SlideShare a Scribd company logo
1 of 1
Download to read offline
H
G
F
E
123
D
C
B
A
4568 7
NOTES:
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
APPRCHK'DREV DATE
REVISIONS
DESCRIPTION
IT WAS PRODUCED AND IS SUBJECT TO RECALL AT ANY TIME.
WRITTEN CONSENT IS EXPRESSLY PROHIBITED.
ANY USE, REPRODUCTION, OR DISCLOSURE TO OTHERS WITHOUT
THIS DRAWING IS TO BE USED ONLY FOR WORK FOR WHICH
DWG NO
TITLE
SIZE
PROJECT #
FILE:
BY
DATE
SCALE:
SHEET OF
FIRM INFO
7540 Windsor Drive, Suite 311
Allentown, PA 18195 USA
Tel: 610.366.1744
DRAWN CHECKED APPROVED
C.R. Bard, Inc.
730 Central Avenue
Murray Hill, NJ 07974
2"
2"
2"
6"
HV-18
1"
1" 1"
24" MW
HV-09
1"
HV-08
1"
SET @
4" WC
HV-10
1"
1/2"V
2"
SET @
14" WC
-2" WC
SET @
1 PSIG
3"
2"
1 1/2"
HV-20
1/4"
TK-701
NOTE 12"
HV-27
2"
2"
2"
6"
HV-21
1"
1" 1"
24" MW
PCV
05
HV-12
1"
HV-11
1"
SET @
4" WC
HV-13
1"
1/2"V
2"
SET @
14" WC
-2" WC
SET @
1 PSIG
1 1/2"
HV-23
1/4"
TK-702
2"
24"MW
HV-28
1"N2
1"N2
2"
2"
2"
6"
HV-24
1"
1" 1"
24" MW
PCV
06
HV-15
1"
HV-14
1"
SET @
4" WC
HV-16
1"
1/2"V
2"
SET @
14" WC
-2" WC
SET @
1 PSIG
HV-25
3"
2"
1 1/2"
HV-26
1/4"
TK-703
NOTE 12"
24" MW
HV-29
XV
03
XY
03
1"N2
PCV
07
HV-02
PI
07
HV-01
HV-03
F-700
NITROGEN
HV-06
1"
HV-05
1"
HV-04
1"
P-703
YC
703
HV-34 CV-03
P-702
HV-32 CV-02
P-701
HV-30 CV-01
XYLENE (DISTILLED)
581-PID-702
XYLENE (VIRGIN)
581-PID-702
HEPTANE
581-PID-606
HV-36CV-04
F-701
HV-31
F-702
HV-33
F-703
HV-35
BULK HEPTANE
12,000 GALLON
BULK XYLENE (VIRGIN)
12,000 GALLON
BULK XYLENE (DISTILLED)
12,000 GALLON
XYLENE (DISTILLED)
581-PID-703
XYLENE (D)
N2
FUTURE TANK TK-704
581-PID-701-D.dwg
581
NONE
D
PIPING & INSTRUMENTATION DIAGRAM
ROCM BUILDING 4
AHB SHK
TANK FARM - BULK CHEMICALS
581-PID-701 11/25/14
1 1
A 04/09/14 SCHEMATIC DESIGN DKS SHK
3"
2"
NOTE 1
24"MW
NC
B 10/01/14 REVISED PER ROCM 3 DESIGN DEE SHK
C 11/01/14 REVISED PER PHA DEE SHK
1. DIP PIPE TO TERMINATE MAXIMUM OF 6" FROM BOTTOM OF TANK.
DIP PIPE TO HAVE A 1/8" ANTI-SIPHON HOLE.
2. CONTROL PANEL LOCATED IN TRUCK LOADING/UNLOADING AREA.
3. ALL EQUIPMENT MUST BE GROUNDED AND ALL PROCESS
LINES ELECTRICALLY BONDED.
4. NITROGEN GAS USED TO BLOW OUT LINES FOLLOWING TRANSFER.
5. HOSE EQUIPPED WITH UNIVERSAL (CHICAGO) FITTINGS.
6. SEE DWG 581-PID-704 FOR PANEL DETAILS.
7. CONNECTION FOR PORTABLE DOUBLE DIAPHRAGM AIR PUMP.
8. OTHER E-STOPS ARE TO BE LOCATED IN THE MIX ROOM AND NEAR
THE MEC DIP TANKS.
9. CAM & GROOVE ADAPTER WITH DUST COVER.
COMPRESSED AIR 1"
PCV
08
P-706
HV-49
P-705
HV-47
P-704
YC
704
HV-45
PI
09
HV-42HV-41
HV-40
CV-07
CV-08
1"x3/4"
D - OWNER REVIEW - -
NOT FOR
CONSTRUCTION
NOTE 9
NOTE 9
NOTE 9
GROUND
GROUND
GROUNDGROUND
NOTE 7
PCV
04
PI
08
PI
10
YC
705
YC
706
PI
11
XV
02
XY
02
YC
702
XV
01
XY
01
YC
701
1 1/2"-C7-00
2"-C7-00
1 1/2"-XYLV-00
2"-XYLV-00
2"-XYLD-00
XV
06
2"-XYLV-00
3"-C7-00
NOTE 8
LAHH
01
TK-701
LAH
01
TK-701
XL
01
PU-704
LI
01
TK-701
HS
01
S/S
PU-704
XL
04
XV-04
HS
04
O/C
XV-04
LAH
02
TK-702
LAHH
02
TK-702
LI
02
TK-702
XL
02
PU-705
XL
05
XV-05
LAH
03
TK-703
LAHH
03
TK-703
LI
03
TK-703
XL
03
PU-706
HS
02
S/S
PU-705
HS
05
O/C
XV-05
HS
03
S/S
PU-706
XL
06
XV-06
HS
06
O/C
XV-06
TRUCK LOADING/UNLOADING STATION
HV-07
1"
1"x 3/4"
NOTE 5
HV-39
3/4"x1/2"
NOTE 5
HV-43
HV-48HV-46
HV-37CV-05
HV-38CV-06
HV-44
NOTE 7
1 1/2"-XYLD-00

