February 2018
1
Forward Looking Statements
Some of the statements in this document may be deemed to be “forward-looking statements”. All
statements in this document, other than statements of historical facts, that address events or
developments that management of the Company expects, are forward-looking statements.
Although reasonable assumptions, such statements are not guarantees of future performance and
actual results or developments may differ materially from those in the forward-looking statements.
The Company undertakes no obligation to update these forward-looking statements if
management’s beliefs, estimates or opinions, or other factors, should change. Factors that could
cause actual results to differ materially from those in the forward-looking statements, include
market prices, exploration and development successes, continued availability of capital and
financing, and general economic, market or business conditions. Please see the public filings of
the Company at www.sedar.com for further information.
Qualified Person
Cornell McDowell, P. Geo., V.P. of Exploration for Aben is the Qualified Person as defined by
National Instrument 43-101 and has reviewed and approved the technical information in this
presentation.
2
2
Aben Trading Symbols
TSX-Venture Exchange: ABN
US OTC Pink Symbol: ABNAF
Frankfurt Exchange: E2L2
Shares Outstanding: 62,698,776
Fully Diluted Shares: 93,734,665
Recent Share Price: CDN $0.16
Market Capitalization: CDN $10.0 million
3
3
Aben Stock Chart
4
4
c• THREE HIGHLY PROSPECTIVE GOLD PROJECTS IN GEOPOLITICALLY
FAVOURABLE WESTERN CANADA
The flagship Forrest Kerr Project located in BC’s Golden Triangle region proximal to recent
discoveries made by GT Gold and Colorado Resources
The Chico Project located in Saskatchewan which was recently ranked the #1 mining jurisdiction
globally by the Fraser Institute
The Justin Project located in the Yukon adjacent to Golden Predator’s 3 Aces Project
• SIGNIFICANT HISTORIC WORK HAS BEEN PERFORMED ON ALL PROJECTS
INCLUDING HIGH GRADE GOLD IN PREVIOUS DRILLING; ROBUST UPSIDE
DISCOVERY POTENTIAL REMAINING
• EXPERIENCED MANAGEMENT TEAM WITH PROVEN TRACK RECORDS OF
SUCCESS AND FOCUSED EXPERTISE IN WESTERN CANADA
5
5
Aben’s Investment Highlights
Management, Directors and Advisory Board
Ronald Netolitzky, M.Sc. Geology: Director, Chairman
Ron Netolitzky serves as Chairman of the Board of Aben Resources. Mr. Netolitzky holds a Bachelor of Science degree from the University of
Alberta and a M.Sc. degree from the University of Calgary, both in geological sciences. He has had an illustrious career in the mining and
exploration industry with over 40 years of experience and having been directly associated with three major gold discoveries in Canada that
subsequently went into production: Eskay Creek, Snip and Brewery Creek. Notably, two of these deposits and mines, Esaky Creek and Snip,
are located in the Golden Triangle of British Columbia. In 2006, his Viceroy Exploration was acquired by Yamana Gold Inc. for its Gualcamayo
gold deposit for $577 million. Mr. Netolitzky has been honored with the Prospector of the Year award from the PDAC, and Developer of the
Year award from the BC & Yukon Chamber of Mines. In 2015, he was inducted into the Canadian Mining Hall of Fame.
James G. Pettit: Director, President & CEO
Jim Pettit has been President & CEO and a Director of Aben Resources since November 2002. Mr. Pettit is currently serving on the board of
directors of five publicly traded companies and offers over 30 years of experience within the industry specializing in finance, corporate
governance, executive management and compliance. Jim was previously Chairman and CEO of Bayfield Ventures Corp. which was acquired
by New Gold Inc. in 2014.
Timothy Termuende: P.Geo., Director
Tim Termuende serves as a Director of Aben Resources and is a professional geologist with over 30 years experience in the mineral
exploration industry and is a Qualified Person as defined by National Instrument 43-101. Since earning his degree in Geological Sciences at
the University of British Columbia in 1987, Mr. Termuende has worked on exploration projects throughout North, Central, and South America
and has been personally involved in exploration at and around Aben’s flagship project, Forrest Kerr in the Golden Triangle, since the early
1990's. He has been continuously active in mineral exploration throughout western Canada since 1976, and currently oversees a broad range
of ongoing exploration projects located throughout British Columbia, Saskatchewan, the Yukon and the Northwest Territories.
