Page 1 of 7 
BHASKAR KOTA 
4805242357 
(bhaskarkota.sas@gmail.com) 
EDUCATION: 
 Master of Technology with specialization in Control Systems from Veermatha Jijabhai 
technological institute (VJTI) Mumbai, India. 
 Bachelor of Technology with specialization in Electrical and Electronics Engineering from 
Jawaharlal Nehru Technological University. 
PROFESSIONAL SUMMARY: 
 SAS Base & Advanced Certified professional with over 7 years of experience in 
developing software applications for Financial, Health Care and Insurance sectors. 
 Proficient in SAS/BASE, SAS/EG, SAS/MACROS, SAS/Connect, SAS/SQL, SAS/ODS, 
SAS Arrays, SAS/STAT, SAS/GRAPH,UNIX Shell Scripting, NDM Scripting, and SFTP. 
 Worked extensively with SAS on UNIX, Windows and Mainframes, SAS Enterprise 
Guide, PC-SAS. 
 Ability to turn business requirements into Technical Design specifications and documents, 
SAS Programs, and SQL Queries related to quantitative, statistical and financial models. 
Capable of working with cross-functional teams to manage projects, determine 
prioritization, and create appropriate timelines. 
 Professional Experience with Import Various External Data Files into SAS Dataset / SAS 
Library by Using SAS/ACCESS, SAS/INFILE, SAS/IMPORT, SAS/SQL. 
 Extensively worked on various RDBMS like Oracle and SQL Server. 
 Four years of experience at Onsite Client location and 3+ yrs of experience at offshore 
location. 
 Extensive Experience in arranging and participating in meetings with Business Users and 
suggesting recommendations for improving system performance. 
 Worked in Production support, Development, Technical project requests, Enhancement, 
implementation support, post-production batch monitoring and Client issues for all 
supported applications. 
 Develop project plan, work-breakdown-structure, metrics, tasks lists, action items, Identify 
critical paths. Understand and define priorities and milestones. 
 Proven skills in efficient processing of millions of records of data, optimizing SAS 
programs for better performance. ETL process design, Analyzing, Reporting and 
migrating Data from multiple platforms/databses(UNIX, SQL Server, Oracle, Teradata, 
Mainframes, DB2) using SAS, NDM and SFTP. Statistical distributions and calculations. 
 Involved in all stages of SDLC (Software Development Life Cycle). 
 Thorough Knowledge and experience in Microsoft Office tools like MS Access, MS 
SharePoint, MS word, MS PowerPoint, MS Excel. 
 Proven abilities in establishing effective task priorities as a team player with result 
oriented attitude. 
 Excellent working experience in tools such as INFOMAN, Maestro, Autosys, Resolve IT 
and ServiseNow. 
 Involved in different server setups for new projects and accessing destination servers on 
various operating systems such as Unix, Windows and Mainframes. 
 Have knowledge on HADOOP-HDFS, PIG,SQOOP,HIVE,HBASE and MapReduce.
Page 2 of 7 
TECHNICAL SKILLS: 
 SAS Tools: SAS/BASE, SAS/MACRO, SAS/SQL, SAS/STAT, SAS/Access, SAS/ODS, 
SAS/Internet SAS/GRAPH. 
 Database: Oracle, DB2, MS-SQL Server 2000, MS Access. 
 Operating Systems: UNIX, MS Windows (95, 98, 2000, NT, XP), MS-DOS, MVS. 
 Languages: SQL, PL-SQL 
 Development Tools: MS Office (Word, Excel, Power Point, Access) 
 Scheduling tools : Maestro, Autosys 
 Special Software : Infoman, Resove IT,Autosys(Work Load Center) and ServiseNow 
Professional Memberships / Certifications 
Professional Society / Certification Member Since / Date Certified 
IBM Certified Database Associate - DB2 Universal 
02/01/2008 
Database (DB2 UDB) V8.1 Family - Test 700 
Sun Certified Programmer for the Java 2 Platform, 
Standard Edition 5.0 - 310-055 
03/01/2008 
Exam 1Z0-007: Introduction to Oracle9i : SQL 03/13/2009 
Certificate in Banking & Finance V2 11/16/2009 
SAS Base Programming for SAS9(211) 09/29/2010 
SAS Advanced Programming for SAS 9(212) 08/17/2012 
AREAS/APLICATIONS 
 Real-estate(REL)/Mortgage 
 Citi Financial North America(CFNA) 
 Banking Domain :BOA credit cards and Citi Bank North America (CBNA)/UCCB. 
