Abortion Pill Prices Midridge Park ](+27832195400*)[ 🏥 Women's Abortion Clinic In Midridge Park ● Abortion Pills For Sale In Midridge Park ● Midridge Park 🏥🚑!!
Abortion Pill Prices Midridge Park ](+27832195400*)[ 🏥 Women's Abortion Clinic In Midridge Park ● Abortion Pills For Sale In Midridge Park ● Midridge Park 🏥🚑!!
Measures in SQL (SIGMOD 2024, Santiago, Chile)Julian Hyde
SQL has attained widespread adoption, but Business Intelligence tools still use their own higher level languages based upon a multidimensional paradigm. Composable calculations are what is missing from SQL, and we propose a new kind of column, called a measure, that attaches a calculation to a table. Like regular tables, tables with measures are composable and closed when used in queries.
SQL-with-measures has the power, conciseness and reusability of multidimensional languages but retains SQL semantics. Measure invocations can be expanded in place to simple, clear SQL.
To define the evaluation semantics for measures, we introduce context-sensitive expressions (a way to evaluate multidimensional expressions that is consistent with existing SQL semantics), a concept called evaluation context, and several operations for setting and modifying the evaluation context.
A talk at SIGMOD, June 9–15, 2024, Santiago, Chile
Authors: Julian Hyde (Google) and John Fremlin (Google)
https://doi.org/10.1145/3626246.3653374
Orca: Nocode Graphical Editor for Container OrchestrationPedro J. Molina
Tool demo on CEDI/SISTEDES/JISBD2024 at A Coruña, Spain. 2024.06.18
"Orca: Nocode Graphical Editor for Container Orchestration"
by Pedro J. Molina PhD. from Metadev
More Related Content
More from Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
Measures in SQL (SIGMOD 2024, Santiago, Chile)Julian Hyde
SQL has attained widespread adoption, but Business Intelligence tools still use their own higher level languages based upon a multidimensional paradigm. Composable calculations are what is missing from SQL, and we propose a new kind of column, called a measure, that attaches a calculation to a table. Like regular tables, tables with measures are composable and closed when used in queries.
SQL-with-measures has the power, conciseness and reusability of multidimensional languages but retains SQL semantics. Measure invocations can be expanded in place to simple, clear SQL.
To define the evaluation semantics for measures, we introduce context-sensitive expressions (a way to evaluate multidimensional expressions that is consistent with existing SQL semantics), a concept called evaluation context, and several operations for setting and modifying the evaluation context.
A talk at SIGMOD, June 9–15, 2024, Santiago, Chile
Authors: Julian Hyde (Google) and John Fremlin (Google)
https://doi.org/10.1145/3626246.3653374
Orca: Nocode Graphical Editor for Container OrchestrationPedro J. Molina
Tool demo on CEDI/SISTEDES/JISBD2024 at A Coruña, Spain. 2024.06.18
"Orca: Nocode Graphical Editor for Container Orchestration"
by Pedro J. Molina PhD. from Metadev
Everything You Need to Know About X-Sign: The eSign Functionality of XfilesPr...XfilesPro
Wondering how X-Sign gained popularity in a quick time span? This eSign functionality of XfilesPro DocuPrime has many advancements to offer for Salesforce users. Explore them now!
DECODING JAVA THREAD DUMPS: MASTER THE ART OF ANALYSISTier1 app
Are you ready to unlock the secrets hidden within Java thread dumps? Join us for a hands-on session where we'll delve into effective troubleshooting patterns to swiftly identify the root causes of production problems. Discover the right tools, techniques, and best practices while exploring *real-world case studies of major outages* in Fortune 500 enterprises. Engage in interactive lab exercises where you'll have the opportunity to troubleshoot thread dumps and uncover performance issues firsthand. Join us and become a master of Java thread dump analysis!
