AIDC Platform
                   TM
Asset Trail               - AMS
    Asset Management Solution
University of Najran Case study
AGENDA




•   Solution Description
•   Asset Trail Software
•   Achieved results
•   Leveraging infrastructure
Previous situation


 The |University of Najran has an internal
mandate to monitor and track its inventory
accurately, this includes people or vehicles,
hereinafter     assets,   across    all    its
Buildings/campus nationwide

 Substantial loss of capital regarding
shrinkage with valuable assets throughout the
university campuses.
       Averaging 5% of monthly purchases
      2009 purchasing total was just above 100 M
     riyals.

Inability to track accurately the asset
conditions and status in restricted areas.

Large discrepancies between IT database
and actual situation

Accurate     guardianship    tracking    and
authorization handover according to the
Ministry of Education guidelines for inventory
and guardianship tracking.
Project Summary


 University current infrastructure:

      21 campuses spread across two cities
     300 KM apart (Najran and Sharoura)

     33 Administrative and teaching buildings
     covering 14 colleges and 68 faculties.

Asset Trail-AMS Phase I project scope to
cover:
      Passive & active RFID tarcking combined
      Security and asset tracking with inventory
      Infrastructure overage for
           8 campuses, 16 buildings, covering
           23,000 assets and counting…..

 Phase II under development: Q32010
     4 more campuses
     9 more buildings
     Addition of more RFID security gates for
    passive and active tags
     Integration to CCTV
    Diversification of tags and utilization
Solution components

 Asset Trail System components:
  – Hardware
     •   Command & Control Center
     •   Active RFID readers
     •   Active RFID tags with IR sensor & tamper switch
     •   RTLS sensors
     •   RFID location server
     •   RFID passive tags
     •   Passive RFID readers


  – Software
     • Asset Trail – Active Management application
     • Asset Trail Middleware
     • Asset Trail-Lite for mobile HH readers.
Project Scope

Active & Passive tagging
Project Scope

 Asset Trail Command & control center:
     Real time tracking console
     Solution KPI monitoring
     Real time security alerts
     Alarm management module
Project Scope

 Asset Trail Command & control center:
AGENDA




•   Solution Description
•   Asset Trail Software
•   Achieved results
•   Leveraging infrastructure
Software features

 Asset Trail software key services:

   Overall system Health & KPI’s
   Adding new asset:
      Mobile or fixed for both active & passive tags
   Asset classification (complaint to Ministry of Education)
      Asset Code definition with picture fully dynamic structure
   Real time Tracking Guardianship for employee or/and department
   Real time Tracking asset maintenance team & schedules
   Advanced search tool
      On location
      On asset
      On any database entry (English &/or Arabic)
   All tagged asset full Inventory audits
   Geo-fencing assets
   Security alerts on alarms
      Audio-visual alerts for command & control center
      SMS alerts through web portal
      Email alerts
   Report generation for all features & statistical data
Asset Trail

 Asset Trail Screen shot samples: Web-enabled appication
Asset Trail

 Asset Trail Screen shot samples: Asset Tree classification
Asset Trail

 Asset Trail Screen shot samples: Asset Catalogue
Asset Trail

 Asset Trail Screen shot samples: Virtual Copy of University
Asset Trail

 Asset Trail Screen shot samples: Security settings
Asset Trail

 Asset Trail Screen shot samples: Real time Alarms
Asset Trail lite

 Asset Trail Lite- Handheld software: Arabized




            Arabized Mobility
Asset Trail Lite

 Asset Trail Lite- Handheld software: Easy Navigation




          Main Screen                    Passive & active New
                                             asset registration
Asset Trail lite

 Asset Trail report Sample
AGENDA




•   Solution Description
•   Asset Trail Software
•   Achieved results
•   Leveraging infrastructure
Achieved results

 Overall project achieved goals:
√ New procedures implementation for asset control & tracking
√ Full mobility for adding new assets and control of guardianships
√ Tight security alarms and automated notification for asset security
√ Major reduction in asset Shrinkage
√ Real time Security reports on vandalism activities by students to assets and
  infrastructure
√ Complete synchronization of what is available in real life and data base information.
√ Quick detection of WMS data discrepancies through the web service integration
  between the systems


