Introduction

As development platforms, coding methodologies, and devices increase in
number, Agile Application Life Management (ALM) tools support integrations
with an ever-increasing range of systems.

This Research Is Designed For:                         This Research Will Help You:

  Enterprises seeking to select a solution for Agile     Understand what’s new in the Agile ALM market.
  Application Lifecycle Management (ALM) technology
                                                         Evaluate Agile ALM vendors and products for your
                                                         enterprise needs.
  Their Agile ALM use case may include:
                                                         Determine which products are most appropriate for
  • Providing testing support for a quality-centric      particular use cases and scenarios.
     development environment.

  • Supporting Agile development.
  • Integrating lifecycle management with Integrated
     Development Environments.




Info-Tech Research Group                                                                                     2
Executive Summary

Info-Tech evaluated eight competitors in the Agile ALM                Info-Tech Insight
market, including the following notable performers:
                                                                      1. ALM and BPM start to intermingle:
Champions:
                                                                         Premium offerings give the ability to
• CollabNet TeamForge, a comprehensive, full-featured ALM tool           customize process. Evaluate your need
  at a reasonable price. Despite its impressive range of offerings,      for, and the cost of, process customization
  CollabNet supports the SMB.                                            before you make your purchase.
• Micro Focus Borland ALM, a long-standing leader in the market
  with a broad feature offering and strong product support.           2. The range of platforms is growing:
• Serena Suite, a robust offering backed by strong customer              Premium products support development
  support and a broad reseller network.                                  across the growing range of platforms and
                                                                         development methodologies, including
Value Award:                                                             mobile, web, and infrastructure.
• TechExcel DevSuite, a comprehensive offering with a price tag
  far below its comparable competitors.                               3. New entrants offer attractive options:
                                                                         Niche offerings can serve your needs at a
                                                                         fraction of the cost of a premium tool. For
                                                                         example, consider specialized tools for
                                                                         Agile and testing integration.




Info-Tech Research Group                                                                                               3
Market Overview

    How it got here                                                        Where it’s going
• Long-standing vendors in the ALM space can trace their               • Agile ALM has moved into the Cloud. Major vendors of
  roots to the 1980s, or even earlier.                                   cloud collaboration software have moved into the ALM
                                                                         space and new SaaS-only ALM tools have appeared.
• Since the 1990s, ALM tools have played a key part in
  the project manager’s arsenal, allowing him or her to                • Process flexibility has become key. Instead of a strict
  track project status and progress towards objectives.                  adherence to Agile or waterfall development, most
                                                                         firms have pursued a middle path and customized
• Managers have paid top dollar for ALM suites that could                their methodology to meet their own needs. Some
  track project data and provide meaningful reporting.                   Agile ALM tools cater to the need for flexibility.

• As development environments have evolved, the tools                  • Quality control has become a core part of ALM.
  and components being used to manage this process                       Several major ALM tools are built around testing tools
  have grown to become integrated and convenient,                        and process maturity.
  covering all phases of the development lifecycle
  including architecture, testing, and deployment with a               • Going forward, expect stronger integration between
  single common interface.                                               ALM tools and the ecosystem of products supporting
                                                                         development, such as testing, PLM tools, and IDEs.




                    As the market evolves, capabilities that were once cutting edge become default, and new functionality
                    becomes differentiating. Traceability has become a table stakes capability and should no longer be used
                    to differentiate solutions. Instead, focus on workflow and reporting to get the best fit for your requirements.



Info-Tech Research Group                                                                                                         4
Agile ALM Vendor Landscape selection / knock-out criteria:
Market share, mind share, and market consolidation
 • The Agile ALM space continues to see new entrants, new products, and new features. Ongoing demand for development
       on mobile and web platforms creates new opportunities for vendors focused on a particular market niche.
 • For this Vendor Landscape, Info-Tech focused on those vendors that have a strong market presence and/or reputational
       presence among small to mid-sized enterprises.


                                             Included in the Vendor Landscape:

   •     CollabNet TeamForge. A relatively recent entrant with a strong offering and a reasonable price tag.

   •     Micro Focus Borland ALM. A large, ALM-focused vendor that provides strong support for its product.

   •     PTC Integrity. A strong ALM offering tightly integrated into a PLM platform.

   •     Parasoft Concerto. A product targeted towards development shops with a high level of process maturity.

   •     Serena Suite. The complete ALM package controlled by a complete business process engine.

   •     SmarteSoft SmartSuite. ALM tools built around a quality-control platform.

   •     TechExcel DevSuite. A flexible tool that supports development on a variety of platforms.

   •     ThoughtWorks Suite (Mingle, Twist, Go). A strong, Agile-focused product offering that provides some flexibility
         within the Agile framework.




Info-Tech Research Group                                                                                                   5
Agile ALM Criteria & Weighting Factors

Product Evaluation                                                            Features                          Usability
                                                                                            30%           30%
                           The solution provides basic
          Features         and advanced feature/functionality.

                           The solution’s dashboard and reporting tools      Architecture    20%         20%    Affordability
          Usability        are intuitive and easy to use.

                           The five year TCO of the solution is                                   Product
      Affordability        economical.
                                                                                                   50%
                           The delivery method of the solution aligns with
      Architecture         what is expected within the space.

Vendor Evaluation
                                                                                                   50%
                           Vendor is profitable, knowledgeable, and will                          Vendor
            Viability be around for the long term.

                           Vendor is committed to the space and has a         Viability                         Strategy
           Strategy future product and portfolio roadmap.                                    25%          30%

                           Vendor offers global coverage and is able to
             Reach         sell and provide post-sales support.                             15%
                                                                              Channel                             Reach
                                                                                                     30%
                           Vendor channel strategy is appropriate and the
           Channel         channels themselves are strong.




Info-Tech Research Group                                                                                                        6
The Info-Tech Agile ALM Vendor Landscape

 Champions receive high scores for most
 evaluation criteria and offer excellent value.
 They have a strong market presence and
 are usually the trend setters for the industry.

 Innovators have demonstrated innovative
 product strengths that act as their
 competitive advantage in appealing to niche
 segments of the market.

 Market Pillars are established players with
 very strong vendor credentials, but with
 more average product scores.

 Emerging players are newer vendors who
 are starting to gain a foothold in the
 marketplace. They balance product and
 vendor attributes, though score lower
 relative to market Champions.




For an explanation of how the Info-Tech Vendor Landscape is created please see the slide entitled “Vendor Evaluation Methodology” in the appendix.


