Operational Excellence diagnostic
Easier – Faster - Better
Practical implementation of 5S
Project approach and details of the implementation of the five "S" actions
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
2
Definition of 5S
 Seiri: Sort, separate the necessary from the unnecessary
 Seiton: Set in order
 Seiso: Shine, clean
 Seiketsu: Standardize
 Shitsuke: Sustain, self-discipline
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
3
5S benefits
The 5S method is actually much more than a cleaning technique. When it is used
according to its true intentions, the benefits are multiple:
cost reduction by eliminating unnecessary tools or parts (Seiri) or standardizing
them (Seiketsu)
 simplifying work and increasing productivity by reducing search times (Seiton)
 prevention of breakdowns by inspecting tools or machines during cleaning
(Seiso) and detecting any anomalies
 reduction of the risk of accidents, for example by avoiding the cluttering of
parts, or places made slippery by oil stains
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
4
Implementation of 5S - A project approach
 The implementation of 5S is visible, requires time and resources and will
change the working conditions of many people
 It therefore needs to be managed as a real change project with five fairly classic
steps
Diagnosis Prepare project ImplementationPilote
1. Identify areas for
improvement
2. Estimate the stakes
1. Define the project
objective and target
2. Select either the areas of
application and the areas
of improvement to be
implemented
3. Define a planning, a
project organization, a
budget
1. Train the project team and
staff
2. Implement actions in the
pilot area
3. Show savings
4. Improve the method
1. Deploy to the rest of the
perimeter
2. Train staff
3. Integrate into the
operational system
4. Measure and
communicate savings
Sustainability
1. Monitor and audit
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
5
The five steps of the project approach: steps 1 and 2
1. Diagnosis
 Identify current problems, areas for improvement and associated issues in the different areas of the defined scope
 (Continue) to show the value of implementing the 5S: this objective is generally achieved by showing managers the
results related to the first objective; it is essential to ensure support from management but also from middle
management who may still be reluctant to implement an approach that could be perceived as additional'cleaning'
tasks without much interest
2. Prepare the project
 Define the objective of the project and its target: define the purpose of the approach and the level of challenge or
expected savings
 Select either the application areas and areas of improvement to be implemented: the project may well cover only part
of the initial scope (e.g. some workshops and not others, production or maintenance...) or not seek to solve all the
problems identified. Choose the pilot.
 Define a planning, a project organization, a budget: define the implementation planning (what duration of pilot, what
durations per zone or per type of improvement...), what will be the implementation team and the roles and
responsibilities of each member, what monitoring mechanism, what is the necessary budget.
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
6
The five steps of the project approach: steps 3 to 5
3. Pilot
 Train the first people, the project team and the staff of the pilot area
 Implement the 5S on the pilot (see details below)
 Show savings: make the savings visible in order to show the interest of the process and motivate the team; check that the savings
correspond to the initial estimated savings
 Improve the method: the pilot is also used to test the implementation of the approach before deploying it in other areas
4. Implementation
 Train the rest of the staff as their zones are deployed
 Integrate into the operational system: integrate the 5S into operational life, managerial follow-up and support functions; for example in
team meetings, dashboards, training, etc.
 Measuring and communicating savings: an essential step to continue to demonstrate the value of the approach, from operational to
top management (who financed the approach)
5. Sustainability
 Monitor:
 At the beginning, monitor the effective integration into operational modes on a regular basis
 Then, manage the 5S like any other operational mode, integrated into the operating modes... i.e. on a continuous basis with 5S performance indicators
 Audit: set up an audit process
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
7
Implementation of the five "S" actions
The implementation of the five actions (Seiri: Sort; Seiton: Set in order; Seiso: Shine; Seiketsu:
Standardise; Shitsuke: Sustain) is carried out for the pilot area and then for each of the areas of
