                                       7190.00           COST OF GBP BUILD FAST                                                   6005.00
(‐) COST OF GBP BUILD FAST                                        6005.00
NET SAVINGS AMT PLUS ADDED BENEFITS                               1185.00            UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST

*Statutory & Govt Taxes extra                                                       1.  Eco Friendly                    7.  Excellent Bonding Strength
                                                                                    2.  Ready to Use                    8.  Water & Time Saving
                                                                                    3.  Self Curing                     9.  Excellent Pot Life
                                                                                    4.  Shrinkage Free                  10.  Non Hazardous
                                                                                    5.  Crack Resistance                11.  Zero Wastage
                                                                                    6.  Water & Fire Resistance         12.  Zero VOC




                                       Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
Cost Comparative Statement between Conventional Mortar and  Build Fast




Build Fast ‐ Cost Analysis ( FLY ASH BRICKS)
A)  CONVENTIONAL METHOD                                                              B) GBP BUILD FAST

             Approximate calculation for per 100sq.ft wall of                                         Approximate calculation for per 100sq.ft wall of
      using Conventional method for Fly Ash Bricks size 9"X 6" X 4"                               using GBP ‐ Build Fast for Fly Ash Bricks Size 9" X 6" X 4"



    ITEM / BRASS (100 sq.ft.)         Qty.       Rates      Value in (INR)               ITEM / BRASS (100 sq.ft.)          Qty.        Rates         Value in (INR)

Fly Ash Bricks                           354          5.5          1947.00           Fly Ash Bricks                             380          5.5                2090.00
Cement Bags (50 Kg)                       1.7        250            425.00           Build Fast Bags (15 KG)                      4         550                 2200.00
Sand (Cft)                                20           23           460.00           Sand (Cft)                                   0                                0.00
Water (Ltrs)                             200        0.06             12.00           Water (Ltrs)                                 0                                0.00
Labour Messon                               1        300            300.00           Labour Messon                                1         300                  300.00
Helper                                      2        130            260.00           Helper                                       1         130                  130.00
In house material handelling                   lumpsum               20.00           In house material handelling                 0                                0.00
Wastage in sand & cement                       lumpsum               50.00           Wastage in sand & cement                     0                                0.00
Electricity                                  8          6            48.00           Electricity                                  0                                0.00
Housekeeping                                   lumpsum              100.00           Housekeeping                                 0                                0.00
Curing Labour                                  lumpsum              300.00           Curing Labour                                0                                0.00
Overheads                                      lumpsum              200.00           Overheads                                    0                                0.00

COST OF CONVENTIONAL METHOD                                        4122.00           COST OF GBP BUILD FAST                                                     4720.00
(‐) COST OF GBP BUILD FAST                                         4720.00
ADDITIONAL AMT. for ADDED BENEFITS                                  798.00            UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST

*Statutory & Govt Taxes extra                                                        1.  Eco Friendly                    7.  Excellent Bonding Strength
                                                                                     2.  Ready to Use                    8.  Water & Time Saving
                                                                                     3.  Self Curing                     9.  Excellent Pot Life
                                                                                     4.  Shrinkage Free                  10.  Non Hazardous
                                                                                     5.  Crack Resistance                11.  Zero Wastage
                                                                                     6.  Water & Fire Resistance         12.  Zero VOC




                                        Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction

More Related Content

Similar to Build fast cost comparison

Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdownarmada7000
 
Pe Insights Presentation (Syd) Aug09
Pe   Insights Presentation (Syd)   Aug09Pe   Insights Presentation (Syd)   Aug09
Pe Insights Presentation (Syd) Aug09peben
 
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...Commerce Resources Corp. (TSXv:CCE)
 
Solution of Outsourcing Problem for Filatoi Riuniti
Solution of Outsourcing Problem for Filatoi RiunitiSolution of Outsourcing Problem for Filatoi Riuniti
Solution of Outsourcing Problem for Filatoi Riunitikilluaanna
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08Haitham Sharnouby
 
Get in the flippin game flipping homes presentation - joleen halloran kelle...
Get in the flippin game   flipping homes presentation - joleen halloran kelle...Get in the flippin game   flipping homes presentation - joleen halloran kelle...
Get in the flippin game flipping homes presentation - joleen halloran kelle...Joleen Halloran, PMP
 
Reducing Embodied Carbon with David Mar - COTE 3/8/2011
Reducing Embodied Carbon with David Mar - COTE 3/8/2011Reducing Embodied Carbon with David Mar - COTE 3/8/2011
Reducing Embodied Carbon with David Mar - COTE 3/8/2011aiasf_11
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012Samuel Hernandez
 
Apollo Insulation Aluminum Composite Foils - Catalog 2012
Apollo Insulation Aluminum Composite Foils - Catalog 2012Apollo Insulation Aluminum Composite Foils - Catalog 2012
Apollo Insulation Aluminum Composite Foils - Catalog 2012Trading Green Ltd.
 