Info-Tech Research Group                                                                                                                        7
Every vendor has its strengths & weaknesses;
Pick the one that works best for you

                                                  Product                                                            Vendor
                                                                 Afford-       Archi-
                           Overall   Features      Usability                              Overall     Viability      Strategy   Reach        Channel
                                                                 ability      tecture

         CollabNet

                 PTC

      Micro Focus

           Parasoft

             Serena

        SmarteSoft

         TechExcel

   ThoughtWorks

                           Legend        =Exemplary             =Good                   =Adequate                 =Inadequate        =Poor



 For an explanation of how the Info-Tech Harvey Balls are calculated please see the slide entitled “Vendor Evaluation Methodology” in the appendix.


Info-Tech Research Group                                                                                                                          8
TechExcel captures the highest value score with a
comprehensive, affordable offering
What is a Value Score?                                                                               On a relative basis, TechExcel
                                                                     Champion
                                                                                                     maintained the highest Info-Tech Value
                                                                                                     ScoreTM of the vendor group. Vendors
The Value Score indexes each vendor’s product
                                                                                                     were indexed against TechExcel’s
offering and business strength relative to their
                                                                                                     performance to provide a complete,
price point. It does not indicate vendor ranking.
                                                                                                     relative view of their product offerings.
Vendors that score high offer more bang for the
buck (e.g. features, usability, stability, etc.) than
the average vendor, while the inverse is true for
those that score lower.

Price-conscious enterprises may wish to give the
                                                                100
Value Score more consideration than those who
are more focused on specific vendor/product
attributes.
                                                                          64                                               Average Score: 31.5
                                                                                     55

                                                                                                22
                                                                                                          13
                                                                                                                   0        0           0
                                                              TechExcel CollabNet   Serena   SmarteSoft   Micro   *PTC   *Parasoft   *Thought-
                                                                                                          Focus                        Works
*Vendor declined to provide pricing.

 For an explanation of how the Info-Tech Value Index is calculated please see the slide entitled “Value Index Ranking Methodology” in the appendix.
 For an explanation of how normalized pricing is determined please see the slide entitled “Product Pricing Scenario & Methodology” in the appendix.


Info-Tech Research Group                                                                                                                          9
Table Stakes represent the minimum standard; without these
a product doesn’t even get reviewed

The Table Stakes                                                              What Does This Mean?

Feature                     Description                                        The products assessed in this Vendor
                                                                               LandscapeTM meet, at the very least, the
Basic task                  The product allows the user to create
                                                                               requirements outlined as Table Stakes.
management                  tasks, assign resources to those tasks, and
                            view project status reporting.
                                                                               Many of the vendors go above and beyond the
Graphical displays          The product displays tasks and other               outlined Table Stakes, some even do so in
                            objects as editable, graphical objects.            multiple categories. This section aims to highlight
                                                                               the products capabilities in excess of the criteria
Traceability                The product ties together objects created          listed here.
                            at various stages of the lifecycle, showing
                            how tasks relate to requirements, etc.
Links to external           The product allows the user to link to
documents                   external documents for requirements and
                            other content.
Central data store          The product stores data in a centralized
                            repository, not on local disk.



                 If Table Stakes are all you need from your Agile ALM solution, the only true differentiator for the
                 organization is price. Otherwise, dig deeper to find the best price to value for your needs.




Info-Tech Research Group                                                                                                        10
Advanced Features are the market differentiators that make or
break a product
Scoring Methodology                                 Advanced Features

Info-Tech scored each vendor’s features offering
                                                    Feature                 What We Looked For
as a summation of their individual scores across    Requirements            Users can enter requirements in a
the listed advanced features. Vendors were given    Management              hierarchical structure.
one point for each feature the product inherently
provided. Some categories were scored on a          Change Management       The product packages and traces changes.
more granular scale with vendors receiving half
points.                                             Workflow                The product provides automated workflow.

                                                    Source Code             The product manages source code or
                                                    Management              integrates with SCM solutions.
                                                    Task Management         The product manages timelines and tasks.

                                                    Testing                 The product provides test management.

                                                    Defect/Bug Tracking     The product manages and traces defects.

                                                    Resource                The product permissions users to edit
                                                    Management              objects and evaluates resource capacity.
                                                    Reporting & Analytics   The product analyzes project progress and
                                                                            provides meaningful reporting.
                                                    Release Management      The product helps with release planning.

                                                    Content Management      The product organizes documents.


Info-Tech Research Group                                                                                                11
Each vendor offers a different feature set; concentrate on what
you need

                                                         Evaluated Features
             Req.          Change    Work-               Task                   Defect       Res.    Report-    Rel.       Content
                                                  SCM               Testing
             Mgmt           Mgmt     flow                Mgmt                   Track        Mgmt      ing      Mgmt        Mgmt
 Collab-
     Net

    PTC

 Micro
 Focus

Parasoft

 Serena

Smarte-
  Soft
  Tech-
  Excel
Thought-
  Works
               Legend           =Feature fully present          =Feature partially present/pending       =Feature absent




Info-Tech Research Group                                                                                                        12
CollabNet offers a strong product with a broad range of
features and a reasonable price tag
     Champion                                   Overview
                                                  • A recent entrant to the ALM space (but in SCM since 1999),
      Product:      TeamForge
                                                    CollabNet offers the range of functionality normally expected
    Employees:      Unavailable
                                                    by large organizations, but targets the SMB market with a
  Headquarters:     Brisbane, CA
                                                    relatively affordable price tag.
      Website:      Collab.net
     Founded:       1999                        Strengths
     Presence:      Private company
                                                  • TeamForge provides all of the functionality associated with full-
                                                    featured ALM, from requirements through to release.
                                                  • Despite its robust offering and some well-known clients,
                                                    CollabNet has a large number of SMB clients as well.
                                                  • CollabNet has strong support offerings, both for its clients and
                                                    its channel partners.

                                                Challenges
                                                  • CollabNet’s limited revenue and emphasis on North America
                                                    sales restricts its global reach. However, the company has
                                                    experienced strong revenue growth.
                                                  • TeamForge’s native resource management solution lacks
         $1                           $1M+
                                                    functionality, although it offers basic capacity management.
 3 Year TCO: Tier 8; between $250K and $500K


Info-Tech Recommends:
       CollabNet offers a very strong product at a reasonable price, supported by a recognized vendor in the
       source code management space.

Info-Tech Research Group                                                                                                13
Micro Focus provides full-featured ALM with strong customer
and reseller support
     Champion                                  Overview
                                                 • With 30 years of experience in application management, Micro
      Product:      Borland ALM
                                                   Focus continues to lead the market with a strong offering.
    Employees:      1,200
  Headquarters:     Newbury, UK
      Website:      microfocus.com
     Founded:       1976                       Strengths
     Presence:      LON: MCRO
                    FY11 Revenue: $436M          • The Borland ALM suite benefits from Micro Focus’s strong
                                                   global reach and extensive experience in ALM.
                                                 • Micro Focus combines large size with a focus on ALM.
                                                 • Micro Focus offers strong support for its products, including
                                                   multi-language, 24x7 support.
                                                 • Micro Focus’s reseller networks stretch across four continents.

