ISSUE 25 | SPRING 2018PUBLICATIONNUMBER42408014
River City’s Mid-rise Possibilities
Do We Have to Over-regulate?
The Good Builder Score
LEED v4 – The Next Evolution
Going for Silver
Lessons from San Lorenzo
INSIDE
Sustainability
ISSUE
Tankless water heaters are the future of hot water supply. They save energy, take up less
space, and offer an endless supply of hot water. At an ultra-efficient Energy Factor of 99.2%,
the future is now with the ENERGYSTAR®
-approved Glow BrandT180.The only system of its
kind, the Glow BrandT180 has on board storage of one gallon of hot water within a stainless
steelheatexchanger,firingupautomaticallyto95FinComfortMode.Insteadofwaitingforhot
water,you’retreatedtoendlesson-demandhotwater.TheGlowBrandT180isfullymodulating
andcanbeinstalledforcombinationspaceheatingapplications.
Glow Brand T180 Tankless Condensing Water Heater
Brand
TM
ENDLESS ON-DEMAND HOT WATER
ONE-OF-A-KIND TECHNOLOGY
99.2% ENERGY FACTOR
98.4% UNIFIED ENERGY FACTOR
5 USG @ 77 F RISE
10 TO 1 MODULATION
PVC VENTING UP TO 100FT
CANADIAN MADE
Manufactured by Glowbrand Manufacturing
GLOWBRAND.CA | 905-264-1414
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
16
1
PUBLISHER’S NOTE
2
Rethinking the Experience
of Sustainability
by John Godden
THE BADA TEST
3
Sustainable Homes
Do We Have to Over-regulate
to Get This Right?
by Lou Bada
INDUSTRY NEWS
7
The Good Builder Score
Proposing a New Approach
to Rating Home Builders
by Paul De Berardis
BUILDER NEWS
10
LEED v4
The Next Evolution for Sustainable
Residential Projects in Canada
by Thomas Green
BUILDER NEWS
13
Going for Silver
by Alex Newman
INDUSTRY EXPERT
14
The Green Side of the Cottage
by Gord Cooke
INDUSTRY EXPERT
24
A Green Rater
by Better Builder Staff
SITE SPECIFIC
26
Reduce, Reuse, Recycle…
and Renovate
by Alex Newman
FROM THE GROUND UP
30
Climate Change and More
Durable Housing
Lessons from San Lorenzo, Part 1
by Doug Tarry
FEATURE STORY
16
On the Waterfront
River City is a prime example of what’s possible in a mid-rise
by Rob Blackstien
20
Rookie of the Year
by Rob Blackstien
30
ISSUE 25 | SPRING 2018
On our cover: River City Phase 1 & 2
by Jose Uribe
Images internally supplied unless otherwise credited.
20
BETTERBUILDER.CA | ISSUE 25 | SPRING 20182
T
his is the 25th issue of Better Builder. In the spring of 2012, this
magazine was called Sustainable Builder. To us, sustainability
is really a common-sense approach to managing resources in
any process. But the word “sustainable” became a buzzword over time
and lost its original punch. Sustainability is more than the process –
it is about relationships between people and things. It is about how
we value our connection with resources to achieve less waste and
better outcomes for the future. It is dynamic, flexible and based on the
experience of what works and what does not. We eventually renamed
the magazine to reflect the fact that better builders build sustainability.
Our Building Code is among the most energy efficient in the
world. However, the last issue demonstrated we are at the point
of diminishing returns through simply adding more insulation or
employing more efficient HVAC systems. Looking ahead, our attention
should be directed towards durability, water efficiency and reducing
occupant loads and behaviour.
This issue showcases three LEED projects recognized in the recent
Canada Green Building Council Greater Toronto Chapter Awards. Each
project represents an important housing form: a mid-rise multi-unit
(page 16), a near zero retirement cottage (page 14) and a LEED Platinum
renovation in Toronto (page 20). The latter may be the most crucial,
because it demonstrates how to improve the existing housing stock.
The LEED rating system will play an important role going forward,
as Thomas Green explains on page 10. LEED currently exists as v4 for
both low- and mid-rise projects. LEED v4.1, under construction, will
be streamlined for wider appeal and ease of use.
We also need to recognize when builders do things right. Lou Bada
from Starlane Homes (winner of the 2017 RESNET Cross Border Home
Builder Challenge President’s Award) argues why over-regulation
hinders sustainability on page 3. Paul De Berardis from RESCON
proposes a Good Builder Score that rewards sustainable practices
(page 7). We also feature renovator Sam Lapidus, who has been taking
aim at minimizing waste in the building industry (page 26).
Finally, we are proud to share Doug Tarry’s “Lessons from San
Lorenzo” on page 30. Doug is not only an innovator, but a humanitarian
too. His current work in Puerto Rico is inspiring, and his common-
sense approach to building with resiliency is anything but common.
I’m very proud of this 25th issue and am grateful to everyone who
has contributed to its success. Better Builder strives to promote the
triple bottom line: outcomes that are good for people, good for the
environment and good for business. We hope to continue pushing all
of us to rethink our experience of sustainability. BB
Rethinking
the Experience
of Sustainability
PUBLISHER
Better Builder Magazine
63 Blair Street
Toronto ON M4B 3N5
416-481-4218 | fax 416-481-4695
sales@betterbuilder.ca
Better Builder Magazine
is a sponsor of
PUBLISHING EDITOR
John B. Godden
MANAGING EDITOR
Wendy Shami
editorial@betterbuilder.ca
To advertise, contribute a story,
or join our distribution list, please
contact editorial@betterbuilder.ca
FEATURE WRITERS
Rob Blackstien, Alex Newman
PROOFREADING
Carmen Siu
CREATIVE
Wallflower Design
www.wallflowerdesign.com
This magazine brings together
premium product manufacturers
and leading builders to create
better, differentiated homes and
buildings that use less energy,
save water and reduce our
impact on the environment.
PUBLICATION NUMBER
42408014
Copyright by Better Builder
Magazine. Contents may not be
reprinted or reproduced without
written permission. The opinions
expressed herein are exclusively
those of the authors and assumed
to be original work. Better Builder
Magazine cannot be held liable
for any damage as a result of
publishing such works.
TRADEMARK DISCLAIMER
All company and/or product
names may be trade names,
trademarks and/or registered
trademarks of the respective
owners with which they are
associated.
UNDELIVERABLE MAIL
Better Builder Magazine
63 Blair Street
Toronto ON M4B 3N5
Better Builder Magazine is
published four times a year.
publisher’snote / JOHN GODDEN
John Godden
Alex Newman
Gord Cooke
Rob Blackstien
Lou Bada
Doug Tarry
CONTRIBUTORS
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
Sustainable Homes
Do We Have to
Over-regulate to Get This Right?
3
H
istorically, “sustainability”
was often seen as being tied
to energy efficiency, and to a
large degree it still is. Quantifiable
and relatively easy to ascribe a cost
to, energy efficiency and energy
conservation were the low-hanging
fruit for sustainability. Instead of
(blindly) marching towards net zero
carbon nirvana, we should at some
point re-examine our goals and our
progress. If our goal is to walk on this
planet leaving the smallest footprint
possible, we should review our
assumptions as well.
I believe we have nearly exhausted
the energy efficiency component of
sustainability in new construction in
any reasonable way. Lowering air
changes and thickening walls is
yielding fewer and fewer environ­
mental returns. Other pillars of
sustainable housing are: indoor air
quality, resource management, water
efficiency and building resiliency
(durability). I’d like to explore some
of these a little more.
I’ve come to believe that over-
regulation does not usually inspire
much. “Thou shalt” and “Thou shalt
not” can only inspire compliance
or, in some cases, avoidance and
non-compliance (cheating) with
unintended consequences and
questionable results. I admit that,
to some degree, regulation has been
effective – for instance, it has forced
mechanical equipment to become
more energy efficient. This could be
considered innovation or continuous
improvement. Nevertheless, greater
regulation does not always bring
thebadatest / LOU BADA
greater innovation, nor does it
bring forth something entirely new
(invention) or something better suited
for use in its environment (adaptation).
When builders are forced into
compliance with something they don’t
believe is of value, they are less likely to
voluntarily take on things they believe
may be of environmental benefit. As
an example, water conservation could
be greatly improved by installing
a greywater recycling system, or
a rough-in for future use. Once a
home is built, the cost of installing a
greywater system without a rough-in
is prohibitive. Now just imagine a
municipality forcing a builder to
install a hot water recirculation system
(a system that runs on a pump and
delivers hot water to a tap promptly):
how likely is it that the builder will
voluntarily install a greywater
rough-in? Not likely. For the sake of
argument, let’s believe (as I do) that the
potential for energy savings is greater
with greywater recycling than with a
hot water recirculation pump. What
have we accomplished?
What happens when builders
are given little choice because of
misguided regulation to lower air
changes per hour from 2.5 to 2.0, or
mandated into building a high-pitched
roof and Disneyland-type architectural
details? Builders must comply with an
ever-increasing number of rules if they
want to obtain a permit and to build,
but will they go above and beyond the
Ontario Building Code when it comes
to choosing materials or methods that
will improve the durability of a home?
There are numerous things that we
could do to improve the durability of
a home to adapt to a changing climate
and extend its life span.
Here’s my opinion: in a regulatory
environment where builders have less
and less discretion, they are less likely
to voluntarily do much.
Another example may be that
Other pillars of sustainable housing are:
indoor air quality, resource management,
water efficiency and building resiliency.
BETTERBUILDER.CA | ISSUE 25 | SPRING 20184
a builder wants to opt for a more
expensive energy recovery ventilator
(in lieu of a heat recovery ventilator)
to make a home more comfortable
and better control indoor humidity.
How do we encourage this? How do
we set the industry up for success?
You may say “more regulation”; I
would propose less. We seem to
continuously add regulation to
correct previous poorly thought out
regulation.
As you may have guessed by
reading my previous articles, I
haven’t strayed much from my
deeply held convictions that over-
regulation – or poorly thought out
regulation – is detrimental to the
industry and, ultimately, to new-
home buyers and an important part
of the economy that sustains our
ability to have a fair and just society.
Sustainable building is multi-faceted
and, at times, complex. Builders need
flexibility to reach their targets. The
targets must be reasonable, and they
must be based on a value proposition
and professionalism, not on ideology
or a political agenda. Our industry
has become a convenient target for
regulation. We need rational and
achievable targets, not programs and
prescriptions that don’t make sense
and are not sustainable. BB
Lou Bada is Vice President of Low
Rise Construction at Starlane Home
Corporation and on the board of
directors for the Residential Construction
Council of Ontario (RESCON).
The targets must be reasonable, and they must be
based on a value proposition and professionalism,
not on ideology or a political agenda.
OneSolutionFOR CONTINUOUS INSULATION
®™ The DOW Diamond Logo is a trademarks of The Dow Chemical Company © 2018
STYROFOAM™
CLADMATE™
CM20 insulation is designed with the builder and contractor in mind.
Changes to many Building Codes include requirements for increased R-values and improved air sealing control measures.
With these new requirements come many options, which sometimes leads
to confusion over howto meet code and which products to use. One of
the biggest changes to complying with the Code, is the requirement of
continuous insulation (ci).
Continuous Insulation (ci): An uninterrupted layer of insulation that
spans over structural members without thermal bridging, otherthan
fasteners and services. A continuous layer of insulation helps reduce the
potential for condensation within the wall where mold and mildew can
accumulate undetected.
DOW BUILDING SOLUTIONS
1-866-583-BLUE (2583)
www.dowbuildingsolutions.com
BETTERBUILDER.CA | ISSUE 25 | SPRING 20186
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018 7
industrynews / PAUL DE BERARDIS
Tarion’s role is anticipated to shift
by 2020, due to the province deciding
to enforce some recommendations
from the Honourable J. Douglas
Cunningham’s report. There is a
possible window of opportunity to
change the rating system from hereon.
Rather than just a negative rating
based on cosmetic deficiencies, there
should be a positive one based on
things done right – especially major
systems and structural elements.
Here’s why: people care about
esthetics – the most obvious defects
and deficiencies. That makes sense, as
these are right in front of home owners
and top of mind. While Tarion deals
with home owner-driven complaints,
those problems usually are about
minor cosmetic issues rather than
the construction practices that may
affect the durability and performance
of your home. So instead of buyers
complaining that their tiles are off by a
few millimetres, why not consider all of
the important things that you can’t see?
Home owners, generally, are not
concerned with what’s behind the
walls, in the ceilings or below the
floors, simply because either they don’t
understand, they can’t see or they don’t
care what’s there (or all three).
Let’s look at Tarion’s list of top five
claims: 	
1.	Paint: streaks and brush marks,
drips and splatters, poor coverage,
poor quality paint.
2.	Doors: finishing, surface damage,
sticking or warping doors, poor
installation.
3.	Floors: gaps between boards,
scratches, cupping, uneven
finishing.
4.	Drywall: cracking, visible seams,
blemishes, rough patches, corners
that aren’t square.
5.	 Stairs and steps: squeaking,
mismatched finishes, scratched
surface finish.
Are all five of these important? Of
course they are. What’s in front of the
buyer’s eyes and ears will always get
first priority in a new home. But these
7
The Good Builder Score
Proposing a New Approach to Rating Home Builders
P
erhaps the biggest myth in new-home construction is that a home builder’s
reputation rests with the Tarion warranty program.
Any builder can run into a string of chargeable conciliations against
them by a few buyers (sometimes unreasonable customers), putting a stain on
their record that can stick for a long time. And that’s a problem.
BETTERBUILDER.CA | ISSUE 25 | SPRING 20188
are not the critical components of a
home that come to mind for a builder
when it comes to the durability and
performance of a new home.
Ideally, home owners should be
aware and ask questions regarding
certain critical systems in their home
and be less concerned with cosmetic
upgrades and finishes. But that’s
difficult to achieve. Not everyone is
that interested in how their home
really functions.
Most home owners should know
their home is constructed according to
code. The responsibility of regulating
and enforcing building construction
standards falls onto designers and
municipal building inspectors.
Here’s a crazy idea for the war­
ranty program (whether it is Tarion
or another agency): why not create a
checklist or point system for builders
that rewards them for including
quality construction improvements or
components that ensure the quality of
your new home for decades?
Is this a pie in the sky? We don’t
think so. We strongly believe that
a point system should consider the
positive qualities of the individual
home builder. Instead of weighing
all of the less important, esthetic
niggles of a new home against the
reputation of a builder, why not use a
system of positivity to build up those
reputations?
The point system – let’s call it
“The Good Builder Score” – would
lead to more healthy competition
between builders, encourage them
to use the most modern techniques
of construction, create a higher level
of understanding between builders
and buyers through education, and
improve the overall home buying
process.