6
Cornell McDowell, P.Geo., Vice President of Exploration & Qualified Person
Cornell McDowell is a professional geologist registered in both Alberta and British Columbia and serves as Vice President of Exploration for
Aben Resources Ltd. and is the Qualified Person. He has been self-employed as a geological consultant since graduating with a Bachelor of
Science (Specialization in Geology) from the University of Alberta in 2005. He has worked with both privately held and publicly listed mineral
exploration corporations, most recently with Gold Reach Resources on the Ootsa Project, where in excess of 100,000 meters of drilling has
advanced the project from initial stage through resource development to the delivery of a positive PEA. He also serves on the Board of
Directors and Audit Committee for Manson Creek Resources Ltd.
Michael Roberts: Ph.D., P.Geo., Technical Advisory Board
Mike is a professional geologist with over 15 years of experience in mineral exploration and was recently the V.P. of Exploration for Kiska
Metals Corporation. As a field geologist for several junior exploration companies and as V.P. for Kiska, Mike has conducted and managed
grassroots to advanced exploration programs for base and breccia metals in North America and Australia, typically in partnerships with major
mining companies. Mike is passionate about the mineral potential of B.C., and has been actively involved in exploration programs in the
Forrest Kerr area since 2005.
Henry Awmack: P.Geo., Technical Advisory Board
Henry has over 30 years of experience in the mining industry. As a co-founder of Equity Engineering Ltd. in 1987, Mr. Awmack has managed
all aspects of a geological consulting and contracting firm including project planning and execution, hiring of field crews, geological fieldwork,
property examinations and preparation of technical reports. He has worked around the world exploring for a variety of commodities and has
extensive "on the ground" experience in the Forrest Kerr area in B.C. Mr. Awmack holds a B.Sc. (Honours) Applied Science in Geological
Engineering from the University of British Columbia and is registered as a professional engineer with the Association of Professional
Engineers and Geoscientists of British Columbia. 7
Management, Directors and Advisory Board
Eskay, Snip,
Brewery
Creek
• Ron Netolitzky has been directly associated with three major gold
discoveries in Canada that have subsequently been put into production: Two
of which are in the Golden Triangle
• Eskay Creek, Snip and Brewery Creek
Producing
Viceroy
Exploration
(TSX-V:
VYE)
• Mr. Netolitzky was previously Chairman and President of Viceroy Exploration
Ltd., which achieved exploration success with its Gualcaymayo gold project
in Argentina
• Successfully sold the company to Yamana Gold in 2006 for $577M
Sold
Bayfield
Ventures
(TSX-V:
BYV)
• Jim Pettit led the Bayfield team that made high grade gold discovery on
Bayfield Ventures’ Burns Block in Ontario
• Successfully sold the company to New Gold in 2014
Sold
Copper
Canyon
(TSX-V:
CPY)
• Tim Termuende was previously the President and CEO of Copper Canyon, a
copper exploration; the company made a high grade copper discovery in the
Golden Triangle
• Successfully sold the company to NovaGold in 2011
Sold
Aben
Resources
(TSX-V:
ABN)
• A gold exploration company with the goal of making the next high grade
discovery in BC’s Golden Triangle where Eskay Creek and Snip are located
with experienced management and technical team
Exploring
8
Management and Board’s Track Record of Success
9
• A stable, geopolitically favourable jurisdiction with an abundance of
mining and exploration activities
• This region has hosted significant mineral deposits including: Pretium
(Brucejack), Eskay Creek, Snip, Galore Creek, Copper Canyon, Schaft
Creek, KSM, Granduc, Red Chris and more
• Recent discoveries have reignited interest in the district including
discoveries made at Garibaldi’s E & L Property (tied onto the
southeast of Forrest Kerr), GT Gold’s Tatogga Property (north of
Forrest Kerr) as well as Colorado Resources’ KSM Property