Why Apache Kafka Clusters Are Like Galaxies (And Other Cosmic Kafka Quandarie...Paul Brebner
Closing talk for the Performance Engineering track at Community Over Code EU (Bratislava, Slovakia, June 5 2024) https://eu.communityovercode.org/sessions/2024/why-apache-kafka-clusters-are-like-galaxies-and-other-cosmic-kafka-quandaries-explored/ Instaclustr (now part of NetApp) manages 100s of Apache Kafka clusters of many different sizes, for a variety of use cases and customers. For the last 7 years I’ve been focused outwardly on exploring Kafka application development challenges, but recently I decided to look inward and see what I could discover about the performance, scalability and resource characteristics of the Kafka clusters themselves. Using a suite of Performance Engineering techniques, I will reveal some surprising discoveries about cosmic Kafka mysteries in our data centres, related to: cluster sizes and distribution (using Zipf’s Law), horizontal vs. vertical scalability, and predicting Kafka performance using metrics, modelling and regression techniques. These insights are relevant to Kafka developers and operators.
Odoo releases a new update every year. The latest version, Odoo 17, came out in October 2023. It brought many improvements to the user interface and user experience, along with new features in modules like accounting, marketing, manufacturing, websites, and more.
The Odoo 17 update has been a hot topic among startups, mid-sized businesses, large enterprises, and Odoo developers aiming to grow their businesses. Since it is now already the first quarter of 2024, you must have a clear idea of what Odoo 17 entails and what it can offer your business if you are still not aware of it.
This blog covers the features and functionalities. Explore the entire blog and get in touch with expert Odoo ERP consultants to leverage Odoo 17 and its features for your business too.
An Overview of Odoo ERP
Odoo ERP was first released as OpenERP software in February 2005. It is a suite of business applications used for ERP, CRM, eCommerce, websites, and project management. Ten years ago, the Odoo Enterprise edition was launched to help fund the Odoo Community version.
When you compare Odoo Community and Enterprise, the Enterprise edition offers exclusive features like mobile app access, Odoo Studio customisation, Odoo hosting, and unlimited functional support.
Today, Odoo is a well-known name used by companies of all sizes across various industries, including manufacturing, retail, accounting, marketing, healthcare, IT consulting, and R&D.
The latest version, Odoo 17, has been available since October 2023. Key highlights of this update include:
Enhanced user experience with improvements to the command bar, faster backend page loading, and multiple dashboard views.
Instant report generation, credit limit alerts for sales and invoices, separate OCR settings for invoice creation, and an auto-complete feature for forms in the accounting module.
Improved image handling and global attribute changes for mailing lists in email marketing.
A default auto-signature option and a refuse-to-sign option in HR modules.
Options to divide and merge manufacturing orders, track the status of manufacturing orders, and more in the MRP module.
Dark mode in Odoo 17.
Now that the Odoo 17 announcement is official, let’s look at what’s new in Odoo 17!
What is Odoo ERP 17?
Odoo 17 is the latest version of one of the world’s leading open-source enterprise ERPs. This version has come up with significant improvements explained here in this blog. Also, this new version aims to introduce features that enhance time-saving, efficiency, and productivity for users across various organisations.
Odoo 17, released at the Odoo Experience 2023, brought notable improvements to the user interface and added new functionalities with enhancements in performance, accessibility, data analysis, and management, further expanding its reach in the market.
The Comprehensive Guide to Validating Audio-Visual Performances.pdfkalichargn70th171
Ensuring the optimal performance of your audio-visual (AV) equipment is crucial for delivering exceptional experiences. AV performance validation is a critical process that verifies the quality and functionality of your AV setup. Whether you're a content creator, a business conducting webinars, or a homeowner creating a home theater, validating your AV performance is essential.
Enhanced Screen Flows UI/UX using SLDS with Tom KittPeter Caitens
Join us for an engaging session led by Flow Champion, Tom Kitt. This session will dive into a technique of enhancing the user interfaces and user experiences within Screen Flows using the Salesforce Lightning Design System (SLDS). This technique uses Native functionality, with No Apex Code, No Custom Components and No Managed Packages required.
What to do when you have a perfect model for your software but you are constrained by an imperfect business model?
This talk explores the challenges of bringing modelling rigour to the business and strategy levels, and talking to your non-technical counterparts in the process.
Consistent toolbox talks are critical for maintaining workplace safety, as they provide regular opportunities to address specific hazards and reinforce safe practices.
These brief, focused sessions ensure that safety is a continual conversation rather than a one-time event, which helps keep safety protocols fresh in employees' minds. Studies have shown that shorter, more frequent training sessions are more effective for retention and behavior change compared to longer, infrequent sessions.
Engaging workers regularly, toolbox talks promote a culture of safety, empower employees to voice concerns, and ultimately reduce the likelihood of accidents and injuries on site.
