Rail Transport
In the wake of a recent merger, the CEO of Rumo
was faced with a decade’s worth of low capex
investment that had weakened the company’s
railroad’s infrastructure. Reporting consecutive
years of negative earnings was enough to
convince him that a partnership with Alexander
Proudfoot was exactly what the organization
needed to return to profitability.
Maintenance challenges
After a thorough analysis of end-to-end operations, it was evident the
maintenance staff was struggling to meet certain goals. Research showed
that approximately one-third of their time was finalizing the daily schedule
instead of actively maintaining the railroad system. This contributed to
spare parts not being readily available which caused significant delays and
downtime. Making matters even more challenging was the fact that there
were very few work standards in place that would allow the company to
benchmark current efficiency levels against an actual plan.
Operations challenges	
Without positive reinforcement of safe practices, there were frequent
accidents (an average of three per day) and rising indemnity costs due
to damaged goods. There was very little interaction between the train
control center and workers in the field, which made the transfer of work-
related tasks especially difficult. There was also little management of
daily activities to track performance. A culture focused on individual
achievement was in need of a new direction.
Objective and context
The CEO of Rumo, one of Latin America’s
largest railway companies, became frustrated
after reporting two consecutive years of
negative earnings. After almost a decade of low
capex investment had weakened its railroad
infrastructure, the company sought a partnership
with an operations expert that could help them
quickly restore profitability through the execution of
productivity, cost-saving and safety initiatives.
Approach
An end-to-end analysis of the client’s operations
revealed root causes for problems in productivity
and maintenance. Better planning, scheduling and
maintenance were extremely effective in reducing
transit times, as well as diesel fuel and accident
indemnification costs. A new organizational structure
helped evenly distribute employees to meet
projected demands. All levels of leadership learned
valuable team management skills and how to sustain
the improvements once the project was over.
Sustainable results
Working closely with the client’s workforce
transformed a culture focused on quick fixes
into one that was committed to doing things
right the first time. Optimum staffing levels were
achieved by strategically reallocating employees
to identified areas of need. Applying best practices
in maintenance strengthened the railroad’s
infrastructure which increased the speed and
reliability of the trains.
Returning
to profitability
Project impact:
•	Railroad maintenance improvement (accident reduction) — $11 million in annualized benefits
•	Third-party contractor costs — $6.5 million in annualized benefits
•	Maintenance productivity — $3 million in annualized benefits
Workstream approach for quick results and
sustainable change
The Proudfoot team worked in conjunction with Rumo to initiate
six concurrent operational workstreams that would generate
results in six short months.
Rapid profitability activities
The team put daily schedule control measures in place that
made it easier to plan as well as quickly adapt to unforeseen
circumstances. Daily safety meetings became an outstanding
forum to drive awareness and information sharing among the
staff. As the level of communication began to improve, so did
the transfer of work from one shift to the next. Consistent work
standards were established so actual performance could be
measured against a specific plan.
Maintenance (rail and fleet)
Revised planning/scheduling processes and a daily activity model
wouldcontributetotheincreasedavailabilityofequipment,spare
partsandthereductionofbackloggedworkrequests.Adjustments
to freight car sealing and closure processes would require a series
ofqualitycontrolchecksbeforethetrainscoulddepart.Proudfoot
spent significant time in the trenches, showing supervisors in
the field how to actively manage their crews during railroad
construction.
Execution (yards)
Rumo was experiencing significant delays, sometimes 30 minutes
or more, due to inefficient charging and discharging of trains in
the various yards along its railroad. Proudfoot was able to install
a series of standards that would allow the management team to
measure daily performance. The standards would also prevent
lost time on maneuvers for incoming/outgoing freight cars. In
order to minimize transit times, port employees learned how to
optimize the amount of freight cars per trip. The installation of
new procedure would help aging trains safely navigate around
railroad construction.
Organizational design
Proudfoot worked closely with Rumo to analyze job descriptions,
consolidate roles and responsibilities, and eliminate unnecessary
layers within the corporate structure. Then, they adjusted the span