 Retail business. 
 Insurance 
CAREER PROFILE 
1) Since June 2010 till date – CITI GROUP 
Client CITI Group 
Project Name Non-Cards Solutions Bridging Group 
Duration From Feb 2011 – till date 
Line of business of 
REL,CFNA,CBNA and CARDS 
the client 
About the project  The primary objective for the Non-Cards SB group is to provide rapid 
technology Solutions when a traditional IT solution is either not required 
or cannot be achieved within the timeframe mandated by business 
needs. Our team supports all lines of business, including Cards (Private 
Label / FDR only), CFNA/One Main, UCCB and REL. The technology 
framework we operate within consists of primarily SAS and SQL code 
executed in a Unix environment, though we do have a small mainframe 
application that is still supported by our group. 
 Project requests are received via a CCR project request. Once captured 
in that system the requests are routed to the CCLM repository where 
they are tracked during the project life cycle. Project status is updated 
routinely on that site where upper management in the Collections COE
can view them. Simultaneously projects will have corresponding 
Planview requests and support tickets opened for tracking hours spent 
and for managing all required project artifacts during its lifecycle. 
 Our products are delivered to our customer base using several methods, 
including NDM and SFT data transfers, SharePoint repositories loaded 
via SMTP transfers (email) and externally to vendors using CitiSFT via 
SFTP. The vendors we interface with today include Soundbite, ORCC, 
Venture, Convergys and Sapient. 
 The team includes 3 in Offshore and 5 at onsite. 
 The technologies used for the Project are SAS, Oracle, SQL Server, 
Page 3 of 7 
Unix ,NDM scripting and Secure File Transfer (SFT) 
Role Project Leader 
Activities  Involved in requirements gathering & Estimation of Efforts. 
 Design Preparation. 
 Assigning the projects to the team based on capacity. 
 Follow-up with the team and making sure the work done on time. 
 Successfully completed more than 20 development projects. 
 Developed SAS code and SQL’s for Data Extraction and Loading into 
flat files. 
 Reviewing Unit Test cases to make sure testing is done properly. 
 Conducting Final Inspection & Audit. 
 Regular Status meetings with the clients and TCS Managers on the 
progress of tasks. 
 Sharing of Knowledge with the team members. 
 Tracking and updating the project status by using the CCLM repository. 
Technical Platform Operating system: Windows Server 2000/ UNIX 
Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, 
Autosys and Resolve IT. 
Database: Oracle, SQL Server 
Location CITIGROUP, IRVING,TX,U.S.A 
Client CITI Group 
Project Name Leveraged Solutions Bridging Production Support 
Duration From Oct 2010 – Feb 2011 
Line of business of 
REL,CFNA,CBNA and CARDS 
the client 
About the project  The prime objective of Solutions Bridging production support team is to 
offer quick solutions unlike any normal development team. The team 
includes 4 in Offshore and 1 at onsite. 
 The primary function of the Leveraged Solutions Bridging Production 
Support team is to identify any production issues and work those issues 
through to resolution. The issues should be resolved within a 24 hour 
period for processes running daily. Those processes running less 
frequently would generally need to be dealt with in 24 to 48 hours 
depending on the job in question. 
 Notifications are received when jobs fail for any reason but can also be 
triggered by non-fatal issues that should be investigated. LSB has two 
means of receiving notifications for job failures/alerts. The first 
notification is usually via an automated email. The second means of 
notification is via the command center. Often both notifications are 
delivered but not always. 
 UNIX script errors are generally trapped by Maestro. Maestro has a web 
tool that can be used to view any error messages trapped from an
Page 4 of 7 
abended process. 
Role Team Lead 
Activities  Involved in presenting induction to the new joiners in the project 
 Worked as primary point of contact for all the Production support jobs 
 Resolved all the abends on time and achieved the customer confidence 
 Developed SAS code and SQL’s for Data Extraction and Loading into 
flat files. 
 Regular Status meetings with the clients and TCS Managers on the 
progress of tasks. 
 Automating the Job failures/alerts notification process by using the UNIX 
Scripting. 
 Resolved the abends as soon as received a call from command center. 
Technical Platform Operating system: Windows Server 2000/ UNIX 
Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, 
Autosys and Resolve IT. 