the deployment phase, with a preliminary preparation phase
The 5S can be used in different environments, in production plants or offices, so we use the word
"element" which can be a part, tool, object or other depending on the environment.
The implementation uses the same method regardless of the environment.
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
8
Implementation of actions: Preparation
For each area where implementation applies, for the pilot or deployment
 (Re)explain to the person in charge of the area concerned the whole process;
the site director must participate at least initially in this exchange to indicate
the importance of the process
 Train staff
 Ensure that at least one person from the team responsible for the area
concerned is involved in the work from start to finish
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
9
Diagram of the implementation of actions during the
project stages
Pilote Implementation Sustainability
• Prepare for temporary storage
• Test and monitor
• Discard the items to be removed
• Define storage areas
• Define the locations of each element
• Test and monitor
• Adjust and install the final supports
• Reference thorough cleaning
• Test cleaning and inspection and monitor
• Adjust
• Standardisation 1 - Start and Pilot
• Standardisation 2 - Ongoing implementation
• Integrate 5S into operational ways of working
• Conduct audits
Seri : Sort
Seiketsu : Standardise
Seiton : Set in order
Seitso : Shine
In parallel if
possible
Pilote
Pilote
Pilote
Implementation
Implementation
Implementation
Standardise
Shitsuke : Sustain
Shitsuke : Sustain
Shitsuke : Sustain
Shitsuke : Sustain
This is a logical diagram; the lengths of the arrows are not proportional to the duration of the activities
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
10
Implementation of actions: Sort (1/2)
1. Prepare for temporary storage
 Take pictures of the target area before removing its elements
 Define a place to temporarily store the elements that will be removed
 Prepare colour-coded labels to remove’, 'maybe remove ‘, 'replace’, 'repair'.
 Prepare handling equipment if necessary: box, trolley, pallet truck, etc.
2. Perform a first sorting
 Make one for the obvious elements, by moving the targeted elements into the storage area. If the
handling equipment is not suitable for sorting 'immediately', put the labels remove ‘.
 During this action, put the labels "maybe remove" in case of doubt
 Put labels for the other categories that are obvious (it is optional at this stage, but it is a saving for the
next steps)
 List the items put in this area for follow-up
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
11
Implementation of actions: Sort (2/2)
3. Test and monitor
 Install the monitoring board; define and install a visual monitoring board in the target area with three categories:
 “Remove” with two columns :
 one to leave comments if some people think that shouldn’t be removed
 one for those who have taken back or used an element of the area to be removed
 “Remove maybe" with four columns:
 The list of elements with the “remove maybe" labels
 Confirmed
 To be kept
 Comments on the report
 “Remove ideas" with two columns:
 one to write additional ideas for parts to be removed
 one to say why or add comments
 Give a week (or other depending on the organization) for people working on the area to comment, add parts to remove, or remove parts from the 'remove'
list
 Review the board and the area 'to be removed' (if elements have been included) and lead a team meeting
 Review all categories and discuss the adjustment of lists and items to be removed
 Take the opportunity to make a first team tour and ask their opinion on the approach and results of this first step.
 Estimate the savings of the removed items (estimate the frequency and cost of purchase if they remain in the list of items used)
4. Finalize: discard the items to be removed
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
12
Implementation of actions: Set in order (1/2)
1. Define storage areas
 Make a list of the elements to be stored for each sub-area (workshop, office, etc.) of the treated area
 For each element, ask the people who use them how often they are used (prepare columns day, week,
month, month, quarter, year, never to facilitate work); note the subpart of the treated area
 Estimate the volume of parts for each periodicity with one detail per sub-area
 For each frequency, identify possible storage locations in the area using the following guidelines:
 The closer the storage place is to the place of use, the more frequently it is used: every day, next to the person;
every week, in the surrounding area....
 The size of the site must be well dimensioned with more space than not enough (ease of search)
