More Related Content Similar to A.LAZAKI_FOLIO C.V 2015 Similar to A.LAZAKI_FOLIO C.V 2015 (9) A.LAZAKI_FOLIO C.V 20151. Antonia Lazaki
972-834-2786
Education
2006-2009 University of East London
Professional degree in Architecture and Science
Advanced Computing and design Ref: Robert Thum + 44.208.223.2014
2000–2004 University of East London
BSC. Architecture Honors RIBA Part I
1992-1994 Athens Arts and Technical College
BS. in Graphic Fine Art A.K.T.O
Experience
2014-2015 Harrison Kornberg Architects-Designer
Responsibilities: designer, client meetings,drafting (revit) ,construction documents.
2012-2015 Freelance artist and consultant.
2012 Urban Design Group Dallas - Intern.
2010-2012 Apple Technical support, Athens Gr.
Responsibilities: client service representative, technical support for apple clients.
Sklevanitis Architects
Responsibilities: Web site design, graphic design,branding.
2009-2010 Tsoulos Associates, Athens Gr.
Responsibilities: Web site design, schematic design, building programming.
2006-2007 Free lance planning agent: Client-Alyn Ross
Planning application for a residential extension in Avebury, U.K. (archaeological site)
2004–2005 Arena Architects LTD. arenaarchitects.com Ref: Noresh Das Gupta
Responsibilities: architectural SD, DD, surveying, preparing & submitting successful planning
applications, specifications, photography, client liaison, office administration.
1994-2000 Venus airlines: Olympic Airways and United Emirates
Responsibilities: Cabin Chief and employee trainer, responsible for duty free in flight sales,
health and safety coordinator
Teaching Experience
2006-2009 Material Matters Workshop (each year)-Fabric Form-work & Wood Construction
Construction Week (each year) Ref: Alain Chandler – alainchnadler@eul.ac.uk
Hand drawing, painting & printing techniques Ref: Mark Hayduk – markhayduk@uel. ac.uk
Technical Skills Design: Auto Cad, Sketch up, Revit
Post production: Photoshop, InDesign, Illustrator
Administration: Excel, Microsoft Word
Modeling Skills Textiles: pattern making, sewing, geo textile moulds
Casting: concrete, plaster, glass, resin, wax, rubber
Fabrication: carpentry, steel
Art Mediums -
working
Fine Art Oils, Acrylics, Watercolors Mixed media, Prisma colors
Antonia Lazaki Laver
antonialazaki@gmail.com
972 834 2786
2. Free Lance work
2010 Exhibition Design, Karin Herzog, Athens Gr. Thessaloniki Gr.
2009 Interior, kitchen refurbishment, Kineta Megara
Graphic Design, Karin Herzog, Athens Gr.
2007 Book Cover design for author: Cathy Giles, cathy.giles@ntlworld.com
2006 Research into Fabric Form-work Technology: Artethis Ltd, aioltd@yahoo.com
2005-08 Promotional photography for singer: Brigette Beraha, www.brigetteberaha.com
2001-03 Part Time Production Assistant: Locrian Promotions: Concert Management, filming, photogra-
phy and design of promotional materials locrianensemble.co.uk
Exhibits and Works
2014 Art Consignment with Art-centric LLC- Dallas
2013-2014 Exhibit with Be Human Gallery - Houston, Gallery at Midtown Dallas
2013 Fab 50 Artist in Dallas, Kettle Art Gallery Dallas, Alleys House Increment um II Dallas, Charity
Auction for Dallas Life
2012 Liquid -The Fab 50 Dallas, White Space Exhibit Dallas
2009 Graphic Design for Eye Clinic Athens GR
Languages Write and speak fluently: English, Greek
Write and speak moderately: French
3. Antonia Lazaki
972-834-2786
Awards
2004 Roof structure for Campus Children’s Play Area (group member)
Campus Bike Shed (group member)
2003 Eco Ceramic Tile Award 1st Prize (group member)
Supercrete Bridge Prototype Award 1st Prize (group member)
Tile Hut 1st prize (group leader)
Light Weight Composite Prototype Award 1st Prize (group leader)
2002 Skin Prototype Award 2nd Prize (group member)