of control to give supervisors direct access to the coordinators and
vice versa. Both parties also worked together to develop a work
activity to eliminate non-value added tasks from the workflow.
Training and development
Implemented a training and development program on three
different levels of the organization: solution-based coaching for
managers, a coordinator development program and supervisor
development program.
Sustainability
Proudfoot worked closely with Rumo’s internal resource team
to design a continuous process improvement model that would
sustain the new framework of operations.
“ The transformation project is the first
step toward a standard of excellence
in our operations. Proudfoot’s
methodology combined with the
complete change of behavior
by our leaders and grass roots
practitioners were the main
catalysts for the rapid results
achieved during the project. I was
particularly surprised that our team
faced fewer obstacles than I initially
expected. Certainly the disciplined
execution of the changes managed
to quickly engage a large number
of people. This was instrumental in
the process. I now realize that the
team clearly sees the improvement
as ‘the point of no return.’ One of the
legacies we created over the course
of the last 30 weeks is a culture
that revolves around efficiency and
productivity gains. This is critical to
the sustainability of initiatives already
implemented, which are a solid
foundation for our next steps. ”
		 – Darlan Fabio de David
		 VP Operations South
The joint Proudfoot-Rumo team collaborated on site to facilitate change and secure buy in from all employees.
Benefits achieved
Within six months, the collaboration between Rumo and
Proudfoot achieved substantial results that spread throughout
the entire organization.
Tangible results
 Maintenance productivity
$3 million in annualized benefits
 Execution productivity
$1.5 million in annualized benefits
 Railroad maintenance improvement
$11 million in annualized benefits through accident reduction
 Railcar maintenance improvement
$3 million in annualized benefits through less indemnification
costs
 Overtime reduction
$1 million in annualized benefits
 Third-party contractor costs
$6.5 million in annualized benefits
 Diesel fuel consumption
$3 million in annualized benefits
Culture
Working side-by-side with three different levels of the
organization helped mold the corporate culture into one that
was committed to doing things right the first time. Employees
became much more safety conscious as a result of the daily
meetings and bought in to the idea of doing what was best
for the company instead of focusing on personal gain. Better
communication throughout the maintenance department was
attributed to the seamless transition of work between shifts.
Business capabilities
Both Rumo and Proudfoot were able to define a set of consistent
work standards that would allow management to measure actual
performance against a specific plan. Revising the scheduling
and planning process improved the availability of equipment
and parts, transit times and the quality of work being performed
on the railroad and freight cars. The end results were a 55%
reduction of indemnification costs and 30% fewer accidents.
Organizational alignment
After several organizational design sessions, Rumo was able to
make informed decisions regarding headcount reduction. Once
this was done, productivity increased as existing coordinators
and supervisors were evenly balanced in strategic areas along
the railroad. This played a major role in reducing the amount of
overtime needed to meet daily requirements. 
Detailed on-the-ground findings helped structure a comprehensive approach
Off-site execution and follow up Close team collaboration Engaging all employees
Copyright © Alexander Proudfoot. All rights reserved. US 30767
www.alexanderproudfoot.com
About us
Alexander Proudfoot helps companies accelerate the execution of their plans and strategies to deliver substantial improvements in
performance and profitability. We specialize in the rapid installation of performance improvement programs aimed at revenue growth,
expense reduction and asset productivity.
For other insights – blog.alexanderproudfoot.com
“ It was a job well done by the entire team. The
transformation project lived up to its name by
transforming the lives of everyone involved. It created
new career paths for professionals, provided clarity of
responsibilities for leaders and redefined the way we
operate. Our goal is to build on this momentum and
sustain it going forward. The next step is to replicate the
results in all areas of our operations. ”
				 – Eduardo Pellegrina Filho
				 VP Human Resources
“ What I found to be interesting was our ability to combine
focus, discipline and work processes with methodology
to facilitate change. It was amazing to see the level of
engagement among the teams and how we adapted
to the different processes. I believe we are well on our
way to success; we have made excellent progress in
26 weeks and there is potential to do so much more. ”
			 	 – Candido Frias
				 Planning Director