1257 1267 1357 1367 zero bacteria food grade valves
1257 1267 1357 1367 zero bacteria food grade valves1257 1267 1357 1367 zero bacteria food grade valves
1257 1267 1357 1367 zero bacteria food grade valvesChaitannya Mahatme
 

Similar to Build fast cost comparison (15)

Fly ash presentation
Fly ash presentationFly ash presentation
Fly ash presentation
 
Fly ash presentation
Fly ash presentationFly ash presentation
Fly ash presentation
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdown
 
Pe Insights Presentation (Syd) Aug09
Pe   Insights Presentation (Syd)   Aug09Pe   Insights Presentation (Syd)   Aug09
Pe Insights Presentation (Syd) Aug09
 
Tomt951b
Tomt951bTomt951b
Tomt951b
 
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
News Release: Positive Preliminary Economic Assessment for Upper Fir Tantalum...
 
Solution of Outsourcing Problem for Filatoi Riuniti
Solution of Outsourcing Problem for Filatoi RiunitiSolution of Outsourcing Problem for Filatoi Riuniti
Solution of Outsourcing Problem for Filatoi Riuniti
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
Get in the flippin game flipping homes presentation - joleen halloran kelle...
Get in the flippin game   flipping homes presentation - joleen halloran kelle...Get in the flippin game   flipping homes presentation - joleen halloran kelle...
Get in the flippin game flipping homes presentation - joleen halloran kelle...
 
Reducing Embodied Carbon with David Mar - COTE 3/8/2011
Reducing Embodied Carbon with David Mar - COTE 3/8/2011Reducing Embodied Carbon with David Mar - COTE 3/8/2011
Reducing Embodied Carbon with David Mar - COTE 3/8/2011
 
4 eco tourism development2012
4 eco tourism development20124 eco tourism development2012
4 eco tourism development2012
 
Apollo Insulation Aluminum Composite Foils - Catalog 2012
Apollo Insulation Aluminum Composite Foils - Catalog 2012Apollo Insulation Aluminum Composite Foils - Catalog 2012
Apollo Insulation Aluminum Composite Foils - Catalog 2012
 
1257 1267 1357 1367 zero bacteria food grade valves
1257 1267 1357 1367 zero bacteria food grade valves1257 1267 1357 1367 zero bacteria food grade valves
1257 1267 1357 1367 zero bacteria food grade valves
 