The traditional method of conducting safety talks with paper documents and lengthy meetings is not only time-consuming but also less effective. Manual tracking of attendance and compliance is prone to errors and inconsistencies, leading to gaps in safety communication and potential non-compliance with OSHA regulations. Switching to a digital solution like Safelyio offers significant advantages.
Safelyio automates the delivery and documentation of safety talks, ensuring consistency and accessibility. The microlearning approach breaks down complex safety protocols into manageable, bite-sized pieces, making it easier for employees to absorb and retain information.
This method minimizes disruptions to work schedules, eliminates the hassle of paperwork, and ensures that all safety communications are tracked and recorded accurately. Ultimately, using a digital platform like Safelyio enhances engagement, compliance, and overall safety performance on site. https://safelyio.com/
WMF 2024 - Unlocking the Future of Data Powering Next-Gen AI with Vector Data...Luigi Fugaro
Vector databases are transforming how we handle data, allowing us to search through text, images, and audio by converting them into vectors. Today, we'll dive into the basics of this exciting technology and discuss its potential to revolutionize our next-generation AI applications. We'll examine typical uses for these databases and the essential tools
developers need. Plus, we'll zoom in on the advanced capabilities of vector search and semantic caching in Java, showcasing these through a live demo with Redis libraries. Get ready to see how these powerful tools can change the game!
Liberarsi dai framework con i Web Component.pptxMassimo Artizzu
In Italian
Presentazione sulle feature e l'utilizzo dei Web Component nell sviluppo di pagine e applicazioni web. Racconto delle ragioni storiche dell'avvento dei Web Component. Evidenziazione dei vantaggi e delle sfide poste, indicazione delle best practices, con particolare accento sulla possibilità di usare web component per facilitare la migrazione delle proprie applicazioni verso nuovi stack tecnologici.
A Comprehensive Guide on Implementing Real-World Mobile Testing Strategies fo...kalichargn70th171
In today's fiercely competitive mobile app market, the role of the QA team is pivotal for continuous improvement and sustained success. Effective testing strategies are essential to navigate the challenges confidently and precisely. Ensuring the perfection of mobile apps before they reach end-users requires thoughtful decisions in the testing plan.
Abortion Pill Prices Midridge Park ](+27832195400*)[ 🏥 Women's Abortion Clinic In Midridge Park ● Abortion Pills For Sale In Midridge Park ● Midridge Park 🏥🚑!!
1. OVER PAGE (1st page)
PROJECT SHEET
SPECIAL TELEFOOD FUND
COUNTRY: CAMEROON
Project title: ______________________________________________________
Name of Beneficiary Group: __________________________________________
Project site (region, district, village, etc.) _________________________________
Planned start date: ___________________________________
Expected closing date: ___________________________
Budget (FAO contribution, in FCFA): ______________________
Name of the co-financing organization (if applicable):
__________________________________________________________________
Project links: _____________________________________________________
2. CONTENT OF THE PROJECT
1. Beneficiary group
Project targeting is essential for the success of a project. We will describe here the group (s)
of small farmers, shepherds, fishermen, manufacturers, or schools that will lead the project
and will benefit directly from it. This description must indicate the name of the group (or
school) and its site (name of the town or village, the date on which it was constituted /
organized, its purpose, the number of members (including the percentage women and / or
young people), etc.
Direct beneficiaries are those who participate in the project, on the one hand by contributing
financially or in kind to the community fund and on the other hand by receiving financial
benefits from the latter.
With regard to schools, orphanages and similar institutes, the benefits for the direct
beneficiaries (children) must be indicated very clearly in the project documentation and the
amount of their contribution (in terms of work) must also be specified. .
The description of direct beneficiaries should include their level of (economic) poverty and
their food security status. Parameters such as: Gross national product (GNP) / capita (if
available), income relative to the national poverty line (if available), family size, housing
conditions, land, other assets, etc., must be used as determining elements.
The proposal should also identify and assess the number of secondary (indirect)
beneficiaries - families or communities of people involved in the project - who will benefit
from the project, for example, through improved diets or 'purchase of agricultural products
from project activities.
2. General and justification of the project
This section should describe the geographic area concerned (site, climate, cropping system,
etc.). It will be necessary to highlight the poverty level of the beneficiary group and among
the problems of the beneficiary group, those that the project will seek to resolve. Any
development initiatives implemented by the government and local populations will also be
reported. We will also indicate the organizations, institutions or local NGOs participating
concretely (and / or financially) in the activities of the project, and we will illustrate their role.