More Related Content

Similar to Alexander Proudfoot - Rail Transportation

Staffing Case Studies
Staffing Case StudiesStaffing Case Studies
Staffing Case Studiesprocurehome
 
Your Path to Fleet Mangement
Your Path to Fleet MangementYour Path to Fleet Mangement
Your Path to Fleet MangementBizPhiz
 
McGavin, Phil EXPANDED RESUME
McGavin, Phil EXPANDED RESUMEMcGavin, Phil EXPANDED RESUME
McGavin, Phil EXPANDED RESUMEPhil McGavin
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
ICMA Leadership Team Capstone Project (1)
ICMA Leadership Team Capstone Project (1)ICMA Leadership Team Capstone Project (1)
ICMA Leadership Team Capstone Project (1)Lynne Ladner
 
John Stewart CV 2016
John Stewart CV 2016John Stewart CV 2016
John Stewart CV 2016John Stewart
 
The true cost of outsourced maintenance
The true cost of outsourced maintenanceThe true cost of outsourced maintenance
The true cost of outsourced maintenanceFemi Esan
 
best-practices-2015_monorail_.pdf
best-practices-2015_monorail_.pdfbest-practices-2015_monorail_.pdf
best-practices-2015_monorail_.pdfLuisMogrovejo3
 
Catalyft Trucking Experience Case
Catalyft Trucking Experience Case Catalyft Trucking Experience Case
Catalyft Trucking Experience Case Tom Atwood
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
Mnc case study_air_products_2013
Mnc case study_air_products_2013Mnc case study_air_products_2013
Mnc case study_air_products_2013Nhat Nguyen
 
Roitt Presentation
Roitt PresentationRoitt Presentation
Roitt Presentationrfpallante
 
Lec1.pdf Transport Fleet Management lecture 1
Lec1.pdf Transport Fleet Management lecture 1Lec1.pdf Transport Fleet Management lecture 1
Lec1.pdf Transport Fleet Management lecture 1nadaibrahimgohar
 
Case Study: Check-6
Case Study: Check-6Case Study: Check-6
Case Study: Check-6Randy Stuart
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsTristan Wiggill
 
A prescription for saving money case study
A prescription for saving money   case studyA prescription for saving money   case study
A prescription for saving money case studyWGroup
 
16-17 Smart Thinking
16-17 Smart Thinking16-17 Smart Thinking
16-17 Smart ThinkingDominic Kelly
 

Similar to Alexander Proudfoot - Rail Transportation (20)

Staffing Case Studies
Staffing Case StudiesStaffing Case Studies
Staffing Case Studies
 
Your Path to Fleet Mangement
Your Path to Fleet MangementYour Path to Fleet Mangement
Your Path to Fleet Mangement
 
For expressways
For expresswaysFor expressways
For expressways
 
McGavin, Phil EXPANDED RESUME
McGavin, Phil EXPANDED RESUMEMcGavin, Phil EXPANDED RESUME
McGavin, Phil EXPANDED RESUME
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
ICMA Leadership Team Capstone Project (1)
ICMA Leadership Team Capstone Project (1)ICMA Leadership Team Capstone Project (1)
ICMA Leadership Team Capstone Project (1)
 
John Stewart CV 2016
John Stewart CV 2016John Stewart CV 2016
John Stewart CV 2016
 
The true cost of outsourced maintenance
The true cost of outsourced maintenanceThe true cost of outsourced maintenance
The true cost of outsourced maintenance
 
best-practices-2015_monorail_.pdf
best-practices-2015_monorail_.pdfbest-practices-2015_monorail_.pdf
best-practices-2015_monorail_.pdf
 
Catalyft Trucking Experience Case
Catalyft Trucking Experience Case Catalyft Trucking Experience Case
Catalyft Trucking Experience Case
 
fkiQuality overview 2014 09
fkiQuality overview 2014 09fkiQuality overview 2014 09
fkiQuality overview 2014 09
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Mnc case study_air_products_2013
Mnc case study_air_products_2013Mnc case study_air_products_2013
Mnc case study_air_products_2013
 