                                               Challenges
                                                 • The Borland ALM suite excludes some key functionality such
                                                   as resource utilization management, assuming that the user
                                                   will integrate with a project management tool.
                                                 • Borland ALM does not have burn-down reports or agile task
         $1                         $1M+
                                                   management reporting.
 3 Year TCO: Tier 8; between $250K and $500K


Info-Tech Recommends:
       Organizations seeking a premium product and willing to pay a substantial amount should consider
       Micro Focus.

Info-Tech Research Group                                                                                             14
Serena provides all the ALM tools, packaged within a powerful
process orchestration engine
     Champion                                   Overview
                                                  • Serena continues to achieve competitive differentiation
      Product:      Serena Suite
                                                    through its Serena Business Manager, a full-fledged process
    Employees:      700
                                                    management solution that orchestrates development.
  Headquarters:     Redwood City, CA
      Website:      serena.com
     Founded:       1980                        Strengths
     Presence:      Private company
                                                  • Serena includes all of the functionality associated with full-
                                                    featured ALM, from requirements to release management.
                                                  • Serena has proven longevity in the ALM space, having entered
                                                    the market over 30 years ago.
                                                  • Serena’s support offices and reseller network stretch across
                                                    four continents. Support is available in ten languages.

                                                Challenges
                                                  • Serena support centers provide only callback service on
                                                    weekends.

         $1                            $1M+
 3 Year TCO: Tier 8; between $250K and $500K


Info-Tech Recommends:
       Serena will make sense for organizations needing a high level of process customizability and
       workflow, and willing to make a substantial investment.

Info-Tech Research Group                                                                                          15
TechExcel offers flexibility and a range of ALM features;
support offering is weak
     Innovator                                   Overview
                                                   • Despite being a long-standing player in the ALM business,
      Product:      DevSuite
                                                     TechExcel has only a small share of the market.
    Employees:      155
  Headquarters:     Lafayette, CA
      Website:      techexcel.com
     Founded:       1999                         Strengths
     Presence:      Private company
                                                   • DevSuite includes most of the functionality associated with full-
                                                     featured ALM, from requirements to task management.
                                                   • DevSuite offers a high degree of flexibility, making it useful for
                                                     development on a range of platforms.
                                                   • TechExcel integrates with a variety of development tools and
                                                     supports development using diverse methodologies.

                                                 Challenges
                                                   • TechExcel offers relatively weak support for a major player,
                                                     providing telephone support only during business hours.
                                                   • TechExcel lacks key release management functionality and
                                                     some reporting and analytics capabilities as well.
         $1                           $1M+
                                                   • Despite its longstanding presence in the market, TechExcel
 3 Year TCO: Tier 7; between $100K and $250K         lacks a strong global revenue footprint.

Info-Tech Recommends:
       Organizations seeking a full-featured ALM solution should consider TechExcel, particularly if they
       have limited support needs.

Info-Tech Research Group                                                                                              16
Concerto provides a range of functionality and targets high-
maturity development shops
     Market Pillar                                Overview
                                                    • A long-standing player in the ALM market, Parasoft has a wide
      Product:      Concerto
                                                      array of patent holdings that gives it a competitive edge in the
    Employees:      Unavailable
                                                      marketplace.
  Headquarters:     Monrovia, CA
      Website:      parasoft.com
     Founded:       1987                          Strengths
     Presence:      Private company
                                                    • Concerto includes most of the functionality associated with full-
                                                      featured ALM, including requirements and task management.
                                                    • Concerto can integrate with .NET and Eclipse IDEs.
                                                    • Concerto allows the user to create custom workflows in UML.
                                                    • Parasoft has a strong market focus on the ALM space.


                                                  Challenges
                                                    • Concerto does not include release management functionality
                                                      and Parasoft has no intention of adding this.
                                                    • While Parasoft has clients in the SMB space, Concerto targets
                                                      a level of process maturity (CMMI 3 or above) that most Info-
         $1                           $1M+
                                                      Tech SMBs do not have.
          Pricing was not made available            • Parasoft has a limited footprint compared to larger players.

Info-Tech Recommends:
       Concerto will provide strong support for organizations of any size that require a high level of
       development process maturity.

Info-Tech Research Group                                                                                                 17
PTC Integrity provides a range of ALM offerings within a
Project Lifecycle Management context
     Emerging Player                              Overview
                                                    • PTC acquired MKS in 2011 to integrate MKS’s Integrity ALM
      Product:      Integrity
                                                      offerings into PTC’s suite of Product Lifecycle Management
    Employees:      5,000
                                                      (PLM) tools.
  Headquarters:     Needham, MA
      Website:      ptc.com
     Founded:       1985                          Strengths
     Presence:      NASDAQ: PMTC
                    FY10 Revenue: $1B               • Integrity provides almost all of the functionality associated with
                                                      full-featured ALM, from requirements to task management.
                                                    • Integrity supports both Agile and waterfall methodologies, plus
                                                      the ability to graphically edit processes.
                                                    • Integrity benefits from strong integration with other lifecycle
                                                      management tools sold by PTC.

                                                  Challenges
                                                    • The target client for the product has at least 25 software
                                                      developers, making it a difficult proposition for many SMBs.
                                                    • PTC limits phone support to weekdays, unusual for a vendor
                                                      of this size.
         $1                           $1M+
                                                    • While PTC has a long history in the PLM space, its ability to
          Pricing was not made available              manage the ALM side of the business remains unproven.

Info-Tech Recommends:
       Integrity has a strong offering for larger organizations, or any organization seeking to integrate ALM
       with a broader PLM suite.

Info-Tech Research Group                                                                                                   18
SmarteSoft provides full-featured ALM at a substantial price;
support offering is weak
     Emerging Player                             Overview
                                                   • SmarteSoft entered the ALM field in 2005 with its SmarteSuite
      Product:      SmarteSuite
                                                     of tools.
    Employees:      50
                                                   • The suite centers around SmarteQM, a quality-oriented ALM
  Headquarters:     Austin, TX
                                                     and testing tool.
      Website:      smartesoft.com
     Founded:       1999                         Strengths
     Presence:      Private company
                                                   • Despite its positioning as a test automation tool, SmarteQM
                                                     has most of the functionality associated with ALM.
                                                   • Half of SmarteSoft’s clients are still mid-sized businesses, a
                                                     relatively strong focus on the SMB client.
                                                   • Customizable workflow in SmarteQM allows users to adapt to
                                                     various development platforms and methodologies.