 Infrastructure: deployment:
√   Passive and active tags unified under one umbrella: Best of both worlds
√   23000 asset tagged and counting….
√   47 active readers. 135 RTLS locators
√   Full coverage of 16 buildings in 8 campuses
√   Mobility in monitoring and tracking assets through Handheld reader.
√   RFID portals on building entrance
Achieved results

 Asset Trail achieved goals:
√ Successful integration of newly developed standardized processes for unified
  inventory, tagging and security protocols dynamically into Asset Trail
√ Compliant to Ministry of Education asset tracking & guardianship tracking mandates.
√ Provide real time location tracking and control
√ Provide real-time security for expensive assets
√ Provide real time data inventory list for all assets
√ Enable accurate full inventory for all assets
√ Enable automated asset Inventory full audits
√ Enable on-line real time inventory checks per location
√ Enable on-line tracking reports on all assets & employees.
√ Integrate to third party WMS and HR ERP application Web-services
AGENDA




•   Solution Description
•   Asset Trail Software
•   Achieved results
•   Leveraging infrastructure
Additional services

 Asset Trail Infrastructure expansion modules in Phase II:
     Create modular Command and Control Centers per region
     Enlarge security infrastructure trough adding more buildings.
     Diversify Asset active tags usage leveraging infrastructure.
     Install more RFID passive portal gates
     Enable automated electronic door locking for added security

 Asset Trail software additional features:
   Add time attendance for students or/and employees or/and
    teachers
   Enable intelligent CCTV monitoring for added security. (phase II)
   Add Vehicle Fleet Management, VFM module (phase II)
   Integrate to fire alarm system
   Integrate to access control system, SACS
Tags Options

   Sensor Active tags:           Standard tags:
       Temp/Hum tag                  Asset Tag
       Door tag                      Wrist Tag
       Dry contact tag               Badge Tag
   RTLS Active tags (sub-meter)      Sensor Tag
       Wrist Tag w/ IR               Rugged Tag
       Asset Tag w/ IR               Rack tag
       Rugged tag w/ IR              Thin Tag
       Aurora Tag control
   Integrated Sensors options for active tags:
       Motion detector
       Tamper protection
       Programmable button
   Passive Tags:
       Rugged passive tags for metals
       Paperback tags
       Destructible tags
THANK YOU
    Q&A



