The document provides an implementation status report for the Financial Sector Rapid Response Project in Afghanistan. Key achievements include the completion of bank audits, and the establishment of a collateral registry and public credit registry that are now fully operational. Work continues on developing a modern payment system, including an automated transfer system, national card payment switch, and reforms to strengthen banking supervision and regulations. Overall implementation progress is rated moderately satisfactory, while risks remain high due to the challenging political and economic environment.
OECD review of the PPP governance framework in the United-Kingdom: preliminar...OECD Governance
This presentation was made by Ian Hawkesworth, OECD, at the 8th Meeting of Senior Public-Private Partnerships and Infrastructure Officials held in Paris on 23-24 March 2015.
VALUE RELEVANCE OF PREPAYMENT AUDIT CHARACTERISTICS AND THE IMPACT ON ENHANCI...IAEME Publication
The present study aims at investigating the value relevance of prepayment audit
characteristics and the impact on enhancing the effective implementation of World Bank
funded project in Nigeria. These characteristics include independence, Size, Expertise
and Meetings frequency of audit project financial management team.The study seeks to
analyse how auditors’ qualities aid in prepayment audit and the resultant effect of the
synergy on performance of public sector funded projects in Nigeria. This study adopted
both an explanatory research design. The source of data was purely from secondary
which used all the twenty-nine (29) ministries between 2000-2016.The statistical tools
adopted parametric and non-parametric techniques of data analysis. In testing the
hypotheses, Ordinary Least Square (OLS), multiple regression technique of analysis
was employed, at 5% level of significance (p<0.05). There was positive and significant
relationship between Audit project financial management unit Independence and ratio
of completed project. There was positive and significant relationship between Audit
Financial Expertise of project financial Management unit and ratio of completed
project. There was positive and significant relationship between Meetings frequency of
audit project financial Management unit and ratio of completed project. The paper
concludes that auditors’ qualities affect positively prepayment audit and this in turn
affect performance of public sector funded projects in Nigeria.
VanFUNDING 2016: Capital raising options for startups and scalups (Alixe cor...Craig Asano
Investor, capital raising expert, NCFA legal advisor, and Principal of Venture Law Corporation, Alixe Cormick, highlights key considerations for startups and scaleups to consider when seeking to raise capital and options available to them at various stages of their business development and commercialization.
So, it is best time for you where you can choose the Hair Extensions Vaughan treatment through your hairs are treated properly and with a small hair surgery you will easily able to overcome from hair falling for permanently.
OECD review of the PPP governance framework in the United-Kingdom: preliminar...OECD Governance
This presentation was made by Ian Hawkesworth, OECD, at the 8th Meeting of Senior Public-Private Partnerships and Infrastructure Officials held in Paris on 23-24 March 2015.
VALUE RELEVANCE OF PREPAYMENT AUDIT CHARACTERISTICS AND THE IMPACT ON ENHANCI...IAEME Publication
The present study aims at investigating the value relevance of prepayment audit
characteristics and the impact on enhancing the effective implementation of World Bank
funded project in Nigeria. These characteristics include independence, Size, Expertise
and Meetings frequency of audit project financial management team.The study seeks to
analyse how auditors’ qualities aid in prepayment audit and the resultant effect of the
synergy on performance of public sector funded projects in Nigeria. This study adopted
both an explanatory research design. The source of data was purely from secondary
which used all the twenty-nine (29) ministries between 2000-2016.The statistical tools
adopted parametric and non-parametric techniques of data analysis. In testing the
hypotheses, Ordinary Least Square (OLS), multiple regression technique of analysis
was employed, at 5% level of significance (p<0.05). There was positive and significant
relationship between Audit project financial management unit Independence and ratio
of completed project. There was positive and significant relationship between Audit
Financial Expertise of project financial Management unit and ratio of completed
project. There was positive and significant relationship between Meetings frequency of
audit project financial Management unit and ratio of completed project. The paper
concludes that auditors’ qualities affect positively prepayment audit and this in turn
affect performance of public sector funded projects in Nigeria.
VanFUNDING 2016: Capital raising options for startups and scalups (Alixe cor...Craig Asano
Investor, capital raising expert, NCFA legal advisor, and Principal of Venture Law Corporation, Alixe Cormick, highlights key considerations for startups and scaleups to consider when seeking to raise capital and options available to them at various stages of their business development and commercialization.