(adjacent south of Forrest Kerr)
• Aben’s Forrest Kerr claim package encompasses in excess of 23,000
hectares which consists of a 40 km long north-south belt overlying
rocks of the Hazelton and Stuhini Groups, a complex assemblage of
volcanic accumulations with intervening sedimentary sequences which
are host to significant gold deposits in the Golden Triangle
• Aben can earn a 100% interest over the entire claim group by
expending $3,000,000 on exploration by June 2020
9
The Golden Triangle Region in NW British Columbia
• Despite the high grade historic drill results from the early 1990’s and
2000’s, limited follow up work has been carried out since then due to high
drilling costs / limited accessibility, historic glacier coverage, and a less
comprehensive understanding of the geology until recently
• Significant improvements to infrastructure recently have lowered
exploration costs and made the project more accessible:
 Forrest Kerr is now road accessible on both the north and south
portions of the property
 Northern road, Galore Creek access road, has cut through 9 km of
geology that is very prospective for hosting high grade gold deposits
and VMS style gold deposits
 AltaGas-owned 250 man camp located on property area
 Existing power line and power generation (hydroelectric facilities)
located on southern part of property
 Proposed power line transects northern portion of the property
• In addition, rapid glacial retreats over the past 25 years have exposed
extensive new areas of outcrop exposure in this highly prospective region
• Lastly, Aben's technical team has spent over a year analyzing and
reinterpreting the historical exploration and geological data with the
help of structural geologists to get a better understanding of the
existing targets and high grade gold mineralization at the project 10
Forrest Kerr Gold Project – A New Look
• Aben’s flagship gold project totals 23,000 hectares located in a world-
class gold district, B.C.’s Golden Triangle
• Acquisition through option agreements of the three properties that make
up the Forest Kerr Project
• Significant historic work has been performed across the whole project
area including previous drilling that returned high grade gold drill
intercepts
• Data compilation study has been performed incorporating all historic data;
regional scale approach to exploration and knowledge is now possible
• First season of fieldwork and drilling included but not be limited to the
testing of excellent drill results in historic holes:
 Boundary Zone drill hole RG91-16 returned 33.4 g/t Au over 11m
 Gossan Creek Zone has a large, relatively untested gold in soil
anomaly extending over 3 km
11
Aben’s Forrest Kerr Gold Project – Highlights
12
12
2017 Forrest Kerr Exploration Program
Aben’s Forrest Kerr 2017 Drill Results Highlights
13
First season of fieldwork and drilling has led to a significant discovery now called the North Boundary Zone. Significant assays
returned:
• FK17-04 returned 6.7 g/t (grams per tonne) Au, 6.4 g/t Ag and 0.9% Cu over 10.0 metres from 16.0 to 26.0 metres
depth. Within this interval was a section which returned 18.9 g/t Au, 16.6 g/t Ag and 2.2% Cu over 3.0 metres.
• FK17-05 returned a broad intercept of 1.2 g/t Au, 1.8 g/t Ag and 0.21% Cu over 122 metres that includes 10.9 g/t
Au, 14.6 g/t Ag and 1.5% Cu over 12 metres with a high grade core of 21.5 g/t Au, 28.5 g/t Ag and 3.1% Cu over 6
metres.
• FK17-06 returned 0.51 g/t Au, 1.03 g/t Ag and 0.1% Cu over 94 metres including 2.91 g/t Au, 5.2 g/t Ag and 0.6%
Cu over 14 metres.
• Boundary Zone mineralization remains open in multiple directions with numerous soil geochemical anomalies and
geophysical targets yet to be drill-tested. Aben will aggressively target the new discovery in 2018 with drilling and a
focused geological ground program.
• The zone displays a high degree of continuity for gold, silver and copper mineralization and is open to the East, West,
North and down-dip. 2017 drilling has shown that base and precious metal mineralization is combined in both a high
grade core and across broad intervals.