2001 Water Collecting Roof Prototype Landscape Award 1st Prize (group leader)
Wooden Suspension Bridge Award 1st Prize (group leader)
Publications
2002 Humanitarian Award RIBA: “The Water that is not drank in Havana”,
Journalism and Mapping in Old Havana Cuba
Drawings published in Unit 9 Educational Book
Drawings published in University Year Books
Seminars Attended
2003&2004 C.A.S.T, Fabric Form-work with Mark West & Alain Chandler
Included Fast Tube, Fast Foot, Panel and Curved Wall mould
5. A05-07
3
A05-07
2
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
2
A06-15
LEVEL 2
14' - 0"
Roof - Academic
42' - 0"
T.O PE PARAPET
32' - 6"
T.O PE ROOF
30' - 0"
T.O Academic Roof Parapet
44' - 6"
1
A06-14
1
A06-12
T.O. L3 Parapet
30' - 6"
2
A04-01
3
A04-00
TILT WALL GLAZING
1
A06-10
STOREFRONT
TILT WALL
1
A06-11
STOREFRONTREVEALS
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
LEVEL 2
14' - 0"
Roof - Academic
42' - 0"
T.O Academic Roof Parapet
44' - 6"
3
A04-00
TILT WALL TILT WALLGLAZING REVEALS
H a r r i s o n K o
A R C H I T E C T S
Checked By:
Drawn By:
Sheet Name/Number:
Project Team:
Issue / Revisions:
Project Name:
Plot Date:
HISD
DOWLING MIDD
SCHOOL
14000 Stancliff St, Ho
TX 77045
Project Name/Number: DMS
SCALE:
© Copyright [2013]
All information, drawn, written, or implied, ap
constitutes the original and unpublished work
Architects, LLC. and may not be duplicated,
any means without the prior written consent
Architects, LLC. This is an instrument of serv
author. The use of this document shall be re
intent or the construction methods shown he
the terms of the contractual agreement for its
3131 Eastsid
Houston, Tex
p. 713-229-06
f. 713-229-06
Contact: Cha
Associate architect:
Civil:
Structural:
MEP:
Landscape:
Corgan
Contact: John Haskew
t: 832.652.3643
GARZA BURY
Contact: Sandy Hardw
t: 512.298.3284
ASA DALLY
Contact: Fred Dally
t: 713.337.8881
Shah Smith and Assoc
Contact: Jeff Bolander
t: 713.780.7563
TBG PARTNER
Contact: Lauren Norton
t: 713.439.0027
Food Service Consult
WORRELL DESIGN G
Contact: Vernon Sanfo
t: 713.784.6376
LEED Consultant:
LEED Firm Name
Contact:
t:
XX/XX/XXXX
Roofing Consultant:
PRICE CONSULTING,
Contact: Karl Schaack,
t: 281.209.1724
Interim Revie
These documents are for re
and are not intended for pe
bidding, or constructi
-Issue Name
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SD
DD
CD
As indicated
Author
Checker
EXTERIOR
ELEVATIONS
A05-07
1/16" = 1'-0"1 East Elevation - Overall
4 Entrance - Dining Commons 5 Auxiliary Gymnasium
Revision Sch
Delta Date
1/8" = 1'-0"3 East Elevation - Physical Ed & Custodial/Maintenance
1/8" = 1'-0"2 East Elevation - Academic Pods
A05-07
3
A05-07
2
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
2
A06-15
LEVEL 2
14' - 0"
Roof - Academic
42' - 0"
T.O PE PARAPET
32' - 6"
T.O PE ROOF
30' - 0"
T.O Academic Roof Parapet
44' - 6"
1
A06-14
1
A06-12
T.O. L3 Parapet
30' - 6"
2
A04-01
3
A04-00
TILT WALL GLAZING
1
A06-10
STOREFRONT
TILT WALL
1
A06-11
STOREFRONTREVEALS
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
LEVEL 2
14' - 0"
Roof - Academic
42' - 0"
T.O Academic Roof Parapet
44' - 6"
3
A04-00
TILT WALL TILT WALLGLAZING REVEALS
H a r r i s o n K o
A R C H I T E C T S
Checked By:
Drawn By:
Sheet Name/Number:
Project Team:
Issue / Revisions:
Project Name:
Plot Date:
HISD
DOWLING MIDD
SCHOOL
14000 Stancliff St, Ho
TX 77045
Project Name/Number: DMS
SCALE:
© Copyright [2013]
All information, drawn, written, or implied, ap
constitutes the original and unpublished work
Architects, LLC. and may not be duplicated,
any means without the prior written consent
Architects, LLC. This is an instrument of serv
author. The use of this document shall be re
intent or the construction methods shown he