                                                 Challenges
                                                   • SmarteSoft offers relatively weak support given the cost of
                                                     SmarteQM: initial contact is usually via email with a 24-hour
                                                     turnaround time.
                                                   • Given its recent entry, SmarteSoft lacks proven longevity in the
         $1                           $1M+
                                                     space, a concern given the high price tag.
 3 Year TCO: Tier 8; between $250K and $500K


Info-Tech Recommends:
       SmarteSoft’s credentials in test management software will make this a suitable choice for users with
       heavy testing and quality management needs.

Info-Tech Research Group                                                                                              19
ThoughtWorks offers a strong offering for Agile development
but limited support for waterfall or other methods
     Emerging Player                           Overview
                                                 • A recent entrant into the Agile ALM market, ThoughtWorks
      Product:      Mingle, Twist, Go
                                                   provides a robust offering but limited support for non-Agile
    Employees:      Unavailable
                                                   development activity.
  Headquarters:     Chicago, IL
      Website:      thoughtworks-studios.com
     Founded:       1993                       Strengths
     Presence:      Private company
                                                 • ThoughtWorks includes most of the functionality associated
                                                   with full-featured ALM, from requirements to task
                                                   management.
                                                 • ThoughtWorks has an organizational focus on Agile ALM and
                                                   long-standing experience in Agile development.
                                                 • ThoughtWorks testing is designed for a variety of platforms.

                                               Challenges
                                                 • ThoughtWorks offers email-only support and a one-day
                                                   turnaround, a relatively weak support offering.
                                                 • ThoughtWorks has a strong focus on the Agile methodology,
                                                   limiting the usefulness of the tool for waterfall or other
         $1                           $1M+
                                                   methods.
          Pricing was not made available         • As well, integration with .NET is not offered.

Info-Tech Recommends:
       ThoughtWorks can make sense for Agile-oriented organizations, or organizations seeking training and
       help in moving towards Agile.

Info-Tech Research Group                                                                                          20
Identify leading candidates with the Agile ALM Vendor
Shortlist Tool
The Info-Tech Agile ALM Vendor Shortlist Tool is designed to generate a
customized shortlist of vendors based on your key priorities.

          This tool offers the ability to modify:
    • Overall Vendor vs. Product Weightings

    • Top-level weighting of product vs. vendor
      criteria

    • Individual product criteria weightings:
        Features
        Usability
        Affordability
        Architecture

    • Individual vendor criteria weightings:
        Viability
        Strategy
        Reach
        Channel




Info-Tech Research Group                                                  21
Quality-sensitive development shops require tight integration
with a top-notch testing tool

Look for a vendor that provides a full-featured testing solution as part of the
ALM offering.
                                  Exemplary Performers

1     Quality-sensitive
      development


                                   Viable Performers
2     Agile focused




3     Development integrated       Adequate Performers




4
Info-Tech Research Group                                                          22
Agile-focused environments should seek a tool with strong
support for Agile

Seek an ALM product with native support for Agile processes and artifacts.

                                 Exemplary Performers

1     Quality-sensitive
      development


                                 Viable Performers
2     Agile focused




3     Development integrated     Adequate Performers




4
Info-Tech Research Group                                                     23
Organizations requiring development integration should seek
flexible integration capabilities

Look for native integrations as well API-based integrations for niche IDEs.

                                  Exemplary Performers

1     Quality-sensitive
      development


                                  Viable Performers
2     Agile focused




3     Development integrated      Adequate Performers




4
Info-Tech Research Group                                                      24
Appendix

   •     Vendor Evaluation Methodology
   •     Value Index Ranking Methodology
   •     Product Pricing Scenario & Methodology




Info-Tech Research Group                          25
Vendor Evaluation Methodology

Info-Tech Research Group’s Vendor Landscape market evaluations are a part of a larger program of vendor evaluations that includes Solution
Sets that provide both Vendor Landscapes and broader Selection Advice.

From the domain experience of our analysts, as well as through consultation with our clients, a vendor/product shortlist is established. Product
briefings are requested from each of these vendors, asking for information on the company, products, technology, customers, partners, sales
models, and pricing.

Our analysts then score each vendor and product across a variety of categories, on a scale of 0-10 points. The raw scores for each vendor are
then normalized to the other vendors’ scores to provide a sufficient degree of separation for a meaningful comparison. These scores are then
weighted according to weighting factors that our analysts believe represent the weight that an average client should apply to each criteria. The
weighted scores are then averaged for each of two high level categories: vendor score and product score. A plot of these two resulting scores
is generated to place vendors in one of four categories: Champion, Innovator, Market Pillar, and Emerging Player.

For a more granular category by category comparison, analysts convert the individual scores (absolute, non-normalized) for each
vendor/product in each evaluated category to a scale of zero to four whereby exceptional performance receives a score of four and poor
performance receives a score of zero. These scores are represented with “Harvey Balls,” ranging from an open circle for a score of zero to a
filled in circle for a score of four. Harvey Ball scores are indicative of absolute performance by category, but are not an exact correlation to
overall performance.

Individual scorecards are then sent to the vendors for factual review, and to ensure no information is under embargo. We will make corrections
where factual errors exist (e.g. pricing, features, technical specifications). We will consider suggestions concerning benefits, functional quality,
value, etc; however, these suggestions must be validated by feedback from our customers. We do not accept changes that are not
corroborated by actual client experience or wording changes that are purely part of a vendor’s market messaging or positioning. Any resulting
changes to final scores are then made as needed, before publishing the results to Info-Tech clients.

Vendor Landscapes are refreshed every 12 to 24 months, depending upon the dynamics of each individual market.




Info-Tech Research Group                                                                                                                           26
Value Index Ranking Methodology

Info-Tech Research Group’s Value Index is part of a larger program of vendor evaluations that includes Solution Sets that provide both Vendor
Landscapes and broader Selection Advice.

The Value Index is an indexed ranking of value per dollar as determined by the raw scores given to each vendor by analysts. To perform the
calculation, Affordability is removed from the Product score and the entire Product category is reweighted to represent the same proportions.
The Product and Vendor scores are then summed, and multiplied by the Affordability raw score to come up with Value Score. Vendors are
then indexed to the highest performing vendor by dividing their score into that of the highest scorer, resulting in an indexed ranking with a top
score of 100 assigned to the leading vendor.