13
14
14
2017 Boundary North Exploration
15
15
2017 Boundary Zone Exploration
16
16
2017 Boundary Cross Section
17
17
2017 Forrest Kerr Soil Sampling Exploration
• Aben has option to earn up to 80% of Chico Gold Project 125
kilometres east of La Ronge, Saskatchewan and 40 kilometres
south of SSR Mining’s Seabee/Santoy mine complex; workable
all year round
• Seabee/Santoy achieved highest annual gold production in 26 year
history in 2016 @ 77,640 ounces from feed averaging 7.91 g/t Au
• SSR Mining acquired Seabee/Santoy through its acquisition of
Claude Resources in May 2016 with deal valued at $337 million
• Chico project has the same structural features as Seabee and
Santoy deposits and Chico trend extends over 1.5 km:
 Shear hosted gold bearing quartz veining in secondary splays
 Multi-episodic tension gash, ribbon and sheeted quartz vein
arrays
 Gabbro and granite host rocks
 Positive gold, copper and silver geochemical associations
 Potassic, carbonate, hematite, calc-silicate and silica alteration
18
18
Chico Gold Project – Highlights
• Significant, shallow gold intercepts in all historic holes drilled
including:
 0.424 oz/ton Au over 0.4m at Chico showing
 0.281 oz/ton Au over 2.0m at Royex
• Over 100 samples from Chico have graded > 500 ppb Au in eight
trenched areas; historic and 2016 soil samples consistently
anomalous along Chico trend with up to 4,523 ppb Au
• Completed IP Geophysical surveys to help refine identify additional
targets
• Project is drill ready and drilling permits have been obtained for
potential winter 2018 drill program:
 Drill along strike and to depth near previous high grade drill
intercepts
 Drill test soil/rock geochemical anomalies and intersecting
mineralized vectors
 Follow up on 2016 geochemical anomalies in context of new
structural interpretation and geophysical data 19
19
Chico Gold Project – Previous Exploration and
Future Plans
Chico 2016 Airborne Geophysics
• Effective in delineating diorite/gabbro lithology
Total Magnetics Vertical Gradient Magnetics
20
Chico Project 3D Chargeability Anomaly
21
21
Chico / Seabee / Santoy Similarities
• Shear hosted gold bearing quartz
veining in secondary splays
• Multi-episodic tension gash, ribbon
and sheeted quartz vein arrays
• Gabbro and granite host rocks
• Positive gold, copper and silver
geochemical associations
• Potassic, carbonate, hematite, calc-
silicate and silica alteration
22
Future Work at Chico
• Project is drill ready – drill permit is being
renewed and will be ready for February drill
program
– Along strike and to depth near previous high
grade intercepts
– Soil/rock geochemical anomalies
– intersecting mineralized vectors
• IP Geophysical survey has been completed over
entire shear zones
• Follow up 2016 geochemical anomalies in context
of new structural interpretation and geophysical
data
• Drill geochemical and co-responding
geophysical anomalies
23
24
• Aben owns a 100% interest in the 18,314 acre Justin Gold Project
in southeast Yukon adjacent to Golden Predator’s 3 Aces project
• The property has the potential to host both high-grade and bulk-
tonnage gold zones within three different styles of mineralization:
epithermal, skarn and sediment-hosted
• Wide spread mineralization across property in a NNW trending
anomaly measuring 3.5 km long and 0.5 km wide encompassing the
Confluence, Main, Kangas, and POW Zones
• Previous drilling encountered gold mineralization in holes drilled on
the POW Zone; discovery of a greenfields Intrusive Related Gold
System (IRGS) in 2011 drilling
24
Justin Gold Project, Yukon Territory
25
• Both phases of mineralization display geochemical affinity
to an Intrusion Related Gold System and indicates that the
mineralizing system was long-lived; notable IRGS deposits
within Tintina Gold Belt include Kinross' Fort Knox operation
in Alaska and Victoria Gold’s Eagle Gold Deposit
• A total of 4,014 metres was drilled in 19 holes during the
2011 & 2012 field seasons with 10 drill holes successfully
intersecting gold mineralization
• Significant drill results include hole JN11009 with 2.47 g/t
Au over 21m within 60m of 1.19 g/t Au, and hole JN12011
with 46.4m of 1.49 g/t Au
• The POW Zone exhibits strong continuity of
mineralization and remains open in all directions
25
25
Justin Gold Project – POW Zone Discovery
• Multi-phase precious metal mineralization has been discovered in the POW Zone: contact metamorphic skarn (massive
replacement style mineralization) and structurally controlled stockwork vein hosted mineralization
Justin Gold Project – NEW Gold-bearing Vein System;
LOST ACE ZONE
26
• Lost Ace Zone is located 2 kilometres along strike from POW Zone
• Gold-bearing vein system occurs in a geologic setting that is very similar to mineralization
present on Golden Predator’s 3 Aces Project located immediately NW of the Justin Claim
Group
• Gold grain count from a 3.8 kg bulk sample located 115 metres upslope from the Lost Ace
Zone returned 1135 visible gold grains of which 1049 gold grains were classified as pristine
suggesting close proximity to lode source
26
CONTACT INFO.