the terms of the contractual agreement for its
3131 Eastsid
Houston, Tex
p. 713-229-06
f. 713-229-06
Contact: Cha
Associate architect:
Civil:
Structural:
MEP:
Landscape:
Corgan
Contact: John Haskew
t: 832.652.3643
GARZA BURY
Contact: Sandy Hardw
t: 512.298.3284
ASA DALLY
Contact: Fred Dally
t: 713.337.8881
Shah Smith and Assoc
Contact: Jeff Bolander
t: 713.780.7563
TBG PARTNER
Contact: Lauren Norton
t: 713.439.0027
Food Service Consult
WORRELL DESIGN G
Contact: Vernon Sanfo
t: 713.784.6376
LEED Consultant:
LEED Firm Name
Contact:
t:
XX/XX/XXXX
Roofing Consultant:
PRICE CONSULTING,
Contact: Karl Schaack,
t: 281.209.1724
Interim Revie
These documents are for re
and are not intended for pe
bidding, or constructi
-Issue Name
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SD
DD
CD
As indicated
Author
Checker
EXTERIOR
ELEVATIONS
A05-07
1/16" = 1'-0"1 East Elevation - Overall
4 Entrance - Dining Commons 5 Auxiliary Gymnasium
Revision Sch
Delta Date
1/8" = 1'-0"3 East Elevation - Physical Ed & Custodial/Maintenance
1/8" = 1'-0"2 East Elevation - Academic Pods
9. LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PE PARAPET
32' - 6"
3
A06-13
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
2
A06-13
1
A06-13
873 SF
CORRIDOR
1240 SF
VISUAL ARTS LEARNING
CENTER
1035 SF
THEATER ARTS
252 SF
WOMEN
257 SF
MEN
4475 SF
AUDITORIUM
1050 SF
CORRIDOR
1493 SF
SERVING AREA
1065 SF
KITCHEN PREP AREA
1065 SF
KITCHEN PREP AREA
297 SF
MAIN EMERGENCY
ELECTRICAL ROOM
A06-10
3
A06-10
2
PERFORMING ARTS AUDITORIUM FOOD SERVICE
LAUNDRY
1604G
CORRIDOR
1400
DINNING COMMONS
2104
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
T.O. L3 Parapet
30' - 6"
1
A06-13
252 SF
WOMEN
1517
257 SF
MEN
1519
4475 SF
AUDITORIUM
1500
1035 SF
THEATER ARTS
1402
1240 SF
VISUAL ARTS
LEARNING
CENTER
2043
873 SF
CORRIDOR
2121
808 SF
CORRIDOR
1400
CLGHEIGHT
16'-0"
CLGHEIGHT
10'-0"
CLGHEIGHT
24'-0"
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
3
A06-13
T.O Academic Roof Parapet
44' - 6"
2
A06-13
T.O. L3 Parapet
30' - 6"
1065 SF
KITCHEN PREP
AREA
1603
297 SF
MAIN EMERGENCY
ELECTRICAL
ROOM
1611
1493 SF
SERVING AREA
1601
1050 SF
CORRIDOR
1509
6987 SF
DINNING
COMMONS
2104
74 SF
LAUNDRY
1604G
CLGHEIGHT
10'-0"
CLGHEIGHTTYP.
10'-0"
H a r r i s o n K
A R C H I T E C T S
Checked By:
Drawn By:
Sheet Name/Number:
Project Team:
Issue / Revisions:
Project Name:
Plot Date:
HISD
DOWLING MID
SCHOOL
14000 Stancliff St, H
TX 77045
Project Name/Number: DM
SCALE:
© Copyright [2013]
All information, drawn, written, or implied
constitutes the original and unpublished
Architects, LLC. and may not be duplica
any means without the prior written cons
Architects, LLC. This is an instrument of
author. The use of this document shall b
intent or the construction methods show
the terms of the contractual agreement f
3131 East
Houston, T
p. 713-229
f. 713-229
Contact: C
Associate architect:
Civil:
Structural:
MEP:
Landscape:
Corgan
Contact: John Haske
t: 832.652.3643
GARZA BURY
Contact: Sandy Hard
t: 512.298.3284
ASA DALLY
Contact: Fred Dally
t: 713.337.8881
Shah Smith and Ass
Contact: Jeff Boland
t: 713.780.7563
TBG PARTNER
Contact: Lauren Nor
t: 713.439.0027
Food Service Consu
WORRELL DESIGN
Contact: Vernon San
t: 713.784.6376
Commissioning Age
CCRD
Contact: Jim Thornto
t: 713.870.7025
XX/XX/XXXX
Roofing Consultant
PRICE CONSULTIN
Contact: Karl Schaac
t: 281.209.1724
Interim Re
These documents are
and are not intended f
bidding, or const
-Issue Name
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SD
DD
60% CD
As indicate
Author
Checker
BUILDING SE
A06-10
Revision S
Delta Date
1/16" = 1'-0"1 Building Section - Performing Arts/Aud./Food Service
1/8" = 1'-0"3 Building Section - Performing Arts/Aud.
