SlideShare a Scribd company logo
Ward#14c Kacke Wala Kot Adu Dist MuzaffarGarh
OBJECTIVE
A challenging position in an organization that seeks employees with potential for growth and
advancement
PROFFESIONAL EXPERIENCE
CURRENTLY WORKING AT PAKITEX BOARDS LIMITED
INCHARGE HSE
Location: PORT QASIM KARACHI
Total Experience: 08 Years
Achievement: 5.6 Millions Safe Man-hours
PREVIOUS EXPERIENCE
 Worked as a In charge HSE at DESCON ENGINEERING LIMITED (KARACHI MANUFACTURING
WORKS) from April, 14, 2009 to May, 14, 2013 in this duration We have successfully achieved 1.85 millions
safe manhours without LTI.
 Worked as a HSE Assistant in Dyconix Engineering Limited at Pak Arab Fertilizer HRSG Project from
Oct 2008 to Mar 2009.
 Worked as an Assistant Supervisor HSE in Associated Constructors Ltd at Atlas Power Plant sheikhu Pura Project
from Aug 2008 to Sep 2008.
 Worked as a HSE Assistant in DESCON Engineering Limited at Kachi Kanal Project Kot adu from Jan
2008 to Aug 2008.
 Worked as a HSE Assistant in DESCON Engineering Limited at Taunsa Barrage Project Kot Adu from
Apr 2006 to Aug 2007
PROJECTS IN DESCON KARACHI MANUFACTURING WORKS
Manufacturing of Heat Exchangers & Vessels National Oil Refinery Karachi Pakistan
Manufacturing of Wind Tower Project # 6918 FFC Energy Limited Pakistan
Manufacturing of Gas Pipe Lines Project # 6915 BHP Bulletin Zamzama Gas Fields Pakistan
Manufacturing of S.S. Vessels & Silos Project # 7422 LOTTE Pakistan PPTA
Manufacturing of Water Holding Tanks Project 7421 British Petroleum Pakistan
Manufacturing of Bucket Elevators Kiln project #6908 Kuwait Cement Company
Manufacturing of Structure Project # 6907 ENGRO Chemicals Pakistan
Manufacturing of Stainless Steel Vessels PPTA Pakistan Port Qasim Karachi
PROFESSIONAL CERTIFICATION
 Corporate Occupational Health & Safety diploma from Karachi University
 Building Winning Team
 Diploma of IOSH Managing Safely
 ISO-14001:2004 Environmental Management Systemand Environmental Protection Act, 1997.
 Safety Standards, OHSAS-18001:2007, Risk assessment and OH&S Management Auditing System.
 Fire Prevention & Control fire Emergency & Rescue Operation.
 Basic Fire Fighting Fire Management Training Course
 Three months Computer Course
QUALIFICATION
 D.A.E Mechanical

More Related Content

Similar to Abdul Rouf Resume

Ramesh Kumar Sharma
Ramesh Kumar SharmaRamesh Kumar Sharma
Ramesh Kumar Sharma
RAMESH KUMAR SHARMA
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016
ANIYAN KUNJU
 
C V farhat_abbas
C V farhat_abbasC V farhat_abbas
C V farhat_abbas
Farhat abbas
 
HSE ENGINEER JIBRAN A.
HSE ENGINEER JIBRAN A.HSE ENGINEER JIBRAN A.
HSE ENGINEER JIBRAN A.
jibran ansari
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
Mohsin Ali Siyal
 
Detailed Profile K Soma Sekhar
Detailed Profile K Soma SekharDetailed Profile K Soma Sekhar
Detailed Profile K Soma Sekhar
Kaladi Soma Sekhar
 
CV Piping
CV PipingCV Piping
CV Piping
Malik Idrees
 
Saeed rasool cv
Saeed rasool cvSaeed rasool cv
Saeed rasool cv
SaEeD RaSoOL Ch
 
SAEED RASOOL CV
SAEED RASOOL CVSAEED RASOOL CV
SAEED RASOOL CV
SaEeD RaSoOL Ch
 
H P SINHA FORM EHS Practitioner Resume
H P SINHA FORM EHS Practitioner ResumeH P SINHA FORM EHS Practitioner Resume
H P SINHA FORM EHS Practitioner Resume
Dr. Harendra Prasad Sinha, PhD
 
P.K Gafoor. CV
P.K Gafoor. CVP.K Gafoor. CV
P.K Gafoor. CV
Gafoor kaladiyil
 
saad-ali-cv-vvvvvv1-1
saad-ali-cv-vvvvvv1-1saad-ali-cv-vvvvvv1-1
saad-ali-cv-vvvvvv1-1
saad Ali
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
Amit Singh
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
Amit Singh
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
Thangamani S
 
Adil Nawab CV
Adil Nawab CVAdil Nawab CV
Adil Nawab CV
Adil Nawab
 
CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016
Habib ur Rehman Babar
 
RESUME SATYENDRA YADAV planning engineer (2)
RESUME SATYENDRA YADAV planning engineer (2)RESUME SATYENDRA YADAV planning engineer (2)
RESUME SATYENDRA YADAV planning engineer (2)
satyendra yadav
 
assistance engineer rsume
assistance engineer  rsumeassistance engineer  rsume
assistance engineer rsume
rajendran ramkumar
 