Jim Pettit: President & CEO
Don Myers: Investor Relations
Suite 1610, 777 Dunsmuir Street
Vancouver, BC, V7Y 1K4, CANADA
Tel: (604) 687-3376 Fax: (604) 687-3119
Toll Free: 1-800-567-8181
Web Site: www.abenresources.com
Email: info@abenresources.com
27

Aben Resources Ltd. Corporate Presentation

  • 1.
  • 2.
    Forward Looking Statements Someof the statements in this document may be deemed to be “forward-looking statements”. All statements in this document, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in the forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information. Qualified Person Cornell McDowell, P. Geo., V.P. of Exploration for Aben is the Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical information in this presentation. 2 2
  • 3.
    Aben Trading Symbols TSX-VentureExchange: ABN US OTC Pink Symbol: ABNAF Frankfurt Exchange: E2L2 Shares Outstanding: 62,698,776 Fully Diluted Shares: 93,734,665 Recent Share Price: CDN $0.16 Market Capitalization: CDN $10.0 million 3 3
  • 4.
  • 5.
    c• THREE HIGHLYPROSPECTIVE GOLD PROJECTS IN GEOPOLITICALLY FAVOURABLE WESTERN CANADA The flagship Forrest Kerr Project located in BC’s Golden Triangle region proximal to recent discoveries made by GT Gold and Colorado Resources The Chico Project located in Saskatchewan which was recently ranked the #1 mining jurisdiction globally by the Fraser Institute The Justin Project located in the Yukon adjacent to Golden Predator’s 3 Aces Project • SIGNIFICANT HISTORIC WORK HAS BEEN PERFORMED ON ALL PROJECTS INCLUDING HIGH GRADE GOLD IN PREVIOUS DRILLING; ROBUST UPSIDE DISCOVERY POTENTIAL REMAINING • EXPERIENCED MANAGEMENT TEAM WITH PROVEN TRACK RECORDS OF SUCCESS AND FOCUSED EXPERTISE IN WESTERN CANADA 5 5 Aben’s Investment Highlights
  • 6.
    Management, Directors andAdvisory Board Ronald Netolitzky, M.Sc. Geology: Director, Chairman Ron Netolitzky serves as Chairman of the Board of Aben Resources. Mr. Netolitzky holds a Bachelor of Science degree from the University of Alberta and a M.Sc. degree from the University of Calgary, both in geological sciences. He has had an illustrious career in the mining and exploration industry with over 40 years of experience and having been directly associated with three major gold discoveries in Canada that subsequently went into production: Eskay Creek, Snip and Brewery Creek. Notably, two of these deposits and mines, Esaky Creek and Snip, are located in the Golden Triangle of British Columbia. In 2006, his Viceroy Exploration was acquired by Yamana Gold Inc. for its Gualcamayo gold deposit for $577 million. Mr. Netolitzky has been honored with the Prospector of the Year award from the PDAC, and Developer of the Year award from the BC & Yukon Chamber of Mines. In 2015, he was inducted into the Canadian Mining Hall of Fame. James G. Pettit: Director, President & CEO Jim Pettit has been President & CEO and a Director of Aben Resources since November 2002. Mr. Pettit is currently serving on the board of directors of five publicly traded companies and offers over 30 years of experience within the industry specializing in finance, corporate governance, executive management and compliance. Jim was previously Chairman and CEO of Bayfield Ventures Corp. which was acquired by New Gold Inc. in 2014. Timothy Termuende: P.Geo., Director Tim Termuende serves as a Director of Aben Resources and is a professional geologist with over 30 years experience in the mineral exploration industry and is a Qualified Person as defined by National Instrument 43-101. Since earning his degree in Geological Sciences at the University of British Columbia in 1987, Mr. Termuende has worked on exploration projects throughout North, Central, and South America and has been personally involved in exploration at and around Aben’s flagship project, Forrest Kerr in the Golden Triangle, since the early 1990's. He has been continuously active in mineral exploration throughout western Canada since 1976, and currently oversees a broad range of ongoing exploration projects located throughout British Columbia, Saskatchewan, the Yukon and the Northwest Territories. 6
  • 7.