The Value Index calculation is then repeated on the raw score of each category against Affordability, creating a series of indexes for Features,
Usability, Viability, Strategy and Support, with each being indexed against the highest score in that category. The results for each vendor are
displayed in tandem with the average score in each category to provide an idea of over and under performance.

The Value Index, where applicable, is refreshed every 12 to 24 months, depending upon the dynamics of each individual market.




Info-Tech Research Group                                                                                                                            27
Product Pricing Scenario & Methodology

Info-Tech Research Group provided each vendor with a common pricing scenario to enable normalized scoring of Affordability, calculation of
Value Index rankings, and identification of the appropriate solution pricing tier as displayed on each vendor scorecard.
Vendors were asked to provide list costs for Agile ALM software licensing to address the needs of a reference organization described in the
pricing scenario.
Additional consulting, deployment, and training services were explicitly out of scope of the pricing request, as was the cost of enhanced
support options, though vendors were encouraged to highlight any such items included with the base product acquisition. Vendors were asked
to prepare a three-year total acquisition cost for their respective Agile ALM solutions. This three-year total acquisition cost is the basis of the
solution pricing tier indicated for each vendor.
Finally, the vendors’ three-year total acquisition costs were normalized to produce the Affordability raw scores and calculate Value Index
ratings for each solution.

Key elements of the common pricing scenario provided to Agile ALM vendors included:
• A six-site organization with 2,200 employees, located at two locations in each of the US, England, and France. The US locations create
  software to be used internally, as well as for external clients, while the development resources in England and France are focused almost
  entirely on externally facing applications, including mobile solutions.
• The development organization has grown rapidly through acquisitions. While the teams work well together, projects are often seen as
   chaotic when crossing office boundaries.
• The corporate development group has determined that implementing ALM consistently across all locations and projects would greatly
   improve the overall efficiency of the collective global development group.
• The corporate development group would like to create visibility for the corporate stakeholders into all projects being executed with real-time
   (or near real-time) access to data. Dashboards and reports should be able to be filtered by project, by development group, and across the
   entire corporation.
• Development projects are typically run with an Agile approach, following two-week sprints for most projects.




Info-Tech Research Group                                                                                                                         28