But the focus not only needs to
shift from a negative rating system to
a positive one. It is also critical that
we change the focus from the purely
cosmetic changes (which is what most
claims are about) to giving credit to
builders where credit is due – that is, for
including modern features that improve
the overall durability of the home.
Here’s the kicker: these important
components of durability are the parts
of the house that you don’t see. Here
are five potential checklist examples
that would give a builder points
towards their Good Builder Score:
1.	 Effective installation of an air-
barrier system to ensure airtight­
ness for energy efficiency and
to prevent condensation in wall
assemblies.
2.	 Proper installation, commissioning
and balancing of the heating
and cooling system, including
components such as the furnace, air
conditioner, ERV/HRV, humidifier
and distribution ducting to provide
desired indoor air quality.
3.	 Precision wood-framed structures
comprised of panelized wall
and floor sections built off-site
in a controlled manufacturing
environment, providing quality
control of a home’s structure.
4.	 Proper flashing of windows, doors
and mechanical penetrations in
the exterior building envelope to
protect against possible water entry
and air leakage.
5.	 Use of new and advanced building
materials, such as engineered floor
joists, which can offer increased
spatial design flexibility as well as
provide greater building material
uniformity.
The Good Builder Score is just a
starting point for a system that would
encourage builder participation. It could
lead to offering rebates and incentives
for the builders who build a cut above
the bare minimum requirements.
Meanwhile, we also strongly
believe that Tarion should be more
open with regards to their claims
database, so home owners can be more
knowledgeable about things to look
for, and builders can increase their
education outreach to consumers.
Tarion is in the business of warranty
and home construction, yet they are
not applying the lessons learned from
their warranty claim database to
address any shortfalls in construction
practices. So, let’s do this.
A Good Builder Score would involve
a steep learning curve. There’s an oppor­
tunity to improve the industry for the
benefit of all home buyers and home
builders, and we should take it. BB
Paul De Berardis is
RESCON’s director of
building science and
innovation. Email him at
deberardis@rescon.com.
8
Why not create a checklist or point system that
rewards builders for including quality construction
improvements or components that ensure the
quality of your new home for decades?
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
• PROVIDES A CONTINUOUS THERMAL RESISTANCE OF R-5; perfect for meeting the
requirements of the Quebec & Ontario Building Code.
• DOES NOT REQUIRE ADDITIONAL BRACING; one-step installation saving time and cost.
• INTEGRATED AIR-BARRIER; no additional housewrap required saving material costs.
• LIGHTWEIGHT AND EASY TO INSTALL; allows for fast installation saving time and cost.
R-5 XP C O M B I N E S T H E W I N D B R A C I N G P R O P E R T I E S
O F W O O D F I B R E W I T H T H E T H E R M A L R E S I S T A N C E
O F E X T R U D E D P O L Y S T Y R E N E
bpcan.com
F O R O V E R 1 0 0 Y E A R S
INSULSHEATHING Panel
Introducing a Unique Innovation:
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
COMPARISON OF LEED CANADA VERSION 2009 TO THE NEW V4
WALLACE RESIDENCE
CATEGORIES LEED VERSION 2009 LEED V4
Innovation & Design Process (ID) 5.5 2
Location and Linkages (LL) 10 10
Sustainable Sites (SS) 5 2.5
Water Efficiency (WE) 3 3
Energy & Atmosphere (EA) 22.5 12
Materials & Resources (MR) 2.5 5
Indoor Environment Quality (EQ) 19 10.5
Awareness & Education (AE) 3 1
Points Accredited 70.5 46
Total Possible Points
	 Certified	 Silver	 Gold	Platinum
	54	 69	84	99
	 Certified	 Silver	 Gold	Platinum
	 40–49	50–59	60–79	80–110
10
buildernews / TOM GREEN
I
t is an exciting and important time
to be involved in green housing in
Canada. People are talking about
sustainable housing issues well
beyond energy efficiency – and it’s
not just individuals from academia
or the green building industry sector,
but also policy-makers, economists,
building code developers, and
governments at all levels. With LEED
v4 now in force and a LEED v4.1
update on the way, the LEED green
building rating system’s integrated
and holistic range of sustainability
criteria continues to evolve to push
the market with new and more
stringent sustainability parameters,
add emphasis on quality assurance
and encourage real-world performance
reporting.
In the 15 years since being
introduced to the market, LEED
has become well-established as
a voluntary, consensus-driven,
internationally recognized
certification system providing third-
party verification that a building or
community is designed and built as
planned to rigorous sustainability
standards. Delivered throughout the
country by the Canada Green Building
Council (CaGBC), LEED provides a
framework to develop leading-edge
green housing, from single-family
homes to high-rise projects, and drives
continual improvements to building
design, construction and operation. To
date, there are more than 7,500 LEED
homes registered in Canada, of which
over 3,500 are certified.
Raising the sustainability bar
with LEED v4
LEED v4 focuses on advancing an even
more sustainable paradigm and aims
to balance the necessary technical
rigour with a market focus to provide
a flexible and effective environmental
assessment methodology that will
facilitate widespread adoption.
Rather than aiming at “less bad”
design, the LEED v4 system asks a
critical question: “What should a LEED
project accomplish?” LEED v4 was
LEED v4 The Next Evolution
for Sustainable Residential Projects in Canada
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
developed with a set of seven impact categories that
focus on specific social, environmental and economic
goals, tailored to the built environment and targeting
positive outcomes involving:
1.	 Climate change – reverse contribution to climate
change
2.	 Human health – enhance human health and well-
being
3.	 Water resources – protect and restore water
resources
4.	Biodiversity – protect biodiversity and ecosystem
services
5.	 Material resources – promote sustainable and
regenerative resource cycles
6.	 Green economy – build a greener economy
7.	Community – enhance community, social equality,
environmental justice and quality of life
LEED v4 raises the bar for the environmental
performance of housing through adjustments to
the credits and prerequisites and a comprehensive
technical update. Fundamental LEED v4 revisions
include:
•	 Greater emphasis on a performance-based
approach, including increased stringency
thresholds for energy, water, waste and indoor
environmental air quality.
•	 A more holistic evaluation of materials using
multiple attributes and approaches such as Life
Cycle Assessment and Environmental Product
Declarations, promoting key next steps to address
the environmental impacts of materials.
•	 Increased focus on human health, integrative
design, envelope commissioning, biodiversity, the
green economy and community.
To support local delivery of the LEED v4 global
platform of tools and resources, CaGBC develops
Alternative Compliance Paths (ACPs) to provide
Canadian residential project teams with the
flexibility to use locally relevant, equivalent means
of demonstrating compliance to LEED credit
requirements. LEED v4 also provides increased
11
BETTERBUILDER.CA | ISSUE 25 | SPRING 201812
alignment between the rating system structures and
enables Canadian projects to access all 21 of the LEED
v4 rating systems.
Introducing LEED v4.1
LEED v4.1 is a recently announced improvement
focused on the implementation, applicability and
agility of LEED – a next evolution of the rating system
built on lessons learned in the four years since LEED
v4 was released. In the first quarter of 2018, USGBC
will release a draft for LEED v4.1 O+M for review,
followed by BD+C, ID+C, Residential and ND, with
plans to offer a test period for the proposed changes.
During this time, LEED v4 will remain open for use by
all projects.
The goals of the LEED v4.1 update are to:
•	 Address market barriers and lessons learned from
LEED v4 project teams
•	 Update performance thresholds and reference
standards
•	 Expand the marketplace for LEED
•	 Incorporate performance reporting to improve the
life cycle performance of buildings
With increasing attention on a cleaner
environment, health and well-being, the continually
evolving LEED v4 green building rating system offers
leading-edge value and confidence for clients wanting
the health benefits and cost savings a LEED-certified
home can bring, in a comprehensive sustainability
framework with third-party quality assurance.
Contact us
Learn more about how LEED v4 can strengthen the
business case for your project. CaGBC has developed
a number of education resources to support the
LEED v4 rating systems, as well as a CaGBC LEED v4
webpage. You can also email CaGBC at info@cagbc.
org or contact your local chapter at any time. BB
Thomas Green is Residential Programs Manager
at the Canada Green Building Council (CaGBC).
Roof truss and wood
sill connection.
Simpson Strong Tie
MGT system shown
Drywall
screwed
into amvic
polypropylene
webs as per
building code
Electrical
outlet
Wood sub-floor
installed as per
local building
Simpson strong tie
ICFLC and wood floor
joists connection
Amvic insulating
concrete forms
Amdeck floor &
roof system
Exterior wood
siding installed
as per local
building code
Amvic high
impact
polypropylene
webs
Acrylic,
standard
ptucco or eifs
applied to
exterior face
of Amvic ICF
Brick veneer
Parge face of
exposed
brick ledge
Grade
Peel-and-stick
waterproofing
membrane (or
equivalent)
as per local
building code
Perforated
weeping tile
INSULATED
CONCRETEFORMS
FOR MORE INFORMATION VISIT:
AMVIC.COM
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
“Just because I was interested
didn’t mean I had the skills to do it
myself,” Wallace says. “The Canada
Green Building Council requires
you to work with someone who is
registered to audit, and that led me to
Clearsphere, where I was connected
with a LEED specialist.”
At Clearsphere, the coordinator
walked him through the various
ways to garner LEED points, from
greywater recycling systems and
zeroscaping, to heavy duty insulation
and vapour barriers. Together, they
were able to sketch the project out as
LEED silver.
There were some items that
Wallace was interested in including,
but was ultimately unable to do.
For example, with a city lot, it’s not
possible to alter the orientation
of the house or to plant a row of
trees along the south edge. Even
installing an electric charging
station is challenging, since each
car manufacturer uses a different
receptacle. And though he initially
looked into greywater systems, it
was a struggle to find plumbers who
could install and maintain one.
Ultimately, he went with “real­
izable” goals: upping the house
envelope and installing an ERV
system. One expectation he had
going in was the prospect of too much
humidity, since moisture can’t escape
due to airtight design. When Wallace
and his family moved in, things
started to crack and shrink, so he
called Clearsphere for advice on how to
manage the home’s relative humidity.
On the insulation, they went
“substantially above code” with high
values in the roof, walls, and windows.
“Insulation is a straightforward and
fairly easy add-in for LEED,” Wallace
says. “It’s a little more expensive than
code levels of insulation, but the
payback was pretty easy to calculate.”
Wallace used Roxul on Clear­
sphere’s recommendation, as well
as an exterior sheathing product by
BP, called R4 Structural Insulated
Sheathing. “It made a lot of sense
rather than the usual tieback and
second vapour barrier which serves to
create a cavity that collects moisture,”
he says. “This sheathing has a high
vapour permeance which allows the
wall to dry to the outside and ended up
being a great product.”
The HVAC system was more
complicated, Wallace says. The hot
water boiler heats the house with
forced air and a radiant basement floor,
required a whole “wall of plumbing
with miniature pumps all around,”
he recalls. It confounded his very
experienced general contractor, who
had never worked with such a system.
“The upside was being able to get away
from bulkheads, thanks to smaller
ducts required by the system.”
Ultimately, Wallace is satisfied
with the silver certification. He feels
that anything higher, like gold or
platinum, would have been more
difficult because of its “much more
aggressive design standard. I think
silver is attainable – you tweak
and focus on certain things, like
increasing efficiency, without getting
into something far out or hard to
maintain.” BB
Alex Newman is a writer, editor and
researcher at alexnewmanwriter.com.
13
buildernews / ALEX NEWMAN
A
s a mechanical engineer involved in sustainable decommissioning (think
power plants), Kevin Wallace was no stranger to LEED certification. But
when he and his wife purchased her parents’ home in Toronto’s Leaside area
with an eye to razing and building new, he encountered a different side of green.
Going for Silver
46
THIS HOME IS 23% BETTER THAN CODE
61BessboroughDrive,Toronto
RatingDateOctober2,2017
Ultimately, Wallace
went with “realizable”
goals: installing an ERV
system and upping the
house envelope with
high insulation values.
BETTERBUILDER.CA | ISSUE 25 | SPRING 201814
industryexpert / GORD COOKE
A few years ago I, and two other
building science educators, helped
facilitate a series of builder design
charrettes. Each time, about 40
builders were given three days of
comprehensive building science
training that included on-site
investigations, testing, case studies,
building material presentations and
evaluations. The builders, working
in groups of five, were then asked
to apply what they had learned and
experienced to a single-family design
project. They were asked to “build a
house that you would feel good about
building for your favoured clientele.”
Upon completion, while we
evaluated the energy performance
improvements they had made using
HERS software, the builders were
asked to cost out the incremental
costs of their chosen advancements.
It was a surprise, even to us, that
in each group in each of the seven
sessions, the annual energy savings of
their chosen advancements provided
a positive return on investment
against the incremental estimated
construction costs applied to the
mortgage of the house. In other words,
the total annual cost of ownership
for the improved design was always
projected lower than the costs for the
standard, reference design.
Then came an intriguing exercise.
Each team was asked to evaluate or
score their project against a few of
the most common green building
programs, such as LEED for Homes
and the U.S. National Green Building
Standard. In each case, the eight
teams in each of the seven sessions
found that the design elements they
had chosen helped them achieve
at least the middle range, Silver or
Gold, in the program they chose. The
builders, initially skeptical about the
need for green, learned that most of
the common-sense decisions they
felt compelled to make to ensure
a high-performance home were
simultaneously recognized as being
green. Looking at this more closely,
most green programs, in addition to
boosting energy conservation, reward
decisions that improve indoor air
quality, water conservation, material
conservation and sustainability and
overall building durability.
The following are some examples of
elements I learned from these builder
charrettes. We were able to incorporate
many of them in the LEED Platinum
cottage we completed recently.
Start with an obvious win-win:
advanced framing. This means lower
construction costs, improved energy
performance and points within
green building programs. Certainly it
requires design considerations, process
changes and training of framers and
other contractors; however, with the
move in codes to “effective R-value”
recognition, advanced framing is
something that should be on all
builders’ agendas for 2018. In the
cottage construction, the framers
admitted we went a little overboard in
striving for minimized wood use. They
ended up adding back a few elements
around windows and doors for trim
and backing, but overall the walls
were lighter and quicker to build.
Next, the most important to me
as I travel and see the impacts of
improper water management details,
is the recognition in LEED and other
programs for durability measures –
specifically, fully drainable, dryable
building enclosures that include
shingled, lapped house wrap details,
window flashing, sill pan flashing,
head flashings and drip caps over
all windows and doors. In my case, I
am a big fan of a systems approach,
The Green Side of the Cottage
A
few years ago I, and two other building science educators, helped facilitate
a series of builder design charrettes. Each time, about 40 builders were
given three days of comprehensive building science training that included
on-site investigations, testing, case studies, building material presentations and
evaluations. The builders, working in groups of five, were then asked to apply
what they had learned and experienced to a single-family design project. They
were asked to “build a house that you would feel good about building for your
favoured clientele.”