So, it is best time for you where you can choose the Hair Extensions Vaughan treatment through your hairs are treated properly and with a small hair surgery you will easily able to overcome from hair falling for permanently.
VanFUNDING 2016: Industry Pitch & Meet Opportunity: FundingNomad Entertainm...Craig Asano
Industry Pitch & Meet Opportunities presented by Brad Kerr, CEO, FundingNomad. Pitch & Meet companies are actively growing their venture and looking to expand operations through strategic partnerships and investment commitments.
Lee Taal, Founder of Chatter High, delivers an outstanding pitch for their online platform where students talk about their future at the VanFUNDING 2016 showcase.
VanFUNDING Oct 18, 2016 Canadian fintech crowdfunding markets - what's the ...Craig Asano
Peter-Paul Van Hoeken, Founder/CEO of FrontFundr provides an update on the Canadian Fintech Crowdfunding markets in terms of market adoption, opportunities & challenges, and deals
Vanfunding 2016: Opening keynote (bundeep rangar) Fineqia - The Rise of FintechCraig Asano
Opening keynote at VanFUNDING 2016 delivered by Fineqia CEO, Bundeep Singh Rangar. Titled: The rise of fintech and it's potential impact on public and private markets in Canada and around the globe.
Vanfunding 2016 2. global data analysis of crowdfunding markets (sherwood n...Craig Asano
VanFUNDING Oct 18, 2016 presentation by Sherwood Neiss, co-founder, Crowdfund Capital Advisors. Global Trends and Data Analysis of Crowdfunding markets.
2016 small business forum crowdfunding 101 workshopCraig Asano
Oct 25, 2016, I delivered an hour Crowdfunding 101+ workshop at the 2016 Small Business Forum at the Metro Toronto Convention Center. This is an annual trade show hosted by Enterprise Toronto that attracts thousands of small businesses each year looking for funding, mentorship, tools, products and services to help them launch and grow. The presentation provides an overview of Crowdfunding markets, both regulated and non-regulated, case studies, deal characteristics to help startups and scaleups understand if Crowdfinance is right for their business. The deck also provides some insight into practical keys to success with planning, executing and following up on a crowdfunding campaign or investment round.
VanFUNDING 2016: Cross border and international crowdfinance (Raising capita...Craig Asano
Presentation slides for Panel discussion on Raising Capital in the U.S. What financing exemptions are available to Canadian issuers interested in raising funds in the United States where the market is ten-fold with a significant appetite for risk capital, pros and cons and process. Moderated discussion led by Alixe Cormick of Venture Law Corporation in discussion with New York Securities attorney, George Georgiades, Esq., President of AltFinEsq, and Bob Poole, Principal, CPA, CGA, Davidson & Company LLP and Dylan Connelly, Principal, CPA, CA, Davidson & Company LLP
The PforR Instrument was introduced in January 2012 as World Bank’s third Instrument in addition to Investment Project Financing (IPF) and Development Policy Financing (DPF).
This presentation was given at the OECD Technical Workshop on Results-Based Funding, 19-20 May 2014, run by the OECD Development Assistance Committee (DAC) Network on Development Evaluation together with the German Development Institute (DIE).
The DAC Network on Development Evaluation (EVALNET) contributes to better development results using evaluation to build a strong evidence base for policy making and for learning.
More on DIE: http://www.die-gdi.de/en/
More on EVALNET: http://www.oecd.org/development/evaluation/
VanFUNDING 2016: Industry Pitch & Meet Opportunity: FundingNomad Entertainm...Craig Asano
Industry Pitch & Meet Opportunities presented by Brad Kerr, CEO, FundingNomad. Pitch & Meet companies are actively growing their venture and looking to expand operations through strategic partnerships and investment commitments.
Lee Taal, Founder of Chatter High, delivers an outstanding pitch for their online platform where students talk about their future at the VanFUNDING 2016 showcase.