Agile ALM Tool Comparison

  • 1.
    Vendor Landscape: AgileALM ALMs for the poor, and for the rich. Info-Tech Research Group 1
  • 2.
    Introduction As development platforms,coding methodologies, and devices increase in number, Agile Application Life Management (ALM) tools support integrations with an ever-increasing range of systems. This Research Is Designed For: This Research Will Help You: Enterprises seeking to select a solution for Agile Understand what’s new in the Agile ALM market. Application Lifecycle Management (ALM) technology Evaluate Agile ALM vendors and products for your enterprise needs. Their Agile ALM use case may include: Determine which products are most appropriate for • Providing testing support for a quality-centric particular use cases and scenarios. development environment. • Supporting Agile development. • Integrating lifecycle management with Integrated Development Environments. Info-Tech Research Group 2
  • 3.
    Executive Summary Info-Tech evaluatedeight competitors in the Agile ALM Info-Tech Insight market, including the following notable performers: 1. ALM and BPM start to intermingle: Champions: Premium offerings give the ability to • CollabNet TeamForge, a comprehensive, full-featured ALM tool customize process. Evaluate your need at a reasonable price. Despite its impressive range of offerings, for, and the cost of, process customization CollabNet supports the SMB. before you make your purchase. • Micro Focus Borland ALM, a long-standing leader in the market with a broad feature offering and strong product support. 2. The range of platforms is growing: • Serena Suite, a robust offering backed by strong customer Premium products support development support and a broad reseller network. across the growing range of platforms and development methodologies, including Value Award: mobile, web, and infrastructure. • TechExcel DevSuite, a comprehensive offering with a price tag far below its comparable competitors. 3. New entrants offer attractive options: Niche offerings can serve your needs at a fraction of the cost of a premium tool. For example, consider specialized tools for Agile and testing integration. Info-Tech Research Group 3
  • 4.
    Market Overview How it got here Where it’s going • Long-standing vendors in the ALM space can trace their • Agile ALM has moved into the Cloud. Major vendors of roots to the 1980s, or even earlier. cloud collaboration software have moved into the ALM space and new SaaS-only ALM tools have appeared. • Since the 1990s, ALM tools have played a key part in the project manager’s arsenal, allowing him or her to • Process flexibility has become key. Instead of a strict track project status and progress towards objectives. adherence to Agile or waterfall development, most firms have pursued a middle path and customized • Managers have paid top dollar for ALM suites that could their methodology to meet their own needs. Some track project data and provide meaningful reporting. Agile ALM tools cater to the need for flexibility. • As development environments have evolved, the tools • Quality control has become a core part of ALM. and components being used to manage this process Several major ALM tools are built around testing tools have grown to become integrated and convenient, and process maturity. covering all phases of the development lifecycle including architecture, testing, and deployment with a • Going forward, expect stronger integration between single common interface. ALM tools and the ecosystem of products supporting development, such as testing, PLM tools, and IDEs. As the market evolves, capabilities that were once cutting edge become default, and new functionality becomes differentiating. Traceability has become a table stakes capability and should no longer be used to differentiate solutions. Instead, focus on workflow and reporting to get the best fit for your requirements. Info-Tech Research Group 4
  • 5.
    Agile ALM VendorLandscape selection / knock-out criteria: Market share, mind share, and market consolidation • The Agile ALM space continues to see new entrants, new products, and new features. Ongoing demand for development on mobile and web platforms creates new opportunities for vendors focused on a particular market niche. • For this Vendor Landscape, Info-Tech focused on those vendors that have a strong market presence and/or reputational presence among small to mid-sized enterprises. Included in the Vendor Landscape: • CollabNet TeamForge. A relatively recent entrant with a strong offering and a reasonable price tag. • Micro Focus Borland ALM. A large, ALM-focused vendor that provides strong support for its product. • PTC Integrity. A strong ALM offering tightly integrated into a PLM platform. • Parasoft Concerto. A product targeted towards development shops with a high level of process maturity. • Serena Suite. The complete ALM package controlled by a complete business process engine. • SmarteSoft SmartSuite. ALM tools built around a quality-control platform. • TechExcel DevSuite. A flexible tool that supports development on a variety of platforms. • ThoughtWorks Suite (Mingle, Twist, Go). A strong, Agile-focused product offering that provides some flexibility within the Agile framework. Info-Tech Research Group 5
  • 6.
    Agile ALM Criteria& Weighting Factors Product Evaluation Features Usability 30% 30% The solution provides basic Features and advanced feature/functionality. The solution’s dashboard and reporting tools Architecture 20% 20% Affordability Usability are intuitive and easy to use. The five year TCO of the solution is Product Affordability economical. 50% The delivery method of the solution aligns with Architecture what is expected within the space. Vendor Evaluation 50% Vendor is profitable, knowledgeable, and will Vendor Viability be around for the long term. Vendor is committed to the space and has a Viability Strategy Strategy future product and portfolio roadmap. 25% 30% Vendor offers global coverage and is able to Reach sell and provide post-sales support. 15% Channel Reach 30% Vendor channel strategy is appropriate and the Channel channels themselves are strong. Info-Tech Research Group 6
  • 7.
    The Info-Tech AgileALM Vendor Landscape Champions receive high scores for most evaluation criteria and offer excellent value. They have a strong market presence and are usually the trend setters for the industry. Innovators have demonstrated innovative product strengths that act as their competitive advantage in appealing to niche segments of the market. Market Pillars are established players with very strong vendor credentials, but with more average product scores. Emerging players are newer vendors who are starting to gain a foothold in the marketplace. They balance product and vendor attributes, though score lower relative to market Champions. For an explanation of how the Info-Tech Vendor Landscape is created please see the slide entitled “Vendor Evaluation Methodology” in the appendix. Info-Tech Research Group 7
  • 8.
    Every vendor hasits strengths & weaknesses; Pick the one that works best for you Product Vendor Afford- Archi- Overall Features Usability Overall Viability Strategy Reach Channel ability tecture CollabNet PTC Micro Focus Parasoft Serena SmarteSoft TechExcel ThoughtWorks Legend =Exemplary =Good =Adequate =Inadequate =Poor For an explanation of how the Info-Tech Harvey Balls are calculated please see the slide entitled “Vendor Evaluation Methodology” in the appendix. Info-Tech Research Group 8
  • 9.
    TechExcel captures thehighest value score with a comprehensive, affordable offering What is a Value Score? On a relative basis, TechExcel Champion maintained the highest Info-Tech Value ScoreTM of the vendor group. Vendors The Value Score indexes each vendor’s product were indexed against TechExcel’s offering and business strength relative to their performance to provide a complete, price point. It does not indicate vendor ranking. relative view of their product offerings. Vendors that score high offer more bang for the buck (e.g. features, usability, stability, etc.) than the average vendor, while the inverse is true for those that score lower. Price-conscious enterprises may wish to give the 100 Value Score more consideration than those who are more focused on specific vendor/product attributes. 64 Average Score: 31.5 55 22 13 0 0 0 TechExcel CollabNet Serena SmarteSoft Micro *PTC *Parasoft *Thought- Focus Works *Vendor declined to provide pricing. For an explanation of how the Info-Tech Value Index is calculated please see the slide entitled “Value Index Ranking Methodology” in the appendix. For an explanation of how normalized pricing is determined please see the slide entitled “Product Pricing Scenario & Methodology” in the appendix. Info-Tech Research Group 9
  • 10.
    Table Stakes representthe minimum standard; without these a product doesn’t even get reviewed The Table Stakes What Does This Mean? Feature Description The products assessed in this Vendor LandscapeTM meet, at the very least, the Basic task The product allows the user to create requirements outlined as Table Stakes. management tasks, assign resources to those tasks, and view project status reporting. Many of the vendors go above and beyond the Graphical displays The product displays tasks and other outlined Table Stakes, some even do so in objects as editable, graphical objects. multiple categories. This section aims to highlight the products capabilities in excess of the criteria Traceability The product ties together objects created listed here. at various stages of the lifecycle, showing how tasks relate to requirements, etc. Links to external The product allows the user to link to documents external documents for requirements and other content. Central data store The product stores data in a centralized repository, not on local disk. If Table Stakes are all you need from your Agile ALM solution, the only true differentiator for the organization is price. Otherwise, dig deeper to find the best price to value for your needs. Info-Tech Research Group 10