We are on a great path to minimize energy resources
over the next 10 to 12 years. In that same time frame,
there will be increased pressure to optimize water use.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
such as provided by the DuPont
Tyvek weatherization system. The
builders in the charrettes chose it
after having seen in the site walks the
potential risks associated with ever
more complicated building enclosure
details, combined with the lowered
drying potential of buildings due to
increased insulation levels. I like the
warranty protection offered by one of
the world’s leading building materials
manufacturers.
Another really simple, cost-
effective decision is to choose
materials that have lower off-gassing
potential to enhance air quality. One
great example is the availability of
high-quality sealants and adhesives,
such as the relatively new LePage
Quad Max window sealant, which
has less than 3% volatile organic
compound content and yet can be
applied down to -18°C in any moisture
condition and provides better
flexibility than any other currently
available. There are similar low-
cost opportunities in paints, sealers
and building materials. It’s time to
re-evaluate your material choices and
add indoor air quality parameters to
your decision matrix.
We are on a great path to minimize
precious energy resources over the
next 10 to 12 years. In that same
time frame, there will be increased
pressure to optimize water use. The
easiest way to start here is by using
reliable and effective ultra low flow
shower heads and dual flush toilets.
I really like the experience of the
Delta H2Okinetic shower heads at
water flow rates of under two gallons
per minute. Then, in the cottage,
we installed a 4,000 litre rain water
cistern to flush toilets and water the
grass. While the cistern itself was less
than $1,000, the pump and controls
needed to satisfy the municipal water
works needs for pressure control
and backflow potential cost us many
thousands more – a decision I wouldn’t
recommend for mainstream housing.
In my opinion, the newly available
packaged greywater systems will be
a much more cost-effective way to
minimize the single largest use of
water in most homes by using waste
water to flush the toilets.
These were but a few of the 30 or so
decisions we considered in designing
and building the cottage. In that effort,
we used the same philosophy that the
builders in the design charrettes used.
Rather than “chasing” green points,
stars, bars or colours, we used the
helpful, well-researched resources and
checklists available from programs
such as LEED for Homes to help make
informed, cost-effective decisions.
Those resources, combined with
now over 40 years of building science
research found in programs such
as R-2000 and ENERGY STAR, can
help you build healthier, safer, more
comfortable, more durable and indeed
more cost-effective homes for your
buyers. Then go ahead and score your
homes against the green building
program of your choice, and you will
find they will reward you with useful
recognition of your decisions. BB
Gord Cooke is president of
Building Knowledge Canada.
15
Left: Advanced framing with studs on a
24" centre yields a higher effective R-value.
Right: When flashing windows, house wrap
improves airtightness and durability.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
featurestory / ROB BLACKSTIEN
On the Water
IMAGESBYJOSEURIBE
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018 17
River City is a prime example of what’s possible in a mid-rise
rfront
R
iver City was a long time in the coming – but
based on the reaction, it was well worth the wait.
Part of the West Don Lands neighbourhood
in Toronto – an 80-acre site bordered by the Don River,
King Street, Parliament Street and the rail line beside
the Gardiner Expressway – River City was developed by
Urban Capital under some very unique circumstances.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
The former industrial site was
originally slated for redevelopment in
1987, but the issues piled up and the
site was never developed. Revitalized
in 2006 by Waterfront Toronto, West
Don Lands was envisioned as a
family-friendly, sustainable and well-
designed community. Ultimately,
River City will be a four-phase project,
consisting of almost 1,100 loft-style
condominiums and townhouse
units, and will include street-level
boutiques, stores and restaurants.
Urban Capital development
director Taya Cook explains that
the RFP process through Waterfront
Toronto was quite involved, one
“which we won in 2008 after an
extensive competition involving
18 national and international
developers.”
“The project was subject to a devel­
opment agreement with Waterfront
Toronto, and required extensive
co-ordination with Waterfront
Toronto and the adjacent properties
to maintain a seamless connection/
experience in the area,” explains
18
Anna Kazmierska of WSP, who acted as
the LEED consultant for River City.
All projects within West Don Lands
had to meet LEED Gold specs – a big
part of the development’s overall plan
for urban sustainability. Kazmierska
adds that River City was subject to
Waterfront Toronto mandatory green
building requirements, LEED Gold
requirements and Toronto Green
Standard Tier 1/Tier 2 requirements.
The fact that this is a mid-rise was
applauded, given that so many believe
that this housing form makes the most
sense for Toronto from a livability
perspective. “Mid-rise offers many
of the same benefits of a high-rise,
multi-unit residential building – mix
of uses, shared building amenities,
central plant equipment, high density
to support transit nodes – at a more
digestible and community-based
scale,” Kazmierska explains.
One of the unique challenges of this
project, Kazmierska says, is that they
couldn’t build any below-grade parking
because of a flood plain, so River City
“required creative parking solutions.”
For example, the development team
successfully argued to lower the
available parking by 50% from the
zoning by-law requirements, putting
all the parking within an above-grade
structure between the two buildings.
To compensate for the reduced
parking, all new residents of River City
were given a free one-year membership
in a low-emitting car sharing program
available on-site – a move that has
helped reduce greenhouse gas emis­
sions. Cook mentions that another
fascinating element of this project
was its relationship to the Don Valley
Parkway on-ramp, one “which the
architecture embraced.”
Kazmierska says that River City
employed a range of energy-efficient
features, such as:
•	 airtight building and suite design to
reduce air movement between suites
and to reduce energy consumption;
•	 the reuse of waste heat to pre-heat
incoming ventilation air;
•	 an accessible green roof (populated
with native and adaptive flora
designed to mitigate the urban heat
Mid-rise housing becomes a role model for sustainable design and development.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018 19
island effect and the quantity of
stormwater runoff);
•	 exceptional indoor air quality from
in-suite ventilation systems;
•	 a rainwater harvesting system
that reuses rainwater for irrigation
purposes;
•	 low-flow plumbing fixtures that
will save over 17 million litres of
water per year;
•	 careful selection of materials and
paints to avoid contaminating
indoor air; and
•	 in-suite metering of electricity,
water, heating and cooling.
River City marks the first private
sector development in the area,
with the first two phases recently
being recognized as the LEED Gold
finalist in the residential awards by
the Canada Green Building Council
(CaGBC) Greater Toronto Chapter.
When assessing River City, the
CaGBC gave the project 44 of a
possible 70 LEED Gold points. The
points breakdown consisted of:
•	 11 of 14 as a sustainable site;
•	 3 of 5 for water efficiency;
•	 10 of 17 for energy and atmosphere;
•	 6 of 14 in materials and resources;
•	 10 of 15 for indoor environmental
quality; and
•	 4 of 5 for innovation and design
process.
Brian Tysoe, a principal at MCW
Consultants Ltd., and one of the
judges that assessed this project,
was impressed with what was
accomplished. “Urban Capital has
done a commendable job at River
City of integrating architecture and
sustainability into a highly livable,
highly energy-efficient development,”
he says. “With elements such as in-suite
master lighting kill switches, the design
team has placed a high emphasis on
sustainability for this project.”
Urban Capital got its start in 1996
by developing the 48-unit Camden
Lofts project in Toronto’s Fashion
District. The company’s philosophy is
that de-industrialized parts of cities
can come alive again as vibrant urban
centres.
Since that debut project, Urban
Capital has expanded into Ottawa,
Montreal, Winnipeg and Halifax, and
overall has built over 3,500 urban
condominiums, with another 1,000
under construction and several
thousand more in the pipeline. All
told, it accounts for over $2 billion in
development.
The company believes in pushing
the envelope and pioneering high-
end, yet functional, design or green
living. “We try to be on the forefront
of green building, being the first to
introduce residential tri-sorters in our
first project, to developing the three-
phased LEED Gold Central project in
Ottawa, and LEED Gold at River City,”
says Cook.
River City could very well be a
template for how Toronto deals with
sustainable living at a time when
density laws are becoming more
stringent. BB
Rob Blackstien is a Toronto-based
freelance writer. Pen-Ultimate.ca
River City’s medium-density, multi-unit residential design successfully maximizes human scale compared to the city’s high-density, high-rise core.
BETTERBUILDER.CA | ISSUE 25 | SPRING 201820
buildernews / ROB BLACKSTIEN
A
ndrew James’ dream to make
an environmental difference
took many twists and turns
over the years, but it wasn’t until he
got a lecture from a grumpy old man
at a bar that he finally realized what
he needed to do.
A lawyer turned legal writer,
James’ interest in the environment
led him to run as a Green Party
candidate, and it was at a party pub
night that a stranger delivered him a
message that still rings true.
“You’re not doing anything, you’re
never going to get elected, you’re
wasting your time,” an old man that
had wandered into the pub scolded
James. “You want to go out and do
something for the environment? Then
do something! Just don’t talk about it
or get your name on an all-candidates
ballot; that’s not accomplishing a
damn thing.”
The words really hit home for
James. He felt it was hard for him to be
a credible voice for the environment
when he didn’t have hands-on exper­
ience in doing something to help it.
The answer, he believed, was
to prove that an existing home
in Toronto could be renovated
affordably, yet still become a model of
energy efficiency.
His efforts in renovating a one-
and-a-half storey wood frame house
built in 1913 on Carlaw Avenue into a
LEED Platinum home – the first such
project in Toronto – earned James a
nod as a finalist for a 2017 Canada
Green Building Council (CaGBC)
Greater Toronto Chapter award in the
residential category.
Not bad for a guy whose previous
building experience came from being
a client of three renovations on his old
homes. Realizing the best way to keep
costs down was to simply act as the
general contractor himself, James did
exhaustive research. And to help guide
him through the process, he partnered
with some experts, including Paul
Caverly (MyHaven GreenVision
Homes) and Clearsphere, which
performs LEED certifications.
In assessing the nominations, the
CaGBC considered several items, most
importantly the following:
•	 Impact to performance: the sys-
tems used that led to performance
improvements;
•	 Impact to community: using
systems/approaches that enhance
the local community;
•	 Impact to occupants: using systems/
approaches that enhance the well-
being of the home owners; and
•	 Responsible products and
materials: green building
approaches that incorporate
methods and materials that factor
in the local climate conditions.
Rookie of the Year
Lawyer-turned-contractor’s debut project was the
The rear addition’s high performance windows, in concert with
shade from overhangs, reduce demand on air conditioning.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
Brian Tysoe, a principal at MCW
Consultants Ltd. and an award judge,
explained what impressed him about
the project. “While the pace of new
construction in Toronto is extremely
high, at the root of it, Toronto is a
city of existing buildings,” he says.
“Achieving a HERS rating of 9 on an
existing building is a very impressive
accomplishment. Other home owners
in the neighbourhood, and in the city
at large, should be encouraged and
motivated by what has been done at
887 Carlaw.”
Given the ultimate results – a
HERS rating 85% better than Code
and an EnerGuide rating of 88 – an
argument could be made that this
project deserved to win. It was
certainly the most novel, given that
it broke new ground as the city’s first
residential LEED Platinum project.
James had a goal to create a
prototype, from an energy efficiency
perspective, of what we need to do
with the housing stock in Toronto, and
he successfully proved it is possible
to take an existing home and make it
highly energy efficient – in a relatively
affordable manner to boot.
This house could very well be a
blueprint for what we have to do to make
housing sustainable in the long term.
“Building a green house wasn’t going
to save the planet all by itself,” James
says. “The house had to be a model for
how other middle-class home owners
could renovate their own houses.”
Needless to say, achieving this
proved a challenge. For instance,
James says “air sealing tightness and
making cavities for standard size
insulation batts is complicated by
the fact that you’re constantly trying
to match old and new construction
material sizes. In 1913, 2x4s really
were 2x4s.” As a result, he says, much
more extensive laser light testing of
the stud alignment and batt cutting
was required to ensure the energy
performance objectives were met.
Another big challenge was trying
to maximize the amount of roof area
for solar panels while minimizing the
shade on them. James says they spent
hours planning around the many
plumbing and radon vents and two sun
tunnels.
He says that stacking all the “water
rooms” (bathrooms, kitchen and
second floor laundry) to minimize
hot water pipe run was also more
complicated in a renovation. The
solution was to shift all this piping to
the three-storey addition at the back of
the house.
While he had to fire a few people
along the way in his quest to ensure
things were done exactly up to snuff,
James is also quick to give credit to
some of his key partners that stayed
the course. “I wasn’t working in a
vacuum. Let me make that clear – I
could not have done it without Paul,”
he says. “He’s a legend. He’s one of the
original green builders in Toronto,
going back 10 to 20 years ago.”
For his part, Caverly is equally
complimentary of James. “We knew
it was going to be challenging, but
having the owner so invested in the
process made it easier.”
Caverly says the process of making
this home so energy efficient was
highly involved, including: furring
out the existing 2x4 walls to accept 5.5
inches of Roxul R-24 batt insulation;
installing plywood sheathing over
existing one-inch lumber so a liquid
air barrier could be installed before
doing the outsulation and stucco
(a system, he says, that enhanced
the effective insulation values by
providing a thermal break outside the
structure); installing Certainteed’s
breathable vapour/air barrier on the
interior; installing a Tyvec air barrier
over the new part of the roof insulation
before installing the vented purlins;
extending a liquid-applied air barrier
on the exterior to meet the Tyvek air
barrier at the roof and to meet the
21
first LEED Platinum residential renovation in Toronto
09
THIS HOME IS 85% BETTER THAN CODE
887CarlawAve.,Toronto,ON
RatingDateAugust10,2017
An impressive outcome — near net zero
on a renovation with a HERS rating of 9.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
vanee.ca
All these products meet ENERGY STAR’s higher standards
For more information or to order, contact your local distributor.
vänEE 100H vänEE 200HvänEE 60H vänEE 60H-V+ vänEE 90H-V ECMvänEE 40H+vänEE 90H-V+ vänEE 60H+ vänEE 50H1001 HRV
vänEE Gold Series
2001 HRV
vänEE Gold Series
vänEE air exchangers: improved line-up
meets ENERGY STAR®
standards
Superior Energy Efficiency
Ideal for LEED homes and new building codes
5-year warranty*
FRESH AIR JUST
GOT GREENER
*ON MOST MODELS.
22
two-pound spray foam they used in
the existing vaulted roof area; giving
special attention to air sealing of
outside walls before they installed
any bulkheads and chases; and using
R-10 insulation under slab on grade.
James says he’d like to build
another house in the future, but
it’s not a fait accompli that this will
happen. Nevertheless, he admits “that
would be really sad if I took all this
knowledge I gained and I never built
another house.”
If nothing else, he certainly
learned a lot about what is realistic
given the costs involved, and he
doesn’t mince his words when
describing the situation. “I believe
there’s a crisis of costs in renovations
in this city, and if we’re trying to green
the existing Toronto housing stock,
that’s a big [freaking] issue,” he says.