Roitt Presentation
Roitt PresentationRoitt Presentation
Roitt Presentation
 
Lec1.pdf Transport Fleet Management lecture 1
Lec1.pdf Transport Fleet Management lecture 1Lec1.pdf Transport Fleet Management lecture 1
Lec1.pdf Transport Fleet Management lecture 1
 
Case Study: Check-6
Case Study: Check-6Case Study: Check-6
Case Study: Check-6
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tactics
 
A prescription for saving money case study
A prescription for saving money   case studyA prescription for saving money   case study
A prescription for saving money case study
 
16-17 Smart Thinking
16-17 Smart Thinking16-17 Smart Thinking
16-17 Smart Thinking
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 

Alexander Proudfoot - Rail Transportation

  • 1. Rail Transport In the wake of a recent merger, the CEO of Rumo was faced with a decade’s worth of low capex investment that had weakened the company’s railroad’s infrastructure. Reporting consecutive years of negative earnings was enough to convince him that a partnership with Alexander Proudfoot was exactly what the organization needed to return to profitability. Maintenance challenges After a thorough analysis of end-to-end operations, it was evident the maintenance staff was struggling to meet certain goals. Research showed that approximately one-third of their time was finalizing the daily schedule instead of actively maintaining the railroad system. This contributed to spare parts not being readily available which caused significant delays and downtime. Making matters even more challenging was the fact that there were very few work standards in place that would allow the company to benchmark current efficiency levels against an actual plan. Operations challenges Without positive reinforcement of safe practices, there were frequent accidents (an average of three per day) and rising indemnity costs due to damaged goods. There was very little interaction between the train control center and workers in the field, which made the transfer of work- related tasks especially difficult. There was also little management of daily activities to track performance. A culture focused on individual achievement was in need of a new direction. Objective and context The CEO of Rumo, one of Latin America’s largest railway companies, became frustrated after reporting two consecutive years of negative earnings. After almost a decade of low capex investment had weakened its railroad infrastructure, the company sought a partnership with an operations expert that could help them quickly restore profitability through the execution of productivity, cost-saving and safety initiatives. Approach An end-to-end analysis of the client’s operations revealed root causes for problems in productivity and maintenance. Better planning, scheduling and maintenance were extremely effective in reducing transit times, as well as diesel fuel and accident indemnification costs. A new organizational structure helped evenly distribute employees to meet projected demands. All levels of leadership learned valuable team management skills and how to sustain the improvements once the project was over. Sustainable results Working closely with the client’s workforce transformed a culture focused on quick fixes into one that was committed to doing things right the first time. Optimum staffing levels were achieved by strategically reallocating employees to identified areas of need. Applying best practices in maintenance strengthened the railroad’s infrastructure which increased the speed and reliability of the trains. Returning to profitability Project impact: • Railroad maintenance improvement (accident reduction) — $11 million in annualized benefits • Third-party contractor costs — $6.5 million in annualized benefits • Maintenance productivity — $3 million in annualized benefits
  • 2. Workstream approach for quick results and sustainable change The Proudfoot team worked in conjunction with Rumo to initiate six concurrent operational workstreams that would generate results in six short months. Rapid profitability activities The team put daily schedule control measures in place that made it easier to plan as well as quickly adapt to unforeseen circumstances. Daily safety meetings became an outstanding forum to drive awareness and information sharing among the staff. As the level of communication began to improve, so did the transfer of work from one shift to the next. Consistent work standards were established so actual performance could be measured against a specific plan. Maintenance (rail and fleet) Revised planning/scheduling processes and a daily activity model wouldcontributetotheincreasedavailabilityofequipment,spare partsandthereductionofbackloggedworkrequests.Adjustments to freight car sealing and closure processes would require a series ofqualitycontrolchecksbeforethetrainscoulddepart.Proudfoot spent significant time in the trenches, showing supervisors in the field how to actively manage their crews during railroad construction. Execution (yards) Rumo was experiencing significant delays, sometimes 30 minutes or more, due to inefficient charging and discharging of trains in the various yards along its railroad. Proudfoot was able to install a series of standards that would allow the management team to measure daily performance. The standards would also prevent lost time on maneuvers for incoming/outgoing freight cars. In order to minimize transit times, port employees learned