This document describes a study investigating the potential of plant species found in areas of historic gold mining in Bendigo, Victoria to remediate arsenic contaminated soils through phytoremediation. The study included sampling vegetation and soils from contaminated and uncontaminated sites in Bendigo and growing three early colonizing plant species (C. arcuata, E. leucoxylon, A. pycnantha) in collected contaminated soil and spiked/unspiked potting mix in a greenhouse. Results found that none of the species accumulated significant arsenic in above-ground biomass, making them unsuitable for phytoextraction. However, C. arcuata and E. leucoxylon