Other energy-efficient features of
the project include:
•	 To recover heat and moisture for all
the bathrooms, an exhaust-ducted
ERV with local timers and smart
controls was installed;
•	 To provide natural light during the
day, a skylight and two sun tunnels
were installed; and
•	 All appliances in the home are
ENERGY STAR certified.
Whether we should pay heed to
grumpy old men in bars remains in
doubt, but to his credit, James certainly
put his money where his mouth is. BB
Rob Blackstien is a Toronto-based
freelance writer. Pen-Ultimate.ca
The house’s renovation design maximized
the south roof area for PV solar arrays.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
Barrie, GTA West, GTA North
Eric Byle | 416-937-8793
Toronto East
Al Crost | 416-676-0168
Available to water heater customers whose equipment is not operational (i.e. no hot water)
BETTERBUILDER.CA | ISSUE 25 | SPRING 201824
A Green Rater
A valuable resource in making a project successful
COMPARISON CHART FOR HOME LABELLING
ENERGY
PATHS
ENERGY
RATING
SOFTWARE
RENEW-
ABLES
WATER
THIRD
PARTY
TESTED
IDP
EASE
OF
USE
LABEL
AT
CLOSING
COSTS
Performance RemRate (HERS) Y
HERS
H2O
Y Y Y Y
No Reg
Rate =
400-500
Performance
Hot2000
(EnerGuide)
Y N Y N Y Y
Reg = 125
Rate = 300
Total = 425
Prescriptive
performance
Hot2000
(EnerGuide)
N N Y N Y Y
Reg = 125
Rate = 500
Total = 625
Prescriptive
performance
Hot2000
(EnerGuide)
RemRate (HERS)
Y Y Y Y N N
Version 4.1
reduces
fees
Performance
Hot2000
(EnerGuide)
Y
(not verified)
Y
(not verified)
N N N N
Reg = 250
Rate = 300
Total = 550
Performance
Hot2000
(EnerGuide)
N N Y Y N N
Reg = 225
Rate = 750
Total = 925
2017 OBC
Prescriptive
performance
Approved
software
(A.3.1.2.1)
— —
Required
for some
compliance
options
Y — —
Labeling
is NOT
required
•	 Helps projects navigate the LEED
process and requirements, offering
clarification and additional
information (for example, offering
advice on proper features for good
Radon sealing when protecting
foundations from sub-soil gasses)
•	 Completes visual inspections and
reviews support documentation
to ensure all credits are verified
(for example, completing required
inspections for insulation during
construction and final inspections
upon completion),
•	 Collects documentation and
required signatures from the
project team, often the builder or
architect, and compiles them into
a package for submission which is
submitted to CaGBC at time of final
Certification.
•	 Signs off on the LEED project as
compliant with the standard before
quality assurance and auditing
by the Provider and CaGBC (for
example, Green Raters must approve
a project as compliant and meeting
the certification levels before a
project is submitted for certification).
A good Green Rater will not act as
the “Green Police” on a LEED Canada
for Homes job site but as an educator
and resource for project teams to use
as they move through construction
and certification. Current Green Raters
come from a variety of backgrounds but
they will have experience in residential
construction and high-performance,
sustainable building practices. Some are
technologists or engineers, often with
a background in EnerGuide, HERS or
other rating systems. Often Green Raters
have additional credentials as Certified
Energy Advisors, certified HERS raters
with EnerGuide, ventilation training
through HRAI and additional building
science or building investigation
training. They have valuable experi­
ence with LEED and energy-efficient
building techniques and they can be
of considerable help to project teams
working toward LEED certification. BB
industryexpert / BETTER BUILDER STAFF
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018 25
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
After returning to Canada, Lapidus
started a renovating business, focused
on green construction, but also
“flipping” – buying, fixing and selling
a house – “until it didn’t make sense
financially to do so,” he says. Not
interested in quick cosmetic updating,
and preferring instead to thoroughly
renovate for full functioning and
energy efficiency, he found it hard to
make a profit in today’s hot market.
Lapidus turned his full attention
to green renovating of single-family
detached homes and semis, but also
condos. He’s found that home owners
of both old and new condos are looking
to incorporate upgrades that weren’t
available at the time from the builder,
Reduce, Reuse, Recycle
… and Renovate
sitespecific / ALEX NEWMAN
Sam Lapidus
26
and to reconfigure the space to suit
their individual needs better.
There are increasingly more clients
interested in going the sustainable
route, even when they have to pay
more for it. And among these clients,
there are two distinct groups: the
first group is keen to reduce their
construction waste and the second is
willing to recycle as much as possible.
“They want to reduce their footprint,
so we discuss how to get less of this
disposal into the waste pile and more
into the recycling pile, and we look
at alternative ways to dissemble this
house – or interior of a condo – in order
to divert some waste to recycling.”
There’s Habitat for Humanity and
Restore, which takes kitchen cabinets
and building materials, but there’s
also furniture banks for those items
that won’t fit with the new look and
would otherwise go into the dumpster,
Lapidus says.
Next is making a concentrated
effort to reduce construction waste,
which Lapidus says is entirely possible
through planning – for example, tile
can be cut to waste little if it’s stepped
S
am Lapidus hadn’t meant to
get into construction. After
finishing his bachelor’s degree
in analytical marketing at Florida
International University (Miami), he
worked in pharmaceutical financial
model building, then returned to
school to do an MBA with a focus on
retail and commercial development.
One of the MBA requirements was
to take a class unrelated to his main
degree focus of Far East trade. From
that came a final research paper,
“Environmental Sustainability in
Canada’s Real Estate Development
Industry.”
“For the research, I had to take
real estate law as well, got hooked and
changed direction,” says the 39-year-
old Toronto renovator, who currently
chairs the renovator and custom
home builder council for the Building
Industry and Land Development
Association (BILD).
At the time he was doing his
master’s degree, in 2007 and 2008,
green was a “hot item,” he says. “I
learned [while writing the paper on
the Canadian construction industry]
what was coming down the pipe. On
the government side, there would
be controls such as carbon tax. I saw
this as an opportunity in terms of
employment, that returning home to
Canada I would have this research
paper to support my understanding.”
The paper, he says, used German
and Austrian building practices
as a co-operative model, and then
compared the Canadian Green
Building Council’s LEED programs
with that of the European ASHRAE
metrics program.
Lapidus has found that
home owners of both
old and new condos are
looking to incorporate
upgrades that weren’t
available at the time
from the builder.
Save more.
Worry less.
Professionals who install Uponor PEX plumbing, radiant floor heating, and fire sprinkler
systems report faster installation times, fewer callbacks and greater peace of mind.
Exceptional products, tools and support. Uponor. Tested in the lab. Proven in the field.
Connect with Uponor.
Connect with confidence.
PEX PLUMBING
FIRE SPRINKLER SYSTEMS
RADIANT HEATING & COOLING
PRE-INSULATED PIPEFind your solution at
www.uponor.ca
BETTERBUILDER.CA | ISSUE 25 | SPRING 201828
out in advance. When it comes to
building materials themselves, there
are more and more products available
thanks to technological advances in
producing them – some are recycled
materials and others, like forest
sustainable wood product, are a
given, he says. He also uses materials
like glues and caulking that are not
only lower in VOCs, but can also be
post-consumer recycled.
Most home owners are willing to
pay up to 1% more to reduce waste
and to upgrade to sustainable brands,
but if you’re doing the entire house in
a sustainable way, the cost is closer to
20%, Lapidus says.
“That’s hard no matter how
committed the home owner is to the
concept. This is when I pull out the
calculator to see the expense and the
payback period, and we weigh the pros
and cons. They may not be ready for
greywater, but can we put the pipes in
the wall for when you are? The same
for solar panels, electric car charging,
and anything else. It will always sell as
a feature down the road.”
Lapidus finds that many younger
clients, especially if they have kids or
are planning on having them, “want to
touch sustainability, and are willing to
add a few percentage points.”
For the 20% upsell commitment,
the demographic is a little older –
60-plus, environmentally aware, with
more money to support their convic­
tions. He has one client, a couple who
want to share the home with their son
and his family, but “mom and dad are
driving the changes: a cistern in back,
greywater, automation to reduce elec-
trical load and gas usage.” Clients like
these are educated and well rounded,
and they’re “looking to give back and
be careful in a meaningful way.”
Lapidus doesn’t want to give the
impression that the sustainable way
forward is only up to home owners.
“It’s not just the responsibility of home
owners to reduce waste. Builders and
developers need to start thinking this
way too, because at the end of the day,
our industry has to deal with waste.
40% of what’s in the landfill comes
from construction waste.” BB
Alex Newman is a writer, editor and
researcher at alexnewmanwriter.com.
Services
Green Building Consultants
LEED Canada, ENERGY STAR® and R-2000 for Homes
GreenHouse™ Certified Construction
Building System Design Optimization & Performance Testing
On-Site Training
Renewable Energy Integration
Building Code Compliance Using HERS
John B Godden B.E.S.
Recipient of CaGBC Green Building Champion Award 2010
Clearsphere is a division
of Alpha-Tec Consulting
& Construction
Proud sponsor of the
Best Wall Study
info@clearsphere.ca www.clearsphere.ca416 481 4218
29BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
LowCostCodeCompliancewiththeBetterThanCodePlatform
This Platform helps Builders with Municipal
Approvals, Subdivision Agreements and Build-
ing Permits. Navigating the performance path
can be complicated. A code change is coming
in 2017 which will cause more confusion. The
new code will be notionally 15% better than
2012 (HERS 51). How are you getting there?
Let the BTC Platform including
the HERS Index help you secure
Municipal Subdivision Approvals
and Building Permits and enhance
your marketing by selling your
homes’ energy efficiency.
Seeournewwebsiteat betterthancode.ca
BetterThanCodeusestheHERSIndextomeasureenergyefficiency–thelowerthescorethebetter–MeasureableandMarketable.
OBC2012 OBC2017
100 80 60 40 20 0
For more information email info@projectfutureproof.com or call us at 416-481-7517
Better
ThanCode
This rating is available for homes
built by leading edge builders
who have chosen to advance
beyond current energy efficiency
programs and have taken the
next step on the path to full
sustainability.
45
HOMEADDRESS
123 Stone Street, Toronto, ON M6K 2T0
RATINGDATE
July 23, 2015
BETTERBUILDER.CA | ISSUE 25 | SPRING 201830
fromthegroundup / DOUG TARRY
After our Project HOPE last June,
I was asked many times if we were
planning a follow-up build. To be
honest, I just wanted to catch my
breath after a long year of working on
HOPE. But after Maria hit, I was asked
by my friend Juan Pablo Hernandez
about coming to Puerto Rico to help
the victims. I felt compelled to go
and bring them HOPE! Our mission
was planned for late November to
assess the damage and get a better
understanding of what we needed to
know to plan a relief mission.
My buddy Scott Davis joined the
mission a week before we left. As a
restoration specialist, Scott brought a
great deal of experience in restoring
homes after disasters hit. Our team
was set and it was time to begin our
mission of HOPE AGUA VITA.
The first thing we noticed flying
into San Juan was the contrast between
the lush green of the nearby mountains
and the blue tarps on so many roofs.
As a builder that understands building
science, I had a very good idea of the
damage these tarps represented – both
to the crippled structure and to the
shattered lives of the people who called
these buildings home.
I was wrong – it was far worse than I
imagined. From driving through large
city intersections with no working
lights, to the darkness as we drove
along the highway, the island was eerily
dark, as if we had stepped back in time.
Arriving in Morovis, we explored
the centre of town. Again the contrast
between beauty and damage was
abundant. Finding a community
garden on an abandoned lot, we
Climate Change
and More Durable
F
or anyone out there in the climate change denial camp, let me offer you an
open invitation to join us on a rebuild mission in San Lorenzo, Puerto Rico.
Three major hurricanes ripped through the Caribbean last September,
including Hurricane Maria, a Category Five monster which hit this area directly
and caused catastrophic damage.
Lessons from San Lorenzo, Puerto Rico (Part 1)
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
came across monarch butterflies
and caterpillars – such a symbol of
renewal. In the background, there
was the sound of generators. At lunch
I realized what was wrong with the
scene: there was no music. None! The
sounds of the Caribbean had been
replaced by the sounds of generators.
As we studied the faces of the
residents, it became very clear that
Puerto Ricans are a proud people, but
they are sad, and they are worried
for their future. Our mission is one of
HOPE. To help people to stand proud
and regain a sense of security. To give
them HOPE for their future and their
children. To bring back the music.
And that meant it was time to head for
our ground zero: San Lorenzo.
Arriving at San Lorenzo was
literally a leap of faith. The bridge
across the river was gone, so the only
way in was to drive through the river.
The back way was a three-hour drive
through the mountains. As the people
of San Lorenzo had to do this daily,
there was nothing to do but put aside
our fear and cross the river. Once
you’ve done it, it’s not that bad.
During our time in San Lorenzo,
we constantly had one eye on the
mountains, watching for rain. We
had been very clearly briefed that if
it started to rain, we would have 15
minutes to get back across or stay until
the river was passable again.
Norma, a retired school teacher,
was our contact for the village. She had
arranged for many of the residents to
meet us at the school. It took a while
for us to explain our mission of HOPE.
Once I stepped to the white board and
drew for them what had happened to
their roofs, and how we could rebuild
their homes to make them stronger
and more durable, their guard came
down and they engaged passionately
in our conversation. We asked for a
31
Housing
Far left: Widespread damage from hurricane
Maria. Above: When a roof is compromised,
any interior surface grows mold — often toxic.
BETTERBUILDER.CA | ISSUE 25 | SPRING 2018
On the final day, we had a review
meeting with the community. We
taught them about mould and reme­
diation, malaria and standing water,
cholera and the need to compost their
organics. Since there was no garbage
pickup, we explained why they needed
to split their garbage into wood, metal,
junk, organic and plastics. We asked
that they begin this immediately
before disease begins to kill people.
We must go back to help give them
HOPE: water, energy, health and safe
buildings that will withstand the next
hurricane. The list is very long and
time is so short. We need volunteers
and we need funding.
For more information, go to www.
hopeaguavita.com or facebook.com/
HOPEAGUAVITA.
Our fundraising efforts can
be supported at GoFundMe.com/
HOPEAGUAVITA. BB
Doug Tarry Jr is director of marketing at
Doug Tarry Homes in St. Thomas, Ontario.
32
few residents to volunteer to help us
assess the damage to the town.
The next morning, we met our
volunteers. We asked why there were
no street names. They said the streets
have no names, but they wished to
name them after Canada, as we had
come from Canada to help.
We began at the school. One build­
ing had the roof completely destroyed.
It had contained the classrooms for
music, science, English and IT.
The school, like the village, did not
have electricity. The greenhouse was
damaged and there was no money
for a new mesh cover or even seeds.