VanFUNDING Oct 18, 2016 Canadian fintech crowdfunding markets - what's the ...Craig Asano
Peter-Paul Van Hoeken, Founder/CEO of FrontFundr provides an update on the Canadian Fintech Crowdfunding markets in terms of market adoption, opportunities & challenges, and deals
Vanfunding 2016: Opening keynote (bundeep rangar) Fineqia - The Rise of FintechCraig Asano
Opening keynote at VanFUNDING 2016 delivered by Fineqia CEO, Bundeep Singh Rangar. Titled: The rise of fintech and it's potential impact on public and private markets in Canada and around the globe.
Vanfunding 2016 2. global data analysis of crowdfunding markets (sherwood n...Craig Asano
VanFUNDING Oct 18, 2016 presentation by Sherwood Neiss, co-founder, Crowdfund Capital Advisors. Global Trends and Data Analysis of Crowdfunding markets.
2016 small business forum crowdfunding 101 workshopCraig Asano
Oct 25, 2016, I delivered an hour Crowdfunding 101+ workshop at the 2016 Small Business Forum at the Metro Toronto Convention Center. This is an annual trade show hosted by Enterprise Toronto that attracts thousands of small businesses each year looking for funding, mentorship, tools, products and services to help them launch and grow. The presentation provides an overview of Crowdfunding markets, both regulated and non-regulated, case studies, deal characteristics to help startups and scaleups understand if Crowdfinance is right for their business. The deck also provides some insight into practical keys to success with planning, executing and following up on a crowdfunding campaign or investment round.
VanFUNDING 2016: Cross border and international crowdfinance (Raising capita...Craig Asano
Presentation slides for Panel discussion on Raising Capital in the U.S. What financing exemptions are available to Canadian issuers interested in raising funds in the United States where the market is ten-fold with a significant appetite for risk capital, pros and cons and process. Moderated discussion led by Alixe Cormick of Venture Law Corporation in discussion with New York Securities attorney, George Georgiades, Esq., President of AltFinEsq, and Bob Poole, Principal, CPA, CGA, Davidson & Company LLP and Dylan Connelly, Principal, CPA, CA, Davidson & Company LLP
The PforR Instrument was introduced in January 2012 as World Bank’s third Instrument in addition to Investment Project Financing (IPF) and Development Policy Financing (DPF).
This presentation was given at the OECD Technical Workshop on Results-Based Funding, 19-20 May 2014, run by the OECD Development Assistance Committee (DAC) Network on Development Evaluation together with the German Development Institute (DIE).
The DAC Network on Development Evaluation (EVALNET) contributes to better development results using evaluation to build a strong evidence base for policy making and for learning.
More on DIE: http://www.die-gdi.de/en/
More on EVALNET: http://www.oecd.org/development/evaluation/
The development of turnaround plan was in part to fulfil the conditions set forth by National Treasury for capital injection and provision of guarantee requested by the Land Bank
1. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 1 of 7
Public Disclosure Copy
Public Disclosure Copy
Financial Sector Rapid Response Project (P119047)
SOUTH ASIA | Afghanistan | Finance & Markets Global Practice |
IBRD/IDA | Specific Investment Loan | FY 2012 | Seq No: 7 | ARCHIVED on 10-Jan-2016 | ISR21682 |
Implementing Agencies: DA AFGHANISTAN BANK
Key Dates
Key Project Dates
Bank Approval Date:25-Aug-2011 Effectiveness Date:06-Sep-2011
Planned Mid Term Review Date:04-Oct-2014 Actual Mid-Term Review Date:25-Apr-2015
Original Closing Date:30-Jun-2014 Revised Closing Date:30-Jun-2016
Project Development Objectives
Project Development Objective (from Project Appraisal Document)
The Project's development objective is to assist DAB to develop actions plans for improved banking supervision and implementamodernnational
payment system for efficient and transparent payment transactions.
Has the Project Development Objective been changed since Board Approval of the Project Objective?
Yes
Board Approved Revised Project Development Objective (If project is formally restructured)PHRPDODEL
To assist DAB to develop action plans for improved banking supervision and to establish key building blocks of financial sector infrastructure:
payment system, movable collateral registry, and public credit registry.