Database: Oracle, SQL Server 
Location CITIGROUP, IRVING,TX,U.S.A 
Client CITI Group 
Project Name CITI Cards – Collections 
Duration From July 2010 – OCT 2010 
Line of business of 
CITI CARDS 
the client 
About the project In CITI Cards Collections, DRI - Diversified Resolutions Incorporated is a default 
application when a loan becomes default for a user the account gets in to the 
collection/ default processing system. It is a system where the loan account gets 
the default processing service done. The project recreates the existing default 
system of CITI and merges it in to a single GUI application and integrates all the 
modules on a single sign on system. 
Role Team Member 
Activities  Requirement Analysis 
 Create and review the design documents (both HLD and LLD) 
 Development and Coding 
 Test script Preparation 
 Unit and System Testing 
 Reviewing and Delivering 
 Bug Fixing 
 Conducting Final Inspection & Audit 
 Sharing of Knowledge with the team members 
 Regular Status meetings with the clients and TCS Managers on the 
progress of tasks. 
 Published the knowledge based documents into Knowmax. 
 Published code snippets in Mighty for automation which avoids re-work. 
 Prepared implementation Documents for Production implementation by 
Maestro Team. 
Technical Platform Operating system: Windows Server 2000/ UNIX 
Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, 
Autosys and Resolve IT. 
Database: Oracle, SQL Server 
Location TCS, Chennai, India
Page 5 of 7 
2) Since July 2009 to June 2010 
Client Name Bank of America 
Title Information Management Non Basel - Information Analytics Foundation 
Collections (IAF - COLLECTIONS) 
Period Since July 2009 to June 2010 
Position Team Member 
Line of business Credit Cards, Banking 
About the project  The goal of the initiative is to produce a number of data extracts 
from the BACARDI database which will be fed to the IAF - 
COLLECTIONS platform by way of the JMS subsystem. The 
programming language used to produce these extracts will be 
SAS. 
 In addition to the daily scheduled extracts and transfers, a one-time 
full extract for each feed will need to be produced in order to 
initialize the IAF - COLLECTIONS platform. The SAS extract 
programs should be written such that they can produce either this 
full extract, or the normal nightly “delta” feed based on a passed 
parameter 
Responsibilities  Analyzing the Business Requirements and System Specifications 
to understand the application. 
 Involved in presenting induction to the new joiners in the project 
 Developed SAS code and SQL’s 
 Automation of run book preparation for support related activities 
after implementation. 
 Prepared implementation Documents. 
 Involved in Creation and review of test Scenario and test Case 
based on requirement and design document 
 Interacting with onsite coordinators and clients. 
 IQA & EQA activities in the project and preparing defects log 
 Customizing the existed components to work for the newly created 
 Creation of New Jobs & Schedules for Info quest. 
 Code fixing, testing, tracking all the documentation and code 
through IPMS tool mapping and following the standards defined in 
TCS-IQMS. 
 Monitoring and fixing production jobs during batch run. 
 Capturing of requirements for enhancement projects, coding, 
 Unit testing and System testing of the modules. 
Languages SAS, UNIX, SQL & SQL SERVER. 
Special Software IRIS, SCCS. 
Tools 
IPMS, IQMS, EXPEDITOR, CHANGEMAN, FILEAID, INFOMAN, ELIPS, 
TSO SAR, REVINE, ASA, TCA, ASSENT 
Work Location 
Hyderabad (India)
Page 6 of 7 
3) Since April 2008 to June 2009 
Client Name AC Nielsen, USA. 
Title Metered Sample Hub (MSH) 
Period Since April 2008 to June 2009 
Position Team Member 
Line of Business Retail 
About the Project The Metered Sample Hub (MSH) is the corporate HUB for the Metered 
Sample data that is collected through the MSM application. The Metered 
Sample Hub archives household and persons characteristics for metered 
samples. MSH replicates data from MSM and A/P Collection Facility 
systems to its stage database throughout the day. It also serves as a 
history database for the A/P Collection Facility. The MSH close process, 
every day, transfers the replicated data to the elemental database in MSH 
HUB. MSH transforms some of the data to the legacy Descriptor Control 
Database (DCDB) format for Active Passive and Mark II metering 
technologies. The transformed data is stored in MSH Summary and 
loaded to the DCDB. The Elemental data is used to serve MSH clients 
such as MVD, IVA, Tracking, ELDB, FMDS, NDDS, National (NPower), 
HHR, A/P Crediting. This project comprises of maintenance and 
production support activity. 