  • 11.
    Advanced Features arethe market differentiators that make or break a product Scoring Methodology Advanced Features Info-Tech scored each vendor’s features offering Feature What We Looked For as a summation of their individual scores across Requirements Users can enter requirements in a the listed advanced features. Vendors were given Management hierarchical structure. one point for each feature the product inherently provided. Some categories were scored on a Change Management The product packages and traces changes. more granular scale with vendors receiving half points. Workflow The product provides automated workflow. Source Code The product manages source code or Management integrates with SCM solutions. Task Management The product manages timelines and tasks. Testing The product provides test management. Defect/Bug Tracking The product manages and traces defects. Resource The product permissions users to edit Management objects and evaluates resource capacity. Reporting & Analytics The product analyzes project progress and provides meaningful reporting. Release Management The product helps with release planning. Content Management The product organizes documents. Info-Tech Research Group 11
  • 12.
    Each vendor offersa different feature set; concentrate on what you need Evaluated Features Req. Change Work- Task Defect Res. Report- Rel. Content SCM Testing Mgmt Mgmt flow Mgmt Track Mgmt ing Mgmt Mgmt Collab- Net PTC Micro Focus Parasoft Serena Smarte- Soft Tech- Excel Thought- Works Legend =Feature fully present =Feature partially present/pending =Feature absent Info-Tech Research Group 12
  • 13.
    CollabNet offers astrong product with a broad range of features and a reasonable price tag Champion Overview • A recent entrant to the ALM space (but in SCM since 1999), Product: TeamForge CollabNet offers the range of functionality normally expected Employees: Unavailable by large organizations, but targets the SMB market with a Headquarters: Brisbane, CA relatively affordable price tag. Website: Collab.net Founded: 1999 Strengths Presence: Private company • TeamForge provides all of the functionality associated with full- featured ALM, from requirements through to release. • Despite its robust offering and some well-known clients, CollabNet has a large number of SMB clients as well. • CollabNet has strong support offerings, both for its clients and its channel partners. Challenges • CollabNet’s limited revenue and emphasis on North America sales restricts its global reach. However, the company has experienced strong revenue growth. • TeamForge’s native resource management solution lacks $1 $1M+ functionality, although it offers basic capacity management. 3 Year TCO: Tier 8; between $250K and $500K Info-Tech Recommends: CollabNet offers a very strong product at a reasonable price, supported by a recognized vendor in the source code management space. Info-Tech Research Group 13
  • 14.
    Micro Focus providesfull-featured ALM with strong customer and reseller support Champion Overview • With 30 years of experience in application management, Micro Product: Borland ALM Focus continues to lead the market with a strong offering. Employees: 1,200 Headquarters: Newbury, UK Website: microfocus.com Founded: 1976 Strengths Presence: LON: MCRO FY11 Revenue: $436M • The Borland ALM suite benefits from Micro Focus’s strong global reach and extensive experience in ALM. • Micro Focus combines large size with a focus on ALM. • Micro Focus offers strong support for its products, including multi-language, 24x7 support. • Micro Focus’s reseller networks stretch across four continents. Challenges • The Borland ALM suite excludes some key functionality such as resource utilization management, assuming that the user will integrate with a project management tool. • Borland ALM does not have burn-down reports or agile task $1 $1M+ management reporting. 3 Year TCO: Tier 8; between $250K and $500K Info-Tech Recommends: Organizations seeking a premium product and willing to pay a substantial amount should consider Micro Focus. Info-Tech Research Group 14
  • 15.
    Serena provides allthe ALM tools, packaged within a powerful process orchestration engine Champion Overview • Serena continues to achieve competitive differentiation Product: Serena Suite through its Serena Business Manager, a full-fledged process Employees: 700 management solution that orchestrates development. Headquarters: Redwood City, CA Website: serena.com Founded: 1980 Strengths Presence: Private company • Serena includes all of the functionality associated with full- featured ALM, from requirements to release management. • Serena has proven longevity in the ALM space, having entered the market over 30 years ago. • Serena’s support offices and reseller network stretch across four continents. Support is available in ten languages. Challenges • Serena support centers provide only callback service on weekends. $1 $1M+ 3 Year TCO: Tier 8; between $250K and $500K Info-Tech Recommends: Serena will make sense for organizations needing a high level of process customizability and workflow, and willing to make a substantial investment. Info-Tech Research Group 15
  • 16.
    TechExcel offers flexibilityand a range of ALM features; support offering is weak Innovator Overview • Despite being a long-standing player in the ALM business, Product: DevSuite TechExcel has only a small share of the market. Employees: 155 Headquarters: Lafayette, CA Website: techexcel.com Founded: 1999 Strengths Presence: Private company • DevSuite includes most of the functionality associated with full- featured ALM, from requirements to task management. • DevSuite offers a high degree of flexibility, making it useful for development on a range of platforms. • TechExcel integrates with a variety of development tools and supports development using diverse methodologies. Challenges • TechExcel offers relatively weak support for a major player, providing telephone support only during business hours. • TechExcel lacks key release management functionality and some reporting and analytics capabilities as well. $1 $1M+ • Despite its longstanding presence in the market, TechExcel 3 Year TCO: Tier 7; between $100K and $250K lacks a strong global revenue footprint. Info-Tech Recommends: Organizations seeking a full-featured ALM solution should consider TechExcel, particularly if they have limited support needs. Info-Tech Research Group 16
  • 17.
    Concerto provides arange of functionality and targets high- maturity development shops Market Pillar Overview • A long-standing player in the ALM market, Parasoft has a wide Product: Concerto array of patent holdings that gives it a competitive edge in the Employees: Unavailable marketplace. Headquarters: Monrovia, CA Website: parasoft.com Founded: 1987 Strengths Presence: Private company • Concerto includes most of the functionality associated with full- featured ALM, including requirements and task management. • Concerto can integrate with .NET and Eclipse IDEs. • Concerto allows the user to create custom workflows in UML. • Parasoft has a strong market focus on the ALM space. Challenges • Concerto does not include release management functionality and Parasoft has no intention of adding this. • While Parasoft has clients in the SMB space, Concerto targets a level of process maturity (CMMI 3 or above) that most Info- $1 $1M+ Tech SMBs do not have. Pricing was not made available • Parasoft has a limited footprint compared to larger players. Info-Tech Recommends: Concerto will provide strong support for organizations of any size that require a high level of development process maturity. Info-Tech Research Group 17
  • 18.
    PTC Integrity providesa range of ALM offerings within a Project Lifecycle Management context Emerging Player Overview • PTC acquired MKS in 2011 to integrate MKS’s Integrity ALM Product: Integrity offerings into PTC’s suite of Product Lifecycle Management Employees: 5,000 (PLM) tools. Headquarters: Needham, MA Website: ptc.com Founded: 1985 Strengths Presence: NASDAQ: PMTC FY10 Revenue: $1B • Integrity provides almost all of the functionality associated with full-featured ALM, from requirements to task management. • Integrity supports both Agile and waterfall methodologies, plus the ability to graphically edit processes. • Integrity benefits from strong integration with other lifecycle management tools sold by PTC. Challenges • The target client for the product has at least 25 software developers, making it a difficult proposition for many SMBs. • PTC limits phone support to weekdays, unusual for a vendor of this size. $1 $1M+ • While PTC has a long history in the PLM space, its ability to Pricing was not made available manage the ALM side of the business remains unproven. Info-Tech Recommends: Integrity has a strong offering for larger organizations, or any organization seeking to integrate ALM with a broader PLM suite. Info-Tech Research Group 18
  • 19.
    SmarteSoft provides full-featuredALM at a substantial price; support offering is weak Emerging Player Overview • SmarteSoft entered the ALM field in 2005 with its SmarteSuite Product: SmarteSuite of tools. Employees: 50 • The suite centers around SmarteQM, a quality-oriented ALM Headquarters: Austin, TX and testing tool. Website: smartesoft.com Founded: 1999 Strengths Presence: Private company • Despite its positioning as a test automation tool, SmarteQM has most of the functionality associated with ALM. • Half of SmarteSoft’s clients are still mid-sized businesses, a relatively strong focus on the SMB client. • Customizable workflow in SmarteQM allows users to adapt to various development platforms and methodologies. Challenges • SmarteSoft offers relatively weak support given the cost of SmarteQM: initial contact is usually via email with a 24-hour turnaround time. • Given its recent entry, SmarteSoft lacks proven longevity in the $1 $1M+ space, a concern given the high price tag. 3 Year TCO: Tier 8; between $250K and $500K Info-Tech Recommends: SmarteSoft’s credentials in test management software will make this a suitable choice for users with heavy testing and quality management needs. Info-Tech Research Group 19