www.depcosystems.com.sa

Asset Trail- Asset Management Solution

  • 1.
    AIDC Platform TM Asset Trail - AMS Asset Management Solution University of Najran Case study
  • 2.
    AGENDA • Solution Description • Asset Trail Software • Achieved results • Leveraging infrastructure
  • 3.
    Previous situation  The|University of Najran has an internal mandate to monitor and track its inventory accurately, this includes people or vehicles, hereinafter assets, across all its Buildings/campus nationwide  Substantial loss of capital regarding shrinkage with valuable assets throughout the university campuses.  Averaging 5% of monthly purchases  2009 purchasing total was just above 100 M riyals. Inability to track accurately the asset conditions and status in restricted areas. Large discrepancies between IT database and actual situation Accurate guardianship tracking and authorization handover according to the Ministry of Education guidelines for inventory and guardianship tracking.
  • 4.
    Project Summary  Universitycurrent infrastructure:  21 campuses spread across two cities 300 KM apart (Najran and Sharoura) 33 Administrative and teaching buildings covering 14 colleges and 68 faculties. Asset Trail-AMS Phase I project scope to cover:  Passive & active RFID tarcking combined  Security and asset tracking with inventory  Infrastructure overage for 8 campuses, 16 buildings, covering 23,000 assets and counting…..  Phase II under development: Q32010  4 more campuses  9 more buildings  Addition of more RFID security gates for passive and active tags  Integration to CCTV Diversification of tags and utilization
  • 5.
    Solution components  AssetTrail System components: – Hardware • Command & Control Center • Active RFID readers • Active RFID tags with IR sensor & tamper switch • RTLS sensors • RFID location server • RFID passive tags • Passive RFID readers – Software • Asset Trail – Active Management application • Asset Trail Middleware • Asset Trail-Lite for mobile HH readers.
  • 6.
  • 7.
    Project Scope  AssetTrail Command & control center:  Real time tracking console  Solution KPI monitoring  Real time security alerts  Alarm management module
  • 8.
    Project Scope  AssetTrail Command & control center:
  • 9.
    AGENDA • Solution Description • Asset Trail Software • Achieved results • Leveraging infrastructure
  • 10.
    Software features  AssetTrail software key services:  Overall system Health & KPI’s  Adding new asset:  Mobile or fixed for both active & passive tags  Asset classification (complaint to Ministry of Education)  Asset Code definition with picture fully dynamic structure  Real time Tracking Guardianship for employee or/and department  Real time Tracking asset maintenance team & schedules  Advanced search tool  On location  On asset  On any database entry (English &/or Arabic)  All tagged asset full Inventory audits  Geo-fencing assets  Security alerts on alarms  Audio-visual alerts for command & control center  SMS alerts through web portal  Email alerts  Report generation for all features & statistical data
  • 11.
    Asset Trail  AssetTrail Screen shot samples: Web-enabled appication
  • 12.
    Asset Trail  AssetTrail Screen shot samples: Asset Tree classification
  • 13.
    Asset Trail  AssetTrail Screen shot samples: Asset Catalogue
  • 14.
    Asset Trail  AssetTrail Screen shot samples: Virtual Copy of University
  • 15.
    Asset Trail  AssetTrail Screen shot samples: Security settings
  • 16.
    Asset Trail  AssetTrail Screen shot samples: Real time Alarms
  • 17.
    Asset Trail lite Asset Trail Lite- Handheld software: Arabized Arabized Mobility
  • 18.
    Asset Trail Lite Asset Trail Lite- Handheld software: Easy Navigation Main Screen Passive & active New asset registration
  • 19.
    Asset Trail lite Asset Trail report Sample
  • 20.
    AGENDA • Solution Description • Asset Trail Software • Achieved results • Leveraging infrastructure
  • 21.
    Achieved results  Overallproject achieved goals: √ New procedures implementation for asset control & tracking √ Full mobility for adding new assets and control of guardianships √ Tight security alarms and automated notification for asset security √ Major reduction in asset Shrinkage √ Real time Security reports on vandalism activities by students to assets and infrastructure √ Complete synchronization of what is available in real life and data base information. √ Quick detection of WMS data discrepancies through the web service integration between the systems  Infrastructure: deployment: √ Passive and active tags unified under one umbrella: Best of both worlds √ 23000 asset tagged and counting…. √ 47 active readers. 135 RTLS locators √ Full coverage of 16 buildings in 8 campuses √ Mobility in monitoring and tracking assets through Handheld reader. √ RFID portals on building entrance
  • 22.
    Achieved results  AssetTrail achieved goals: √ Successful integration of newly developed standardized processes for unified inventory, tagging and security protocols dynamically into Asset Trail √ Compliant to Ministry of Education asset tracking & guardianship tracking mandates. √ Provide real time location tracking and control √ Provide real-time security for expensive assets √ Provide real time data inventory list for all assets √ Enable accurate full inventory for all assets √ Enable automated asset Inventory full audits √ Enable on-line real time inventory checks per location √ Enable on-line tracking reports on all assets & employees. √ Integrate to third party WMS and HR ERP application Web-services
  • 23.
    AGENDA • Solution Description • Asset Trail Software • Achieved results • Leveraging infrastructure
  • 24.
    Additional services  AssetTrail Infrastructure expansion modules in Phase II:  Create modular Command and Control Centers per region  Enlarge security infrastructure trough adding more buildings.  Diversify Asset active tags usage leveraging infrastructure.  Install more RFID passive portal gates  Enable automated electronic door locking for added security  Asset Trail software additional features:  Add time attendance for students or/and employees or/and teachers  Enable intelligent CCTV monitoring for added security. (phase II)  Add Vehicle Fleet Management, VFM module (phase II)  Integrate to fire alarm system  Integrate to access control system, SACS
  • 25.
    Tags Options  Sensor Active tags:  Standard tags:  Temp/Hum tag  Asset Tag  Door tag  Wrist Tag  Dry contact tag  Badge Tag  RTLS Active tags (sub-meter)  Sensor Tag  Wrist Tag w/ IR  Rugged Tag  Asset Tag w/ IR  Rack tag  Rugged tag w/ IR  Thin Tag  Aurora Tag control  Integrated Sensors options for active tags:  Motion detector  Tamper protection  Programmable button  Passive Tags:  Rugged passive tags for metals  Paperback tags  Destructible tags
  • 26.
    THANK YOU Q&A www.depcosystems.com.sa