More Related Content

What's hot

SHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand GrinderSHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand GrinderRussell Cantos
 
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics Trade
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics TradeInstruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics Trade
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics TradeOptics-Trade
 
PITOL GRIPSLIDING HOLDER-1
PITOL GRIPSLIDING HOLDER-1PITOL GRIPSLIDING HOLDER-1
PITOL GRIPSLIDING HOLDER-1SYED BAKHTIARY
 
Kinetic Marine Hydraulic Ram DRW.PDF
Kinetic Marine Hydraulic Ram DRW.PDFKinetic Marine Hydraulic Ram DRW.PDF
Kinetic Marine Hydraulic Ram DRW.PDFArran Crosland
 
High Voltage Drawing Package.PDF
High Voltage Drawing Package.PDFHigh Voltage Drawing Package.PDF
High Voltage Drawing Package.PDFLansing Wei
 

What's hot (12)

400w single supply btl ucd
400w single supply btl ucd400w single supply btl ucd
400w single supply btl ucd
 
SHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand GrinderSHOP_DRAWING Hand Grinder
SHOP_DRAWING Hand Grinder
 
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics Trade
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics TradeInstruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics Trade
Instruction Manual | Primary Arms SLX3.5 4-14x44 FFP riflescope | Optics Trade
 
Speed Reducer
Speed ReducerSpeed Reducer
Speed Reducer
 
ButterflyValveAssemblyDesign
ButterflyValveAssemblyDesignButterflyValveAssemblyDesign
ButterflyValveAssemblyDesign
 
PITOL GRIPSLIDING HOLDER-1
PITOL GRIPSLIDING HOLDER-1PITOL GRIPSLIDING HOLDER-1
PITOL GRIPSLIDING HOLDER-1
 
Offset Guid.PDF
Offset Guid.PDFOffset Guid.PDF
Offset Guid.PDF
 
A18530SR
A18530SRA18530SR
A18530SR
 
MAB Bottle Crusher.PDF
MAB Bottle Crusher.PDFMAB Bottle Crusher.PDF
MAB Bottle Crusher.PDF
 
Kinetic Marine Hydraulic Ram DRW.PDF
Kinetic Marine Hydraulic Ram DRW.PDFKinetic Marine Hydraulic Ram DRW.PDF
Kinetic Marine Hydraulic Ram DRW.PDF
 
Termometro
TermometroTermometro
Termometro
 
High Voltage Drawing Package.PDF
High Voltage Drawing Package.PDFHigh Voltage Drawing Package.PDF
High Voltage Drawing Package.PDF
 

Similar to 581-PID-701-D-581b-PID-701

vent option from vapor return line to flare.pdf
vent option from vapor return line to flare.pdfvent option from vapor return line to flare.pdf
vent option from vapor return line to flare.pdfMashRaisa
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTRene Aguilar
 
MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10Vijay Kumar
 
HXT Gasket installtion tool
HXT Gasket installtion toolHXT Gasket installtion tool
HXT Gasket installtion toolEarl Schneider
 
How a Blue Print works
How a Blue Print worksHow a Blue Print works
How a Blue Print worksGeoff Hunt
 
FEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTREFEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTRETokunbo Akinsara
 
Miata water outlet base
Miata water outlet baseMiata water outlet base
Miata water outlet baseJoseph Legan
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specificationskristinemassey
 
Goebel Heavy Duty 90 degree TransmissionR1d
Goebel Heavy Duty 90 degree TransmissionR1dGoebel Heavy Duty 90 degree TransmissionR1d
Goebel Heavy Duty 90 degree TransmissionR1dRobert Riley
 
Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Wuillian Medrano
 
Portfolio Final Edit.pdf
Portfolio Final Edit.pdfPortfolio Final Edit.pdf
Portfolio Final Edit.pdfFinaDamastuti1
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015Javier Pena
 
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENTRene Aguilar
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKNoel Carroll
 

Similar to 581-PID-701-D-581b-PID-701 (19)

vent option from vapor return line to flare.pdf
vent option from vapor return line to flare.pdfvent option from vapor return line to flare.pdf
vent option from vapor return line to flare.pdf
 
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 6 - LOT 1 PROPOSED DEVELOPMENT
 
MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
YD-CTS-06
YD-CTS-06YD-CTS-06
YD-CTS-06
 
HXT Gasket installtion tool
HXT Gasket installtion toolHXT Gasket installtion tool
HXT Gasket installtion tool
 
How a Blue Print works
How a Blue Print worksHow a Blue Print works
How a Blue Print works
 
FEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTREFEEDER & GRIZZLY STEEL STRUCTRE
FEEDER & GRIZZLY STEEL STRUCTRE
 
PV Array
PV ArrayPV Array
PV Array
 
Miata water outlet base
Miata water outlet baseMiata water outlet base
Miata water outlet base
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Recycled water project draft plans and specifications
Recycled water project draft plans and specificationsRecycled water project draft plans and specifications
Recycled water project draft plans and specifications
 
Goebel Heavy Duty 90 degree TransmissionR1d
Goebel Heavy Duty 90 degree TransmissionR1dGoebel Heavy Duty 90 degree TransmissionR1d
Goebel Heavy Duty 90 degree TransmissionR1d
 
Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower Revit Steel Shop Drawings - Tower
Revit Steel Shop Drawings - Tower
 
Portfolio Final Edit.pdf
Portfolio Final Edit.pdfPortfolio Final Edit.pdf
Portfolio Final Edit.pdf
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015
 
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENTDESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENT
DESERT SPRINGS UNIT 3 - LOT 1 PROPOSED DEVELOPMENT
 
6056996 003
6056996 0036056996 003
6056996 003
 
EAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORKEAST SITRA VILLAGE 2 FOUL NETWORK
EAST SITRA VILLAGE 2 FOUL NETWORK
 