1/8" = 1'-0"2 Building Section - Food Service
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PE PARAPET
32' - 6"
3
A06-13
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
2
A06-13
1
A06-13
873 SF
CORRIDOR
1240 SF
VISUAL ARTS LEARNING
CENTER
1035 SF
THEATER ARTS
252 SF
WOMEN
257 SF
MEN
4475 SF
AUDITORIUM
1050 SF
CORRIDOR
1493 SF
SERVING AREA
1065 SF
KITCHEN PREP AREA
1065 SF
KITCHEN PREP AREA
297 SF
MAIN EMERGENCY
ELECTRICAL ROOM
A06-10
3
A06-10
2
PERFORMING ARTS AUDITORIUM FOOD SERVICE
LAUNDRY
1604G
CORRIDOR
1400
DINNING COMMONS
2104
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
T.O. L3 Parapet
30' - 6"
1
A06-13
252 SF
WOMEN
1517
257 SF
MEN
1519
4475 SF
AUDITORIUM
1500
1035 SF
THEATER ARTS
1402
1240 SF
VISUAL ARTS
LEARNING
CENTER
2043
873 SF
CORRIDOR
2121
808 SF
CORRIDOR
1400
CLGHEIGHT
16'-0"
CLGHEIGHT
10'-0"
CLGHEIGHT
24'-0"
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
3
A06-13
T.O Academic Roof Parapet
44' - 6"
2
A06-13
T.O. L3 Parapet
30' - 6"
1065 SF
KITCHEN PREP
AREA
1603
297 SF
MAIN EMERGENCY
ELECTRICAL
ROOM
1611
1493 SF
SERVING AREA
1601
1050 SF
CORRIDOR
1509
6987 SF
DINNING
COMMONS
2104
74 SF
LAUNDRY
1604G
CLGHEIGHT
10'-0"
CLGHEIGHTTYP.
10'-0"
H a r r i s o n K
A R C H I T E C T S
Checked By:
Drawn By:
Sheet Name/Number:
Project Team:
Issue / Revisions:
Project Name:
Plot Date:
HISD
DOWLING MID
SCHOOL
14000 Stancliff St, H
TX 77045
Project Name/Number: DM
SCALE:
© Copyright [2013]
All information, drawn, written, or implied
constitutes the original and unpublished
Architects, LLC. and may not be duplica
any means without the prior written cons
Architects, LLC. This is an instrument of
author. The use of this document shall b
intent or the construction methods show
the terms of the contractual agreement f
3131 East
Houston, T
p. 713-229
f. 713-229
Contact: C
Associate architect:
Civil:
Structural:
MEP:
Landscape:
Corgan
Contact: John Haske
t: 832.652.3643
GARZA BURY
Contact: Sandy Hard
t: 512.298.3284
ASA DALLY
Contact: Fred Dally
t: 713.337.8881
Shah Smith and Ass
Contact: Jeff Boland
t: 713.780.7563
TBG PARTNER
Contact: Lauren Nor
t: 713.439.0027
Food Service Consu
WORRELL DESIGN
Contact: Vernon San
t: 713.784.6376
Commissioning Age
CCRD
Contact: Jim Thornto
t: 713.870.7025
XX/XX/XXXX
Roofing Consultant
PRICE CONSULTIN
Contact: Karl Schaac
t: 281.209.1724
Interim Re
These documents are
and are not intended f
bidding, or const
-Issue Name
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SD
DD
60% CD
As indicate
Author
Checker
BUILDING SE
A06-10
Revision S
Delta Date
1/16" = 1'-0"1 Building Section - Performing Arts/Aud./Food Service
1/8" = 1'-0"3 Building Section - Performing Arts/Aud.