 Do not put the same type of element in two different places... but limit travel if two remote teams use the same
elements
 Review why the two teams are distant; this can mean a redefinition of physical flows and workstations (a reason to deploy the 5S
in a broader integrated Lean approach)
 Otherwise, it will be necessary to choose the best solution (to be discussed with the teams) between duplicating the tools or
increasing the travel
 Involve teams in the choices
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
13
Implementation of actions: Set in order (2/2)
2. Define the location of each element
 Collect the elements by search/use logic and according to specific constraints (safety, humidity...)
 Identify the necessary storage supports, standard (cabinet...) or to be manufactured (template...)
 prefer modular and flexible supports; one thing is for sure, there will be changes!
 If possible, do not purchase anything, or have any manufactured before the next test phase
 Further involve teams in the choices, especially for workstation elements
3. Test and monitor
 Define and implement monitoring means to obtain user feedback and start measuring the change (search and travel
time, productivity...)
 It is easy to get feedback for daily use and there will be at least two weekly iterations but higher uses will be more
random, so monitoring may need to be done later if the test phase is too long.
 Store each element in its place as defined and operate for at least two weeks.
4. Adjust and install the final supports
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
14
Implementation of actions: Shine
1. Do a thorough “reference” cleaning
 Take a picture of each area before cleaning
 Define cleaning and inspection instructions at the same time as cleaning:
 Cleaning instructions: frequencies, cleaning means, people who clean and specific instructions when necessary (disassembly, safety...)
 Inspection: In industrial (factory, warehouse, etc.) or technical (e. g. laboratory) environments, inspection is the greatest added value of cleaning because
it helps to prevent breakdowns or work incidents
 Doing it at the same time will allow to test the instructions during the next cleaning.
 Take reference photos
 Photos of the result AND anomalies (if observed) for each area with details for critical elements.
 Add them to cleaning and inspection instructions or other procedures (e. g. self maintenance)
2. Test cleaning and inspection
 Review cleaning and inspection instructions with area managers and adjust if necessary
 Define and implement monitoring means to obtain user feedback
 Carry out the test, if possible at the same time as the "Sort" stage in order to pool monitoring resources and reduce the pilot's total
time, unless this delays the test in the "Sort" stage too much
3. Adjust
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
15
Implementation of actions: Standardise
 This phase makes it possible to standardise the 5S approach but also provides an opportunity to
detect the lack of standardisation in operating procedures (format, level of detail, content)
 Inventory and Pilot Standardization
 Make an inventory of the different standards in terms of operating procedures in the different areas;
select or define a standard format; this phase must begin before describing the storage and cleaning
procedures
 Adjust the standard at the end of the pilot and ensure that all pilot documents or tools are standardised
 Possibly standardise the other procedures, "outside 5S".
 Implementation standardisation
 Each deployed area must apply the standards
 Nevertheless, adjustments can be made during deployment based on accumulated experience;
continuous improvement begins
©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18
16
Implementation of actions: Sustain
 Sustainability starting at the pilot phase
 The sustainability actions are already starting within the pilot since it is at this point that the results
measurements begin
 At the end of the pilot, an assessment is made to adjust and complete the measurement system before
deployment
 Sustainability during deployment
 The 5S approach is integrated into the existing performance monitoring tools and operational ways of
working of each deployed area: procedures, visual display, area indicators
 A progress dashboard of actions and results is consolidated as they are deployed
 Sustainability after deployment
 Results monitoring indicators are integrated into the management dashboards
 An audit process is defined, with a faster frequency at the beginning
Operational Excellence diagnostic
Easier – Faster - Better
Get more Operational
Excellence content on
www.wevalgo.com
Follow us on:
Linkedin
Twitter