We learned that the science class
had never even had a microscope or
chemistry set. The students were let go
early each day as there was no drinking
water for them. We adopted the school
and are going back to help save it.
After the school, we began a house-
by-house assessment. The very first
home was fully contaminated with
deadly toxic mould – some of the
worst I’ve ever seen! The home owner
was still living there. The second home
had lost its roof and was also fully
contaminated.
We showed our team how to flag
each home with a number in chalk
on the front of the home and take a
photo for reference. The symbolism
of chalking homes was deeply
disheartening, especially when we
would come across a home that could
not be saved. That was the saddest
of all. Only the more well off had
generators; the majority lived in total
darkness until sunrise. Mothers would
begin crying when the sun goes down,
fearful for their babies in the darkness.
I can’t even imagine. We came to
understand that they were suffering
from post-traumatic stress disorder.
Arriving at San Lorenzo
was literally a leap of
faith. The bridge across
the river was gone, so
the only way in was to
drive through the river.
A typical scene, damaged bridges
hampered aid and rebuilding
efforts in remote areas.
Homeowners, contractors,
and builders rely on
ROCKWOOL™
for
dependable insulation
solutions.
More than a rock,
ROCKWOOL™
insulation
products resist fire, repel
water and absorb sound.
This year, start your
renovation right with
easy-to-use ROCKWOOL™
stone wool insulation.
www.rockwool.com
What it’s made of
makes all the difference.
ROCKWOOL
COMFORTBATT®
An exterior insulation product
for use in both new residential
construction and renovations where
wood or steel studs are used.
ROCKWOOL
SAFE’n’SOUND®
A residential insulation product
for interior walls constructed with
wood or steel studs, where superior
fire resistance and acoustical
performance are required.
ROCKWOOL
COMFORTBOARD™
80
An exterior non-structural
insulation sheathing that provides
a continuous layer of insulation
around the building envelope.
ROXUL®
is proud to now be known as ROCKWOOL™
Together,wemakebetter
energyperformancepossible.
Building energy efficient buildings doesn’t need to be costly and
complicated. Savings by Design can help, whether you’re a residential or
commercial builder. This comprehensive program gives you free access to
industry experts and performance incentives for constructing energy
efficient, sustainable buildings beyond code requirements.
Learn more at savingsbydesign.ca

Better Builder Magazine, Issue 25 / Spring 2018

  • 1.
    ISSUE 25 |SPRING 2018PUBLICATIONNUMBER42408014 River City’s Mid-rise Possibilities Do We Have to Over-regulate? The Good Builder Score LEED v4 – The Next Evolution Going for Silver Lessons from San Lorenzo INSIDE Sustainability ISSUE
  • 2.
    Tankless water heatersare the future of hot water supply. They save energy, take up less space, and offer an endless supply of hot water. At an ultra-efficient Energy Factor of 99.2%, the future is now with the ENERGYSTAR® -approved Glow BrandT180.The only system of its kind, the Glow BrandT180 has on board storage of one gallon of hot water within a stainless steelheatexchanger,firingupautomaticallyto95FinComfortMode.Insteadofwaitingforhot water,you’retreatedtoendlesson-demandhotwater.TheGlowBrandT180isfullymodulating andcanbeinstalledforcombinationspaceheatingapplications. Glow Brand T180 Tankless Condensing Water Heater Brand TM ENDLESS ON-DEMAND HOT WATER ONE-OF-A-KIND TECHNOLOGY 99.2% ENERGY FACTOR 98.4% UNIFIED ENERGY FACTOR 5 USG @ 77 F RISE 10 TO 1 MODULATION PVC VENTING UP TO 100FT CANADIAN MADE Manufactured by Glowbrand Manufacturing GLOWBRAND.CA | 905-264-1414
  • 3.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 16 1 PUBLISHER’S NOTE 2 Rethinking the Experience of Sustainability by John Godden THE BADA TEST 3 Sustainable Homes Do We Have to Over-regulate to Get This Right? by Lou Bada INDUSTRY NEWS 7 The Good Builder Score Proposing a New Approach to Rating Home Builders by Paul De Berardis BUILDER NEWS 10 LEED v4 The Next Evolution for Sustainable Residential Projects in Canada by Thomas Green BUILDER NEWS 13 Going for Silver by Alex Newman INDUSTRY EXPERT 14 The Green Side of the Cottage by Gord Cooke INDUSTRY EXPERT 24 A Green Rater by Better Builder Staff SITE SPECIFIC 26 Reduce, Reuse, Recycle… and Renovate by Alex Newman FROM THE GROUND UP 30 Climate Change and More Durable Housing Lessons from San Lorenzo, Part 1 by Doug Tarry FEATURE STORY 16 On the Waterfront River City is a prime example of what’s possible in a mid-rise by Rob Blackstien 20 Rookie of the Year by Rob Blackstien 30 ISSUE 25 | SPRING 2018 On our cover: River City Phase 1 & 2 by Jose Uribe Images internally supplied unless otherwise credited. 20
  • 4.
    BETTERBUILDER.CA | ISSUE25 | SPRING 20182 T his is the 25th issue of Better Builder. In the spring of 2012, this magazine was called Sustainable Builder. To us, sustainability is really a common-sense approach to managing resources in any process. But the word “sustainable” became a buzzword over time and lost its original punch. Sustainability is more than the process – it is about relationships between people and things. It is about how we value our connection with resources to achieve less waste and better outcomes for the future. It is dynamic, flexible and based on the experience of what works and what does not. We eventually renamed the magazine to reflect the fact that better builders build sustainability. Our Building Code is among the most energy efficient in the world. However, the last issue demonstrated we are at the point of diminishing returns through simply adding more insulation or employing more efficient HVAC systems. Looking ahead, our attention should be directed towards durability, water efficiency and reducing occupant loads and behaviour. This issue showcases three LEED projects recognized in the recent Canada Green Building Council Greater Toronto Chapter Awards. Each project represents an important housing form: a mid-rise multi-unit (page 16), a near zero retirement cottage (page 14) and a LEED Platinum renovation in Toronto (page 20). The latter may be the most crucial, because it demonstrates how to improve the existing housing stock. The LEED rating system will play an important role going forward, as Thomas Green explains on page 10. LEED currently exists as v4 for both low- and mid-rise projects. LEED v4.1, under construction, will be streamlined for wider appeal and ease of use. We also need to recognize when builders do things right. Lou Bada from Starlane Homes (winner of the 2017 RESNET Cross Border Home Builder Challenge President’s Award) argues why over-regulation hinders sustainability on page 3. Paul De Berardis from RESCON proposes a Good Builder Score that rewards sustainable practices (page 7). We also feature renovator Sam Lapidus, who has been taking aim at minimizing waste in the building industry (page 26). Finally, we are proud to share Doug Tarry’s “Lessons from San Lorenzo” on page 30. Doug is not only an innovator, but a humanitarian too. His current work in Puerto Rico is inspiring, and his common- sense approach to building with resiliency is anything but common. I’m very proud of this 25th issue and am grateful to everyone who has contributed to its success. Better Builder strives to promote the triple bottom line: outcomes that are good for people, good for the environment and good for business. We hope to continue pushing all of us to rethink our experience of sustainability. BB Rethinking the Experience of Sustainability PUBLISHER Better Builder Magazine 63 Blair Street Toronto ON M4B 3N5 416-481-4218 | fax 416-481-4695 sales@betterbuilder.ca Better Builder Magazine is a sponsor of PUBLISHING EDITOR John B. Godden MANAGING EDITOR Wendy Shami editorial@betterbuilder.ca To advertise, contribute a story, or join our distribution list, please contact editorial@betterbuilder.ca FEATURE WRITERS Rob Blackstien, Alex Newman PROOFREADING Carmen Siu CREATIVE Wallflower Design www.wallflowerdesign.com This magazine brings together premium product manufacturers and leading builders to create better, differentiated homes and buildings that use less energy, save water and reduce our impact on the environment. PUBLICATION NUMBER 42408014 Copyright by Better Builder Magazine. Contents may not be reprinted or reproduced without written permission. The opinions expressed herein are exclusively those of the authors and assumed to be original work. Better Builder Magazine cannot be held liable for any damage as a result of publishing such works. TRADEMARK DISCLAIMER All company and/or product names may be trade names, trademarks and/or registered trademarks of the respective owners with which they are associated. UNDELIVERABLE MAIL Better Builder Magazine 63 Blair Street Toronto ON M4B 3N5 Better Builder Magazine is published four times a year. publisher’snote / JOHN GODDEN John Godden Alex Newman Gord Cooke Rob Blackstien Lou Bada Doug Tarry CONTRIBUTORS
  • 5.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 Sustainable Homes Do We Have to Over-regulate to Get This Right? 3 H istorically, “sustainability” was often seen as being tied to energy efficiency, and to a large degree it still is. Quantifiable and relatively easy to ascribe a cost to, energy efficiency and energy conservation were the low-hanging fruit for sustainability. Instead of (blindly) marching towards net zero carbon nirvana, we should at some point re-examine our goals and our progress. If our goal is to walk on this planet leaving the smallest footprint possible, we should review our assumptions as well. I believe we have nearly exhausted the energy efficiency component of sustainability in new construction in any reasonable way. Lowering air changes and thickening walls is yielding fewer and fewer environ­ mental returns. Other pillars of sustainable housing are: indoor air quality, resource management, water efficiency and building resiliency (durability). I’d like to explore some of these a little more. I’ve come to believe that over- regulation does not usually inspire much. “Thou shalt” and “Thou shalt not” can only inspire compliance or, in some cases, avoidance and non-compliance (cheating) with unintended consequences and questionable results. I admit that, to some degree, regulation has been effective – for instance, it has forced mechanical equipment to become more energy efficient. This could be considered innovation or continuous improvement. Nevertheless, greater regulation does not always bring thebadatest / LOU BADA greater innovation, nor does it bring forth something entirely new (invention) or something better suited for use in its environment (adaptation). When builders are forced into compliance with something they don’t believe is of value, they are less likely to voluntarily take on things they believe may be of environmental benefit. As an example, water conservation could be greatly improved by installing a greywater recycling system, or a rough-in for future use. Once a home is built, the cost of installing a greywater system without a rough-in is prohibitive. Now just imagine a municipality forcing a builder to install a hot water recirculation system (a system that runs on a pump and delivers hot water to a tap promptly): how likely is it that the builder will voluntarily install a greywater rough-in? Not likely. For the sake of argument, let’s believe (as I do) that the potential for energy savings is greater with greywater recycling than with a hot water recirculation pump. What have we accomplished? What happens when builders are given little choice because of misguided regulation to lower air changes per hour from 2.5 to 2.0, or mandated into building a high-pitched roof and Disneyland-type architectural details? Builders must comply with an ever-increasing number of rules if they want to obtain a permit and to build, but will they go above and beyond the Ontario Building Code when it comes to choosing materials or methods that will improve the durability of a home? There are numerous things that we could do to improve the durability of a home to adapt to a changing climate and extend its life span. Here’s my opinion: in a regulatory environment where builders have less and less discretion, they are less likely to voluntarily do much. Another example may be that Other pillars of sustainable housing are: indoor air quality, resource management, water efficiency and building resiliency.
  • 6.
    BETTERBUILDER.CA | ISSUE25 | SPRING 20184 a builder wants to opt for a more expensive energy recovery ventilator (in lieu of a heat recovery ventilator) to make a home more comfortable and better control indoor humidity. How do we encourage this? How do we set the industry up for success? You may say “more regulation”; I would propose less. We seem to continuously add regulation to correct previous poorly thought out regulation. As you may have guessed by reading my previous articles, I haven’t strayed much from my deeply held convictions that over- regulation – or poorly thought out regulation – is detrimental to the industry and, ultimately, to new- home buyers and an important part of the economy that sustains our ability to have a fair and just society. Sustainable building is multi-faceted and, at times, complex. Builders need flexibility to reach their targets. The targets must be reasonable, and they must be based on a value proposition and professionalism, not on ideology or a political agenda. Our industry has become a convenient target for regulation. We need rational and achievable targets, not programs and prescriptions that don’t make sense and are not sustainable. BB Lou Bada is Vice President of Low Rise Construction at Starlane Home Corporation and on the board of directors for the Residential Construction Council of Ontario (RESCON). The targets must be reasonable, and they must be based on a value proposition and professionalism, not on ideology or a political agenda.
  • 7.
    OneSolutionFOR CONTINUOUS INSULATION ®™The DOW Diamond Logo is a trademarks of The Dow Chemical Company © 2018 STYROFOAM™ CLADMATE™ CM20 insulation is designed with the builder and contractor in mind. Changes to many Building Codes include requirements for increased R-values and improved air sealing control measures. With these new requirements come many options, which sometimes leads to confusion over howto meet code and which products to use. One of the biggest changes to complying with the Code, is the requirement of continuous insulation (ci). Continuous Insulation (ci): An uninterrupted layer of insulation that spans over structural members without thermal bridging, otherthan fasteners and services. A continuous layer of insulation helps reduce the potential for condensation within the wall where mold and mildew can accumulate undetected. DOW BUILDING SOLUTIONS 1-866-583-BLUE (2583) www.dowbuildingsolutions.com
  • 8.
    BETTERBUILDER.CA | ISSUE25 | SPRING 20186
  • 9.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 7 industrynews / PAUL DE BERARDIS Tarion’s role is anticipated to shift by 2020, due to the province deciding to enforce some recommendations from the Honourable J. Douglas Cunningham’s report. There is a possible window of opportunity to change the rating system from hereon. Rather than just a negative rating based on cosmetic deficiencies, there should be a positive one based on things done right – especially major systems and structural elements. Here’s why: people care about esthetics – the most obvious defects and deficiencies. That makes sense, as these are right in front of home owners and top of mind. While Tarion deals with home owner-driven complaints, those problems usually are about minor cosmetic issues rather than the construction practices that may affect the durability and performance of your home. So instead of buyers complaining that their tiles are off by a few millimetres, why not consider all of the important things that you can’t see? Home owners, generally, are not concerned with what’s behind the walls, in the ceilings or below the floors, simply because either they don’t understand, they can’t see or they don’t care what’s there (or all three). Let’s look at Tarion’s list of top five claims: 1. Paint: streaks and brush marks, drips and splatters, poor coverage, poor quality paint. 2. Doors: finishing, surface damage, sticking or warping doors, poor installation. 3. Floors: gaps between boards, scratches, cupping, uneven finishing. 4. Drywall: cracking, visible seams, blemishes, rough patches, corners that aren’t square. 5. Stairs and steps: squeaking, mismatched finishes, scratched surface finish. Are all five of these important? Of course they are. What’s in front of the buyer’s eyes and ears will always get first priority in a new home. But these 7 The Good Builder Score Proposing a New Approach to Rating Home Builders P erhaps the biggest myth in new-home construction is that a home builder’s reputation rests with the Tarion warranty program. Any builder can run into a string of chargeable conciliations against them by a few buyers (sometimes unreasonable customers), putting a stain on their record that can stick for a long time. And that’s a problem.