    Cornell McDowell, P.Geo.,Vice President of Exploration & Qualified Person Cornell McDowell is a professional geologist registered in both Alberta and British Columbia and serves as Vice President of Exploration for Aben Resources Ltd. and is the Qualified Person. He has been self-employed as a geological consultant since graduating with a Bachelor of Science (Specialization in Geology) from the University of Alberta in 2005. He has worked with both privately held and publicly listed mineral exploration corporations, most recently with Gold Reach Resources on the Ootsa Project, where in excess of 100,000 meters of drilling has advanced the project from initial stage through resource development to the delivery of a positive PEA. He also serves on the Board of Directors and Audit Committee for Manson Creek Resources Ltd. Michael Roberts: Ph.D., P.Geo., Technical Advisory Board Mike is a professional geologist with over 15 years of experience in mineral exploration and was recently the V.P. of Exploration for Kiska Metals Corporation. As a field geologist for several junior exploration companies and as V.P. for Kiska, Mike has conducted and managed grassroots to advanced exploration programs for base and breccia metals in North America and Australia, typically in partnerships with major mining companies. Mike is passionate about the mineral potential of B.C., and has been actively involved in exploration programs in the Forrest Kerr area since 2005. Henry Awmack: P.Geo., Technical Advisory Board Henry has over 30 years of experience in the mining industry. As a co-founder of Equity Engineering Ltd. in 1987, Mr. Awmack has managed all aspects of a geological consulting and contracting firm including project planning and execution, hiring of field crews, geological fieldwork, property examinations and preparation of technical reports. He has worked around the world exploring for a variety of commodities and has extensive "on the ground" experience in the Forrest Kerr area in B.C. Mr. Awmack holds a B.Sc. (Honours) Applied Science in Geological Engineering from the University of British Columbia and is registered as a professional engineer with the Association of Professional Engineers and Geoscientists of British Columbia. 7 Management, Directors and Advisory Board
  • 8.
    Eskay, Snip, Brewery Creek • RonNetolitzky has been directly associated with three major gold discoveries in Canada that have subsequently been put into production: Two of which are in the Golden Triangle • Eskay Creek, Snip and Brewery Creek Producing Viceroy Exploration (TSX-V: VYE) • Mr. Netolitzky was previously Chairman and President of Viceroy Exploration Ltd., which achieved exploration success with its Gualcaymayo gold project in Argentina • Successfully sold the company to Yamana Gold in 2006 for $577M Sold Bayfield Ventures (TSX-V: BYV) • Jim Pettit led the Bayfield team that made high grade gold discovery on Bayfield Ventures’ Burns Block in Ontario • Successfully sold the company to New Gold in 2014 Sold Copper Canyon (TSX-V: CPY) • Tim Termuende was previously the President and CEO of Copper Canyon, a copper exploration; the company made a high grade copper discovery in the Golden Triangle • Successfully sold the company to NovaGold in 2011 Sold Aben Resources (TSX-V: ABN) • A gold exploration company with the goal of making the next high grade discovery in BC’s Golden Triangle where Eskay Creek and Snip are located with experienced management and technical team Exploring 8 Management and Board’s Track Record of Success
  • 9.
    9 • A stable,geopolitically favourable jurisdiction with an abundance of mining and exploration activities • This region has hosted significant mineral deposits including: Pretium (Brucejack), Eskay Creek, Snip, Galore Creek, Copper Canyon, Schaft Creek, KSM, Granduc, Red Chris and more • Recent discoveries have reignited interest in the district including discoveries made at Garibaldi’s E & L Property (tied onto the southeast of Forrest Kerr), GT Gold’s Tatogga Property (north of Forrest Kerr) as well as Colorado Resources’ KSM Property (adjacent south of Forrest Kerr) • Aben’s Forrest Kerr claim package encompasses in excess of 23,000 hectares which consists of a 40 km long north-south belt overlying rocks of the Hazelton and Stuhini Groups, a complex assemblage of volcanic accumulations with intervening sedimentary sequences which are host to significant gold deposits in the Golden Triangle • Aben can earn a 100% interest over the entire claim group by expending $3,000,000 on exploration by June 2020 9 The Golden Triangle Region in NW British Columbia
  • 10.