Responsibilities  Understanding and Capturing of requirements. 
 Involved in the preparation of high level/low level design 
documents. 
 Involved in the Analysis, Development and testing phases of the 
project. 
 Involved in Analyzing and providing the resolution for the bugs 
raised. 
 Involved in the Unit testing and User Acceptance Testing. 
 Involved in the Resolution of technical issues while testing. 
 Production Support (Dedicated). 
 Worked on Control-M tool for keeping the system healthy and to 
make the jobs of various environments to run as per the schedule. 
 Creating our own region for testing modelling the UAT regions. 
 Adherence to IQMS (Integrated Quality Management System) by 
 Following quality procedures like IQA (Internal Quality 
Assurance). 
 EQA (External Quality Assurance) and FI (Final 
Inspection) for all the deliverables. 
 Adherence to IPMS by entering efforts and logging defects. 
 Adherence to SPEED by achieving goals periodically. 
Languages SAS,UNIX,SQL-PL/SQL 
Database SYBASE 
Special 
Software/Tools 
PVCS (for source code control), WSFTP, Control-M, Remedy, Remote 
desktop 
Project Location Chennai (India)
Page 7 of 7 
4) Since November 2007 to March 2008 
Client Name Prudential & Financial, USA. 
Title Output Systems 
Period November 2007 – March 2008 
Client Name Prudential & Financial, USA. 
Position Developer 
Line of Business Insurance 
About the Project Prudential Output Systems is the doorway through which prudential 
communicates to its customers. DAP-(Document Automation Platform) is 
used to produce the policy package and customer communication letter. 
The System interfaces with the policy administration system AOS. 
Documents are composed from images using the DAP Tool. The tool will 
produce print files in either metacode or Print Control Language (PCL). 
The former is used in production environment and the later in development 
environment. 
Responsibilities  Analyzing the Business Requirements to understand the 
application. 
 Prepared implementation Documents. 
 IQA & EQA activities in the project and preparing defects log 
 Code fixing, testing, tracking all the documentation and code 
through IPMS tool mapping and following the standards defined in 
TCS-IQMS. 
 Capturing of requirements for enhancement projects, coding, 
 Unit testing and System testing of the modules. 
Languages SAS,UNIX,SQL SEVER,Mainframes Cobol. 
Special 
Software/Tools 
DAP Tool. 
Project Location Chennai (India) 
Awards/Appreciations 
Professional Society / Certification Member Since / Date Certified 
CITI Galaxy of thanks 02/20/2014 
TCS On the spot award 12/11/2009 
Bank of America Chess Championship 08/13/2010 
TCS On the spot award 07/18/2012 
TCS Best Team award 08/07/2013

BHASKAR_KOTA_SAS_Certified_Developer

  • 1.
    Page 1 of7 BHASKAR KOTA 4805242357 (bhaskarkota.sas@gmail.com) EDUCATION:  Master of Technology with specialization in Control Systems from Veermatha Jijabhai technological institute (VJTI) Mumbai, India.  Bachelor of Technology with specialization in Electrical and Electronics Engineering from Jawaharlal Nehru Technological University. PROFESSIONAL SUMMARY:  SAS Base & Advanced Certified professional with over 7 years of experience in developing software applications for Financial, Health Care and Insurance sectors.  Proficient in SAS/BASE, SAS/EG, SAS/MACROS, SAS/Connect, SAS/SQL, SAS/ODS, SAS Arrays, SAS/STAT, SAS/GRAPH,UNIX Shell Scripting, NDM Scripting, and SFTP.  Worked extensively with SAS on UNIX, Windows and Mainframes, SAS Enterprise Guide, PC-SAS.  Ability to turn business requirements into Technical Design specifications and documents, SAS Programs, and SQL Queries related to quantitative, statistical and financial models. Capable of working with cross-functional teams to manage projects, determine prioritization, and create appropriate timelines.  Professional Experience with Import Various External Data Files into SAS Dataset / SAS Library by Using SAS/ACCESS, SAS/INFILE, SAS/IMPORT, SAS/SQL.  Extensively worked on various RDBMS like Oracle and SQL Server.  Four years of experience at Onsite Client location and 3+ yrs of experience at offshore location.  Extensive Experience in arranging and participating in meetings with Business Users and suggesting recommendations for improving system performance.  Worked in Production support, Development, Technical project requests, Enhancement, implementation support, post-production batch monitoring and Client issues for all supported applications.  Develop project plan, work-breakdown-structure, metrics, tasks lists, action items, Identify critical paths. Understand and define priorities and milestones.  Proven skills in efficient processing of millions of records of data, optimizing SAS programs for better performance. ETL process design, Analyzing, Reporting and migrating Data from multiple platforms/databses(UNIX, SQL Server, Oracle, Teradata, Mainframes, DB2) using SAS, NDM and SFTP. Statistical distributions and calculations.  Involved in all stages of SDLC (Software Development Life Cycle).  Thorough Knowledge and experience in Microsoft Office tools like MS Access, MS SharePoint, MS word, MS PowerPoint, MS Excel.  Proven abilities in establishing effective task priorities as a team player with result oriented attitude.  Excellent working experience in tools such as INFOMAN, Maestro, Autosys, Resolve IT and ServiseNow.  Involved in different server setups for new projects and accessing destination servers on various operating systems such as Unix, Windows and Mainframes.  Have knowledge on HADOOP-HDFS, PIG,SQOOP,HIVE,HBASE and MapReduce.