  • 10.
    BETTERBUILDER.CA | ISSUE25 | SPRING 20188 are not the critical components of a home that come to mind for a builder when it comes to the durability and performance of a new home. Ideally, home owners should be aware and ask questions regarding certain critical systems in their home and be less concerned with cosmetic upgrades and finishes. But that’s difficult to achieve. Not everyone is that interested in how their home really functions. Most home owners should know their home is constructed according to code. The responsibility of regulating and enforcing building construction standards falls onto designers and municipal building inspectors. Here’s a crazy idea for the war­ ranty program (whether it is Tarion or another agency): why not create a checklist or point system for builders that rewards them for including quality construction improvements or components that ensure the quality of your new home for decades? Is this a pie in the sky? We don’t think so. We strongly believe that a point system should consider the positive qualities of the individual home builder. Instead of weighing all of the less important, esthetic niggles of a new home against the reputation of a builder, why not use a system of positivity to build up those reputations? The point system – let’s call it “The Good Builder Score” – would lead to more healthy competition between builders, encourage them to use the most modern techniques of construction, create a higher level of understanding between builders and buyers through education, and improve the overall home buying process. But the focus not only needs to shift from a negative rating system to a positive one. It is also critical that we change the focus from the purely cosmetic changes (which is what most claims are about) to giving credit to builders where credit is due – that is, for including modern features that improve the overall durability of the home. Here’s the kicker: these important components of durability are the parts of the house that you don’t see. Here are five potential checklist examples that would give a builder points towards their Good Builder Score: 1. Effective installation of an air- barrier system to ensure airtight­ ness for energy efficiency and to prevent condensation in wall assemblies. 2. Proper installation, commissioning and balancing of the heating and cooling system, including components such as the furnace, air conditioner, ERV/HRV, humidifier and distribution ducting to provide desired indoor air quality. 3. Precision wood-framed structures comprised of panelized wall and floor sections built off-site in a controlled manufacturing environment, providing quality control of a home’s structure. 4. Proper flashing of windows, doors and mechanical penetrations in the exterior building envelope to protect against possible water entry and air leakage. 5. Use of new and advanced building materials, such as engineered floor joists, which can offer increased spatial design flexibility as well as provide greater building material uniformity. The Good Builder Score is just a starting point for a system that would encourage builder participation. It could lead to offering rebates and incentives for the builders who build a cut above the bare minimum requirements. Meanwhile, we also strongly believe that Tarion should be more open with regards to their claims database, so home owners can be more knowledgeable about things to look for, and builders can increase their education outreach to consumers. Tarion is in the business of warranty and home construction, yet they are not applying the lessons learned from their warranty claim database to address any shortfalls in construction practices. So, let’s do this. A Good Builder Score would involve a steep learning curve. There’s an oppor­ tunity to improve the industry for the benefit of all home buyers and home builders, and we should take it. BB Paul De Berardis is RESCON’s director of building science and innovation. Email him at deberardis@rescon.com. 8 Why not create a checklist or point system that rewards builders for including quality construction improvements or components that ensure the quality of your new home for decades?
  • 11.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 • PROVIDES A CONTINUOUS THERMAL RESISTANCE OF R-5; perfect for meeting the requirements of the Quebec & Ontario Building Code. • DOES NOT REQUIRE ADDITIONAL BRACING; one-step installation saving time and cost. • INTEGRATED AIR-BARRIER; no additional housewrap required saving material costs. • LIGHTWEIGHT AND EASY TO INSTALL; allows for fast installation saving time and cost. R-5 XP C O M B I N E S T H E W I N D B R A C I N G P R O P E R T I E S O F W O O D F I B R E W I T H T H E T H E R M A L R E S I S T A N C E O F E X T R U D E D P O L Y S T Y R E N E bpcan.com F O R O V E R 1 0 0 Y E A R S INSULSHEATHING Panel Introducing a Unique Innovation:
  • 12.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 COMPARISON OF LEED CANADA VERSION 2009 TO THE NEW V4 WALLACE RESIDENCE CATEGORIES LEED VERSION 2009 LEED V4 Innovation & Design Process (ID) 5.5 2 Location and Linkages (LL) 10 10 Sustainable Sites (SS) 5 2.5 Water Efficiency (WE) 3 3 Energy & Atmosphere (EA) 22.5 12 Materials & Resources (MR) 2.5 5 Indoor Environment Quality (EQ) 19 10.5 Awareness & Education (AE) 3 1 Points Accredited 70.5 46 Total Possible Points Certified Silver Gold Platinum 54 69 84 99 Certified Silver Gold Platinum 40–49 50–59 60–79 80–110 10 buildernews / TOM GREEN I t is an exciting and important time to be involved in green housing in Canada. People are talking about sustainable housing issues well beyond energy efficiency – and it’s not just individuals from academia or the green building industry sector, but also policy-makers, economists, building code developers, and governments at all levels. With LEED v4 now in force and a LEED v4.1 update on the way, the LEED green building rating system’s integrated and holistic range of sustainability criteria continues to evolve to push the market with new and more stringent sustainability parameters, add emphasis on quality assurance and encourage real-world performance reporting. In the 15 years since being introduced to the market, LEED has become well-established as a voluntary, consensus-driven, internationally recognized certification system providing third- party verification that a building or community is designed and built as planned to rigorous sustainability standards. Delivered throughout the country by the Canada Green Building Council (CaGBC), LEED provides a framework to develop leading-edge green housing, from single-family homes to high-rise projects, and drives continual improvements to building design, construction and operation. To date, there are more than 7,500 LEED homes registered in Canada, of which over 3,500 are certified. Raising the sustainability bar with LEED v4 LEED v4 focuses on advancing an even more sustainable paradigm and aims to balance the necessary technical rigour with a market focus to provide a flexible and effective environmental assessment methodology that will facilitate widespread adoption. Rather than aiming at “less bad” design, the LEED v4 system asks a critical question: “What should a LEED project accomplish?” LEED v4 was LEED v4 The Next Evolution for Sustainable Residential Projects in Canada
  • 13.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 developed with a set of seven impact categories that focus on specific social, environmental and economic goals, tailored to the built environment and targeting positive outcomes involving: 1. Climate change – reverse contribution to climate change 2. Human health – enhance human health and well- being 3. Water resources – protect and restore water resources 4. Biodiversity – protect biodiversity and ecosystem services 5. Material resources – promote sustainable and regenerative resource cycles 6. Green economy – build a greener economy 7. Community – enhance community, social equality, environmental justice and quality of life LEED v4 raises the bar for the environmental performance of housing through adjustments to the credits and prerequisites and a comprehensive technical update. Fundamental LEED v4 revisions include: • Greater emphasis on a performance-based approach, including increased stringency thresholds for energy, water, waste and indoor environmental air quality. • A more holistic evaluation of materials using multiple attributes and approaches such as Life Cycle Assessment and Environmental Product Declarations, promoting key next steps to address the environmental impacts of materials. • Increased focus on human health, integrative design, envelope commissioning, biodiversity, the green economy and community. To support local delivery of the LEED v4 global platform of tools and resources, CaGBC develops Alternative Compliance Paths (ACPs) to provide Canadian residential project teams with the flexibility to use locally relevant, equivalent means of demonstrating compliance to LEED credit requirements. LEED v4 also provides increased 11
  • 14.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201812 alignment between the rating system structures and enables Canadian projects to access all 21 of the LEED v4 rating systems. Introducing LEED v4.1 LEED v4.1 is a recently announced improvement focused on the implementation, applicability and agility of LEED – a next evolution of the rating system built on lessons learned in the four years since LEED v4 was released. In the first quarter of 2018, USGBC will release a draft for LEED v4.1 O+M for review, followed by BD+C, ID+C, Residential and ND, with plans to offer a test period for the proposed changes. During this time, LEED v4 will remain open for use by all projects. The goals of the LEED v4.1 update are to: • Address market barriers and lessons learned from LEED v4 project teams • Update performance thresholds and reference standards • Expand the marketplace for LEED • Incorporate performance reporting to improve the life cycle performance of buildings With increasing attention on a cleaner environment, health and well-being, the continually evolving LEED v4 green building rating system offers leading-edge value and confidence for clients wanting the health benefits and cost savings a LEED-certified home can bring, in a comprehensive sustainability framework with third-party quality assurance. Contact us Learn more about how LEED v4 can strengthen the business case for your project. CaGBC has developed a number of education resources to support the LEED v4 rating systems, as well as a CaGBC LEED v4 webpage. You can also email CaGBC at info@cagbc. org or contact your local chapter at any time. BB Thomas Green is Residential Programs Manager at the Canada Green Building Council (CaGBC). Roof truss and wood sill connection. Simpson Strong Tie MGT system shown Drywall screwed into amvic polypropylene webs as per building code Electrical outlet Wood sub-floor installed as per local building Simpson strong tie ICFLC and wood floor joists connection Amvic insulating concrete forms Amdeck floor & roof system Exterior wood siding installed as per local building code Amvic high impact polypropylene webs Acrylic, standard ptucco or eifs applied to exterior face of Amvic ICF Brick veneer Parge face of exposed brick ledge Grade Peel-and-stick waterproofing membrane (or equivalent) as per local building code Perforated weeping tile INSULATED CONCRETEFORMS FOR MORE INFORMATION VISIT: AMVIC.COM
  • 15.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 “Just because I was interested didn’t mean I had the skills to do it myself,” Wallace says. “The Canada Green Building Council requires you to work with someone who is registered to audit, and that led me to Clearsphere, where I was connected with a LEED specialist.” At Clearsphere, the coordinator walked him through the various ways to garner LEED points, from greywater recycling systems and zeroscaping, to heavy duty insulation and vapour barriers. Together, they were able to sketch the project out as LEED silver. There were some items that Wallace was interested in including, but was ultimately unable to do. For example, with a city lot, it’s not possible to alter the orientation of the house or to plant a row of trees along the south edge. Even installing an electric charging station is challenging, since each car manufacturer uses a different receptacle. And though he initially looked into greywater systems, it was a struggle to find plumbers who could install and maintain one. Ultimately, he went with “real­ izable” goals: upping the house envelope and installing an ERV system. One expectation he had going in was the prospect of too much humidity, since moisture can’t escape due to airtight design. When Wallace and his family moved in, things started to crack and shrink, so he called Clearsphere for advice on how to manage the home’s relative humidity. On the insulation, they went “substantially above code” with high values in the roof, walls, and windows. “Insulation is a straightforward and fairly easy add-in for LEED,” Wallace says. “It’s a little more expensive than code levels of insulation, but the payback was pretty easy to calculate.” Wallace used Roxul on Clear­ sphere’s recommendation, as well as an exterior sheathing product by BP, called R4 Structural Insulated Sheathing. “It made a lot of sense rather than the usual tieback and second vapour barrier which serves to create a cavity that collects moisture,” he says. “This sheathing has a high vapour permeance which allows the wall to dry to the outside and ended up being a great product.” The HVAC system was more complicated, Wallace says. The hot water boiler heats the house with forced air and a radiant basement floor, required a whole “wall of plumbing with miniature pumps all around,” he recalls. It confounded his very experienced general contractor, who had never worked with such a system. “The upside was being able to get away from bulkheads, thanks to smaller ducts required by the system.” Ultimately, Wallace is satisfied with the silver certification. He feels that anything higher, like gold or platinum, would have been more difficult because of its “much more aggressive design standard. I think silver is attainable – you tweak and focus on certain things, like increasing efficiency, without getting into something far out or hard to maintain.” BB Alex Newman is a writer, editor and researcher at alexnewmanwriter.com. 13 buildernews / ALEX NEWMAN A s a mechanical engineer involved in sustainable decommissioning (think power plants), Kevin Wallace was no stranger to LEED certification. But when he and his wife purchased her parents’ home in Toronto’s Leaside area with an eye to razing and building new, he encountered a different side of green. Going for Silver 46 THIS HOME IS 23% BETTER THAN CODE 61BessboroughDrive,Toronto RatingDateOctober2,2017 Ultimately, Wallace went with “realizable” goals: installing an ERV system and upping the house envelope with high insulation values.
  • 16.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201814 industryexpert / GORD COOKE A few years ago I, and two other building science educators, helped facilitate a series of builder design charrettes. Each time, about 40 builders were given three days of comprehensive building science training that included on-site investigations, testing, case studies, building material presentations and evaluations. The builders, working in groups of five, were then asked to apply what they had learned and experienced to a single-family design project. They were asked to “build a house that you would feel good about building for your favoured clientele.” Upon completion, while we evaluated the energy performance improvements they had made using HERS software, the builders were asked to cost out the incremental costs of their chosen advancements. It was a surprise, even to us, that in each group in each of the seven sessions, the annual energy savings of their chosen advancements provided a positive return on investment against the incremental estimated construction costs applied to the mortgage of the house. In other words, the total annual cost of ownership for the improved design was always projected lower than the costs for the standard, reference design. Then came an intriguing exercise. Each team was asked to evaluate or score their project against a few of the most common green building programs, such as LEED for Homes and the U.S. National Green Building Standard. In each case, the eight teams in each of the seven sessions found that the design elements they had chosen helped them achieve at least the middle range, Silver or Gold, in the program they chose. The builders, initially skeptical about the need for green, learned that most of the common-sense decisions they felt compelled to make to ensure a high-performance home were simultaneously recognized as being green. Looking at this more closely, most green programs, in addition to boosting energy conservation, reward decisions that improve indoor air quality, water conservation, material conservation and sustainability and overall building durability. The following are some examples of elements I learned from these builder charrettes. We were able to incorporate many of them in the LEED Platinum cottage we completed recently. Start with an obvious win-win: advanced framing. This means lower construction costs, improved energy performance and points within green building programs. Certainly it requires design considerations, process changes and training of framers and other contractors; however, with the move in codes to “effective R-value” recognition, advanced framing is something that should be on all builders’ agendas for 2018. In the cottage construction, the framers admitted we went a little overboard in striving for minimized wood use. They ended up adding back a few elements around windows and doors for trim and backing, but overall the walls were lighter and quicker to build. Next, the most important to me as I travel and see the impacts of improper water management details, is the recognition in LEED and other programs for durability measures – specifically, fully drainable, dryable building enclosures that include shingled, lapped house wrap details, window flashing, sill pan flashing, head flashings and drip caps over all windows and doors. In my case, I am a big fan of a systems approach, The Green Side of the Cottage A few years ago I, and two other building science educators, helped facilitate a series of builder design charrettes. Each time, about 40 builders were given three days of comprehensive building science training that included on-site investigations, testing, case studies, building material presentations and evaluations. The builders, working in groups of five, were then asked to apply what they had learned and experienced to a single-family design project. They were asked to “build a house that you would feel good about building for your favoured clientele.” We are on a great path to minimize energy resources over the next 10 to 12 years. In that same time frame, there will be increased pressure to optimize water use.