Expenses
ExpensesExpenses
Expenses
 
Expenses
ExpensesExpenses
Expenses
 

Recently uploaded

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 

Build fast cost comparison

  • 1. Cost Comparative Statement between Conventional Mortar and  Build Fast Build Fast ‐ Cost Analysis ( Light Weight Blocks) A)  CONVENTIONAL METHOD B) GBP BUILD FAST Approximate calculation for per 100sq.ft wall of Approximate calculation for per 100sq.ft wall of using Conventional method for AAC Block 150X600X200mm using GBP ‐ Build Fast for AAC Block 150X600X200mm         ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) Blocks 60 65 3900.00 Blocks 63 65 4095.00 Cement Bags 1.5 250 375.00 Build Fast Bags (15 KG) 1.666 550 916.30 Sand (Cft) 15 45 675.00 Sand (Cft) 0 0.00 Water (Ltrs) 200 0.06 12.00 Water (Ltrs) 0 0.00 Labour Messon 1 300 300.00 Labour Messon 1 300 300.00 Helper  2 130 260.00 Helper  1 130 130.00 In house material handelling lumpsum 20.00 In house material handelling 0 0.00 Wastage in sand & cement lumpsum 50.00 Wastage in sand & cement 0 0.00 Electricity 8 6 48.00 Electricity 0 0.00 Housekeeping  lumpsum 100.00 Housekeeping  0 0.00 Curing Labour lumpsum 300.00 Curing Labour 0 0.00 Overheads lumpsum 200.00 Overheads 0 0.00 COST OF CONVENTIONAL METHOD 6240.00 COST OF GBP BUILD FAST 5441.3 (‐) COST OF GBP BUILD FAST 5441.30 NET SAVINGS AMT PLUS ADDED BENEFITS 798.70 UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST *Statutory & Govt Taxes extra 1.  Eco Friendly 7.  Excellent Bonding Strength 2.  Ready to Use 8.  Water & Time Saving 3.  Self Curing 9.  Excellent Pot Life 4.  Shrinkage Free 10.  Non Hazardous 5.  Crack Resistance 11.  Zero Wastage 6.  Water & Fire Resistance 12.  Zero VOC Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
  • 2. Cost Comparative Statement between Conventional Mortar and  Build Fast Build Fast ‐ Cost Analysis ( Light Weight Blocks) A)  CONVENTIONAL METHOD B) GBP BUILD FAST Approximate calculation for per 100sq.ft wall of Approximate calculation for per 100sq.ft wall of using Conventional method for AAC Block 200X600X200mm using GBP ‐ Build Fast for AAC Block 200X600X200mm ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) Blocks 60 90 5400.00 Blocks 63 90 5670.00 Cement Bags 2 250 500.00 Build Fast Bags (15 KG) 2 550 1100.00 Sand (Cft) 18 45 810.00 Sand (Cft) 0 0.00 Water (Ltrs) 200 0.06 12.00 Water (Ltrs) 0 0.00 Labour Messon 1 300 300.00 Labour Messon 1 300 300.00 Helper  2 130 260.00 Helper  1 130 130.00 In house material handelling lumpsum 20.00 In house material handelling 0 0.00 Wastage in sand & cement lumpsum 50.00 Wastage in sand & cement 0 0.00 Electricity 8 6 48.00 Electricity 0 0.00 Housekeeping  lumpsum 100.00 Housekeeping  0 0.00 Curing Labour lumpsum 300.00 Curing Labour 0 0.00 Overheads lumpsum 200.00 Overheads 0 0.00 COST OF CONVENTIONAL METHOD 8000.00 COST OF GBP BUILD FAST 7200 (‐) COST OF GBP BUILD FAST 7200.00 NET SAVINGS AMT PLUS ADDED BENEFITS 800.00 UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST *Statutory & Govt Taxes extra 1.  Eco Friendly 7.  Excellent Bonding Strength 2.  Ready to Use 8.  Water & Time Saving 3.  Self Curing 9.  Excellent Pot Life 4.  Shrinkage Free 10.  Non Hazardous 5.  Crack Resistance 11.  Zero Wastage 6.  Water & Fire Resistance 12.  Zero VOC Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
  • 3. Cost Comparative Statement between Conventional Mortar and  Build Fast Build Fast ‐ Cost Analysis ( Light Weight Blocks) A)  CONVENTIONAL METHOD B) GBP BUILD FAST Approximate calculation for per 100sq.ft wall of Approximate calculation for per 100sq.ft wall of using Conventional method for AAC Block 100X600X200mm using GBP ‐ Build Fast for AAC Block 100X600X200mm ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) Blocks 60 45.5 2730.00 Blocks 63 45.5 2866.50 Cement Bags 1 250 250.00 Build Fast Bags (15 KG) 1.42 550 781.00 Sand (Cft) 12 45 540.00 Sand (Cft) 0 0.00 Water (Ltrs) 200 0.06 12.00 Water (Ltrs) 0 0.00 Labour Messon 1 300 300.00 Labour Messon 1 300 300.00 Helper  2 130 260.00 Helper  1 130 130.00 In house material handelling lumpsum 20.00 In house material handelling 0 0.00 Wastage in sand & cement lumpsum 50.00 Wastage in sand & cement 0 0.00 Electricity 8 6 48.00 Electricity 0 0.00 Housekeeping  lumpsum 100.00 Housekeeping  0 0.00 Curing Labour lumpsum 300.00 Curing Labour 0 0.00 Overheads lumpsum 200.00 Overheads 0 0.00 COST OF CONVENTIONAL METHOD 4810.00 COST OF GBP BUILD FAST 4077.50 (‐) COST OF GBP BUILD FAST 4077.50 NET SAVINGS AMT PLUS ADDED BENEFITS 732.50 UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST *Statutory & Govt Taxes extra 1.  