    • Despite thehigh grade historic drill results from the early 1990’s and 2000’s, limited follow up work has been carried out since then due to high drilling costs / limited accessibility, historic glacier coverage, and a less comprehensive understanding of the geology until recently • Significant improvements to infrastructure recently have lowered exploration costs and made the project more accessible:  Forrest Kerr is now road accessible on both the north and south portions of the property  Northern road, Galore Creek access road, has cut through 9 km of geology that is very prospective for hosting high grade gold deposits and VMS style gold deposits  AltaGas-owned 250 man camp located on property area  Existing power line and power generation (hydroelectric facilities) located on southern part of property  Proposed power line transects northern portion of the property • In addition, rapid glacial retreats over the past 25 years have exposed extensive new areas of outcrop exposure in this highly prospective region • Lastly, Aben's technical team has spent over a year analyzing and reinterpreting the historical exploration and geological data with the help of structural geologists to get a better understanding of the existing targets and high grade gold mineralization at the project 10 Forrest Kerr Gold Project – A New Look
  • 11.
    • Aben’s flagshipgold project totals 23,000 hectares located in a world- class gold district, B.C.’s Golden Triangle • Acquisition through option agreements of the three properties that make up the Forest Kerr Project • Significant historic work has been performed across the whole project area including previous drilling that returned high grade gold drill intercepts • Data compilation study has been performed incorporating all historic data; regional scale approach to exploration and knowledge is now possible • First season of fieldwork and drilling included but not be limited to the testing of excellent drill results in historic holes:  Boundary Zone drill hole RG91-16 returned 33.4 g/t Au over 11m  Gossan Creek Zone has a large, relatively untested gold in soil anomaly extending over 3 km 11 Aben’s Forrest Kerr Gold Project – Highlights
  • 12.
    12 12 2017 Forrest KerrExploration Program
  • 13.
    Aben’s Forrest Kerr2017 Drill Results Highlights 13 First season of fieldwork and drilling has led to a significant discovery now called the North Boundary Zone. Significant assays returned: • FK17-04 returned 6.7 g/t (grams per tonne) Au, 6.4 g/t Ag and 0.9% Cu over 10.0 metres from 16.0 to 26.0 metres depth. Within this interval was a section which returned 18.9 g/t Au, 16.6 g/t Ag and 2.2% Cu over 3.0 metres. • FK17-05 returned a broad intercept of 1.2 g/t Au, 1.8 g/t Ag and 0.21% Cu over 122 metres that includes 10.9 g/t Au, 14.6 g/t Ag and 1.5% Cu over 12 metres with a high grade core of 21.5 g/t Au, 28.5 g/t Ag and 3.1% Cu over 6 metres. • FK17-06 returned 0.51 g/t Au, 1.03 g/t Ag and 0.1% Cu over 94 metres including 2.91 g/t Au, 5.2 g/t Ag and 0.6% Cu over 14 metres. • Boundary Zone mineralization remains open in multiple directions with numerous soil geochemical anomalies and geophysical targets yet to be drill-tested. Aben will aggressively target the new discovery in 2018 with drilling and a focused geological ground program. • The zone displays a high degree of continuity for gold, silver and copper mineralization and is open to the East, West, North and down-dip. 2017 drilling has shown that base and precious metal mineralization is combined in both a high grade core and across broad intervals. 13
  • 14.
  • 15.
  • 16.
  • 17.
    17 17 2017 Forrest KerrSoil Sampling Exploration
  • 18.
    • Aben hasoption to earn up to 80% of Chico Gold Project 125 kilometres east of La Ronge, Saskatchewan and 40 kilometres south of SSR Mining’s Seabee/Santoy mine complex; workable all year round • Seabee/Santoy achieved highest annual gold production in 26 year history in 2016 @ 77,640 ounces from feed averaging 7.91 g/t Au • SSR Mining acquired Seabee/Santoy through its acquisition of Claude Resources in May 2016 with deal valued at $337 million • Chico project has the same structural features as Seabee and Santoy deposits and Chico trend extends over 1.5 km:  Shear hosted gold bearing quartz veining in secondary splays  Multi-episodic tension gash, ribbon and sheeted quartz vein arrays  Gabbro and granite host rocks  Positive gold, copper and silver geochemical associations  Potassic, carbonate, hematite, calc-silicate and silica alteration 18 18 Chico Gold Project – Highlights
  • 19.