Name Previous Rating Current Rating
Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory
Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory
Overall Risk Rating High High
Components
Name
Strengthening the DAB's capacity:(Cost $8.00 M)
Development of the financial sector infrastructure:(Cost $14.70 M)
Technical assistance and training for project implementation:(Cost $3.00 M)
Overall Ratings
2. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 2 of 7
Public Disclosure Copy
Public Disclosure Copy
Implementation Status and Key Decisions
The project is implemented by the Central Bank of Afghanistan (Da Afghanistan Bank, DAB). The project supports (i) audits (financial, portfolio and
institutional) of ten commercial banks operating in Afghanistan and targeted technical assistance to DAB Financial Supervision Department; (ii)
development of financial sector infrastructure. This includes the modernization of the national payment system to facilitate payments within the country,
which involves the establishment of a Real Time Gross Settlement (RTGS), Automated Clearing House (ACH) and Central Securities Depository (CSD),
as one system, at DAB; and a national card and mobile payments switch at Afghan Payments Systems (APS, a consortium of commercial banks). This
also includes continuous support to the Public Credit Registry, Collateral Registry and Afghanistan Institute of Banking and Finance; and (iii) technical
assistance and training for project implementation.
The audits of the ten commercial banks were completed in June 2012, and presentations on the findings of the audits were given in June and July 2012
to development partners. The procurement process for targeted technical assistance to DAB Financial Supervision Department is underway.
The Collateral Registry (CR) and the Public Credit Registry (PCR) became fully operational in 2013 and 2014 respectively. This is a significant
achievement. CR is now utilized by all commercial banks and four microfinance institutions. DAB also indicated that as of end June 2015, more than
108,000 credit records were registered in the PCR system, of which around 40% records are for women. The PCR was well received in the Afghan
financial sector as a significant step forward to circumvent bureaucracy within financial institutions, reduce the cost of access to credit and systematic
risk. Stakeholders also recognized the role of the CR and PCR in bridging the credit information gap in the country.
The Automated Transfer System (ATS) that includes Real Time Gross Settlement System (RTGS), Automated Clearing House (ACH) and Centralized
Securities Depository (CSD) is well progressing. It is meant to modernize the national payment system for efficient and transparent payment
transactions. The ATS and its sub-components will reflect on enhancing financial intermediation and enabling safety and efficiency of the financial
system. It will also facilitate financial inclusion and service delivery and outreach through building the required infrastructure for more efficient payment
services. The procurement of the (ATS) is underway as the draft contract between DAB and the awarded firm was initialed, the draft was reviewed and
approved by the Bank and the National Procurement Authority and is now being finalized to move ahead with implementation.
The Afghan Payment System (APS) component is now entering the User Acceptance Testing (UAT) phase; the APS team should expedite the other
critical activities identified in the MTR to be completed before Go-Live. The APS will ensure interconnecting Afghan Banks (participants) with the main
datacenter in Kabul and the Dubai backup data center. Once the APS is operationally ready, it will serve its potential participants in terms of being able
to bring their ATMs, Point of Sale (POS) terminals, agents and cards on to the APS platform. Accordingly, enhance the efficiency of electronic
payments, reduce transaction costs and foster financial intermediation. The switch should go live by end December 2015.
DAB senior management is committed to reforming AIBF, a consultant was hired to advice on the reform action plan that was presented to AIBF’s
Board of Directors (BoD) in July 2015. DAB is currently appointing an able and competent Executive Director who will be mandated by AIBF BoD to fully
adopt the reform plan. This will be finalized by end of December 2015.
3. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 3 of 7
Public Disclosure Copy
Public Disclosure Copy
Risks
Systematic Operations Risk-rating Tool
Risk Category Rating at Approval Previous Rating Current Rating
Political and Governance -- High High
Macroeconomic -- High High
Sector Strategies and Policies -- High High
Technical Design of Project or Program -- Substantial Substantial
Institutional Capacity for Implementation and
Sustainability
-- Substantial Substantial
Fiduciary -- Substantial Substantial
Environment and Social -- Low Low
Stakeholders -- Substantial Substantial
Other -- -- --
Overall -- High High
Results
Project Development Objective Indicators
PHINDPDOTBL
Actions plans developed, with initial implementation monitored,for the ten banks audited (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value No action plan
Targeted TA on
banking supervision
under procurement
Targeted TA on banking
supervision under
procurement
Action plans
under
implementation
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
4. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 4 of 7
Public Disclosure Copy
Public Disclosure Copy
PHINDPDOTBL
Payment system conforms to international norms (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value Not conform Not conform Not conform Conform
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
Overall Comments
Intermediate Results Indicators
PHINDIRITBL
Audit reports completed highlighting strengths and weaknesses of each bank (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value
No audit
reports to
international
standards
Audits completed Audits completed
Audits
completed
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
PHINDIRITBL
RTGS operational and transactions settled in real time by end of project (Text, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value No RTGS No RTGS No RTGS
RTGS
operational
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
PHINDIRITBL
Number of commercial banks’ staff trained in AIBF reaches 4,500 by end of project (Text, Custom Breakdown)
Baseline Actual (Previous) Actual (Current) End Target
Value 1017 4235 4235 4500
Date 01-Aug-2011 02-Jun-2015 02-Jun-2015 30-Jun-2016
5. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 5 of 7
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Effective Financial SupervisionDepartment (FSD) organization with training processes in place toensure sustainable
capacitydevelopment (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value
Revised FSD
organization
approved by
DAB
Procurement of TA for
Financial Supervision
Department underway
Procurement of TA for
Financial Supervision
Department underway
Continuous
implementation
of action plan
Date 01-Nov-2013 02-Jun-2015 02-Jun-2015 30-Jun-2016
PHINDIRITBL
Approval by DAB of financial sector regulations ensuring consistency with international standards (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value
Afghanistan financial
sector regulations not fully
aligned with international
standards
Banking law under
review at Parliament.
Regulations will be
finalized after approval
of the banking law. TA
for Financial
Supervision
Department under
procurement
Banking law under
review at Parliament.
Regulations will be
finalized after approval
of the banking law. TA
for Financial Supervision
Department under
procurement
Key regulations
approved
Date 01-Nov-2013 02-Jun-2015 02-Jun-2015 30-Jun-2016
PHINDIRITBL
Interbank payment (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value
T+1 for Kabul area and
T+3 for other areas
T+1 for Kabul area and
T+3 for other areas
T+1 for Kabul area and
T+3 for other areas
Same day all
over
Afghanistan
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
PHINDIRITBL
Card payment system (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value No interbank card system
Implementation of
interbank card system
underway. Switch to go
live by end December
2015.
Implementation of
interbank card system
underway. Switch to go
live by end December
2015.
System
operational
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
6. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 6 of 7
Public Disclosure Copy
Public Disclosure Copy
PHINDIRITBL
Rating of national payment system (Text, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value
Low: a, e, f; Med-low: d;
n.a. b, c
Low: a, e, f; Med-low:
d; n.a. b, c
Low: a, e, f; Med-low: d;
n.a. b, c
Med-High: a, b,
d, f; Med-Low:
c, e
Date 01-Aug-2011 02-Jun-2015 07-Oct-2015 30-Jun-2016
PHINDIRITBL
Increase in the number of creditreports sent by the Public Credit Registry to commercial banks (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 0.00 1370.00 1370.00 25000.00
Date 01-Nov-2013 02-Jun-2015 07-Oct-2015 30-Jun-2016
PHINDIRITBL
Increase in the number of items of collateral registered in the Collateral Registry (Number, Custom)
Baseline Actual (Previous) Actual (Current) End Target
Value 815.00 3687.00 3687.00 2000.00
Date 01-Nov-2013 02-Jun-2015 07-Oct-2015 30-Jun-2016
Overall Comments
Data on Financial Performance
Disbursements (by loan)
Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed
P119047 IDA-H7320 Effective XDR 11.90 11.90 0.00 6.66 5.24 56%
P119047 IDA-H8930 Effective XDR 4.40 4.40 0.00 1.76 2.64 40%
Key Dates (by loan)
7. The World Bank Implementation Status & Results Report
Financial Sector Rapid Response Project (P119047)
1/10/2016 Page 7 of 7
Public Disclosure Copy
Public Disclosure Copy
Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date
P119047 IDA-H7320 Effective 25-Aug-2011 27-Aug-2011 06-Sep-2011 30-Jun-2014 30-Jun-2016
P119047 IDA-H8930 Effective 26-Nov-2013 10-Mar-2014 04-Jun-2014 30-Jun-2016 30-Jun-2016
Cumulative Disbursements
Restructuring History
Level 2 Approved on 26-Jan-2015
Related Project(s)
P147624-Additional Financing to Financial Sector Rapid Response Project