More Related Content

What's hot

What's hot (7)

Tax Savings & Pitfalls for Manufacturers
Tax Savings & Pitfalls for ManufacturersTax Savings & Pitfalls for Manufacturers
Tax Savings & Pitfalls for Manufacturers
 
Work measurement
Work measurementWork measurement
Work measurement
 
Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)Industrial Engineering (Method Study and Work study)
Industrial Engineering (Method Study and Work study)
 
Work study
Work studyWork study
Work study
 
Work study
Work studyWork study
Work study
 
Cumulative and flyback timing
Cumulative and flyback timingCumulative and flyback timing
Cumulative and flyback timing
 
Modul 1 process planning and standard time calculation
Modul 1 process planning and standard time calculationModul 1 process planning and standard time calculation
Modul 1 process planning and standard time calculation
 

Similar to 5 s implementation

Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...viveksangwan007
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and OperationsAchal Gupta
 
Lean Management
Lean ManagementLean Management
Lean ManagementAshish Dev
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing CompanyIRJET Journal
 
IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET Journal
 
5S Presentation By Milan Mishra.pdf
5S Presentation By Milan Mishra.pdf5S Presentation By Milan Mishra.pdf
5S Presentation By Milan Mishra.pdfMilanMishra16
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
A036501014
A036501014A036501014
A036501014theijes
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2Ahmad Ammari
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods StudyJoseph Konnully
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET Journal
 

Similar to 5 s implementation (20)

Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and Operations
 
Lean Management
Lean ManagementLean Management
Lean Management
 
‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company‘5S’ Implementation in a Fasteners Manufacturing Company
‘5S’ Implementation in a Fasteners Manufacturing Company
 
PPC_UNIT - II.pptx
PPC_UNIT - II.pptxPPC_UNIT - II.pptx
PPC_UNIT - II.pptx
 
UNIT 2 - WORK STUDY
UNIT 2 -  WORK STUDYUNIT 2 -  WORK STUDY
UNIT 2 - WORK STUDY
 
Method study
Method studyMethod study
Method study
 
IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value Engineering
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
5S Presentation By Milan Mishra.pdf
5S Presentation By Milan Mishra.pdf5S Presentation By Milan Mishra.pdf
5S Presentation By Milan Mishra.pdf
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
A036501014
A036501014A036501014
A036501014
 
CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2CIS 2303 LO2 Part 2
CIS 2303 LO2 Part 2
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 

Recently uploaded

Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 

Recently uploaded (20)

Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 

5 s implementation

  • 1. Operational Excellence diagnostic Easier – Faster - Better Practical implementation of 5S Project approach and details of the implementation of the five "S" actions
  • 2. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 2 Definition of 5S  Seiri: Sort, separate the necessary from the unnecessary  Seiton: Set in order  Seiso: Shine, clean  Seiketsu: Standardize  Shitsuke: Sustain, self-discipline
  • 3. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 3 5S benefits The 5S method is actually much more than a cleaning technique. When it is used according to its true intentions, the benefits are multiple: cost reduction by eliminating unnecessary tools or parts (Seiri) or standardizing them (Seiketsu)  simplifying work and increasing productivity by reducing search times (Seiton)  prevention of breakdowns by inspecting tools or machines during cleaning (Seiso) and detecting any anomalies  reduction of the risk of accidents, for example by avoiding the cluttering of parts, or places made slippery by oil stains
  • 4. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 4 Implementation of 5S - A project approach  The implementation of 5S is visible, requires time and resources and will change the working conditions of many people  It therefore needs to be managed as a real change project with five fairly classic steps Diagnosis Prepare project ImplementationPilote 1. Identify areas for improvement 2. Estimate the stakes 1. Define the project objective and target 2. Select either the areas of application and the areas of improvement to be implemented 3. Define a planning, a project organization, a budget 1. Train the project team and staff 2. Implement actions in the pilot area 3. Show savings 4. Improve the method 1. Deploy to the rest of the perimeter 2. Train staff 3. Integrate into the operational system 4. Measure and communicate savings Sustainability 1. Monitor and audit
  • 5. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 5 The five steps of the project approach: steps 1 and 2 1. Diagnosis  Identify current problems, areas for improvement and associated issues in the different areas of the defined scope  (Continue) to show the value of implementing the 5S: this objective is generally achieved by showing managers the results related to the first objective; it is essential to ensure support from management but also from middle management who may still be reluctant to implement an approach that could be perceived as additional'cleaning' tasks without much interest 2. Prepare the project  Define the objective of the project and its target: define the purpose of the approach and the level of challenge or expected savings  Select either the application areas and areas of improvement to be implemented: the project may well cover only part of the initial scope (e.g. some workshops and not others, production or maintenance...) or not seek to solve all the problems identified. Choose the pilot.  Define a planning, a project organization, a budget: define the implementation planning (what duration of pilot, what durations per zone or per type of improvement...), what will be the implementation team and the roles and responsibilities of each member, what monitoring mechanism, what is the necessary budget.
  • 6. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 6 The five steps of the project approach: steps 3 to 5 3. Pilot  Train the first people, the project team and the staff of the pilot area  Implement the 5S on the pilot (see details below)  Show savings: make the savings visible in order to show the interest of the process and motivate the team; check that the savings correspond to the initial estimated savings  Improve the method: the pilot is also used to test the implementation of the approach before deploying it in other areas 4. Implementation  Train the rest of the staff as their zones are deployed  Integrate into the operational system: integrate the 5S into operational life, managerial follow-up and support functions; for example in team meetings, dashboards, training, etc.  Measuring and communicating savings: an essential step to continue to demonstrate the value of the approach, from operational to top management (who financed the approach) 5. Sustainability  Monitor:  At the beginning, monitor the effective integration into operational modes on a regular basis  Then, manage the 5S like any other operational mode, integrated into the operating modes... i.e. on a continuous basis with 5S performance indicators  Audit: set up an audit process
  • 7. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 7 Implementation of the five "S" actions The implementation of the five actions (Seiri: Sort; Seiton: Set in order; Seiso: Shine; Seiketsu: Standardise; Shitsuke: Sustain) is carried out for the pilot area and then for each of the areas of the deployment phase, with a preliminary preparation phase The 5S can be used in different environments, in production plants or offices, so we use the word "element" which can be a part, tool, object or other depending on the environment. The implementation uses the same method regardless of the environment.
  • 8. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 8 Implementation of actions: Preparation For each area where implementation applies, for the pilot or deployment  (Re)explain to the person in charge of the area concerned the whole process; the site director must participate at least initially in this exchange to indicate the importance of the process  Train staff  Ensure that at least one person from the team responsible for the area concerned is involved in the work from start to finish
  • 9. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 9 Diagram of the implementation of actions during the project stages Pilote Implementation Sustainability • Prepare for temporary storage • Test and monitor • Discard the items to be removed • Define storage areas • Define the locations of each element • Test and monitor • Adjust and install the final supports • Reference thorough cleaning • Test cleaning and inspection and monitor • Adjust • Standardisation 1 - Start and Pilot • Standardisation 2 - Ongoing implementation • Integrate 5S into operational ways of working • Conduct audits Seri : Sort Seiketsu : Standardise Seiton : Set in order Seitso : Shine In parallel if possible Pilote Pilote Pilote Implementation Implementation Implementation Standardise Shitsuke : Sustain Shitsuke : Sustain Shitsuke : Sustain Shitsuke : Sustain This is a logical diagram; the lengths of the arrows are not proportional to the duration of the activities
  • 10. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 10 Implementation of actions: Sort (1/2) 1. Prepare for temporary storage  Take pictures of the target area before removing its elements  Define a place to temporarily store the elements that will be removed  Prepare colour-coded labels to remove’, 'maybe remove ‘, 'replace’, 'repair'.  Prepare handling equipment if necessary: box, trolley, pallet truck, etc. 2. Perform a first sorting  Make one for the obvious elements, by moving the targeted elements into the storage area. If the handling equipment is not suitable for sorting 'immediately', put the labels remove ‘.  During this action, put the labels "maybe remove" in case of doubt  Put labels for the other categories that are obvious (it is optional at this stage, but it is a saving for the next steps)  List the items put in this area for follow-up