  • 17.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 such as provided by the DuPont Tyvek weatherization system. The builders in the charrettes chose it after having seen in the site walks the potential risks associated with ever more complicated building enclosure details, combined with the lowered drying potential of buildings due to increased insulation levels. I like the warranty protection offered by one of the world’s leading building materials manufacturers. Another really simple, cost- effective decision is to choose materials that have lower off-gassing potential to enhance air quality. One great example is the availability of high-quality sealants and adhesives, such as the relatively new LePage Quad Max window sealant, which has less than 3% volatile organic compound content and yet can be applied down to -18°C in any moisture condition and provides better flexibility than any other currently available. There are similar low- cost opportunities in paints, sealers and building materials. It’s time to re-evaluate your material choices and add indoor air quality parameters to your decision matrix. We are on a great path to minimize precious energy resources over the next 10 to 12 years. In that same time frame, there will be increased pressure to optimize water use. The easiest way to start here is by using reliable and effective ultra low flow shower heads and dual flush toilets. I really like the experience of the Delta H2Okinetic shower heads at water flow rates of under two gallons per minute. Then, in the cottage, we installed a 4,000 litre rain water cistern to flush toilets and water the grass. While the cistern itself was less than $1,000, the pump and controls needed to satisfy the municipal water works needs for pressure control and backflow potential cost us many thousands more – a decision I wouldn’t recommend for mainstream housing. In my opinion, the newly available packaged greywater systems will be a much more cost-effective way to minimize the single largest use of water in most homes by using waste water to flush the toilets. These were but a few of the 30 or so decisions we considered in designing and building the cottage. In that effort, we used the same philosophy that the builders in the design charrettes used. Rather than “chasing” green points, stars, bars or colours, we used the helpful, well-researched resources and checklists available from programs such as LEED for Homes to help make informed, cost-effective decisions. Those resources, combined with now over 40 years of building science research found in programs such as R-2000 and ENERGY STAR, can help you build healthier, safer, more comfortable, more durable and indeed more cost-effective homes for your buyers. Then go ahead and score your homes against the green building program of your choice, and you will find they will reward you with useful recognition of your decisions. BB Gord Cooke is president of Building Knowledge Canada. 15 Left: Advanced framing with studs on a 24" centre yields a higher effective R-value. Right: When flashing windows, house wrap improves airtightness and durability.
  • 18.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 featurestory / ROB BLACKSTIEN On the Water IMAGESBYJOSEURIBE
  • 19.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 17 River City is a prime example of what’s possible in a mid-rise rfront R iver City was a long time in the coming – but based on the reaction, it was well worth the wait. Part of the West Don Lands neighbourhood in Toronto – an 80-acre site bordered by the Don River, King Street, Parliament Street and the rail line beside the Gardiner Expressway – River City was developed by Urban Capital under some very unique circumstances.
  • 20.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 The former industrial site was originally slated for redevelopment in 1987, but the issues piled up and the site was never developed. Revitalized in 2006 by Waterfront Toronto, West Don Lands was envisioned as a family-friendly, sustainable and well- designed community. Ultimately, River City will be a four-phase project, consisting of almost 1,100 loft-style condominiums and townhouse units, and will include street-level boutiques, stores and restaurants. Urban Capital development director Taya Cook explains that the RFP process through Waterfront Toronto was quite involved, one “which we won in 2008 after an extensive competition involving 18 national and international developers.” “The project was subject to a devel­ opment agreement with Waterfront Toronto, and required extensive co-ordination with Waterfront Toronto and the adjacent properties to maintain a seamless connection/ experience in the area,” explains 18 Anna Kazmierska of WSP, who acted as the LEED consultant for River City. All projects within West Don Lands had to meet LEED Gold specs – a big part of the development’s overall plan for urban sustainability. Kazmierska adds that River City was subject to Waterfront Toronto mandatory green building requirements, LEED Gold requirements and Toronto Green Standard Tier 1/Tier 2 requirements. The fact that this is a mid-rise was applauded, given that so many believe that this housing form makes the most sense for Toronto from a livability perspective. “Mid-rise offers many of the same benefits of a high-rise, multi-unit residential building – mix of uses, shared building amenities, central plant equipment, high density to support transit nodes – at a more digestible and community-based scale,” Kazmierska explains. One of the unique challenges of this project, Kazmierska says, is that they couldn’t build any below-grade parking because of a flood plain, so River City “required creative parking solutions.” For example, the development team successfully argued to lower the available parking by 50% from the zoning by-law requirements, putting all the parking within an above-grade structure between the two buildings. To compensate for the reduced parking, all new residents of River City were given a free one-year membership in a low-emitting car sharing program available on-site – a move that has helped reduce greenhouse gas emis­ sions. Cook mentions that another fascinating element of this project was its relationship to the Don Valley Parkway on-ramp, one “which the architecture embraced.” Kazmierska says that River City employed a range of energy-efficient features, such as: • airtight building and suite design to reduce air movement between suites and to reduce energy consumption; • the reuse of waste heat to pre-heat incoming ventilation air; • an accessible green roof (populated with native and adaptive flora designed to mitigate the urban heat Mid-rise housing becomes a role model for sustainable design and development.
  • 21.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 19 island effect and the quantity of stormwater runoff); • exceptional indoor air quality from in-suite ventilation systems; • a rainwater harvesting system that reuses rainwater for irrigation purposes; • low-flow plumbing fixtures that will save over 17 million litres of water per year; • careful selection of materials and paints to avoid contaminating indoor air; and • in-suite metering of electricity, water, heating and cooling. River City marks the first private sector development in the area, with the first two phases recently being recognized as the LEED Gold finalist in the residential awards by the Canada Green Building Council (CaGBC) Greater Toronto Chapter. When assessing River City, the CaGBC gave the project 44 of a possible 70 LEED Gold points. The points breakdown consisted of: • 11 of 14 as a sustainable site; • 3 of 5 for water efficiency; • 10 of 17 for energy and atmosphere; • 6 of 14 in materials and resources; • 10 of 15 for indoor environmental quality; and • 4 of 5 for innovation and design process. Brian Tysoe, a principal at MCW Consultants Ltd., and one of the judges that assessed this project, was impressed with what was accomplished. “Urban Capital has done a commendable job at River City of integrating architecture and sustainability into a highly livable, highly energy-efficient development,” he says. “With elements such as in-suite master lighting kill switches, the design team has placed a high emphasis on sustainability for this project.” Urban Capital got its start in 1996 by developing the 48-unit Camden Lofts project in Toronto’s Fashion District. The company’s philosophy is that de-industrialized parts of cities can come alive again as vibrant urban centres. Since that debut project, Urban Capital has expanded into Ottawa, Montreal, Winnipeg and Halifax, and overall has built over 3,500 urban condominiums, with another 1,000 under construction and several thousand more in the pipeline. All told, it accounts for over $2 billion in development. The company believes in pushing the envelope and pioneering high- end, yet functional, design or green living. “We try to be on the forefront of green building, being the first to introduce residential tri-sorters in our first project, to developing the three- phased LEED Gold Central project in Ottawa, and LEED Gold at River City,” says Cook. River City could very well be a template for how Toronto deals with sustainable living at a time when density laws are becoming more stringent. BB Rob Blackstien is a Toronto-based freelance writer. Pen-Ultimate.ca River City’s medium-density, multi-unit residential design successfully maximizes human scale compared to the city’s high-density, high-rise core.
  • 22.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201820 buildernews / ROB BLACKSTIEN A ndrew James’ dream to make an environmental difference took many twists and turns over the years, but it wasn’t until he got a lecture from a grumpy old man at a bar that he finally realized what he needed to do. A lawyer turned legal writer, James’ interest in the environment led him to run as a Green Party candidate, and it was at a party pub night that a stranger delivered him a message that still rings true. “You’re not doing anything, you’re never going to get elected, you’re wasting your time,” an old man that had wandered into the pub scolded James. “You want to go out and do something for the environment? Then do something! Just don’t talk about it or get your name on an all-candidates ballot; that’s not accomplishing a damn thing.” The words really hit home for James. He felt it was hard for him to be a credible voice for the environment when he didn’t have hands-on exper­ ience in doing something to help it. The answer, he believed, was to prove that an existing home in Toronto could be renovated affordably, yet still become a model of energy efficiency. His efforts in renovating a one- and-a-half storey wood frame house built in 1913 on Carlaw Avenue into a LEED Platinum home – the first such project in Toronto – earned James a nod as a finalist for a 2017 Canada Green Building Council (CaGBC) Greater Toronto Chapter award in the residential category. Not bad for a guy whose previous building experience came from being a client of three renovations on his old homes. Realizing the best way to keep costs down was to simply act as the general contractor himself, James did exhaustive research. And to help guide him through the process, he partnered with some experts, including Paul Caverly (MyHaven GreenVision Homes) and Clearsphere, which performs LEED certifications. In assessing the nominations, the CaGBC considered several items, most importantly the following: • Impact to performance: the sys- tems used that led to performance improvements; • Impact to community: using systems/approaches that enhance the local community; • Impact to occupants: using systems/ approaches that enhance the well- being of the home owners; and • Responsible products and materials: green building approaches that incorporate methods and materials that factor in the local climate conditions. Rookie of the Year Lawyer-turned-contractor’s debut project was the The rear addition’s high performance windows, in concert with shade from overhangs, reduce demand on air conditioning.
  • 23.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 Brian Tysoe, a principal at MCW Consultants Ltd. and an award judge, explained what impressed him about the project. “While the pace of new construction in Toronto is extremely high, at the root of it, Toronto is a city of existing buildings,” he says. “Achieving a HERS rating of 9 on an existing building is a very impressive accomplishment. Other home owners in the neighbourhood, and in the city at large, should be encouraged and motivated by what has been done at 887 Carlaw.” Given the ultimate results – a HERS rating 85% better than Code and an EnerGuide rating of 88 – an argument could be made that this project deserved to win. It was certainly the most novel, given that it broke new ground as the city’s first residential LEED Platinum project. James had a goal to create a prototype, from an energy efficiency perspective, of what we need to do with the housing stock in Toronto, and he successfully proved it is possible to take an existing home and make it highly energy efficient – in a relatively affordable manner to boot. This house could very well be a blueprint for what we have to do to make housing sustainable in the long term. “Building a green house wasn’t going to save the planet all by itself,” James says. “The house had to be a model for how other middle-class home owners could renovate their own houses.” Needless to say, achieving this proved a challenge. For instance, James says “air sealing tightness and making cavities for standard size insulation batts is complicated by the fact that you’re constantly trying to match old and new construction material sizes. In 1913, 2x4s really were 2x4s.” As a result, he says, much more extensive laser light testing of the stud alignment and batt cutting was required to ensure the energy performance objectives were met. Another big challenge was trying to maximize the amount of roof area for solar panels while minimizing the shade on them. James says they spent hours planning around the many plumbing and radon vents and two sun tunnels. He says that stacking all the “water rooms” (bathrooms, kitchen and second floor laundry) to minimize hot water pipe run was also more complicated in a renovation. The solution was to shift all this piping to the three-storey addition at the back of the house. While he had to fire a few people along the way in his quest to ensure things were done exactly up to snuff, James is also quick to give credit to some of his key partners that stayed the course. “I wasn’t working in a vacuum. Let me make that clear – I could not have done it without Paul,” he says. “He’s a legend. He’s one of the original green builders in Toronto, going back 10 to 20 years ago.” For his part, Caverly is equally complimentary of James. “We knew it was going to be challenging, but having the owner so invested in the process made it easier.” Caverly says the process of making this home so energy efficient was highly involved, including: furring out the existing 2x4 walls to accept 5.5 inches of Roxul R-24 batt insulation; installing plywood sheathing over existing one-inch lumber so a liquid air barrier could be installed before doing the outsulation and stucco (a system, he says, that enhanced the effective insulation values by providing a thermal break outside the structure); installing Certainteed’s breathable vapour/air barrier on the interior; installing a Tyvec air barrier over the new part of the roof insulation before installing the vented purlins; extending a liquid-applied air barrier on the exterior to meet the Tyvek air barrier at the roof and to meet the 21 first LEED Platinum residential renovation in Toronto 09 THIS HOME IS 85% BETTER THAN CODE 887CarlawAve.,Toronto,ON RatingDateAugust10,2017 An impressive outcome — near net zero on a renovation with a HERS rating of 9.
  • 24.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 vanee.ca All these products meet ENERGY STAR’s higher standards For more information or to order, contact your local distributor. vänEE 100H vänEE 200HvänEE 60H vänEE 60H-V+ vänEE 90H-V ECMvänEE 40H+vänEE 90H-V+ vänEE 60H+ vänEE 50H1001 HRV vänEE Gold Series 2001 HRV vänEE Gold Series vänEE air exchangers: improved line-up meets ENERGY STAR® standards Superior Energy Efficiency Ideal for LEED homes and new building codes 5-year warranty* FRESH AIR JUST GOT GREENER *ON MOST MODELS. 22 two-pound spray foam they used in the existing vaulted roof area; giving special attention to air sealing of outside walls before they installed any bulkheads and chases; and using R-10 insulation under slab on grade. James says he’d like to build another house in the future, but it’s not a fait accompli that this will happen. Nevertheless, he admits “that would be really sad if I took all this knowledge I gained and I never built another house.” If nothing else, he certainly learned a lot about what is realistic given the costs involved, and he doesn’t mince his words when describing the situation. “I believe there’s a crisis of costs in renovations in this city, and if we’re trying to green the existing Toronto housing stock, that’s a big [freaking] issue,” he says. Other energy-efficient features of the project include: • To recover heat and moisture for all the bathrooms, an exhaust-ducted ERV with local timers and smart controls was installed; • To provide natural light during the day, a skylight and two sun tunnels were installed; and • All appliances in the home are ENERGY STAR certified. Whether we should pay heed to grumpy old men in bars remains in doubt, but to his credit, James certainly put his money where his mouth is. BB Rob Blackstien is a Toronto-based freelance writer. Pen-Ultimate.ca The house’s renovation design maximized the south roof area for PV solar arrays.