  • 2.
    Page 2 of7 TECHNICAL SKILLS:  SAS Tools: SAS/BASE, SAS/MACRO, SAS/SQL, SAS/STAT, SAS/Access, SAS/ODS, SAS/Internet SAS/GRAPH.  Database: Oracle, DB2, MS-SQL Server 2000, MS Access.  Operating Systems: UNIX, MS Windows (95, 98, 2000, NT, XP), MS-DOS, MVS.  Languages: SQL, PL-SQL  Development Tools: MS Office (Word, Excel, Power Point, Access)  Scheduling tools : Maestro, Autosys  Special Software : Infoman, Resove IT,Autosys(Work Load Center) and ServiseNow Professional Memberships / Certifications Professional Society / Certification Member Since / Date Certified IBM Certified Database Associate - DB2 Universal 02/01/2008 Database (DB2 UDB) V8.1 Family - Test 700 Sun Certified Programmer for the Java 2 Platform, Standard Edition 5.0 - 310-055 03/01/2008 Exam 1Z0-007: Introduction to Oracle9i : SQL 03/13/2009 Certificate in Banking & Finance V2 11/16/2009 SAS Base Programming for SAS9(211) 09/29/2010 SAS Advanced Programming for SAS 9(212) 08/17/2012 AREAS/APLICATIONS  Real-estate(REL)/Mortgage  Citi Financial North America(CFNA)  Banking Domain :BOA credit cards and Citi Bank North America (CBNA)/UCCB.  Retail business.  Insurance CAREER PROFILE 1) Since June 2010 till date – CITI GROUP Client CITI Group Project Name Non-Cards Solutions Bridging Group Duration From Feb 2011 – till date Line of business of REL,CFNA,CBNA and CARDS the client About the project  The primary objective for the Non-Cards SB group is to provide rapid technology Solutions when a traditional IT solution is either not required or cannot be achieved within the timeframe mandated by business needs. Our team supports all lines of business, including Cards (Private Label / FDR only), CFNA/One Main, UCCB and REL. The technology framework we operate within consists of primarily SAS and SQL code executed in a Unix environment, though we do have a small mainframe application that is still supported by our group.  Project requests are received via a CCR project request. Once captured in that system the requests are routed to the CCLM repository where they are tracked during the project life cycle. Project status is updated routinely on that site where upper management in the Collections COE
  • 3.