Special attention will be given to FAO activities, more particularly those of FAO Programs -
MINADER / DOPA or other - in the project area, emphasizing the synergies between the
TeleFood project and the broader ongoing program.
3. Project objective
This section will describe, in a short and clear manner, the objective that the project is
expected to achieve. It could be for example "to help the members of the group (or of the
cooperative) to increase their production of fruits and vegetables", to "provide inputs to
improve the production of small animals", to "improve income by reducing post-harvest
losses in artisanal fisheries ", etc. The immediate objectives must be mentioned in concrete
and measurable terms.
The project should not promote the introduction of complex or particularly innovative
techniques, new to the community concerned or likely to be unsustainable. TeleFood cannot
be used to fund adaptive research or the dissemination of the latest techniques.
4. Description and duration of the Project
A very detailed description of the project is requested, clearly explaining how the project will
be carried out. All quantifiable project parameters should be included, for example: cultivated
area and description of crops, number of animals provided to each family, indication of how
tools and construction materials will be distributed among all beneficiaries, or managed
individually. Parameters like: yield per hectare, milk production per animal, egg production,
slaughter weight etc. Should be used to describe the quantities of products expected during
the first year of operation.
The duration of the project (i.e. from TeleFood fund to project), should be specified in the
proposal. The duration should not exceed 12 months. It should be mentioned in the project
documentation whether the project implementation period refers to: the sowing or harvesting
season, the rainy season, the fishing ban period, etc.
3. 5. Project activities or activity schedule
The proposal should contain a list of the main activities to be carried out month by month
(giving a precise timetable) to achieve the objective of the project. They should be presented
in the form of a simple work plan, indicating for each activity the entity that will have to
ensure its implementation and the period of execution.
6. Project Results
It will be necessary to indicate here the results that the project should allow to obtain. These
results should be tangible and measurable products of the activities undertaken under the
project, and compatible with the intended objectives. This could be, for example, the
establishment of a marketing system intended to open up more lucrative markets for
producers; establishing a low-cost post-harvest system to reduce crop losses; the
establishment of a fruit tree nursery of a certain size, well managed and the start of a
process of multiplication of the plants; the production, breeding and marketing of a certain
number of lambs or kids, etc. Unit selling prices must be mentioned.
7. Inputs / Budget or descriptive estimate
A detailed list of inputs will need to be drawn up. All inputs should, as far as possible, be
obtained locally (see above, in section B of the General Guidelines, for inputs which may or
may not be financed by TeleFood. (Ineligible inputs will delay, or prevent, approval of the
project proposal).
A detailed list of all inputs is required, including quantities and unit price. It refers to the
following supplies: building materials, tools, seeds, fertilizer, animal feed, veterinary
equipment, irrigation equipment, etc.
Exemple de plan de travail concernant un hypothétique projet d’apiculture (Il s'agit là d'un
exemple. Les responsabilités effectives peuvent différer d'un projet à l'autre, selon les nécessités).
- Organisation des bénéficiaires en groupe Bénéficiaires Mois 1
- Spécification du matériel et des fournitures Fonctionnaire National (Ministère) Mois 1
- Recherche de devis pour le matériel/fournitures FAO Mois 1
- Constitution d'un fonds communautaire Bénéficiaires Mois 1
- Commande du matériel et des fournitures FAO Mois 1 – 2
- Livraison du matériel et des fournitures FAO/Ministère Mois 3
- Construction et peinture des ruches Bénéficiaires Mois 3-4
- Préparation/présentation du rapport intérimaire Fonctionnaire National /FAO Mois 4
- Récolte du miel (ruches en exploitation) Bénéficiaires Mois 4 – 12
- Formation aux méthodes d'apiculture modernes FonctionnaireTechnique (Ministère)Mois 5
- Formation à la petite entreprise/commercialisation ONG collaborant au projet Mois 6
- Traitement du miel (ruches en exploitation) Bénéficiaires Mois 4 – 12
- Distribution et vente Bénéficiaires Mois 4 – 12
- Préparation/présentation du rapport final Fonctionnaire national /FAO Mois 13
Example of a work plan for a hypothetical beekeeping project (This is an example. The actual
responsibilities may differ from project to project, depending on the needs).
