The document summarizes a project in Malabo, Equatorial Guinea where François REMOND served as the Senior Site Engineer from 2006 to 2008. The project involved constructing three concrete bridges and 17 box culverts on the Malabo bypass at a cost of 17,000 euros. REMOND managed a team of 5 local supervisors and 80 workers to plan and oversee the construction works while ensuring quality, safety, and environmental standards were met according to certifications.