    can view them.Simultaneously projects will have corresponding Planview requests and support tickets opened for tracking hours spent and for managing all required project artifacts during its lifecycle.  Our products are delivered to our customer base using several methods, including NDM and SFT data transfers, SharePoint repositories loaded via SMTP transfers (email) and externally to vendors using CitiSFT via SFTP. The vendors we interface with today include Soundbite, ORCC, Venture, Convergys and Sapient.  The team includes 3 in Offshore and 5 at onsite.  The technologies used for the Project are SAS, Oracle, SQL Server, Page 3 of 7 Unix ,NDM scripting and Secure File Transfer (SFT) Role Project Leader Activities  Involved in requirements gathering & Estimation of Efforts.  Design Preparation.  Assigning the projects to the team based on capacity.  Follow-up with the team and making sure the work done on time.  Successfully completed more than 20 development projects.  Developed SAS code and SQL’s for Data Extraction and Loading into flat files.  Reviewing Unit Test cases to make sure testing is done properly.  Conducting Final Inspection & Audit.  Regular Status meetings with the clients and TCS Managers on the progress of tasks.  Sharing of Knowledge with the team members.  Tracking and updating the project status by using the CCLM repository. Technical Platform Operating system: Windows Server 2000/ UNIX Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, Autosys and Resolve IT. Database: Oracle, SQL Server Location CITIGROUP, IRVING,TX,U.S.A Client CITI Group Project Name Leveraged Solutions Bridging Production Support Duration From Oct 2010 – Feb 2011 Line of business of REL,CFNA,CBNA and CARDS the client About the project  The prime objective of Solutions Bridging production support team is to offer quick solutions unlike any normal development team. The team includes 4 in Offshore and 1 at onsite.  The primary function of the Leveraged Solutions Bridging Production Support team is to identify any production issues and work those issues through to resolution. The issues should be resolved within a 24 hour period for processes running daily. Those processes running less frequently would generally need to be dealt with in 24 to 48 hours depending on the job in question.  Notifications are received when jobs fail for any reason but can also be triggered by non-fatal issues that should be investigated. LSB has two means of receiving notifications for job failures/alerts. The first notification is usually via an automated email. The second means of notification is via the command center. Often both notifications are delivered but not always.  UNIX script errors are generally trapped by Maestro. Maestro has a web tool that can be used to view any error messages trapped from an
  • 4.
    Page 4 of7 abended process. Role Team Lead Activities  Involved in presenting induction to the new joiners in the project  Worked as primary point of contact for all the Production support jobs  Resolved all the abends on time and achieved the customer confidence  Developed SAS code and SQL’s for Data Extraction and Loading into flat files.  Regular Status meetings with the clients and TCS Managers on the progress of tasks.  Automating the Job failures/alerts notification process by using the UNIX Scripting.  Resolved the abends as soon as received a call from command center. Technical Platform Operating system: Windows Server 2000/ UNIX Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, Autosys and Resolve IT. Database: Oracle, SQL Server Location CITIGROUP, IRVING,TX,U.S.A Client CITI Group Project Name CITI Cards – Collections Duration From July 2010 – OCT 2010 Line of business of CITI CARDS the client About the project In CITI Cards Collections, DRI - Diversified Resolutions Incorporated is a default application when a loan becomes default for a user the account gets in to the collection/ default processing system. It is a system where the loan account gets the default processing service done. The project recreates the existing default system of CITI and merges it in to a single GUI application and integrates all the modules on a single sign on system. Role Team Member Activities  Requirement Analysis  Create and review the design documents (both HLD and LLD)  Development and Coding  Test script Preparation  Unit and System Testing  Reviewing and Delivering  Bug Fixing  Conducting Final Inspection & Audit  Sharing of Knowledge with the team members  Regular Status meetings with the clients and TCS Managers on the progress of tasks.  Published the knowledge based documents into Knowmax.  Published code snippets in Mighty for automation which avoids re-work.  Prepared implementation Documents for Production implementation by Maestro Team. Technical Platform Operating system: Windows Server 2000/ UNIX Languages/Tools: SAS, UNIX, NDM, SFTP, SSH Tectia, Infoman, Maestro, Autosys and Resolve IT. Database: Oracle, SQL Server Location TCS, Chennai, India
  • 5.
