CROWNE PLAZA
ANAHEIM, CA
April 24-25, 2014
PACIFIC
COAST
Kelli Lubeley
Power Up Your Project
with Electrical Families
LEARNING OBJECTIVES
• Understand the parameters associated with power connectors and
how they relate to panel schedules
• Define connectors for non-power electrical elements
• Understand panel families and how to create panels and devices for
custom electrical systems
• Use spaces and zones to spatially organize systems
Understanding Electrical Connectors
In the Family Editor…
• System Type
• Number of Poles
• Power State Factor
• Load Classification
• Voltage
• Apparent Load
• Power Factor
In the Project…
In the Project…
What’s Important?
It’s all about Connector Parameters
1. Voltage
2. Apparent Load
3. Load Classification
4. Number of Poles
Non-Power Connector Types
Data
Fire Alarm
Nurse Call
Communication
Controls
Security
Telephone
If we do this…
Why aren’t we doing this…
We rely on this…
Why not…
Special Panel Families
+ =
Panel Schedules
Systems &
Circuiting
Coordination &
Details
It’s as easy as…
1. Create a family defined as
Electrical Equipment.
2. Select “Other Panel” under
Part Type.
3. Assign the Connector to the
correct System Type.
Customizing Panel Shedules
General Settings
Circuit Table
Loads Summary
1. Select a cell in the panel schedule template.
2. In the Choose Category drop-down, select a category.
3. In the Add Parameter drop-down, select a parameter.
Using Spaces and Zones
Annotation in Electrical Families
The problem with wall mounted fixtures:
The Fix
Ta da!!!
Lighting Fixtures for Multi-Discipline
Projects
Placed in MEP Model Appearance in ARCH Model
Lighting Fixtures for Multi-Discipline
Projects
Placed in MEP Model Appearance in ARCH Model
Thank You!
Kelli Lubeley
Virtual Design Coordinator
Dewberry
klubeley@dewberry.com

More Related Content

Viewers also liked

Зоопарк-урок в первом классе
Зоопарк-урок в первом классеЗоопарк-урок в первом классе
Зоопарк-урок в первом классе
Sergey_Nosal
 
CV_LI XIAONI
CV_LI XIAONICV_LI XIAONI
CV_LI XIAONIAnnie Li
 
Flying Talk
Flying TalkFlying Talk
Flying Talk
flyingtalk
 
итоги воспитательной работы 3«б» класса за 2013 2014гг
итоги воспитательной работы 3«б» класса за 2013 2014ггитоги воспитательной работы 3«б» класса за 2013 2014гг
итоги воспитательной работы 3«б» класса за 2013 2014гг
cbyfdf
 
nama ella azhari, nim: 140601009
nama ella azhari, nim: 140601009nama ella azhari, nim: 140601009
nama ella azhari, nim: 140601009
ellaazh
 
Alexandra de Curts SS 2016 Lookbook
Alexandra de Curts SS 2016 LookbookAlexandra de Curts SS 2016 Lookbook
Alexandra de Curts SS 2016 LookbookAlexandra de Curtis
 
Agile for Marketing Backlog Series - Visual Primer
Agile for Marketing Backlog Series - Visual PrimerAgile for Marketing Backlog Series - Visual Primer
Agile for Marketing Backlog Series - Visual Primer
CMG Partners
 
Talent Growth Hacking by Philip Fanthom
Talent Growth Hacking by Philip FanthomTalent Growth Hacking by Philip Fanthom
Talent Growth Hacking by Philip Fanthom
Kevin Matthews
 
итоги воспитательной работы за 2012 2013гг
итоги воспитательной работы за 2012  2013ггитоги воспитательной работы за 2012  2013гг
итоги воспитательной работы за 2012 2013гг
cbyfdf
 
Kentsbridge University Masters Degree Program Prospectus
Kentsbridge University Masters Degree Program ProspectusKentsbridge University Masters Degree Program Prospectus
Kentsbridge University Masters Degree Program Prospectus
Kentsbridgeuni
 
portfolio.compressed (1)
portfolio.compressed (1)portfolio.compressed (1)
portfolio.compressed (1)Hailey Steed
 

Viewers also liked (16)

Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
Зоопарк-урок в первом классе
Зоопарк-урок в первом классеЗоопарк-урок в первом классе
Зоопарк-урок в первом классе
 
ADC SS16 Lookbook SINGLES
ADC SS16 Lookbook SINGLESADC SS16 Lookbook SINGLES
ADC SS16 Lookbook SINGLES
 
CV_LI XIAONI
CV_LI XIAONICV_LI XIAONI
CV_LI XIAONI
 
Flying Talk
Flying TalkFlying Talk
Flying Talk
 
ACAR-PD_May'2014-July'2015_FINAL
ACAR-PD_May'2014-July'2015_FINALACAR-PD_May'2014-July'2015_FINAL
ACAR-PD_May'2014-July'2015_FINAL
 
итоги воспитательной работы 3«б» класса за 2013 2014гг
итоги воспитательной работы 3«б» класса за 2013 2014ггитоги воспитательной работы 3«б» класса за 2013 2014гг
итоги воспитательной работы 3«б» класса за 2013 2014гг
 
nama ella azhari, nim: 140601009
nama ella azhari, nim: 140601009nama ella azhari, nim: 140601009
nama ella azhari, nim: 140601009
 
Alexandra de Curts SS 2016 Lookbook
Alexandra de Curts SS 2016 LookbookAlexandra de Curts SS 2016 Lookbook
Alexandra de Curts SS 2016 Lookbook
 
No_31-1
No_31-1No_31-1
No_31-1
 
Agile for Marketing Backlog Series - Visual Primer
Agile for Marketing Backlog Series - Visual PrimerAgile for Marketing Backlog Series - Visual Primer
Agile for Marketing Backlog Series - Visual Primer
 
Talent Growth Hacking by Philip Fanthom
Talent Growth Hacking by Philip FanthomTalent Growth Hacking by Philip Fanthom
Talent Growth Hacking by Philip Fanthom
 
итоги воспитательной работы за 2012 2013гг
итоги воспитательной работы за 2012  2013ггитоги воспитательной работы за 2012  2013гг
итоги воспитательной работы за 2012 2013гг
 
Playground mats&tiles
Playground mats&tilesPlayground mats&tiles
Playground mats&tiles
 
Kentsbridge University Masters Degree Program Prospectus
Kentsbridge University Masters Degree Program ProspectusKentsbridge University Masters Degree Program Prospectus
Kentsbridge University Masters Degree Program Prospectus
 
portfolio.compressed (1)
portfolio.compressed (1)portfolio.compressed (1)
portfolio.compressed (1)
 

Similar to BIMWorkshops_Electrical Families

Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
Transcat Design
 
Power Systems Training Course for Non-Engineers
Power Systems Training Course for Non-EngineersPower Systems Training Course for Non-Engineers
Power Systems Training Course for Non-Engineers
Tonex
 
Myths and realities about designing high availability data centers
Myths and realities about designing high availability data centersMyths and realities about designing high availability data centers
Myths and realities about designing high availability data centers
Morrison Hershfield
 
Customer Perceptions of New AMI Meters
Customer Perceptions of New AMI MetersCustomer Perceptions of New AMI Meters
Customer Perceptions of New AMI Meters
TESCO - The Eastern Specialty Company
 
Healthcare electrical power
Healthcare electrical powerHealthcare electrical power
Healthcare electrical power
Romeo Cretu
 
POWER QUALITY AUDIT -PM ELECTRONICS
POWER QUALITY AUDIT -PM ELECTRONICSPOWER QUALITY AUDIT -PM ELECTRONICS
POWER QUALITY AUDIT -PM ELECTRONICS
PM ELECTRONICS
 
Power Quality Standards
Power Quality StandardsPower Quality Standards
Power Quality Standards
Rajesh Thangaraj
 
solar Energy and fire service protection required
solar Energy and fire service protection requiredsolar Energy and fire service protection required
solar Energy and fire service protection required
AvishekGhosal4
 
Optimizing Power System Reliability.pptx
Optimizing Power System Reliability.pptxOptimizing Power System Reliability.pptx
Optimizing Power System Reliability.pptx
diatechin
 