  • 20.
    ThoughtWorks offers astrong offering for Agile development but limited support for waterfall or other methods Emerging Player Overview • A recent entrant into the Agile ALM market, ThoughtWorks Product: Mingle, Twist, Go provides a robust offering but limited support for non-Agile Employees: Unavailable development activity. Headquarters: Chicago, IL Website: thoughtworks-studios.com Founded: 1993 Strengths Presence: Private company • ThoughtWorks includes most of the functionality associated with full-featured ALM, from requirements to task management. • ThoughtWorks has an organizational focus on Agile ALM and long-standing experience in Agile development. • ThoughtWorks testing is designed for a variety of platforms. Challenges • ThoughtWorks offers email-only support and a one-day turnaround, a relatively weak support offering. • ThoughtWorks has a strong focus on the Agile methodology, limiting the usefulness of the tool for waterfall or other $1 $1M+ methods. Pricing was not made available • As well, integration with .NET is not offered. Info-Tech Recommends: ThoughtWorks can make sense for Agile-oriented organizations, or organizations seeking training and help in moving towards Agile. Info-Tech Research Group 20
  • 21.
    Identify leading candidateswith the Agile ALM Vendor Shortlist Tool The Info-Tech Agile ALM Vendor Shortlist Tool is designed to generate a customized shortlist of vendors based on your key priorities. This tool offers the ability to modify: • Overall Vendor vs. Product Weightings • Top-level weighting of product vs. vendor criteria • Individual product criteria weightings: Features Usability Affordability Architecture • Individual vendor criteria weightings: Viability Strategy Reach Channel Info-Tech Research Group 21
  • 22.
    Quality-sensitive development shopsrequire tight integration with a top-notch testing tool Look for a vendor that provides a full-featured testing solution as part of the ALM offering. Exemplary Performers 1 Quality-sensitive development Viable Performers 2 Agile focused 3 Development integrated Adequate Performers 4 Info-Tech Research Group 22
  • 23.
    Agile-focused environments shouldseek a tool with strong support for Agile Seek an ALM product with native support for Agile processes and artifacts. Exemplary Performers 1 Quality-sensitive development Viable Performers 2 Agile focused 3 Development integrated Adequate Performers 4 Info-Tech Research Group 23
  • 24.
    Organizations requiring developmentintegration should seek flexible integration capabilities Look for native integrations as well API-based integrations for niche IDEs. Exemplary Performers 1 Quality-sensitive development Viable Performers 2 Agile focused 3 Development integrated Adequate Performers 4 Info-Tech Research Group 24
  • 25.
    Appendix • Vendor Evaluation Methodology • Value Index Ranking Methodology • Product Pricing Scenario & Methodology Info-Tech Research Group 25
  • 26.
    Vendor Evaluation Methodology Info-TechResearch Group’s Vendor Landscape market evaluations are a part of a larger program of vendor evaluations that includes Solution Sets that provide both Vendor Landscapes and broader Selection Advice. From the domain experience of our analysts, as well as through consultation with our clients, a vendor/product shortlist is established. Product briefings are requested from each of these vendors, asking for information on the company, products, technology, customers, partners, sales models, and pricing. Our analysts then score each vendor and product across a variety of categories, on a scale of 0-10 points. The raw scores for each vendor are then normalized to the other vendors’ scores to provide a sufficient degree of separation for a meaningful comparison. These scores are then weighted according to weighting factors that our analysts believe represent the weight that an average client should apply to each criteria. The weighted scores are then averaged for each of two high level categories: vendor score and product score. A plot of these two resulting scores is generated to place vendors in one of four categories: Champion, Innovator, Market Pillar, and Emerging Player. For a more granular category by category comparison, analysts convert the individual scores (absolute, non-normalized) for each vendor/product in each evaluated category to a scale of zero to four whereby exceptional performance receives a score of four and poor performance receives a score of zero. These scores are represented with “Harvey Balls,” ranging from an open circle for a score of zero to a filled in circle for a score of four. Harvey Ball scores are indicative of absolute performance by category, but are not an exact correlation to overall performance. Individual scorecards are then sent to the vendors for factual review, and to ensure no information is under embargo. We will make corrections where factual errors exist (e.g. pricing, features, technical specifications). We will consider suggestions concerning benefits, functional quality, value, etc; however, these suggestions must be validated by feedback from our customers. We do not accept changes that are not corroborated by actual client experience or wording changes that are purely part of a vendor’s market messaging or positioning. Any resulting changes to final scores are then made as needed, before publishing the results to Info-Tech clients. Vendor Landscapes are refreshed every 12 to 24 months, depending upon the dynamics of each individual market. Info-Tech Research Group 26
  • 27.
    Value Index RankingMethodology Info-Tech Research Group’s Value Index is part of a larger program of vendor evaluations that includes Solution Sets that provide both Vendor Landscapes and broader Selection Advice. The Value Index is an indexed ranking of value per dollar as determined by the raw scores given to each vendor by analysts. To perform the calculation, Affordability is removed from the Product score and the entire Product category is reweighted to represent the same proportions. The Product and Vendor scores are then summed, and multiplied by the Affordability raw score to come up with Value Score. Vendors are then indexed to the highest performing vendor by dividing their score into that of the highest scorer, resulting in an indexed ranking with a top score of 100 assigned to the leading vendor. The Value Index calculation is then repeated on the raw score of each category against Affordability, creating a series of indexes for Features, Usability, Viability, Strategy and Support, with each being indexed against the highest score in that category. The results for each vendor are displayed in tandem with the average score in each category to provide an idea of over and under performance. The Value Index, where applicable, is refreshed every 12 to 24 months, depending upon the dynamics of each individual market. Info-Tech Research Group 27
  • 28.
    Product Pricing Scenario& Methodology Info-Tech Research Group provided each vendor with a common pricing scenario to enable normalized scoring of Affordability, calculation of Value Index rankings, and identification of the appropriate solution pricing tier as displayed on each vendor scorecard. Vendors were asked to provide list costs for Agile ALM software licensing to address the needs of a reference organization described in the pricing scenario. Additional consulting, deployment, and training services were explicitly out of scope of the pricing request, as was the cost of enhanced support options, though vendors were encouraged to highlight any such items included with the base product acquisition. Vendors were asked to prepare a three-year total acquisition cost for their respective Agile ALM solutions. This three-year total acquisition cost is the basis of the solution pricing tier indicated for each vendor. Finally, the vendors’ three-year total acquisition costs were normalized to produce the Affordability raw scores and calculate Value Index ratings for each solution. Key elements of the common pricing scenario provided to Agile ALM vendors included: • A six-site organization with 2,200 employees, located at two locations in each of the US, England, and France. The US locations create software to be used internally, as well as for external clients, while the development resources in England and France are focused almost entirely on externally facing applications, including mobile solutions. • The development organization has grown rapidly through acquisitions. While the teams work well together, projects are often seen as chaotic when crossing office boundaries. • The corporate development group has determined that implementing ALM consistently across all locations and projects would greatly improve the overall efficiency of the collective global development group. • The corporate development group would like to create visibility for the corporate stakeholders into all projects being executed with real-time (or near real-time) access to data. Dashboards and reports should be able to be filtered by project, by development group, and across the entire corporation. • Development projects are typically run with an Agile approach, following two-week sprints for most projects. Info-Tech Research Group 28