    Page 5 of7 2) Since July 2009 to June 2010 Client Name Bank of America Title Information Management Non Basel - Information Analytics Foundation Collections (IAF - COLLECTIONS) Period Since July 2009 to June 2010 Position Team Member Line of business Credit Cards, Banking About the project  The goal of the initiative is to produce a number of data extracts from the BACARDI database which will be fed to the IAF - COLLECTIONS platform by way of the JMS subsystem. The programming language used to produce these extracts will be SAS.  In addition to the daily scheduled extracts and transfers, a one-time full extract for each feed will need to be produced in order to initialize the IAF - COLLECTIONS platform. The SAS extract programs should be written such that they can produce either this full extract, or the normal nightly “delta” feed based on a passed parameter Responsibilities  Analyzing the Business Requirements and System Specifications to understand the application.  Involved in presenting induction to the new joiners in the project  Developed SAS code and SQL’s  Automation of run book preparation for support related activities after implementation.  Prepared implementation Documents.  Involved in Creation and review of test Scenario and test Case based on requirement and design document  Interacting with onsite coordinators and clients.  IQA & EQA activities in the project and preparing defects log  Customizing the existed components to work for the newly created  Creation of New Jobs & Schedules for Info quest.  Code fixing, testing, tracking all the documentation and code through IPMS tool mapping and following the standards defined in TCS-IQMS.  Monitoring and fixing production jobs during batch run.  Capturing of requirements for enhancement projects, coding,  Unit testing and System testing of the modules. Languages SAS, UNIX, SQL & SQL SERVER. Special Software IRIS, SCCS. Tools IPMS, IQMS, EXPEDITOR, CHANGEMAN, FILEAID, INFOMAN, ELIPS, TSO SAR, REVINE, ASA, TCA, ASSENT Work Location Hyderabad (India)
  • 6.
    Page 6 of7 3) Since April 2008 to June 2009 Client Name AC Nielsen, USA. Title Metered Sample Hub (MSH) Period Since April 2008 to June 2009 Position Team Member Line of Business Retail About the Project The Metered Sample Hub (MSH) is the corporate HUB for the Metered Sample data that is collected through the MSM application. The Metered Sample Hub archives household and persons characteristics for metered samples. MSH replicates data from MSM and A/P Collection Facility systems to its stage database throughout the day. It also serves as a history database for the A/P Collection Facility. The MSH close process, every day, transfers the replicated data to the elemental database in MSH HUB. MSH transforms some of the data to the legacy Descriptor Control Database (DCDB) format for Active Passive and Mark II metering technologies. The transformed data is stored in MSH Summary and loaded to the DCDB. The Elemental data is used to serve MSH clients such as MVD, IVA, Tracking, ELDB, FMDS, NDDS, National (NPower), HHR, A/P Crediting. This project comprises of maintenance and production support activity. Responsibilities  Understanding and Capturing of requirements.  Involved in the preparation of high level/low level design documents.  Involved in the Analysis, Development and testing phases of the project.  Involved in Analyzing and providing the resolution for the bugs raised.  Involved in the Unit testing and User Acceptance Testing.  Involved in the Resolution of technical issues while testing.  Production Support (Dedicated).  Worked on Control-M tool for keeping the system healthy and to make the jobs of various environments to run as per the schedule.  Creating our own region for testing modelling the UAT regions.  Adherence to IQMS (Integrated Quality Management System) by  Following quality procedures like IQA (Internal Quality Assurance).  EQA (External Quality Assurance) and FI (Final Inspection) for all the deliverables.  Adherence to IPMS by entering efforts and logging defects.  Adherence to SPEED by achieving goals periodically. Languages SAS,UNIX,SQL-PL/SQL Database SYBASE Special Software/Tools PVCS (for source code control), WSFTP, Control-M, Remedy, Remote desktop Project Location Chennai (India)
  • 7.
    Page 7 of7 4) Since November 2007 to March 2008 Client Name Prudential & Financial, USA. Title Output Systems Period November 2007 – March 2008 Client Name Prudential & Financial, USA. Position Developer Line of Business Insurance About the Project Prudential Output Systems is the doorway through which prudential communicates to its customers. DAP-(Document Automation Platform) is used to produce the policy package and customer communication letter. The System interfaces with the policy administration system AOS. Documents are composed from images using the DAP Tool. The tool will produce print files in either metacode or Print Control Language (PCL). The former is used in production environment and the later in development environment. Responsibilities  Analyzing the Business Requirements to understand the application.  Prepared implementation Documents.  IQA & EQA activities in the project and preparing defects log  Code fixing, testing, tracking all the documentation and code through IPMS tool mapping and following the standards defined in TCS-IQMS.  Capturing of requirements for enhancement projects, coding,  Unit testing and System testing of the modules. Languages SAS,UNIX,SQL SEVER,Mainframes Cobol. Special Software/Tools DAP Tool. Project Location Chennai (India) Awards/Appreciations Professional Society / Certification Member Since / Date Certified CITI Galaxy of thanks 02/20/2014 TCS On the spot award 12/11/2009 Bank of America Chess Championship 08/13/2010 TCS On the spot award 07/18/2012 TCS Best Team award 08/07/2013