how to optimize the amount of freight cars per trip. The installation of new procedure would help aging trains safely navigate around railroad construction. Organizational design Proudfoot worked closely with Rumo to analyze job descriptions, consolidate roles and responsibilities, and eliminate unnecessary layers within the corporate structure. Then, they adjusted the span of control to give supervisors direct access to the coordinators and vice versa. Both parties also worked together to develop a work activity to eliminate non-value added tasks from the workflow. Training and development Implemented a training and development program on three different levels of the organization: solution-based coaching for managers, a coordinator development program and supervisor development program. Sustainability Proudfoot worked closely with Rumo’s internal resource team to design a continuous process improvement model that would sustain the new framework of operations. “ The transformation project is the first step toward a standard of excellence in our operations. Proudfoot’s methodology combined with the complete change of behavior by our leaders and grass roots practitioners were the main catalysts for the rapid results achieved during the project. I was particularly surprised that our team faced fewer obstacles than I initially expected. Certainly the disciplined execution of the changes managed to quickly engage a large number of people. This was instrumental in the process. I now realize that the team clearly sees the improvement as ‘the point of no return.’ One of the legacies we created over the course of the last 30 weeks is a culture that revolves around efficiency and productivity gains. This is critical to the sustainability of initiatives already implemented, which are a solid foundation for our next steps. ” – Darlan Fabio de David VP Operations South The joint Proudfoot-Rumo team collaborated on site to facilitate change and secure buy in from all employees.
  • 3. Benefits achieved Within six months, the collaboration between Rumo and Proudfoot achieved substantial results that spread throughout the entire organization. Tangible results  Maintenance productivity $3 million in annualized benefits  Execution productivity $1.5 million in annualized benefits  Railroad maintenance improvement $11 million in annualized benefits through accident reduction  Railcar maintenance improvement $3 million in annualized benefits through less indemnification costs  Overtime reduction $1 million in annualized benefits  Third-party contractor costs $6.5 million in annualized benefits  Diesel fuel consumption $3 million in annualized benefits Culture Working side-by-side with three different levels of the organization helped mold the corporate culture into one that was committed to doing things right the first time. Employees became much more safety conscious as a result of the daily meetings and bought in to the idea of doing what was best for the company instead of focusing on personal gain. Better communication throughout the maintenance department was attributed to the seamless transition of work between shifts. Business capabilities Both Rumo and Proudfoot were able to define a set of consistent work standards that would allow management to measure actual performance against a specific plan. Revising the scheduling and planning process improved the availability of equipment and parts, transit times and the quality of work being performed on the railroad and freight cars. The end results were a 55% reduction of indemnification costs and 30% fewer accidents. Organizational alignment After several organizational design sessions, Rumo was able to make informed decisions regarding headcount reduction. Once this was done, productivity increased as existing coordinators and supervisors were evenly balanced in strategic areas along the railroad. This played a major role in reducing the amount of overtime needed to meet daily requirements.  Detailed on-the-ground findings helped structure a comprehensive approach Off-site execution and follow up Close team collaboration Engaging all employees
  • 4. Copyright © Alexander Proudfoot. All rights reserved. US 30767 www.alexanderproudfoot.com About us Alexander Proudfoot helps companies accelerate the execution of their plans and strategies to deliver substantial improvements in performance and profitability. We specialize in the rapid installation of performance improvement programs aimed at revenue growth, expense reduction and asset productivity. For other insights – blog.alexanderproudfoot.com “ It was a job well done by the entire team. The transformation project lived up to its name by transforming the lives of everyone involved. It created new career paths for professionals, provided clarity of responsibilities for leaders and redefined the way we operate. Our goal is to build on this momentum and sustain it going forward. The next step is to replicate the results in all areas of our operations. ” – Eduardo Pellegrina Filho VP Human Resources “ What I found to be interesting was our ability to combine focus, discipline and work processes with methodology to facilitate change. It was amazing to see the level of engagement among the teams and how we adapted to the different processes. I believe we are well on our way to success; we have made excellent progress in 26 weeks and there is potential to do so much more. ” – Candido Frias Planning Director