    • Significant, shallowgold intercepts in all historic holes drilled including:  0.424 oz/ton Au over 0.4m at Chico showing  0.281 oz/ton Au over 2.0m at Royex • Over 100 samples from Chico have graded > 500 ppb Au in eight trenched areas; historic and 2016 soil samples consistently anomalous along Chico trend with up to 4,523 ppb Au • Completed IP Geophysical surveys to help refine identify additional targets • Project is drill ready and drilling permits have been obtained for potential winter 2018 drill program:  Drill along strike and to depth near previous high grade drill intercepts  Drill test soil/rock geochemical anomalies and intersecting mineralized vectors  Follow up on 2016 geochemical anomalies in context of new structural interpretation and geophysical data 19 19 Chico Gold Project – Previous Exploration and Future Plans
  • 20.
    Chico 2016 AirborneGeophysics • Effective in delineating diorite/gabbro lithology Total Magnetics Vertical Gradient Magnetics 20
  • 21.
    Chico Project 3DChargeability Anomaly 21 21
  • 22.
    Chico / Seabee/ Santoy Similarities • Shear hosted gold bearing quartz veining in secondary splays • Multi-episodic tension gash, ribbon and sheeted quartz vein arrays • Gabbro and granite host rocks • Positive gold, copper and silver geochemical associations • Potassic, carbonate, hematite, calc- silicate and silica alteration 22
  • 23.
    Future Work atChico • Project is drill ready – drill permit is being renewed and will be ready for February drill program – Along strike and to depth near previous high grade intercepts – Soil/rock geochemical anomalies – intersecting mineralized vectors • IP Geophysical survey has been completed over entire shear zones • Follow up 2016 geochemical anomalies in context of new structural interpretation and geophysical data • Drill geochemical and co-responding geophysical anomalies 23
  • 24.
    24 • Aben ownsa 100% interest in the 18,314 acre Justin Gold Project in southeast Yukon adjacent to Golden Predator’s 3 Aces project • The property has the potential to host both high-grade and bulk- tonnage gold zones within three different styles of mineralization: epithermal, skarn and sediment-hosted • Wide spread mineralization across property in a NNW trending anomaly measuring 3.5 km long and 0.5 km wide encompassing the Confluence, Main, Kangas, and POW Zones • Previous drilling encountered gold mineralization in holes drilled on the POW Zone; discovery of a greenfields Intrusive Related Gold System (IRGS) in 2011 drilling 24 Justin Gold Project, Yukon Territory
  • 25.
    25 • Both phasesof mineralization display geochemical affinity to an Intrusion Related Gold System and indicates that the mineralizing system was long-lived; notable IRGS deposits within Tintina Gold Belt include Kinross' Fort Knox operation in Alaska and Victoria Gold’s Eagle Gold Deposit • A total of 4,014 metres was drilled in 19 holes during the 2011 & 2012 field seasons with 10 drill holes successfully intersecting gold mineralization • Significant drill results include hole JN11009 with 2.47 g/t Au over 21m within 60m of 1.19 g/t Au, and hole JN12011 with 46.4m of 1.49 g/t Au • The POW Zone exhibits strong continuity of mineralization and remains open in all directions 25 25 Justin Gold Project – POW Zone Discovery • Multi-phase precious metal mineralization has been discovered in the POW Zone: contact metamorphic skarn (massive replacement style mineralization) and structurally controlled stockwork vein hosted mineralization
  • 26.
    Justin Gold Project– NEW Gold-bearing Vein System; LOST ACE ZONE 26 • Lost Ace Zone is located 2 kilometres along strike from POW Zone • Gold-bearing vein system occurs in a geologic setting that is very similar to mineralization present on Golden Predator’s 3 Aces Project located immediately NW of the Justin Claim Group • Gold grain count from a 3.8 kg bulk sample located 115 metres upslope from the Lost Ace Zone returned 1135 visible gold grains of which 1049 gold grains were classified as pristine suggesting close proximity to lode source 26
  • 27.
    CONTACT INFO. Jim Pettit:President & CEO Don Myers: Investor Relations Suite 1610, 777 Dunsmuir Street Vancouver, BC, V7Y 1K4, CANADA Tel: (604) 687-3376 Fax: (604) 687-3119 Toll Free: 1-800-567-8181 Web Site: www.abenresources.com Email: info@abenresources.com 27