H07 Power Load Survey
H07 Power Load SurveyH07 Power Load Survey
H07 Power Load Survey
phase3-120A
 
Practical Power Quality Measurements and Fixes Presented by Fluke and Transcat
Practical Power Quality Measurements and Fixes Presented by Fluke and TranscatPractical Power Quality Measurements and Fixes Presented by Fluke and Transcat
Practical Power Quality Measurements and Fixes Presented by Fluke and Transcat
Transcat
 
POWER SUPPLY-WPS Office.pptx
POWER   SUPPLY-WPS Office.pptxPOWER   SUPPLY-WPS Office.pptx
POWER SUPPLY-WPS Office.pptx
NioLemuelLazatinConc
 
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
GirlyPedregosa1
 
Sqa l01 1
Sqa l01 1Sqa l01 1
Sqa l01 1
Seema Shah
 
bittuai-160426173847 (1) (1).pptx
bittuai-160426173847 (1) (1).pptxbittuai-160426173847 (1) (1).pptx
bittuai-160426173847 (1) (1).pptx
DiwakarDiwakar12
 
Data Wrangler Presentation.pptx
Data Wrangler Presentation.pptxData Wrangler Presentation.pptx
Data Wrangler Presentation.pptx
WayneDehn1
 

Similar to BIMWorkshops_Electrical Families (18)

Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
Fluke and Transcat Webinar: Turning Power Quality Measurements Into Actionabl...
 
Power Systems Training Course for Non-Engineers
Power Systems Training Course for Non-EngineersPower Systems Training Course for Non-Engineers
Power Systems Training Course for Non-Engineers
 
Myths and realities about designing high availability data centers
Myths and realities about designing high availability data centersMyths and realities about designing high availability data centers
Myths and realities about designing high availability data centers
 
Customer Perceptions of New AMI Meters
Customer Perceptions of New AMI MetersCustomer Perceptions of New AMI Meters
Customer Perceptions of New AMI Meters
 
Healthcare electrical power
Healthcare electrical powerHealthcare electrical power
Healthcare electrical power
 
POWER QUALITY AUDIT -PM ELECTRONICS
POWER QUALITY AUDIT -PM ELECTRONICSPOWER QUALITY AUDIT -PM ELECTRONICS
POWER QUALITY AUDIT -PM ELECTRONICS
 
Power Quality Standards
Power Quality StandardsPower Quality Standards
Power Quality Standards
 
solar Energy and fire service protection required
solar Energy and fire service protection requiredsolar Energy and fire service protection required
solar Energy and fire service protection required
 
Optimizing Power System Reliability.pptx
Optimizing Power System Reliability.pptxOptimizing Power System Reliability.pptx
Optimizing Power System Reliability.pptx
 
H07 Power Load Survey
H07 Power Load SurveyH07 Power Load Survey
H07 Power Load Survey
 
Power quality
Power qualityPower quality
Power quality
 
Practical Power Quality Measurements and Fixes Presented by Fluke and Transcat
Practical Power Quality Measurements and Fixes Presented by Fluke and TranscatPractical Power Quality Measurements and Fixes Presented by Fluke and Transcat
Practical Power Quality Measurements and Fixes Presented by Fluke and Transcat
 
POWER SUPPLY-WPS Office.pptx
POWER   SUPPLY-WPS Office.pptxPOWER   SUPPLY-WPS Office.pptx
POWER SUPPLY-WPS Office.pptx
 
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
TLE CES NC II Y2 - Module 4 - Terminating and Connecting of Electrical Wiring...
 
MaddieDrake_ ResearchPoster
MaddieDrake_ ResearchPosterMaddieDrake_ ResearchPoster
MaddieDrake_ ResearchPoster
 
Sqa l01 1
Sqa l01 1Sqa l01 1
Sqa l01 1
 
bittuai-160426173847 (1) (1).pptx
bittuai-160426173847 (1) (1).pptxbittuai-160426173847 (1) (1).pptx
bittuai-160426173847 (1) (1).pptx
 
Data Wrangler Presentation.pptx
Data Wrangler Presentation.pptxData Wrangler Presentation.pptx
Data Wrangler Presentation.pptx
 

BIMWorkshops_Electrical Families