  • 11. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 11 Implementation of actions: Sort (2/2) 3. Test and monitor  Install the monitoring board; define and install a visual monitoring board in the target area with three categories:  “Remove” with two columns :  one to leave comments if some people think that shouldn’t be removed  one for those who have taken back or used an element of the area to be removed  “Remove maybe" with four columns:  The list of elements with the “remove maybe" labels  Confirmed  To be kept  Comments on the report  “Remove ideas" with two columns:  one to write additional ideas for parts to be removed  one to say why or add comments  Give a week (or other depending on the organization) for people working on the area to comment, add parts to remove, or remove parts from the 'remove' list  Review the board and the area 'to be removed' (if elements have been included) and lead a team meeting  Review all categories and discuss the adjustment of lists and items to be removed  Take the opportunity to make a first team tour and ask their opinion on the approach and results of this first step.  Estimate the savings of the removed items (estimate the frequency and cost of purchase if they remain in the list of items used) 4. Finalize: discard the items to be removed
  • 12. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 12 Implementation of actions: Set in order (1/2) 1. Define storage areas  Make a list of the elements to be stored for each sub-area (workshop, office, etc.) of the treated area  For each element, ask the people who use them how often they are used (prepare columns day, week, month, month, quarter, year, never to facilitate work); note the subpart of the treated area  Estimate the volume of parts for each periodicity with one detail per sub-area  For each frequency, identify possible storage locations in the area using the following guidelines:  The closer the storage place is to the place of use, the more frequently it is used: every day, next to the person; every week, in the surrounding area....  The size of the site must be well dimensioned with more space than not enough (ease of search)  Do not put the same type of element in two different places... but limit travel if two remote teams use the same elements  Review why the two teams are distant; this can mean a redefinition of physical flows and workstations (a reason to deploy the 5S in a broader integrated Lean approach)  Otherwise, it will be necessary to choose the best solution (to be discussed with the teams) between duplicating the tools or increasing the travel  Involve teams in the choices
  • 13. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 13 Implementation of actions: Set in order (2/2) 2. Define the location of each element  Collect the elements by search/use logic and according to specific constraints (safety, humidity...)  Identify the necessary storage supports, standard (cabinet...) or to be manufactured (template...)  prefer modular and flexible supports; one thing is for sure, there will be changes!  If possible, do not purchase anything, or have any manufactured before the next test phase  Further involve teams in the choices, especially for workstation elements 3. Test and monitor  Define and implement monitoring means to obtain user feedback and start measuring the change (search and travel time, productivity...)  It is easy to get feedback for daily use and there will be at least two weekly iterations but higher uses will be more random, so monitoring may need to be done later if the test phase is too long.  Store each element in its place as defined and operate for at least two weeks. 4. Adjust and install the final supports
  • 14. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 14 Implementation of actions: Shine 1. Do a thorough “reference” cleaning  Take a picture of each area before cleaning  Define cleaning and inspection instructions at the same time as cleaning:  Cleaning instructions: frequencies, cleaning means, people who clean and specific instructions when necessary (disassembly, safety...)  Inspection: In industrial (factory, warehouse, etc.) or technical (e. g. laboratory) environments, inspection is the greatest added value of cleaning because it helps to prevent breakdowns or work incidents  Doing it at the same time will allow to test the instructions during the next cleaning.  Take reference photos  Photos of the result AND anomalies (if observed) for each area with details for critical elements.  Add them to cleaning and inspection instructions or other procedures (e. g. self maintenance) 2. Test cleaning and inspection  Review cleaning and inspection instructions with area managers and adjust if necessary  Define and implement monitoring means to obtain user feedback  Carry out the test, if possible at the same time as the "Sort" stage in order to pool monitoring resources and reduce the pilot's total time, unless this delays the test in the "Sort" stage too much 3. Adjust
  • 15. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 15 Implementation of actions: Standardise  This phase makes it possible to standardise the 5S approach but also provides an opportunity to detect the lack of standardisation in operating procedures (format, level of detail, content)  Inventory and Pilot Standardization  Make an inventory of the different standards in terms of operating procedures in the different areas; select or define a standard format; this phase must begin before describing the storage and cleaning procedures  Adjust the standard at the end of the pilot and ensure that all pilot documents or tools are standardised  Possibly standardise the other procedures, "outside 5S".  Implementation standardisation  Each deployed area must apply the standards  Nevertheless, adjustments can be made during deployment based on accumulated experience; continuous improvement begins
  • 16. ©2017-2019Wevalgo.Allrightsreserved.Proprietaryandconfidential3-Oct-18 16 Implementation of actions: Sustain  Sustainability starting at the pilot phase  The sustainability actions are already starting within the pilot since it is at this point that the results measurements begin  At the end of the pilot, an assessment is made to adjust and complete the measurement system before deployment  Sustainability during deployment  The 5S approach is integrated into the existing performance monitoring tools and operational ways of working of each deployed area: procedures, visual display, area indicators  A progress dashboard of actions and results is consolidated as they are deployed  Sustainability after deployment  Results monitoring indicators are integrated into the management dashboards  An audit process is defined, with a faster frequency at the beginning
  • 17. Operational Excellence diagnostic Easier – Faster - Better Get more Operational Excellence content on www.wevalgo.com Follow us on: Linkedin Twitter

Editor's Notes

  1. 9