Eco Friendly 7.  Excellent Bonding Strength 2.  Ready to Use 8.  Water & Time Saving 3.  Self Curing 9.  Excellent Pot Life 4.  Shrinkage Free 10.  Non Hazardous 5.  Crack Resistance 11.  Zero Wastage 6.  Water & Fire Resistance 12.  Zero VOC Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
  • 4. Cost Comparative Statement between Conventional Mortar and  Build Fast Build Fast ‐ Cost Analysis ( Concrete Blocks) A)  CONVENTIONAL METHOD B) GBP BUILD FAST Approximate calculation for per 100sq.ft wall of Approximate calculation for per 100sq.ft wall of using Conventional method for Concrete Blocks size 15' X7.5"X5.5"(w) using GBP ‐ Build Fast for Concrete Blcok Size 15' X7.5"X5.5" (w) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) Concrete Blocks 100 40 4000.00 Concrete Blocks 100 40 4000.00 Cement Bags (50 Kg) 3 250 750.00 Build Fast Bags (15 KG) 2.5 550 1375.00 Sand (Cft) 20 45 900.00 Sand (Cft) 0 0.00 Water (Ltrs) 200 0.06 12.00 Water (Ltrs) 0 0.00 Labour Messon 1 450 450.00 Labour Messon 1 450 450.00 Helper  2 180 360.00 Helper  1 180 180.00 In house material handelling lumpsum 20.00 In house material handelling 0 0.00 Wastage in sand & cement lumpsum 50.00 Wastage in sand & cement 0 0.00 Electricity 8 6 48.00 Electricity 0 0.00 Housekeeping  lumpsum 100.00 Housekeeping  0 0.00 Curing Labour lumpsum 300.00 Curing Labour 0 0.00 Overheads lumpsum 200.00 Overheads 0 0.00 COST OF CONVENTIONAL METHOD 7190.00 COST OF GBP BUILD FAST 6005.00 (‐) COST OF GBP BUILD FAST 6005.00 NET SAVINGS AMT PLUS ADDED BENEFITS 1185.00 UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST *Statutory & Govt Taxes extra 1.  Eco Friendly 7.  Excellent Bonding Strength 2.  Ready to Use 8.  Water & Time Saving 3.  Self Curing 9.  Excellent Pot Life 4.  Shrinkage Free 10.  Non Hazardous 5.  Crack Resistance 11.  Zero Wastage 6.  Water & Fire Resistance 12.  Zero VOC Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction
  • 5. Cost Comparative Statement between Conventional Mortar and  Build Fast Build Fast ‐ Cost Analysis ( FLY ASH BRICKS) A)  CONVENTIONAL METHOD B) GBP BUILD FAST Approximate calculation for per 100sq.ft wall of Approximate calculation for per 100sq.ft wall of using Conventional method for Fly Ash Bricks size 9"X 6" X 4"  using GBP ‐ Build Fast for Fly Ash Bricks Size 9" X 6" X 4" ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) ITEM / BRASS (100 sq.ft.) Qty. Rates Value in (INR) Fly Ash Bricks 354 5.5 1947.00 Fly Ash Bricks 380 5.5 2090.00 Cement Bags (50 Kg) 1.7 250 425.00 Build Fast Bags (15 KG) 4 550 2200.00 Sand (Cft) 20 23 460.00 Sand (Cft) 0 0.00 Water (Ltrs) 200 0.06 12.00 Water (Ltrs) 0 0.00 Labour Messon 1 300 300.00 Labour Messon 1 300 300.00 Helper  2 130 260.00 Helper  1 130 130.00 In house material handelling lumpsum 20.00 In house material handelling 0 0.00 Wastage in sand & cement lumpsum 50.00 Wastage in sand & cement 0 0.00 Electricity 8 6 48.00 Electricity 0 0.00 Housekeeping  lumpsum 100.00 Housekeeping  0 0.00 Curing Labour lumpsum 300.00 Curing Labour 0 0.00 Overheads lumpsum 200.00 Overheads 0 0.00 COST OF CONVENTIONAL METHOD 4122.00 COST OF GBP BUILD FAST 4720.00 (‐) COST OF GBP BUILD FAST 4720.00 ADDITIONAL AMT. for ADDED BENEFITS 798.00 UNIQUE FEATURES OF GBP‐BUILD FAST & ITS ADDED BENEFITS FREE OF COST *Statutory & Govt Taxes extra 1.  Eco Friendly 7.  Excellent Bonding Strength 2.  Ready to Use 8.  Water & Time Saving 3.  Self Curing 9.  Excellent Pot Life 4.  Shrinkage Free 10.  Non Hazardous 5.  Crack Resistance 11.  Zero Wastage 6.  Water & Fire Resistance 12.  Zero VOC Green Build Products (I) Pvt. Ltd.................... One Step Ahead Towards Green Clean Construction