This document analyzes the historic evolution of tiered electricity rates in California. It discusses how rates were regulated prior to PURPA in 1978 and the introduction of time-of-use pricing. It then covers the introduction of competition through AB 1890 in 1996 and the subsequent energy crisis. AB 1X was passed in 2001 in response, guaranteeing rate recovery and laying the groundwork for tiered rates. The document examines how tiered rates have changed over time and been used to fund social programs and subsidies.