1/8" = 1'-0"2 Building Section - Food Service
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PE PARAPET
32' - 6"
3
A06-13
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
2
A06-13
1
A06-13
873 SF
CORRIDOR
1240 SF
VISUAL ARTS LEARNING
CENTER
1035 SF
THEATER ARTS
252 SF
WOMEN
257 SF
MEN
4475 SF
AUDITORIUM
1050 SF
CORRIDOR
1493 SF
SERVING AREA
1065 SF
KITCHEN PREP AREA
1065 SF
KITCHEN PREP AREA
297 SF
MAIN EMERGENCY
ELECTRICAL ROOM
A06-10
3
A06-10
2
PERFORMING ARTS AUDITORIUM FOOD SERVICE
LAUNDRY
1604G
CORRIDOR
1400
DINNING COMMONS
2104
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
T.O PA ROOF
20' - 0"
T.O PA PARAPET
22' - 6"
T.O. L3 Parapet
30' - 6"
1
A06-13
252 SF
WOMEN
1517
257 SF
MEN
1519
4475 SF
AUDITORIUM
1500
1035 SF
THEATER ARTS
1402
1240 SF
VISUAL ARTS
LEARNING
CENTER
2043
873 SF
CORRIDOR
2121
808 SF
CORRIDOR
1400
CLGHEIGHT
16'-0"
CLGHEIGHT
10'-0"
CLGHEIGHT
24'-0"
LEVEL 1
0' - 0"
LEVEL 3
28' - 0"
T.O LEVEL 2 PARAPET
16' - 6"
LEVEL 2
14' - 0"
T.O.W. LEVEL 2
27' - 6"
T.O.W. LEVEL 1
13' - 6"
T.O.W. LEVEL 3
41' - 6"
3
A06-13
T.O Academic Roof Parapet
44' - 6"
2
A06-13
T.O. L3 Parapet
30' - 6"
1065 SF
KITCHEN PREP
AREA
1603
297 SF
MAIN EMERGENCY
ELECTRICAL
ROOM
1611
1493 SF
SERVING AREA
1601
1050 SF
CORRIDOR
1509
6987 SF
DINNING
COMMONS
2104
74 SF
LAUNDRY
1604G
CLGHEIGHT
10'-0"
CLGHEIGHTTYP.
10'-0"
H a r r i s o n K
A R C H I T E C T S
Checked By:
Drawn By:
Sheet Name/Number:
Project Team:
Issue / Revisions:
Project Name:
Plot Date:
HISD
DOWLING MID
SCHOOL
14000 Stancliff St, H
TX 77045
Project Name/Number: DM
SCALE:
© Copyright [2013]
All information, drawn, written, or implied
constitutes the original and unpublished
Architects, LLC. and may not be duplica
any means without the prior written cons
Architects, LLC. This is an instrument of
author. The use of this document shall b
intent or the construction methods show
the terms of the contractual agreement f
3131 East
Houston, T
p. 713-229
f. 713-229
Contact: C
Associate architect:
Civil:
Structural:
MEP:
Landscape:
Corgan
Contact: John Haske
t: 832.652.3643
GARZA BURY
Contact: Sandy Hard
t: 512.298.3284
ASA DALLY
Contact: Fred Dally
t: 713.337.8881
Shah Smith and Ass
Contact: Jeff Boland
t: 713.780.7563
TBG PARTNER
Contact: Lauren Nor
t: 713.439.0027
Food Service Consu
WORRELL DESIGN
Contact: Vernon San
t: 713.784.6376
Commissioning Age
CCRD
Contact: Jim Thornto
t: 713.870.7025
XX/XX/XXXX
Roofing Consultant
PRICE CONSULTIN
Contact: Karl Schaac
t: 281.209.1724
Interim Re
These documents are
and are not intended f
bidding, or const
-Issue Name
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SD
DD
60% CD
As indicate
Author
Checker
BUILDING SE
A06-10
Revision S
Delta Date
1/16" = 1'-0"1 Building Section - Performing Arts/Aud./Food Service
1/8" = 1'-0"3 Building Section - Performing Arts/Aud.
1/8" = 1'-0"2 Building Section - Food Service