- Organization of beneficiaries as a group Beneficiaries Month 1
- Specification of equipment and supplies National Civil Servant (Ministry) Month 1
- Search for quotes for CAM equipment / supplies Month 1
- Constitution of a community fund Beneficiaries Month 1
- Order CAM equipment and supplies Months 1 - 2
- Delivery of equipment and supplies FAO / Ministry Month 3
- Construction and painting of beehives Beneficiaries Months 3-4
- Preparation / presentation of the interim report National Official / FAO Month 4
- Honey harvest (hives in operation) Beneficiaries Months 4 - 12
- Training in modern beekeeping methods Technical Officer (Ministry) Month 5
- Small business training / NGO marketing collaborating in the project Month 6
- Honey treatment (beehives in operation) Beneficiaries Months 4 - 12
- Distribution and sale Beneficiaries Months 4 - 12
- Preparation / presentation of the final report National official / FAO Month 13
4. The contribution of the group (s), for example in the form of labor, land, buildings or other
inputs, should be declared in the project proposal in order to indicate their degree of
commitment and level of participation. In the case of school vegetable gardens, the
participation of parents will be promoted.
A budget summary should be presented, showing the subtotal by type of input, including
contributions from FAO and cofinancing agencies / institutions, indicated by name:
Fournitures FAO
(FCFA)
OTHER
DONOR
(FCFA)
Total
(FCFA)
Tools
Construction materials
Food for animals
Fertilizer
Veterinary equipment and supplies
Pesticides
Cheptel, alevins Livestock, fry
seeds, planting material
Other field supplies / transport
Total (maximum FAO contribution 5,000,000
FCFA)
8. Simple cost / benefit analysis
A simple cost / benefit analysis will be presented to highlight the financial viability of the
project and its long term sustainability. The project must be able to create enough funds to
cover operational costs (seeds, fertilizers, feed, fry, animals, etc.) as well as the annual
depreciation of non-consumable inputs (buildings, greenhouses, boats, tools, etc.). water
tanks, treatment, installation and equipment, fishing nets, etc.).
To simplify the calculation, we consider a fixed rate of depreciation of 20% for all non-
consumable inputs. Therefore, the annual cost will equal the sum of operating costs plus
20% of the value of non-consumable inputs.
9. Risks
Most projects involve risks that could jeopardize their success (for example, adverse weather
conditions, social unrest or insecurity, interruption of the supply of inputs, pest or disease
outbreaks that may cause death or reduce yield, etc.). If this is the case, the possible risks
should be pointed out in the project document, with indications of how the project participants
will deal with such risks, should they arise.
10. Project links
Links with other ongoing development projects should be indicated in the project proposal,
specifying whether they are projects financed by FAO (preferably within the framework of
MINADER / DOPA, where the latter is operational, but also Decentralized Cooperation
projects (PCDG) PCT, GCP, UTF, or other) or by other sources (other United Nations
agencies, bilateral aid projects, NGOs, etc.). The decentralized services of MINADER will be
involved. These links must be clearly indicated in the evaluation form when presenting the
project.
11. Community fund
The community fund is an important instrument to ensure the smooth running of operations
and the long-term sustainability of the project. All beneficiaries (except in school vegetable
garden projects) should participate in the fund. All contributions in cash or in kind paid by
beneficiaries or by a third party must go into the fund.
Project profits must be deposited in the fund so that there is sufficient liquidity to meet the
needs of the project, and cover operational costs, maintenance costs and annual
depreciation. The management of the fund must be clearly indicated.
12. Technical support, supervision, monitoring and reporting arrangements
5. The project proposal should specify who is responsible for the overall management and
monitoring of project activities and how this monitoring will be carried out. The person in
charge is usually the designated national official (MINADER / DOPA executive), but it could
equally well be the representative of an NGO participating in the project or (although more
rarely) an official from the target group. himself.
The proposal should also indicate which organization and / or individuals will provide any
necessary technical guidance and advice, or provide training to the group if necessary.
Technical guidelines should emanate from FAO (through a MINADER / DOPA framework, for
example) or from a source approved by the Organization. Finally, it will be necessary to
indicate who will be responsible for preparing the interim report (three months after the start
of the project) and the final report (after TeleFood funding).