  • 25.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 Barrie, GTA West, GTA North Eric Byle | 416-937-8793 Toronto East Al Crost | 416-676-0168 Available to water heater customers whose equipment is not operational (i.e. no hot water)
  • 26.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201824 A Green Rater A valuable resource in making a project successful COMPARISON CHART FOR HOME LABELLING ENERGY PATHS ENERGY RATING SOFTWARE RENEW- ABLES WATER THIRD PARTY TESTED IDP EASE OF USE LABEL AT CLOSING COSTS Performance RemRate (HERS) Y HERS H2O Y Y Y Y No Reg Rate = 400-500 Performance Hot2000 (EnerGuide) Y N Y N Y Y Reg = 125 Rate = 300 Total = 425 Prescriptive performance Hot2000 (EnerGuide) N N Y N Y Y Reg = 125 Rate = 500 Total = 625 Prescriptive performance Hot2000 (EnerGuide) RemRate (HERS) Y Y Y Y N N Version 4.1 reduces fees Performance Hot2000 (EnerGuide) Y (not verified) Y (not verified) N N N N Reg = 250 Rate = 300 Total = 550 Performance Hot2000 (EnerGuide) N N Y Y N N Reg = 225 Rate = 750 Total = 925 2017 OBC Prescriptive performance Approved software (A.3.1.2.1) — — Required for some compliance options Y — — Labeling is NOT required • Helps projects navigate the LEED process and requirements, offering clarification and additional information (for example, offering advice on proper features for good Radon sealing when protecting foundations from sub-soil gasses) • Completes visual inspections and reviews support documentation to ensure all credits are verified (for example, completing required inspections for insulation during construction and final inspections upon completion), • Collects documentation and required signatures from the project team, often the builder or architect, and compiles them into a package for submission which is submitted to CaGBC at time of final Certification. • Signs off on the LEED project as compliant with the standard before quality assurance and auditing by the Provider and CaGBC (for example, Green Raters must approve a project as compliant and meeting the certification levels before a project is submitted for certification). A good Green Rater will not act as the “Green Police” on a LEED Canada for Homes job site but as an educator and resource for project teams to use as they move through construction and certification. Current Green Raters come from a variety of backgrounds but they will have experience in residential construction and high-performance, sustainable building practices. Some are technologists or engineers, often with a background in EnerGuide, HERS or other rating systems. Often Green Raters have additional credentials as Certified Energy Advisors, certified HERS raters with EnerGuide, ventilation training through HRAI and additional building science or building investigation training. They have valuable experi­ ence with LEED and energy-efficient building techniques and they can be of considerable help to project teams working toward LEED certification. BB industryexpert / BETTER BUILDER STAFF
  • 27.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 25
  • 28.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 After returning to Canada, Lapidus started a renovating business, focused on green construction, but also “flipping” – buying, fixing and selling a house – “until it didn’t make sense financially to do so,” he says. Not interested in quick cosmetic updating, and preferring instead to thoroughly renovate for full functioning and energy efficiency, he found it hard to make a profit in today’s hot market. Lapidus turned his full attention to green renovating of single-family detached homes and semis, but also condos. He’s found that home owners of both old and new condos are looking to incorporate upgrades that weren’t available at the time from the builder, Reduce, Reuse, Recycle … and Renovate sitespecific / ALEX NEWMAN Sam Lapidus 26 and to reconfigure the space to suit their individual needs better. There are increasingly more clients interested in going the sustainable route, even when they have to pay more for it. And among these clients, there are two distinct groups: the first group is keen to reduce their construction waste and the second is willing to recycle as much as possible. “They want to reduce their footprint, so we discuss how to get less of this disposal into the waste pile and more into the recycling pile, and we look at alternative ways to dissemble this house – or interior of a condo – in order to divert some waste to recycling.” There’s Habitat for Humanity and Restore, which takes kitchen cabinets and building materials, but there’s also furniture banks for those items that won’t fit with the new look and would otherwise go into the dumpster, Lapidus says. Next is making a concentrated effort to reduce construction waste, which Lapidus says is entirely possible through planning – for example, tile can be cut to waste little if it’s stepped S am Lapidus hadn’t meant to get into construction. After finishing his bachelor’s degree in analytical marketing at Florida International University (Miami), he worked in pharmaceutical financial model building, then returned to school to do an MBA with a focus on retail and commercial development. One of the MBA requirements was to take a class unrelated to his main degree focus of Far East trade. From that came a final research paper, “Environmental Sustainability in Canada’s Real Estate Development Industry.” “For the research, I had to take real estate law as well, got hooked and changed direction,” says the 39-year- old Toronto renovator, who currently chairs the renovator and custom home builder council for the Building Industry and Land Development Association (BILD). At the time he was doing his master’s degree, in 2007 and 2008, green was a “hot item,” he says. “I learned [while writing the paper on the Canadian construction industry] what was coming down the pipe. On the government side, there would be controls such as carbon tax. I saw this as an opportunity in terms of employment, that returning home to Canada I would have this research paper to support my understanding.” The paper, he says, used German and Austrian building practices as a co-operative model, and then compared the Canadian Green Building Council’s LEED programs with that of the European ASHRAE metrics program. Lapidus has found that home owners of both old and new condos are looking to incorporate upgrades that weren’t available at the time from the builder.
  • 29.
    Save more. Worry less. Professionalswho install Uponor PEX plumbing, radiant floor heating, and fire sprinkler systems report faster installation times, fewer callbacks and greater peace of mind. Exceptional products, tools and support. Uponor. Tested in the lab. Proven in the field. Connect with Uponor. Connect with confidence. PEX PLUMBING FIRE SPRINKLER SYSTEMS RADIANT HEATING & COOLING PRE-INSULATED PIPEFind your solution at www.uponor.ca
  • 30.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201828 out in advance. When it comes to building materials themselves, there are more and more products available thanks to technological advances in producing them – some are recycled materials and others, like forest sustainable wood product, are a given, he says. He also uses materials like glues and caulking that are not only lower in VOCs, but can also be post-consumer recycled. Most home owners are willing to pay up to 1% more to reduce waste and to upgrade to sustainable brands, but if you’re doing the entire house in a sustainable way, the cost is closer to 20%, Lapidus says. “That’s hard no matter how committed the home owner is to the concept. This is when I pull out the calculator to see the expense and the payback period, and we weigh the pros and cons. They may not be ready for greywater, but can we put the pipes in the wall for when you are? The same for solar panels, electric car charging, and anything else. It will always sell as a feature down the road.” Lapidus finds that many younger clients, especially if they have kids or are planning on having them, “want to touch sustainability, and are willing to add a few percentage points.” For the 20% upsell commitment, the demographic is a little older – 60-plus, environmentally aware, with more money to support their convic­ tions. He has one client, a couple who want to share the home with their son and his family, but “mom and dad are driving the changes: a cistern in back, greywater, automation to reduce elec- trical load and gas usage.” Clients like these are educated and well rounded, and they’re “looking to give back and be careful in a meaningful way.” Lapidus doesn’t want to give the impression that the sustainable way forward is only up to home owners. “It’s not just the responsibility of home owners to reduce waste. Builders and developers need to start thinking this way too, because at the end of the day, our industry has to deal with waste. 40% of what’s in the landfill comes from construction waste.” BB Alex Newman is a writer, editor and researcher at alexnewmanwriter.com. Services Green Building Consultants LEED Canada, ENERGY STAR® and R-2000 for Homes GreenHouse™ Certified Construction Building System Design Optimization & Performance Testing On-Site Training Renewable Energy Integration Building Code Compliance Using HERS John B Godden B.E.S. Recipient of CaGBC Green Building Champion Award 2010 Clearsphere is a division of Alpha-Tec Consulting & Construction Proud sponsor of the Best Wall Study info@clearsphere.ca www.clearsphere.ca416 481 4218
  • 31.
    29BETTERBUILDER.CA | ISSUE25 | SPRING 2018 LowCostCodeCompliancewiththeBetterThanCodePlatform This Platform helps Builders with Municipal Approvals, Subdivision Agreements and Build- ing Permits. Navigating the performance path can be complicated. A code change is coming in 2017 which will cause more confusion. The new code will be notionally 15% better than 2012 (HERS 51). How are you getting there? Let the BTC Platform including the HERS Index help you secure Municipal Subdivision Approvals and Building Permits and enhance your marketing by selling your homes’ energy efficiency. Seeournewwebsiteat betterthancode.ca BetterThanCodeusestheHERSIndextomeasureenergyefficiency–thelowerthescorethebetter–MeasureableandMarketable. OBC2012 OBC2017 100 80 60 40 20 0 For more information email info@projectfutureproof.com or call us at 416-481-7517 Better ThanCode This rating is available for homes built by leading edge builders who have chosen to advance beyond current energy efficiency programs and have taken the next step on the path to full sustainability. 45 HOMEADDRESS 123 Stone Street, Toronto, ON M6K 2T0 RATINGDATE July 23, 2015
  • 32.
    BETTERBUILDER.CA | ISSUE25 | SPRING 201830 fromthegroundup / DOUG TARRY After our Project HOPE last June, I was asked many times if we were planning a follow-up build. To be honest, I just wanted to catch my breath after a long year of working on HOPE. But after Maria hit, I was asked by my friend Juan Pablo Hernandez about coming to Puerto Rico to help the victims. I felt compelled to go and bring them HOPE! Our mission was planned for late November to assess the damage and get a better understanding of what we needed to know to plan a relief mission. My buddy Scott Davis joined the mission a week before we left. As a restoration specialist, Scott brought a great deal of experience in restoring homes after disasters hit. Our team was set and it was time to begin our mission of HOPE AGUA VITA. The first thing we noticed flying into San Juan was the contrast between the lush green of the nearby mountains and the blue tarps on so many roofs. As a builder that understands building science, I had a very good idea of the damage these tarps represented – both to the crippled structure and to the shattered lives of the people who called these buildings home. I was wrong – it was far worse than I imagined. From driving through large city intersections with no working lights, to the darkness as we drove along the highway, the island was eerily dark, as if we had stepped back in time. Arriving in Morovis, we explored the centre of town. Again the contrast between beauty and damage was abundant. Finding a community garden on an abandoned lot, we Climate Change and More Durable F or anyone out there in the climate change denial camp, let me offer you an open invitation to join us on a rebuild mission in San Lorenzo, Puerto Rico. Three major hurricanes ripped through the Caribbean last September, including Hurricane Maria, a Category Five monster which hit this area directly and caused catastrophic damage. Lessons from San Lorenzo, Puerto Rico (Part 1)
  • 33.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 came across monarch butterflies and caterpillars – such a symbol of renewal. In the background, there was the sound of generators. At lunch I realized what was wrong with the scene: there was no music. None! The sounds of the Caribbean had been replaced by the sounds of generators. As we studied the faces of the residents, it became very clear that Puerto Ricans are a proud people, but they are sad, and they are worried for their future. Our mission is one of HOPE. To help people to stand proud and regain a sense of security. To give them HOPE for their future and their children. To bring back the music. And that meant it was time to head for our ground zero: San Lorenzo. Arriving at San Lorenzo was literally a leap of faith. The bridge across the river was gone, so the only way in was to drive through the river. The back way was a three-hour drive through the mountains. As the people of San Lorenzo had to do this daily, there was nothing to do but put aside our fear and cross the river. Once you’ve done it, it’s not that bad. During our time in San Lorenzo, we constantly had one eye on the mountains, watching for rain. We had been very clearly briefed that if it started to rain, we would have 15 minutes to get back across or stay until the river was passable again. Norma, a retired school teacher, was our contact for the village. She had arranged for many of the residents to meet us at the school. It took a while for us to explain our mission of HOPE. Once I stepped to the white board and drew for them what had happened to their roofs, and how we could rebuild their homes to make them stronger and more durable, their guard came down and they engaged passionately in our conversation. We asked for a 31 Housing Far left: Widespread damage from hurricane Maria. Above: When a roof is compromised, any interior surface grows mold — often toxic.
  • 34.
    BETTERBUILDER.CA | ISSUE25 | SPRING 2018 On the final day, we had a review meeting with the community. We taught them about mould and reme­ diation, malaria and standing water, cholera and the need to compost their organics. Since there was no garbage pickup, we explained why they needed to split their garbage into wood, metal, junk, organic and plastics. We asked that they begin this immediately before disease begins to kill people. We must go back to help give them HOPE: water, energy, health and safe buildings that will withstand the next hurricane. The list is very long and time is so short. We need volunteers and we need funding. For more information, go to www. hopeaguavita.com or facebook.com/ HOPEAGUAVITA. Our fundraising efforts can be supported at GoFundMe.com/ HOPEAGUAVITA. BB Doug Tarry Jr is director of marketing at Doug Tarry Homes in St. Thomas, Ontario. 32 few residents to volunteer to help us assess the damage to the town. The next morning, we met our volunteers. We asked why there were no street names. They said the streets have no names, but they wished to name them after Canada, as we had come from Canada to help. We began at the school. One build­ ing had the roof completely destroyed. It had contained the classrooms for music, science, English and IT. The school, like the village, did not have electricity. The greenhouse was damaged and there was no money for a new mesh cover or even seeds. We learned that the science class had never even had a microscope or chemistry set. The students were let go early each day as there was no drinking water for them. We adopted the school and are going back to help save it. After the school, we began a house- by-house assessment. The very first home was fully contaminated with deadly toxic mould – some of the worst I’ve ever seen! The home owner was still living there. The second home had lost its roof and was also fully contaminated. We showed our team how to flag each home with a number in chalk on the front of the home and take a photo for reference. The symbolism of chalking homes was deeply disheartening, especially when we would come across a home that could not be saved. That was the saddest of all. Only the more well off had generators; the majority lived in total darkness until sunrise. Mothers would begin crying when the sun goes down, fearful for their babies in the darkness. I can’t even imagine. We came to understand that they were suffering from post-traumatic stress disorder. Arriving at San Lorenzo was literally a leap of faith. The bridge across the river was gone, so the only way in was to drive through the river. A typical scene, damaged bridges hampered aid and rebuilding efforts in remote areas.
  • 35.
    Homeowners, contractors, and buildersrely on ROCKWOOL™ for dependable insulation solutions. More than a rock, ROCKWOOL™ insulation products resist fire, repel water and absorb sound. This year, start your renovation right with easy-to-use ROCKWOOL™ stone wool insulation. www.rockwool.com What it’s made of makes all the difference. ROCKWOOL COMFORTBATT® An exterior insulation product for use in both new residential construction and renovations where wood or steel studs are used. ROCKWOOL SAFE’n’SOUND® A residential insulation product for interior walls constructed with wood or steel studs, where superior fire resistance and acoustical performance are required. ROCKWOOL COMFORTBOARD™ 80 An exterior non-structural insulation sheathing that provides a continuous layer of insulation around the building envelope. ROXUL® is proud to now be known as ROCKWOOL™
  • 36.
    Together,wemakebetter energyperformancepossible. Building energy efficientbuildings doesn’t need to be costly and complicated. Savings by Design can help, whether you’re a residential or commercial builder. This comprehensive program gives you free access to industry experts and performance incentives for constructing energy efficient, sustainable buildings beyond code requirements. Learn more at savingsbydesign.ca