581-PID-701-D-581b-PID-701

  • 1. H G F E 123 D C B A 4568 7 NOTES: 8 7 6 5 4 3 2 1 A B C D E F G H APPRCHK'DREV DATE REVISIONS DESCRIPTION IT WAS PRODUCED AND IS SUBJECT TO RECALL AT ANY TIME. WRITTEN CONSENT IS EXPRESSLY PROHIBITED. ANY USE, REPRODUCTION, OR DISCLOSURE TO OTHERS WITHOUT THIS DRAWING IS TO BE USED ONLY FOR WORK FOR WHICH DWG NO TITLE SIZE PROJECT # FILE: BY DATE SCALE: SHEET OF FIRM INFO 7540 Windsor Drive, Suite 311 Allentown, PA 18195 USA Tel: 610.366.1744 DRAWN CHECKED APPROVED C.R. Bard, Inc. 730 Central Avenue Murray Hill, NJ 07974 2" 2" 2" 6" HV-18 1" 1" 1" 24" MW HV-09 1" HV-08 1" SET @ 4" WC HV-10 1" 1/2"V 2" SET @ 14" WC -2" WC SET @ 1 PSIG 3" 2" 1 1/2" HV-20 1/4" TK-701 NOTE 12" HV-27 2" 2" 2" 6" HV-21 1" 1" 1" 24" MW PCV 05 HV-12 1" HV-11 1" SET @ 4" WC HV-13 1" 1/2"V 2" SET @ 14" WC -2" WC SET @ 1 PSIG 1 1/2" HV-23 1/4" TK-702 2" 24"MW HV-28 1"N2 1"N2 2" 2" 2" 6" HV-24 1" 1" 1" 24" MW PCV 06 HV-15 1" HV-14 1" SET @ 4" WC HV-16 1" 1/2"V 2" SET @ 14" WC -2" WC SET @ 1 PSIG HV-25 3" 2" 1 1/2" HV-26 1/4" TK-703 NOTE 12" 24" MW HV-29 XV 03 XY 03 1"N2 PCV 07 HV-02 PI 07 HV-01 HV-03 F-700 NITROGEN HV-06 1" HV-05 1" HV-04 1" P-703 YC 703 HV-34 CV-03 P-702 HV-32 CV-02 P-701 HV-30 CV-01 XYLENE (DISTILLED) 581-PID-702 XYLENE (VIRGIN) 581-PID-702 HEPTANE 581-PID-606 HV-36CV-04 F-701 HV-31 F-702 HV-33 F-703 HV-35 BULK HEPTANE 12,000 GALLON BULK XYLENE (VIRGIN) 12,000 GALLON BULK XYLENE (DISTILLED) 12,000 GALLON XYLENE (DISTILLED) 581-PID-703 XYLENE (D) N2 FUTURE TANK TK-704 581-PID-701-D.dwg 581 NONE D PIPING & INSTRUMENTATION DIAGRAM ROCM BUILDING 4 AHB SHK TANK FARM - BULK CHEMICALS 581-PID-701 11/25/14 1 1 A 04/09/14 SCHEMATIC DESIGN DKS SHK 3" 2" NOTE 1 24"MW NC B 10/01/14 REVISED PER ROCM 3 DESIGN DEE SHK C 11/01/14 REVISED PER PHA DEE SHK 1. DIP PIPE TO TERMINATE MAXIMUM OF 6" FROM BOTTOM OF TANK. DIP PIPE TO HAVE A 1/8" ANTI-SIPHON HOLE. 2. CONTROL PANEL LOCATED IN TRUCK LOADING/UNLOADING AREA. 3. ALL EQUIPMENT MUST BE GROUNDED AND ALL PROCESS LINES ELECTRICALLY BONDED. 4. NITROGEN GAS USED TO BLOW OUT LINES FOLLOWING TRANSFER. 5. HOSE EQUIPPED WITH UNIVERSAL (CHICAGO) FITTINGS. 6. SEE DWG 581-PID-704 FOR PANEL DETAILS. 7. CONNECTION FOR PORTABLE DOUBLE DIAPHRAGM AIR PUMP. 8. OTHER E-STOPS ARE TO BE LOCATED IN THE MIX ROOM AND NEAR THE MEC DIP TANKS. 9. CAM & GROOVE ADAPTER WITH DUST COVER. COMPRESSED AIR 1" PCV 08 P-706 HV-49 P-705 HV-47 P-704 YC 704 HV-45 PI 09 HV-42HV-41 HV-40 CV-07 CV-08 1"x3/4" D - OWNER REVIEW - - NOT FOR CONSTRUCTION NOTE 9 NOTE 9 NOTE 9 GROUND GROUND GROUNDGROUND NOTE 7 PCV 04 PI 08 PI 10 YC 705 YC 706 PI 11 XV 02 XY 02 YC 702 XV 01 XY 01 YC 701 1 1/2"-C7-00 2"-C7-00 1 1/2"-XYLV-00 2"-XYLV-00 2"-XYLD-00 XV 06 2"-XYLV-00 3"-C7-00 NOTE 8 LAHH 01 TK-701 LAH 01 TK-701 XL 01 PU-704 LI 01 TK-701 HS 01 S/S PU-704 XL 04 XV-04 HS 04 O/C XV-04 LAH 02 TK-702 LAHH 02 TK-702 LI 02 TK-702 XL 02 PU-705 XL 05 XV-05 LAH 03 TK-703 LAHH 03 TK-703 LI 03 TK-703 XL 03 PU-706 HS 02 S/S PU-705 HS 05 O/C XV-05 HS 03 S/S PU-706 XL 06 XV-06 HS 06 O/C XV-06 TRUCK LOADING/UNLOADING STATION HV-07 1" 1"x 3/4" NOTE 5 HV-39 3/4"x1/2" NOTE 5 HV-43 HV-48HV-46 HV-37CV-05 HV-38CV-06 HV-44 NOTE 7 1 1/2"-XYLD-00