DES-CV-Farhan
DES-CV-FarhanDES-CV-Farhan
DES-CV-Farhan
Farhan Aslam
 

Similar to Abdul Rouf Resume (20)

Ramesh Kumar Sharma
Ramesh Kumar SharmaRamesh Kumar Sharma
Ramesh Kumar Sharma
 
AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016AK-BIODATA-Sep-2016
AK-BIODATA-Sep-2016
 
C V farhat_abbas
C V farhat_abbasC V farhat_abbas
C V farhat_abbas
 
HSE ENGINEER JIBRAN A.
HSE ENGINEER JIBRAN A.HSE ENGINEER JIBRAN A.
HSE ENGINEER JIBRAN A.
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
Detailed Profile K Soma Sekhar
Detailed Profile K Soma SekharDetailed Profile K Soma Sekhar
Detailed Profile K Soma Sekhar
 
CV Piping
CV PipingCV Piping
CV Piping
 
Saeed rasool cv
Saeed rasool cvSaeed rasool cv
Saeed rasool cv
 
SAEED RASOOL CV
SAEED RASOOL CVSAEED RASOOL CV
SAEED RASOOL CV
 
H P SINHA FORM EHS Practitioner Resume
H P SINHA FORM EHS Practitioner ResumeH P SINHA FORM EHS Practitioner Resume
H P SINHA FORM EHS Practitioner Resume
 
P.K Gafoor. CV
P.K Gafoor. CVP.K Gafoor. CV
P.K Gafoor. CV
 
saad-ali-cv-vvvvvv1-1
saad-ali-cv-vvvvvv1-1saad-ali-cv-vvvvvv1-1
saad-ali-cv-vvvvvv1-1
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
AMIT KUMAR (3)
AMIT KUMAR (3)AMIT KUMAR (3)
AMIT KUMAR (3)
 
Thangamani CV -Sept 2016
Thangamani CV -Sept 2016Thangamani CV -Sept 2016
Thangamani CV -Sept 2016
 
Adil Nawab CV
Adil Nawab CVAdil Nawab CV
Adil Nawab CV
 
CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016CV Engr Habib ur Rehman Babar August 26, 2016
CV Engr Habib ur Rehman Babar August 26, 2016
 
RESUME SATYENDRA YADAV planning engineer (2)
RESUME SATYENDRA YADAV planning engineer (2)RESUME SATYENDRA YADAV planning engineer (2)
RESUME SATYENDRA YADAV planning engineer (2)
 
assistance engineer rsume
assistance engineer  rsumeassistance engineer  rsume
assistance engineer rsume
 
DES-CV-Farhan
DES-CV-FarhanDES-CV-Farhan
DES-CV-Farhan
 

Abdul Rouf Resume

  • 1. Ward#14c Kacke Wala Kot Adu Dist MuzaffarGarh OBJECTIVE A challenging position in an organization that seeks employees with potential for growth and advancement PROFFESIONAL EXPERIENCE CURRENTLY WORKING AT PAKITEX BOARDS LIMITED INCHARGE HSE Location: PORT QASIM KARACHI Total Experience: 08 Years Achievement: 5.6 Millions Safe Man-hours PREVIOUS EXPERIENCE  Worked as a In charge HSE at DESCON ENGINEERING LIMITED (KARACHI MANUFACTURING WORKS) from April, 14, 2009 to May, 14, 2013 in this duration We have successfully achieved 1.85 millions safe manhours without LTI.  Worked as a HSE Assistant in Dyconix Engineering Limited at Pak Arab Fertilizer HRSG Project from Oct 2008 to Mar 2009.  Worked as an Assistant Supervisor HSE in Associated Constructors Ltd at Atlas Power Plant sheikhu Pura Project from Aug 2008 to Sep 2008.  Worked as a HSE Assistant in DESCON Engineering Limited at Kachi Kanal Project Kot adu from Jan 2008 to Aug 2008.  Worked as a HSE Assistant in DESCON Engineering Limited at Taunsa Barrage Project Kot Adu from Apr 2006 to Aug 2007 PROJECTS IN DESCON KARACHI MANUFACTURING WORKS Manufacturing of Heat Exchangers & Vessels National Oil Refinery Karachi Pakistan Manufacturing of Wind Tower Project # 6918 FFC Energy Limited Pakistan Manufacturing of Gas Pipe Lines Project # 6915 BHP Bulletin Zamzama Gas Fields Pakistan Manufacturing of S.S. Vessels & Silos Project # 7422 LOTTE Pakistan PPTA Manufacturing of Water Holding Tanks Project 7421 British Petroleum Pakistan Manufacturing of Bucket Elevators Kiln project #6908 Kuwait Cement Company Manufacturing of Structure Project # 6907 ENGRO Chemicals Pakistan Manufacturing of Stainless Steel Vessels PPTA Pakistan Port Qasim Karachi PROFESSIONAL CERTIFICATION  Corporate Occupational Health & Safety diploma from Karachi University  Building Winning Team  Diploma of IOSH Managing Safely  ISO-14001:2004 Environmental Management Systemand Environmental Protection Act, 1997.  Safety Standards, OHSAS-18001:2007, Risk assessment and OH&S Management Auditing System.  Fire Prevention & Control fire Emergency & Rescue Operation.  Basic Fire Fighting Fire Management Training Course  Three months Computer Course QUALIFICATION  D.A.E Mechanical